G EN ARCH
GUSTAVO GABRIEL ENGEL Portfolio 2009 - 2017
GUSTAVO ENGEL ARCHITECT AND URBAN PLANNER
C O N TA C T
engel.architecture@gmail.com 2nd December st. flat 415 Al Hubaiba, Dubai - UAE +971 582 590 331 +55 11 983551105 www.linkedin.com/in/gustavogabriel-engel-0a59b6106/
SKILLS
PROFILE
Architect and Urban Planner graduated in a leading Latin American university with one year of international academic experience sponsored by a Brazilian government scholarship for students with high academic achievements. Over two years of professional experience working in a major architecture office in Brazil as a part III Architect Assistant developing project for international corporation’s offices all over Latin America. Self-driven team player with great communication skills; proven track record in softwares of technical drawings, graphics and 3D modelling, passionate about technical and social aspects of architecture and urban design and eager to add value and continue developing professionally. Currently looking for an Architect position.
E D U C AT I O N
TECNICAL
Mackenzie Presbyterian University AutoCAD 2D / 3D Revit Architecture
(B. Arch.), Architecture and Urban Planning Sao Paulo - Brazil
06/2009 - 06/2016
Sketchup Photoshop
Kingston University London
Adobe Suite
Exchange student (B. Arch.), Architecture London - United Kingdom
V-Ray
09/2014 - 05/2015
3D Models Microsoft Office
Kingston University London Research intern
PROFESSIONAL Conceptual design to final executive drawings
06/2015 - 07/2015
Carried out a research about the typological development of the Temple complex in London, focusing on the relation between the system of courtyards, gardens, thresholds and buildings considering their materiality, scale and spatial aspects to understand how people behave in the different spaces the complex provide.
Tecnical detailing Complementary projects copatibilization (air conditioning, electrical, sprinklers and hydraulic) Concept presentation
United International College (UIC) English language course London - United Kingdom
2010 - 2011
Construction site management AsBuilt drawings Joinery detailing
Portfolio: https://issuu.com/gustavogengel/docs/portfolio_-_march_2017_-_english
LANGUAGES
AWARDS AND SCHOLARSHIPS Portuguese
Native speaker
English
Fluent
Design of multi-functional building complex selected for University exhibition in 2011
Spanish
Basic work proficience
Science without Borders Scholarship from the Brazilian Government during 2014/15
GUSTAVO ENGEL
G EN ARCH
ARCHITECT AND URBAN PLANNER
EXPERIENCE HHTC Architecture, Sao Paulo, Brazil Architect Key projects:
09/2016 – 03/2017
COPAG office refurbishment - Sao Paulo - Brazil Architect responsible from the design concept to completion. Development from the conceptual design to the final proposal including all the respective executive drawings, technical detailing and complementary projects compatibilation; Presentation of the concept, materials and vendors to the clients; Construction management (contact with contractors and vendors such as monitoring the work site) Andrade Azevedo Corporate Architecture ( A T H I É | W O H N R A T H ) , Sao Paulo, Brazil Architecture Assistant (part III)
03/2012 – 11/2013
Contributed to the design, oriented by a team of well experienced architects, of headquarter offices for companies such as Unilever, Philips and Syngenta, including input to the respective accessibility studies, concept designs, design development, technical details, client presentation and planning studies. Key projects: Unilever central office - Sao Paulo - Brazil Architectural survey of structure, window frames, layout; ceiling and floor plans; AsBuilt Cad drawings; Project compatibilization; Technical detail of wet areas and material specification; Preparation of concept design, materials and furniture presentations. Philips central office - Sao Paulo - Brazil Architectural survey of structure, window frames, layout; ceiling and floor plans; AsBuilt Cad drawings; Project compatibilization; Material and furniture specifications of the meeting rooms and CEO’s offices Syngenta Brazil - Sao Paulo - Brazil Architectural survey of structure, window frames, layout; ceiling and floor plans; Project compatibilization; Technical detail of wet and common areas and material specification; Material and furniture specifications of the CEO’s offices and conference rooms.
