Placer County Contractors Association & Builders Exchange
November 5, 2012 Vol. 6, No. 46
C ontractor’s Z one weekly newspaper
VIEW OUR INVENTORY 24/7 ONLINE AT WWW.WHYBUYNEWAUTOS.COM
flat beds
work trucks
utility trucks
hd duallies
We offer value for your money by selling low mileage high quality trucks! Over 100 trucks in stock.
facebook.com/whybuynewautos
Page 2
November 5, 2012
Zone • Contractor’s .
WhyBuyNewAutos.com 4429 Granite Dr Rocklin, CA 95677 (916) 624-8100
Inside This Issue This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.
SUPPORT OUR ADVERTISERS!
Inspiration for the Week
Page 2
Your Weekly Smile
Page 2
Industry Links
Page 2
The Week’s Weather Forecast
Page 3
Bottomline Lawyers
Page 6
Web site
PCCA Calendar of Events
Pages 4 - 5
Bozzuto Insurance
Page 36
Web site
Contractor Yellow Pages
Page 6
Diamond Pacific
Page 76
Web site
News Briefs
Pages 7 - 9
Hansen Bros. Enterprises
Page 27
Web site
Industry News
Pages 10 - 16
Inland Busines Systems
Page 11
Web site
Jensen Masonry
Page 6
Web site
Weekly Safety Meeting
Page 17
Philadelphia Insurance
Page 71
Classified Ads
Pages 18 - 19
Q & A Insurance
Page 13
New Plan Arrivals
Page 21 - 23
Smith Chiropractic and Massage Page 6
Web site
Week At A Glance
Pages 24 - 26
The Capps Group
Page 6
Web site
Cal Trans Projects
Pages 28 - 29
Tre Pazzi Trattoria
Page 6
Web site
Plans On File
Pages 30 - 71
State Fund Insurance
Page 23
Web site
WhyBuyNewAutos.com
Page IFC
Web Site
Lega Ads
Pages 72 - 75
Bid Results
Pages 75 - 76
They support the PCCA and deserve your business!
Web site
Don’t let the money ship sail without you! A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!
Construction Industry Links Association Links
CSLB
Contractor’s State License Board
OSHA
Occupational Safety & Health Administration
GSBE
Golden State Builders Exchange
AIA
American Institute of Architects
AGC
Associated general Contractors
BIA
Building Industry Association
SCIF
State Compensation Insurance Fund
Employers Guardian Human Resources
American Subcontractors Association
Projects Online
DGS Contracts
DOT
DOT District 3
SMUD
CSI Code List
Fed Biz Opps
First say to yourself what you would be; and then do what you have to do. — Epictetus
The Right Experience?
Safety
OSHA Hazard Communication
OSHA Safety & Health Topics
Click Safety Online OSHA Safety Classes
Employer Records of Occupational Injury & Illness
Governor’s Office of Emergency Services
Injury & Illness Prevention Program
Risk Management – IIPP
Someone advertising on Craigslist said she was well suited for child care. After all, she had plenty of experience in “CPR and Choking Children.”
State & Federal Links
California Building Standards
California Prevailing Wage Rates
Federal Prevailing Wage Rates
California Dept. of Industrial Relations
California Environmental Protection Agency
Mechanics Lien Law Information
Mechanics Lien Guide
Local Government Links
California Chamber of Commerce
City of Auburn
City of Rocklin
City of Roseville
City of Lincoln
County of Placer
How computerization made our working lives so much easier
Page 2
November 5, 2012
Zone • Contractor’s .
Board of Directors PCCA: Patrick Remington - President Remington Construction Chris Harris - Vice President James L. Harris Painting George Henley – Treasurer Henley Homes, Inc Mike Garman – Secretary California construction and Renovation Inc. Michelle Strange – Director TriCounties Bank
Auburn Today 75o Cloudy 75o - 54o
Cheryl Gibson – Director Von Jac Developments, Inc. Cyndi Cook – Director Cook Design Company Tim Busk – Public Relations Director Heritage Painting Jack Remington – VP of Governmental Affairs Andregg Geomatics
PBX:
Tuesday
Wednesday
Thursday
Friday
John Brun – President John Brun Masonry, 530-269-2044 Michael Bennett Bennett Tile Company, 916-773-8453 Chad Twardus – Secretary Twardus Construction, 530-878-1790
74o 51o
69o 47o
62o 39o
54o 42o
Nick Forestiere Gurnee & Daniels LLP, 916-797-3100 Ed Simpson
Roseville Today 75o Cloudy 75o - 45o
Staff: Chae Gale-Director of Operations admin@placerbx.com Jeff Henry-Director of Business Development jhenry@placerbx.com Kellie Russell-Auburn Planroom Coordinator planroom@placerbx.com Dianne Barnao-Roseville Planroom Coordinator planroom@placerbx.com
Tuesday
Wednesday
Thursday
Friday
Jim Couk - Scan Technician
Placer County Contractors Association 10656 Industrial Ave., Ste.160, Roseville, CA 95678
916-771-7229 231 Cherry Ave., Ste.101, Auburn, CA 95603
530-889-3953
Open Monday-Friday: 8am-5pm www.placerbx.com
75o 45o
72o 44o
66o 39o
56o 39o
November
Annual Dinner Friday, January 18th 2013 at the
2020 Golf Course Rd, Auburn, California
Contractor Of The Year Awards Cocktails at 5pm Presentation & Dinner at 6pm Dinner
$50.00 Per Ticket
Meals purchased in advance ~ No Refunds Reserve the date on your calendar, so you don’t miss this great event. Dinner, Networking, Raffle Prizes, Sponsorships, Opportunities and more. Tri-Tip, Grilled Salmon, Salad, Potatoes, Green Beans, Chocolate Dessert Meet the PCCA and PBX Leadership, as well as our Contractor and Project and Volunteers of the year awards. Company Phone Number No. Dinners Names of Guest 1. 3. 2. 4. If you have more guest please call 916-771-7229 Final Dinner Sales Jan. 18th 2011- No Refunds You must send check to: 10656 Industrial Ave., Ste 160 Roseville, Ca 95678 Pay Online by Credit Card: http://www.placerbx.com/Payment.htm
Page 4
November 5, 2012
Zone • Contractor’s .
6
Election Day. Don’t Forget To Vote!
6
Plans Online and New Member Orientation. 9:30 am to Noon at the Roseville PCCA Classroom.
8
CPR Class 9:00 am to 1:00 pm at Roseville $75.00 Per Person
8
CalOSHA 8 Class 8:00 am to 5:00 pm at Roseville $50.00 Per Person
8
Aerial Work Platform Certification 8:00 am to 2:00 pm $50.00 Per Person
8
Health Fair and Open Enrollment 2:00 pm to 4:30 pm at Roseville
15
Workers Comp Employers Training and Information Seminar. 3:00 pm to 4:00 pm at the Roseville PCCA Classroom.
22
Happy Thanksgiving. The PCCA and Roseville Offices will be closed today.
23
Happy Thanksgiving. The PCCA and Roseville Offices will be closed today
27
Member to Member Mixer 5:00 pm to 7:00 pm. Loomis Basin Brewery. No Charge to attend this networkin event. Chili Cookoff!
December 4
Plans Online and New Member Orientation. 9:30 am to Noon at the Roseville PCCA Classroom.
5
CPR and First Aid 2 year certification course. 9:00 am at Roseville.
11
QSP/QSD Training Seminar hosted by BT Consulting 8:30am to 4:30pm Roseville
November SUNDAY
MONDAY
Nov. 4 5
11
12
TUESDAY
6
WED.
7
THURSDAY
8
Election Day. Don’t Forget To Vote!
CPR Class
Plans Online and New Member Orientation.
Aerial Work Platform Certification
13
FRIDAY
SAT.
9
10
16
17
23
24
CalOSHA 8 Class
Health Fair and Open Enrollment
14
15 Workers Comp Employers Training and Information Seminar. 3:00 pm to 4:00
18
19
20
21
22
Happy Thanksgiving PCCA & Roseville offices closed
25
26
27
28
29
30
Dec. 1
Contractor Yellow Pages The Capps Group A Professional Real Estate Team
Smith Chiropractic and Massage Auburn Family run and family friendly health care for all ages. Includes chiropractic care and massage therapy. Serving the Auburn region for more than 49 years. Call (530) 885-8205 for an appointment.
Kevin Capps - Managing Broker Kevin@cappsgroup.com (DRE 01705659) Carolyn Hearn - Realtor Carolyn@cappsgroup.com (DRE 01483632)
13136 Lincoln Way Auburn, CA 95603-4114 530-885-8205 info@smithchiropractic.net http://www.smithchiropractic.net
530-823-2111 Office www.cappsgroup.com 856 Lincoln Way, Auburn, CA 95603
Jensen Masonry
Traditional Italian Cuisine in Downtown Auburn
928 Lincoln Way, Auburn Open 11:30 am - 9:00 pm M-F Open at 4:30 Saturday & Sunday
Mark Jensen 916.663.3429 www.Jensen-Masonry.com Paradisembj@earthlink.net
530.823.2994
www.trepazzi.net
Outdoor dining!
Full Service Masonry Contractor License # 804650
Legal options to improve your financial future Bankruptcy • Company & Personal Debt • Foreclosure
CALL TODAY (530) 888-7100 www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603
Page 6
November 5, 2012
Zone • Contractor’s .
News Briefs Yolo Courthouse Project Going Out To Bid The State Treasurer’s Office held its bond sale right on schedule last month. That’s good news for the Yolo County Courthouse slated for downtown Woodland. Construction of the new courthouse has now been given “a green light” after the treasurer sold $133.8 million in lease-revenue construction bonds, according to statement from Yolo Superior Court. The project, slated for 1000 Main Street, is for a 14-courtroom, 163,000-square-foot structure to replace the historic Woodland Courthouse nearby on Court Street. That building is antiquated and no longer up to the task of serving Yolo County, according to Superior Court Judge Dave Rosenberg, who is among those spearheading the effort to get a new courhouse built. Rosenberg says the historic building is too small, poorly designed for its current uses, and has seismic, plumbing and other problems. Construction is expected to begin early next year, with the project completed by May 2015 at a cost of about $160.6 million. Rosenberg has said, “Once the cash is lined up, there are no further hoops that we have to jump through.” The next step in the process is subcontractor bidding, to be overseen by construction manager Hensel Phelps Construction Co. More information on the courthouse is online at http://www. courts.ca.gov/facilities-yolo.htm Sacramento Promotes Construction Work As development springs back to life, the city of Sacramento is streamlining its building permit policies to make them more efficient and business-
friendly. The City Council has approved updated parking codes that ease restrictions and encourage development. Last July, the city combined its planning and design review commissions into one entity to expedite permit approvals. There are more changes to come under the campaign, which the city has dubbed Sacramento Streamline. A long list of reforms are scheduled to be adopted through June 2013, city officials say. Recently the City unveiled ePlan Check – the latest improvement as part of Sacramento Streamline, a comprehensive program to eliminate barriers for development. ePlan Check enables commercial customers to submit building plans electronically, thereby reducing the need to reproduce several sets of hard copy plans. In addition, ePlan Check saves time during the approval and permitting process for development projects. “It has been our goal to provide a service to our customers that will eliminate the need to print costly and environmentally unfriendly building plans,” said Ryan DeVore, chief building official. “In the past, hard copy processing required numerous sets of building plans. Today, commercial customers can submit their building plans using a disk or flash drive, and only a single hard copy at completion is necessary.” The immediate roll out of this new program will yield dividends for the customer. First, there will be immediate cost savings with the almost elimination of paper plans. For example, on a four-story, 48,000 square foot building, it is estimated that reproduction costs are roughly $7,000. Secondly, this mostly paperless processing will also result in
improved processing time that will be passed down to the customer. “Delivering services in an more streamlined way is environmentally and pocket book friendly but will also improve our time on service delivery,” said DeVore. “By virtue of going digital, this will allow staff to review and approve building plans digitally.” The ePlan Check project is part of a sundry of improvements that have been implemented under last year’s launch of the Sacramento Streamline program. Since then, the City has incorporated a solar fee program that allows significant savings on both commercial and residential solar projects. In September, the an express line was at its building counter to provide a quick way of getting simple requests completed in less than 30 minutes. “ePlan Check further exemplifies the city’s commitment to be business-friendly,” said Councilmember Darrell Fong. “This new tool provides customers with an easier way to do business with us, and our hope is that the ease of use will also increase our ability to process projects quicker.” Other streamlined improvements are on the horizon this year, including an electronic permit program that will allow customers to conveniently obtain building permits online without having to come to the City’s public counter. Click here for more information. Theatre Project Goes Out To Bid Corning City Councilwoman Continued on next page
Placer County Contractors Association & Builders Exchange
PCCA
The PCCA Monthly Networking Mixer! November 27th 2012 - 4:30-7pm The Loomis Basin Brewery Located at 3277 Swetzer Rd. Loomis, CA 95650. Join us November 27th at the Loomis Basin Brewery for our monthly networking mixer. Bring your best chili and compete for the win!
The last mixer was a great one, don’t miss this! Thanks! Cyndi Cook, Ambassador Team Lead Cook Design Company, Inc. 3444 Swetzer Rd. Ste K Loomis, CA 95650 916-660-1593 office • 916-660-1594 fax www.cookdesigncompany.com
Page 8
November 5, 2012
Zone • Contractor’s .
News Briefs Continued from last page
and Corning Community Foundation member Darlene Dickison have announced that phase II of the Rodger’s Theatre restoration project has gone out to bid. Bids for the project, which focuses on refurbishing the men’s and women’s restrooms on the main floor and reconstructing the loge seating, will close Nov. 15, City Manager and Public Works Director John Brewer said. We’re refurbishing them with previously purchased fixtures, Brewer said. We already removed asbestos and lead-containing paint and tiles and are ready for the installation (of the fixtures). One of the new features of the loge area is the addition of storage areas above the restroom and underneath the loge, which make the auditorium floor level to allow it to be a multipurpose area, he said. The first phase of the project, which used park bond money and an Energy Efficiency Grant, took care of getting rid of asbestos, reinforcing the roof structure, new roofing and installing a new heating, ventilation and air conditioning unit and putting in insulation. September Construction Numbers Good U.S. builders spent more on home construction in September. Construction spending grew 0.6 percent compared to August when spending had fallen 0.1 percent, the Commerce Department said last week. The strength in September came from a 2.8 percent rise in home building. The September increase pushed construction spending to a seasonally adjusted annual rate of $851.6 billion, 14.1 percent higher
than a 12-year low hit in February 2011. New home sales in September jumped to the highest annual pace in the past two and a half years. Spending on residential construction climbed to an annual rate of $285.9 billion in September, up 20.9 percent from a year ago. Single-family construction, the biggest part of the market, was up 25.7 percent over the past year while apartment construction was up 48.9 percent. Although new homes represent less than 20 percent of the housing sales market, they have an outsize impact on the economy. Each home built creates an average of three jobs for a year and generates about $90,000 in tax revenue, according to the National Association of Home Builders. Home builders started work on new homes and apartments at the fastest pace in more than four years in September. They also requested the most building permits in four years, a sign that many are confident that recent gains in home sales will continue. Judge Rules In Favor of Construction A federal judge has refused to halt construction on the Willits Bypass highway project, after environmental groups had requested a preliminary injunction. The proposed four-lane freeway would reroute U.S. Highway 101 around the downtown Willits area, and has caused controversy with environmental groups who say the project would harm wetlands, salmon streams and endangered plants. The groups have a pending lawsuit challenging the permits and approvals of the project, but that won’t be heard until December, a press release from the Environmental Protection Information Center in Arcata said.
The motion for a preliminary injunction was requested by the Center for Biological Diversity, Willits Environmental Center, Redwood Chapter of the Sierra Club and EPIC. The court agreed there is a risk of environmental harm in allowing cutting of legacy oak trees and riparian vegetation to continue forward before the trial, but its ruling allows Caltrans to initiate the construction process. Stockton Rail Project Gets $11 Million Allocation State transportation officials allocated nearly $11 million in high-speed rail funds to shore up the infrastructure for existing passenger rail service passing through Stockton to other points in Northern California. Approved by the California Transportation Commission last week, the money will pay for 2.6 miles of track to connect the downtown Cabral Station used by the Altamont Commuter Express to a maintenance facility north of the station. The $61 million project on 64 acres north of the downtown station is the biggest construction for ACE in the rail service’s 14-year history. It’s also important in efforts to build a statewide bullet train, because building the track is a step toward improving and growing service for ACE and other passenger trains through Stockton, transportation officials said. The new maintenance facility is under construction north of the station. The San Joaquin Regional Rail Commission already has the money to build the facility and a bridge over Miner Street to get there. The bridge also will have a walkway for pedestrians. But the latest $11 million pays most of the cost to build the actual track, said ACE spokesman Thomas Reeves.
Industr y News
Project Cost Management Minimize costly jobsite errors with a simple process shift
Construction projects often involve tracking hundreds, or even thousands, of details. Every day presents an opportunity for project expenditures to spiral out of control. Minimizing costly jobsite errors requires a shift in process. Identify and Track the Details It’s typically not the large expenditures that derail a project. Instead, the devil is in the details. The best step toward preventing errors from derailing a project is to ensure that the team actively manages small expenses.
Page 10 November 5, 2012
A mistake can easily be overlooked until a project is underway, and once all hands are on the jobsite, it’s too late—or very expensive—to make corrections. Zeroing in on details before ground is broken is important for owners and contractors. Owners need to be clear upfront about expectations and include as much detail as possible in the contract. After the contract has been signed, contractors have little room to avoid doing what is asked or to claim they didn’t know what the project entailed.
Zone • Contractor’s .
Setting a unit of measurement before the project begins keeps the owner and contractor on the same page. The unit itself—cubic yards, linear feet—doesn’t matter, but the point is to standardize the measurement among all involved parties so that expectations are aligned, reporting is clear and progress is visible. After a unit of measurement is agreed upon, the number of units that must be reached each day can be determined in order for the project to stay on schedule and on budget. When these two standards are set, add them to the contract alongside
a requirement for weekly reports to give the project total visibility. Report Weekly While monthly reports are the norm for most projects, weekly reports can go a long way toward preventing costly mistakes. This increased reporting frequency gives the owner more visibility into project status regarding materials, labor availability and other potentially fluctuating factors. Unpredictable elements such as weather must be taken into account so that additional costs and delays are avoided or minimized. Reviewing historical data, specifically prior projects completed on the same calendar dates, can help the team gauge and prepare for potential weather-induced setbacks. By evaluating historical data and staying on top of weekly reports, alternate jobsite plans can be mapped out ahead of time. The best way to handle weekly reporting is for the contractor to receive jobsite data daily and to compile that data into weekly reports delivered to the
owner. When the owner is able to view the status of the moving parts of a project on a weekly basis, adjustments can be made quickly to ensure that progress is not slowed and costs remain within the budget. Another way that weekly reporting saves money and expedites progress is by keeping earned value front and center. Earned value instantly tells the owner whether the project is on track. Continual monitoring of the project’s earned value allows for the scheduling performance and cost performance to be gauged. Weekly reporting is crucial for providing owners with the information they need in order to identify errors in a timely manner. Support the Shift Implementing these changes may sound easy, but objections are bound to surface. Such objections may stem from a fear of change, and it’s important to know how to respond to them. Showing contrac-
tors and coworkers the logic is one effective way to curtail these doubts. By implementing a logical, consistent payitem structure, for instance, reporting is easier and the collections process is simplified, resulting in faster payments. If objections are based on a reluctance to change longstanding practices, make it clear that the market is changing and adaptation is necessary to survive. Help the team to understand that giving owners more visibility allows for more effective project management. Although not every construction project possibility can be accounted for in advance, covering as many bases as possible before work begins helps curtail costly jobsite mistakes. Insist on upfront, detailed contracts, and trust contractors to deliver weekly reports so you can make amendments to the plan as the need arises. Shifting the process from haphazard to fully-planned will eliminate money-wasting delays and allow you to get the job done on time and within budget.
Your Authorized www.igoinland.com
&
At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing
Dealer
needs and develop an individualized plan of products and services that will serve your company best.
PCCA member since 2004
1500 North Market Boulevard, Sacramento, CA 95834 Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801
Industr y News
Effective Site Communication Stay in compliance with OSHA regulations by using wireless headsets Safety regulations aim to minimize preventable tragedies on the jobsite and ensure that companies take the proper precautions to protect workers from serious injury. Currently, many regulations focus specifically on better equipping workers to more quickly and efficiently relay information. For many contractors, the emphasis on jobsite communication not only preserves the health and safety of the workers, but also increases productivity. Current Regulations The Occupational Health and Safety Administration (OSHA) addresses the issue of adequate communication for workers in different types of construction projects, from underground tunneling to crane and bulldozer operations. OSHA has mandated communications standards in nearly every area of the construction industry, and these changes have vastly improved working conditions for crews. • Communication tower construction—OSHA requires that the hoist operator or signal person remain in continuous sight and/or in direct communication with the employee being hoisted. The use of a signal person and hand signals is recommended, except when direct visual contact is not possible. • Underground construction and
Page 12 November 5, 2012
tunneling—OSHA requires that employers maintain open lines of communication through power-assisted communication systems with an independent power supply. These systems ensure communication between the work face, the bottom of the shaft and the surface when natural unassisted voice communication is ineffective. In addition, two effective means of communication are required for shafts under development. Hoist operators must have a closed-circuit voice communication system connected to each landing station. • Heavy equipment operations—No specific requirements exist regarding the operation of backhoes, excavators, front-end loaders, bulldozers, scrapers, dump trucks, wagons, rollers and graders. However, at a minimum, hand signals and twoway radios should be implemented to ensure constant communication between operators and workers on the ground. OSHA also suggests hearing protection when working around heavy equipment. • Crane operations—Today’s revised crane rules for construction represent the most significant overhaul of crane safety regulations in more than 40 years. Of particular importance are new rules governing communication among the crane operator, signal person and spotter, specifically those requir-
Zone • Contractor’s .
ing electronic signaling through a dedicated channel and a hands-free system. In addition to requiring adequate communication for workers on a jobsite, OSHA also requires hearing protection when the timeweighted average noise level exceeds 85 decibels (dB)—a standard routinely surpassed in construction and industrial environments due to noisy machinery, tools and vehicles. While the average human threshold of pain is typically around 110dB, many of the operations outlined to the left in Figure 1 can lead to severe or permanent hearing loss, even with limited exposure. Wireless Advantage Despite the clear need for safety regulations, construction managers often face challenges in implementing guidelines and complying with industry standards. Many companies are turning to hands-free, selfcontained wireless communication headsets for construction safety— eliminating the need for two-way radios and hand signals in many cases. With improvements in communication methods on jobsites, the number of accidents, injuries and deaths has greatly decreased. Beyond safety improvements, enhanced
communication also benefits the business owner by increasing team effectiveness and business productivity, contributing to lower insurance costs and enhancing new business acquisition through a reputation for safety and efficiency. The advent of advanced digital communication technology has brought the benefits of wireless communication to several jobsites. Construction managers should consider the following attributes: • Hands-free—Hands-free operation encourages workers to communicate without interrupting their work. • Duplex communication—Full du-
plex communication afforded by wireless headsets allows verbal warnings to be delivered instantly, even if someone else is talking. • Closed circuit channels—Digitally encoded, dedicated radio channels meet OSHA requirements for many projects. • Radio integration—Seamless integration with existing radio systems enables both monitoring of multiple radios and push-to-talk radio transmit capabilities on headsets. • Noise reduction—Hearing protection headsets reduce noise by at least 24dB.
• Long range—New systems with ranges up to 1,600 feet are sufficient to cover most construction applications, including crane operations. • Power supply—Battery-powered, portable base stations offer full-day operation and application flexibility, while direct-powered base stations can be mounted on vehicles, equipment or structures. Construction managers need to consider these benefits as they explore wireless and digital communication tools. With higher standards and new technology, the industry is poised to make great strides in worker well-being.
New Member Orientation And Plans Online Class We have the projects, make sure you and your estimators know how to find them. Learn how to drive less, print less, and save more time and money while bidding.
November 6th, 2012 9:30 AM through 12:00 Noon
Roseville PCCA Classroom 10656 Industrial Ave, Suite 160 Roseville, CA 95678 RSVP to Jeff Henry 916-771-7229 Attendance is free, and encouraged for all new members as well as Existing members who just wish to be brought up to speed on the Different benefits of the PCCA, or a refresher course on the Use of the Online Plan Service. Make sure your estimators attend so they are also familiar with the Online Plan Room, and your Admin Staff so they are aware of the various Group Health, Workers Comp and other insurance programs that are available Through membership.
Page 14 November 5, 2012
Zone • Contractor’s .
Kalb Q & A
Capitol Connection Q&A Resource For Contractors By Shauna Krause and David Kalb Capitol Services, Inc. Can an old CA contractor’s license be brought back to life again when it ‘died’ a decade ago? The ‘mettle’ of a framing contractor is tested and we finish by helping readers learn what it takes to pull together to form a ‘joint venture’ effort… Q: My husband had a CA license and failed to renew it on time. It expired back in 2000. Now he wants to renew it. He currently has an Arizona “K-11” (Electrical) license that he has held for approx 12yrs. How does he go about this in the quickest way, as we are looking to move to CA early next year? A: Thank you for contacting Capitol Services Inc. Because his CA license has been expired for over 5 years he can no longer ‘renew’ it. He can however re-apply for the license and request that the number be reissued. As you may know, there is a reciprocal agreement between CA and AZ so he can request to waive the trade exam based on the fact that he has been licensed for the past five years in Arizona. He’ll still be required to take the law test again. The process to obtain the license will likely take about 8 weeks, so if you begin soon, he will have the license before you move. Let us know if you’d like help with the process. Q: I need assistance with determining what classification my company will need to meet the requirements to do metal stud framing in the State of California. I don’t do Structural Steel, just the metal stud framing. I also
David Kalb
Shauna Krause
handle the drywall and insulation to finish off the wall, so I’m not sure if I need separate classifications to do that, or if it would be covered under the framing. Thank you in advance.
another contractor whom holds both. Please let me know what all is required, particularly the application process.
