PORTFOLIO an exploration of MUTUALITY Xinlei Gu
Any relationship between all objects in the world can be called mutuality. Since majoring in landscape architecture, I pay more attention to the relationship between natural factors and human factors. When these factors restrict each other and have negative mutuality, I will explore how to change the relationship between these same factors to produce a positive result.
Xinlei Gu
Nanjing Argriculture University 2019 Candidate
2
Email: 1659408930@qq.com Tel: 86 15715197808
PROJECTS
SELECTED WORKS 2014-2018
01 ZIGZAG FLOW TO RIVER 08/2018
Ecological Restoration Design Of E-waste & Waterlogging issue Area Type
: 9.82 ha : Individual Work
02 THE VALUE OF COURTYARD 06/2018 Urban Design Area Type
: 0.3 ha : Individual Work
03 FEEDBACK FROM MINE 01/2018
Abandoned Mine Landscape Architecture Design Area Type
: 56 ha : Individual Work
04 NETTING IN CITY 05/2017
Flooding Resilience Landscape Architecture Planning & Design Area Type
: 17533 ha (planning) & 70 ha (design) : Team Work
05 OTHER WORKS
an exploration of mutuality / selected works 2014-2018
01
02
03
04
05
ZIGZAG FLOW TO RIVER Ecological Restoration Design Of E-waste & Waterlogging Issue Type Site Area Time Advisor
: Individual Work : Guangdong, China : 9.82 ha : Aug. 2018 : Haoran Li
PROJECT PROCESS News
Issue
Extreme Flood in Guiyu in 2018
Waterlogging E-waste pollution
The largest electronics disassembly site in China
3
Strategy
mutual solution
Severe E-waste Pollution & Waterlooging Guiyu Town is the largest e-waste village in the world. It handles 10 million tons of e-waste every year. Electronic waste is sorted, and after disassembly, the useless parts are randomly stacked on the river bank. Heavy metal ions penetrate into the soil and then into groundwater and rivers. Many rivers are black, threatening the health of local people. Meanwhile, because of its low terrain, Guiyu Town is one of the cities with the most serious waterlogging disasters in China. The serious waterlogging makes Guiyu Town unable to develop agricultural economy. Therefore, even if there is serious e-waste pollution, electronic disassembly is still the largest economic chain in Guiyu Town. In a city full of pollution and disasters, purification and flood management need to be carried out simultaneously. Therefore, in this project, I will focus on the configuration of catchment lines and the combination of purified plants. What form of catchment line and what kind of plants can minimize pollution and waterlogging problems, but also have a certain degree of ornamental.
How to MAXIMUMLY purify water??
an exploration of mutuality / selected works 2014-2018
pollutant movement direction electronic trash storage area electronic disassembly factory residential area green area 20 years flooding level
AVERAGE PERCIPITATION OF GUIYU TOWN
ELECTRONIC WAST CHAIN OF PURCHASE & DISMANTLING HIGH PARTICIPATION DEGREE 60,000
150,000
electronic employees
90%
population in town
E-waste chain
pollution not treated
electronic waste dismantling chain
Waterlogging
10 million purchase glass and discarded metal
industrial output value
FORMATION OF ELECTRONIC WAST CHAIN
DEVELOPMENT OF ELECTRONIC WASTE GDP
4
low income of agriculture
establish electronic economic zone
electronic waste chain
purchase electronic waste
coastal regious 1950
100%
1990
2005
2016
purchase glass,waste and discarded metal
80% Kids Respiratory Disease 82% kids lead poisoning
SITE ISSUE
OVERALL STRATEGY
HEAVY METAL POLLUTION
HYPERACCUMULATORS pollutants
polluted soil
heavy metals in soil caused by electronic waste dump
Surface runoff takes away heavy metals from soil
rain falling to the ground
kidney injure brain injure, miscarry cell cancerate respiratory disease coronary heart disease uremia bone lesion
hyperaccumulators
TOPOGRAPHY
WASTLAND
MULTIPLE FUNCTIONS
demands
surface runoff pipeline discharge narrow river channel
infiltration
other
events
plant transpiration
low infiltration
residences
green space party sports commerce
patiences
parking
falt terrain
amusment
customers lead runoff into river
create low-lying lands
needs
music
students
evaporation
heavy rainfall
detrimental effects
absorb
Discharge into low-lying rivers, resulting in secondary pollution
WATERLOGGING
contaminants in soil Hg Pb Cr Ni Zn Cu Cd
education
create mounds
blooms
tourists
rest space
SITE CONTEXT
DESIGN DOAL
factory residential area school recreation flow direction hostipal current road contamination point
The site is located in the center of Guiyu Town, surrounded by multiple land use type. It should be of greater value. Therefore, in this project, I tend to reduce pollution by planting hyperaccumulators, alleviate waterlogging problems by creating catchment lines, and enhance the play experience by adding a three - dimensional road system. This abandoned land will eventually become a clean and resilient wetland in the downtown.