A D D I T I O N A L I N F O R M AT I O N Interests Social equality; Contemporary and urban art (Adriana Vareijao; Ian Cumberland) Fashion Design (Alexander McQueen - Savage Beauty, London 2015) Hobbies Sports (gym, circus and running) Reading - Fixtion (J.R.R. Tolkien; Suzanne Collins) - Architecture (Aldo Rossi, Peter Zumthor, Jane Jacobs)
Academic work
T Y P O L O G Y S T U DY G e o r g e a n Te r r a c e d H o u s e
Brief WC
WC
This survey developed in group, focus on understand the typological aspects of the L o n d o n G e o r g i a n Te r r a c e d h o u s e s . Credits: Ebba Down, Alexandra Olsen, Gustavo Engel • • • •
Focus on the corner conditions of the G e o r g i a n Te r r a c e d H o u s e s ; Materiality study; Relationship between the building and the Queens Square, Fiscal Model of the corner condition.
PLANTA PAVIMENTO PLANTATÉRREO PAVIMENTO TÉRREO
WC
PLANTA PAVIMENTO TÉRREO PLANTA SUBSOLO PLANTA SUBSOLO PLANTA PAVIMENTO TÉRREO
2º PAVIMENTO 2º PAVIMENTO
1º PAVIMENTO 1º PAVIMENTO
1º PAVIMENTO1º PAVIMENTO
WC
2º PAVIMENTO2º PAVIMENTO
3º PAVIMENTO3º PAVIMENTO
3º PAVIMENTO 3º PAVIMENTO
West - East Section
South Elevation
1:200 Roofplan
Roof Plan
Plaster Model on Kingston University Exhibition
TYPOLOGY AND TOPOGRAPHY Inhabiting Heritage
Brief T h i s p r o j e c t , d e v e l o p e d d u r i n g t h e p e r i o d a t K i n g s t o n U n i v e r s i t y, i s l o c a t e d in the old centre of Seville, Spain , listed by UNESCO as world heritage. The goal was through the study of the topography and the unique city typology: Casa Patio; Corales and Pasajes , design a mixed use building to house apartments, workshops, auditorium and a space for temporary exhibitions.
Urban contex diagram Seville Nolly Plan
City inside the city
Site strategy development process
B
A
B
A
GROUND FLOOR PLAN
ROOF
PLAN
Section B-B
Section A-A
0
2
5
10
20 meters
nor
Materiality Observing the city of Seville, it´s possible to realise that only the facade of the public and institutional buildings have a diferent materiality (briks), the rest and majority of the buildins were made in conventional plaster finish. Understanding that the city isn´t made of monuments, the strategy to compose the materyality of the complex was to keep Seville´s given statment (Briks on public areas and plaster finishon in the privet ones)
T E R R A N VA G U E I n h a b i t i n g t h e U r b a n Vo i d
Brief This project was developed on the final year of the graduation. This project consists in a mixes income house complex in one of the most complex sites in the centre of Sao Paulo. This site went through all of the urbanization process that f r a g m e n t e d t h e u r b a n f a b r i c o f t h e c i t y. The design consists: • • • • • • • •
