Gyaw Gyaw Projects 2012 Mae Tao Clinic, Mae Sot New Classrooms and Landscape Total costs: Total time:
thb 895 040 / kr 171 410 12 workers/ 25 weeks
Costs 2011: thb 642 120 / kr 121 150 Costs 2012: thb 252 920/ kr 48 437 Time 2012: 12 workers/ 10 weeks
Classrooms for education of medics in cooperation with Mae Tao Clinic, started in 2011. Photo: Franc Pallarès López
Materials: Loadbearing adobe walls on a concrete slab. Roofplates are resting on timber construction of third-hand local timber. Landscape walls with local stones, concrete-paths and trenches.
Mae Tao Clinic, Mae Sot New Office Total costs: Total time:
thb 223 760 / kr 42 853 12 workers/ 6 weeks
Office for medics education staff in cooperation with Mae Tao Clinic.
Photo: Franc Pallarès López
Materials: Loadbearing adobe walls on a concrete slab. Roofplates are resting on timber construction of third-hand local timber.
Mae Tao Clinic, Mae Sot New Dormitories Total costs 1 house: thb 68 000 / kr 12 450 Gyaw Gyaw expenses for 3 workers in 2 weeks thb 7 920 / kr 1 517 Total time: 6 workers/ 2 weeks
Temporary dormitory for migrant students at CDC school: Child Development Center in cooperation with Mae Tao Clinic Photo: Franc Pallarès López
Materials: Third-hand local timber with temporary bamboo walls and leaf roof. Creating semiprivate and functional spaces for 25 students.
Primaryschool Maw Kwee/Workshop Total costs: Total costs 2012: Total time 2012:
thb 411 276 / kr 78 764 thb 135 675/ kr 25 983 20 workers/ 2 weeks 2 workers/ 4 weeks
New classrooms for 110 migrant children
Photo: Franc Pallarès López
2011: Concrete slab, timber construction and roof. 2012: Workshop with international architects. Design and construction of adobe walls creating chilled, functional and natural lighted classrooms.