Gyaw Gyaw - Annual Report 2012

Page 1

Gyaw Gyaw Projects 2012 Mae Tao Clinic, Mae Sot New Classrooms and Landscape Total costs: Total time:

thb 895 040 / kr 171 410 12 workers/ 25 weeks

Costs 2011: thb 642 120 / kr 121 150 Costs 2012: thb 252 920/ kr 48 437 Time 2012: 12 workers/ 10 weeks

Classrooms for education of medics in cooperation with Mae Tao Clinic, started in 2011. Photo: Franc Pallarès López

Materials: Loadbearing adobe walls on a concrete slab. Roofplates are resting on timber construction of third-hand local timber. Landscape walls with local stones, concrete-paths and trenches.

Mae Tao Clinic, Mae Sot New Office Total costs: Total time:

thb 223 760 / kr 42 853 12 workers/ 6 weeks

Office for medics education staff in cooperation with Mae Tao Clinic.

Photo: Franc Pallarès López

Materials: Loadbearing adobe walls on a concrete slab. Roofplates are resting on timber construction of third-hand local timber.

Mae Tao Clinic, Mae Sot New Dormitories Total costs 1 house: thb 68 000 / kr 12 450 Gyaw Gyaw expenses for 3 workers in 2 weeks thb 7 920 / kr 1 517 Total time: 6 workers/ 2 weeks

Temporary dormitory for migrant students at CDC school: Child Development Center in cooperation with Mae Tao Clinic Photo: Franc Pallarès López

Materials: Third-hand local timber with temporary bamboo walls and leaf roof. Creating semiprivate and functional spaces for 25 students.

Primaryschool Maw Kwee/Workshop Total costs: Total costs 2012: Total time 2012:

thb 411 276 / kr 78 764 thb 135 675/ kr 25 983 20 workers/ 2 weeks 2 workers/ 4 weeks

New classrooms for 110 migrant children

Photo: Franc Pallarès López

2011: Concrete slab, timber construction and roof. 2012: Workshop with international architects. Design and construction of adobe walls creating chilled, functional and natural lighted classrooms.


Roof kinder garden T`Lao Kla Total costs: Total time:

thb 7 877 / kr 1 509 3 workers/ 1 weeks

Close a gap between two roofs to improve the outdoor area. Materials:

Aluminium plates and iron tread.

Photo: Line Ramstad

Waterproject Noh Bo Total costs: Total time:

thb 41 006 / kr 7 853 4 workers/ 2 weeks

Improving wateraccess for the village Materials: Pipes to replace the existing narrow connection from a natural watersource to the existing storage/distributor. Digging trenches and improve connections to increase the availability of fresh water for approximately 250 households in the village. Photo: Line Ramstad

Fence around fishpond Noh Bo Total costs: Total time:

thb 18 683 / kr 3 578 4 workers/ 2 weeks

Secure an abandoned hazardous fishpond in a schoolyard. A leftover from previous aidwork. Materials: Ironshoes and concrete to fasten a timber frame to the existing slab. Iron net and timber rails. Photo: Line Ramstad

Improvements of concrete walls Academyschool Noh Bo Total costs: Total time:

thb 63 676 / kr 12 195 4 workers/ 9 weeks

Visitors left half finished walls that created a risk for the students and left them warm and dark classrooms not suited for learning. We fixed it. Materials: Equipment to make windows/ tear down part of the walls to obtain natural light and airflow. Cement and local timber to finish the walls and secure them from falling down. Photo: Line Ramstad


Toilets Kle Po Klo Total costs: Total time:

thb 41 704 / kr 7 987 10 workers/ 3 weeks

Toilets for existing school and the villagers in a remote Burmese village. Materials: Concrete slab, local timber construction with roofplates. Bamboowalls and ceramic toilet seats.

Photo: Saw Dee

Kwe Ka Baung School Mae Sot Total budget: Gyaw Gyaw: Gyaw Gyaw: Total time :

thb 750 000 / kr 143 633 thb 18 034 / kr 3 454 3 workers/8 weeks 10 workers / 8 weeks 10 Volunteers from Casira

6 new classrooms for a migrant School in cooperation with Agora-architects, MTC and Casira organization (Canada)

Photo: Line Ramstad

Materials: Loadbearing adobe walls on concrete slab. Leafroof on eucalyptus logs. A concrete pathway connects the freestanding classrooms with gardens inbetween. Designed with focus on natural ventilation and light, functional areas for learning and customized outdoor areas.

Waterproject Eh Maw Doe Total costs: Total time:

thb 68 200 / kr 13 061 4 workers/2 weeks

Improving wateraccess for a mountain village by leading water from a natural watersource to the village. Materials:

Pipes to lead water to the village.

Grace Garden Noh Bo Photo: Peter

Total budget: Est time: 2012:

thb 598 000 / kr 114 523 7 workers / 18 weeks thb 5 235 / kr 1 003 3 workers/ 3 weeks

Sustainable learningcenter for Border Green Energy Team (BGET) in cooperation with Agora architects. Materials: Loadbearing adobe walls as circular elements on iron reinforced concrete foundation. Roofplates on beams made of local second-hand timber. Adobe walls protecting towards direct sunlight and light bamboowalls opening towards north for natural light. The building contains of classrooms, kitchen, toilets, library, computer room and hang out areas.


Gyaw Gyaw Car Total costs:

Photo: Line Ramstad

thb 400 000 / kr 78 580

To transport materials and people, simply to make our work possible, we need a car. The places we travel are often off the beaten track and we have used a lot of time to find a car well suited for our needs. We finally found it! A 4 wheel, 2 door Toyota Tiger from 2002 with a spacious cargobed well adjusted for load and transportation of various materials and weights on various surfaces. It was well taken care of by it`s previous owner, and has become a hugely welcome addition to the team.

Gyaw Gyaw Administration Total costs: Total time:

thb 347 499 / kr 66 550 10 workers/ 40 weeks

Equipment for making our work possible, administration salaries and transportation costs including plane tickets Oslo - Bangkok - Oslo.

Photo: Franc Pallarès López

Support to schools, single students and families in need. Total costs:

thb 175 429 / kr 33 597

Mainly support for food, schoolequipment and medicines/hospitalcosts to make education possible. The support also include a riceproject to the village of Maw Kwee in cooperation with Vestkysten, a Norwegian fotballclub.

Photo: Saw Dee

Total Costs 2012:

thb 1 817 948 / kr 348 157