Virginia Tech: Campus Master Plan

Page 1

EXECUTIVE SUMMARY A short, automated overview of the master plan analysis & proposals. EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

ACKNOWLEDGEMENTS

TOPIC/SUBJECT NAVIGATION Interactively explore the Virginia Tech master plan by subject.

QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY

CAMPUS MASTER PLAN UPDATE 2006

SITE MAP NAVIGATION Navigate directly to a particular diagram or piece of information.


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


Master Plan Goals 1. Support the University Strategic Plan by providing for development of physical resources which accommodate the strategic vision and program directions articulated in the plan. EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION

2. Preserve the core qualities of the campus while nurturing growth.

3. Plan for the long range highest and best use of the University’s significant land assets.

CAMPUS SYSTEMS

4. Plan transportation and infrastructure systems to Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

anticipate growth rather than react to demand.

5. While the master plan will propose solutions based on current data, it is understood that a plan should be a ‘living’ document and therefore allow for future change within its framework.

6. Celebrate the unique Virginia Tech Campus as PLACE.

CAMPUS MASTER PLAN UPDATE 2006

Planning Drivers


Master Plan Goals

Planning Drivers Research: Plan for facilities and support space to increase research capacity to be competitive with Top 30 institutions ($540M annual research expenditures target)

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES

Access: Provide multi-modal campus access strategies. Provide appropriate parking and roadway infrastructure to support growth.

PROGRAM ACCOMMODATION

Infrastructure: Physical Plant steam capacity rapidly

CAMPUS SYSTEMS

approaching critical levels. Chilled water rapidly approaching capacity. Storm water issues – Stroubles Creak identified as “Impaired Stream”. Mitigate flooding on campus.

Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program

Place Making: Maintaining and enhancing the

Academic Core District

historic character of the campus “walkable village” , while nurturing growth which embodies the best attributes of the existing campus. This includes the use of stone, traditional architectural elements and extending the existing campus spatial hierarchy.

Life Sciences District Future Grad./Professional District

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District Environmental and Cultural Greenway District Circles Parking Structures Campus Entry Points New Roads Transit Center Physical Plant

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


Master Plan Program Existing Academic/Research Space Inventory New Academic Space Classrooms Research Labs Office & Conference Study

3,694,861 GSF

New Academic/Research Space

1,877,199

Master Plan Goals/Planning Drivers

Total Academic/Research Space

5,572,060 GSF

Defining Strategies

Existing ‘Other’ Space Inventory

3,635,736

GSF

New ‘Other’ Space

62,500 158,571 369,185 33,750 377,750 1,001,756

SF SF SF SF SF GSF

Total ‘Other’ Space Total New Space (Academic/Research & Other)

4,637,492 GSF 2,878,955 GSF

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

Master Plan Program Academic Core District

SF SF SF SF GSF

New ‘Other’ Space Special Use General Use Support Facilities Health Care Residence Facilities

Life Sciences District Future Grad./Professional District

Total Space

CAMPUS MASTER PLAN UPDATE 2006

132,433 915,385 651,336 178,045

10,209,552


ACADEMIC CORE

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

NOTE TO VELOPERS: CAMERA POSITION, PAGE 11

N

150

600 300

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

CAMPUS MASTER PLAN UPDATE 2006

Note to Velopers: This sketch needs to be scaled up to fill square frame at top & bottom, sketch needs to be animated so it slowly pans from left to right inside square frame.


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers

LIFE SCIENCES DISTRICT

Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

N

150

600 300

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

CAMPUS MASTER PLAN UPDATE 2006

Note to Velopers: Fade from page 15 sketch to this one. This sketch needs to be scaled up to fill square frame at top & bottom, sketch needs to be animated so it slowly pans from left to right inside square frame.


PROFESSIONAL/ GRADUATE DISTRICT (FUTURE LAND BANK)

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

N

150

600 300

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Master Plan Goals/Planning Drivers Defining Strategies Master Plan Program Academic Core District Life Sciences District Future Grad./Professional District

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY

EXECUTIVE SUMMARY

Lorem ipsum phaedrum deterruisset ne eos. Eu quidam petentium nec, an harum iudicabit est. Vidisse virtute persequeris sit an, vel te vero consectetuer, eam at inani laoreet. At sit nusquam accusamus dignissim.

MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

ACKNOWLEDGEMENTS

QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY

TOPIC/SUBJECT NAVIGATION Lorem ipsum phaedrum deterruisset ne eos. Eu quidam petentium nec, an harum iudicabit est. Vidisse virtute persequeris sit an, vel te vero consectetuer, eam at inani laoreet. At sit nusquam accusamus dignissim.

QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY QWERTYQWERTYQWERTYQWERTYQWERTYQWERTY

CAMPUS MASTER PLAN UPDATE 2006

SITE MAP NAVIGATION Lorem ipsum phaedrum deterruisset ne eos. Eu quidam petentium nec, an harum iudicabit est. Vidisse virtute persequeris sit an, vel te vero consectetuer, eam at inani laoreet. At sit nusquam accusamus dignissim.