an exploration of mutuality / selected works 2014-2018
PROTOTYPE DEDUCATION Combining three types of water treatment with two functions, the site can adapt to different precipitation to the greatest extent, and has different landscape under different precipitation conditions.
hold
"HOLD" FUNCTION When the interval of X id fixed, the change of Y value is small, The smaller the length of Y axis mapped in the site, the slower the flow velocity of water, and it's easier to store water
split
"MERGE" FUNCTION When the interval of X id fixed, the value of H varies greatly. The longer the H axis is mapped in the site, the faster the flow rate of water is, and the diversion is easier.
merge
flow
flow
flow
flow
flow
hold merge hold merge hold
MERGE
HOLD hold
split
merge split
split
hold
merge split
split
hold
5
hold merge hold merge hold split split split split split split
hold
hold split
merge
split
hold
merge
merge hold merge hold split split split split split
hold
FORM TOPOGRAPHY
ADD ROAD SYSTEM
Paste Catchment Lines To Site
Place Horizontal & Vertical Access
Dig Down To Form Emergent Wetland
Create Different Dimensional Space
Dig Down To Form 'Hold' Part
Connect
Final Topography
split & merge
hold
Scale 1:1000 Material : CNC an exploration of mutuality / selected works 2014-2018
MASTER PLAN
2
1 2
3 3 3
PLANTING OF HYPERACCUMULATORS
THE WATER WILL EVENTUAL
When hyperaccumulators finish absorbing heavy metals,they are removed from the site and then new hyperaccumulators are replanted. In this way, the catchment line is gradually formed while purifying. hyperaccumulators
after asorption
heavy metal
section 1
clean soil
Step 1 section 2 polluted land
absorb
hyperaccumulators
reap
Step 2 4Y
section 3
6Y
section 4
layer 1 dig
absorb
hyperaccumulators
reap
Step 3 layer 2
6Y
section 5
8Y
layer 1 dig
hyperaccumulators
absorb
reap 1
Step 3 6
X2 =
4
layer 3 layer 2 layer 1
8 formation of catchment line
1
2
1. Little Squre 2. Rest Space 3. Viewing Platform
3
LLY FLOW INTO RIVER
rainfall
flow direction
section 6
section 7
section 8
an exploration of mutuality / selected works 2014-2018
green space
rest space
rest space
Iris tectorum
Pb Hg Cd Mn As Zn Cu Ni
7
sports
amusement
education
Wi t h t h e i n c r e a s e o f r a i n f a l l , the water in the low-lying lands overflows and converges for the first time, and is effectively introduced into the river channel through the catchment lines. In this process, hyperaccumulators still play a purification role.
When it rains heavily, the water flows along the catchment line to the river course to solve the waterlogging problem.
Adsorption of Heavy Metals by Different Hyperaccumulators
party
EMERGED HERB
Clinopodium urticifolium (Hance) C. Y. Wu et Hsuan
FLOATING HERB
Acorus tatarinowii
Trapa bispinsa Roxb.L
Emma minor L.
Marisilea
green space
music
rest space
party
sports
amusement
education
blooms
green space
Wa t e r c o l l e c t s i n t h e l o w - l y i n g lands for purification. Heavy metal ions in the water are absorbed by hyperaccumulators.
SUBMERGED HERB
quadrifolia L.