Site strategy that organises the site considering the pre-existences; Reconstitute the vegetation; Promote the pedestrian life; Streets and squares as meeting spaces (dynamic life) Diversification of uses on the ground floor (Jane Jacobs); Prioritise pedestrians over cars; Buildings typology to recover the boundar y between public and private spaces; Evoke industrial materiality heritage o f t h e c i t y i n t h e b u i l d i n g ’s f a ç a d e ( b r i c k s )
S I T E S T R AT E G Y
V
V
V V
0.00
-5.00
3 1 9
+0.36
9
LEGEND:
+0.72
V
V
1 - Ta m a n d u a t e i R i v e r 2 - S t a d o A v. 3 - Footbr idge 4 - C e i l i n g a b o v e S t a d o A v. 6 - Tr u c k a c c e s s 7Logistics Centre 8Canal conecting the River and the floodings control pond contenção 9 - Floodings control pond 10 - Open Amphitheatre 11 - New topography 12 - Elevated Square 13 - Midnight Market 1 4 - M i d n i g h t M a r k e t Pe d e s t r i a n a r e a 1 5 - Po n d 1 6 - B u s Pa r k i n g 17 - Grean Areas V
V
2
6
-7.00
4 V 0.00
5
V
V
17
16
14 15
+0.72
13 11
12 +8.00
11
10 9 5
8
9
-7.00
5
6
7
N 0
10
25
50
100
200
metros IMPLANTAÇÃO - ESC: 1.1000
B2
B1 B2
INCLINAÇÃO 1%
B2
B1
B1
INCLINAÇÃO 1%
3 2
1
INCLINAÇÃO 1%
1
A1
1
1
1
2
INCLINAÇÃO 1%
A1
A1
A2
A2
A1
INCLINAÇÃO 1%
INCLINAÇÃO 1%
A1
2
2
A2
2
1
1
INCLINAÇÃO 1%
2
2
A3
3
A3
B2
B1
A2
1
2
INCLINAÇÃO 1%
A2
B2
3
A3
A3
1
B1
B2
B1
First floor plan B2
5
Roof plan B2
B1
1
5
3
5
2
6
A1
4
A3
3
1
1
B1
1
1
2
A1
A1
7 2
A2
A2
8
2
A2
1
1
2
2
7
8
8
8
B2
8
8
B1
A3
A3
3
A3
B2
B1
North elevation
2
3 4
3 4
5
5
6
6
3,15
1
2
2,10
3,15
3,10
7 8
7 8
9
10
11 12 14 15
13
16
16
17
17
18
18
19
19
20
20
1,20
1,20 SECTION: 1.20
13
2,20
2,20
3,10 2,10
SECTION: 1.20 fACADE ELEVATION fACADE - ESC: ELEVATION 1.20 - ESC: 1.20
2,70
,04 ,12 ,02 ,10 ,03 ,04 ,12 ,02 ,10
,04 ,12 ,02 ,10
1,30
,03
1 - Waterproof 1 -membrane Waterproof membrane 2 - Aricon SD21 2 - Aricon - wall tiles SD21 at -450mm wall tiles vertical at 450mm centres vertical centres 3 - External grade 3 - External rigid insulation grade rigid - 0,02W/mK insulation - 0,02W/mK 4 - Aricon MDC 4 - brackers Aricon MDC at 300 brackers mm horizontal at 300 mm horizontal 5 - Brick - 5cmX10cmX21cm 5 - Brick - 5cmX10cmX21cm 6 - Brick void6detail - Brick void detail 7 - Porcelain 7 floor - Porcelain 60cmX60cm floor 60cmX60cm - surface protected - surface protected against slippery against slippery 8 - Sub-floor 8- 2cm - Sub-floor - 2cm 9 - Concrete Slab 9 - Concrete - 15cm Slab - 15cm 10 - Aricon MDC 10 - brackers Aricon MDC - 11cm brackers - 11cm 11 - Concrete11 surface - Concrete to suport surface window to suport frame window frame 12 - Aluminium 12 -frame Aluminium - H = 2cm frame - H = 2cm 13 - Window 13 glass - Window aluminium glassframe aluminium - 2cmX2cm frame - 2cmX2cm 14 - Double glazing 14 - Double window glazing window 15 - Aluminium 15 -window Aluminium frame window external frame finish external finish 16 - luminium 16window - luminium frame window internal frame finishinternal finish 17 - Water drain 17 --Water 1% inclination drain - 1% inclination 18 - Drip - avoid 18 -rain Dripwater - avoid torain flowwater on the tobrick flow wall on the brick wall 19 - DPC - mechanically 19 - DPC - mechanically fixed to insulation fixed to insulation 20 - Screw to20 hold - Screw the bircks to hold the bircks
