Installation of GRS •
15th, 1500 hrs
•
16th, 1900 hrs
GRS unit arrived from Barry. GRS operators Bård Norberg, Helge Johansen and Andrzej Brezinskij arived GSK. GRS unit put into position GRS trailer with control panel arrived GSK
•
18th
Installed GRS equipment
•
19th, 0800-1430hrs
BOC installed N2 tank and connected N2 piping
•
19th, 1500 hrs
All GRS equippment installed,tested and ready for Recovery of P11 and P12 from 4 x 10 cbm tanks and piping network
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
November 19th Recovery of P11 Phase ”0” liquid draining 1535 hrs
Starting condition +2 degC, 0,8 bara estimated remaining P11 about 1000kg
• 1535-1555 hrs
Pressure building with nitrogen to 4,1 bara in both P11 tanks1
• 1555 hrs
Tank 1 and 2 drained from free liquid into the GRS Unit and pumped to P11 collecting tank. Drainage at 0 degC in GRS unit
• 1600 hrs
Commenced cooling GRS unit down to freezingpoint of P11 -110,5 degC
• 1640 hrs • 1930 hrs • 2000 hrs
Continued draining P11
Gulf Coast Consulting Technology Global Marketing & Sales
588 kg P11 recoverd and pumped into collecting tank Stopped operation Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
November 20th Recovery of P11 •
0830 hrs
•
0930-1145 hrs Purged and recovered P11 from all system pipelines, low spots, filters and internal pumping systems.
Continued recovery process from P11 tanks at freezing point –110,5 deg C
Simultaneously P11 tanks were purged with warm N2 with a rate of 220 CBM/hr
• •
1400 hrs
516 kg P11 recovered and pumped to 2nd collecting tank
1415 hrs
Measured P11 content in both P11 tanks and piping system with Dräger tubes, type for Halogonated Hydrocarbons100/a. No indication of P11 was detected on the tubes which corresponds to less than100ppm.
•
1415 hrs
Approximately 3,5 tons of N2 were consumed for P11 recovery. We estimate P11 tanks having been purge with 1000 CBM N2. With this ammount N2 throughput P11 remenants is less than 3 PPM.
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
November 20th Recovery of P12 •
1430 hrs
Starting condition 0 degC, 0,8 bar a pressure in both P12 tanks. Tanks said to contain N2 with only small amount of P12 remaining
•
1445 hrs
GRS unit cooled down to freezing point of P12 –157degC, commenced pressure build up to 4 bar a
• • •
1455 hrs
Commenced purging and recovery from P12 tanks with warm N2
1455-1830 hrs
Continious recovery operation at freezing point of P12
1830 hrs
Pumped 88 kg of a mixture of P12 and P11 into collecting tank. Estimated recovered P12 less than 30 kg
•
1830 hrs
Measured P12 tank content wit Dräger tubes for Halogonated Hydrocarbon type 100/a. No indication of P12 was detected which corresponds to less than 100 ppm
•
1830 hrs
About 2mt of N2 were consumed for the P12 recovery. We estimate the P12 have been purged with 1000cbm N2. Estimated P12 remenats is less than 3 PPM
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
November 20th Completion of Recovery Operation
•
1900 hrs Completed the recovery operation • Heated up the GRS unit • Disconnected all piping • Assembled all equipment
•
2130 hrs
Completed packing left GSK
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
November 21st
•
Final day
• • •
0900 hrs GRS team at Ware Packing up rest of equipment
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
P11 and P12 Recovery Summary • • •
• •
P11 Pumped into 1st recovery cylinder P11 Pumped into 2nd recovery cylinder Pure P11 recovered
588 kg 516 kg 104 kg
During recovery of P12 some P11 still remained in GRS unit. The P12 and P11 were mixed and pumped to 3rd recovery cylinder Total recovered P11 and P12
88 kg 1192 kg
The GRS unit was totally empted and purged into he 3rd cylinder. No traces of P11 and P12 remained in the GRS unit, measured with Dräger tubes.
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
Nitrogen for the Recovery Process
•
Nitrogen summary
•
1st tank filling
•
Remaining nitrogen after completion 3mt
• •
Nitrogen for P11 recovery Nitrogen for P12 recovery
•
P11 and P12 tanks purged with more than 1000 cbm N2 vapors
Gulf Coast Consulting Technology Global Marketing & Sales
8 mt
3,5 mt 2,0 mt
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
Certificate of Decontamination Result 2 x 10m3 P11 Pressure Tanks 2 x 10m3 P12 Pressure Tanks
•
•
Measuring method
• • • • • •
By Dräger tubes for Halogenated Hydrocarbons Measuring with 50% air and 50% tank content Method advised by Dräger laboratory in Zürich 5mt nitrogen used for purging and recovery Purged volume totally 4 x 10 cbm cbm 50 volume changes for 4 tanks
Result
• • • •
No P11 detectable with Dräger tubes No P12 detectable with Dräger tubes Estimated tank content to be less than 3 PPm All 4 tanks completed with slight overpressure
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies
Gas Recovery Systems
Thank You For Viewing. For inquiries, please contact our US Sales Channel Partner Fred Reyes GRS Licensed Agent
Gulf Coast Consulting 2525 Barry Rose Road, Suite 701 Pearland, Texas Tel 832-230-1029 Fax: 832-220-9871 www.gulfcoastconsulting.net
Gulf Coast Consulting Technology Global Marketing & Sales
Strategy & Technology Consulting Oil &Gas, Chemical, Environmental Blue Skies Recovery Technologies