PROFESSIONAL/ GRADUATE DISTRICT (FUTURE LAND BANK)

ACADEMIC CORE

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS LIFE SCIENCES DISTRICT

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


Master Plan Goals

Planning Drivers

1. Support the University Strategic Plan by providing for development of physical resources which accommodate the strategic vision and program directions articulated in the plan. EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION

2. Preserve the core qualities of the campus while nurturing growth.

3. Plan for the long range highest and best use of the University’s significant land assets.

CAMPUS SYSTEMS

4. Plan transportation and infrastructure systems to Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

anticipate growth rather than react to demand.

5. While the master plan will propose solutions based on current data, it is understood that a plan should be a ‘living’ document and therefore allow for future change within its framework.

6. Celebrate the unique Virginia Tech Campus as PLACE.

CAMPUS MASTER PLAN UPDATE 2006

Master Plan Goals 1 2


Master Plan Goals

Planning Drivers Research: Plan for facilities and support space to increase research capacity to be competitive with Top 30 institutions ($540M annual research expenditures target)

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES

Access: Provide multi-modal campus access strategies. Provide appropriate parking and roadway infrastructure to support growth.

PROGRAM ACCOMMODATION

Infrastructure: Physical Plant steam capacity rapidly

CAMPUS SYSTEMS

approaching critical levels. Chilled water rapidly approaching capacity. Storm water issues – Stroubles Creak identified as “Impaired Stream”. Mitigate flooding on campus.

Strategic Plan Core Qualities Land Assets

Place Making: Maintaining and enhancing the

Transit & Infrastructure

historic character of the campus “walkable village” , while nurturing growth which embodies the best attributes of the existing campus. This includes the use of stone, traditional architectural elements and extending the existing campus spatial hierarchy.

Living Document Virginia Tech as a Place

CAMPUS MASTER PLAN UPDATE 2006

Master Plan Goals 1 2


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Context Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

Strategic Plan: Key Points

Undergraduate Education: Strengthen the quality of undergraduate instruction, including an increase in

Discovery: Increase the stature of Virginia Tech

the number of undergraduates involved in research.

as a research university. The 2012 target is for $540M in annual research expenditures.

The 2012 enrollment target is 22,500 undergraduate students including 3,000 who enter as transfer students.

Graduate Education: Increase the quality of the graduate programs. Increase graduate enrollment including 2,600 PhD students by 2012.

Engagement: Expand professional education, respond to societal needs, create new strategic partnerships with the private sector.

CAMPUS MASTER PLAN UPDATE 2006

Strategic Plan 1 2 3 4


Benchmarking

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

In order to understand the physical space required to achieve the strategic goals, the master plan team conducted a benchmarking study against ten competitive and aspirant peer institutions. The institutions were evaluated on university academic space normalized to net square feet/student and net square feet/faculty. Additionally, several key performance factors were evaluated. The peer institutions benchmarked were:

Georgia Institute of Technology - Atlanta Michigan State University - East Lansing North Carolina State University - Raleigh Ohio State University - Columbus Pennsylvania State University - University Park Purdue University - West Lafayette Texan A&M University - College Station University of Arizona - Tucson

University of Illinois at Urbana-Champaign University of Michigan - Ann Arbor University of Texas - Austin University of Wisconsin - Madison

Conclusions from the Benchmarking Study contributed to establishing a basis for the quantification and distribution of the Master Plan Program.

CAMPUS MASTER PLAN UPDATE 2006

Strategic Plan 1 2 3 4


Undergraduate Goal: Enhance the quality of undergraduate programs, and endeavor to increase in the number of undergraduates involved in research. EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

Over the 2002-2003 academic year the Provost led a process to “realign� the then 8 colleges, allowing academic departments to reconsider where they would report. Five departments realigned college affiliations. The College of Arts and Sciences was merged with the College of Human Resources, and a new College of Science emerged. It is anticipated that undergraduate enrollment will see only slight growth over the next 10 years (primarily via transfer students).

Student Support Enhancement of on-campus student support space continues to be a priority. Union and Dining space, particularly in the academic core area is in great need. Indoor and outdoor recreation areas are currently over utilized. Recommended from the 2005 housing facilities study recommend systematic upgrades to the existing housing stock, including air conditioning of the older residence halls. It is recommended that new residence hall space be constructed to provide swing space for renovations, as well as provide a variety of housing options.

CAMPUS MASTER PLAN UPDATE 2006

Strategic Plan 1 2 3 4


Research Increasing funded research initiatives is a primary goal of the Strategic Plan. Research space totals 839,000 gross square feet with an additional 717,000 identified as teaching laboratories. EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

2003 research expenditures were reported at $247 M. New research initiatives are planned to bring research expenditures over $540 M by 2012. The Virginia Tech board of Visitors adopted a plan in 2005 to grow PhD enrollment by 900 students by 2012.

Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

The developing Life Sciences District will create a new district of campus primarily focused on research initiatives. Additionally, the Corporate Research Center provides short-term lease space for new research programs.

Graduate Studies Graduate studies will play a key role in enabling the University to reach its research goals. Recruitment and retention of quality graduate students is a core element of a strong graduate studies program. Quality academic and graduate support space is key to student recruitment and retention. In 2006, a new Graduate Student Center opened its doors in a facility previously occupied by the Donaldson Brown Hotel and Conference Center.

CAMPUS MASTER PLAN UPDATE 2006

Strategic Plan 1 2 3 4


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Virginia Tech is one of the most spatially coherent campuses in the country today. The master plan endeavors to identify and preserve these spatial qualities.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Central to this coherency is the array of iconic spaces formed by the Alumni Mall, Drill Field, Duck Pond and the Grove which define an armature of formal open space.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Most people think of campuses as a collection of its buildings.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Most people think of campuses as a collection of its buildings.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Virginia Tech is also a collection of its quadrangles and positive open spaces.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Over time, there is an opportunity to strengthen Virginia Tech’s positive core qualities by addressing its negative open spaces, largely parking lots.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place And by addressing the vehicular and pedestrian networks that tie them together.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place With relation to origins.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place And destinations.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place These, along with the Hokie Stone building exteriors and collegiate gothic architecture, exemplify the core qualities of Virginia Tech

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


Design Tenets 1. The dominant exterior building material will continue to be the local dolomite limestone (Hokie Stone) set in a random ashlar pattern. EXECUTIVE SUMMARY MASTER PLAN GOALS

2. New building placement should help define outdoor campus space.

DEFINING STRATEGIES

3. Building heights should primarily range from two

PROGRAM ACCOMMODATION

to four stories, appropriate in scale with the adjacent outdoor spaces.

CAMPUS SYSTEMS

4. Building design should complement the character of Strategic Plan Core Qualities Land Assets

the core campus architecture, integrating simple building massing with simply ordered and well articulated facades.

Transit & Infrastructure

5. The architectural and landscape guidelines from the

Living Document

1994 Campus Master Plan Update will continue to be used to provide general guidance in future development of architecture and landscapes.

Virginia Tech as a Place These, along with the Hokie Stone building exteriors and collegiate gothic architecture, exemplify the core qualities of Virginia Tech

CAMPUS MASTER PLAN UPDATE 2006

Core Qualities 1 2 3 4 5 6 7 8 9 10 11


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Priority 1 - Acquisition underway (within current campus boundaries Priority 2 - May be considered for acquisition to clarify campus boundaries Priority 3 - Heth property (may be acquired to support long term growth strategy

0

100’

200’

300’

400’

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

Land Assets 1 2


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place Environmental Greenway Forested Areas

The University and the Town of Blacksburg share a drainage basin that flows through Stroubles Creek. Stroubles Creek has been designated an impaired body of water by the State. Future planning needs to embody sustainable land use practices and development patterns to preserve key assets and key drainage ways such as the Duck Pond, Drill Field, and wooded areas like the Grove.

STROUBLES CREEK

0

100’

200’

300’

400’

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006

Land Assets 1 2


10 -M

CEREMONIAL ENTRANCE

u in

FIR S

TT IM E

king Circle Wal te

EXECUTIVE SUMMARY

R TO SI VI

MASTER PLAN GOALS

DU CK P O ND

DEFINING STRATEGIES PROGRAM ACCOMMODATION

NE W

CAMPUS SYSTEMS Strategic Plan

AD RO

MOVE RD AWAY FROM ENVIRONMENTAL AREAS

Core Qualities

CONFLICT WITH NEIGHBORHOOD

Land Assets NE W

Transit & Infrastructure

PRIMARY ENTRANCE

NTER

Virginia Tech as a Place

TECH CE

Living Document

DR

RELOCATE TECH CENTER ROAD IV E

Observed Congestion Pedestrian/Vehicular Conflict Problem Unsignalized Intersection FU TU

B Level of Service - Good

RC

EX P

C Level of Service - Adequate

C RE

D Level of Service - Poor

AIRPORT RUNWAY EXPANSION

AN

NS SIO

F Level of Service - Failing 0

100’

200’

300’

POTENTIAL CRC ACCESS TO 460 BYPASS

400’

N

500

CRC

2000 1000

CAMPUS MASTER PLAN UPDATE 2006

Transit & Infrastructure 1 2


POLARIZED CENTRAL GENERATION

OUBLES STR

EXECUTIVE SUMMARY

DEFINING STRATEGIES

CREEK WATERSHE D

STRAINED FUTURE STEAM DISTRIBUTION

MASTER PLAN GOALS

FUTURE SEWER LINE

PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities

STRAINED FUTURE STEAM DISTRIBUTION

Land Assets Transit & Infrastructure Living Document STROUBLES CREEK CLASSIFIED AS IMPAIRED BODY OF WATER

Virginia Tech as a Place

FUTURE SEWER LINE

Existing Steam Existing Sanitary Sewer Existing Stormwater Environmental Greenway Forested Areas

0

100’

200’

300’

400’

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006

Transit & Infrastructure 1 2


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place This master plan, like most, builds on previous planning. The 1980 master plan document developed infill concepts to enhance and organize the spacial character of the campus. The plan provided for new program space while maximizing the existing utility infrastructure, and increasing building density to desired ranges.

