EoYS 2021

Page 1

FINAL REVIEW CORE II GORDON KIPPING SEUNG HO SHIN


INCOME LEVEL

PROPERTY PRICE

GREEN SPACE


SITE OVERVIEW I


SITE OVERVIEW II

Proposed School Site


INCOME LEVEL

Proposed School Site Over $100,000 $100,000-70,000 $70,000-40,000 $40,000-20,000 Under $20,000


PROPERTY PRICE PER SQFT

Proposed School Site Over $850 $850-400 $400-100 Under $100 No Data


GREEN & OPEN SPACE

Proposed School Site Parks & Public/Open Space Community/School Gardens & Playgrounds Pedestrian Green Space Sports Fields Cemetries


PROXIMITY

2 MINUTES WALKING DISTANCE


EXISTING H


EXISTING H: NEW PROGRAMS

ELEVATORS


EXISTING H: CIRCULATION

Medical Suite Office, Conference Room, Storage Nurse’s Office, Resting, Exam, Waiting Area Grounds Equipment Storeroom Guidance Suite Storage/Workshop Shower/Changing Room Custodial Locker Rooms

Library

Auditorium Educational Supply Closet Janitor’s Sink Closet

CIRCULATION ELEVATORS

basement


EXISTING H: CIRCULATION

Art Studio Music Studio Woodshop Stage

Refuse and Recycling Room

Chair Storage Health Instructor’s Office

Auditorium Educational Supply Closet Janitor’s Sink Closet

CIRCULATION ELEVATORS

1st floor


EXISTING H: CIRCULATION

Science Labs

Administration Suite General’s Office Cubicles/Time & Mail/Duplicating Principal Office Storage Classrooms

Locker Rooms Gym Equipment Storage

Educational Supply Closet Janitor’s Sink Closet

CIRCULATION ELEVATORS

2nd floor


EXISTING H: CIRCULATION

Science Lab

Courts

Auditorium Green Lab

Courts

Classrooms

Educational Supply Closet Janitor’s Sink Closet

CIRCULATION ELEVATORS

3rd floor


EXISTING H: CIRCULATION

Science Lab Garden Green Lab Auditorium Classrooms

Garden

Educational Supply Closet Janitor’s Sink Closet

CIRCULATION ELEVATORS

4th floor


EXISTING H: CIRCULATION

Dietitian’s Office Food Storage Play Space Kitchen

Teaching Kitchen

Students’ Dining Area Classrooms

Play Space

Educational Supply Closet Janitor’s Sink Closet

CIRCULATION ELEVATORS

5th floor


EXISTING H: CIRCULATION

Dormitory Mini Kitchens Dormitory Closets Dormitory Bathrooms Dormitory Rooms Study Lounges Laundromats Urban Farms

Greenhouses

CIRCULATION ELEVATORS

above roof i


EXISTING H: CIRCULATION

Dormitory Mini Kitchens Dormitory Closets Dormitory Bathrooms Dormitory Rooms Study Lounges Laundromats

Greenhouses

CIRCULATION ELEVATORS

above roof ii


EXISTING H: CIRCULATION

Dormitory Mini Kitchens Dormitory Closets Dormitory Bathrooms Dormitory Rooms Study Lounges Laundromats

CIRCULATION ELEVATORS

above roof iii


NEW MASSING

the central gap space has been decreased in size as the left portion of the H has been enlarged towards the east








NEW MASSING: CIRCULATION

CIRCULATION ELEVATORS

circulation through outdoor green space


NEW MASSING: PROGRAMS

ELEVATORS






FACADE CIRCULATION CONCEPT


FACADE CIRCULATION CONCEPT




BASEMENT

1”=24’ 0”


1st FLOOR

1”=24’ 0”


2nd FLOOR

1”=24’ 0”


3rd FLOOR

1”=24’ 0”


4th FLOOR

1”=24’ 0”


5th FLOOR

1”=24’ 0”


6th FLOOR: ROOFTOP

1”=24’ 0”


7th FLOOR

1”=24’ 0”


8th FLOOR

1”=24’ 0”


N-S SECTION


E-W SECTION


PERSPECTIVE SECTION


WIND STUDY

PRIMARY WIND PATH SECONDARY WIND PATH


SUN STUDY SUMMER

WINTER










Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.