WHO'S WHO IN CONCRETE

The completed Val de Vie Berg River bridge

Creative use of precast Weighing 64 t each, 18 prestressed beams were employed during the construction of the Val de Vie Berg River bridge in the Western Cape, each measuring over 35 m long and 2 m high. Their manufacture required a creative mix design.

T

he large volume and tight spacing of the reinforcing steel, coupled with the presence of stressing cables, meant conventional concrete would not suffice and the local Chryso Southern Africa team worked in conjunction with the precast contractor to design, test and submit a selfcompacting concrete mix. Chryso Premia 310 superplasticiser and Chryso Dem Bio 10 release agent formed part of the solution for the successful casting of these beams and were also used in the project’s large facing panels, coping and culverts. Once all the beam strands were evenly stressed, readymix concrete was placed and

Close-up view of the precast facing panels and the prestressed beams

16 of the 18 prestressed beams in place between the abutments and central pier

a combination of external and poker vibration was used for compaction. This provided a good surface finish with minimal blow holes. After pouring, a tarpaulin was placed over the mould and steam was injected under the cover to accelerate hydration. Using this method, a strength of 40 MPa was achieved in 20 hours, enabling the production of one beam a day. The final strength required was 60 MPa, which was achieved within 28 days.

Off-shutter finish Before the casting process, Chryso Retarder paste was applied at the end of each beam shutter and the concrete washed off with water the following day after the shutter was removed. This created a rough, exposed aggregate finish that provided a

14

IMIESA May 2021

good bonding surface for the assembly of the bridge. The facing panels were also steamcured and were cast with a glass-smooth finish. They were attached using ‘fingers’, eliminating the use of visual fixing on the front face. Some panels were curved, such as those used for cladding the central viewing cove. Once all precast beams were in position, five diaphragm transverse beams were cast in situ between the precast beams. Permanent deck shutters, measuring 1.2 m by 300 mm by 50 mm, closed the remaining gaps between the precast beams, resting on recesses cast into the beams for that purpose. Readymix concrete using Chryso’s waterreducing plasticiser Chryso Plast Omega 126 was then poured on to the shutters to create the deck.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Updated specifications are needed to meet cement innovation

5min
pages 14-15

Speciality dozers for local landfill sites

3min
page 57

Vehicles & Equipment

2min
pages 55-56

Recycling

5min
pages 50-51

Building Systems

2min
page 54

Procurement

5min
pages 52-53

Innovative rehabilitation of a deep gulley

4min
pages 48-49

Environmental Engineering

5min
pages 46-47

Valuable systems upgrade for AECI Much Asphalt

2min
page 45

Roads & Bridges

2min
page 44

Smart devices predict unplanned downtime

2min
page 43

Pumps & Valves

1min
page 35

Real-time decision-making capabilities in construction

2min
page 42

Renewable Energy

4min
pages 36-37

Creating the future of life

2min
pages 38-39

Information & Communications Technology

4min
pages 40-41

Pipe Systems

2min
pages 33-34

MAPEI’s concrete additives –the proof is in the mix design

1min
page 24

Water for rural communities

2min
page 29

Making smart cities inclusive

3min
page 26

Africa Round-up

2min
page 25

Importance of water conservation in the built environment

2min
page 28

16 on Bree Street

4min
pages 22-23

Concrete pipes for sewerage and water systems

2min
page 21

Cover Story

9min
pages 8-11

SA refines precast reservoir construction

2min
page 20

Water quality in the concrete mix

3min
pages 12-13

Custom-made precast specialists provide solutions to industry

2min
page 19

Creative use of precast

2min
page 16

Updated specifications are needed to meet cement innovation

5min
pages 14-15

Paving and kerbing at the Mall of Thembisa

1min
pages 17-18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.