Myriophyllum verticillatum L.
TERRESTRIAL HERB
Hydrilla verticillata
Eremochloa ciliaris (Linn.) Merr.
Arabis paniculata Franch.
Vetiveria zizanioides (L.) Nash
spot 1
spot 2
an exploration of mutuality / selected works 2014-2018
ADAPTATION TO DIFFERENT PRECIPITATION Precipitation Increases
spot 1 8
spot 2 an exploration of mutuality / selected works 2014-2018
01
02
03
04
05
THE VALUE OF COURTYARD Urban Design Type Site Area Time Advisor
: Individual Work : Shanghai, China : 0.3 ha : Jun. 2018 : Hongfei Ji
PROJECT PROCESS Triggered Point many historical buildings left in Shanghai
Issue the cour tyard has become a negative place since it's crowded, dirty and lack of management.
activate the courtyard various valuable interac tions remained in the building
conservation of
historical building or residents' life pattern? 9
Strategy
M o ve w h a t i s happening in the building to the yard
A Unique Chinese Life Pattern “Tongzi" building, also known as Tube-shaned building, is a housing style with Chinese characteristics. It is the result of the tense housing distribution system of Chinese enterprises and institutions in the 1970s and 1980s. The long corridors, bathrooms and toilets are all public space, usually preceded by offces invarious units or dormitories for single workers. The courtyard in the center of a tube building is usually chaotic because of its small size and lack of proper management. Therefore, dirty and crowded is a summary of this living environment. However, with the continuous development of society, the legacy of the tubular buildings are mostly included in the historical protection of the building, in addition to the building itself, people want to protect the "life pattern" in the tubular building, which matches the old Chinese saying, "distant relatives are inferior to neighbors". Therefore, in the premise that the building itself can not be renovated and modified to explore the preservation of the living mode of the residents in the tubular building, we have to start withe the compound courtyard in the tubular building. Courtyard is the public activity space of residents. How to maximize the use of courtyard for residents is the problem that this project tends to explore and solve.
What's the POTENTIAL of the yard??
an exploration of mutuality / selected works 2014-2018
various problems accumulate CHRONOLOGICALLY
ACCESS SPACE After the elevator is abandoned, only stairs and corridors are left for residents. With the increase of the number of residents, the amount of debris piled on the corridor further reduces the access space.
PUBLIC SPACE With the increase of the number of residents, more and more public spaces become housing, and nowadays public spaces almost disappear. The central courtyard was also divided into fragmented pieces from its former whole.
LIVING SPACE
SITE
Today, the living space increases year by year. Apart from the stores on the first floor in the West and the public toilets on the north, the rest are for residents.
GREEN SPACE The central courtyard was once an English garden at the beginning of its construction. Since then, the courtyard has become a hard cement field to meet the various needs of the residents (such as drying clothes, parking, etc.). Today, only a small amount of potted plants are available.
PARKING SPACE
Longchang Apartment was built in 1920s and 1930s. It was designed by the British during the British Concession. The first name of Longchang Apartment is the patrol house on Gram Road. It is the office site of the patrol house in the public concession. The whole apartment is like a square barrel building like an ancient Roman Colosseum, with a spacious courtyard in the middle, like a large square surrounded by five-storey buildings with grey soil. After liberation, the south side of the patrol house became the office space of Yangpu District Public Security Bureau, while Longchang Apartment became the staff dormitory of the Public Security Bureau. Later, many people came in one after another. Most of them are office workers or businessmen in the vicinity. They move here because of the cheap rent and convenient transportation. It have maintained about 250 households all the time. Due to its unique historical role and value, Longchang Apartment in Shanghai was classified as an immovable cultural relic in 2004. 10
There is no designated parking space in the central courtyard. Vehicles are parked in disorder in the courtyard. And as the number of bic ycles parked in the courtyard increases, the parking space becomes smaller and smaller, and eventually parked crowdedly in the narrow space around the entrance.
INDOOR SPACE With the increase of residents, the living space of 40 square meters per household has been separated and reduced to 20 square meters. Residents built one more house in the corridor to increase their own housing area, so the corridor became more crowded.
