hanis.!! ! hanis a razak! b.sc(arch), b.arch! international islamic university.malaysia!
!
p +60122996484! e hanisabdrazak@gmail.com! w http://cargocollective.com/hanisabdrazak!
!
k. lumpur
!
hanis abd razak hanisabdrazak@gmail.com ./ ACADEMIC HISTORY! (2011 - 12)! B. Architecture (part 2)! International Islamic University Malaysia! Final Year Project | KLCoca - Contingent space for contingent people! (2006 - 09)! B. Sc Arch (part 1)!
! ./ ACHIEVEMENTS! !
Awarded ! d3 : Housing Tomorrow Competition 2014! Honorable mention - Dystopian Vision Rhizome : Anti Oedepus Manifesto HYP International Student Competition 2013! Honorable mention - International Student competition 2013 Oi Polloi Nippon Paint Gold Medal Young Designer Award 2012! Gold Medal winner for Nippon Paint Young Designer Award Malaysian Architecture Association (PAM)
!
Exhibitions! PAM Exhibition! ! One Utama | November ! Young Designer Award Exhibition! ! Showcase in local universities Malaysia | November! Featured Works in d3 Website! Featured Works in Archdaily Website! Featured in AM Architecture Magazine! ! December 2012 - Emerging Talents! Featured in designscape Magazine! Featured in Impiana magazine! Featured in New Straits Times newspaper! ! Showcasting fresh, sustainable design ideas! http://www.nst.com.my/red/networking-showcasing-freshsustainable-design-ideas-1.203574! Featured in The Star newspaper! ! Architectural vision! http://www.thestar.com.my/Lifestyle/Archive/2013/02/18/ Architectural-visions.aspx/!
!
./ SOCIETY! EPIC army ! Volunteer and Community - design and built for aboriginal ! ./ PROGRAM SKILLS!
!
Sketch-Up! Auto Cad! Adobe CS! Photoshop! Illustrator! InDesign! Microsoft Office Suite!
!
GENERAL SKILLS! Verbal presentation! Model making! Hand Drawing! Graphic design + Layout! Mac + Pc!
!
! WORK EXPERIENCES! !./(2012 - 14)!
Design Architect at NWKA Architects Sdn Bhd | Malaysia! (2009 - 10)! Assistant Architect at NWKA Architects Sdn Bhd | Malaysia!
!
./! Proposed Soho Development at :! KANVAS CYBERJAYA ! for! SUNTRACK RAVEN SDN BHD! Design, Council & Tender Drawing Preparation!
!
./! Proposed Renovation and Refurbishment to Existing school at SRI GARDEN INTERNATIONAL SCHOOL KUALA LUMPUR! for! TAYLORS EDUCATION GROUP! Schematic Design, Design Development!
!
./! Proposed Renovation and Refurbishment to Existing school at ! GARDEN INTERNATIONAL SCHOOL MONT KIARA! for! TAYLORS EDUCATION GROUP! Schematic Design, Design Development!
!
./ ! Proposed Mix Development at! SOUTHKEY MOSAIC JOHOR BHARU! for! SOUTHKEY DEVELOPMENT SDN BHD! Schematic Design, Design Development!
!
./! Proposed Renovation and Refurbishment at :! SOUTHKEY MOSAIC SALES GALLERY! for! SOUTHKEY DEVELOPMENT SDN BHD! Schematic Design, Design Development!
!
./! Proposed Mix Development at ! WCT 32 KLANG! for! WCT DEVELOPMENT SDN BHD! Schematic Drawing, Design Development!
!
./! Proposed 4 unit Bungalow at ! BUKIT DAMANSARA ! for! LOY T N! Schematic Drawing!
! !./ REFERENCES! ! Contact details on request! !
Ng Wai Keong of NWKA Architects Sdn Bhd! Carmen Yeo of NWKA Architects Sdn Bhd! Aida Kesuma of International Islamic University Malaysia ! Zuraini Denan of International Islamic University Malaysia
!
hanis abd razak hanisabdrazak@gmail.com ! !