CAMPUS MASTER PLAN UPDATE 2006

Living Document 1 2 3


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place The 1994 Master Plan Update continued the infill strategies of the previous plan. The plan also called for future expansion to the west while preserving a central natural landscape along the Stroubles Creek corridor.

CAMPUS MASTER PLAN UPDATE 2006

Living Document 1 2 3


Existing Buildings Master Plan Program Future Build Out

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006

Living Document 1 2 3


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Strategic Plan Core Qualities Land Assets Transit & Infrastructure Living Document Virginia Tech as a Place

CAMPUS MASTER PLAN UPDATE 2006


PROFESSIONAL/ GRADUATE DISTRICT (FUTURE LAND BANK)

ACADEMIC CORE

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS LIFE SCIENCES DISTRICT

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


DOWNTOWN MP (CULTURAL ARTS DISTRICT)

CEREMONIAL ENTRANCE

TT IM E

EXECUTIVE SUMMARY

THE INN & ALUMNI CENTER

ACADEMIC CORE (UNDERGRADUATE DISTRICT)

FIR S

MASTER PLAN GOALS

R TO SI VI

VISITOR’S CENTER

DEFINING STRATEGIES

FUTURE GRADUATE & PROFESSIONAL DISTRICT 20 YEAR GROWTH AD

PROGRAM ACCOMMODATION

DU CK P O ND

CAMPUS SYSTEMS

NE W

Defining Strategies Land Use | Short Term

RECREATION FIELDS

RO

LIFE SCIENCES DISTRICT 10 YEAR GROWTH

Land Use | Long Term CRC Town Gown NE W TECH CE

Stormwater/Sustainability Study

NTER

PRIMARY ENTRANCE

Environmental and Cultural Greenway

DR

IV E

District Circles

AIRPORT RUNWAY EXPANSION

RELOCATE AG OPS

Parking Structures Campus Entry Points

HETH PROPERTY ACQUISITION

New Roads Transit Center

HETH PROPERTY

Physical Plant

AIRPORT CRC EXPANSION

CRC PHASE I N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Defining Strategies Land Use | Short Term Land Use | Long Term CRC Town Gown Stormwater/Sustainability Study Academic Research Clinical Residential Outreach

Athletic Recreation Support Greenway

0

100’

200’

300’

400’

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Defining Strategies Land Use | Short Term Land Use | Long Term CRC Town Gown Stormwater/Sustainability Study Academic Research Clinical Residential Outreach

Athletic Recreation Support Greenway

0

100’

200’

300’

400’

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006


FUTURE CRC EXPANSION

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES

CRC PHASE 2

PROGRAM ACCOMMODATION RESERVE FOR POTENTIAL ACCESS TO 460 BYPASS

CAMPUS SYSTEMS Defining Strategies

CRC PHASE 1

46

Land Use | Short Term

0

S

CRC Town Gown Stormwater/Sustainability Study Virginia Tech organized an affiliated corporate research park in the 1980’s. Today the Virginia Tech Corporate Research Center (VTCRC) has 675,000 square feet of space in 19 buildings on 120 acres. Phase I total capacity is approximately 1,000,000 square feet. The VTCRC plays a crucial role not only in its outreach and economic development roles but in providing shortterm space for research and academic program needs. Phase II of the CRC is planned for adjacent property north of the current park. Additional adjacent land is earmarked for future phases. CAMPUS MASTER PLAN UPDATE 2006

BY

PA S

Land Use | Long Term

N

250

1000 500


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Defining Strategies Land Use | Short Term Land Use | Long Term CRC Town Gown Stormwater/Sustainability Study Virginia Tech Arts Buildings

N

200

800 400

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Defining Strategies Land Use | Short Term Land Use | Long Term CRC Town Gown Stormwater/Sustainability Study Environmental Greenway Forested Areas

Early in the planning process, issues related to stormwater management, flood plains, and water quality prompted an additional sub-study of the drainage shed shared by Blacksburg and Virginia Tech. This study proposes the creation and preservation of an environmental corridor along the Stroubles Creek drainage ways, linking the University’s critical environmental and cultural assets together in a no-build zone, the “Environmental and Cultural Greenway.” CAMPUS MASTER PLAN UPDATE 2006

STROUBLES CREEK

0

100’

200’

300’

400’

N

500

2000 1000

Stormwater/Sustainability Study 1 2 3


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Defining Strategies Land Use | Short Term Land Use | Long Term CRC Town Gown Stormwater/Sustainability Study A major implementing strategy of the “Environmental and Cultural Greenway,” is the day-lighting of Stroubles Creek and resolution of the flood plain from the Duck Pond to Price’s Fork Road through the parking lots north of the academic core. Day-lighting Stroubles Creek will improve water quality downstream and further define the boundaries of the flood plain, thereby allowing development of these parking lots in the future. This will provide additional proximate building sites as well as positive open spaces to expand the academic core.