A: In order to do the metal stud framing you’ll need a “C-5” (Framing and Rough Carpentry) classification. Even though drywall and insulation are part of your projects, the CSLB will require you to have the “C-2” (Insulation) and “C-9” (Drywall) classifications to perform this work because the “C-5” doesn’t cover these trades. According to the CSLB, the “B” classification would cover you for all three trades; however, in our experience we have found it is difficult to qualify for the exam without electrical, concrete, roofing and/or plumbing experience. Q: I am inquiring about the fees and requirements to set up a Joint Venture with another contractor. I want to bid a project that requires both “C-20”(HVAC) and “C-10”(Electrical) licenses. My firm only holds the HVAC and would like to partner with
A: A Joint Venture (JV) consists of two or more entities, each of which holds a valid CA contractor’s license in good standing. Since you hold the “C-20”, you could locate a company with the “C-10” or, as indicated, “another contractor whom holds both”. A JV application signed by all Qualifiers and an Officer of record for each entity is required. You’ll also need to post a $12,500 Contractor’s Bond, which is in addition to the bond you presently have on your corporate license. Further, a new Worker’s Comp policy (or certified Exemption) is necessary. The State fee will run $555.00. Knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866443-0657, email info@cutredtape. com, or write us at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA 95814. Research past columns at www.cutredtape.com.
Page 16 November 5, 2012
Zone • Contractor’s .
Weekly Safety Meeting Company Name:
Job Name:
Date:
In Case of Fire During National Fire Protection Week in October (713), attention is placed on fire safety awareness and prevention. State Fund would like to remind our policyholders and their employees the importance of practicing fire safety year round. The most effective way to fight a fire is to keep one from occurring through awareness and correcting potential fire hazards. If a fire does occur, workers must be prepared to keep themselves safe from injury. Housekeeping A major cause of a fire in the workplace is due to improper or lack of housekeeping on the jobsite. • Keep heating and electrical equipment clean, and in good working condition. • Regularly clean ducts and fume hood filters. • Keep paper products, aerosols or other flammable materials away from heating elements. • Store flammable liquids away from heat sources, exits or escape routes. • To avoid an electrical fire, check, replace or professionally repair any appliances with frayed or loose cords and wires or cords that become hot during use. • Avoid running cords or wires under rugs and carpets or near a heat source where they can overheat. • Keep cords out of doorways where they can become worn.
Fire detection and/or suppression devices Ensure that fire protection equipment (i.e., sprinklers, smoke/heat detectors, alarms, fire hoses, fire extinguishers, and fire blankets) are maintained, and readily available for use. • Educate workers on the proper use of fire extinguishers and their location. • Make sure all fire suppression equipment, including fire extinguishers, correspond to the potential risk. Use the right fire extinguisher for the type of fire. Staff training in fire prevention/emergency procedures Periodically train all employees in fire safety, emergency communication, and evacuation procedures. • Post telephone numbers of emergency response personnel where they can be quickly retrieved. • In case of an evacuation, make sure workers know the number, location, and accessibility of exits, along with the location of fire alarms. • In the event of a fire, workers should not hesitate to call the fire department All workers share a responsibility for preventing fires, but not to put out a major fire. Workers should only fight a fire if they can do it safely with proper extinguishing materials. Fire fighting is best handled by trained professionals.
Special topics for your project:
Employee Safety Recommendations: Reviewed MSDS #
Subject
Meeting attended by:
Supervisor’s Signature:
Date:
Classified Ads 2003 Chevrolet Silverado 3500 Extended Cab $75k miles New tires Utility bed w/ rack Dual rear wheels New 100 gallon fuel transfer tank & pump $15,000 or best offer Contact Gary at (530) 886-3100 during business hours or (916) 826-8931 after hours. Pictures below.
Page 18 November 5, 2012
Zone • Contractor’s .
Evolvedecks Building Enterprises is seeking Contractors experienced in Light Gauge Metal Framing to assist in ongoing short term projects Call Rodger at 263-5854 And/or send response to: info@evolvedecks.com
Thursday November 8th 9:00 am to Noon CPR 2 Year Certification Class Roseville PCCA Classroom 10656 Industrial Ave, Suite 160, Roseville, CA 95678 Course and Certificate $70.00 Per Student. You can pay at the door. All of the classes offered by SimplyCPR are based on the American Heart Association standards. Students completing the requirements of the SimplyCPR courses will receive a CPR or first aid card. Monthly Training Program to have the certification classes available on a regular basis.
Call to schedule a training session for larger groups in your own office if you would prefer an onsite class.
Register Now! Call Jeff at 916-771-7229 or fax this back to 916-771-0556 Name
Name
Name
Name
Smith Chiropractic and Massage Auburn
Back Pain?
You don’t need to live with the pain. Chiropractic care can help. Call Dr. Keith Smith in Auburn for a free consultation. Serving the Auburn community for 49 years. Click a link, at the right, for more information.
Page 20 November 5, 2012
Zone • Contractor’s .
Web Site About Us Office Info New Patients Bulletins Products Coupon Specials Life & Chiropractic HydroMassage Available
New Plans All published entries in this report are obtained from sources deemed reliable. Placer County Contractors Association and Builders Exchange assumes no responsibility for any inaccuracies listed in this report. It is up to the individual to verify all information.
Yuba City
ROOFING & EXTERIOR IMPROVEMENTS @ 517/519 TEESDALE ROAD Turlock FIRE STATION NO. 4 ROOF REPLACEMENT Yuba City ROOFING AND EXTERIOR IMPROVEMENTS Pleasanton SPORTS PARK CONCESSION STAND Folsom RED ROBIN T.I. FOLSOM Chico DICK’S SPORTING GOODS TENANT IMPROVEMENT San Jose TEMPORARY FENCING RENTAL AND REPAIRS San Francisco MONROE ELEMENTARY SCHOOL Redwood City WOODSIDE ROAD MEDIAN AND ROADWAY CLEANUP PROJECT San Joaquin RFP-CIVIL ENGINEERING SERVICES - MOUNTAIN VIEW Hanford ULTA -636 Modesto ROSS DRESS FOR LESS TI - 1621 San Pablo CCS - AT DOWNER SCHOOL Sacramento/Place LICENSED GENERAL CONTRACTOR - HANDYMAN SERVICE Coachella SEWER PIPELINE REHABILITATION PROJECT-ESMERALDA RESORT AND PGA Running Springs PALI MOUNTAIN CABINS Cupertino HOMESTEAD SQUARE Citrus Heights 7101 BONITA WAY SEWER LOWER LATERAL RELOCATION Various Locations ALARM MONITORING AT VARIOUS CHP CENTRAL DIVISION AREA OFFICES Sac/Placer/Yolo/A REFRIGERATION PREVENTATIVE MAINTENANCE West Sacramento WEST SAC TRIANGLE (70 UNIT MULTI-FAMILY HOUSING PROJECT) North Highlands DOLLAR TREE TI Tracy SILAGE COVERING SERVICES (2-YR CONTRACT) Mill Valley STORAGE, POOL AND SPA IMPROVEMENTS Oakland RCD BOILER REPLACEMENT San Jose INSTALL SAFETY STAIR AND DECK COVERS AT GUADALUPE LRT DIVISION Alameda FALL 2012 ROOFING PROJECT - ALAMEDA UNIFIED SCHOOL DISTRICT San Jose VILLAGE OAKS SITEWORK Murrietta SAM’S CLUB - 4822-202RM San Francisco ARELIOUS WALKER STAIRWAY REPLACEMENT West Palmdale SAM’S CLUB 4767-201 Martinez RENTAL PROPERTY IMPROVEMENTS San Diego PUBLIC STORAGE - 2046 San Francisco 1701 DIVISADERO 1ST FLOOR - GI CLINIC EXPANSION Citrus Heights RFP -COMPLETEING LOMA’S AND FEMA ELEVATION CERTIFICATES FOR San Francisco LANDSCAPE AND INTERIOR PLANT MAINTENANCE Los Banos DOLLAR GENERAL STORE Alpine Co. OUT VALLEY TRANSMISSION LINE PROJECT - PREQUALIFICATION Modesto TUOLUMNE RIVER REGIONAL PARK GATEWAY PHASE 1.3 TRAILS Modesto MODESTO WEST BASIN IMPROVEMENTS Palo Alto RFP - DESIGN OF DMF PERFORMANCE OPTIMIZATON Santa Rosa FIRE ALARM UPGRADE/STEELE LANE COMMUNITY CENTER Redwood City SANITARY SEWER PUMP STATION 10 IMPROVEMENTS PROJECT Ukiah ORCHARD SUBSTATION LANDSCAPE CONSTRUCTION Sacramento CURTIS PARK AND OAK PARK WATER METER RETROFIT PROJECT Dublin RFQ - ERECTION OF 2 METAL BUILDINGS S.A.R. BUILDING PROJECT Fairfield CLAYBANK ROAD PAVEMENT REHABILITATION AND SSWA TOLENAS LATERAL Corning RODGERS THEATER PHASE II IMPROVEMENTS Carson JOINT WATER POLLUTION CONTROL PLANT AND SAN JOSE CREEK WATER
2019 37009 188089 80065 85059 86064 223090 316005 90082 177091 89069 114081 159075 172001 87071 317006 119080 123080 186088 216086 102087 106089 215079 228089 235091 237087 318005 4010 55095 125081 286044 306010 320005 131069 174099 229092 271045 310006 18023 19023 176006 0 21017 45097 206090 282054 6031 41012 147059
Page 22 November 5, 2012
Zone • Contractor’s .
New Plans Kentfield Santa Cruz Roseville Santa Cruz Marysville Marysville Alameda Alameda Alameda West Sacramento Sacramento Alameda Co. Rancho Cordova Santa Clara Co. Union City Tuolumne County Stanislaus Co.
AUSTIN SWING SPACE RECOATING AND REPAIR OF DELAVEAGA TANK NO.1 PARKING LOT SWEEP/STEAM ROSEVILLE DMV - REBID NEWELL CREEK DAM PIPELINE INSPECTION SERVICES 2012 SEWER/STORM TRENCH REPAIR PROJECT 2012 PAVEMENT REPAIR PROJECT JOB ORDER CONTRACTING - 13004 JOB ORDER CONTRACTING - 13005 JOB ORDER CONTRACTING - 13003 WEST CAPITAL COMMONS POLE REPLACEMENT AND OTHER LINE WORK ELMHURST HAZMAT ABATEMENT - JOB ORDER HAGAN PICNIC PAVILION IMPROVEMENTS STEVENS CREEK PIPELINE REHABILITATION PROJECT UNION CITY INTERMODAL STATION PHASE 2 - BART STATION IMPROVEMENTS QUALIFIED CONTRACTORS LIST - TUOLUMNE COUNTY RFP - CROWS LANDING AIR FACILITY
148060 162058 214089 170094 181096 203098 266042 270041 275045 25017 88064 204001 198095 299043 109082 319005 231087
Week At A Glance Monday, November 05, 2012 LAGUNA CREEK TRAIL CONNECTION AT CAMADA COURT IMPROVEMENT Elk Grove PROJECT Carmichael BARRETT MIDDLE SCHOOL RESTROOM UPGRADES FAIRFIELD WALGREENS - 15432 Fairfield HOMESTEAD SQUARE Cupertino 7101 BONITA WAY SEWER LOWER LATERAL RELOCATION Citrus Heights FOLSOM LAKE COLLEGE - ATHLETIC FIELDS PHASE 2 Folsom OLD CANYON ROAD BRIDGE PROTECTION REPAIR PROJECT Fremont ALARM MONITORING AT VARIOUS CHP CENTRAL DIVISION AREA OFFICES Various Locations REFRIGERATION PREVENTATIVE MAINTENANCE Sac/Placer/Yolo/Amador UNION PACIFIC RAILROAD FENCE PROJECT Elk Grove SECURITY SYSTEMS INSTALLATION AND TESTING Sacramento
Plan # 9022 Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan #
16018 62098 119080 123080 141055 175090 186088 216086 272049 287041
Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan #
7017 12003 20001 29008 50096 54004 56003 57098
Plan # Plan # Plan # Plan # Plan # Plan #
61076 81073 102087 106089 144058 164072
Plan # Plan # Plan # Plan # Plan # Plan # Plan #
193088 202095 210098 211097 215079 217082 226090
Plan # Plan # Plan # Plan # Plan # Plan # Plan #
228089 235091 237087 241091 243050 260050 274041
Tuesday, November 06, 2012 WASTEWATER TREATMENT PLANT CAKE HOPPER EQUIPMENT San Mateo COUNCIL CHAMBERS A/V SYSTEM RENOVATION Antioch JAMES DONLON & LARKSPUR WATER STORAGE RESERVOIR Antioch LIGHTING UPGRADES OF SOFTBALL FIELDS Fresno CARMICHAEL E.S./WHITNEY E.S. RESTROOMS UPGRADES Carmichael/Sacramento DIXON STREET IMPROVEMENTS Hayward MARIEMONT ELEMENTARY SCHOOL, RESTROOM UPGRADES Sacramento JONAS SALK MIDDLE SCHOOL AKA THOMAS EDISON LANGUAGE INSTITUTE Sacramento K-6 RESTROOM UPGRADES Calistoga CALISTOGA LIBRARY RE-ROOF SIMPKINS STADIUM CENTER KITCHEN ANSUL SYSTEM PROJECT San Jose West Sacramento WEST SAC TRIANGLE (70 UNIT MULTI-FAMILY HOUSING PROJECT) DOLLAR TREE TI North Highlands VETERINARY GENETICS LABORATORY SAMPLE STORAGE CONTAINERS Davis HOSPITAL WIRELESS ACCESS POINTS INSTALLATION EAST WING Sacramento WIRELESS ACCESS POINTS Modesto SANITARY LIFT STATION LINING REHABILITATION HOUSEHOLD HAZARDOUS WASTE STATION IMPROVEMENT PROJECT Palo Alto ANNUAL STORM DRAIN MAINTENANCE Placer Co. FIRE DAMAGE REPAIRS AT LAS DELTAS UNITS 606 & 607 Richmond SILAGE COVERING SERVICES (2-YR CONTRACT) Tracy DMF VALVE REPLACEMENT AND HIGH PRESSURE PIPING Redwood City RFQ - CIVIL ENGINEERING SERVICES - LA RUE BRIDGE OVER PUTAH Davis CREEK WIDENING PROJECT Mill Valley STORAGE, POOL AND SPA IMPROVEMENTS RCD BOILER REPLACEMENT Oakland INSTALL SAFETY STAIR AND DECK COVERS AT GUADALUPE LRT DIVISION San Jose HANFORD NON CHEMICAL LANDSCAPE MAINTENANCE-RE-BID Hanford RFP - PROFESSIONAL SERVICES - COMPRESSED NATURAL GAS SERVICES Palo Alto Various Locations MAINTENANCE AND REPAIR OF SECURITY VIDEO EQUIPMENT L-612 STUDENT SERVICE REMODEL Pittsburg
Page 24 November 5, 2012
Zone • Contractor’s .
HOUSEHOLD HAZARDOUS WASTE (HHW) DISPOSAL IPIC THEATERS WESTWOOD - BID PKG 2 FALL 2012 ROOFING PROJECT - ALAMEDA UNIFIED SCHOOL DISTRICT
Stanislaus Co. Los Angeles Alameda
Plan # 284043 Plan # 303011 Plan # 318005
Wednesday, November 07, 2012 VILLAGE OAKS SITEWORK San Jose WASTEWATER TREATMENT PLANT ENERGY OPTIMIZATION IMPROVEMENT Grass Valley PROJECT Murrietta SAM’S CLUB - 4822-202RM 1640/1650 MISSION STREET EMERGENCY GENERATOR, DESIGN/BUILD San Francisco ALTERATION & TENANT IMPROVEMENTS REMODEL RE-BID San Francisco ARELIOUS WALKER STAIRWAY REPLACEMENT COSUMNES RIVER BOULEVARD EXTENSION I-5 TO FRANKLIN BOULEVARD Sacramento SANTA CRUZ RIVER FRONT PARKING STRUCTURE PARCS SYSTEMS Santa Cruz DISTRIBUTION SYSTEM VALVE REPLACEMENT Daly City SLIDE-IN ASPHALT PATCH BOX Yuba City KITCHEN HOODS - FIRE SUPPRESSION SYSTEM UPGRADES - RE-BID 2 San Quentin TOWNPLACE SUITES Lancaster LEVEE MAINTENANCE PROJECT - 2012 EROSION REPAIRS AT VARIOUS San Joaquin Co. LOCATIONS West Palmdale SAM’S CLUB 4767-201 SPROUTS FARMERS MARKET Petaluma MH58 STRUCTURAL IMPROVEMENTS PROJECT Port of Stockton JOANN FABRIC & CRAFT STORE RENOVATION Redding RENTAL PROPERTY IMPROVEMENTS Martinez PUBLIC STORAGE - 2046 San Diego
Plan # 4010 Plan # 17007 Plan # 55095 Plan # 105082 Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan #
125081 133063 153062 183073 196085 197092 277035 280044
Plan # Plan # Plan # Plan # Plan # Plan #
286044 294033 296042 304010 306010 320005
Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan #
1019 3013 14012 30018 66082 107084 128066 131069 138057 140047 146058 161058 174099
Thursday, November 08, 2012 CHEVRON GAS STATION San Jose GATEWAY EAST STORM SEWER IMPROVEMENT PROJECT San Jose SCHOOL STREET PLAZA PROJECT Bridgeport SAVERS -1197 Vacaville HATCH-MOFFETT WELL NO. 23 ELECTRICAL UPGRADE PROJECT Ceres Long Beach LONG BEACH MAIN PUMPING PLANT PORTABLE PUMP CONNECCTIONS INTERIM POLICE STATION & G-2010 OFFICES San Jose 1701 DIVISADERO 1ST FLOOR - GI CLINIC EXPANSION San Francisco 4-PLEX HOUSING UNIT Merced EL CAMINO - STREET AND SIDEWALK IMPROVEMENT PROJECT Sacramento BRIDGE PREVENTIVE MAINTENANCE PROJECT Siskiyou County RECLAIMED WATER SYSTEM IMPROVEMENTS (CONSTRUCTION) San Rafael RFP -COMPLETEING LOMA’S AND FEMA ELEVATION CERTIFICATES FOR Citrus Heights HABITABLE STRUCTURES WITHIN THE BASE FLOOD ELEVATION Sacramento NORTH TRUXEL STREETSCAPES LANDSCAPE AND INTERIOR PLANT MAINTENANCE San Francisco NON-CHEMICAL LANDSCAPE MAINTENANCE SERVICES FOR THE HAYWARD Hayward DMV FIELD OFFICE Soledad !!CANCELLED!!ASPHALT MAINTENANCE AND REPAIR M STREET HISTORIC HOMES RESTORATION Fresno
Plan # 208078 Plan # 229092 Plan # 236092 Plan # 248049 Plan # 268042
Week At A Glance Thursday, November 08, 2012 POLICE VEHICLE EMERGENCY EQUIPMENT PARTS AND INSTALLATION LANDSCAPE MAINTENANCE FOR NORTH CORDELIA, SOUTHBROOK, CREEKSIDE LIGHTING & LANDSCAPE MAINTENANCE DISTRICTS LANDSCAPE MAINTENANCE FOR ROLLING HILLS-KOLOB-WATERMAN HIGHLANDS LIGHTING & LANDSCAPE MAINTENANCE DISTRICTS LANDSCAPE MAINTENANCE FOR VARIOUS PUBLIC FACILITIES LANDSCAPE MAINTENANCE - AIR BASE PARKWAY INTERCHANGE, TRAVIS BLVD INTERCHANGE AND INTERSTATE 80 NORMAN Y. MINETA SAN JOSE INT’L AIRPORT - MECHANICAL SERVICES CONTRACT 12-13
Berkeley Fairfield
Plan # 302010 Plan # 311006
Fairfield
Plan # 312004
Fairfield Fairfield
Plan # 313006 Plan # 314006
San Jose
Plan # 315004
Friday, November 09, 2012 RFQ - ALL-INCLUSIVE BRIDGE ENGINEERING SERVICES ON VARIOUS Stanislaus Co. PROJECTS Berkeley REQUEST FOR STATEMENT OF QUALIFICATIONS - 1608 FOURTH STREET RFP - LANDSCAPE MANAGEMENT AND MAINTENANCE San Jose STREET LIGHT POLE DELAMINATION REPAIR Sacramento RFP - PROFESSIONAL ENGINEERING SERVICES - FOUR BRIDGES Sacramento Co. CITY AUDITORIUM BOILERS Richmond SEWER MAIN MANHOLE REHABILITATION PROJECT Woodland MAIN LIBRARY EMERGENCY GENERATOR Richmond RFQ - INTEREST FOR AIRPORT CONSULTING SERVICES AT EL DORADO Placerville/Georgetown COUNTY AIRPORTS Los Banos DOLLAR GENERAL STORE .
Plan # 168071 Plan # Plan # Plan # Plan # Plan # Plan # Plan # Plan #
190087 200089 209002 242080 244092 249058 261050 264043
Plan # 271045
To Run Your Legal Ad, Please Visit www.thedailyreporter.net Or Give Us A Call 916-729-5432
We have created a menu consisting of Traditional Italian Cuisine. All of our dishes are made in house and prepared to order using local ingredients when available. Simplicity and freshness are the key to authentic Italian cooking. Our menu will change frequently depending on seasonality. All wines & beer imported from Italy. 928 Lincoln Way, Auburn
530.823.2994 www.trepazzi.net Page 26 November 5, 2012
Outdoor dining in downtown!
Traditional Italian Cuisine in Auburn Zone • Contractor’s .
Est. 1953
CSL 207705
From large to small, HBE can do it all! Rental Equipment & Tools
RENTALS Carpet Cleaners Chippers & Compressors Backhoes & Excavators Dozers & Trenchers Tile Saws & Trailers Tillers & Forklifts Scaffolding & much more
273-3381
Grass Valley 11727 LaBarr Meadows Rd. Mon. – Fri. 8-5 Sat. 8-12, Sun. Closed
Colfax
346-8174
45 Central Street
CalTrans CDOT 44
11/06/2012
DOT 01-385724 CONSTRUCT NEW BRIDGE AND ROCK FISH WEIR.
MENDOCINO COUNTY
1
CDOT 30
11/06/2012
DOT 03-2F35U4 PAVEMENT REHABILITATION.
NEVADA COUNTY
1
CDOT 57
11/07/2012
DOT 04-014074 PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM
ALAMEDA COUNTY
2
CDOT 30
11/07/2012
DOT 06-0K3904 REPLACE EXISTING BRIDGE AND RECONSTRUCT RAMPS.
KERN COUNTY
1
CDOT 37
11/08/2012
DOT 08-0K2604 COLD PLANE AND OVERLAY, UPGRADE MBGR, DIKES, REPLACE OVERSIDE DRAINS
SAN BERNARDINO COUNTY
1
CDOT 30
11/08/2012
DOT 07-259104 CONSTRUCT STORM WATER TREATMENT BMPS.
LOS ANGELES COUNTY
1
CDOT 30
11/08/2012
DOT 07-267504 INSTALL MBGR AND CONCRETE BARRIER, COLD PLANE AND OVERLAY SHOULDER
LOS ANGELES COUNTY
1
CDOT 30
11/08/2012
DOT 07-2X9604 CONSTRUCT ROCK BLANKET AND INLETS AND HIGHWAY PLANTING.
LOS ANGELES COUNTY
0
CDOT 30
11/08/2012
DOT 11-290304 FOOTING/COLUMN RETROFIT, CONCRETE BARRIER, PLANTING AND IRRIGATION.
SAN DIEGO COUNTY
0
CDOT 23
11/08/2012
DOT 07-252614 REPLACE CONCRETE SLABS WITH PRECAST CONCRETE PANELS.
LOS ANGELES COUNTY
1
CDOT 37
11/14/2012
DOT 01-423704 RECONSTRUCT ROADWAY WITH HMA OVER AB AND CONSTRUCT RETAINING WALLS.
HUMBOLDT COUNTY
0
CDOT 23
11/14/2012
DOT 01-463914 RECONSTRUCT METAL BEAM GUARD RAILING
HUMBOLDT COUNTY
1
CDOT 9
11/14/2012
DOT 09-354504 PLACE ASPHALT-RUBBER SEAL COAT ON EXISTING PAVEMENT.
MONO COUNTY
0
CDOT 2
11/14/2012
DOT 02-2E8704 REFURBISH BUILDING INTERIORS AND ADA PARKING. 1
SHASTA COUNTY
0
CDOT 30
11/15/2012
DOT 07-2770U4 APPLY EROSION CONTROL.
LOS ANGELES COUNTY
1
11/15/2012
DOT 08-0K2704 MILL, OVERLAY AC, METAL BEAM GUARD RAILS, DIKES AND OVER SIDE DRAINS
SAN BERNARDINO COUNTY
0
CDOT 30
Page 28 November 5, 2012
Zone • Contractor’s .
CDOT 23
11/15/2012
DOT 07-258704 PLACE HMA TEXURED PAVING AND SLOPE PAVING.
LOS ANGELES COUNTY
0
CDOT 16
11/15/2012
DOT 07-274304 UPGRADE MBGR, CRASH CUSHIONS AND END TREATMENTS.
LOS ANGELES COUNTY
0
CDOT 16
11/27/2012
DOT 03-1A7324 PLACE HMA CONCRETE SURFACING AND MODIFY DRAINAGE SYSTEM
EL DORADO COUNTY
0
CDOT 16
11/27/2012
DOT 05-0C3304 CONSTRUCT SOLDIER PILE RETAINING WALL.
SAN LUIS OBISPO COUNTY
0
CDOT 9
11/27/2012
DOT 04-4A2504 INSTALL METAL BEAM GUARD RAILING.
SOLANO COUNTY
0
TULARE COUNTY
0
BUTTE COUNTY
0
CONTRA COSTA COUNTY
0
ORANGE COUNTY
0
LOS ANGELES COUNTY
0
SAN DIEGO COUNTY
0
VENTURA COUNTY SAN BERNARDINO COUNTY
0
SAN DIEGO COUNTY
0
FRESNO, KERN, MADERA AND TULARE COUNTIES
0
CDOT 2
11/27/2012
CDOT 16
11/28/2012
CDOT 16
11/28/2012
CDOT 30
11/29/2012
DOT 06-0N5404 COLD PLANE AC PAVEMENT AND PLACE HMA SURFACING. DOT 03-1E5104 RETROFIT STEEL MEMBERS, CLEAN AND PAINT STEEL, PREPARE BRIDGE DECK. DOT 04-2285H4 WIDEN FREEWAY, CONSTRUCT RETAINING WALLS AND SOUND WALLS. DOT 12-0C5704 ROUTE 91 WESTBOUND IMPROVEMENTS OF RAMPS AND BRIDGE WIDENING DOT 07-3X0104 REPAIR SLOPE AND APPLY EROSION CONTROL.
CDOT 23
11/29/2012
CDOT 16
11/29/2012
DOT 11-298604 CONCRETE BARRIER, METAL BEAM GUARDRAIL AND END TREATMENT UPGRADES.
CDOT 9
11/29/2012
DOT 07-228204 REPLACE SEAWALL AND REPAIR SHOLDER.