The name in its essence depicts the nature of scraping the ground perpendicular to gravity while shooting roots from its nodes; a metaphorical representation of the project reflected in architectural forms in the context of Klang River in Kuala Lumpur, Malaysia. Apart from revitalizing the river, the proposal seeks to aspire as a platform of pivotal paradigm shift to challenge interdependency of social domains; economics, politics, ecology, culture, and history.
!
Literally means "muddy estuary", Kuala Lumpur has had significant relationships and connection with the river as a valuable resource to the urbanization of Kuala Lumpur; unfortunately neglected presently turning it into a mere monsoon drain. Series of significant flooding events occurred as the result to this attitude, even more diminishing the association between the city and the river. The river; what was then an important reference of the city, now becomes a history of less value.
./ rhizome : an anti oedepus manifesto
!
hanis abd razak hanisabdrazak@gmail.com ! !
The project consists of four (4) types of facilities; Facility I is to facilitate the demolishing of the concrete surfaces of the river bed, retaining and utilizing the river current as convertible hydroelectric energy, and as a mechanism for bamboo planting machinery; Facility II functions to process (i.e. harvest, cut, cure, and dry) and prepare bamboo as the main building material and also acts as a waste incineration facility (boiler) that generates energy; Facility III serves as a link bridge between the river banks and essentially functions as an institute for archiving and a community centre. This facility contains temporary and permanent structures for research, storage, preservation and exhibition of each process of re-generation of the linear scraper; Facility IV concludes the process; which is the human habitat and continuous food production. The final result will be a complex consisting a chain of living units stretched along the 10.7km river span in stages at a given rate and later will penetrate slowly throughout the city and creating a self-sufficient society; contributing back to the city.!
./ rhizome : an anti oedepus manifesto
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ rhizome : an anti oedepus manifesto
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ oi polloi
Architecture as a tool of thought and representation, of socio-cultural and behavioural expressions has undeniably endured various stages of experimentation and definitions through time. The history tells us how its defining has evolved from a humble hut into soaring colonnades and arches, into super-structures, shrines of modernity. However interestingly, Franco La Cecla in his book Against Architecture summarised this as the "symbolic excellence of American modernity that has transformed itself into turgid showcase, a shrine not for preserving the fabric of humanity and its sense of community, but a physical format that is by now merely a brand rather than an urban configuration." This speculation is due to the grand separation of public-private buildings, as it is now being idolised by capitalistic corporations and bureaucratic political powers, subjugating the welfare of the greater public. Most dramatically, the housing and civic designs typified by the Modern Movement has become a world wide failure, technically, culturally, climatically, and socially.
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ oi polloi
The integral argument of the manifesto has existed historically by challenging the bureaucratic solutions of social problems that are often isolated from the communities they serve. Oi Polloi demands the massive architecture driven by political and economic forces that crush our lives and hopes to disappear, and replacing the old abstract notions of 'society' with new abstract concepts of community allowing people to have direct control over their environments.!
!
The structures are expected to serve, built by drones suiting to individual needs and ergonomes, creating ecstatic fabric of the urban environment. Transpired within the ruins of modernity, the living vessels carry the main programmes of individual living as well as common interactions among other vessels creating a more dynamic urban landscape.!
!
Besides being the catalyst of this entirely new configuration of urban landscape, the existence of the Piers is also as fundamental to serve the living vessels as a hub providing services and energy supply, as well as an infrastructure holding the entire network of transportation. The Piers will initially placed on abandoned construction sites within the city, benefitting the existing structure as support. The Piers are later interlinked by cables carrying living vessels as the mean of transportation.!
!
The emergence of this new configuration of an urban landscape will soon be acknowledged as the desirable solution for providing efficient use of space and ownership. The epidemic it created will later take over the soon-to-be abandoned architecture of the corporations, and hence the architecture will disappear.
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ oi polloi
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ lenggong visitor center This scheme indulges strong insistence on the idea of flexibility and adaptability linking it to the notion of "calculated uncertainty." This term is defined by Cedric Price as "the creation of temporary, adaptable structures that can be altered, transformed or demolished, serving the need of the moment." (Price,1984)!
!