CAMPUS MASTER PLAN UPDATE 2006

Stormwater/Sustainability Study 1 2 3


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Defining Strategies Land Use | Short Term Land Use | Long Term CRC Town Gown Stormwater/Sustainability Study A major implementing strategy of the “Environmental and Cultural Greenway,” is the day-lighting of Stroubles Creek and resolution of the flood plain from the Duck Pond to Price’s Fork Road through the parking lots north of the academic core. Day-lighting Stroubles Creek will improve water quality downstream and further define the boundaries of the flood plain, thereby allowing development of these parking lots in the future. This will provide additional proximate building sites as well as positive open spaces to expand the academic core.

CAMPUS MASTER PLAN UPDATE 2006

Stormwater/Sustainability Study 1 2 3


PROFESSIONAL/ GRADUATE DISTRICT (FUTURE LAND BANK)

ACADEMIC CORE

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS LIFE SCIENCES DISTRICT

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


PROFESSIONAL/ GRADUATE DISTRICT (FUTURE LAND BANK)

ACADEMIC CORE

PRICES

RD RK FO

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location

District Plan

Existing FAR

Academic Core District

Life Science District

Campus Perimeter

Future FAR

LIFE SCIENCES DISTRICT

Data Existing Buildings

AIRPORT

HETH PROPERTY

Master Plan Program Future Build Out Environmental Greenway

The Master Plan program is distributed primarily within the northern area of the Academic Core District while completing the development of the Life Sciences District. Additionally, the Master Plan provides a framework for infrastructure and roadway development beyond the 10 year program in the Golf Course District. CAMPUS MASTER PLAN UPDATE 2006

CRC PHASE I

N

500

2000 1000


0

EXECUTIVE SUMMARY MASTER PLAN GOALS

.52

.90

DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location

District Plan

Existing FAR

Academic Core District

Life Science District

Campus Perimeter

Future FAR

.77

Data

FAR stands for Floor Area FAR stands for Floor Area Ratio, which Ratio, which is acomparing simple ratio is a simple ratio total land comparing landarea. areaThe defining area to total total building core qualities of the to total building area.campus The are best expressed by the existing campus in defining core qualities of the densities ranging from approximately campus are best expressed 0.7 to 1.0 FAR. The existing FAR vary by the throughout existing campus in indicating greatly the campus densities ranging frominapadditional infill potential all districts of the campus particularly the eastern proximately 0.7 to 1.0along FAR. and northern sections of the Academic The existing FAR vary greatly Core District and throughout the entire Life Sciences District. CAMPUS MASTER PLAN UPDATE 2006

.20

N

250

1000 500


9 EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION

PRICES

F OR

D OA R K

6a

17

7

3

2

10

6

4

24

8

11a

11

14

18

15

1

17a

21

12

13

Location District Plan

Existing FAR

Academic Core District

Life Science District

Campus Perimeter

Future FAR

20

19

5

CAMPUS SYSTEMS

20a

22

16

25

25a

23

Data Academic Athletic/Recreation Residential

27

Support Existing Buildings Future Build Out Environmental Greenway

26 29 30 N

12

CAMPUS MASTER PLAN UPDATE 2006

150

600 300

CLICK BUILDING NUMBER TO VIEW PROGRAM ACCOMODATION DATA

28


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES

CAMPUS SYSTEMS

23

District Plan

Existing FAR

7 7a

PROPOSED RECREATION FIELDS Academic Core District

12

Life Science District

10

Campus Perimeter

Future FAR

Athletic/Recreation

11

1

15

13

8 17b

9

20b

14

24

22

21 23 17a 18

20a

Residential Support

5 6

16

Data Academic

2

12a

Location

4

3

PROGRAM ACCOMMODATION

19

24

Existing Buildings Future Build Out Environmental Greenway

N

12

CLICK BUILDING NUMBER TO VIEW PROGRAM ACCOMODATION DATA

CAMPUS MASTER PLAN UPDATE 2006

U SO

D ATE G TH

E RIV

150

600 300


64

PRICES FO

RK

AD RO

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES

63

PROGRAM ACCOMMODATION

60

CAMPUS SYSTEMS PROPOSED RECREATION FIELDS

Location

District Plan

Existing FAR

Academic Core District

Life Science District

Campus Perimeter

Future FAR

67 66

62

46 0

Academic Athletic/Recreation Residential Support Existing Buildings Future Build Out Environmental Greenway

