DEPARTMENT OF URBAN BETTERMENT
The Inflato Dumpster is not a solitary event, rather it is part of an extended life-cycle of engagement, the repurcussions of which can continually be felt long after the physical manifestation of the inflato has been removed. As a mobile learning laboratory, the knowledge gained from the workshops held within the big inflatable space can directly effect the urban streetscape in specific, long-lasting ways. For instance, participants can design sensors to monitor local air quality or light installations that respond to sound or movement. The Inflato Dumpster is an urban intervention dedicated to the creation of smaller, urban interventions, thus becoming a functional and programmatic indication of the operations housed within the space. PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
EVENT LIFE CYCLE
SHEET
01 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
SITE AXONOMETRIC VIEW
SHEET
02 / 11
DEPARTMENT OF URBAN BETTERMENT
05 AIR SUPPLY TYVEK BLDG WRAP RECYCLED CLEAR PLASTIC BAG GOLD MYLAR SILVER MYLAR 5’ - 6”
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
5’ - 6”
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
5’ - 6”
5’ - 6”
SHEET TITLE:
INDEX:
OVERHEAD VIEW
SHEET
03 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
ELEVATION VIEW
SHEET
04 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
NIGHT VIEW
SHEET
05 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
LONGITUDINAL SECTION
SHEET
06 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
INTERIOR VIEW
SHEET
07 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
POTENTIAL WORKSHOPS
SHEET
08 / 11
DEPARTMENT OF URBAN BETTERMENT
VOLUME: 3536887 AREA: 141375
VOLUME: 4729964 AREA: 169766
VOLUME: 4187533 AREA: 141171
V/A: 25
V/A: 27.8
V/A: 29.6
VOLUME: 3555327 AREA: 141325
VOLUME: 3181530 AREA: 127989
VOLUME: 3673476 AREA: 148131
V/A: 25.1
V/A: 24.8
V/A: 24.9
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
INITIAL INFLATED FORM TESTS
SHEET
09 / 11
DEPARTMENT OF URBAN BETTERMENT
12 11
7
6
1
5
4
3
2
1'-7 3/4"
1
1'-8 1/2"
2'-3 1/2"
1'-7 1/4"
1'-7 3/4"
12
2
3
5
4
6
7
8
9
10
11
1'-6"
1'-5 3/4"
1'-8 1/2"
2'-4 1/2"
10
8
1'-7 3/4"
1'-8 1/4" 1'-7 1/2"
2'-5"
1'-8"
11
9
1
1'-8 1/4"
12
10
2'-2 1/2"
2
MATERIAL TOTALS: 3
CLEAR POLYETHELYNE
457 SF
GOLD MYLAR
195 SF
SILVER MYLAR
226 SF
TYVEK BLDG WRAP
179 SF
4
9 8 5 6
7 PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
UNROLLED SURFACES
SHEET
10 / 11
DEPARTMENT OF URBAN BETTERMENT
PROJECT:
INFLATO DUMPSTER
DATE:
JULY 17, 2013 SEPTEMBER 07, 2013 OCTOBER 06, 2013
DESIGNER:
COPYRIGHT 2013 DEPARTMENT OF URBAN BETTERMENT info@dubnewyork.org
SHEET TITLE:
INDEX:
PROPOSED STREET VIEW
SHEET
11 / 11