,04 ,12
2,10
3,10
11 12 14 15
9
10
,02 ,10
3,10 2,10
1
1,30
2,70 1,30
1,30
WINDOW FRAME WINDOW DETAIL PLAN FRAME - ESC: DETAIL 1.20PLAN - ESC: 1.20
WINDOW FRAME DETAIL WINDOW FRAME DETAIL PLAN - ESC: 1.20PLAN - ESC: 1.20
1 - Window aluminium frame - H = 2cm 2 - Water drain - 1% inclination 3 - Concrete Slab - 15cm 4 - Aricon MDC brackers at 300 mm horizontal 5 - Waterproof membrane 6 - Brick - 5cmX10cmX21cm 7 - External grade rigid insulation - 0,02W/mK 8 - Aricon SD21 - wall tiles at 450mm vertical centres 9 - DPC - mechanically fixed to insulation 10 - Screw manually fixed to hold Aricon MDC brackers at 300 mm horizontal 11 - Aricon MDC brackers at 300 mm horizontal 12 - Strew manually fixed to hold the brick 13 - Porcelain floor 60cmX60cm - surface protected against slippery 14 - Sub-floor - 2cm
1 2 3 4 5
7
0,95
1,02
6
8
9 13
12
0,04
0,11
14
10 11
Faรงade fiish setion detail - SC:. 1.10
FACADE FINISH SECTION DETAIL - ESC: 1.10
Professional work
U N I L E V E R - S A O PA U L O H . Q .
Andrade Azevedo arquitetura cororativa ( AT H I É | W O H N R AT H )
Brief The Unilever refurbishment project consisted on adapting 13 floors to a more flexible, integrated and relaxed workspace. In these ter ms, the strategy was to expand the common areas, such as the breakroom and living and take of the existing dividers to integrate the office.
•Architectural survey of structure, window frames, layout; ceiling and floor plans; •AsBuilt Cad drawings; •Project compatibilization of complementary projects (sprinklers, A.C, electric and hydraulic. •Technical detail of wet areas and material specification;
P H I L I P S - S A O PA U L O H . Q .
Andrade Azevedo arquitetura cororativa ( AT H I É | W O H N R AT H )
C i r c u l a t i o n + Tu n e l
Breakroom (green) Meeting Room (brown)
Workspace (perimeter)
•Architectural survey of structure, window frames, layout; ceiling and floor plans; •AsBuilt Cad drawings; •Project compatibilization; •Material and furniture specifications of the meeting rooms and CEO’s offices.
PLOTER
1.68
1.68
0.56
0.56
1.68
PLOTER
PLOTER
0.56
EXECUTIVE PROECT
EXECUTIVE PROECT
4ยบ FLOOR - LAYOUT ESC.: 1:125
4ยบ FLOOR - LAYOUT ESC.: 1:125
CURVED TUNEL SECTION DIAGRAM ESC.: 1:25
Additional constribution Andrade Azevedo arquitetura cororativa ( AT H I É | W O H N R AT H )
S Y N G E N TA - S A O PA U L O
Andrade Azevedo arquitetura cororativa ( AT H I É | W O H N R AT H )
•Architectural survey of structure, window frames, layout; ceiling and floor plans; •Project compatibilization; •Technical detail of wet and common areas and material specification; •Material and furniture specifications of the CEO’s offices and conference rooms.