CDOT 37
12/06/2012
DOT 08-0Q7304 PAVEMENT REHABILITATION
CDOT 16 CDOT 2
12/06/2012 12/12/2012
DOT 11-2T1824 REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR). DOT 06-0C1304 RETROFIT BRIDGES WITH COMPOSITE COLUMN CASING, IN-FILL WALLS, CIDH
3
Plans On File Monday, November 05, 2012 LAGUNA CREEK TRAIL CONNECTION AT CAMADA COURT IMPROVEMENT PROJECT PLAN #: 9022 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Elk Grove Est Cost: $40,000.00 OWNER: City of Elk Grove DESCR: Contact, David Lawson, 916-691-1243. Asphalt Conrete paving of an existing dirt path from the end of Camada Ct to the existing Laguna BIDDERS LIST: General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 BARRETT MIDDLE SCHOOL RESTROOM UPGRADES PLAN #: 16018 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Carmichael Online & Print On Est Cost: $625,000.00 # OF ADDENDA: 3 Demand PREBID: MAND 10/24 @ 3pm OWNER: San Juan Unified School District DESCR: Contact, Danny Martin, Innovative Construcction Services, Inc., 916-333-5701. The project consists of, but is not limited to the following scope(s) of work:Modernization of three gang rest rooms located at the end of wings #1-#8, #9-#16, and #17-#21. Locker room rest rooms also included. Modernization includes new flooring, wall finishes, new efficient fixtures, and water closets. Modernization will also bring rest rooms up to current ADA compliance codes. Construction of ADA compliant path from office to all rest rooms included in project. PLANS & SPECS ARE NOT AVAILABLE AT THIS TIME. BIDDERS LIST: Pre-bid Online 530-889-3953 530-889-3956 General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 Hometown 916-991-2486 916-991-2881 D.g. Granade, Inc. 530-677-7484 530-677-7550 Bobo Construction, Inc. 916-685-2285 916-714-4850 Landmark Construction 916-663-1953 916-663-1867 S W Allen Construction 916-344-2098 916-344-0307 Owens Construction 530-878-3905 530-878-3906 Peterson Development 916-961-4756 916-966-0943 Younger General Cont 916-631-8000 916-631-8293 Seward L. Schreder 530-229-0001 530-229-0070 FAIRFIELD WALGREENS - 15432 PLAN #: 62098 Bid Date: 11/5/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Fairfield # OF ADDENDA: 2
Page 30 November 5, 2012
Zone • Contractor’s .
G.C.: Woodland Construction Ph: (209) 545-1987 FAX: (209) 545-2114 DESCR: Contact, Woodland Construction, Curtis Basore, 209-545-1987. Site demolition,; concrete; -unit masonry; -structural metal framing, metal joists/metal decking, cold formed metal framing, metal fabrications; carpentry; thermal insulation, aluminum-faced composite panel system, membrane roofing, built-up roofing system, thermoplastic membrane roofing (canopy roofs), flashing & sheet metal, joint protection, metal doors & frames, wood doors, specialty doors & frames, sliding decorative door assembly, folding grilles, storefronts & automatic entrancesm hardware, glazing; exterior portland cement plaster, gypsum boards, thin set tiling, acoustic ceilings, resilient flooring, carpeting, special wall surfacing, painting & vinyl wallcovering; miscellaneous specialties, toilet partitions & accessories, fire protection specialtyies, pre-manufactured canopy; drive-thru equipment; motorized roller shades, floor mats & frames; general mechanical; water based fire suppression; plumbing, HVAC; lighting & electrical systems; communications; sitework/excavation; paving, ornamental fence, planting/irrigation; site mechanical utilities. BIDDERS LIST: Sub Contractor: On-site Engineering 916-652-0600 916-652-0610 Supplier: Groeniger & Company 916-455-3333 916-455-3402 HOMESTEAD SQUARE PLAN #: 119080 Bid Date: 11/5/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office # OF Location: Cupertino ADDENDA: 2 G.C.: South Bay Construction Ph: 408-379-5500 FAX: 408-379-3256 DESCR: Contact, South Bay Construction, Richard Furtado, (rfurtado@sbci.com) Seeking sub-bids for New Safeway, retail shopts / pad buildings consisting of facade remodel & site Improvements. BIDDERS LIST: Sub Contractor: H.a. Bowen Electric, Inc. 510-483-0500 510-483-7210 7101 BONITA WAY SEWER LOWER LATERAL RELOCATION PLAN #: 123080 Bid Date: 11/5/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Citrus Heights Online and Planroom Est Cost: $22,000.00 OWNER: Citrus Heights Water District Ph: 916-725-6873 DESCR: Contact, Robert Churchill, 916-725-6873. Installing and connecting one 4-inch residential sewer service for the City of Citrus
Plans On File Continued from last page
Monday, November 05, 2012 FOLSOM LAKE COLLEGE - ATHLETIC FIELDS PHASE Bid Date: 11/5/2012 PLAN #: 141055 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Folsom Planroom Est Cost: $1,953,000.00 # OF ADDENDA: 2 PREBID: 10/24 @ 10am OWNER: Los Rios Community College District Ph: 916-856-3441 FAX: 916-856-3448 DESCR: Contact, Janet DeBerard, 916-568-3077. Earthwork, grading and drainage, and site utility improvements. The Athletic Facilities are tennis court complex, interpretive trail and cross country course. BIDDERS LIST: General Contractor: F & H Construction 209-931-3738 209-931-4427 Bobo Construction, Inc. 916-685-2285 916-714-4850 Lamon Construction Co., 530-671-1370 530-671-7482 Otto Construction 916-441-6870 916-441-2486 Diede Construction 209-369-8255 209-368-0600 American River Const 530-621-1785 530-621-0360 Flintco 916-351-5400 916-294-0557 Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925 OLD CANYON ROAD BRIDGE PROTECTION REPAIR PROJECT PLAN #: 175090 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fremont Online and Planroom OWNER: City of Fremont DESCR: Contact, City of Fremont, (510) 494-4620. Field
reconnaissance, site assessment, environmental review, permit acquisition, engineering design, and construction technical support for installing scour countermeasure improvements at the Old Canyon Road Bridge over the Alameda Creek. ALARM MONITORING AT VARIOUS CHP CENTRAL DIVISION AREA OFFICES Bid Date: 11/5/2012 PLAN #: 186088 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Various Online and Planroom OWNER: California Highway Patrol Ph: 916-375-2940 FAX: 916-375-2944 DESCR: Contact, Kimberly Vlahos. 916-843-3800. Alarm Monitoring at Various CHP Central Division Area Offices. REFRIGERATION PREVENTATIVE MAINTENANCE Bid Date: 11/5/2012 PLAN #: 216086 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sac/Placer/Yol Online and Planroom OWNER: Department of Rehabilitation DESCR: Contact, Shari Cooley, 916-558-5690. Department of Rehabilitation is requesting bids for Refrigeration Preventative Maintenance, for the Sac/Placer/Yolo/Amador Counties. UNION PACIFIC RAILROAD FENCE PROJECT PLAN #: 272049 Bid Date: 11/5/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Elk Grove Planroom Est Cost: $25,000.00 OWNER: City of Elk Grove DESCR: Contact, Avtar Banwait, 916-478-3613. Furnish and install approx 1,200 ft of chain link fence along Union Pacific Railroad tracks just south of Elk Grove Blvd. SECURITY SYSTEMS INSTALLATION AND TESTING PLAN #: 287041 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office
The Capps Group A Professional Real Estate Team
Kevin Capps - Managing Broker Kevin@cappsgroup.com (DRE # 01705659)
Carolyn Hearn - Realtor Carolyn@cappsgroup.com (DRE # 01483632)
530-823-2111 Office www.cappsgroup.com 856 Lincoln Way, Auburn, CA 95603
Located in the heart of Downtown Auburn, serving Buyers & Sellers since 1987 Residential, Commercial & Investment
Page 32 November 5, 2012
Zone • Contractor’s .
Location: Sacramento Planroom Est Cost: $1,250,000.00 # OF ADDENDA: 2 PREBID: 10/25 @ 1:30pm OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Phleacia Christopher (phleacia.christopher@ smud.org). Furnish, install, unit test, configure, calibrate, optimize, turn-up and test a perimeter zone security system at designated SMUD facilities, including installation of SMUD furnished surveillance cameras and infared illuminators.
Tuesday, November 06, 2012 WASTEWATER TREATMENT PLANT CAKE HOPPER EQUIPMENT PLAN #: 7017 Bid Date: 11/6/2012 Bid Time: 2:00 PM Location: San Mateo PLANS AT: Auburn & Roseville Office Online & Print On Demand # OF ADDENDA: 1 OWNER: City of San Mateo DESCR: Contact, City of San Mateo, (650) 522-7300. Project consists of furnishing all applicable labor, materials including all applicable sales taxes, equipment, permits (if necessary), fees & other appurtenances of services to furnish & deliver a cake hopper per technical specs for the purpose of conveying cake at the San Mateo WTP. Installation of the equipment is not included BIDDERS LIST: Supplier: Jbi 916-933-5500 916-933-5573 COUNCIL CHAMBERS A/V SYSTEM RENOVATION PLAN #: 12003 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Antioch Online & Print On Demand PREBID: 10/17/12 @ 10:00 am # OF ADDENDA: 2 OWNER: City of Antioch DESCR: Contact, City of Antioch, (925) 779-7050. Complete renovation of the City of Antioch’s Council Chambers’ audiovisual systems, which consists of, but not limited to, cameras, production environment/switcher, sound system, graphics generator, projector and screen, etc. JAMES DONLON & LARKSPUR WATER STORAGE RESERVOIR REHABILITATION PLAN #: 20001 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Antioch Est Cost: $890,000.00 # OF ADDENDA: 1 OWNER: City of Antioch DESCR: Contact, City of Antioch - Capital Improvements (925) 779-7050. Project consists of Interior & exterior relining & repainting of two existing 2.0 million gallon, welded steel, potable water storage reservoir tanks, furnishing
& installing multi-level reservoir water quality sampling stations, submersible reservoir mixing systems, and removal & replacement of cathodic protection BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 LIGHTING UPGRADES OF SOFTBALL FIELDS PLAN #: 29008 Bid Date: 11/6/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Est Cost: $306,700.00 # OF ADDENDA: 2 PREBID: 10-15-12 @ 10AM OWNER: City of Fresno DESCR: Contact, Fresno Purchasing Dept (559) 621-1332. Replacement of wood sports lighting poles, fixtures, and associated electrical with new wood sports lighting poles, fixtures, and associated electrical at Einstein and Quigley Playgrounds. CARMICHAEL E.S./WHITNEY E.S. RESTROOMS UPGRADES PLAN #: 50096 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Carmichael/Sa Online and Planroom Est Cost: $525,000.00 # OF ADDENDA: 4 PREBID: MAND 10/25 @ 2:30pm OWNER: San Juan Unified School District DESCR: Contact, Danny Martin, Innovative Construction Services, Inc., 916-333-5701. Carmichael ES: Modernization of two student gang restrooms; including new flooring, wall finishes, new efficient fixtures and water closets & ADA Compliance.Whitney ES: Modernization of two gang restrooms located at A & D Wings. Includes new flooring, wall finishes, new efficient fixtures and water closets, ADA Compliance. BIDDERS LIST: Pre-bid Online 530-889-3953 530-889-3956 General Contractor: Hometown 916-991-2486 916-991-2881 D.g. Granade, Inc. 530-677-7484 530-677-7550 S W Allen Construction 916-344-2098 916-344-0307 Owens Construction 530-878-3905 530-878-3906 Younger General Cont 916-631-8000 916-631-8293 Seward L. Schreder 530-229-0001 530-229-0070
Continued on next page
Plans On File Continued from last page
Tuesday, November 06, 2012 DIXON STREET IMPROVEMENTS PLAN #: 54004 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Hayward Online and Planroom PREBID: 10/17 @ 2pm OWNER: City of Hayward DESCR: Contact, City of Hayward, (510) 583-4738. To improve vehicle, pedestrian and bicycle access. Removal of exidting curb and gutter, sidewalk, trees, overhead utilities and utility poles. Placement of nuew curb and gutter, joint trench, permeable pavers, sidewalk, sanitary sewer, strom drain, landscaping, signing and striping, street lighting and traffic signal and performing other items or details. BIDDERS LIST: General Contractor:
Jensen
Masonry 916.663.3429 Paradisembj@earthlink.net www.Jensen-Masonry.com BBQ’s Fireplaces Brick Rock Etc.
CCL #:804650
Page 34 November 5, 2012
MARIEMONT ELEMENTARY SCHOOL, RESTROOM UPGRADES PLAN #: 56003 Bid Date: 11/6/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Demand PREBID: MAND 10/18 @ 3:30 # OF ADDENDA: 1 OWNER: San Juan Unified School District DESCR: Contact, Vanir Construction Mgmt., Jeff Scruggs, 916-275-8440. Modernization of two sets of boys/girls restrooms, one set of single use restrooms and Kindergarten restrooms for ADA compliance and ADA path of travel flatwork leading to the restrooms. BIDDERS LIST: General Contractor: Hometown 916-991-2486 916-991-2881 Bobo Construction, Inc. 916-685-2285 916-714-4850 Landmark Construction 916-663-1953 916-663-1867 C & C Construction 916-434-5280 916-434-5288 Division 5-15, Inc. 916-638-1520 916-638-1521 Owens Construction 530-878-3905 530-878-3906 Peterson Development 916-961-4756 916-966-0943 Seward L. Schreder 530-229-0001 530-229-0070 American River Const 530-621-1785 530-621-0360 JONAS SALK MIDDLE SCHOOL AKA THOMAS EDISON LANGUAGE INSTITUTE K-6 RESTROOM UPGRADES PLAN #: 57098 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PREBID: MAND 10/18 @ 1:30pm OWNER: San Juan Unified School District DESCR: Contact, Vanir Construction Mgmt., Jeff Scruggs, 916-275-8440. Site work, Concrete,Metals, Wood & Plastic, Thermal & Moisture Control, Doors and Windows, Finishes, Specialties, Mechanical, Electrical & Technology. BIDDERS LIST: General Contractor: Hometown 916-991-2486 916-991-2881 Landmark Construction 916-663-1953 916-663-1867 Division 5-15, Inc. 916-638-1520 916-638-1521 Owens Construction 530-878-3905 530-878-3906 Treehenge 530-269-2816 530-269-0289 Seward L. Schreder 530-229-0001 530-229-0070 American River Const 530-621-1785 530-621-0360 Sub Contractor: Guardian Environmental 916-997-1830 916-641-5690
Mark Jensen, Master Mason • • • • •
Cf Contracting 415-721-7160 415-296-6437 Ghilotti Construction Co 707-585-1221 707-585-1601
Zone • Contractor’s .
CALISTOGA LIBRARY RE-ROOF PLAN #: 61076 Bid Date: 11/6/2012 Bid Time: 3:30 PM PLANS AT: Print On Demand Location: Calistoga Online & Print On Demand PREBID:MAND 10/30@ 8:30 am OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627 DESCR: Contact: County of Napa (707) 253-4351.Re-roofing of approximately 2,900 square feet of sloped roof and 625 square feet of flat roof of the Calistoga Library. SIMPKINS STADIUM CENTER KITCHEN ANSUL SYSTEM PROJECT Bid Date: 11/6/2012 PLAN #: 81073 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: San Jose Online & Print On Est Cost: $22,000.00 Demand PREBID: 10/23 @ 1:30PM OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243 DESCR: Contact, Diana.cornell@sjsu.edu and Sylvia.sosa@ sjsu.edu. To provide all supervision, engineering, design, labor and materials necessary to install a complete new pre-engineered wet chemical fire extinguishing system for the protection of the existing cooking equipment, including exhaust hoods and ducts and related work. WEST SAC TRIANGLE (70 UNIT MULTI-FAMILY HOUSING PROJECT) PLAN #: 102087 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: West Online & Print On Demand G.C.: Sunseri Associates Ph: 916-455-8200 FAX: 916-455-8229 DESCR: Contact, SUNSERI Associates, Inc.., Julie Meeker, Jmeeker@sunseriassociates.com Phone: (916) 455-8200 Fax: (916) 455-8229 West Sacramento Triangle Affordable Apartments will be a new 5-story building, housing 70 residential apartments with accessory use spaces and a one level podium garage. The structure will be reinforced concrete at the first level, with four levels of wood frame construction above. BIDDERS LIST: Supplier: Teichert Ready-mix 916-480-5535 916-978-9254 DOLLAR TREE TI PLAN #: 106089 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: North Online & Print On Demand G.C.: Tilton Pacific Construction
Ph: 916-630-7200 FAX: 916-630-4982 DESCR: Contact, Tilton Pacific Construction, 916-6307200. Construct 11,647 SF of tenant improvements, including demolition, construction staking, earthwork, grading, asphalt paving, striping, signage, asphalt slurry seal, underground utilities, landscaping, irrigation, concrete masonry, structural steel, rough carpentry, insulation, roofing, sheet metal flashings, caulking, doors, frames, hardware, storefront, lath / plaster, EIFS, metal studs / drywall, tile, acoustical ceilings, painting, flooring, FRP, sealed concrete, toilet accessories, fixtures, awnings, fire sprinklers, plumbing, HVAC, electrical and fire alarm. BIDDERS LIST: Supplier: Sunbelt Rentals 916-789-1234 916-789-7077 VETERINARY GENETICS LABORATORY SAMPLE STORAGE CONTAINERS PLAN #: 144058 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Davis Online & Print On Est Cost: $130,000.00 Demand PREBID: MAND 10/23 @ 9:30 AM OWNER: University Of California, Davis DESCR: Contact, Heather Eckels (heckels@ucdavis.edu) (530) 752-6115. Install a new 51’ x 60’ - 8” minimum AB base cargo container pad and concrete sidewalk, including moving five existing cargo containers located at the grounds, furnishing / installing two new cargo containers on to the new AB pad, electrical connection improvements to all seven cargo containers, removal of cargo doors, construction of new insulated exterior walls with new 3’ x 6’ - 8” doors, new insulated interior walls, ceilings and florescent lighting. HOSPITALWIRELESSACCESS POINTS INSTALLATION EAST WING WIRELESS ACCESS POINTS PLAN #: 164072 Bid Date: 11/6/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $359,000.00 Demand PREBID: MAND 10/23 @ 10 AM OWNER: University of California, Davis Health System DESCR: Contact, UC, Davis Health System (UCDHS) Lavell Tyler, Jr. (916) 734-7024. Relocate & install new and existing wireless access points; provide & install new surface wiremold raceway system for WAP cabling installation; terminate CAT6 cabling from each wireless access point device to new or existing patch panel; perform system testing; protect existing equipment and systems; patch & repair existing construction reuqired for new work or relocate existing WAPs and relocate up to 5% of WAPs after system testing for signal coverage. Continued on next page
Plans On File Continued from last page
Tuesday, November 06, 2012 SANITARY LIFT STATION LINING REHABILITATION PLAN #: 193088 Bid Date: 11/6/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Online and Planroom # OF ADDENDA: 1 PREBID: 10/9 & 10/10 @ 9am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, 209-577-5462, Lou Schlitz (lschilitz@modestogov.com) Sanitary Lift Station Lining Rehabilitation HOUSEHOLD HAZARDOUS WASTE IMPROVEMENT PROJECT PLAN #: 202095 Bid Date: 11/6/2012
STATION
Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Online and Planroom # OF ADDENDA: 2 PREBID: MAND 10/24 @ 10am OWNER: City of Palo Alto DESCR: Contact, John Montenero, 650-329-2319. Requesting proposals for Household Hazardous Waste Station Improvement Project. BIDDERS LIST: General Contractor: Wickman Development 415-215-3473 415-341-0155 Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000 Mission City Rebar, Inc 925-449-6999 925-447-8797 FIRE DAMAGE REPAIRS AT LAS DELTAS UNITS 606 PLAN #: 211097 Bid Date: 11/6/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Richmond Planroom PREBID: 10/23/2012@11am OWNER: Housing Authority of the County of Contra Costa Ph: 925-957-8012 DESCR: Contact, Lorita K. Childress 925-957-8058. Fire Damage Repairs, 606 & 607 Las Deltas, North Richmond, Ca ANNUAL STORM DRAIN MAINTENANCE Bid Date: 11/6/2012 PLAN #: 210098 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Placer Co. Online and Planroom # OF ADDENDA: 1 OWNER: County of Placer Procurement Dept DESCR: Contact, County of Placer, Procurement, 530-8897776. Annual storm drain maintenance in various locations. SILAGE COVERING SERVICES (2-YR CONTRACT) PLAN #: 215079 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Tracy Planroom OWNER: California Prison Industry Authority DESCR: Contact, Kathi Young, (kathi.young@calpia.ca.gov) CALPIA is soliciting for Silage Covering Services at Deuel Vocational Institution. DMF VALVE REPLACEMENT AND HIGH PRESSURE PLAN #: 217082 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Redwood City Online & Print On Demand PREBID: 10/23 @ 10am OWNER: South Bayside System Authority DESCR: Contact, South Bayside System Authority (650) 5917121. Project consists of non-shrink grout, protective coatings,
Page 36 November 5, 2012
Zone • Contractor’s .
identifying devices, pipe supports, piping & accessories, butterfly valves, potable water system & high pressure air piping. RFQ - CIVIL ENGINEERING SERVICES - LA RUE BRIDGE OVER PUTAH CREEK WIDENING PROJECT Bid Date: 11/6/2012 PLAN #: 226090 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Davis Online and Planroom Est Cost: $2,000,000.00 OWNER: University Of California, Davis DESCR: Contact, Kurt Wengler at (kmwengler@ucdavis.edu). Provide civil engineering services for the La Rue Bridge over Putah Creek STORAGE, POOL AND SPA IMPROVEMENTS PLAN #: 228089 Bid Date: 11/6/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Mill Valley Online and Planroom Est Cost: $710,000.00 PREBID: MAND 10/29/12 @ 10:00 am OWNER: Strawberry Recreation District DESCR: Contact, Nute Engineering (415) 453-4480. Newly construct maintenance building and add rentable storage, relocate trash enclosure, relocate pool equipment, construct new Adult Spa, construct new Teaching Pool (relocate), construct new “Zero Depth” Children’s Water Play Area, rebuild east pool enclosure, improve/construct path of travel, improve parking lot, entry, and two dugouts. BIDDERS LIST: General Contractor: Romkon Inc. 415-525-4432 415-529-2073 Cf Contracting 415-721-7160 415-296-6437 A.e. Nelson Construction 707-636-1750 707-636-1755 RCD BOILER REPLACEMENT PLAN #: 235091 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland Planroom OWNER: County of Alameda DESCR: Contact, County of Alameda, Tim Wesig, 510-2089517. Furnish and install a new, low-pressure steam boiler equipped with a non-resettable gas meter in the boiler room of the Rene C. Davidson INSTALL SAFETY STAIR AND DECK COVERS AT GUADALUPE LRT DIVISION PLAN #: 237087 Bid Date: 11/6/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom PREBID: 10/29 @ 10:30 AM at 3331 North First St., Bldg A, San Jose OWNER: Santa Clara Valley Transportation Authority
FAX: 408-955-9729 Ph: 408-321-7189 DESCR: Contact: VTA (408) 952-8981.Installation of safety tread stair covers & deck civers at the VTA Guadalupe Division Bldg A external staircase HANFORD NON CHEMICAL LANDSCAPE MAINTENANCE-RE-BID Bid Date: 11/6/2012 PLAN #: 241091 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Hanford Online and Planroom OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Dyan Rose-Clemons, DMV, 916-657-6977. Provide Non Chemical Landscape Maintenance for the City of Hanford DMV. RFP - PROFESSIONAL SERVICES - COMPRESSED NATURAL GAS SERVICES Bid Date: 11/6/2012 PLAN #: 243050 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Online and Planroom OWNER: City of Palo Alto DESCR: Contact, (john.montenero@cityofpaloalto.org) The City of Palo Alto is requesting proposals for Compressed Natural Gas Services. MAINTENANCE AND REPAIR OF SECURITY VIDEO EQUIPMENT PLAN #: 260050 Bid Date: 11/6/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Various Online and Planroom OWNER: State of CA - Dept. of Transportation Ph: 916-227-6033 FAX: 916-227-6112 DESCR: Contact, Arlena Zavala, Fax: 916-227-6138. Provide Maintenance and Repair of Security Video Equipment for the Department of Transportation, Division of Procurement and Contracts.
C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts, and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors?
For rates, call Steve today at (916) 729.5432 or email him at CandSpublishing@gmail.com Continued on next page
Plans On File Continued from last page
Tuesday, November 06, 2012 L-612 STUDENT SERVICE REMODEL PLAN #: 274041 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Pittsburg Online & Print On Est Cost: $10,000,000.00 # OF ADDENDA: 5 Demand PREBID: MAND 9/27 @ 10am OWNER: Contra Costa Community College District Ph: 925-229-1000 FAX: 925-370-2019 DESCR: Contact, Contra Costa Community College District Jovan Esprit (jesprit@4cd.edu) FAX: (925) 370-6517. Construct alterations to a two-story section, +/- 38,110 SF of the existing College Complex and a new two-story 7,470 SF addition, including demolition / hazardous material removal, a new steel-frame structural system, exterior enclosure, roofing system, elevator, interior partitions, casework, finishes, mechanical, pluming, fire protection, electrical, security, telecommunications, temporary relocation of existing main telephone and internet cables, etc. BIDDERS LIST: Cooper Pugeda Manag 415-552-5511 415-543-6510 General Contractor: F & H Construction 209-931-3738 209-931-4427 C. Overaa And Co. 510-234-0926 510-237-2435 Landmark Construction 916-663-1953 916-663-1867 Sub Contractor: G. D. Long Electric Co 707-252-3512 707-252-8340 Quality Erectors & Const 707-746-1233 707-751-3962 Mission City Rebar, Inc 925-449-6999 925-447-8797
HOUSEHOLD HAZARDOUS WASTE (HHW) DISPOSAL PLAN #: 284043 Bid Date: 11/6/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Stanislaus Co. Planroom # OF ADDENDA: 3 OWNER: County of Stanislaus DESCR: Contact, Stephanie Shafer (ShaferS@stancounty. com), 209-525-7787. Household Hazardous Waste (HHW) Disposal IPIC THEATERS WESTWOOD - BID PKG 2 PLAN #: 303011 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Angeles # OF ADDENDA: 5 G.C.: RSR Construction Co. Ph: 503-645-8531 FAX: 503-645-5357 DESCR: Contact, RSR Construction, Becki Wildschut, 503645-8531 ext.#537 Fax: 503-645-5357 (beckiw@robcon.com) Construct an upscale 6 screen theater with 2 kitchens with restaurant & bar. Also, includes office space. Bid Package #2 includes all scopes of work except FALL 2012 ROOFING PROJECT - ALAMEDA UNIFIED SCHOOL DISTRICT Bid Date: 11/6/2012 PLAN #: 318005 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Alameda Online and Planroom PREBID: MAND 10/29 @ 1 pm @ 210 Central Avenue, Alameda DESCR: Contact: Counterpoint Construction Services Inc (707) 824-8440. 1. ENCINAL HIGH SCHOOL- 210 Central Avenue, Alameda, CA • Re-Roof 400 Wing as shown (refer to aerial plan for location of building) and asspecified herein 2. Island High School-1900 Third Street, Alameda, CA • Re-roof
Legal options to improve your financial future Bankruptcy • Company & Personal Debt • Foreclosure
CALL TODAY (530) 888-7100 www.BottomLineLawyers.com
Page 38 November 5, 2012
Zone • Contractor’s .