The new Lenggong Valley Visitor Centre presents itself under an elegant structure of a massive canopy that seemingly floating gracefully on the sloping site held up by thin steel pillars. The canopy is established as a platform where the space underneath would be manipulated and transformed accordingly to fulfill the present need of the building which at the moment as a visitor centre. This platform consists of intersecting spaces arranged contrasting the verticality of the main structure which will be either suspended between columns or hung from the canopy. The language of lightly touching the ground was an effort to preserve the site's potential as an important archaeological site.
!
hanis abd razak hanisabdrazak@gmail.com ! !
The idea of its flexibility as an infrastructural architecture can be seen in the play of its open and closed spatial criteria as well as its ability to be able to be dismantled, expanded and relocated to a new place for future use. Modular construction is adopted to allow this to happen. Motorised facade and amphitheatre allows the space to be transformed into public spaces where all kind of activities could take place. The 'skins' that enclosed the spaces could be thoroughly permeable, semi or non permeable depending on its spatial requirement which suggest a space could easily be a 'stage' to other activities that requires different spatial condition. This also apply to the canopy which is made of 'patches' of materials that respond to varied spatial requirements. The main staircase is hung from the canopy by means of tension cables/rods. The columns are dispersed to form a grid division of 8 x 8 where slabs are laid accordingly to create flexible spaces. This could expand or contract with time with the grid system as a division guide. ./ lenggong visitor center
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ lenggong visitor center
!
hanis abd razak hanisabdrazak@gmail.com ! !
The realization of the topic is depicted based on the future of art in Malaysia significantly. To ensure sustained growth in the long run, Malaysia must forge an environment that is conducive to innovations, new discoveries and the creation of new knowledge. Globally Kuala Lumpur is well known for its Petronas Twin Tower and Malaysia itself is well known of its landmark on the world map rather than its society and talent. Building up an artistic and creative buzz will thus help to attract both local and foreign talents to contribute to the dynamism and growth of economy and society.! Pasar Seni (Central Market) has long been known as Malaysian art hub.‘Seni means art in Malay’. However, where is the ‘seni’ in Pasar Seni now? Pasar Seni no longer carries the same value as it had always been back during the 90’s, which is a bit disappointing as it used to be a place where the local gathers to enjoy local arts and cultures, a place which defines Malaysia in its artistic and cultural aspects. It may received more visitor these days but none could deny the ‘emptiness’ evoked by its present’s atmosphere. It is just another ‘shopping mall’, contradicting its initial purpose. ! This scheme was my personal respond to ‘recreate’ Pasar Seni, to reclaim what it originally was, to bring it back to its glorious past where art meets culture. This project try to revive Pasar Seni area to its name by introducing art as a nodes. As the current site is the home of the longest graffiti wall in Malaysia, rather than only allow people to view from afar, it is an opportunity to bring people to the work of the art itself.
./ KL coca
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ KL coca
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ KL coca
!
hanis abd razak hanisabdrazak@gmail.com ! !
./ KL coca
./ KL coca
!
hanis abd razak hanisabdrazak@gmail.com ! !
!
hanis abd razak hanisabdrazak@gmail.com ! !
A999
43967
PA108380
A999
NO.DOOR 33022
43966
TAPAK CADANGAN
23584
2359
0
TAPAK CADANGAN
23576
44025
44019
23585
1600mm(W) x 2100mm (H)
Metal frame 2 hours double leaf self closing fire rated door to be approved by Bomba Malaysia
FD2
1000mm(W) x 2100mm (H)
Metal frame 2 hours single leaf self closing fire rated door to be approved by Bomba Malaysia
FD3
2400mm(W) x 2100mm (H)
Metal frame 2 hour double leaf self closing fire rated door to be approved by Bomba Malaysia c/w M&E specification
FD4
1200mm(W) x 2100mm (H)
Metal frame 2 hour single leaf self closing fire rated door to be approved by Bomba Malaysia c/w M&E specification
FD5
1200mm(W) x 2100mm (H)
Metal frame 1 hour single leaf self closing fire rated door to be approved by Bomba Malaysia c/w M&E specification
FD6
44
02 4
23577 106424
23578 91.