N

12

CAMPUS MASTER PLAN UPDATE 2006

ED GAT

E RIV

61

Data

CLICK BUILDING NUMBER TO VIEW PROGRAM ACCOMODATION DATA

UTH SO

500

2000 1000

BY -P AS

68 S


EXECUTIVE SUMMARY

.69

MASTER PLAN GOALS DEFINING STRATEGIES

.70

1.05

PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location

District Plan

Existing FAR

Academic Core District

Life Science District

Campus Perimeter

Future FAR

.82

Data FAR stands for Floor Area Ratio, which is a simple ratio comparing total land area to total building floor area. Proposed development brings all districts FAR closer to the desired density of approximately 0.7 to .1.0 FAR.

.60

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006


Academic/Research and Non-Academic Space GSF EXECUTIVE SUMMARY MASTER PLAN GOALS

3.0M

DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location Data

Academic/Research &

Non-Academic Space

Master Plan Program

Academic Core District

Life Sciences District

Campus Perimeter

2.5M

2.0M

1.5M

1.9M GSF ACADEMIC\RESEARCH SPACE

1.0M

0.3M GSF NON-ACADEMIC SPACE 1M GSF ACADEMIC/RESEARCH SPACE

0.5M

Master Plan Program

CAMPUS MASTER PLAN UPDATE 2006

2.9M GSF

1M GSF NON-ACADEMIC SPACE

Six Year Capital Plan

1.3M GSF


Master Plan Program EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location Data

Academic/Research &

Non-Academic Space

Master Plan Program

Academic Core District

Life Sciences District

Campus Perimeter

Note: The goal of accommodating over 1.3 M gross square feet of research space is achieved by combining the space in the “Research Labs” category with a percentage of space in the “Office & Conference” and “Study” categories.

CAMPUS MASTER PLAN UPDATE 2006

Existing Academic/Research Space Inventory New Academic Space Classrooms Research Labs Office & Conference Study

3,694,861 GSF

New Academic/Research Space

1,877,199

Total Academic/Research Space

5,572,060 GSF

Existing ‘Other’ Space Inventory

3,635,736

GSF

New ‘Other’ Space

62,500 158,571 369,185 33,750 377,750 1,001,756

SF SF SF SF SF GSF

Total ‘Other’ Space Total New Space (Academic/Research & Other)

4,637,492 GSF 2,878,955 GSF

132,433 915,385 651,336 178,045

SF SF SF SF GSF

New ‘Other’ Space Special Use General Use Support Facilities Health Care Residence Facilities

Total Space

10,209,552


VIRGINIA TECH

2006- 2016 Master Plan

DRAFT Program Accommodation

Note: All quantities are approximate in Gross Square Feet

Academic Core District BLDG

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location Data

Academic/Research &

Non-Academic Space

Master Plan Program

Academic Core District

Life Sciences District

Campus Perimeter

Function

MP Program 2006-08

2008-10

1 2 3 4 5 6 7 8 9 9A

Engineering Computational Instruction Academic Building Academic Building Parking Structure I - 1,000 cars Transit Center/ Northwest Student Union Dining Engineering Comp. Science I Engineering Comp. Science II Academic Building Parking Structure II - 1,200 cars Stanger Surge Space Building

10 11 11A 12 13 14 15 15A 16 17 17A 18 19 20 20A 21 22 23 24 25 25A 26 27

AREA TOTAL ICTAS I Academic and Student Programs Academic Replacement Building Academic Replacement Building Academic Replacement Building Academic Replacement Building New Architecture Bldg. 1 Academic Building Classroom Building Academic or Student Support Academic Building Lane Hall Renovation / Addition Upper Quad Residence Hall Performing Arts Center Parking Structure - 600 cars Henderson Hall Addition Newman Library Addition Replace det. Section of Davidson Campus Heat Plant Parking Structure - 600 cars Regional Chiller Plant Academic Infill opportunity Academic replacement building Surge Space Building - not yet sited

107,000 164,600 99,400

AREA TOTAL Demolition of Randolph - phased Demolition of section of Holden Demolition of Femoyer Demolition of Military Building