1970s
s
1990s
2010s
an exploration of mutuality / selected works 2014-2018
MAPPING THE VALUEABLE INTERACTIONS IN THE HISTORICAL BUILDING
we st
WEST SIDE sec
sid
e
tion
ele
va tio
n
ELEVATION
ELEVATION
summary of interactions
CLASSIFIED BY AGE GROUPS reading
sports
studying drying cloths
garbage
biking
pet
eating
bath
chat
parking
smoking
triggered spaces
CHILDREN
11
YOUTH
WEST SIDE
ELEVATION
ELEVATION
MIDDLE AGE
ELDERLY
an exploration of mutuality / selected works 2014-2018
STRATEGY MAKE THE COURTYARD SATISFYING ALL KINDS OF INTERACTIONS
create streamline generate grid
generate vertical streamline
interactions distribution
spaces distributions
combine interactions & spaces 12
MASTER PLAN 1 GROUND SPACE
7
8
7
1
7
2 3 8
4
5
6
1. open lawn 4. outdoor dining space 7. living space
2. clothes airing bar 5. indoor reading space 8. elevator
3.outdoor reading space 6. indoor dining space
MASTER PLAN 2
UNDERGROUND SPACE & PARKING LOT
5 8
7
2
6 1
3
4
8
1. bathhouse 4. bicycle parking lot 7. laundry house
2. resting space 5. vehicle parking lot 8. elevator
3.outdoor theater 6. individual bathroom an exploration of mutuality / selected works 2014-2018
STREAMLINE
SECOND FLOOR
connecting stairways
open lawn
PUBLIC READIN
At 4 p.m. in summe Apartment was shado sunken public reading read extra-curricular interesting games here
GROUND FLOOR
connecting stairways
OUTDOOR THE UNDERGROUND FLOOR
Open-air theatre provi movies or live broadca festival parties togethe screen and communic have a fixed frequenc time it will become a u
connecting stairways
PARKING LOT
BATHHOUSE
The public bathhou underground recreat no water in the pool. not only meets the he the connection amon activities have unexp different locations whe
13
NG SPACE
er, the Western courtyard of Longchang owed. At this moment, the outdoor semig area became a popular place. Children can books, talk with their peers or play some e after school.
EATER
ides a place for residents to watch excellent asts of exciting sports events and traditional er. People sit on the big steps in front of the cate with each other. Such projections can cy, once a week or once a month, and over unique "courtyard culture".
use is open after dark, and it is a quiet tional space during the day when there is . The establishment of public bathhouses ealth needs of residents, but also enhances ng residents. The seemingly ordinary daily pectedly positive effects because of the ere they are carried out.
an exploration of mutuality / selected works 2014-2018
EASTERN PASSAGEWAY
STAIRWAY
lead to the laundry house & individual bathroom
14
LAWN
STAIRWAY
lead to the bathhouse
e
MIDDLE PASSAGEWAY CLOTHES AIRING BAR
BATHHOUSE
RESTING SPACE
WESTERN PASSAGEWAY
STAIRWAY
lead to the bathhouse
an exploration of mutuality / selected works 2014-2018
By increasing the vertical space, the utilization space of the courtyard is greatly increased. Both motor vehicles and bicycles are parked in underground parking lot, which no longer affects the activities of residents in the courtyard. The courtyard has also changed from the first floor to the second floor and many functions have been implanted. Residents can spend more time in the courtyard to interact and communicate with each other to continue this unique Chinese life pattern.
15
an exploration of mutuality / selected works 2014-2018
MODEL WORK Scale 1:100 Material : Resin (3D print)
INDIVIDUAL BATHROOM
No time for a bath? Let's take a quick shower!
BATHHOUSE Enjoy your bath time and talk to you neighbor about your day!
OVERHEAD PASSAGEWAY Let's walk up and down!
16
walk through the lawn
choose your direction
to the bathhouse
to the laundry house
an exploration of mutuality / selected works 2014-2018
01
02
03
04
05
FEEDBACK FROM MINE Abandoned Mine Landscape Architecture Design Type Site Area Time Advisor
: Individual Work : Anhui, China : 56 ha : Jan. 2018 : Qiyi Li
PROJECT PROCESS Issue Triggered Point abandoned mines in Anhui province
What's the impact?