AEC
N AP
IARA
23588 23589 2 23 359 59 2 4
3301 3301 2 3
6 AT KR
23580
23581
33007
23582
AEC
33 00 4
33008
33010
33000
PERS
33003
32999
IARA
32998
9
3300
PERMAI
PERSIARAN RIMBA PERMAI 44056
44052
44063
05
473
44061
44062
1 05 44 0 05 44
44058
47303 44059
47304
44957
44054 44048
A999
Metal frame 2 hours double leaf self closing fire rated door to be approved by Bomba Malaysia
800mm(W) x 2100mm (H)
Metal frame 1 hours single leaf self closing fire rated door to be approved by Bomba Malaysia
D1
1200mm(W) x 2100mm (H)
Double leaf flush door
D2
1200mm(W) x 2100mm (H)
Single leaf flush door c/w waterproof lining at internal side
D3
1000mm(W) x 2100mm (H)
Single leaf flush door c/w waterproof lining at external side
D4
1000mm(W) x 2100mm (H)
Single leaf flush door
D5
1600mm(W) x 2100mm (H)
Double leaf flush door c/w waterproof lining at internal side
D6
800mm(W) x 2100mm (H)
D7
1000mm(W) x 2100mm (H)
D8
800mm(W) x 2100mm (H)
Single leaf folding door c/w waterproof lining at internal side
D10
900mm(W) x 2100mm (H)
Single leaf flush door
D11
900mm(W) x 2100mm (H)
Single leaf flush door
D12
800mm(W) x 2100mm (H)
Single leaf flush door c/w waterproof lining at internal side
D13
810mm(W) x 2100mm (H)
Single leaf flush door c/w waterproof lining at internal side
GD1
2600mm(W) x 2100mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w 8mm thk. fixed clear glass panel
GD2
1600mm(W) x 2100mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w 8mm thk. fixed clear glass panel
GD3
1700mm(W) x 2100mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w 8mm thk. fixed clear glass panel
Single leaf timber flush door c/w waterproof lining at internal side Single leaf flush door
1 3301
33001
PERSIARAN RIMBA
1200mm(W) x 2100mm (H)
FD7
D9
N AP
32997
A999
PERS
23587
O KN TE
32996
33019
23570 23 57 23 2 59 3
23579 32995
33006
23571
235
JALAN
44024
43985
23586
44021
A999
DESCRIPTION
FD1
GD4
1000mm(W) x 2100mm (H)
Single leaf frameless 8mm thk tempered clear glass door with ironmongery c/w 8mm thk. fixed clear glass panel
GD5
1200mm(W) x 2100mm (H)
Single leaf frameless 8mm thk tempered clear glass door with ironmongery c/w 8mm thk. fixed clear glass panel
GD6
1650mm(W) x 2100mm (H)
Single leaf frameless 8mm thk tempered clear glass door with ironmongery c/w 8mm thk. fixed clear glass panel
SD1
1200mm(W) x 2700mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door with top hung window above
SD2
1000mm(W) x 2100mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door with top hung window above
SD3
900mm(W) x 2100mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door with top hung window above
SD4
2200mm(W) x 2900mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door with fixed glass panel window above
SD5
2200mm(W) x 2900mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door with fixed glass panel window above
SD6
4100mm(W) x 5560mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door fixed glass panel window above
SD7
2150mm(W) x 5560mm (H)
Aluminium frame 8mm thk. tempered clear glass sliding door with fixed glass panel window above
RS1
4050mm(W) x 2400mm (H)
Heavy duty Zincalume color bond steel roller shutter with see through panels at eye level (motorised) to manuf's detail
W1
1200mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window to manuf's detail
W2
5800mm(W) x 1500mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel above to manuf's detail
W3
6675mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panel c/w top hung window above to manuf's detail
W4
1925mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W5
2700mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W6
2030mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W7
2345mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W8
2060mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W9
4290mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W10
600mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window to manuf's detail
W11
900mm(W) x 2100mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panel c/w top hung window above to manuf's detail
TAJUK PROJEK
W12
2600mm(W) x 4000mm (H)
Powder coated aluminium frame with 8mm thk. casement window c/w fixed glass panel to manuf's detail
W13
1200mm(W) x 1200mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI: -
W14
4800mm(W) x 1200mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panels to manuf's detail
W15
1200mm(W) x 1200mm (H)
Powder coated aluminium frame with 8mm thk. casement window to manuf's detail