WEB SITE
INFO CENTER
ABOUT
CONTACT
985 Lincoln Way, Auburn, CA 95603
classroom wings as shown (refer to aerial plan for location). 3. Lincoln Middle School-1250 Ferndale Blvd, Alameda, CA • Reroof Media Center as shown (refer to aerial plan for location).
Wednesday, November 07, 2012 VILLAGE OAKS SITEWORK PLAN #: 4010 Bid Date: 11/7/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: San Jose Online & Print On Demand G.C.: SD Deacon Corp. Ph: 916-969-0900 FAX: 916-735-0800 DESCR: Contact, SD Deacon, alex.robles@deacon.com. Site Work (30 Acres). Trades to include: Surveying/staking, SWPPP’s, Grading,AC Paving, underground utilities, stripping and signage, conrete, biotreatment basins,landscaping, CMU, rough carpentry, structural steel, site amenities, roofing, sheetmetal/flashing, plaster ,painting and electrical. BIDDERS LIST: General Contractor: Mcguire & Hester 510-632-7676 510-562-5209 WASTEWATER TREATMENT PLANT ENERGY OPTIMIZATION IMPROVEMENT PROJECT PLAN #: 17007 Bid Date: 11/7/2012 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Grass Valley Online and Planroom Est Cost: $110,000.00 # OF ADDENDA: 1 OWNER: City of Grass Valley Dept Of Public Works DESCR: Contact, City of Grass Valley, Department of Public Works (530) 274-4352. Construct improvements, including modifications to controls for the aeration system and the WAS storage and conveyance system. POLICE BUILDING REMODEL PROJECT PLAN #: 36005 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Wheatland Planroom Est Cost: $80,000.00 PREBID: MAND 10/29 @ 2pm OWNER: City of Wheatland DESCR: Contact, City of Wheatland, 530.633.2761. Work consists of the improvements to an existing unoccupied 3,808 SF building including: interior demolition, parition walls, cover and add exterior openings, electrical, plumbing, HVAC, interior finishes, painting and various other items of work. BIDDERS LIST: General Contractor: B & B General Engin. 530-277-7305 530-237-1798 Peterson Development 916-961-4756 916-966-0943 Owens Construction 530-878-3905 530-878-3906
Supplier: Cavolt & Sons Inc
916-624-8222 916-624-0878
SAM’S CLUB - 4822-202RM PLAN #: 55095 Bid Date: 11/7/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Murrietta G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656 DESCR: Contact, Shames Construction, 925-606-3000. Scopeofworkincludes:Interior/lition,ErosionControl,Paving,Tile WarningSystem,SiteConcrete,StripingandSignage,PavementSea lcat,Masonry,PartialInteriorSlabConcreteReplacement,Concrete Polishing,poxyFlooring,Structural/MiscSteel,SheetMetal,Roofi ng,Stucco/EIFS,Paint,Caulking&Sealants,MetalStudDrywall,In sulation,CeramicTile,,Fiing,Flooring,AcousticalCeiAccessories ,FixtureAnchoring,DockEquipment,OverheadDoors,Fencing,Fi reSprinklers,HVAC,Plumbing,Electrical,Refrigeration,EMS,Se 1640/1650 MISSION STREET EMERGENCY GENERATOR, DESIGN/BUILD ALTERATION & TENANT IMPROVEMENTS REMODEL RE-BID Bid Date: 11/7/2012 PLAN #: 105082 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online & Print On Est Cost: $1,400,000.00 # OF ADDENDA: 3 Demand PREBID: 10/*18 @ 1:30pm OWNER: City & County of San Francisco DESCR: Contact, Paul Travis, 415-557-4631. The work is replacement of the emergency power system at 1640/1650 Mission Street building, including, but not limited to, design services, demolition, furnishing and installing new diesel generator and automatic transfer switch, sound enclosure, concrete pads, tank system, fire alarm system, structural supports, tenant improvements, and all appurtenant work. ARELIOUS WALKER STAIRWAY REPLACEMENT PLAN #: 125081 Bid Date: 11/7/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online & Print On Est Cost: $500,000.00 Demand # OF ADDENDA: 1 PREBID: 10/25 @ 1:30pm OWNER: City & County of San Francisco DESCR: Contact, Raymond Lui, 415-558-4585. The work to be done under this contract is located at Arelious Walker Drive between Innes Avenue and Northridge Road in the northwestern portion of the Bayview Hunters Point District in San Francisco and includes demolition of existing concrete stairway and work to furnish and install new concrete stairway with anti-slip strip at noising, metal railing, and vandal Continued on next page
Plans On File Continued from last page
Wednesday, November 07, 2012 COSUMNES RIVER BOULEVARD EXTENSION I-5 TO FRANKLIN BOULEVARD Bid Date: 11/7/2012 PLAN #: 133063 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $68,238,450.00 # OF ADDENDA: 4 Demand PREBID: 10/16 @ 10am OWNER: City of Sacramento DESCR: Contact, Nader Kamal, 916-808-7035. Construction of the extension of Cosumnes River Blvd., from Franklin Rd., to Freeport Blvd., including the construction of a new interchange and overcrossing at Interstate-5 and bridge over Morrison Creek. Includes; construction of new roadways, curb, gutters, sidewalks, drainage facilities, water lines, sewer facilities, landscaping and street lighting and traffic signal BIDDERS LIST: General Contractor: Shasta Constructors 530-365-3930 530-365-5465 Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925 SANTA CRUZ RIVER FRONT PARKING STRUCTURE PARCS SYSTEMS PLAN #: 153062 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Est Cost: $535,000.00 Demand PREBID: MAND 10/22 @ 10AM # OF ADDENDA: 2 OWNER: City of Santa Cruz DESCR: Contact, City of Santa Cruz (831) 420-5160. Demolition and installation of new PARCS system and prefabricated office and existing open air parking structure, COSUMNES RIVER BOULEVARD EXTENSION I-5 TO FRANKLIN BOULEVARD PLAN #: 133063 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $68,238,450.00 # OF ADDENDA: 3 Demand PREBID: 10/16 @ 10am OWNER: City of Sacramento DESCR: Contact, Nader Kamal, 916-808-7035. Construction of the extension of Cosumnes River Blvd., from Franklin Rd., to Freeport Blvd., including the construction of a new interchange and overcrossing at Interstate-5 and bridge over Morrison Creek. Includes; construction of new roadways,
Page 40 November 5, 2012
Zone • Contractor’s .
curb, gutters, sidewalks, drainage facilities, water lines, sewer facilities, landscaping and street lighting and traffic signal BIDDERS LIST: General Contractor: Shasta Constructors 530-365-3930 530-365-5465 Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925 DISTRIBUTION SYSTEM VALVE REPLACEMENT PLAN #: 183073 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Daly City Online and Planroom Est Cost: $97,000.00 OWNER: City of Daly City DESCR: Contact, Tom Piccolotti, 650-991-8207. Installation of (24) new water main valves with restrained connections, new valve pots with risers, valve extensions, excavation, shoring, locating and spupporting of other utilites within the trench area, backfill of trench and temporary restoration of sidewalk/ driveway/walkway/planting/roadway. SLIDE-IN ASPHALT PATCH BOX PLAN #: 196085 Bid Date: 11/7/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Yuba City Online and Planroom OWNER: County of Sutter DESCR: Contact, Sutter County Public Works, 530-822-7473. (1) One Slide-In Asphalt Patch Box to be frnished to the Sutter County Department of Public Works/Roads Division. KITCHEN HOODS - FIRE SUPPRESSION SYSTEM UPGRADES - RE-BID 2 PLAN #: 197092 Bid Date: 11/7/2012 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: San Quentin Online & Print On Est Cost: $75,000.00 Demand PREBID: MAND 10/24 @ 10am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Xavier Contreras, 916-255-6165. Contractor shall provide all labor, supplies, materials, transportation, bonds, insurance, travel and per diem, tools, mobilization, waste disposal, testing and every other item of expense necessary to install six (6) kitchen hood fire suppression systems to meet the California State Fire Code application of Underwriters Laboratories Standard 300 (UL300) and as per the attached plans and specifications at San Quentin State Prison (SQSP), at San Quentin, California 94964. TOWNPLACE SUITES PLAN #: 277035 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand
Location: Lancaster Online & Print On # OF ADDENDA: 1 Demand G.C.: Tricorp/Hearn Construction Ph: 916-779-8010 FAX: 916-779-8011 DESCR: Contact, James Morefield (jmorefield@tricorphearn. com) Scope of Work:New construction of a new 52,594 sq. ft., 4 story, 92 room hotel with associated site work. Project is to have a small prep kitchen, outdoor pool to be under separate deferred submittal.This is NOT a Prevailing Wage project.All bids to be good for a minimum of 60 days from bid dateSubcontractor bonds may be required – provide your bond rating with your bid submittal. LEVEE MAINTENANCE PROJECT - 2012 EROSION REPAIRS AT VARIOUS LOCATIONS PLAN #: 280044 Bid Date: 11/7/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Joaquin Planroom Est Cost: $85,000.00 OWNER: Reclamation District No. 2 DESCR: Contact, Kjeldsen, Sinnock & Neudeck, Inc., 209946-0268. Preparing the levee waterside erosion repair sites for slope protection and furnishing and placing approximately 3,570 tons of 18-inch minus quarry stone riprap along the designated., SAM’S CLUB 4767-201 PLAN #: 286044 Bid Date: 11/7/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: West G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656 DESCR: Contact, Shames Construction, 925-606-3000. Interior/ExteriorDemolition, ErosionControl,SiteConcrete,Str ipingandSignage,PavementSealcoat,PartialInteriorSlabConcr eteReplacement,ConcretePolishing,EpoxyFlooring,Structural/ MiscSteel,SheetMetal,Roofing,InteriorPaint,Caulking&Sealan ts,MetalStudDrywall,Insulation,CeramicTile,FRP,DFH,Fixturi ng,Millwork,RoughCarpentry,GlassandGlazing,AcousticalCei lings,ToiletAccessories,FixtureAnchoring,DockEquipment,Ov erheadDoors,Fencing,FireSprinklers,HVAC,Plumbing,Electric al, Refrigeration, EMS, Seismic Protection, Tire SPROUTS FARMERS MARKET PLAN #: 294033 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Petaluma Online & Print On Demand G.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700 DESCR: Contact, Midstate Construction, 707-559-2320. New Costruction, approximately 25,100 SQ. FT.
MH58 STRUCTURAL IMPROVEMENTS PROJECT PLAN #: 296042 Bid Date: 11/7/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Port of Stockton Online and Planroom PREBID: MAND 10/24 @ 10 AM OWNER: Port of Stockton DESCR: Contact, Port of Stockton Steve Escobar (209) 9460246. Construct site improvements for an existing material storage building, including sawcutting pavement, asphalt grinding, excavation, grading, compaction, installation of base rock, installation of concrete, storm water pollution control, etc. BIDDERS LIST: General Contractor: Andrew L. Lee, Inc. 209-369-8077 209-368-2435 Diede Construction 209-369-8255 209-368-0600 JOANN FABRIC & CRAFT STORE RENOVATION PLAN #: 304010 Bid Date: 11/7/2012 Bid Time: 4:00 PM PLANS AT: Auburn & Roseville Location: Redding # OF ADDENDA: 1 PREBID: 10/29 to 10/31 from 8 AM to 5 PM G.C.: Construction 1 Inc Ph: 614-961-1117 FAX: 614-961-1317 DESCR: Contact, Construction One, Inc., (614) 961-1115 Fax:(614) 961-1315. Renovate an +/- 28,535 SF building, including selective demolition, asphalt repair, site and building concrete, concrete cutting, masonry, steel, carpentry, insulation, EIFS, roofing, storefront, drywall, acoustical ceiling, flooring (installation of Owner-supplied VCT and sheet vinyl and furnishing / installation of ceramic tile), painting, FRP, loading dock equipment, sprinklers, plumbing, HVAC and electrical. **Do NOT contact the vendors, architect or owner. RENTAL PROPERTY IMPROVEMENTS PLAN #: 306010 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Martinez Est Cost: $55,000.00 PREBID: 10/30 @ 10am OWNER: Central Contra Costa Sanitary Dist. DESCR: Contact, Chathu Abeyrathna, 925-335-7764. Improvements to office spaces, including ADA improvements.
Continued on next page
Plans On File Continued from last page
Wednesday, November 07, 2012 PUBLIC STORAGE - 2046 PLAN #: 320005 Bid Date: 11/7/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: San Diego Online & Print On Demand G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656 DESCR: Contact, Shames Construction, 925-606-Construction of a New 3 Story Storage Facility. TradesNeeded:SiteDemoliti on,ErosionControl,Survey,Grading/Paving/triping,Undergroun dUtilitiesscape,SiteConcrete,BldgConcrete,Masonry,Structura lSteel,Plaster/,Waterproofing,SingleplyroofingoverRidgidInsul ation,MetalRoofing,hitectualSheetMetal,StorefrontGlazing,DF H,OverheadDoors,Insulation,ToiletAccessories,Caulking/Seal ants,Drywall,Flooring,FRP,Painting,Elevators,
Thursday, November 08, 2012 CHEVRON GAS STATION PLAN #: 1019 Bid Date: 11/8/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: San Jose G.C.: Town & Country Contractors Ph: 916-636-9500 FAX: 916-636-9507 DESCR: Contact, Town & County Contractors, Dave Frazierr (Dave@TCContractors.com) 916-636-9500, Fax:916-6369507. Ground up construction for a Chevron Gas Station in San Jose GATEWAY EAST STORM SEWER IMPROVEMENT PROJECT PLAN #: 3013 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose OWNER: City of San Jose # OF ADDENDA: 1 DESCR: Contact, Greg Card, 408-535-8300. Construction, Sewer and Storm Drain, Maintenance and Repair, Sewer and Storm drain ( Including SCHOOL STREET PLAZA PROJECT PLAN #: 14012 Bid Date: 11/8/2012 Bid Time: 4:30 PM PLANS AT: Roseville Office Location: Bridgeport Online & Print On Demand PREBID: MAND 10/25 @ 11am OWNER: County of Mono FAX: 760-932-5441
Page 42 November 5, 2012
Zone • Contractor’s .
DESCR: Contact, County of Mono, 760-932-5440. Removal of existing sidewalk, curb, gutter, asphalt and landscape and placement of new sidewalk, curb and gutter, pedestrian ramps, electrical installation and SAVERS -1197 PLAN #: 30018 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Vacaville G.C.: R & O Construction Ph: 702-895-9322 FAX: 702-895-9388 DESCR: Contact, R & O Construction, Don Mataya, 702895-9322 x 1001. Project Description:28,262 sq ft Tenant Improvement for new Savers Retail Store. Includes all interior and exterior finishes. Miscellaneous Onsite Improvements will be included for front parking and back loading HATCH-MOFFETT WELL NO. 23 ELECTRICAL UPGRADE PROJECT PLAN #: 66082 Bid Date: 11/8/2012 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Ceres Online & Print On # OF ADDENDA: 1 Demand OWNER: City of Ceres DESCR: Contact, City of Ceres, (209) 538-5792. Installation of one (1) new standby generator, transfer switch, removal & disposal of existing generator, transfer switch & associated work. LONG BEACH MAIN PUMPING PLANT PORTABLE PUMP CONNECCTIONS PLAN #: 107084 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Long Beach Planroom # OF ADDENDA: 2 PREBID: MAND 9/25 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Melissa Fischer, 562-908-4288, ext. 6807. Portable pump connections at the Long Beach Main Pumping Plant. INTERIM POLICE STATION & G-2010 OFFICES PLAN #: 128066 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Est Cost: $900,000.00 Demand PREBID: MAND 10/24/12 AT 2 PM OWNER: San Jose/Evergreen Community College District DESCR: Contact, Program Manager (hrank@gilbaneco.com) Project consists of selective structure demolition, concrete topping, rough & finish carpentry, blanket insulation, expansion
joint cover assemblies, custom hollow metal doors & frames, bullet resistant hollow metal door & frame assembly, bullet resistant transaction windows, door hardware, gyspsum board assemblies, bullet resistant fiberglass, acoustical panel ceilings (T-Bar Ceilings), resilient base & accessories, sheet linoleum floor covering, tile carpeting, painting, horizontal louver blinds, educational/library casework (plywood), plumbing, HVAC, lighting, electrical, communications, fire alarm, access control & alarm monitoring system, video surveillance, security testing, soils for earthwork, site clearing, rough grading, excavation & fill, trenching, backfill, aggregate base course, asphalt pavement, concrete paving, chain link fence BIDDERS LIST: General Contractor: Clp Construction 916-344-6646 916-331-4335 Strawn Construction, Inc 408-286-1299 408-286-1288 1701 DIVISADERO 1ST FLOOR - GI CLINIC PLAN #: 131069 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Est Cost: $500,000.00 PREBID: MAND 10/30/12 AT 10 AM OWNER: University of California, S.F. Medical Center DESCR: Contact, UCSF - Ben La (415) 476-5030. Project consists of complete & selective demolition of the project area including removing finishes, casework, walls, ceilings, plumbing & electrical work as called for on the drawings or required for installation of the new work. The General Scope of new work includes Architectural, Mechanical, Plumbing, Electrical, and Fire & Life Safety upgrade work BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 4-PLEX HOUSING UNIT PLAN #: 138057 Bid Date: 11/8/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Merced Online & Print On # OF ADDENDA: 1 Demand PREBID: 10/16 @ 2pm OWNER: Merced County Community Action Agency Ph: 209-381-5221 DESCR: Contact, Merced Co Community Action Agency (209) 381-5221. Scope of work involves, but not limited to: On & Off Site Improvements and Construction of a new wood framed, slab on grade building consisting of four residential units. EL CAMINO STREET AND SIDEWALK IMPROVEMENT PROJECT PLAN #: 140047 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $2,540,000.00
OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 : DESCR: Contact, Sacramento County Municipal Services Agency (916) 874-6544. The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for clearing and grubbing, pavement grinding and removal, tree removal, roadway excavation, installation of curb gutter & sidewalk, installation of drainage pipes, manholes & inlets, aggregate base and asphalt pavement, traffic striping, traffic signal modifications, street lighting, median construction, placement of landscaping and other incidental work. BIDDERS LIST: General Contractor: Doug Veerkamp General 530-626-0825 530-626-7917 C & C Construction 916-434-5280 916-434-5288 Westcon Construction 916-663-2425 916-663-2448 Lamon Construction Co. 530-671-1370 530-671-7482 Sub Contractor: Studebaker Brown Elect 530-333-3423 530-823-1341 BRIDGE PREVENTIVE MAINTENANCE PROJECT PLAN #: 146058 Bid Date: 11/8/2012 Bid Time: 10:00 AM PLANS AT: Location: Siskiyou County Online and Planroom OWNER: County of Siskiyou FAX: 530-842-8288 DESCR: Contact: County of Siskiyou 530-842-8250.The bridge work consists of repairing bridge deck surfaces, applying waterproofing membranes and asphalt concrete overlays, repairing roadway approach settlements, applying asphalt concrete roadway approach overlays, raising and or repairing guardrail and bridge barrier heights, repairing isolated substructure spalls, and joint seal BIDDERS LIST: General Contractor: Timberworks 530-926-4093 530-926-2118 RECLAIMED WATER SYSTEM IMPROVEMENTS (CONSTRUCTION) PLAN #: 161058 Bid Date: 11/8/2012 Bid Time: 10:30 PM PLANS AT: Roseville Office Location: San Rafael Planroom Est Cost: $500,000.00 PREBID: 10/25 @ 10AM OWNER: Central Marin Sanitation Agency Ph: 415-459-1455 DESCR: Contact, Ken Katen, 415-459-1455. Demolish existing hydropneumatic tank, reclaimed water ppumps, reclaimed water strainers and associated electrical equipment and install new Agency-supplied replacement hydropneumatic tanks, reclaimed water pumps reclaimed water strainers and associate electrical equipment etc. BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 Continued on next page
Plans On File Continued from last page
Thursday, November 08, 2012 RFP -COMPLETEING LOMA’S AND FEMA ELEVATION CERTIFICATES FOR HABITABLE STRUCTURES WITHIN THE BASE FLOOD ELEVATION PLAN #: 174099 Bid Date: 11/8/2012 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Citrus Heights Online and Planroom PREBID: MAND 10/30 @ 2pm OWNER: City of Citrus Heights DESCR: Contact, Cesar Montes de Oca, (916) 727-4770. The City of Citrus Heights Gener5al Services Department invites proposals to conduct the survey field work and complete the paperwork required by FEMA to file FEMA elevation certificates and LOMAs. NORTH TRUXEL STREETSCAPES PLAN #: 208078 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom OWNER: City of Sacramento DESCR: Contact, Sheryl Fox, City of Sacramento, 916-8084959. Landscape maintenance, repair of traffic control systems, strrecapes. LANDSCAPE AND INTERIOR PLANT MAINTENANCE PLAN #: 229092 Bid Date: 11/8/2012 Bid Time: 2:00 AM PLANS AT: Roseville Office Location: San Francisco Online and Planroom PREBID: MAND 10/ 30 @ 10am OWNER: California Dept. of General Services DESCR: Contact, Whitney Lemont, 916-323-3750. The Contractor shall provide all labor, equipment, and materials required to provide landscaping maintenance for all exterior plants and trees, including planters and beds on all four (4)sides of the facility and maintenance of all interior plants. NON-CHEMICAL LANDSCAPE MAINTENANCE SERVICES FOR THE HAYWARD DMV FIELD OFFICE PLAN #: 236092 Bid Date: 11/8/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Hayward Online and Planroom PREBID: MAND 10/18 @ 9:00am OWNER: DMV Ph: 916-657-7822 DESCR: Contact, Allison Stanek, 916-657-9810. Seeking proposals for Non-Chemical Landscape Maintenance Services for the Hayward DMV
Page 44 November 5, 2012
Zone • Contractor’s .
NON-CHEMICAL LANDSCAPE MAINTENANCE SERVICES FOR THE HAYWARD DMV FIELD OFFICE Bid Date: 11/8/2012 PLAN #: 236092 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Hayward Online and Planroom PREBID: MAND 10/18 @ 9:00am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Allison Stanek, 916-657-9810. Seeking proposals for Non-Chemical Landscape Maintenance Services for the Hayward DMV !!CANCELLED!ASPHALT MAINTENANCE AND REPAIR Bid Date: 11/8/2012 PLAN #: 248049 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Soledad Online and Planroom PREBID: MAND 10/30 @ 9am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Tracey Morrison, 916-255-5658. Asphalt Maintenance and Repair at the Correctional Training Facility located in Soledad, Ca. M STREET HISTORIC HOMES RESTORATION PLAN #: 261042 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Online & Print On Est Cost: $950,000.00 Demand # OF ADDENDA: 2 OWNER: City of Fresno PREBID: MAND 10-23-12 @ 10AM DESCR: Contact, City of Fresno, (559) 621-1332. Restoration of five (5) Historic Homes. The homes exteriors will be finished. All missing siding and finish trim will be installed. All windows and doors in storage will be fully abated and returned to working condition. Windows and doors that are missing will be installed to match existing windows. The porch decorative ballastraids, columns, posts and spindles will be reinstalled if existing and replicated where missing. Final grades will be verified and finished for installation of site work items: finish concrete, parking lot, accessible ramps, landscaping and irrigation. The exteriors will be painted. The summer kitchen needs to be structurally stabilized. Standard stick framing and four corner posts will be installed as well as new 1x skip sheathing. Minimum Class “C” comp roof over 15# felt over new plywood will then be installed. POLICE VEHICLE EMERGENCY EQUIPMENT PARTS AND INSTALLATION PLAN #: 302010 Bid Date: 11/8/2012
Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Berkeley Planroom OWNER: City of Berkeley DESCR: Contact, City of Berkeley, Senior Electrical Supervisor, Mike Loyola, (mloyola@cityofberkeley.info) Requesting bids for the purchase of Police Vehicle Emergency Equipment Parts and Installation. LANDSCAPE MAINTENANCE FOR NORTH CORDELIA, SOUTHBROOK, CREEKSIDE LIGHTING & LANDSCAPE MAINTENANCE DISTRICTS PLAN #: 311006 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Planroom PREBID: MAND 10/31 @ 9AM OWNER: City of Fairfield DESCR: Contact, City of Fairfield (707) 428-7485. Landscape Maintenance consists of furnishing all labor, materials, equipment and other services necessary for the complete maintenance of all the landscape areas, hardscapes and irrigation. LANDSCAPE MAINTENANCE FOR ROLLING HILLSKOLOB-WATERMAN HIGHLANDS LIGHTING & LANDSCAPE MAINTENANCE DISTRICTS PLAN #: 312004 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Planroom PREBID: MAND 10/31 @ 9AM OWNER: City of Fairfield DESCR: Contact, City of Fairfield (707) 428-7485. Landscape Maintenance consists of furnishing all labor, materials, equipment and other services necessary for the complete
Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are often required. This newspaper is state-certified. Email your ad to:
CandSpublishing@gmail.com
maintenance of all the landscape areas, hardscapes and irrigation. LANDSCAPE MAINTENANCE FOR VARIOUS PUBLIC FACILITIES PLAN #: 313006 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Planroom PREBID: MAND 10/31 @ 9am # OF ADDENDA: 1 OWNER: City of Fairfield DESCR: Contact, City of Fairfield (707) 428-7485. Landscape Maintenance consists of furnishing all labor, materials, equipment and other services necessary for the complete maintenance of all the landscape areas, hardscapes and irrigation. NORMAN Y. MINETA SAN JOSE INT’LAIRPORT - MECHANICAL SERVICES CONTRACT 12-13 PLAN #: 315004 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom OWNER: City of San Jose DESCR: Contact, Greg Card, 408-535-8300. Plumbing Equipment and Fixtures Maintenance and Repair, Plumbing Repair and Maintenance Services, Plumbing, HVAC Maintenance and Repair Services & HVAC
Friday, November 09, 2012 RFQ - ALL-INCLUSIVE BRIDGE ENGINEERING SERVICES ON VARIOUS PROJECTS PLAN #: 168071 Bid Date: 11/9/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Stanislaus Co. Online and Planroom OWNER: County of Stanislaus DESCR: Contact, David Leamon, by fax: 209-541-2509. County of Stanislaus is soliciting a Letter of Interest and Statement of Qualifications from consultants for the Bridge Engineering Services on Various REQUEST FOR STATEMENT OF QUALIFICATIONS 1608 FOURTH STREET PLAN #: 190087 Bid Date: 11/9/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Berkeley Online and Planroom OWNER: University of California - Berkeley DESCR: Contact, David Hunsberger, 510-643-0924. University of California invites designers to submit written statement of qualifications for the design team of Telecom, AV, Data aand security upgrade for an existing four story building. Continued on next page
Plans On File Continued from last page
Friday, November 09, 2012 RFP LANDSCAPE MANAGEMENT AND MAINTENANCE Bid Date: 11/9/2012 PLAN #: 200089 Bid Time: 5:00 PM PLANS AT: Print On Demand Location: San Jose Online & Print On Demand PREBID: MAND 10/29 @ 1pm OWNER: City of San Jose DESCR: Contact, Rosa Marie Velez, 408-535-7047, (Rosamarie. velez@sanjoseca.gov)The City of San José (City) is soliciting proposals from qualified Contractors to provide all labor, materials, equipment and vehicles for Landscape Management and Maintenance (Services) in areas within the public right-ofway managed by the Department of Transportation (DOT). The areas are funded by two distinctly different sources that define the level of service for each of the different landscape areas. Special Districts Landscape: The intent of the Special Districts contracts is to provide a high level of landscape management with maintenance services provided on a weekly basis for all areas of each district.Maintenance District 2Trade Zone-LundyRingwood-ConcourseMaintenance District 5 O r c h a r d Parkway-PlumeriaMaintenance District 11Brokaw-MurphyOld OaklandMaintenance District 13Karina-O’NelMaintenance District 18The MeadowlandsMaintenance District 21Airport Pkwy-Gateway-Metro-Skyport Communities Facility District 14Hitachi STREET LIGHT POLE DELAMINATION REPAIR PLAN #: 209002 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom OWNER: City of Sacramento DESCR: Contact, Norm Colby, 916-808-6635 (ncolby@ cityofsacramento.org). Street Light Pole Delamination Repairs RFP - PROFESSIONAL ENGINEERING SERVICES FOUR BRIDGES PLAN #: 242080 Bid Date: 11/9/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom OWNER: County of Sacramento DESCR: Contact, County of Sacramento, Project Manager, John Jaeger, 916-874-7507. Provide professional engineering services for the Alta Mesa Road, New Hope Road, Rio Linda Blvd & Winding Way Bridges in Sacramento County
Page 46 November 5, 2012
Zone • Contractor’s .