17
three vulnerable groups in Anhui
t h re e m o s t co m m o n diseases in Anhui lack of rehabilitation consciousness
a rehabilitation environment for these groups suffering from these diseases
Planning Concept rehabilitation community
Mines can benefit vulnerable groups As a large mining Province in China, Anhui has hundreds of abandoned Mines every year. After the mine was abandoned, most of the workers who used to work here chose to leave, but their physical and psychological trauma caused by heavy manual labor or some mine accidents could not be cured. Under such circumstances, abandoned mines can be used as a place for health care. When people who have been affected by the mining industry come back here again, they have an emotional sense of belonging, which is the feedback from abandoned mines. In this project, I tend to focus on three categories: retired coal miners, left-behind rural women and left-behind children. All three groups are vulnerable groups in China, they’re of great number and all have similar psychological and physiological problems (lung disease, physical injury, mental illness). In the context of weak rehabilitation awareness in China, this mixed rehabilitation of different ages, diseases and genders can play a positive role in promoting each group of people. Such a mixed mode eventually leads to a community model, and perhaps the patients are more likely to feel a normal social climate, reducing a sense of social disconnection.
What can an abandoned mine mountain BECOME??
an exploration of mutuality / selected works 2014-2018
He Fei City
Still Mining: 27 Stop Mining: 5
Ma Anshan City Still Mining: 33 Stop Mining: 15
Wu Hu City
Still Mining: 84 Stop Mining: 25
SITE Tong Ling City
Still Mining: 107 Stop Mining: 68
Chi Zhou City Still Mining: 72 Stop Mining: 68
Abandoned Mine
An Qing City
Still Mining: 48 Stop Mining: 7
0KM
20KM
The gap in quantity is getting smaller and smaller stil mining
stop mining
800 600 400
Perhaps in the near future, abandoned mines will be all over the province. At that time, we should consider whether the abandoned mine is:
200 0
18
2010
2011
2012
2013
2014
2015
2016
2017
2018
1, just a scar of environment or 2, the emotional sustenance of some groups.
VULNERABLE GROUPS IN ANHUI
DISEASE TYPES IN ANHUI 0
200
400
600
800
respiratory disease trauma gynecopathy digestive diseases urinary system Diseases cancer cerebralvascular diseases coronary disease metabolic diseases infectious diseases
When the two informations are superimposed, it will surprisingly find that all the informations can be linked through mineral industry.
an exploration of mutuality / selected works 2014-2018
REHABILITATION IN ANHUI
PLANNING CONCEPT: A REHAB
Number of hospitals and rehabilitation centers in China 2.50k
rehabilitation center
hospital
1000k
1.88k
75k
1.25k
50k
625
25k
0
0
625 2010
2011
2012
2013
2014
2015
Redefine
supply can't meet demand demand
Reclassify
supply
physiology
REHABILITATION psycology
25 medical staff medical equipment
bed
The current situation of rehabilitation in Anhui can be summarized into three phrases: a huge group waiting to be rehabilitated, a weak sense of rehabilitation and poor rehabilitation conditions. When people find themselves sick, they simply choose to go to the hospital for treatment. Once their condition is under control, they stop treatment and continue their previous unhealthy lifestyles. Over time, the previous disease recurs. Only a small number of people choose to receive follow-up rehabilitation work in rehabilitation centers.
disease type & 3 vulnerable groups
age
COMMUNITY
gender
demand
Function Community parks serves as the center of a community where people can engage in various social and outdoor rehabilitation activities. The terrain of the mine itself adds a lot of vertical space to the park. Both the patients living in the rehabilitation community and the outsiders can have an excellent experience in the community park
Function There are hotels and recuperation facilities for subhealthy people outside the rehabilitation community. These people mainly come from nearby towns or cities. Since they have no serious diseases, they only come here on weekends or holidays for simple physiotherapy. patients living in rehabilitation community can also come here for social activities, contacting with the outside world can reduce patients'negative emotions.
bus station parking lot road
19
Function
This is the best place for limb rehabilitation. Forest oxygen bar is r which can provide the best rehabilita It is a good place for patients to exerc since it's close to the residential area.