1) DUA (2) BLOK SOHO 30 TINGKAT (646 UNIT) DARI ARAS 2 HINGGA 28 2) SATU (1) TINGKAT RUANG SERBAGUNA DI ARAS 29 3) DUA (2) TINGKAT RUANG PERNIAGAAN (18 UNIT) DI ARAS BAWAH DAN ARAS 1 4) KEMUDAHAN ASAS DARI ARAS BAWAH HINGGA ARAS 2 5) SATU (1) TINGKAT TEMPAT LETAK KERETA DI ARAS BAWAH 6) DUA (2) TINGKAT SUB-BESMEN TEMPAT LETAK KERETA 7) SATU (1) UNIT PONDOK PENGAWAK 2 TINGKAT
W16
1800mm(W) x 1800mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W17
1800mm(W) x 1800mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W18
4800mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W19
4800mm(W) x 1200mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W20
2600mm(W) x 4000mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W21
1800mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window to manuf's detail
W22
7400mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panel c/w top hung window above to manuf's detail
W23
9550mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panel c/w top hung window above to manuf's detail
W24
6675mm(W) x 3000mm (H)
Powder coated aluminium frame with 8mm thk. fixed glass panel c/w top hung window above to manuf's detail
W25
1200mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window to manuf's detail
W26
3600mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window to manuf's detail
W27
8485mm(W) x 4500mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W29
2200mm(W) x 2425mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W30
2200mm(W) x 2425mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
600mm(W) x 1200mm (H)
Powder coated aluminium frame with 8mm thk. casement window to manuf's detail
600mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window to manuf's detail
NO.WINDOW
PELAN LOKASI
PELAN KUNCI
TIDAK BERSKALA
TIDAK BERSKALA
DI ATAS LOT 32998 & LOT 32999, JALAN TEKNOKRAT 6, CYBER 5, CYBERJAYA DALAM MUKIM DENGKIL, DAERAH SEPANG, SELANGOR DARUL EHSAN.
DESCRIPTION
W28
W31 W32
Adalah saya mencadangkan maksud utama penggunaan cadangan projek seperti di atas adalah dalam Kumpulan Maksud dan keperluan kelengkapan keselamatan kebakaran adalah seperti berikut, (keperluan kelengkapan keselamatan kebakaran hendaklah ditentukan mengikut UBBL pada sesuatu cadangan projek)
PELAN TAPAK 1. Adakan 5 buah pili bomba jenis tiang pengeluaran dua hala dengan pengeluaran air sebanyak 1135 liter seminit bagi setiap pili bomba sepertimana yang ditandakan di dalam III & V pelan sekiranya tiada terdapat pili bomba sedia ada dalam jarak 91.5 meter. 2. Mengadakan 2 talian hos berukuran 64 mm x 30 meter dan sebatang nozzle dari jenis 'Jet & Spray' yang ditempatkan di dalam peti kabinet berhampiran dengan tiap-tiap pili bomba.
W33
14650mm(W) x 3100mm (H)
W34
600mm(W) x 1200mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail Powder coated aluminium frame with 8mm thk. fixed louvers glass window to manuf's detail
W35
2400mm(W) x 600mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W36
7350mm(W) x 2100mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
W37
9150mm(W) x 2100mm (H)
Powder coated aluminium frame with 8mm thk. top hung window c/w fixed glass panel to manuf's detail
FG1
3950mm(W) x 5750mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w powder coated aluminium frame 8mm thk. fixed clear glass panel to manuf's detail
FG2
5400mm(W) x 4500mm (H)
FG3
4150mm(W) x 3950mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w powder coated aluminium frame 8mm thk. fixed clear glass panel to manuf's detail Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w powder coated aluminium frame 8mm thk. fixed clear glass panel to manuf's detail
FG4
3990mm(W) x 4500mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w powder coated aluminium frame 8mm thk. fixed clear glass panel to manuf's detail
FG5
4220mm(W) x 4500mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w powder coated aluminium frame 8mm thk. fixed clear glass panel to manuf's detail
FG6
2150mm(W) x 4500mm (H)
Double leaf frameless 8mm thk tempered clear glass door with ironmongery c/w powder coated aluminium frame 8mm thk. fixed clear glass panel to manuf's detail
3. Adakan jalan masuk perkakas bomba (Access Road) dengan kelebaran tidak kurang 20 kaki (6 meter) yang boleh menanggung keberatan beban 25 tan sepertimana yang ditandakan didalam pelan. 4. Kecerunan jalan akses perkakas bomba hendaklah tidak kurang 1:15 5. Ketinggian kelegaan hendaklah tidak kurang daripada 5 meter. 6. Jarak antara bangunan hendaklah mematuhi Jadual ke Enam UBBL 1984.