CITY AUDITORIUM BOILERS PLAN #: 244092 Bid Date: 11/9/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Richmond Online and Planroom PREBID: MAND 10/19 @ 11am OWNER: City of Richmond FAX: 510-307-8116 DESCR: Contact, City of Richmond (510) 620-6699. In general, the work consists of Installing two triad Series 1600 Low Pressure Boilers 996,000 BTU/HR or an equivalent boiler, and the concerned piping and ductwork at the CITY AUDITORIUM. SEWER MAIN MANHOLE REHABILITATION PROJECT PLAN #: 249058 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Woodland Online and Planroom OWNER: City of Woodland DESCR: Contact, Linda Morello, 530-661-5836. City of Woodland is seeking proposals for the Sewer Main Manhole Rehabilitation Project. MAIN LIBRARY EMERGENCY GENERATOR PLAN #: 261050 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Richmond Online and Planroom PREBID: MAND 10/19 @ 10am OWNER: City of Richmond FAX: 510-307-8116 DESCR: Contact, City of Richmond, City of Richmond (510) 620-6699. In general, the work consists of Installing one (1) new 45kW Kohler Power systems generator, model# 5OREOZJB or an equivalent emergency generator, and the concerned electrical wiring and conduits at the Richmond Main Library. BIDDERS LIST: General Contractor: Era Construction, Inc. 510-830-5955 510-743-4153 RFQ INTEREST FOR AIRPORT CONSULTINGSERVICES AT EL DORADO COUNTY AIRPORTS PLAN #: 264043 Bid Date: 11/9/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Placerville/Geo Online and Planroom OWNER: County of El Dorado, Dept of Trans DESCR: Contact, Bonnie Rich, 530-621-5940 or email (bonnie. riche@edcgov.us) The El Dorado County Transportation Dept., is soliciting a Request for Qualifications and Statement of Interest for professional services from qualified airport
consulting firms for two El Dorado County Airports (Placerville/ Georgetown) DOLLAR GENERAL STORE Bid Date: 11/9/2012 PLAN #: 271045 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Banos Plans on Disk G.C.: The Hatch Group Ph: 714-257-4600 FAX: 714-000-0000 DESCR: Contact, The Hatch Group, Stacey Frame, 530-6769200. The Hatch Group is accepting bids for the Dollar General Los Banos located at 485 N. Mercy Springs Road - Los Banos, CA 93635. Project description: New construction of a 20,695 SF Doll General Market with onsite and offsite improvements. BIDDERS LIST: General Contractor: The Hatch Group 714-257-4600 714-000-0000 Tilton Pacific Const 916-630-7200 916-630-4982
Monday, November 12, 2012 DOLLAR GENERAL SACRAMENTO TI- AND NEW CONSTRUCTION PLAN #: 137061 Bid Date: 11/12/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento G.C.: The Hatch Group Ph: (530) 676-9200 DESCR: Contact, Hatch Group, Dawn Modena (dawn. modena@thehatchgroup,net). or Andrew Lee, LEED AP, Assistant Project Manager, (530) 676-9200. Construct tenant improvements for a 29,000 SF market.
Tuesday, November 13, 2012 HILLTOP AREA STRENGTHEN AND REPLACE WATER SYSTEM PLAN #: 11013 Bid Date: 11/13/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Online & Print On Est Cost: $1,162,500.00 Demand PREBID: 10/23 @ 11am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, 209-577-5462. Replace & upgrade deficient water mains in the outlying areas southwest of Modesto generally bounded by Paradise Rd, Ohio Ave, Robertson Rd and Carpenter Rd. The project will maintain & provide an increase in service reliability of the City of Modesto’s water system. The project will include replacement of associates water valves and fire hydrants and installation of water meters and service lines. BIDDERS LIST:
General Contractor: Herback General Engin 775-267-6800 775-786-7595 Supplier: Groeniger & Company 916-455-3333 916-455-3402 TUOLUMNE RIVER REGIONAL PARK GATEWAY PHASE 1.3 TRAILS PLAN #: 18023 Bid Date: 11/13/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Est Cost: $391,533.00 PREBID: 10/25 @ 10am & site visit 10/25 @ 11am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Loren Holt, 209-571-5573. The West Basin is a large detention basin that captures stormwater runoff. The basin has heavy erosion along the banks that has deteriorated the walls and requires constant maintenance. This project will mitigate the issues by using engineered landscaping materials and methods to dissipate the concentrated flows that cause the erosion. MODESTO WEST BASIN IMPROVEMENTS PLAN #: 19023 Bid Date: 11/13/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Est Cost: $391,533.85 PREBID: 10/29 @ 11am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Pete Kambel, 209-577-5444. The West Basin is a large detention basin that captures stormwater runoff. The basin has heavy erosion along the banks that has deteriorated the walls and requires constant maintenance. This project will mitigate the issues by using engineered landscaping materials and methods to dissipate the concentrated flows that cause the erosion. The Payment of Prevailing Wages is Required on this Project. CITY COUNTCIL CHAMBERS A/V RENOVATION PLAN #: 35011 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Online and Planroom # OF ADDENDA: 1 PREBID: MAND 10-16 or 10/31 @ 10am OWNER: City of Fairfield DESCR: Contact, City of Fairfield, (707) 428-7485. Relocate existing audio/video equipment and operator for the broadcasting of public meetings from one room to another room in the City of Fairfield Council
To Run Your Legal Ad, Please Visit www.thedailyreporter.net Or Give Us A Call 916-729-5432 Continued on next page
Plans On File Continued from last page
Tuesday, November 13, 2012 HANS MILLER DEMOLITION PROJECT PLAN #: 48007 Bid Date: 11/13/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Yuba City Online and Planroom PREBID: 11/1/2012 @ 10AM OWNER: Regional Housing Authority of Sutter & Nevada County DESCR: Contact, John Guanzon, Regional Housing Authority of Sutter & Nevada Co. (530) 671-0220. Work consists of the demolishing the existing structure on site and remove/properly dispose of all materials. CO ROAD SAFETY IMPROVEMENT PROJECT AT COUNTY ROAD 98 AND COUNTY ROAD 29 PLAN #: 49010 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Yolo Co. Online & Print On Demand OWNER: County of Yolo DESCR: Contact, County of Yolo (530) 666-8852. Work consists of excavating two trenches for reinforced concrete pipe (RCP), furnishing and installing Class III (min.) RCP, and backfilling and compacting road base material. PUBLIC STORAGE PLAN #: 52009 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Demand # OF ADDENDA: 1 G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656 DESCR: Contact, Shames Construction, 925-606-6656. This project consists of a 3 story build-out (57,521sf 1st floor and 51,967sf for each 2nd and 3rd floors) in an existing Public Storage warehouse building. Trades Needed: Demolition, Paving/Striping, Slurry Seal, Underground Utilities, Landscape, Site Concrete, Bldg Concrete, Masonry, Structural Steel, Plaster/stucco, Waterproofing, Singleply Roofing, Sheet Metal, Auto-Door/Storefront Glazing, DFH, Insulation, Toilet Accessories, Caulking/Sealants, MetalStud/Drywall, Flooring, FRP, Painting, Thyseen-Krupp Elevators, HVAC, Fire Sprinkler, Plumbing, Electrical, Fire Alarm. AGRICULTURAL COMMISSIONER’S MAIN OFFICE EXPANSION Bid Date: 11/13/2012 PLAN #: 59003
Page 48 November 5, 2012
Zone • Contractor’s .
Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Yuba City Online & Print On Est Cost: $300,000.00 Demand PREBID: 11/1 @ 9am OWNER: County of Sutter DESCR: Contact, County of Sutter, (530) 822-7450. 1,000 square foot office space building addition along with approximately 1,400 square feet in tenant improvements to include electrical, mechanical and structural modifications. BIDDERS LIST: General Contractor: Bullard Construction 916-485-4370 916-485-4388 Sierra Valley Constructio 916-772-0800 916-772-0825 Broward Builders Inc. 530-666-5635 530-666-5723 Bobo Construction, Inc. 916-685-2285 916-714-4850 S W Allen Construction 916-344-2098 916-344-0307 Treehenge 530-269-2816 530-269-0289 Peterson Development 916-961-4756 916-966-0943 Younger General Cont 916-631-8000 916-631-8293 Hilbers, Inc. 530-673-2947 530-674-9578 Donald F. Gallino, Inc. 530-246-7671 530-246-8714 JEFFERSON STREET GRADE CONTROL STRUCTURE AND SEWER PIPELINE IMPROVEMENTS PLAN #: 124073 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Coachella Online & Print On Demand OWNER: Coachella Valley Water District Ph: 760-398-2651 FAX: 760-391-9637 DESCR: Contact, Coachella Valley Water District, David Wilson, 760-398-2651. Jefferson Street Grade Control Structure and Sewer Pipeline Improvements: The work to be performed includes a grade control structure, concrete slope lining extensions, sewer pipeline abandonment and installation, sewer by-pass during construction, connection to an existing wet well, well site perimeter wall removal and replacement, concrete block revetment over Mid-Valley Pipeline and proposed sewer, and all related concrete and material appurtenances. BIDDERS LIST: General Contractor: Herback General Engine 775-267-6800 775-786-7595 AUHSD DISTRICT OFFICE ALTERATIONS MEASURE E IMPROVEMENTS PLAN #: 151062 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Lafayette Online & Print On Est Cost: $2,400,000.00 # OF ADDENDA: 2 Demand PREBID: MAND 10/5
OWNER: Acalanes Union High School District DESCR: Contact, LCA Architect (925) 944-1626. Project consists of demolition, tree preservation & pruning, site preparation & demolition, tree removal, site clearing, stripping & grubbing, earhwork & grading, trenching, backfilling & compacting, water systems, sanitary sewer, storm drainage, paving & surfacing, pavement marking, irrigation system, ornamental fences & gates, site furnishings & accessories, landscape planting, restoration of surfaces, concrete, reinforced masonry assemblies, structural steel, steel studs. metal fabrication, expansion joint cover assemblies, rough & finish carpentry, custom casework, insulation, roof & deck insulation, water emission control system, firestopping, built-up bituminous roofing, sheet metal flasing, gutters & downspouts, self-adhered membrane flashing, reglet & flashing systems, roof hatches, sealants & caulking, metal doors & frames, pre-finished steel door frames, wood doors, access doors & panels, aluminum entrance & storefront, aluminum windows, finish hardware, gate hardware, glazing, mirrors, lath & plaster/stucco, gypsum board, ceramic tile floor finish, ceramic tile wall finish, suspended acoustical celings, resilient floor coverings, resilient base, carpet-glue down, fiberglass reinforced plastic paneling, painting, markerboards, bulletin board cabinet, tackable wall panels, toilet compartment partitions, wall louvers, louvered roof screens, protective wallcovering, signage, fire extinguishers & cabinets, toilet accessories, projection screens;, horizontal blinds, motorized window shades, plumbing, HVAC, communications, fire alarm, CATV system, lighting & electrical. BIDDERS LIST: Pre-bid Online 530-889-3953 530-889-3956 General Contractor: Cal Pacific Construction 415-824-8871 415-824-8867 S W Allen Construction 916-344-2098 916-344-0307 HELMS MIDDLE SCHOOL SPORTS FIELDS AND LANDSCAPING PLAN #: 152058 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Pablo Online & Print On Est Cost: $6,900,000.00 # OF ADDENDA: 2 Demand PREBID: MAND 10/25 @ 1pm OWNER: West Contra Costa Unified School District Ph: 510-412-5657 FAX: 510-236-0464 DESCR: Contact, Hector DeLeon, 510-364-2647. Rough and finish grading of a building pad for a new community building, demolition and construction of a new toilet building and a new storage building; rough and finish grading for landscaping, fencing, paving and walks and installation of artificial turf sports fields, play courts, playground BIDDERS LIST: General Contractor: Landmark Construction 916-663-1953 916-663-1867
Taber Construction 925-682-6133 925-682-6122 F & H Construction 209-931-3738 209-931-4427 Oc Jones And Sons 510-526-3424 510-526-0990 Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000 Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Const 925-820-9245 925-831-3093 Kck Builders 415-559-9312 415-453-9250 RFP - DESIGN OF DMF PERFORMANCE PLAN #: 176006 Bid Date: 11/13/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Online and Planroom PREBID: 10/30 @ 10:30 OWNER: City of Palo Alto DESCR: Contact, City of Palo Alto, John Montenero, (john. montenero@cityofpaloalto.org) City of Palo Alto is seeking proposals from qualified firms to provide professional services for providing engineering services for design, control programming, construction support, startup and testing of a dual media filtration airwash system, blowers, electrical and control/automation equipment, LIGHTING CONTROL RETROFIT - PAUL BONDERSON BUILDING NO. 16 PLAN #: 230090 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $298,760.00 # OF ADDENDA: 5 PREBID: MAND 10/9 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Jennifer Maier, 916-376-1754. Provide & install a wireless lighting control system which will replace the existing lighting control system and will utilize zone or room based occupancy sensing, day light sensing, auto-scheduling and local switching to control all new fixtures.
Talk to us! Do you have a legal ad that needs to be run?
Want to advertise? Questions about the new format?
Give us a call.
We will be happy to help you! 916-729-5432 Continued on next page
Plans On File Continued from last page
Tuesday, November 13, 2012 PEACOCK GAP GOLF CLUB PLAN #: 273035 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Rafael Online and Planroom PREBID: 11/1 @ 11:30am G.C.: SD Deacon Corp. Ph: 916-969-0900 FAX: 916-735-0800 DESCR: Contact, S D Deacon, Brandon Nelson, brandon. nelson@deacon.com. Description: Demo existing clubhouse and building new building work to include: surveying, concrete sawing, selective demolition, earthwork, erosion control, site utilities, dry utilities, asphalt paving, pavement markings, unit pavers, fences & gates, retaining walls, landscaping, concrete, masonry, steel, rough carpentry, finish carpentry/millwork, solid surfacing, FRP, insulation, roofing, sheet metal, doors & hardware, storefront, drywall, ceramic tile, acoustical ceiling, wood flooring, resilient flooring, painting, fireplaces, toilet partitions & accessories, fire protection, plumbing, HVAC, electrical, fire alarm BIDDERS LIST: General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435
Wednesday, November 14, 2012 CAMPUS SIGNAGE RESTORATION (REBID) PLAN #: 15016 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Hayward Online & Print On Est Cost: $50,000.00 # OF ADDENDA: 3 Demand PREBID: MAND 10/30 @ 9am OWNER: California State University East Bay Ph: 510-885-3607 DESCR: Contact, Chuck Copus, P.M., 510-885-4259. Remove existing exterior site signage to contractor’s shop, repair & restore aliminum sign boxes to new condition, including removal of dents & scratches & replacing damaged panels as required; repaint the signs per the University specs & install new vinyl lettering & logos per sign schedule; replace the signs to their existing locations or relocate to new locations, including new footings & frames as required & shown in the contract SANITARY SEWER PUMP STATION IMPROVEMENTS PROJECT PLAN #: 21017 Bid Date: 11/14/2012
Page 50 November 5, 2012
Zone • Contractor’s .
10
Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Redwood City Plans on Disk Est Cost: $300,000.00 PREBID: 11/05 @ 10am OWNER: City of Redwood City DESCR: Contact, Jimmy Tan, 650-780-7397. Replacing the existing motor controllers with new variable frequency drive equipment, replacing and upgrading field instrumentation, and replacing the existing facility telemetry quipment with new devices that match present City standards. POLICE BUILDING REMODEL PROJECT PLAN #: 36005 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Wheatland Online and Planroom Est Cost: $80,000.00 # OF ADDENDA: 2 PREBID: MAND 10/29 @ 2pm OWNER: City of Wheatland DESCR: Contact, City of Wheatland, 530.633.2761. Work consists of the improvements to an existing unoccupied 3,808 SF building including: interior demolition, parition walls, cover and add exterior openings, electrical, plumbing, HVAC, interior finishes, painting and various other items of work. BIDDERS LIST: General Contractor: B & B General Engin 530-277-7305 530-237-1798 Hometown 916-991-2486 916-991-2881 Joe Miller Construction 916-452-6108 916-452-1153 Owens Construction 530-878-3905 530-878-3906 Treehenge 530-269-2816 530-269-0289 Peterson Development 916-961-4756 916-966-0943 Sturgeon Construction, Inc. 916-452-6108 916-452-1153 Supplier: Cavolt & Sons Inc 916-624-8222 916-624-0878 ORCHARD SUBSTATION LANDSCAPE PLAN #: 45097 Bid Date: 11/14/2012 Bid Time: 2:00 PM Location: Ukiah PLANS AT: Auburn & Roseville Office Online and Planroom Est Cost: $30,000.00 # OF ADDENDA: 1 PREBID: MAND 11/1 @ 11am OWNER: City of Ukiah
To Run Your Legal Ad, Please Visit w w w. t h e d a i l y r e p o r t e r. n e t Or Give Us A Call 916-729-5432
DESCR: Contact, Mary Horger (mhorger@cityofukiah.com) (707) 463-6233. Includes earthwork, subgrade preparation and base material, irrigation system, decomposed granite, fieldstone boulders, flagstone, metal edging, stepping stones, landscape plantings, site concrete work, INTERIOR RENOVATION/IHTA @ MT DIABLO HIG SCHOOL PLAN #: 120071 Bid Date: 11/14/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Concord Online & Print On Est Cost: $410,000.00 Demand PREBID: MAND 10/17 @ 10am OWNER: Mt. Diablo Unified School District Ph: 925-825-7440 FAX: 925-825-2505 DESCR: Contact, Tim Cody, Proj Mgr, @ 925-682-8000, ext 85615 NOTE:Volume 1 spec book is not available yet. We will post when it becomes available.Complete renovation of existing classroom to facilitate use by International Hospitality Training Academy.Selective demolition, protection, new interior finishes, roofing, framing, mechanical, electrical and specialty work necessary to provide a complete renovation of existing room. BIDDERS LIST: General Contractor: Miller Paneling Specia 530-662-0860 530-662-0864 JUVENILE SERVICES BUILDING WINDOW REPLACEMENT & SUPPLEMENTAL HVAC PLAN #: 108086 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Rafael Online and Planroom Est Cost: $210,000.00 PREBID: 11/5 @ 2pm OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-7877. Installation of roof top pre-heat units, ductwork and replacement of 43 office windows, stucco abatement and patchwork at windows. BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 INTERIOR RENOVATION/IHTA @ MT DIABLO HIGH SCHOOL Bid Date: 11/14/2012 PLAN #: 120071 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Concord Online & Print On Est Cost: $410,000.00 Demand PREBID: MAND 10/17 @ 10am OWNER: Mt. Diablo Unified School District Ph: 925-825-7440 FAX: 925-825-2505 DESCR: Contact, Tim Cody, Proj Mgr, @ 925-682-8000, ext 85615 NOTE:Volume 1 spec book is not available yet. We will post when it becomes available.Complete renovation of
existing classroom to facilitate use by International Hospitality Training Academy.Selective demolition, protection, new interior finishes, roofing, framing, mechanical, electrical and specialty work necessary to provide a complete renovation of existing room. BIDDERS LIST: General Contractor: Miller Paneling Special 530-662-0860 530-662-0864 Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851 ARSENIC TREATMENT PROJECT PLAN #: 122077 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Rio Vista Online & Print On Demand PREBID: 11/7 @ 10am OWNER: City of Rio Vista ENGINEER: Dillon & Murphy Engineers Ph: 209-334-6613 DESCR: Contact, Dillon & Murphy (209) 334-6613. The project consists of installation of the arsenic treatment project. BIDDERS LIST: General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Auburn Constructors, 916-924-0344 916-924-1800 Swank Construction 707-446-8808 707-446-8303 Sub Contractor: Bockmon & Woody 209-993-2633 209-464-2615 Mission City Rebar, Inc 925-449-6999 925-447-8797 CURTIS PARK AND OAK PARK WATER METER RETROFIT PROJECT PLAN #: 206090 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $3,650,000.00 OWNER: City of Sacramento - Dept of Utilities DESCR: Contact, Inthira Mendoza, 916-808-1473. Work consists of installing meter setters, meter boxes, lids, meter valves and water meters at various commercial and residential properties, excavation, backfill, surface restoration, retrofitting water meters on existing water services.
Continued on next page
Plans On File Continued from last page
Wednesday, November 14, 2012 640 CAPITOLA ROAD PARKING LOT IMPROVEMENT PROJECT Bid Date: 11/14/2012 PLAN #: 276044 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Santa Cruz Online and Planroom Est Cost: $20,000.00 # OF ADDENDA: 1 PREBID: 9/26 @ 10AM OWNER: County of Santa Cruz FAX: 831-454-2710 DESCR: Contact, County of Santa Cruz (831) 454-2210. Grinding, cleaning, slurry seal coating and re·striping of an existing approximately 14,040 s.f. parking lot, and re”use and reinstallation of existing wheel stops. Installing new asphalt and miping, installing new 4” eoncrete slab l’lT new accessible van loading area and striping. Installing new accessible parking striping and new wheel stop on existing concrete surface, Installing new accessiblc parking signage on building exterior wall, installing new motorcycle parking striping on repaved surface with new signage installed on existing sign post. Installing new bicycle parking are” with 5 ncw bikc loop posts. Installing new Christy box U21 S water treatment unit with new asphalt paving, installing new 6’ high asphalt concrete curbs, installing new pedestrian walkway striping and lenering on repaved surface. RFQ - ERECTION OF 2 METAL BUILDINGS S.A.R. BUILDING PROJECT PLAN #: 282054 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Dublin Online and Planroom # OF ADDENDA: 1 PREBID: MAND 11/1 @ 2pm OWNER: County of Alameda DESCR: Contact, Roger Power, Captain, 510-208-9830 (rpower@acgov.org) The Alameda County Sherriff’s Office has purchased two S-type steel bui8ldings, 40’ wide by 64’ long. They are requesting informal quotes for the erection of these 2 buildings. FIRE ALARM UPGRADE/STEELE LANE COMMUNITY CENTER PLAN #: 288043 Bid Date: 11/14/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Santa Rosa Online & Print On Demand PREBID: MAND 10/30 @ 10am
Page 52 November 5, 2012
Zone • Contractor’s .
OWNER: City of Santa Rosa DESCR: Contact, Jennifer Myles, 707-543-3709. Fire Alarm Upgrade/Steele Lane Community Center BIDDERS LIST: Sub Contractor: Slembrouck-many Corp., 707-778-0170 707-778-0177
Thursday, November 15, 2012 CLAYBANK ROAD PAVEMENT REHABILITATION AND SSWA TOLENAS LATERAL REPLACEMENT PLAN #: 6031 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Plans on Disk PREBID: MAND 11/1 @ 9am OWNER: City of Fairfield DESCR: Contact, Thanh Vuong, 707-428-7017. Furnishing and installing a new SSWA 24inch underground water main using AWWA C905 DR18 Polyvinyl Chloride PVC pipe including a new water line blow-off valve. Once the new waterline is in service Contractor shall remove and dispose of a large portion of the old existing SSWA 24-inch water main that is within the portion of Claybank Rd., to be reconstructed and shall backfill the old trench with Class 2 Aggregate Base up to the new road subgrade and then reconstruct the pavement section for the entire road width including pavement 5removal and replacement of asphalt concrete BIDDERS LIST: General Contractor: Ghilotti Construction Co 707-585-1221 707-585-1601 Ghilotti Brothers Inc 415-454-7011 415-454-8376 Supplier: Groeniger & Company 916-455-3333 916-455-3402 SEWER AND WATERLINE REPLACEMENT IN ALLEY’S CANAL TO BERKELEY Bid Date: 11/15/2012 PLAN #: 10016 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Turlock Online & Print On # OF ADDENDA: 3 Demand PREBID: MAND 10/2 @ 10am OWNER: City of Turlock DESCR: Contact, City of Turlock, 209-668-5520. Install new waterline, replace sewerline, install new manholes, demo and earthwork, cold plane operations, hot mix asphalt, pavement reinforcing fabric and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place.