C O PA G - S A O PA U L O H . Q . HHTC Architecture
Brief AIR CONDITIONING CH=2.72m
GENTS TOILET 01 CH=2.71m
1.91
D
The Copag refurbishment and expansion project consisted on adapt the third floor seeking to integrate the workspace and build additional meeting rooms and p a r t o f t h e s t a f f t o t h e n e w f l o o r. LADIES TOILET 01 CH=2.71m
floor inter vantions 2.80
.16
3
rd
1.34
S
.69
2.12 1.34
•Bring sun light to the workdpace; •Turn down reception and corridor walls; •Add a breakroom; •Design a space for smaller meetings •Rearrange and change the workspace furniture for easier circulation through the office
4.28 5.62
7.31
2.72
Fábio
Lucas
VACANT
Liria
Nildro
Istael
3.28
VACANT
VACANT
1.06
4.21
4.35
.08
1.05
3.10
4.36
VIDEO CONFERENCE
1.55
9.00
.61
GLASS CURTAIN WALL BUILD
OFFICE WORKSTATIONS CH=2.67m 4.30
SANIT. MASCULINO CH=2.65m
.80
1.10 1.22
PLOTER4.67
.80
.08
IMPRESSORA 0.56
.08
0.80
1.68
CAFÉ CH=2.50m
1.50
1.99
.51
SANIT. FEMIN. CH=2.50m
2.09
RICARDO NETO
.05
VACANT
.13
VACANT
M. CAFÉ
VACANT
ÁGUA
VACANT
.90
7.19
.44
.18
.80
D.P.L. CH=2.50m
1.62
4.57
3.32
Jéssica
WOODEN RETRACTABLE DIVIDERS - BUILD
4.20
3.52
João
4.45 1.63
1.25
4.28
.30
LILIAN CAROLINA
CAIO PELIZON
DANIELLI TUNIN
EDSON IOSHIO
EDGAR HIDEKI
JULIANA RIBEIRO
.40
1.29
1.94
.15
.11
ANA CAROLINA
FERNANDA CASONATO
MÁRCIO NUNES
MARCELO SANCHES
WILLIAM SOUZA
.37
2.05
2.25
1.30 1.22
1.40
.30
VACANT
Mariana
EDMILSON Raquel RIBEIRO
PEDRO WINK
MARIANA GONÇALVES
RODRIGO COIS
RAQUEL CRISTINA
.16 LUIZ HIROYUKI
REUNIÃO 02 3.28 CH=2.50m
.38
FERNANDO RODRIGUES
VACANT
2.83
CARLA CRISTINA
CASULO CH=2.37m
.09
DAVI FRIZZO
1.73
1.52
1.20
DAIANA MENDES
.08
HALL 2.39 CH=2.50m
10.18
RISONEIDE ALVES
4.86
4.58
2.01
ANDRÉ FERNANDES
3.11
.08
3.19
SALA ANA CAROLINA CH=2.64m
GLASS CURTAIN WALL BUILD
.08
1.11
6.23
3.34
.79
.08 8.20
GLASS CURTAIN WALL BUILD
.08
14.33 1.27
7,68
.80
ARQUIVO DESLIZANTE
2.61
4.34
4.27
1.25
MEETING ROOM 06 CH=2.67m 2.04
2.01
10.45
1.25
0,65
5.95
2.40 .15
GLASS CURTAIN WALL BUILD GLASS CURTAIN WALL BUILD
SALA CORINGA CH=2.64m DECOMPRESSION ROOM CH=2.67m
Amanda
AR CONDICIONADO CH=2.72m
CH=2.64m
REUNIÃO 01 PD=2.64m
Carina
MARIANA
CPD
4.32
SANIT. MASC. CH=2.71m
4.30
MEETING ROOM 05 CH=2.67m
2.38
4.78
4.68
AR CONDICIONADO CH=2.72m
SANIT. FEMIN. CH=2.71m
6.95
GLASS CURTAIN WALL BUILD
GLASS CURTAIN WALL BUILD
2.06
RECEPTION CH=2.67m
.07
EDGAR HIDEKI
RODRIGO NOFFS
LUCAS MISSI
DAVID MEDINA
NILDO MOLINARI
AMANDA PACHECO
CARINA OKADA
1.24
.12
1.25
VESTIÁRIO PCD CH=2.64m
.08
.69
.46
SALA ANTONIO CH=2.64m
SALA LUCIANO CH=2.64m