KEHENDAK-KEHENDAK AKTIF 1. Adakan sistem pancur basah mengikut Piawaian Malaysia MS 1489:Part 1:1999 dan peruntukan dalam UBBL 1984. 2. Adakan sistem pancur kering mengikut Piawaian Malaysia MS 1489:Part 1:1999 dan peruntukan dalam UBBL 1984.
KAWALAN
3. Adakan sistem pancur menurun mengikut peruntukan dalam UBBL 1984 4. Adakan..........unit saluran bantu mula mengikut Piawaian Malaysia MS1489:Part 1:1999 atau mana-mana penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia. 5. Adakan..........unit penggera kebakaran jenis pecah mengikut syarat-syarat penentuan Tatatertib Amalan British atau mana-mana penentu yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia.
PODIUM (PERNIAGAAN)
6. Adakan sistem pengesan haba / asap mengikut syarat-syarat penentuan Tatatertib Amalan Piawaian British atau mana-mana penentuan yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia. 7. Adakan suis pengasingan elektrik (electrical isolation switch) dan hendaklah tidak menjejaskan lampu kecemasan apabila ia ditutup. 8. Adakan sebuah pusat pemerintahan dan kawalan kebakaran di lantai tetuan (designated floor) yang dilengkapi dengan peti penggera kebakaran.
TOWER B
KEHENDAK-KEHENDAK PASIF 1. Penggunaan siling bangunan hendaklah menepati kehendak-kehendak UBBL 1984 Jadual kelapan. 2. Semua tangga keselamatan hendaklah dikepong dengan tembok batu bata setebal 115mm atau tangga terbuka yang mematuhi kehendak-kehendak UBBL 1984 sepertimana yang ditandakan di dalam pelan.
TOWER A
3. Adakan pintu rintangan api 1 jam sepertimana yang ditandakan di dalam pelan. Pemasangannya hendaklah tertutup sendiri dan tertutup rapat. 4. Adakan dinding pemetakkan (compartment wall) setebal 112mm/225mm batu-batu yang dibina sehingga paras bumbung/lantai sepertimana yang ditandakan di dalam pelan. 5. Dinding bagi bilik setor yang disifatkan merbahaya hendaklah setebal 100mm batu bata dan pintunya dari jenis rintangan api satu jam dipasang dengan 'door closer' 6. Adakan bidai gulung (roller shutter) rintangan api 2 jam / 4 jam seperti tertanda di dalam pelan. 7. Penggunaan kaca-kaca pada dinding luar bangunan hendaklah dari jenis yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia. 8. Semua lubang perkhidmatan (service shaft) hendaklah ditutup di setiap tingkat dengan bahan rintangan api 2 jam.
96 TLM
PELAN TAPAK
84 TLM
SKALA 1 : 400
33 TLM
9. Semua bilik bagi penempatan pam bomba dan janakuasa hendaklah dibina dari tembok batu-bata yang tahan rintangan api 2 jam. Pintu-pintunya hendaklah dari rintangan api 1 jam. 10. Dinding pemisah hendaklah dari jenis batu bata setebal 200mm jenis yang menanggung beban. Dinding ini hendaklah dinaikkan 225mm melebihi paras bumbung atau mematuhi rekabentuk yang dipersetujui oleh Jabatan Bomba dan Penyelamat Malaysia. 11. Semua dinding pembahagi dalaman hendaklah dari jenis rintangan setengan jam dan dari jenis yang dibenarkan oleh Jabatan Bomba dan Penyelamat Malaysia.