BIDDERS LIST: General Contractor: Taylor Backhoe Service, 209-384-8424 209-384-7629 EAST REDDING BIKE LANES - PHASE II PLAN #: 13018 Bid Date: 11/15/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Redding Online & Print On Demand OWNER: County of Shasta FAX: 530-225-5667 DESCR: Contact, Mark Ciancio (mciancio@co.shasta.ca.us) (fax #) (530) 225-5667. Includes clearing and grubbing, excavation and embankment, removing existing asphalt, placing aggregate base material, placing new hot mix asphalt and widening existing roadway, cold planning asphalt concrete, removing existing metal beam guardrail, adjusting utility boxes, extending existing culverts, replacing culverts, reconstructing driveways, constructing a section of new 12� PVC water main, constructing paved ditch and HMA dike, new wire mesh fence, slurry seal, shoulder backing, removing striping and pavement markings, installing new thermoplastic striping and pavement markings, installing new signs, and removing and MONTEZUMA ELEMENTARY SIDEWALK GAP CLOSURE PLAN #: 27017 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Est Cost: $350,000.00 Demand PREBID: MAND 11/5 @ 10am OWNER: City of Stockton DESCR: Contact, Jodi Almassy, 209-937-8299. The project includesconstructing improvements on Eighth Street between Mariposa Road and Nightingale Avenue. Improvements include: roadway frontage (curb, gutter and BIDDERS LIST: General Contractor: Diede Construction 209-369-8255 209-368-0600 Bc Construction 209-531-1252 209-531-1254 CITY-WIDE STREET AND MEDIAN LANDSCAPE MAINTENANCE AND WEED CONTROL-REBID Bid Date: 11/15/2012 PLAN #: 29010 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Est Cost: $449,000.00 Demand PREBID: MAND 11/6 @ 9am OWNER: City of Stockton DESCR: Contact, David Kroll, 209-937-8676. City-Wide Street and Median Landscape Maintenance and Weed Control at various locations in the City of Stockton.
6900 - LOS ESTEROS ROAD-ZANKER ROAD SERVICE LATERAL PLAN #: 34007 Bid Date: 11/15/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Est Cost: $780,550.00 Demand OWNER: City of San Jose DESCR: Contact, City of San Jose, Darwin Lasat, (darwin. lasat@sanjoseca.gov). 6900 -Los Esteros Road - Zanker Road Service Lateral FLEET SERVICES BUILDING PLAN #: 37010 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonora Online and Planroom PREBID: MAND 11/8 @ 10am OWNER: County of Tuolumne DESCR: Contact, County of Tuolumne, phone 209-5335660. Contractor to furnish all labor, materials, equipment, transportation, sitework, and services for the completion of the Fleet Services Building. RODGERS THEATER PHASE II IMPROVEMENTS PLAN #: 41012 Bid Date: 11/15/2012 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Corning Online & Print On Demand PREBID: 11/6 @ 10am OWNER: City of Corning DESCR: Contact, City of Corning (530) 824-7029. Work consists of providing concrete foundation construction, demolition, wood framing, plumbing, electrical, mechanical and finish work. BUTTERFIELD WAY AND FOLSOM BOULEVARD INTERSECTION IMPROVEMENT PROJECT Bid Date: 11/15/2012 PLAN #: 46091 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $180,000.00 # OF ADDENDA: 1 OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, County of Sacramento Municipal Services (916) 874-6544. Work consists of proving pavement, striping, median works, ADA ramp upgrades, slurry seals, and signal modification work. BIDDERS LIST: General Contractor: B & M Builders, Inc. 916-862-0095 866-903-3437 Sub Contractor: Studebaker Brown Electr 530-333-3423 530-823-1341 Supplier: Blain Stumpf Sand & Gr 916-933-1555 916-933-2925 Continued from last page
Plans On File Continued from last page
Thursday, November 15, 2012 FOLSOM HALL REMODEL - PHYSICAL THERAPY DEPARTMENT PLAN #: 100076 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Est Cost: $1,400,000.00 PREBID: 10/23 @ 10am OWNER: California State University, Sacramento Ph: 916-278-4895 DESCR: Contact, Diede Construction, 209-369-8255. Construction of tenant improvements within an office building and associated site improvements. BIDDERS LIST: General Contractor: Pnp Construction, Inc. 530-885-9360 530-885-9365 Bullard Construction 916-485-4370 916-485-4388 Miller Paneling Specialt 530-662-0860 530-662-0864 Hometown 916-991-2486 916-991-2881 Landmark Construction 916-663-1953 916-663-1867 S W Allen Construction 916-344-2098 916-344-0307 Bobo Construction 916-685-2285 916-714-4850 Peterson Development 916-961-4756 916-966-0943 Younger General Contr 916-631-8000 916-631-8293 American River Const 530-621-1785 530-621-0360 Diede Construction 209-369-8255 209-371-8942 Dg Granade 530-677-7484 530-677-7550 Sub Contractor: Bob-leon Plastics, Inc. 916-452-4063 916-452-3759
Demand G.C.: Hospital Building Equipment Company Ph: 314-567-9000 DESCR: Contact, Hospital Building & Equipment Co. (HBE Corp.) #283655 (314) 567-9000 Fax:(314) 567-6994 Negotiated GC. Construct a new 25,260 SF one-story steelframed addition to the existing hospital, including a 2,367 SF mechanical / electrical penthouse and helicopter landing pad on the roof; trades needed are selective demolition, excavation, grading, site preparation, site utilities, asphaltic concrete paving, concrete, steel reinforcement, metal decking, miscellaneous metal, carpentry, millwork, dampproofing, split-slab waterproofing system, helistop deck coating, TPO roofing system, sheet metal and equipment screens, spray-on fireproofing, firestopping, sealants, metal doors / frames, wood doors, integrated fire door assemblies, elevator door smoke containment system, aluminum entrances / storefront, finish hardware, automatic door operators / doors, glazing, exterior stucco, gypsum drywall systems, ceramic tile, acoustical ceiling, resilient flooring, carpeting, painting, miscellaneous specialties, toilet accessories, modular lavatory / toilet unit, undercounter refrigerator, patient service modules, medical gas security modules, steel cabinets, radiation protection, hydraulic elevators, medical gases, fire protection, plumbing, HVAC, automatic control systems, test / balance, electrical, fire BIDDERS LIST: Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099
2010 PAVEMENT PRESERVATION PROGRAM PLAN #: 118072 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonoma Co. Planroom # OF ADDENDA: 1 OWNER: County of Sonoma-Dept. of Transportation & Public DESCR: Contact, County of Sonoma, Department of Transportaion, Kevin Howze, 707-565-2620. Placement of a Bonded Wearing Course on various County Roads together with associated flagging, traffic control and preparation required to construct the work, along with delineation of the new pavement surface.
SAN ANTONIO BACKUP PIPELINE PLAN #: 126070 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Co. Plans on Disk # OF ADDENDA: 1 PREBID: 10/16 @ 9:30am OWNER: San Francisco Public Utilities Commission DESCR: Contact, Pauline Lam, SFPUC, 415-551-4603. Install approx., 6,600 feet of 66-inch diameter of welded steel pipe located along the west side of Calaveras Rd from the Alameda Siphons on the south to the edge of the SMP-24 quarry pit on the north etc.. BIDDERS LIST: Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 Ferguson Welding 510-487-5906 510-487-5909
UKIAH VALLEY MEDICAL CENTER (NO GC PLAN #: 121076 Bid Date: 11/15/2012 Bid Time: 12:00 PM PLANS AT: Auburn & Roseville Location: Ukiah Online & Print On
SITE WIDE LOW VOLTAGE MODERNIZATION - W. CHURCHILL MIDDLE SCHOOL PLAN #: 139062 Bid Date: 11/15/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office
Page 54 November 5, 2012
Zone • Contractor’s .
Location: Carmichael Online & Print On # OF ADDENDA: 1 Demand PREBID: MAND 10/11 @ 2pm OWNER: San Juan Unified School District ENGINEER: KMM Services, Inc. Ph: 916-825-3625 DESCR: Contact, KMM Services, Inc., Ronny Kagstrom, 916-825-3625. Site Wide Low Voltage Modernization at W. Churchill Middle School in JOINT WATER POLLUTION CONTROL PLANT AND SAN JOSE CREEK WATER RECLAMATION PLANT WEST SKIMMER MODIFICATIONS Bid Date: 11/15/2012 PLAN #: 147059 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Carson Planroom # OF ADDENDA: 1 PREBID: MAND10/23 @ 9:30am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Steve Krai, 562-908-4288, ext 5255. Removal and replacement of existing skimmer equipment in JWPCP and San Jose Creek West WRP with new skimmers made of stainless steel and non-metallic components; inspection and repair of concrete and concrete protective lining as necessary. AUSTIN SWING SPACE PLAN #: 148060 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Kentfield Online and Planroom PREBID: 10/30 @ 10AM at 700 College Ave, Bldg PE-8, OWNER: Marin Community College District Ph: 415-457-8811 FAX: DESCR: Contact: Marin Community College District (415) 883-2211.Div_02-selective bldg demolition; Div_03-concrete; Div_05-metal support assemblies, metal fabrications; Div_06wood treatment, rough & finish carpentry, custom casework; Div_07-waterproofing, polyutherane foam roof repairs, sheet metal flashing & trim, firestopping, joint sealants; Div_08steel frames, flush wood doors, access doors & frames, door hardware, glazing; Div_09-gypsum board, acoustical ceilings, resilient flooring, tile carpeting, access flooring, painting & coating, vapor emission treatment systems, coating systems for steel; Div_10-visual display surface, signage, fire protection specialties; Div_11-audio-visual equipment; Div_23-plumbing, HVAC: Div_26-electrical syste; Div_27-communications BIDDERS LIST: General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 A.e. Nelson Construction 707-636-1750 707-636-1755 DESIGN BUILD OF THE SAN JOAQUIN REGIONAL TRANSIT DISTRICT REGIONA TRANSPORTATION PLAN #: 155062 Bid Date: 11/15/2012
Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton PREBID: 10-17 @ 10am OWNER: San Joaquin RTD Ph: 209-948-5566 FAX: 209-948-8516 DESCR: Contact, San Joaquin Regional Transit District (209) 948-5566. Design Build of the San Joaquin Regional Transit District Regional Transportation Center**Documents are not available at this time. RECOATING AND REPAIR OF DELAVEAGA TANK NO.1 Bid Date: 11/15/2012 PLAN #: 162058 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Demand PREBID: MAND 10/20 @ 1:30pm OWNER: City of Santa Cruz DESCR: Contact, City of Santa Cruz, Matt Zeman, 831420-5211 (mzeman@cityofsantacruz.com) Repairs, surface preparation, lead paint removal, and repainting of the interior and exterior surfaces of DeLaveaga Tank No. 1, a one million gallon riveted and welded steel water storage tank; removal of surface preparation debris and materials; disinfection and filling; and all appurtenant work. JANITORIAL SERVICES PLAN #: 180099 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom PREBID: 11/7 @ 10am OWNER: Sacramento Housing & Redevelopment Agency FAX: 916-927-6963 DESCR: Contact, Wayne Whitley 916-442-6736 (wwhitley@ shra.org) Sacramento Housing & Redevelopement Procurement (916) 440-1331. Requesting Janitorial Services. NORTH BAY REGIONAL WATER TREATMENT PLANT - VALVE REPLACEMENT IN FILTER 7 PLAN #: 189014 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fairfield Online & Print On Demand PREBID: 11/1 @ 10am OWNER: City of Fairfield DESCR: Contact, City of Fairfield, (707) 428-7485. Remove and replace filter to waste valve (16”), modulating effluent valve (24”), and individual filter backwash valve (30”) in Filter No. 7 at the North Bay Regional Water Treatment Plant.
Click on the blue underline to go to the Online Planroom Continued on next page
Plans On File Continued from last page
Thursday, November 15, 2012 NORTH BAY REGIONAL WATER TREATMENT PLANT - REPLACEMENT OF MEDIA IN FILTER 7 PLAN #: 194093 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fairfield Online & Print On Demand PREBID: MAND 11/1 @ 10am OWNER: City of Fairfield DESCR: Contact, City of Fairfield, (707) 428-7485. Removal and replacement of the sand and granular activated carbon media in a two-bay filter at the North Bay Regional Water Treatment Plant, 5110 Water Works Lane, Fairfield, Solano County, California. The Contractor is responsible for disposing of the existing media at Contractor’s cost. The Contractor is to remove and dispose of the existing nozzles at Contractor’s cost, and Contractor installs new City-provided nozzles. !!!CANCELLED!!!RFQAS-NEEDED ARCHITECTURAL SERVICES PLAN #: 204099 Bid Date: 11/15/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online and Planroom # OF ADDENDA: 1 PREBID: 10/11 @ 3:30pm OWNER: City & County of San Francisco DESCR: Contact, Robert Nist, (Robert.Nist@sfdpw.org) City & Cunty of San Francisco is requesting qualifications from Architectural services on an as-needed basis for public building projects. PARKING LOT SWEEP/STEAM ROSEVILLE DMV REBID PLAN #: 214089 Bid Date: 11/15/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Roseville Planroom OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Melanie Pilliard, (Melanie.Pilliard@dmv. ca.gov.) Parking lot sweep/steam Roseville DMV. COLUMBIA STATE HISTORIC PARK - INSTALLATION OF AUTOMATIC DOORS Bid Date: 11/15/2012 PLAN #: 222076 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Columbia PREBID: MAND 10/30 @ 11am OWNER: California State Parks DESCR: Contact, Kristi Darby (svonh@parks.ca.gov) Install automatic door operators at fifteen (15) exterior doorways and wood doors throughout Columbia State Historic Park.
Page 56 November 5, 2012
Zone • Contractor’s .
RFQ - BUTTE HALL ELEVATORS AND FIRE PLAN #: 240089 Bid Date: 11/15/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Chico Planroom Est Cost: $1,200,000.00 OWNER: California State University, Chico DESCR: Contact, Michael McNairn, 530-898-5134. Submit your statement of qualification to provide design / build services for the rehabilitation of Butte Hall and a new fire suppression system, which will include rehabilitation of three elevator cabs, including new controls, pulleys, doors and related components and design / installation of a waterless fire suppression system for seven existing server rooms in Butte Hall and Meriam Library. ABOVE GROUND SEWER PIPE REPLACEMENT PLAN #: 245050 Bid Date: 11/15/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Byron Online & Print On Demand PREBID: MAND 11-1-12 @ 10AM OWNER: County of Contra Costa FAX: 925-313-2333 DESCR: Contact, Contra Costa County, Maintenance Division (925) 313-7000. Contra Costa County is requesting qualified persons or firms to submit proposals for a Sewer Pipe Replacement Project. The purpose of the Project is to remove and replace 1,260 linear feet of above ground plastic sewer pipe with welded steel pipe, while minimizing the impact on the surrounding habitat. The selected contractor will work the County’s Project Manager to determine the best system for providing the required functionality, and minimizing the impact on the surrounding habitat. The existing sewer piping on the northern end runs underground between a pumping station that is located inside a compound within the grounds of the Orin Allen Youth Rehabilitation Center, approximately 225 feet to where the piping daylights to above ground. The block that is located at the northern most end of the above ground piping, where the pipe daylights, is leaking and will need to be removed. Several of the pillars throughout the path of the pipe appear to be sinking. Prior to the installation of the new pipe, the sinking pillars will need to be raised in order to obtain fall. The assumption by the County is that the new piping can be welded to the existing steel pipe. WING A & WING B COOLING SYSTEM UPGRADE PLAN #: 254061 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Vacaville Online and Planroom PREBID: MAND 10/25 @ 10am
OWNER: State of CA - Dept of General Services DESCR: Contact, Eric Waddell, 916-376-11768. Project comprises labor, material and services necessary for: Removal and demolition of existing cooling systems for wings A and B. Provide cooling system upgrade for wings A and B including electrical and structural work to support equipment. Remove and replace the chilled water coils at a number of existing units. Provide chillers including concrete pad, piping and electrical requirements. Provide structural strengthening required for mechanical equipment. Patch and repair roofing as required for mechanical changes and support system. BIDDERS LIST: General Contractor: Bell Products, Inc. 707-255-1811 707-255-1908 Bobo Construction, Inc. 916-685-2285 916-714-4850 Division 5-15, Inc. 916-638-1520 916-638-1521 HELICOPTER SERVICES - UPPER AMERICAN RIVER PROJECT Bid Date: 11/15/2012 PLAN #: 263040 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $300,000.00 Demand PREBID: 11/1 @ 9:30am OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Paul Bagley, 916-732-6536. (pbagley@ smud.org) The Contractor shall provide all transportation, labor, material, equipment, supervision, materials, and incidentals required by SMUD to provide helicopter service for transporting SMUD and other authorized personnel and/ or equipment on SMUD’s Upper American River Project (Desolation Wilderness and surrounding areas) and associated SMUD transmission and sub-transmission facilities. MOUNT TORO GROUNDING PLAN #: 269080 Bid Date: 11/15/2012 Bid Time: 3:30 PM PLANS AT: Print On Demand Location: Monterey Co. Online & Print On Demand PREBID: MAND 11/1 @ 9am OWNER: Co of Monterey FAX: 831-755-4958 DESCR: Contact, County of Monterey, 831-755-4990. Installation of a grounding ring around the building and tower, and connection of every metallic structure surrounding the site to the ring to maintain equal potential. A single point grounding scheme is required for the site to reduce circulating current, unwanted surges, and lighting from entering the building damaging the equipment. RECLAMATION PUMP VFD REPLACEMENT PLAN #: 290043 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office
Location: Marina Online and Planroom PREBID: 11/6 @ 10am OWNER: Monterey Regional Water Pollution Control Agency DESCR: Contact, MRWPCA, 831-372-2385. Demolition of existing Reclamation Pump VFDs. Install new reclamation pump VFDs, including modifications to housekeeping pads and anchorage, mod and reconnection of existing power and control cables for the reclamation pump, modification of existing backwash pump VFDs and pump
Friday, November 16, 2012 EASTRIDGE TRANSIT CENTER AND BUS PLAN #: 117074 Bid Date: 11/16/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom # OF ADDENDA: 3 PREBID: 8/10 @ 10 am. OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729 DESCR: Contact: VTA (408) 321-7189 .The work generally includes clearing and grubbing, demolition, excavation, street improvements, AC paving, addition of curb and gutter and sidewalk, multiuse path, street and pedestrian lighting, landscaping new utilities, conduits, service connections, signing and striping and misc other work. BIDDERS LIST: Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Const 925-820-9245 925-831-3093 Monterey Bay Rebar 831-724-3013 831-724-3151 Supplier: Reed & Graham Inc 916-381-9900 916-388-1486 SJUSD HORACE MANN ELEMENTARY SCHOOL THIRD FLOOR RAIN SCREENS PLAN #: 130067 Bid Date: 11/16/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: San Jose PREBID: 11/1 @ 3PM (Highly Recommended OWNER: San Jose Unified School District Ph: 408-535-6071 DESCR: Contact, Kitchell, 408-280-7889. Kitchell CEM, as construction managers for SJUSD, is soliciting prices from several sources for the Third Floor Rain Screens Project
To Run Your Legal Ad, Please Visit www.thedailyreporter.net Or Give Us A Call 916-729-5432 Continued on next page
Plans On File Continued from last page
Friday, November 16, 2012 RFQ - MINOR BUILDING CONSTRUCTION, PLUMBING, CARPETING, FLOORING & CEILING Bid Date: 11/16/2012 PLAN #: 171093 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Planroom OWNER: City of San Jose DESCR: Contact, Priscilla Louangrath, 408-535-7058. Contractor to provide maintenance repairs of the interior buildings on the site of the Water Pollution Control Plant and South Bay Water Remote Facilities1.Repair/replace various ceiling materials & installations (T-bar, sheetrock, acoustical, etc.)2.Provide service for minor plumbing repairs & installations (water, sewer & gas)3.Provide service for various floor repairs & installations (tile, vinyl & carpet)4.Provide minor construction repairs & installations (dividing wall, partitions, etc.) WALKER COMMONS PAINTING PLAN #: 219089 Bid Date: 11/16/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Chico Online and Planroom PREBID: 11/6 @ 1pm OWNER: Butte County Housing Authority DESCR: Contact, Butte County Housing Authority, Sheri Bouvier (sherib@butte-housing.com) (x 237) (530) 895-4474. Paint gray exterior siding at Walker Commons, Units 1 through 56 and the community RFQ - RUBBISH AND DEBRIS REMOVAL SERVICES PLAN #: 225081 Bid Date: 11/16/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Planroom OWNER: City of San Jose DESCR: Contact, Priscilla Louangrath, 408-535-7058. City of San Jose is seeking Requests for Qualifications for Rubbish and Debris Removal Services from private properties on an asneeded basis. TEMPORARY FENCING SERVICES PLAN #: 238089 Bid Date: 11/16/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office
Page 58 November 5, 2012
Zone • Contractor’s .
Location: Sacramento Online and Planroom # OF ADDENDA: 1 PREBID: 10/30 @ 10am OWNER: City of Sacramento DESCR: Contact, Elise Gumm (egumm@cityofsacramento. org) (916) 808-1927. Repair, maintain, install, reset, remove and replace fencing as directed by the City, which will include temporary and semi-permanent / permanent fencing. ELEVATOR MODERNIZATION PLAN #: 258047 Bid Date: 11/16/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Modesto Online & Print On Demand PREBID: MAND 10/31 @ 9AM OWNER: County of Stanislaus DESCR: Contact, County Of Stanislaus (209) 525-6319. The County Of Stanislaus is seeking proposals from qualified & experienced organizations for the modernization of two elevators in the county-owned buildings.
Monday, November 19, 2012 NEWELL CREEK DAM PIPELINE INSPECTION PLAN #: 170094 Bid Date: 11/19/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online and Planroom PREBID: MAND 10/31 @ 10am OWNER: City of Santa Cruz DESCR: Contact, Isidro Rivera, 831-420-5313 (irivera@ cityofsantacruz.com). The City of Santa Cruz Water Department is seeking qualified individuals or firms/consultants with expertise in remote pipeline inspection services to submit proposals to provide inspection services for Newell Creek Dam Outlet Pipeline. This request for proposal covers the inspection of a pipeline consisting of over 1600 lineal feet and four different pipe diameters ranging from 22-inch to 36-inch. 2012 SEWER/STORM TRENCH REPAIR PROJECT PLAN #: 181096 Bid Date: 11/19/2012 Bid Time: 11:30 AM PLANS AT: Roseville Office Location: Marysville Planroom OWNER: City of Marysville DESCR: Contact, City of Marysville City Services (530) 7493902. Repair settled sewer and storm drain trenches, including removal / replacement of the asphalt concrete over three settled sewer and storm drain trenched (pavement patching). BIDDERS LIST:
General Contractor: United Building Contrac 530-345-8455 530-345-8885 2012 PAVEMENT REPAIR PROJECT PLAN #: 203098 Bid Date: 11/19/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Marysville Planroom OWNER: City of Marysville DESCR: Contact, City of Marysville City Services (530) 749-3902. Repair damaged asphalt, including edge grinding, installation of pavement reinforcement fabric, 1-1/2” overlay with Type B 1/2” AC in two intersections and removal / replacement of problem sections of asphlat concrete (pavement patching). JOB ORDER CONTRACTING - 13004 PLAN #: 266042 Bid Date: 11/19/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Online and Planroom PREBID: MAND 11/1 @ 1PM at 1401 Lakeside Dr., Oakland & 11/2 @ 2PM at 100 Civic Plaza, Dublin OWNER: County of Alameda DESCR: Contact, Gary Russel, Proj Mgr, @ 510-208-9586. The scope of General JOC contracts are for for general construction, repair, remodel & other repetitive related work to be performed for the County of Alameda. JOB ORDER CONTRACTING - 13005 PLAN #: 270041 Bid Date: 11/19/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Online and Planroom PREBID: MAND 11/1 @ 1PM at 1401 Lakeside Dr., Oakland & 11/2 @ 2PM at 100 Civic Plaza, Dublin OWNER: County of Alameda DESCR: Contact, Gary Russel, Proj Mgr, @ 510-208-9586. The scope of General JOC contracts are for for general construction, repair, remodel & other repetitive related work to be performed for the County of Alameda. JOB ORDER CONTRACTING - 13003 PLAN #: 275045 Bid Date: 11/19/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Online and Planroom PREBID: MAND 11/1 @ 1PM at 1401 Lakeside Dr., Oakland & 11/2 @ 2PM at 100 Civic Plaza, OWNER: County of Alameda DESCR: Contact, Gary Russel, Proj Mgr, @ 510-208-9586. The scope of General JOC contracts are for for general construction, repair, remodel & other repetitive related work to be performed for the County of Alameda.