285,000

61,000 0

DISTRICT TOTALS

Beyond Program

Beyond 6 yr plan

TOTAL

48,000 48,000 87,400 77,200

77,200

46,000 77,200 65,000

53,600 0 53,600 76,500 85,500

37,000

96,000

40,300 90,000 8,600 5,000 51,000 0

68,000 81,000

0 20,000

60,000 120,000

60,000 105,300 -83,000 -42,000 -36,000

340,000 -83000

21,500

267,000

248,000

1,034,300

0

0

-280,000

363,000

248,000

1,252,700

-36,000

0 -161,000 -119,000

392,000 201,600

498,400

54,000 84,000

68,000

37,000

0

48,000

61,000

0

DEMOLITION TOTAL

2010-12

274,600

BACK TO DISTRICT MAP

CAMPUS MASTER PLAN UPDATE 2006

TOTAL ACCOMMODATION Master Plan Program Difference

615,100

637,600

2,862,300

2,878,000 -15,700


VIRGINIA TECH

2006- 2016 Master Plan

DRAFT Program Accommodation

Note: All quantities are approximate in Gross Square Feet

Life Sciences District BLDG

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Location Data

Academic/Research &

Non-Academic Space

Master Plan Program

Academic Core District

Life Sciences District

Campus Perimeter

1 2 3 4 5 6

Function

ICTAS II Sciences Research Lab I Sciences Research II Academic Building Research Natural Resources Lab

7 7A 8 9 10 11 12 12A 13

AREA TOTAL Research Research Research Parking Garage - 1,200 cars Chiller Plant - Phase I Instrumentation Center Research Plant Growth Facility New surface lot - 1,200 cars

14 15 16 17 A 17 B 18 19 20 A 20 B

AREA TOTAL Large Animal Teaching Facility Vet. Med Hospital Addition Sciences Research Lab II / Trans. HABBI Research Research Vet. Med. Faculty Offices Vet Med. Instruction Addition NIH Research Facility

21 22 23 24

AREA TOTAL Recreation, Counseling, Clinic Space Parking Structure @ Cassell lot Research CMMID Replacement

DISTRICT TOTALS

CAMPUS MASTER PLAN UPDATE 2006

2006-08

77,000 93,000

2008-10

2010-12

170,000

92,300

92,300

39,000

92,300

93,000

39,000 20,000

0 100,000

124,500

144,000

0 48,000

42,000 0 148,000

186,000

0

84,800 24,000

31,000 16,300

92,000

80,000

172,000

353,300 243,600

373,000

0

84,800

24,000

172,000

197,000

100,000 30,000 0

479,100

25,000

92,300

140,300 112,300 43,000

TOTAL

51,000 73,500

0 0

Beyond Program

Beyond 6 yr plan

92,300

43,000

AREA TOTAL

BACK TO DISTRICT MAP

MP Program

0

361,400 1200 cars 12

0

0

130,000

43,000

92,300 232,800

334,500

499,000

1,256,500


VIRGINIA TECH

2006- 2016 Master Plan

DRAFT Program Accommodation

Note: All quantities are approximate in Gross Square Feet

Campus sites BLDG

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS

60 61 62 63 64 65 66 67 68

MP Program Function

Special Purpose Housing IV Hazardous Materials Facility Architecture Research Facility Oak Lane Commons Bldg Visitors and Admissions Center Indoor Athletic Facility New Police Facility Administrative Services Bldg CNS Storage Facility

2006-08

7,500

2008-10

40,000

18,000 120,000 7,600 48,000

2010-12

TOTAL

Beyond 6 yr plan

72,000

20,000

20,000

Location

TOTAL

Data

Academic/Research &

Non-Academic Space

Master Plan Program

Academic Core District

Life Sciences District

Campus Perimeter

BACK TO DISTRICT MAP

CAMPUS MASTER PLAN UPDATE 2006

TOTALS

201,100

40,000

40,000

72,000

0

353,100

201,100

40,000

40,000

72,000

0

353,100

281,100


PROFESSIONAL/ GRADUATE DISTRICT (FUTURE LAND BANK)

ACADEMIC CORE

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS The Master Plan proposes transportation and infrastructure systems that will anticipate growth rather than reacting to demand. Current critical conditions include central steam and chilled water capacity and distribution, as well as stormwater quality and quantity issues.

LIFE SCIENCES DISTRICT

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


D OA KR PRICES FOR

P

ET RE ST

L AL

M

FUTURE

EXECUTIVE SUMMARY

RY ER

MASTER PLAN GOALS

M N AI ET

RE ST

DEFINING STRATEGIES A ST C

WE

PROGRAM ACCOMMODATION

US MP

CAMPUS SYSTEMS

VE DRI

NG HI AS W

N TO

RE ST

ET

Circulation Roadways Parking Transit Pedestrian Circulation

RIV

U SO

Bike Routes

Infrastructure

46 0

Utilities

D ATE THG

BY -P AS

E

NEW TEC CEN H

FUTURE S

OU

TH

GA TE

TE RD RIV E

S

AIR

Existing Major Roads

LO O P

PO RT

New Road Segments Future Roads Traffic Calming

FUT URE

Intersection Improvements F U TU RE CR O SS

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

CO UN TY CO N N

E C TO R


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation

Roadways

Parking

Transit

Pedestrian Circulation

Bike Routes

Infrastructure Utilities Academic Core: Displaced 1,800 +/ Demand 700 +/ New Parking 3,400 +/ Net Gain 900 +/-