BILITATION COMMUNITY Regroup disability degradation of limb function respiratory disease gynecological diseases brain disease
Partition FEMALE CARE CENTER
CHILDREN CARE CENTER
autism sexual assault children youth middle age elderly
PATIENT RESIDENTIAL AREA
FOREST OXYGEN BAR
male female shopping sports education rest space party parking lot green space
COMMERCIAL STREET
COMMUNITY PARK
Function A series of facilities are set up for left-behind children such as Children's libraries, amusement parks and museums , ect. Also there's special education institute for children with congenital disabilities. When children are together, they become more optimistic and cheerful.
Function Provide women with a variety of communication opportunities, such as flower arranging courses, cooking courses, tea art courses, etc., through communication to reduce the loneliness of Left-behind women. There are also special psychological counseling services.
and respiratory rich in oxygen ions ation environment. cise in the morning .
Function Rehabilitation community has the same residential area as ordinary city. It also has cafes, teahouses, restaurants, theatres and so on. Patients who living here will not feel separated from the outside world.
an exploration of mutuality / selected works 2014-2018
DETAIL DESIGN:THE COMMUNITY PARK CENTER OF THE REHABILITATION COMMUNITY
current road
abandoned workshop tailing pond
mine mountain dumping site Sightseeing
Education Relax
Sports
Communication
Social
SITE ISSUE strategy of
STRATEGY
WASTEWATER
Purification Polluted Tailing Water various toxic substances remained in the tailing water
pine oil metal oil arsenic mercury
Water Accumulation rainfall causes the water accumulation at the bottom of mine
20
static settlement physisorption chemical adsorption
Multiple Functions fishing boating ……
Wetland Plants
Rainwater Garden
strategy of
STEEP SLOPE
>300m
Spiral Corridor
260m
Due to the extremely sheer slope, a spiral corridor is able to make the mine mountain more accessible to patients.
drag
220m 180m
tilt
140m connect
100m <100m
strategy of
UNUSED WORKSHOP
corridor
abandoned fac tories are scattered over the mountains.
Unite combining abandoned fac tories of different sizes to form a new integrated indoor activity center
large size
middle size
small size
strategy of
BARE ROCK
dense vegetation
Replant Since the local ecosystem has been destroied due to the overly mining, various plant species are supposed to be introduced to sustain a relatively steady ecosystem and a decent theraeutic environment
sparse vegetation
bare rock
herbaceous plant
pioneer plant
evergreen trees
shrubs
wetland plants
deciduous trees
an exploration of mutuality / selected works 2014-2018
MASTER PLAN
1. small square 2. boardwalk 3. small wharf 4. purified tailing 5. stream 6. lawn
7. indoor theraputic building 8. outdoor courts 9. parking lot 10. spiral corridor 11. rain garden 12. aerial corridor
13. reserved mine walls 14. platform 15. commanding height 16. roller skating area 17. interactive device 18. rock climbing area 309m
3 4
1
5
6
142m
2
3
Section 1-1
2 4
5
135m
140m
268m
205m
6 1
140m Section 2-2
160m
140m
Section 3-3
201m
265m 180m 172m
154m
Section 4-4
135m Section 5-5
268m
Section 6-6
21
257m
242m
256m232m 201m
TOUR ROUTE
B-2B-1
STARTING POINT starting point A-1
A-3
The service center is located at the entrance, where there are a series of infrastructure and entertainment venues. Community residents and tourists can choose to stay in the building for dinner, tea or a series of indoor social activities. They can also choose to play outdoor ball games in the stadium beside the building. If they want to gain a richer experience, they can take a break in the building and start exploring the whole mine.
B-3
A-2 route A route B
Route B is mainly a river tour route. Residents and tourists carry out a series of water or hydrophilic activities around the purified tailings pond. After a circle around the lake, they can reach the rainwater garden at the bottom of mine.