Saya mengakui walaupun apa-apa pelan, lukisan atau kiraan yang telah diperakukakan oleh Jabatan Bomba dan Penyelamat Malaysia, tanggungjawab bagi kemungkiran kepada mana-mana bangunan atau sebahagian daripada sesuatu bangunan hendaklah terletak atas orang yang mengemukakan pelan, lukisan atau kiraan itu.
./ work experiences
./! Proposed Development! KANVAS SOHO 640 UNIT! for! SUNTRACK RAVEN SDN BHD! DO Submission Preparation / Design Development
!
hanis abd razak hanisabdrazak@gmail.com 1
3
2
4
5
6
! !
7
FFL. ±26.05
8
9
10
11
13
12
15
14
FFL. ±26.50
FFL. ±26.20
Taxi Stand FFL. ±27.05
FFL. ±26.65
132° 21 ' 5
FFL. ±27.20
0" 31 .234
FFL. ±26.65
DN
132° 21' 50" 31.23
ST-6
STAIRCASE ST-6
FFL. ±26.65
4
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=5
127° 55' 00" 13.11 9
2 nos. of 75 Ø waste pipe from floor below
123° 29' 20" 31.171 DN
119° 30' 20" 5.806
ST-7
STAIRCASE ST-7
A
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=11
DRIVEWAY RL. ±28.05
DRIVEWAY
12200mm BUILDING SETBACK
ACK
TER PL ANTIN G
RL. ±28.05
SETB
D LE G AB IN K DIS AR P
ILDING
PERIME
B
Dashed line indicated r.c. slab above
mm BU
TERRACE
TERRACE
TERRACE
TERRACE
TERRACE
6100
3000mm
D LE G AB IN K DIS AR P
R.c column to engr's detail
TERRACE
TURFING
GRADIENT 1:8
FFL. ±28.15
FFL. ±28.15
C UP
UP
STAIRCASE ST-S4 R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with full homogenous tiles with skirting. R=166.7mm, T=255mm Nosing=25mm, Number=24
D
LIFT 1
ST-S4
STAIRCASE ST-S5 R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with full homogenous tiles with skirting. R=166.7mm, T=255mm Nosing=25mm, Number=24
ST-S5
Lift core to engr's detail
Powder coated alumn frame composite glass window to window schedule
Powder coated alumn frame composite glass window to window schedule
SHOP OFFICE TYPE 1A
SHOP OFFICE TYPE 1
SHOP OFFICE TYPE 2
SHOP OFFICE TYPE 2
SHOP OFFICE TYPE 3
SHOP OFFICE TYPE 4
SHOP OFFICE TYPE 2
FFL. ±28.20
FFL. ±28.20
FFL. ±28.20
FFL. ±28.20
FFL. ±28.20
FFL. ±28.20
FFL. ±28.20
SHOP OFFICE TYPE 5
SHOP OFFICE TYPE 1B FFL. ±28.20
FFL. ±28.20
DRIVEWAY RL. ±28.05
190mm thk. party wall with 20mm cement plaster & paint on both sides
Dotted lines indicated bird nest structure to landscape arch's detail
R.c column to engr's detail
Lift core to engr's detail
200mm Ø powder coated m.s. post to engr's detail
GUARD HOUSE CONTROL ROOM
DISABLED TOILET
LIFT 2 ST-S1
FFL. ±28.15
SERVICE LOADING ZONE
FFL. ±28.15
110mm thk. brickwall with 20mm thk. cement plaster and paint on bothsides
ST-S3
DN
DN
FFL. ±28.20
UP
2 nos. of 75 Ø waste pipe from floor below
F
190mm thk. party wall with 20mm cement plaster & paint on both sides
UP
E
190mm thk. party wall with 20mm cement plaster & paint on both sides
TOILET G-1
STAIRCASE ST-S3 R.C. staircase to engr's detail with 900mm high m.s railing and selected tiles finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=18