SALA ERICA CH=2.64m
6.34 1.08
SANIT. FEMIN. CH=2.71m
EXECUTIVE PROJECT EXECUTIVE PROECT 4º FLOOR - BUILD / DEMOLITION PLAN 3º FLOOR - BUILD/DEMOLITION ESC.: 1:50 LEGEND
ESTRUTURA ALVENARIA EXISTENTE DRYWALL EXISTENTE ALVENARIA A CONSTRUIR DRYWALL A CONSTRUIR ALVENARIA / DRYWALL A DEMOLIR ENCHIMENTO ENCHIMENTO A CONSTRUIR
.08
3.61
VITOR LANZONI
2.38 JOÃO PAULO RIBEIRO
JÉSSICA CARVALHO
LIRIA BEZERRA
3.50
1.31 CH=2.64m
IT CH=2.64m
.19
SALA ADRIANO CH=2.64m
DRYWALL (FILLING) FOR PIPELINE (UNDER THE SINK)
SALA MARIANA CH=2.64m .15
.90
1.44
3.77
3.84
1.39
1.22
.39
MIGUEL MOHAMAD
ISRAEL JESUS
4.25 .70
SAN MASC 02 SALA MARTA CH=2.71m
.12
2.21 1.30
SALA MULTIUSO LÍDERES CH=2.64m
2.32
2.03
.07
.70
GLASS CURTAIN WALL BUILD
3.77
3.27
3.12
1.55
1.26
PEDRO EZEQUIEL
1.20
ROGÉRIO SOUZA
1.04
MELO
4.11
HENRIQUE
CAIO OLIVEIRA
DISABLED TOILET CH=2.71m
2.24
ANA PAULA PEDRO VIDEO CONFERENCE
3.19
4.16
SALA GELBER CH=2.64m
.52
1.45
FÁBIO MICHELAN
.18 .08
MARIA CHRISTINA
3.55
SANIT. FEMININO CH=2.64m
.05
1.15 1.03 SANIT. MASCULINO CH=2.64m
3.29
MEETING ROOM 07 AMANDA DUARTE CH=2.67m
LUIZ F. GONÇALVES
3.37
PATRÍCIA HELENA
RAFAEL SEVERINO
3.84
LUIZ ANTONIO
PAULO WINK
.08
NICOLI BUSQUETS
4.28
1.02
.60 LEANDRO GOMES
1.34
.08 .30
4.33
7.29
4.27 SALA RICARDO NETO CH=2.64m
2.01
REFOINCEMENT OF DRYWALL’S STUCTURE FOR CABNETS FIXATION
WORK SPACE CH=2.50m
2.25
3.15
VIDEO CONFERENCE
2.61
AIR CONDITIONING CH=2.72m
D
GENTS TOILET 01 CH=2.71m
4 th f l o o r i n t e r v a n t i o n s 1.91
LADIES TOILET 01 CH=2.71m
1.34
S
2.80
.16
•Design 3 additional meeting rooms; •Design a common room; •Move the reception from the 3rd to 4th floor; •Create two additional toilets; •Expand the workspace area.
.69
2.12 1.34
4.28 5.62
7.31
2.72
Fábio
Lucas
VACANT
Liria
Nildro
Istael
3.28
VACANT
VACANT
1.06
4.21
4.35
.08
1.05
3.10
4.36 VIDEO CONFERENCE
1.55
4.30
4.78
GLASS CURTAIN WALL BUILD
MEETING ROOM 05 CH=2.67m
João
Jéssica GENTS TOILET 01 CH=2.71m
OFFICE WORKSTATIONS CH=2.67m 4.30 1.91
LADIES TOILET 01 CH=2.71m
1.34 2.80 VACANT
VACANT
VACANT 2.72
VACANT
.16
D
WOODEN RETRACTABLE DIVIDERS - BUILD
RICARDO NETO
.69
2.12
1.34
4.28 5.62
7.31
GLASS CURTAIN WALL BUILD
S
9.00
3.52
Amanda
AIR CONDITIONING CH=2.72m
4.32
DECOMPRESSION ROOM CH=2.67m
Carina
MARIANA
GLASS CURTAIN WALL BUILD
4.68
6.95
GLASS CURTAIN WALL BUILD
GLASS CURTAIN WALL BUILD
2.38
RECEPTION CH=2.67m
Fábio
Lucas
VACANT
Liria
Nildro
Istael
4.34 3.10
1.05
VIDEO CONFERENCE
VACANT
2.38
VACANT
VACANT
VACANT
1.20
6.23
1.31
MEETING ROOM 06 CH=2.67m
VACANT
1.04
SAN MASC 02 CH=2.71m
VACANT ANA CAROLINA