ROUTE A A-1
A-2
ROUTE B B-1
Those who choose route B will first go to the dock, where they can take a boat ride to the open w a t e r a n d fe e l t h e p u r i f i e d tailings water at close range.
A-3
At the end of the corridor is the top of the hill and the commanding height of the whole site. Open vision not only meets the viewing needs of tourists, but also can effectively alleviate the mental illness of some patients and achieve better rehabilitation results.
Those who chose route A first slowly approached the top of the mountain along the corridor. The setting of gentle slope not only enables patients who need physical rehabilitation to get effective rehabilitation, but also makes it easy for patients who use wheelchairs to go up and down. The conserved mine can evoke the miners'memories and give them a sense of belonging.
Route A mainly travels along the orebody, reaching the viewing platform at the top of the mine through the spiral corridor along the orebody, and then to the skateboard park transformed from the original dump.
B-2
After leaving the dock, we arrive at the trestle and the small square. Faced with the quiet water, people can do morning exercises in the small square, watch open-air movies and play mahjong. There will be a very harmonious atmosphere of rehabilitation.
After coming down from the viewing platform, people can enter the skateboard park, which used to be a dump for rubble. Now it has a completely new look. After the earth heap and gravel have been reprocessed, it is now a sports ground for teenagers. Left-behind children who don't have their parents' company can have a series of interesting activities such as roller skating, rock climbing and make friends easily. They wonâ&#x20AC;&#x2122;t feel lonely anymore.
B-3
Finally, people reach the rainwater garden at the bottom of the pit, where people can enjoy the beautiful scenery. Whatâ&#x20AC;&#x2122;s more, the garden can provide chances for leftbehind women and children to entertain and communicate. They can grow flowers together and help each other and wonâ&#x20AC;&#x2122;t have negative feelings even without the accompanying of relatives.
from MONOCHROM
BEFORE
AFTER
After the revival of th mine became a pop rehabilitation comm rehabilitation groups c other in va
22
ME to POLYCHROME
he mine, the once bare pular backyard in the munity, where different could interact with each arious ways.
an exploration of mutuality / selected works 2014-2018
01
02
03
04
05
NETTING IN CITY Flooding Resilience Landscape Architecture Planning & Design Type Site Area Time Advisor
: Group Work : Surabaya, Indonesia : 17533 ha (planning) & 70 ha (design) : May. 2017 : Hong Li
PROJECT PROCESS Issue News
many rivers are not interconnected
frequent flooding in Surabaya city
Planning Strategy connection the river channel & renew the green space
wasteland is scattered in the city A TOOL BOX
23
A City Suffers From Flood Frequently Surabaya is located in East Java Province of Indonesia, is an important port in Indonesia, and one of the cities that suffered most from floods. According to records, Surabaya has an average of 30 flood disasters per year, even 70-80 in severe cases. Every flood is undoubtedly a blow to the urban economy and the quality of life of residents. In this project, we first explore the strategies to reduce flood hazards from the macro perspective of the whole city. We have redesigned the urban water system and green space to effectively guide the flow of water into the ocean. At the same time, we came up with a series of small strategies, and after evaluating each strategy, we put them in the planning. After that, under the guidance of the General Regulation, we selected a part of the city, combined with the small strategies we had come up with before and the surrounding situation of each plot to have a detail design
How to make the city RESILIENT??
an exploration of mutuality / selected works 2014-2018
0km
5km
natural river channel flow direction floodgate ocean city area
24
SURABAYA CITY The abundant precipitation in Surabaya City is one of the reasons for frequent flooding issue in the city. The flood peak period is usually between December and March. During this period, the river water level almost always exceeds the normal level.
FLOOD FREQUENCY IN SURABAYA CITY Various reaons such as Low-lying terrain, abundant rainfall, weak drainage system... make Surabay City suffer serious flood disasters all the year round.
CURRENT SITUATION IN SURABAYA CITY The river is close to the street and there is no buffer zone.
Numerous wasteland
surabaya city high flooding risk area influence from rivers influence from ocean river source
an exploration of mutuality / selected works 2014-2018
DESIGN PROCESS : 2 STRATEGIES TO REACH 3 GOALS GOAL 1
settle the flood issue
GOAL 2
provide a better living condition
GOAL 3
enhance economic performance
STRATEGY
FLOOD
SAFE !
