Gyaw Gyaw - Annual Report 2011

Page 1

Ga Yaw Ga Yaw Projects 2011 Teamhouse Noh Bo II Total costs: thb 61 697 / kr 11 600 Time:

10 workers/2 weeks

Finishing teamhouse for accomodation for the workshopparticipants. Materials: Bamboo walls, plywood windows. Expences also covers matresses, blankets, pillows, mosquitonet and other equipment needed.

Academyschool/Workshop Total costs: thb 272 567 / kr 51 400 Time: 26 workers /2 weeks2 11 workers/8 weeks Workshop with 15 participants from Norway and Spain. with common designcompetition and projectstart. Materials: Timber posts construction with concrete slab floor, adobe walls and brick roof

Primaryschool Noh Bo II

Total costs: thb 29 806 / kr 5 600 Time: 4 workers/ 5 weeks Replace bamboowalls with adobewalls. Materials: Adobe walls and wooden gable

Total costs 2010 and 2011 for primaryschool and toilets: thb 233 826 / kr 44 000

Wells Noh Bo Total costs: thb 28 362 /kr 5 350 Time:

11 workers/2 weeks

Materials: Concrete rings, concrete slab for

hygienic purposes and tinn roof to avoid leaf fall into the wells.


Primaryschool Maw Kwee Total costs: thb 275 601 / kr 52 200 Time:

8 workers/7 weeks

Materials: Timber posts construction with

concrete slab floor, concrete brick roof. Bamboo walls to be replaced with adobe walls after rainy season.

Wells Maw Kwee Total costs: thb 32 882 /kr 6 200 Time:

11 workers/2 weeks

Materials for two wells: Concrete rings, concrete

slab for hygienic purposes and tinn roof to avoid leaf fall into the wells.

Monastery eatingroom Noh Bo Total costs: thb 383 020 / kr 72 200 Time:

11 workers/8 weeks

Materials: Timber posts construction with concrete slab floor, concrete brick roof. Half wall made with concrete bricks.

Mae Tao Clinic, Mae Sot Total costs: estimated thb 835 000

Costs 2011: thb 642 121 / kr 121 150 Time 2011: 12 workers/15 weeks

Materials: Loadbearing adobe walls with timber construction roof. Timber construction on concrete slab. Concrete floors and interiors, plastic pipes and tinn roof and doors. Ceramic toilets.


Ga Yaw Ga Yaw Administration Total costs: thb 298 603 / kr 56 300 Time:

16 workers/52 weeks

Equipment for making our work possible,

administration salaries and transportation costs. Inkuding 2 x planeticket Oslo-Bangkok-Oslo.

Support to schools, single students and families in need. Total costs: thb 293 612 /kr 55 400 Mainly used for food for the children,

mosquitonet and medicines/hospitalcosts.

Total Costs 2011:

thb 2 318 271 / kr 437 400


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.