Tuesday, November 20, 2012 EAST STOCKTON SOUND WALL RENOVATION PLAN #: 5015 Bid Date: 11/20/2012
Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Elk Grove Online & Print On Est Cost: $1,053,000.00 Demand PREBID: MAND 11/13 @ 1pm OWNER: City of Elk Grove DESCR: Contact, Gary Grunwald, 916-478-2236 (ggrunwald@ elkgrovecity.org). Includes construction of a 10’-8” high sound wall +/- 1,750’ long (post tensioned wall is optional), roadway reconstruction, micro-surfacing, curb / gutter / sidewalk removal / replacement, LED retrofit lighting, pavement delineation and drainage WEST CAPITAL COMMONS PLAN #: 25017 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: West Online & Print On Demand DESCR: Contact: INLAND WASHINGTON, LLC. (509) 891-5162.New construction of a 270 unit apartment complex consisting of (11) 3 story apartment buildings. This project includes a Clubhouse and Pool House that will be bid at a separate time. Building envelopes include asphalt composition roofs, fiber cement siding, and vinyl windows. KRUSI PARK RENOVATIONS PLAN #: 38019 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Online & Print On Demand PREBID: MAND 10/17 & 10/24 @ 10am OWNER: City of Alameda DESCR: Contact, City of Alameda, 510-747-7930. The work to be done consists of furnishing all labor, tools, equipment, materials, except as herein specified, and doing all work associated with The work for Renovations to Krosi Park. The site work at this park includes but is not limited to: dust and noise control, demolition, tree and plant protections, staking, clearing and grubbing, earthwork, trenching, site preparation, erosion control, subgrade preparation, water systems, storm drain system, sanitary sewer, asphaltic concrete pavement, concrete, paving, pavement marking, landscape grading, landscape drainage, signage, irrigation, site furnishings, metal work, electrical work, planting and planting maintenance. The building work at this park includes but is not limited to site work, site preparation, utility connections, foundation, concrete, masonry, metals, wood and plastic, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, plumbing and electrical. BIDDERS LIST: General Contractor: Romkon Inc. 415-525-4432 415-529-2073 Sub Contractor: National Electric Co. 510-475-9400 510-475-9411 Mission City Rebar, Inc 925-449-6999 925-447-8797 Continued on next page
Plans On File Continued from last page
Tuesday, November 20, 2012 POLE REPLACEMENT AND OTHER LINE WORK PLAN #: 88064 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Demand PREBID: 11- 6, 2012@ 9am OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Cheryl Brooks, 916-732-5607,cbrooks@ smud.org. This contract is for the replacement of existing wood poles on the District’s distribution system. Poles may have a variety of voltages (230kV to 120V), communication conductors, and associated equipment on them. The contractor shall furnish all labor, supervision, and equipment, necessary to complete the work assigned under this contract. The District will furnish all material necessary to install the pole and rebuild or reinstall the existing equipment based upon current District Construction Standards. The work consists of obtaining all necessary permits; hole drilling, digging, trenching; removal of existing pole, installation of new pole, transfer of existing equipment and conductors, rebuilding of cross-arms or other structures on the pole as directed, back-filling, temporary sidewalk & street repair with approved material (example: cold patch or cutback), debris removal; and as-built documentation. Work may also include other work as directed by the District. The work on this contract consists of numerous individual jobs, which will be assigned after award of the contract. This contract will terminate on or before December 31, 2014. STATION AND TUNNEL EMERGENCY LIGHTING PLAN #: 110082 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Online and Planroom Est Cost: $2,000,000.00 # OF ADDENDA: 1 PREBID: 10/03/12 @ 9:00 am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit (510) 464-6088. The work includes, but is not limited to, the following work at Civic Center Station, San Francisco and 19th Street Station, Oakland. Work such as providing battery rooms, battery room ventilation system, eye wash stations, batteries and battery racks, UPS and UPS maintenance Bypass cabinets, 480 VAC circuit breakers, distribution panels, DC battery disconnect switches, junction boxes, pull boxes, conduits, wires, fittings, and accessories needed to complete the
Page 60 November 5, 2012
Zone • Contractor’s .
installation. Work also includes disconnecting and recircuiting existing light fixtures from existing and new panels, start-up, commissioning and maintenance. BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 STANDBY GENERATOR AND ELEVATED BUS DUCT REPLACEMENT PROJECT PLAN #: 127062 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: So. San Online & Print On # OF ADDENDA: 1 Demand PREBID: MAND 10/16 @ 1:30pm OWNER: City of South San Francisco DESCR: Contact, CIty of South San Francisco, 650) 829-6652. Demolition of the existing Standby Generator Building No. 1 and the equipment inside, demoliton of the existing elevated bus duct, construction of the new Standby Generator Building No. 1 and including providing Standby Generator No. 1 and appurtenances, providing a new cable bus and rehabilitating the associated support structure and BIDDERS LIST: Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 SEISMIC IMPROVEMENTS FOR HOB PLAN #: 165076 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Contra Costa Online & Print On Est Cost: $5,500,000.00 Demand PREBID: 10/24 @ 10am OWNER: Central Contra Costa Sanitary Dist. DESCR: Contact, Nathan Hodges, 925-335-7762. Seismic retrofit & building renovation of an existing four-story steel frame building designed in 1981, including carpet replacement, ADA improvements, asbestos abatement, network cable replacement & improvements to kitchen & restrooms & HVAC & electrical systems. BIDDERS LIST: Cooper Pugeda Manag 415-552-5511 415-543-6510 General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435 Bobo Construction, Inc. 916-685-2285 916-714-4850 Taber Construction 925-682-6133 925-682-6122 Swank Construction 707-446-8808 707-446-8303 Diede Construction 209-369-8255 209-368-0600 A-zcon Builders 916-786-8003 916-786-8046
HVAC MAINTENANCE SERVICES PLAN #: 227079 Bid Date: 11/20/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom Est Cost: $224,000.00 DESCR: Contact, City of San Jose, Priscilla Louangrath, 408-535-7058. The City of San José ( hereinafter “City”) is soliciting bids from qualified Contractors (hereinafter “Bidder”) to provide HVAC maintenance services including all labor, material, and equipment necessary to perform repairs, replacements, and support of such services as specified in the bid document scope of work, Attachment 1 at various City sites.The City intends to award two contracts as a result of this bid for a cumulative total of approximately $224,000.The City reserves the right to award the two contracts with a 60/40 split. The City reserves the option to renew the resulting Purchase Orders for four (4) additional terms of 1 year, for a total of five (5) years.Important Note: The quantities/hours specified herein are estimates and are not guaranteed. The estimated quantities/ hours may vary depending on the demands of the City. Any variations from these estimated quantities shall not entitle the bidder to an adjustment in the rates or to any additional compensation. U2 MAINTENANCE TANK PROJECT PLAN #: 293043 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Demand PREBID: 11/6 @ 2pm OWNER: City of Santa Cruz DESCR: Contact, Matt Zeman (mzeman@cityofsantacruz. com) Construct a nominal 58,000 gallon bolted steel tank, plus associated facilities and utilities as illustrated on the plans and project specifications. WATER MAIN SEISMIC IMPROVEMENT PROJECT PLAN #: 295028 Bid Date: 11/20/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Redwood City Online & Print On Demand OWNER: City of Redwood City DESCR: Contact, City of Redwood City (650) 780-7380. Install new piping & piping components, including pipes, flexible couplings, corrosion protection, pipe supports & pipe restraints & all associated firrings, dewatering, vehicular & pedestrian traffic control & safety & all other associated work. MOSS LANDING MARINE LAB AQUACULTURE LAB PROJECT PLAN #: 305009 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office
Location: San Jose Est Cost: $953,000.00 # OF ADDENDA: 4 PREBID: 9/19 @ 10am (strongly recommended) OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243 DESCR: Contact, Sylvia Sosa (sylvia.sosa@sjsu.edu). Construction of 1645 sq.ft. of new Aquaculture Lab building and tank slab to replace demolished Aquaculture Lab buildings and tanks. BIDDERS LIST: General Contractor: Legg, Inc. 925-605-4500 925-605-4510 Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797
Wednesday, November 21, 2012 BUCKEYE WATER TREATMENT PLANT STORAGE BUILDING PLAN #: 73066 Bid Date: 11/21/2012 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Redding Online & Print On Est Cost: $165,000.00 Demand OWNER: City of Redding DESCR: Contact, City of Redding, Darren Langfield, 530225-4469. Construct a 2,268 square-foot pre-engineered metal storage building; the building will have associated electrical, mechanical, and plumbing; sitework will include minor grading for the building pad and cutting / patching pavement for electrical and water trench. BIDDERS LIST: General Contractor: R.k. Ricks Construction 530-604-3102 530-241-4360 B & B General Engin 530-277-7305 530-237-1798 Donald F. Gallino, Inc. 530-246-7671 530-246-8714 FURNISH 5 KV SWITCHGEAR - CITRUS, CRAFTON HILLS AND CHERRY VALLEY PUMP STATIONS/EAST BRANCH EXTENSION-PHASE II PLAN #: 158063 Bid Date: 11/21/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Planroom # OF ADDENDA: 1 PREBID: 10/3 @ 10am OWNER: State of California, Dept of Water Resources Ph: 916-653-5791 DESCR: Contact, Department of General Services, 916-3754940, Jim Veres telephone (916) 653-4867, fax (916) 653-6166, or by e-mail at doe_specs@water.ca.gov. See specifications for details. Continued on next page
Plans On File Continued from last page
Wednesday, November 21, 2012 ELMHURST HAZMAT ABATEMENT - JOB ORDER PLAN #: 204001 Bid Date: 11/21/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Co. Online and Planroom OWNER: County of Alameda DESCR: Contact, Jason Garrison, 510-208-9520. Remove the obsolete HVAC, the ducts are covered with wood trim that is painted with lead-based paint. Beneath the wood trim is asbestos insulation that is between two layers of transite panels. Loose and peeling paint will need to be stabilized and some of the paint will need to be spot bated so that the County can cut the steel without disturbing the remaining lead-based RFQ - EXECUTIVE PROGRAM ADVISOR FOR WATER POLLUTION CONTROL PLANT CAPITAL IMPROVEMENT PROGRAM Bid Date: 11/21/2012 PLAN #: 220076 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom OWNER: City of San Jose DESCR: Contact, Greg Card, 408-535-8304. City of San Jose is seeking Statement of Qualification from qualified consultants for the Executive Program Advisor for Water Pollution Control Plant Capital Improvement Program.
Monday, November 26, 2012 BUILD 3 OFFICES FOR USDI BUREAU OF LAND PLAN #: 160063 Bid Date: 11/26/2012 Bid Time: 12:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $42,000.00 Demand PREBID: MAND 11/7 @ 1pm OWNER: General Services Administration DESCR: Contact, General Services Admin. (916) 4685366 Timothy Day (timothy.day@gsa.gov) Work consists of constructing three offices in the existing Bureau of Land Management suites.
Tuesday, November 27, 2012 FIBER OPTIC CABLE INSTALLATION AT A-LINE, MLINE, & CONCORD YARD PLAN #: 156084 Bid Date: 11/27/2012
Page 62 November 5, 2012
Zone • Contractor’s .
Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Various Online and Planroom Est Cost: $900,000.00 PREBID: MAND 10/23/12 @ 9:00 am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit (510) 464-6088. The work consists of providing all labor, materials, fiber optic cable, equipment, and services necessary to install fiber optic cables as indicated in the specifications, and to furnish and install 2” Galvanized Rigid Steel conduit, 2” flex conduit, conduit radius extenders, transition and pull boxes, conduit hubs, gaskets, and other ancillary equipment where required to make a complete and functional installation, as indicated. All mounting hardware and pull boxes shall be of stainless steel. Interested prospective Bidders are requrested to confirm their intention to attend by notifying the District’s Contract Administrator Sunni Gunawardena @ 510-464-6550 prior to the date of the scheduled pre-bid meeting and site tour. BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 BUILDING 800 RENOVATION PLAN #: 163072 Bid Date: 11/27/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Aptos Online & Print On Est Cost: $3,354,000.00 # OF ADDENDA: 1 Demand PREBID: MAND 10/25 @ 10am OWNER: Cabrillo College Ph: 831-479-6100 DESCR: Contact, Cabrillo Community College Dist (831) 477-5613. Renovation of the 800 Building brings together several related programs into a state-of-the-art learning facility in one building: Engineering, Physics, Computer Science, Computer and Information Systems, and MESA (Mathematics, Engineering, Science Achievement). The project is funded in part by a STEM Grant from the U.S. Department of Education, to facilitate broader participation in these disciplines by the County’s Latino community. The STEM Grant will provide $1,952,530 or 46% of the estimated $4,202,530 construction and soft costs. The balance of the estimated construction costs ($2,250,000) will be paid from the District’s Measure D Bond funds. BIDDERS LIST: General Contractor: Menghetti Construction 209-524-2465 209-524-2495 Garden City Construction 408-289-8807 408-289-8523 Strawn Construction, Inc 408-286-1299 408-286-1288 Tombleson Inc 831-422-9696 831-422-0566
Bobo Construction, Inc. 916-685-2285 916-714-4850 Sub Contractor: Culbert Installs Doors, 916-675-4050 916-992-0133 PARKING LOT SWEEPING AND STEAM CLEANING SERVICES FOR ARVIN DMV FIELD OFFICE Bid Date: 11/27/2012 PLAN #: 195095 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Arvin Planroom OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Allison Stanek, DMV, 916-657-9810. Parking Lot Sweeping and Steam Cleaning Services for Arvin DMV Field Office. UTILITY POTHOLING ON VARIOUS ROADWAYS IN UNINCORPORATED AREAS, ALAMEDA Bid Date: 11/27/2012 PLAN #: 279040 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Planroom PREBID: MAND 11/7 @ 2PM at 951 Turner Ct., Rm 230, Hayward OWNER: County of Alameda DESCR: Contact: Tam Nguyen 510-670-5758.Locating both horizontally & bertically various underground utility lines by “non-destructive vacuum excavation;” providing traffic control; restoration of disturbed roadway pavement; cleaning site & miscellaneous work.
Wednesday, November 28, 2012 JPS EAST CAMPUS-OPERATION CENTER MOVE PLAN #: 53095 Bid Date: 11/28/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $1,750,000.00 Demand PREBID: 11/7 @ 10am (strongly recommended) OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, John Slingerland, 916-732-6515, jslinge@ smud.org The Move Contractor shall be responsible to provide all labor, including but not limited to, electrical, mechanical, plumbing, hazardous materials, riggers, specialty equipment subcontractors and provide all vehicles, equipment and materials required to safely and efficiently execute a “turnkey” solution when relocating SMUD’s existing operations to SMUD’s new East Campus-Operations Center. The Move Contractor shall pack, relocate, and unpack a wide range of
existing Yard equipment and materials (e.g., bins of parts, hand tools, batteries, tires, hazardous materials, pallets, inventory, specialty equipment, heavy transformers, etc.). In addition, Move Contractor shall relocate office contents for approximately 375staff which will be packed and unpacked by SMUD. BUS STOP PAVEMENT IMPROVEMENTS FY12 PLAN #: 79053 Bid Date: 11/28/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: San Jose, Planroom PREBID: 11/8 @ 10AM at 3331 North First St., San Jose OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729 DESCR: Contact: VTA (408) 321-5743.Improvements at 19 bus stops in the cities of Palo Alto, Santa Clara & San Jose, including bus stop PCC pad restoration, various sidewalk & street improvements for ADA approved access. BROADWAY STREETSCAPE IMPROVEMENTS PROJECT PHASE III Bid Date: 11/28/2012 PLAN #: 101084 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco PREBID: 11/6 @ 2:30pm OWNER: City & County of San Francisco DESCR: Contact, Cristina Olea, 415-558-4004. Streetscape and pedestrian improvements, roadway rehabilitation, sewer work, streetlight and traffic signal work and traffic routing, striping and signage work. HOSPITAL WIRELESS ACCESS POINT INSTALLATION CP NO. 8 - NORTH / SOUTH WING Bid Date: 11/28/2012 PLAN #: 103084 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $359,000.00 Demand PREBID: MAND 11/7 @ 10 AM OWNER: University of California, Davis Health System DESCR: Contact, Facilities and Design Construction (contracts@ucdmc.ucdavis.edu) (916) 734-7024. Relocate / install new and existing wireless access points (WAP), provide / install new surface wiremold raceway system for WAP cabling installation, terminate patch cords from each wireless access point device to a new or existing patch panel, install / connect patch cords between patch panel and switch, install switches, test system, protect existing equipment and system, patch / repair existing construction required for new work or relocate existing WAPs and relocate up to 5% of WAPs after system testing for signal coverage. Continued on next page
Plans On File Continued from last page
Wednesday, November 28, 2012 SICKLES AVENUE AND ALEMANY BOULEVARD- PAVEMENT RENOVATION AND SEWER Bid Date: 11/28/2012 PLAN #: 104084 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco PREBID: 11/6 @ 1:30pm OWNER: City & County of San Francisco DESCR: Contact, Ramon Kong, 415-554-8280. The Work is located on Sickles Avenue from Mission Street to Alemany Boulevard and on Alemany Boulevard from San Jose Avenue to Seneca Avenue and consists of pavement renovation, curb ramps, traffic routing, sewer replacement and all other related work. REPLACEMENT OF TOILET PARTITIONS AND BATHROOM ACCESSORIES PLAN #: 233071 Bid Date: 11/28/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Long Beach Online and Planroom PREBID: MAND 11/8 @ 8am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Loretta Vaquez, 916-657-8697. Replacement of Toilet Partitions and Bathroom Accessories MULTI-USE PATHWAY MAINTENANCE PROJECT Bid Date: 11/28/2012 PLAN #: 278040 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Marin Co. Planroom Est Cost: $250,000.00 OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-7877. Asphalt concrete resurfacing, pavement repairs, asphalt concrete grinding, concrete sidewalk, concrete curbs, vegetation removal.
Thursday, November 29, 2012 2012 SOUNDWALL REPAIR & REPLACEMENT PROJECT Bid Date: 11/29/2012 PLAN #: 0
Page 64 November 5, 2012
Zone • Contractor’s .
Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Clara Online & Print On Demand PREBID: 11/14 @ 10am OWNER: County of Santa Clara DESCR: Contact, Herbert Naraval, Proj Engr, @ 408-4941308. Removal & replacement of soundwall panels & posts along various expressways. GOLD RUN SITE DEVELOPMENT PROJECT PLAN #: 2015 Bid Date: 11/29/2012 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Placer Co. Plans on Disk Est Cost: $225,000.00 PREBID: 11/8 @ 10am OWNER: County of Placer Procurement Dept DESCR: Contact, County of Placer Procurement Services (530) 889-4255. Work consists of developing a public safety radio site to support the Countywide Interoperable Radio Communications Project. Site development includes: installation of an owner-provided 12’ x 20’ shelter; construction of an owner-provided 180 foot tower; construction of pads to support the shelter, generator, and propane tank; installation of owner-provided backup generator, transfer switch and propane tank; grading as required for the site; and all site work associated with the public safety radio site including foundation, trenching, electrical, grounding and HAGAN PICNIC PAVILION IMPROVEMENTS PLAN #: 198095 Bid Date: 11/29/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Rancho Planroom Est Cost: $118,300.00 OWNER: Cordova Recreation & Park District Ph: 916-362-1841 FAX: 916-362-9602 DESCR: Contact, Cordova Recreation and Park District, Jerry Fox, (916) 947-6794. Construction fence, construction sign, demolition, grading, postconstructionturf seeding, erosion control, approx. 6000 sq. feet of concrete installation, minor electrical (per plan), irrigation head relocation, ADA lot striping and signage installation, 2 Group BBQ’s and installation, picnic and prep table installation, shelter installation with stone column cladding, as detailed in the plans and specifications. VETERANS MEMORIAL BUILDING PLAN #: 145062 Bid Date: 11/29/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Demand PREBID: MAND 11/7 @ 10am OWNER: County of Santa Cruz
FAX: 831-454-2710 DESCR: Contact, Vanir Construction Management, Dolores Montenegro, Senior Project Manager via email at dolores. montenegro@vanir.com, with copy to Domenic Zigant @ domenic.zigant@vanir.com.Each bidder must submit a bid proposal for the project for which they intend to bid to the General Services. Project consists of the Phase 2 interior renovation and modifications to the SANTA CRUZ VETERANS MEMORIAL BUILDING. The Work specifically includes all the work as represented by the Drawings and Specifications issued for construction and subsequent approved revisions and includes but is not limited to: hazardous material abatement in areas where demolition is shown, modifications to electrical, mechanical HVAC systems, new menand women’s toilets, improvements for compliance with Americans with Disabilities, and seismic upgrade of the building. HAGAN PICNIC PAVILION IMPROVEMENTS PLAN #: 198095 Bid Date: 11/29/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Rancho Online and Planroom Est Cost: $118,300.00 OWNER: Cordova Recreation & Park District Ph: 916-362-1841 FAX: 916-362-9602 DESCR: Contact, Cordova Recreation and Park District, Jerry Fox, (916) 947-6794. Construction fence, construction sign, demolition, grading, postconstructionturf seeding, erosion control, approx. 6000 sq. feet of concrete installation, minor electrical (per plan), irrigation head relocation, ADA lot striping and signage installation, 2 Group BBQ’s and installation, picnic and prep table installation, shelter installation with stone column cladding, as detailed in the plans and specifications. BIDDERS LIST: General Contractor: C & C Construction 916-434-5280 916-434-5288 REQUIREMENTS CONTRACT FOR AUTOMATIC FAREBOX COLLECTION SYSTEM PLAN #: 201089 Bid Date: 11/29/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno PREBID: 11/7 @ 10am OWNER: City of Fresno DESCR: Contact, Jean Runnels, Phone: (559) 621-1163 OR 6211332. New AFC system that is based on open system architecture, modular, and flexible to adapt to and accept any commonly used fare media, such as paper-based or limited-use ticket, magnetic stripe card, or smart card, over the service life of the system. The AFC system should conform to technological and environmental Open Standards and Guidelines, including, but not limited to the following applicable industry standards, as required to provide the levels of service required by this bid:. This request is for a one -year contract with one (1) one-year extensions.
RESEAL AND RESTRIPE PARKING LOT PLAN #: 221094 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fresno Online and Planroom PREBID: MAND 11/15 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Peter Flores, 916-322-8883Contractor shall provide all labor, equipment, and materials necessary to provide Parking Lot Repairs, Sealing and Striping at the Water Resources Office Building. GOLDEN HILL TANK NO. 1 AND MERRY HILL TANK REHABILITATION PLAN #: 232083 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Paso de Online and Planroom PREBID:10/26@ 1:30pm OWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Repairs to Golden hill Tank No. 1 and Merry Hill Tank, removal and repair of corroded rafter ends, removal of clips attached to the dollar plate and repair of coatings on dollar plate. A curved beam assembly with clips will be installed to support the rafters. Select interior coating repairs will be performed at direction of Owner. Merry Hill Tank will undergo seismic improvements including installation of a concrete ringwall and attachment of the tank to ringwall with seismic restraints. Piping modifications are required to facilitate the new footing. The interior of the tank will be recoated and exterior surfaces will be coated. JOB ORDER CONTRACT PHASE 19 AND 20 PLAN #: 262036 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom PREBID: MAND 11/6 @ 10am OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243 DESCR: Contact, San Jose State University, Sylvia Sosa-Galindo [sylvia.sosa@sjsu.edu] JOC is a competitively bid, firm fixed priced, indefinite quantity contract. The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the “Contractor” for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, structures, or other real property. Work is accomplished by means of issuance of a purchase order against the JOC. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the work. The JOC contract awarded under this solicitation will each have a minimum value of work of $50,000.00 and a maximum value of work of $1,000,000.00. The JOC Contracts will have the option to extend the maximum value up to $3,000,000.00. The term of the contract will be for 365 calendar days. Continued on next page
Plans On File Tuesday, December 04, 2012
Continued from last page
Thursday, November 29, 2012 RFP ON-CALL GENERAL ENGINEERING CONSULTANT DESIGN SERVICES PLAN #: 267041 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Carlos Online and Planroom PREBID: 10/26 @ 9:00am OWNER: San Mateo Co. Transit District DESCR: Contact, Samtrans, Patric May, (mayp@samtrans.com). General Engineering Consultant Design Services for San Mateo Co
Friday, November 30, 2012 MISSION 12” WATER MAIN PLAN #: 39016 Bid Date: 11/30/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Santa Clara Plans on Disk PREBID: 11/14 @ 9:30am OWNER: City of Santa Clara DESCR: Contact, Rocco Colicchia, 925-348-1098. Installation of a 12” water main on Mission College Blcd., trench & excavation safety, aggregate base, asphaltic concrete pavement, resurfacing and berms, furnishing and installing pipe. ON-CALL ENGINEERING AND TECHNICAL SUPPORT SERVICES FOR COUNTY AIRPORTS PLAN #: 185095 Bid Date: 11/30/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Siskiyou Co. Online and Planroom OWNER: County of Siskiyou FAX: 530-842-8288 DESCR: Contact, Mellissa Cummins, 530-842-8295. County of Siskiyou is soliciting bids for On Call Engineering andTechnical Support Services for County Airports LANDSCAPE MAINTENANCE AT VARIOUS WATER WELLS AND WATER DIVISION PROPERTIES IN FRESNO PLAN #: 298026 Bid Date: 11/30/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Online and Planroom # OF ADDENDA: 2 PREBID: 11/8 @ 10am OWNER: City of Fresno DESCR: Contact, City of Fresno, 559-621-1332. City of Fresno is soliciting proposals for a requirements contract for landscape maintenance at various water wells and water division properties ( 1 yr Contract ) with two one-year extensions.
Page 66 November 5, 2012
Zone • Contractor’s .
IMPROVEMENTS TO THE OTTER EXPRESS FOOD SERVICE BUILDING PLAN #: 285043 Bid Date: 12/4/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Monterey Online & Print On Est Cost: $1,450,000.00 Demand PREBID: 11/13 @ 10am OWNER: California State University Monterey Bay Ph: 831-582-4169 FAX: 831-582-4436 DESCR: Contact, Reyola H Carlisle, 831-582-3506. ***** Plans and specificaitons may be seen on the BIDSYNC Website after 10/29. ***** Renovations to an existing facility to expand the food service area and increase the dining capacity. The scope includes, but is not necessarily limited to: selective demolition; foundation and structural steel reinforcement; existing roof recoating; preformed metal roofing installations; new windows and skylights; interior construction and all new finishes including, suspended acoustical ceiling, ceramic tile, carpet and painting; custom casework and countertops; new food service equipment; new furnishings including manufactured booths and banquettes; restroom renovations; HVAC and plumbing improvements; electrical system improvements; new lighting; and new fire alarm system. California Contractor License Requirement: Class B. A voluntary Pre-bid Conference Walkthrough is scheduled for Tuesday, November 13, 2012 at 10:00 A.M. Interested bidders should assemble at: California State University Monterey Bay, University Center (Campus Building 29), Room 115, 4314 Sixth Avenue, Seaside, CA 93955. BIDDERS LIST: General Contractor Tombleson Inc 831-422-9696 831-422-0566 Wysong Construction 805-466-1038 805-466-5176
Wednesday, December 05, 2012 BICENTENNIAL WAY AND MENDOCINO AVENUE TRAFFIC SIGNAL MODIFICATION Bid Date: 12/5/2012 PLAN #: 289041 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Rosa PREBID: 11/14 @ 10am OWNER: City of Santa Rosa DESCR: Contact, City of Santa Rosa, Stephen Dittmer, 707543-3847. Bicentennial Way and Mendocino Avenue Traffic Signal Modification Project will be available on website on 10/29 BIDDERS LIST: General Contractor:
Ghilotti Construction C 707-585-1221 707-585-1601 Ghilotti Brothers Inc 415-454-7011 415-454-8376 STEVENS CREEK PIPELINE REHABILITATION PROJECT PLAN #: 299043 Bid Date: 12/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Clara Online & Print On Est Cost: $600,000.00 Demand PREBID: MAND 11/14/12 AT 9 AM OWNER: Santa Clara Valley Water District Ph: 408-265-2607 DESCR: Contact, Contact Thomas Lau, Project Manager, at (408) 265-2607, ext 2587. Project consists of work on the Stevens Creek Pipeline at 51 sites in multiple cities within Santa Clara County. Work includes conducting internal pipeline inspections using remote video equipment on the entire Stevens Creek pipeline, complete interior pipeline repair work as needed, should damaged areas be indentified during the internal pipeline inspections, prepare & paint/coat all in-utility box, invault & exposed pipeline, appurtenances & piping assembly components, restore all impacted work sites to a condition equal to or better than that existing prior to construction.
