LA203_Spring2016_Portfolio

Page 1

BIN NAKATANI

Portfolio LA203L Spring 2016


TABLE OF CONTENT Project1 1 Project2 Project3 Project4


Project 1 Pieces and Parts

This project explored the basic landscape elements at a small scale of 2� by 2� wooden cubes. The siteless exploration allowed the pieces to be an experimental study of the relationship between the different components.


430

450

440

Project 2 Mapping and Recon Origin Stories

Partner: Diego Vazquez 12 PM

46

0

The goal of the next step was to study and explore the project site through physically occupying the site and research through other media. The data and information obtained was then overlayed and diagrammed over plan and section drawings. Through the process, few photographic techniques were applied for further explorations.

48

0

49

0

50

0

510 52

0

53

0

540 9:30AM - 9:45AM

46

26

18

15 550

11:55Am - 12:10PM

0

52 53 0

8’

1/16”=1’

0

8 PM

COOL

0

54

16’ 32’

WARM

WALKING AND BIKING ROUTES

=100,000 Families

LA203 | Bin Nakatani | Diego Vazquez


Built Frame

Narrative Sequence

Trivial Familiar


Project 3 Taxonomy of Emergent

Spatial Type Group Members:

HOLD Mound

Depre

ssion

Ramp

Bin Nakatani & Diego Vazquez Collin Ng & Adriana Villalpando Roof/C a

nopy

This project aimed to explore the typology using the common littoral edge condition. The typology was designed through the application of a set of terms, which were then created as a 3D print model and lazercut models.

Platfor

m

Forest

/Field

Wall

Elevat

ed

Stretc h

Sprea

d

Score

Perfor a

te

Accum

ulate

Disper

se

Protec

t


+ + + +

+ Black Ball Rule

N CO

Fish Rule

Fish Habitat Rule

Heat Intensity Rule

Drainage Rule

Migratory Bird Rule

+

+

+

IO CT NE Sound Pollution Rule

+

Walk/Jog Path Rule

Ruler Rule

Ageing Rule

Jenga Rule

No Rule

Wind Speed Rule

+

Traffic Rule

+ Water Tempeture Rule

+

Fish Rule

+ Tempeture Rule

Temperature Rule

+

+

Pollution Rule

+ Heat Intensity Rule

No Rule

Water Drainage Rule

+

+

Water Drainage Rule

+ Shadow Rule

No Rule

+

+

Water Capture Rule

Hawk Rule

No Rule

+ =

+ =

=

+ =

LA 203L | Collin Ng | Bin Nakatani | Adriana Villalpando | Diego Vazquez Project 3 | Critical Combine | James Becerra | Andy Wilcox

tion rea Rec e pac al S

N

Fishing Bird Watching Swiming/Recreation Animal Habitat

Programmatic Potential | Bin Nakatani | LA203 | Andrew Wilcox


Project 4 Silver Linkages + Exquisite Structures

Bin Nakatani & Diego Vazquez:

Section4 Colaborated Members Collin Ng Section3 Leo Rios Section5

This final project combined all the previous process to reveal the potential of the Silver Lake Reservoir. The design was then explored through multiple drawings from different perspectives.


Shallow Island Fishing Area

Underwater Observation Point

Small Pool Area

End User Perspective: Black Bass Underwater habitat supports small aquatic animals which benefits the black bass. Bin Nakatani | LA203

End User Perspective: Bird’s Eye The views of the birds perching on the mangroves. Bin Nakatani | LA203

Topographic + Fixed Program

1/16”=1’

Points of Interest and potential programs.

0

4’

8’

16’

N

Bin Nakatani | LA203

Topographic + Planting Stratergy

1/16”=1’

Different environments to support the aquatic lives.

0

4’

8’

16’

N

Bin Nakatani | LA203

455

450

End User Perspective: Human Bin Nakatani | LA203

End User Perspective: Existing Tree The commonly forgotten perspective, the hidden area between buildings viewed through the trees that has existed there. Bin Nakatani | LA203

Critical Design Decision

Topographic Line Drawing

Topographic + Circulation Drawing The two circulation above and below water line

Use of topography and curved pathway and width to filter the traffic down as it leads to the water.

1/16”=1’

Proposed over Existing Reveals the topography of underwater site.

1/16”=1’

N

Potential use of the propsed site described through human perspective.

0

4’

8’

16’

Bin Nakatani | LA203

0

4’

8’

16’

N

Bin Nakatani | LA203

1/16”=1’ 0

4’

8’

16’

Bin Nakatani | LA203

N

24’ 16’

8’ 0

Aerial Section Linework Aerial view of the site with focusing on the path which runs through the site.

Aerial Section Rendered

Section 1/16”=1’

The two circulation above and below water line

0

4’

8’

16’

General division and flow of the proposed site through rendered materials and entourages.

Bin Nakatani | LA203

Bin Nakatani | LA203

Bin Nakatani | LA203

Plan Rendering Potential microenvironment for aquatic animals. 1/16”=1’ 0

4’

8’

Bin Nakatani | LA203

16’

N


BIN NAKATANI


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.