GLASS CURTAIN WALL BUILD
2.24
GLASS CURTAIN WALL BUILD
2.32 3.11
GLASS CURTAIN WALL BUILD
10.45
1.26
3.77
3.27
VACANT
WOODEN RETRACTABLE DIVIDERS - BUILD
VIDEO CONFERENCE
3.12
OFFICE WORKSTATIONS CH=2.67m 4.30
RICARDO NETO
REFOINCEMENT OF DRYWALL’S STUCTURE FOR CABNETS FIXATION 4.34
Jéssica
4.28
DISABLED TOILET CH=2.71m
10.18
1.45
9.00
3.52
CH=2.67m
1.34
.52
MEETING ROOM 07 CH=2.67m DECOMPRESSION ROOM
MARIANA
João
GLASS CURTAIN WALL BUILD
.60
Amanda
Raquel
VIDEO CONFERENCE
4.33
4.30
ANA Carina CAROLINA
GLASS CURTAIN WALL BUILD
GLASS CURTAIN WALL BUILD
GLASS CURTAIN WALL BUILD
4.78
10.18
Mariana
4.32
2.61
6.95
VACANT
GLASS CURTAIN WALL BUILD
MEETING ROOM 05 CH=2.67m
2.25
GLASS CURTAIN WALL BUILD
1.55
GLASS CURTAIN WALL BUILD
3.11
4.68
4.36
RECEPTION CH=2.67m
Mariana
Raquel
DRYWALL (FILLING) FOR PIPELINE SINK)
THE VIDEO(UNDER CONFERENCE
1.34
2.61
.08
6.34
4.33
.60
3.61
1.15
4.28
MEETING ROOM 07 CH=2.67m
DISABLED TOILET CH=2.71m
1.20 2.24
2.32
4º FLOOR - BUILD / DEMOLITION PLAN
SAN MASC 02 CH=2.71m 1.04
LEGEND
GLASS CURTAIN WALL BUILD
3.77
3.27
3.12
EXECUTIVE PROJECT
1.31
1.26
.52
VIDEO CONFERENCE
REFOINCEMENT OF DRYWALL’S STUCTURE FOR CABNETS FIXATION
ESTRUTURA ALVENARIA EXISTENTE DRYWALL EXISTENTE ALVENARIA A CONSTRUIR DRYWALL A CONSTRUIR ALVENARIA / DRYWALL A DEMOLIR ENCHIMENTO ENCHIMENTO A CONSTRUIR
.39
6.34
EXECUTIVE PROJECT 4º FLOOR - BUILD / DEMOLITION PLAN LEGEND ESTRUTURA ALVENARIA EXISTENTE DRYWALL EXISTENTE ALVENARIA A CONSTRUIR DRYWALL A CONSTRUIR ALVENARIA / DRYWALL A DEMOLIR ENCHIMENTO ENCHIMENTO A CONSTRUIR
.08
3.61
2.25
1.45
.39
4.35
3.28
VACANT
6.23
MEETING ROOM 06 CH=2.67m
VACANT
1.06
4.21
10.45
.08
1.15
DRYWALL (FILLING) FOR PIPELINE (UNDER THE SINK)
.15
.63
.78 .96 2.66 3.75
1.90
.04
.15
.09
.63
.78
.20
3ยบ FLOOR
.18
.76
4ยบ FLOOR
Reception cabinet - Joinery Detail
CARDBOARD CARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARD CARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARDCARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARDCARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARD PLASTER CEILING
CARDBOARD PLASTER CEILING
"
"
"
"
"
CARDBOARD CARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARD CARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARDCARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARDCARDBOARD PLASTER CEILING PLASTER CEILING
CARDBOARD PLASTER CEILING
CARDBOARD PLASTER CEILING
Thank you for stopping by
GUSTAVO GABRIEL ENGEL
G EN ARCH
Architect and Urban Planner +971 582 590 331 / +55 11 983551105
engel.architecture@gmail.com