Thursday, December 06, 2012 9-INCH DUCTILE IRON MAIN INSTALLATION IN 23RD STREET FROM CHURCH STREET TO HOFFMAN Bid Date: 12/6/2012 PLAN #: 112084 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Plans on Disk PREBID: 11/13 @ 10am OWNER: City & County of San Francisco DESCR: Contact, City & County of San Francisco (415) 5514603. Install approximately 4,100 linear feet of 4, 6 & 8 inch ductile iron pipe & 2,700 linear feet of copper services in 23rd St from Church St to Hoffman Dt.
Tuesday, December 11, 2012 UNION CITY INTERMODAL STATION PHASE 2 BART STATION IMPROVEMENTS PLAN #: 109082 Bid Date: 12/11/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Union City Planroom PREBID: 11/8 @ 9am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, Sunni Gunawardena, 510-464-6550. Construction of a 2000 SF concourse addition on the east side of the Union City Station and a re-configuration of the existing
station concourse, including finish surface upgrades to provide a free passage through the station for future connection to 11th St..etc BIDDERS LIST: Supplier: Lane-aire Manufacturing 916-732-2224 916-732-2227
Thursday, December 13, 2012 21ST STREET IMPROVEMENTS PLAN #: 84080 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Paso de Online and Planroom PREBID: 11/20 @ 2pm OWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Remove existing & install new road, curb, gutter, drain lines, sewer, water, streetlights, underground utilities, striping, landscaping, & minor grading. CONSTRUCTION, DEVELOPMENT AND TESTING OF THE SULLIVAN AVENUE WELL PLAN #: 182097 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Daly City Online & Print On Demand OWNER: City of Daly City DESCR: Contact, City of Daly City, (650) 991-8200. Construction, Development and Testing of the Sullivan Avenue Well. CHP OCEANSIDE AREA OFFICE REPLACEMENT PLAN #: 307010 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Vista Online & Print On Demand PREBID: MAND 11/5 @ 11am OWNER: State of CA - Dept of General Services DESCR: Contact, Department of General Services, (916) 3761629. BIDDERS LIST: General Contractor: Augustine Company, The 619-670-4466 619-670-4411
Continued on next page
Plans On File Continued from last page
Tuesday, December 18, 2012 RWQCP ADMIN. BLDG. SYSTEMS UPGRADE PLAN #: 169086 Bid Date: 12/18/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Plans on Disk PREBID: MAND 11/16 @ 10am OWNER: City of Palo Alto DESCR: Contact, Daisy Stark, 650-444-6352. Upgrades of Wastewater Treatment electrical facilities in the Administration. Building including construction of medium (15 KV), and low voltage electrical connections to existing wastewater treatment plant power grid, and construction of miscellaneous systems and accessories at the Regional Water Quality Control Plant, 2501 Embarcadero Way in Palo Alto. BIDDERS LIST: General Contractor: Cf Contracting 415-721-7160 415-296-6437 Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797
Thursday, December 20, 2012 FIRE ALARM CONTROL UNIT REPLACEMENT, SOS BUILDING PLAN #: 188090 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom PREBID: MAND 12/4 @ 9:30am OWNER: State of CA - Dept of General Services DESCR: Contact, Department of General Services (916) 376-1754 Work consists of the replacement of a complete operational fire alarm system including calibration, testing and engineering.
Monday, December 31, 2012 PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORS PLAN #: 173079 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Auburn & Roseville Location: Placer County Online and Planroom OWNER: Placer County Office of Education Ph: 916-415-4424 DESCR: The Placer County Office of Education (PCOE) is
Page 68 November 5, 2012
Zone • Contractor’s .
inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2012. You must resubmit to be included on the 2012 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2012 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board. Phone: 530-889-8020 BIDDERS LIST: General Contractor: Steeltech Roofing 530-845-5681 530-367-5310 Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099 Brandon Thorp Electric 916-740-0479 916-000-0000 ARDEN PARK RECREATION AND PARK DISTRICT QUALIFIED BIDDER LIST Bid Date: 12/31/2012 PLAN #: 179092 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom OWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Contact, Colin Miller, 916-483-6069 (cmiller@aprpd. org). The Arden Park Recreation and Park District recently adopted an ordinance to participate in the Uniform Public Construction Cost Accounting Act. (Contractors seeking to be included on qualified bidder lists) BIDDERS LIST: Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099 RFQ COUNTY OF SACRAMENTO SMALL PROJECTS PLAN #: 187073 Bid Date: 12/31/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $100,000.00 OWNER: County of Sacto DESCR: Co of Sacramento, CUPCCAA@saccounty.net. If you would like to have your firm added to a mailing list to receive our Notice to Contractors for projects $100,000 or less being bid under CUPCCAA, please provide the following information: 1. Name and address of the firm 2. Name of contact person 3. Firm’s telephone number (and fax number if available)
4. The type(s) of work (e.g. earthwork, pipelines, electrical, painting, general building, etc) in which you are interested and currently licensed to do 5. Class of California contractor’s license(s) held by firm 6. Contractors license number(s) 7. Other California State certifications held by firm (e.g. ASB, HAZ, etc) 8. Any Federal, State, DBE certifications SEND THIS INFORMATION TO: County of Sacramento CUPCCAA Project / Contract Services 827 7th Street, Room 101 Sacramento, CA 95814 Or email to: CUPCCAA@saccounty.net THERE IS NO SUBMITTAL DEADLINE, NAMES WILL BE ADDED TO THE MAILING LIST AS THEY ARE RECEIVED. For this invitation, names will be retained on the list through December 31, 2012. SIERRA COLLEGE QUALIFIED CONTRACTORS LIST PLAN #: 191080 Bid Date: 12/31/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Rocklin Online and Planroom OWNER: Sierra Joint Community College District DESCR: Contact: Purchasing Dept. 916-660-7626.Sierra Joint Community College District Informal Bidding for projects less than $125,000 For more information, contact Facilities Development & Construction at 916-660-7658. BIDDERS LIST: Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099 Supplier: Sunbelt Rentals 916-789-1234 916-789-7077 Jms Industries 916-348-1502 916-408-6609 2012 BUTTE COUNTY QUALIFIED BIDDERS LIST PLAN #: 213071 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Oroville Online and Planroom OWNER: County of Butte FAX: 530-538-7171 DESCR: Janet Woods, (JWoods@ButteCounty.net). All licensed contractors are invited to submit the name of their firm to the County of Butte list of qualified bidders for calendar year 2012. BIDDERS LIST: Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693 NOTICE INVITING QUALIFIED CONTRACTORS TAHOE TRUCKEE USD PLAN #: 252041 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Truckee/Tahoe Online and Planroom OWNER: Tahoe Truckee Unified School District
DESCR: Contact, Todd Rivera, 530-582-2541 (trivera@ttusd. org). The Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2012 BIDDERS LIST: Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693 FOLSOM CORDOVA UNIFIED SCHOOL DISTRICT LIST OF CONTRACTORS 2012 PLAN #: 251038 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Cordo Online and Planroom OWNER: Folsom Cordova Unified School District Ph: 916-355-1111 DESCR: Contact: Peggy Beller 916-355-1111 ext. 139. All licensed contractors are invited to submit the name of their firm to the District for inclusion in the District’s list of qualified bidders for the Calendar Year 2012. BIDDERS LIST: Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693 NOTICE INVITING QUALIFIED CONTRACTORS TAHOE TRUCKEE USD PLAN #: 252041 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Truckee/Tahoe Online and Planroom OWNER: Tahoe Truckee USD DESCR: Contact, Todd Rivera, 530-582-2541 (trivera@ttusd. org). The Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2012 OHLONE COMMUNITY COLLEGE DISTRICTINCLUSION OF QUALIFIED CONTRACTORS PLAN #: 257065 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Co. Online and Planroom OWNER: Ohlone Community College District Ph: 510-659-6000 DESCR: Send Information to (purchasing@ohlone.edu) The Ohlone Community College District is inviting all licensed contractors to submit the information requested to the District for inclusion on the District’s list of qualified bidders for informal bidding for calendar year 2012.
Click on any blue underline because it’s an active link! Continued on next page
Plans On File Continued from last page
Monday, December 31, 2012
BIDDERS LIST: Sub Contractor: Presidential Fire Prote
916-379-9199 916-379-9099
NOTICE INVITING LICENSED CONTRACTORS CITY OF GALT PLAN #: 265036 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Galt Online and Planroom OWNER: City of Galt DESCR: Contact, City of Galt, 209-366-7130. City of Galt is inviting all licensed contractors to submit the name of their firm to the City for inclusion on the City’s list of qualified bidders for the current calendar BIDDERS LIST: Sub Contractor: Presidential Fire Prote 916-379-9199 916-379-9099
QUALIFIED CONTRACTORS LIST - TUOLUMNE COUNTY PLAN #: 319005 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Planroom OWNER: County of Tuolumne DESCR: Contact, County of Tuolumne Facilites Management, Jenny Watts, 209-533-5660. County of Tuolumne are inviting all licensed Contractors interested in bidding on projects submit the information for inclusion on the Qualified Contractor’s list for the upcoming year.
NOTICE INVITING QUALIFIED CONTRACTORS/TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT Bid Date: 12/31/2012 PLAN #: 283052 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tahoe/Truckee Online and Planroom OWNER: Tahoe Truckee Unified School District DESCR: Contact, Becca McGough, Facilities Department, 530-582-2540. Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2013 calendar year.
DESIGN-BUILD OF OUTER HARBOR INTERMODAL TERMINAL RAILYARD, PHASE 1, AT THE FORMER OAKLAND ARMY BASE PLAN #: 293041 Bid Date: 1/4/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland Planroom Est Cost: $60,000,000.00 OWNER: Port Of Oakland DESCR: Contact, Bill Russell, (brussell@portoakland.com) The Port will select a qualified Design-Build entity (DesignBuilder) to design and construct the Outer Harbor Intermodal Terminal (OHIT) Railyard, Phase 1 along the eastern half of the Port’s portion of the former Oakland Army Base (OAB) (the Project). BIDDERS LIST: Supplier: Modern Building System 916-985-9852 916-985-9865
DIXON UNIFIED SCHOOL DISTRICT - LIST OF CONTRACTORS PLAN #: 297033 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Dixon Planroom OWNER: City of Dixon DESCR: Contact, Cecile L. Nunley, (cnunley@dixonusd. org) Inviting interested contractors in performing public works projects for the Dixon Unified School District. COUNTY OF EL DORADO - AGENCY BIDDERS LIST PLAN #: 300025 Bid Date: 12/31/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Dorado Co. Online and Planroom OWNER: County of El Dorado DESCR: Bonnie Rich, 530-621-5940 or by email at (bonnie. rich@edcgov.us)Register your firms information even if you have been previously listed or have recently bid on a public works project.
Page 70 November 5, 2012
Zone • Contractor’s .
Friday, January 04, 2013
Monday, January 14, 2013 DESIGN BUILD OF OUTER HARBOR INTERMODAL TERMINAL RAILYARD, PHASE 1 AT FORMER OAKLAND ARMY BASE Bid Date: 1/14/2013 PLAN #: 157068 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland PREBID: MAND 11/27 @ 9am OWNER: Port Of Oakland DESCR: Contact, Barry Mac Donnell, 510-627-1383. Port of Oakland is inviting design build Proposals from qualified Bidders for the design and construction of Phase 1 of its Outer Harbor Intermodal Terminal Railyard project.
Friday, February 01, 2013 RFP - CROWS LANDING AIR FACILIT PLAN #: 231087 Bid Date: 2/1/2013 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Stanislaus Co. Online and Planroom
PREBID: 11/16 @ 2pm OWNER: County of Stanislaus DESCR: Contact, City of Modesto, General Service Agency/ Purchasing Division, 209-525-6319. Stanislaus County is seeking a Master Developer partner for a 1,531 acre former air facility development project.
Legal Ads ADVERTISEMENT FOR BIDS Please refer to additional requirements contained in the complete Advertisement for Bids published on-line at http://dcm.ucdavis. edu. Subject to conditions prescribed by the University of California, Davis, sealed bids for a lump-sum contract are invited for the following Work: LANDSCAPE IMPROVEMENTS, RMI WEST, Project No.: Q-214065 9571300/6623113/9570551. DESCRIPTION OF WORK: Provide all labor, materials, equipment, tools, transportation, insurance, and services for landscape improvements in the Robert Mondavi Institute courtyard area. Work to include, but is not limited to, the following: demolish existing concrete and asphalt, clean up existing debris, break up compaction in landscape areas, grade the site, and install new concrete sidewalk and bands, drainage improvements, irrigation improvements, planting improvements (including sod meadow and sod lawn), and metal benches, as noted on Drawings. Estimated Construction Cost of this project is $90,200.00 (Base Bid) A MANDATORY Pre-Bid Conference and MANDATORY Pre-Bid Job Walk will be conducted on TUESDAY, NOVEMBER 13, 2012 beginning promptly at 10:00 AM. Participants shall meet at the DESIGN AND CONSTRUCTION MANAGEMENT MAIN CONFERENCE ROOM. Bidders must be present at the Pre-Bid Conference no later than the scheduled start time. Only bidders who participate in both the Conference and the Job Walk in their entirety will be allowed to bid on the Project as prime contractors. For further information, contact HEATHER ECKELS at (530) 752-6115. The Job Walk will last approximately 2 hours. Transportation will be provided to the Job Walk. THERE WILL BE NO EXCEPTIONS FOR LATE ENTRY INTO PRE-BID CONFERENCE AND DEADLINE FOR SUBMITTING A BID. Bids will be received only at: Design and Construction Management, University of California, 255 Cousteau Place, Davis, California 95618. Bid Deadline: Sealed bids must be received on or before: 2:00 PM, THURSDAY NOVEMBER 29, 2012. Bids will be opened at: 2:01 P.M. or promptly thereafter. The successful Bidder will be required to have the following California current and active contractor’s license at the time of submission of the Bid: C-27 – Landscaping Contractor. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. THE REGENTS OF THE UNIVERSITY OF CALIFORNIA University of California, Davis October 31, 2012
Page 72 November 5, 2012
Zone • Contractor’s .
INVITATION FOR BID The Housing Authority of the City of Sacramento is soliciting sealed bids for Invitation for Bid (IFB) No. 2012073-MPlg for Clauss Court Office 2012, 1 Clauss Court, Unit 5B, Sacramento, CA. Possible subcontracting trades are Asbestos Removal; Cabinet, Millwork & Finish Carpentry; Concrete; Construction Clean-up; Doors, Gates & Activating Devices; Drywall; Electrical; Flooring & Floor Covering; Framing & Rough Carpentry; Hydroseed Spraying; Lathing & Plastering; Lead Removal; Ornamental Metal; Painting & Decorating; Plumbing; and Warm-Air Heating, Ventilation & AC. The estimated bonding range is between $40,000 $45,000. Bids will be received at the Procurement Services Division, 801 12th Street, 2nd Floor, Sacramento, California until 2:00 p.m. on December 3, 2012 at which time and place all bids received will be publicly opened and read aloud. Interested licensed “B” General Building Contractors should plan to attend the Pre-Bid Conference scheduled for 11/14/2012 at 9:00 AM, at 801 12th Street, 2nd Floor, Sacramento, California with a site visit following the Pre-Bid Conference. The site visit will only be conducted immediately following the Pre Bid Conference. All contractors are urged to attend the Pre-Bid Conference including the site inspection. Prime contractors are encouraged to bring any subcontractors interested in visiting the site to the Pre Bid Conference and site visit. Although attendance is not mandatory, contractors will be required to verify that they are aware of the existing site conditions. A bid package, plan holders list, and other contract documents relating to the project may be obtained beginning November 9, 2012 through: Signature Reprographics 620 Sunbeam Avenue Sacramento, CA 95814 916-454-0800 http://www.planroom.us/shra A deposit of $100.00 check or money order only is required for the first set of plans and any additional plans may be purchased through Signature Reprographics. Deposits will be refunded if plans are returned in good condition, to Signature Reprographics, no later than three weeks after bid opening. Please direct all general and contractual questions to Mike Peek, Buyer – Procurement Services, at 916-449-6277. For any technical questions regarding the Technical Plans and Specifications, please contact Mary L. Lyon, Program Manager, at 449-6263. For information on other construction projects, visit our website at http://www.shra.org. This contract is subject to Federal labor standards, affirmative action requirements, Section 3 Requirements of the HUD Act of 1968, and Minority and Women Owned Business Enterprise standards. All bidders will be required to furnish and pay for a satisfactory Bid Bond in the amount of not less than 10% of the total bid price. The successful bidder will be required to furnish and pay for a satisfactory Performance Bond and Payment Bond in the amount of not less than 100% of the contract price. Pursuant to the California Public Contract Code Section 22300 the Contractor may request that the Agency substitute a security in the amount of the performance retention. The Sacramento Housing and Redevelopment Agency reserves the right to reject any or all bids and waive any informalities in the bidding. The Agency is an Equal Opportunity Employment employer.
Legal Ads ANNOUNCEMENT TO PREQUALIFIED PROPOSERS Subject to conditions prescribed by the University of California, Davis, sealed proposals for a design build contract are invited from prequalified proposers for the following work: UC Davis Welcome Center, Project Number: 2829070. Description of Work: The University is seeking a Design Build Team for an approximately 7500 SF tenant improvement project in an existing LEED Platinum building on Campus that has an innovative HVAC system. This project is to construct an Admissions Welcome Center for prospective undergraduate students. This new center is intended to serve as the headquarters for campus tours and information sessions, deliver advising and one-on-one counseling, as well as present information about student life and student services. The Work shall include all design work, labor, material, tools, equipment, excavation, shoring, testing, inspection, commissioning and all necessary general conditions that may be reasonably inferred from the Contract Documents to provide all Design Work and Construction Work for UC Davis Welcome Center. Target Contract Amount: $1,500,000.00 Maximum Acceptance Cost: $1,700,000.00 Procedures: Procedures: NOTE: Credit card orders for documents are now accepted on our Reprographics website at http:// reprographics.ucdavis.edu/store/ Downloadable Bidding Documents will be available to Bidders on Thursday, November 8, 2012. A non-refundable fee will be required in the amount of $50.00. If paying by check or money order, make payable to UC Regents. All payments must be received at UCD Reprographics before documents can be made available for download. Prequalified contractors will be issued 1 set of documents at no charge. The following design builders have been prequalified to submit proposals on this project: FIRM:
PHONE:
FAX: EMAIL:
Kitchell
(916) 648-9700
(916) 648-6534 kvoll@kitchell.com
Otto Construction
(916) 441-6870
(916) 441-6138 allison@ottoconstruction.com
XL Construction Inc. (916) 282-2900
(916) 282-2901 snigam@xlconstruction.com
PLEASE NOTE: Subcontractors wishing to bid on this project should contact the prequalified General Contractor directly at the numbers listed above. A MANDATORY Pre-Bid Conference and MANDATORY Pre-Bid Job Walk will be conducted on Wednesday, November 14, 2012 beginning promptly at 9:30 a.m. Participants shall meet at Design and Construction Management, 255 Cousteau Place, Davis, CA 95618. Bidders must be present at the Pre-Bid Conference no later than the scheduled start time. Only bidders who participate in both the Conference and the Job Walk in their entirety, will be allowed to bid on the Project as prime contractors. For further information, contact Chris McGuire at (530) 754-1021 or (530) 754-1111. The Job Walk will last approximately 2 hours. Transportation will be provided to the Project Site Visit. Proposals will be received only at: Design and Construction Management, University of California 255 Cousteau Place, Davis, California 95616 (530) 754-1111 Proposals must be received on or before: 2:00 P.M. Thursday, December 6, 2012.
Page 74 November 5, 2012
Zone • Contractor’s .
Proposals will be opened at: 2:01 p.m., or promptly thereafter. Proposal Security in the amount of 10% of the Lump Sum Base Proposal, excluding alternates, shall accompany each bid. The surety issuing the Bid Bond shall be, on the bid deadline, an admitted surety insurer (as defined in the California Code of Civil Procedure Section 995.120) All insurance policies required to be obtained by Design Builder shall be subject to approval by University for form and substance. All such policies shall be issued by a company rated by Best as A- or better with a financial classification of VIII or better, or have equivalent rating by Standard and Poor’s or Moody’s. The successful proposer and its subcontractors will be required to follow the nondiscrimination requirements set forth in the proposal documents and to pay prevailing wage rates at the location of the work. The successful proposer will be required to have the following California contractor’s license at the time of the proposal opening: General Building “B”. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. THE REGENTS OF THE UNIVERSITY OF CALIFORNIA University of California, Davis November 6, 2012
Bid Results Tuesday, October 16, 2012
Tuesday, October 23, 2012
GERARD AVENUE SEWER MAIN REPLACEMENT PHASE 2, Merced
2501 AND 2531 LAND AVENUE ROOF PROJECT REBID, Sacramento
Plan Number:
Plan Number:
90081
Rolfe Construction $1,389,867 Mid Cal Pipelines & Utilities, Inc. $1,517,233 Dawson-Mauldin Construction, Inc. $1,890,275 MAINTENANCE FACILITY/RESTROOM & ATHLETIC STORAGE BUILDING, St. Helena
Plan Number:
199098
Northwest Engineering Murray Building Helmer & Sons, Inc.
$388,131 $389,000 $408,000
Click on any blue underline because it’s an active link!
159074
Pacific Builders $226,203 GENERAL EDUCATION BUILDINGS AND TECHNOLOGY CENTER PAINTING PROJECT, San
Plan Number:
19022
Leo’s AC, Inc. Wednesday, October 24, 2012
$317,000
ROAD IMPROVEMENTS - (RAISED CENTER MEDIAN) NORTH BEALE ROAD (LINDHURST AVE. TO LINDA AVE), Yuba Co.
Plan Number:
48006
Knife River Construction
$1,345,847
Bid Results
Thursday, October 25, 2012
CHILLER REPLACEMENT AT THE MARTINEZ DETENTION FACILITY, Martinez
Plan Number:
160062
WASTEWATER TREATMENT FACILITY DIGEST ER 2 & 3 CLEANING, Santa Cruz
Plan Number:
240088
Tuesday, October 30, 2012
Synagro $207,803 AIRPORT - LARKFIELD - WIKIUP SANITATION ZONE TREATMENT PLANT EMERGENCY GAS SCRUBBER SYSTEM, Santa Rosa
O’HARA AVENUE WIDENING - ROADWAY IMPROVEMENTS, Oakley
Plan Number:
Arnold Construction Company $236,176 BUENA VISTA AVENUE SANITARY SEWER AND STORM DRAIN IMPROVEMENTS, Vallejo
Agbayani Construction
$514,880
97065
Grade Tech Inc. $1,327,989.52 Bay Cities Paving & Grading $1,443,246.28 M C I Engineering, Inc. $1,452,905.55 UNIVERSE TIMELINE (SET IN CONCRETE SIDEWALK) @ BUTTE COMMUNITY COLLEGE,
Plan Number:
24007
United Building Contractors R & R Horn, Inc. Franklin Construction
$31,818 $36,950 $40,000
http://designcenters.paccoast.com
Page 76 November 5, 2012
Zone • Contractor’s .
Plan Number:
Plan Number:
26088
63091
Carone & Company, Inc
$214,035
TUBBS ISLAND ROAD RECONSTRUCTION PROJECT 2012, Vallejo
Plan Number:
Grade Tech Inc.
64089 $63,767
4 8 6 $ ion l l i b
The Internet Accounts For 4.7% of the U.S. Economy
Survey Says: 77% of Americans would be willing to give up chocolate for an entire year, rather than go without the Internet. Only 21% though would give up sex, and an even smaller 7% would go without a shower.
According to a recent survey conducted by CNN Money, the Internet contributes more to the American economy than the entire federal government, according to a new study by the Boston Consulting Group. The Internet accounted for $684 billion, or 4.7% of all U.S. economic activity in 2010, Boston Consulting Group found. By way of comparison, the federal government, contributed $625 billion, or 4.3%, to the nation’s output. If it was considered its own separate industry, the Internet would also be larger than America’s education, construction or agricultural sectors.
In the retail sphere alone, e-commerce accounted for 5% of U.S. sales in 2010. “All businesses are increasingly digital and need to think about how to take advantage of these opportunities,” said Dominic Field, a BCG partner and co-author of the report. Boston Consulting Group predicts the Internet will grow about 10% a year through 2016 in the Group of 20 nations.
Advertising HERE makes dollars, and sense! And this digital media will grow every year.
Call Steve today to get your powerful display ad started. 916.729.5432
Placer County Contractors Association & Builders Exchange
PCCA
N ewspaper R ate S heet REV JULY 2012
Display Advertising Policy, Rates and Information The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!
Our LOWEST rates
Upgraded format, larger ad sizes, lowered rates: Ad Type
Ad Size
1 run
6 runs
13 runs
26 runs
52 runs
Two Page Spread 17 1/4” wide by 11 1/4” tall
$782
$639
$497
$355
$209
Full page (bleed) 8 5/8” wide by 11 1/4” tall
$427
$355
$284
$213
$139
Full page (boxed) 8” wide by 9 3/4” tall
$427
$355
$284
$213
$139
Half page 8” wide by 4 3/4” tall
$229
$193
$158
$123
$87
One Third (V) 2 7/8” wide by 7 1/2” tall
$171
$144
$118
$92
$63
One Third (H) 8” wide by 3 1/8” tall
$171
$144
$118
$92
$63
$97
$81
$64
$47
$39
$32
$24
$19
Quarter Page 3 7/8” wide by 4 3/4” tall Contractor Yellow Pages (Business Card Sized Ad) Legal ads
• 3 7/8” wide and up to 2 1/4” tall $50
• 3 7/8” wide and up to 3 1/2” tall
• 3 7/8” wide and up to 5” tall
• 3 7/8” wide and up to 6 1/2” tall $135
$95
$75
Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:candspublishing@gmail. com. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: CandSpublishing@gmail.com. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members! Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract. For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:candspublishing@gmail.com See the newspaper onlne at www.PCCAe-Zone.com Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust U.S. currency regulations; inconsistent with the objectives of the Association. Zone Page 78 orNovember • Contractor’s . or is deemed 5, 2012