DECENT ENVIRONMENT !
By connecting rivers, rainfall can be effectively diverted and eventually introduced into the sea. And by reviving the green space, the infiltration rate of the city is greatly increased and the surface runoff is reduced.
Once residents could only have activities in a few parks in the city. Now with the increase of multi-functional green space and waterfront space, residents can have leisure activities throughout the city.
LAYOUT : 2 STRATEGIES Water System CONNECTION
Green System RENEWAL
25
existing proposal
GDP INCREASED ! When urban floods are alleviated, cities can reduce their expenditure on disaster management. And more urban riverside landscape makes urban tourism develop rapidly and bring economic benefits to the city.
LAYOUT : 3 GOALS GOAL 1 Flood Issue MITIGATE
existing proposal
GOAL 2 Living Condition IMPROVE
GOAL 3 Social Economical Benefit INCREASE
an exploration of mutuality / selected works 2014-2018
MASTER PLAN AN OVERALL PLANNING OF WATER & GREEN SYSTEM
Safe
GDP Increase
En
JAVA SEA
river flooding mitigation area lake wetland 0m refuge area economic land
500m
INDIVIDUAL DESIGN PART
A Wasteland Surrounded By Residential Area
SITE ISSUE Absent Buffer Zone
No Acc
Rivers are close to residential a re a s a n d h o u s e s m ay b e destroyed by floods
The wa by cob can't e
STRATEGY
STRA
S1, S4, D4
S1, D2
The site is located in the east of Sishui City, surrounded by dense residential areas. It is one of the areas seriously affected by waterlogging issue because of its low terrain. I tend to revitalize this wasteland as a wetland. It can not only provide leisure space for the residents around it, but can also help alleviate the waterlogging problem.
STRATEGIES FROM TOOLBOX S1, S4, D2, D3, D4, D5
26
TOOL BOX WITH AN EVALUATION SYSTEM
Decent nvironment
S1. Buffer Zone
S2. Refuge
D1. Wetland
D2. Park
G1. Purification
cessibility
S3. Consolidate levee
S4. Wilden River
S5. Distruibutary
D3. Resstore Water
D4. Soften Levee
D5. Reforestation
G3. Fishery
G4. Agriculture
G5. Tourism
G2. Hydroelectric Generation
Low Infiltrability
Diverse Public Needs
aste land was surrounded b walls hence residents enter it.
Flat terrain can hardly store water and drain water effectively.
The dense surrounding residential areas indicate a large demand for activities.
ATEGY
STRATEGY
STRATEGY
2
D3, D5
D2 an exploration of mutuality / selected works 2014-2018
SCHEME DEDUCATION
MASTER PLAN
drag
connect
break
dig
connect
1. Private-owned Fishpond 2. Elasticity Passageway 3. Overhead Bridge 4. Residential Building 5. Multifunction Building 27
6. Little Mounds 7. Highland 8. Slight Grade Wetland 9. Water Playform 10. Spiral Tour
CONTOUR LINES & SECTIONS
SITE RESILIENCE
average rainfall
Jul. - Oct. water level
Nov. - Jun. water level
20 years flood level
0m -2.5m
an exploration of mutuality / selected works 2014-2018
MODEL WORK
perspective view
28
an exploration of mutuality / selected works 2014-2018
PERSPECTIVE VIEW THE RETURN OF FIREFLIES When the site was revived, it not only solved the problems of flood and waterlogging, but also provided better quality of life for the residents around the site. And when the ecosystem of this site is gradually improved, the rich tropical ecological landscape will become an excellent tourist spot, which may improve the economic situation of the city.
29
an exploration of mutuality / selected works 2014-2018
05
OTHER WORKS SELECTED PHOTOGRAPH, DIGITAL ILLUSTRATIONS AND MODEL WORK 2013-2018
HANDMADE VASE material: wood 2'' x 8''
30
THANKS FOR WATCHING Xinlei Gu
Nanjing Argriculture Universuty 2019 Candidate
Email: 1659408930@qq.com Tel: 86 15715197808