AT V FINAL GROUP CZHZ Chuqi Huang | Claire Chen | Hao Zhong | Tony Zhang
PROPOSAL SUMMARY
Proposed Site Aerial View
Proposed Site Plan
1 : 2500
N
Adaptive Reuse Strategy
RESEARCH
High
Low
Age
under 18 18-64 65 and over
0-9
10-19
20-29
30-39
40-49
50-59
60-69
70-79
80+
Sex
Ethnicity
White
Demographic Density
1 : 20000
N
Black
Native
Asian
Islander
Other
Two+
Hispanic
Male 51% Female 49%
Demographic Income
1 : 10000
N
Regional Zoning Map
1 : 10000
N
Neighborhood Landuse Map
1 : 5000
N
Subway Line Ferry Line Road Outline Site Boundary
Subway Station
Regional Transportation Map
1 : 20000
N
Q
67
Q
39 BM
24
5
32
24
62
Q
Q
39
67 24 43
32
BM
5
G
24
Q
67
48
BM
1
24
G
BM
2
BM
3
BM
Q
4
43
X
37
32
X
39 24
Q
59
38 L Q
L
L
59
Q
Q
G
L
39 32
62
Existing Mobility Map
67
J
59
57
38
43
48 Z
54
Q
54
L M J
1 : 10000
13
G
M
N
J
M
60
Precipitation by month
Wind rose
Sky dome
Climate Analysis
Energy Consumption
1 : 10000
N
Existing Solar Panel Condition
1 : 10000
N
Composting System
1 : 20000
N
Air Pollution In Greenpoint and Williamsburg, levels of PM2.5, the most harmful air pollutant, are 10.1 micrograms per cubic meter; the district ranks eighth-highest in the city.
Greenpoint & Williamsburg
Ironclad Warship USS Monitor 1862
Rockway & Broad Channel
Brooklyn
Charles Pratt’s Astral Oil Works 1850s
Potentially Polluted Sites Highly regulated Sites E-Designed Williamsburg Gas Light Company 1850
Spills >= 100 Gallons Spills < 100 Gallons Polluted and Remediated Sites
Asthma Rate
# of cases per 1,000 people, 2008-2012 1 -5 6-9 10 - 20
Continental Iron Works
21 - 35 Waste Transfer Stations
Brooklyn Eastern District Termial 1960
Contamination Map
1 : 5000
N
NYC
Waterfront Condition
1 : 5000
N
Shoreline In 1869 Shoreline In 1988 2050s Projected 100-Year Floodplain 2050s Projected 500-Year Floodplain
Bushwick Inlet is a remnant of Bushwick Creek, which reached further inland prior to urbanization. Towards the middle of the 19th century, industries were established along Bushwick Creek. In 1839, Kent Avenue was extended over the creek and wetlands to the east of this bridge were filled in the following decades. A proposal to fill in Bushwick Creek, and replace it with a park, was brought forward in 1896. By then, the creek was being used as an outflow point for the surrounding area’s sewage system. The wetlands was entirely filled in by 1913.
Shoreline Historical Context
1 : 5000
N
2020s Projected Floodplain
2050s Projected Floodplain
FEMA Special Flood Hazard Area ZONE AE: Portion of the 100-year flood zone that is not subject to wave action. ZONE X: The 500-year floodplain—an area that has a 0.2 percent or greater chance of flooding in any given year.
Regional Flood Map
1 : 10000
2080s Projected Floodplain
N
Regional Sewer Map
1 : 10000
N
Marine Life Diversity
1 : 5000
N
ENERGY SYSTEMS
Solar Energy Plan & Calculation
1 : 2500
N
WATER SYSTEMS
Regional Flood Protection
1 : 7500
N
Flood Protection Toolkit
Water System Diagram
Water System Section
Water System Plan
1 : 2500
N
Water Calculation
1 : 10000
N
TRANSPORTATION SYSTEMS
Proposed Mobility Map
1 : 2500
N
Truck Route & Parking
1 : 2500
N
Parking Structure
1 : 2500
N
REMEDIATION & BIODIVERSITY
Site Section
BUILDING INTEGRATED SYSTEMS
Oyster Farm
Oyster System
Oyster Diagram
2050 Flood Plain
Oyster Farm Section
Oyster Network
1 : 10000
N
Oyster Farm Perspective
Water Treatment Plant
Water Treatment Plant Section
Water Treatment Plant Perspective
Office
Office Section
Canal
Canal Section
ing
r
oo
td Ou
ing
n Din
th Pa ane L n e ria Bik est d Pe
or
o utd
O
Axon 1
Waterfront Axon
n Din
e Bik
e Lan
r
est
d Pe
th Pa n ia
Axon 2
Water Collection Section
Waterfront Perspective
THANK YOU