Ga Yaw Ga Yaw Projects 2011 Teamhouse Noh Bo II Total costs: thb 61 697 / kr 11 600 Time:
10 workers/2 weeks
Finishing teamhouse for accomodation for the workshopparticipants. Materials: Bamboo walls, plywood windows. Expences also covers matresses, blankets, pillows, mosquitonet and other equipment needed.
Academyschool/Workshop Total costs: thb 272 567 / kr 51 400 Time: 26 workers /2 weeks2 11 workers/8 weeks Workshop with 15 participants from Norway and Spain. with common designcompetition and projectstart. Materials: Timber posts construction with concrete slab floor, adobe walls and brick roof
Primaryschool Noh Bo II
Total costs: thb 29 806 / kr 5 600 Time: 4 workers/ 5 weeks Replace bamboowalls with adobewalls. Materials: Adobe walls and wooden gable
Total costs 2010 and 2011 for primaryschool and toilets: thb 233 826 / kr 44 000
Wells Noh Bo Total costs: thb 28 362 /kr 5 350 Time:
11 workers/2 weeks
Materials: Concrete rings, concrete slab for
hygienic purposes and tinn roof to avoid leaf fall into the wells.