Life Sciences District: Displaced 3,200 +/ Demand 1,200 +/ New Parking 4,800 +/ Net Gain 400 +/Parking Structures Parking Lots EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

N

250

1000 500


FUTURE TRANSIT CENTER HUB

EXECUTIVE SUMMARY MASTER PLAN GOALS

CURRENT TRANSIT HUB

DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS NEW LIFE SCIENCES ROUTE

Circulation

Roadways

Parking

Transit

Pedestrian Circulation

Bike Routes

REDIRECTED TECH CENTER DRIVE ROUTE TO SUPPORT INCREASED CRC POPLUATION

Infrastructure Utilities Existing Route Proposed Route Redirected Route Transit Hub

With roadway realignments it is recommended that the hub for Blacksburg transit be moved from the Drill Field at Burruss Hall to a transit center on Perry Street north of the academic core and that bus traffic be removed from the Drill Field as part of this initiative. Other minor route reconfigurations will be necessary in association with road realignments. CAMPUS MASTER PLAN UPDATE 2006

N

500

2000 1000


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION

20

CAMPUS SYSTEMS

15

10

5

0

Circulation

Roadways

Parking Transit

Pedestrian Circulation

Bike Routes

Infrastructure Utilities Great campuses are pedestrian places. Virginia Tech’s Academic Core District is a walkable village defined by the 15 minute class change schedule and the distance a pedestrian can walk in 10-15 minutes.

N

250

1000 500

CAMPUS MASTER PLAN UPDATE 2006

Pedestrian Circulation 1 2


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation

Roadways

Parking Transit

Pedestrian Circulation

Bike Routes

Infrastructure Utilities Existing Major Paths Existing Minor Paths Proposed Major Paths Proposed Minor Paths Existing Icons Proposed Icons Future Icons

N

250

1000 500

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

Pedestrian Circulation 1 2


D OA KR PRICES FOR

Y RR

ET RE ST

L AL M

PE

EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES

ST C WE

PROGRAM ACCOMMODATION

AM

Pedestrian Circulation

ATE

G UTH

Bike Routes

IV DR

SO

Infrastructure Utilities

46 0

Bicycle accommodations will be achieved through the use of parallel bike lanes on streets and roads and off road trails. Bike lanes primarily provide functional movement and while trails provide functional routes, they also are used for exercise and recreation. Establishing an integrated system of bikes lanes and paths will encourage greater use of bicycles as a primary mode of transportation. CAMPUS MASTER PLAN UPDATE 2006

BY

-P AS S

Existing Bike Lane Existing Bike Paths Proposed Bike Lane Proposed Bike Paths

N

500

2000 1000

E

RY TR AIL

IVE DR

Transit

EBER

TER EN

Parking

HUCK L

Roadways

HC T EC

DU CK

Circulation

VE D RI

PON DD RIV E

PUS

CAMPUS SYSTEMS

ON GT IN H AS W

ET RE ST


EXECUTIVE SUMMARY

Alternate Future Plant

MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Steam

Chilled Water

Electrical CNS Utilities

Future Plant

Existing Upgraded Proposed

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY

Near Term Plant

MASTER PLAN GOALS DEFINING STRATEGIES Long Term Plant

PROGRAM ACCOMMODATION CAMPUS SYSTEMS

Near Term Plant

Circulation Infrastructure

Steam

Chilled Water

Electrical CNS Utilities

Existing Proposed Decommissioned Plant

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure

Steam

Chilled Water

Electrical

CONTINUES TO SOUTH SUBSTATION

CNS Utilities

Existing Proposed Existing Substation

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006

CONTINUES TO SOUTH SUBSTATION


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure

Steam

Chilled Water

Electrical

CNS

Utilities

Existing Proposed Existing CNS Wire Center

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Utilities Water

Sanitary Sewer

Stormwater

Existing Water Main Future Water Main

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Utilities

Water

Sanitary Sewer

Stormwater

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Utilities

Water

Sanitary Sewer

Stormwater

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

Stormwater 1 2 3 4


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Utilities

Water

Sanitary Sewer

Stormwater

The Stroubles Creek Study and the master plan further propose that the university fully consider and employ a range of structural “Best Management Practices” (BMPs). BMPs include such things as pervious parking lots over storage beds, green roofs, and vegetated swales with the design intent of managing the runoff from impervious surfaces locally.

N

500

2000 1000

CAMPUS MASTER PLAN UPDATE 2006

Stormwater 1 2 3 4


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Utilities

Water

Sanitary Sewer

Stormwater

N

500

2000 1000

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

Stormwater 1 2 3 4


EXECUTIVE SUMMARY MASTER PLAN GOALS DEFINING STRATEGIES PROGRAM ACCOMMODATION CAMPUS SYSTEMS Circulation Infrastructure Utilities

Water

Sanitary Sewer

Stormwater

EXPAND FOR TEXT

CAMPUS MASTER PLAN UPDATE 2006

Stormwater 1 2 3 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.