STAIRCASE ST-S1
FFL. ±28.15
R.C. staircase to engr's detail with 900mm high m.s railing and selected tiles finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=18
Lightweight m.s staircase to engr's detail
STAIRCASE ST-9 R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=158mm, T=840mm Nosing=25mm, Number=20
DRIVEWAY
DRIVEWAY
FFL. ±28.05
DRIVEWAY
FFL. ±28.05
2 nos. of 75 Ø waste pipe from floor below
FFL. ±28.05
3000mm high polycarbonate roof above to manuf's details
R.c ramp to engr's detail
5600mm high polycarbonate roof above to manuf's details
PAVEMENT
G FI CO2
Dashed line indicated r.c. slab above
GENSET ROOM
METER ROOM
FI
48.364
FI
VOID
RAMP UP TO 1ST FLOOR 1:8 GRADIENT
FI
SW 2
TX 3
TX 4
FFL. ±28.20
FFL. ±28.20
FFL. ±28.20
44°
52' 2
0" 1
FI
MSB ROOM 2
FFL. ±28.20
FFL. ±28.20
500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
212° 22' 20" 101.696
UP
Green wall to landscape arch's detail
H
200mm thk. R.C shearwall c/w skim coat and paint on both sides to engr's details to engr's detail
150mm kerb
FFL. ±28.15
REFUSE CHAMBER 2
RAMP DN TO BASEMENT 1 1:8 GRADIENT
FFL. ±28.15
SURAU
FFL. ±28.15
DRIVEWAY
FFL. ±28.20
FFL. ±28.25
FFL. ±28.05
R.c ramp to engr's detail
50dp
HR
50dp
STORAGE
RAMP UP FROM BASEMENT 1 1:8 GRADIENT
STAIRCASE ST-B1
ST-B1
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=18
FFL. ±28.15
GRADIENT 1:30
GRADIENT 1:30
DISABLED PARKING
I
HR/WR TANK
ST-B2
FFL. ±28.05
FFL. ±28.05
SURAU FFL. ±28.25 FFL. ±28.15
DISABLED PARKING
CW PUMP ROOM
CW TANK FFL. ±28.20
VOID
FIRE PUMP ROOM
SP TANK
HR/WR TANK
FFL. ±28.20
FFL. ±28.20
SERVICE LOADING ZONE
Elv 50dp
50dp
50dp
FFL. ±28.05
12
15
20
MOTORCYCLE PARKING
25
MOTORCYCLE PARKING
30
33 900mm high m.s guardrail
VOID
FFL. ±28.20
FFL. ±28.20
500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
FFL. ±28.20
Shear wall to engr's detail
FI
FFL. ±28.15
K
500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
STAIRCASE ST-A1 R.c ramp to engr's detail
R.c ramp to engr's detail
DISABLED PARKING
ST-A1
STORAGE
FFL. ±28.15
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=18
FFL. ±28.20
50dp
50dp
REFUSE CHAMBER 1
DRIVEWAY
DRIVEWAY
FFL. ±28.05
DRIVEWAY
FFL. ±28.05
FFL. ±28.05
FFL. ±28.15
TURFING
GRADIENT 1:30
L
GRADIENT 1:30 FFL. ±28.20
STAIRCASE ST-A2
FI
DRIVEWAY
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=18
MSB ROOM 1
TURFING
FFL. ±28.05
ST-A2
FFL. ±28.20
FFL. ±28.05
DRIVEWAY
DP FA BG
TURFING Elv 50dp
HR
50dp
50dp
FFL. ±28.20
METER ROOM
TURFING
2 nos. of 75 Ø waste pipe from floor below
M TURFING
200mm thk. R.C shearwall c/w skim coat and paint on both sides to engr's details to engr's detail
TX 1
1
SW 1
TX 2
FFL. ±28.20
MOTORCYCLE PARKING
FFL. ±28.20
FFL. ±28.20
VOID
5
10 R.C. roof slab 900mm high m.s. guardrail TURFING TURFING
FI
Exit to Park & Ride 500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
DN
STAIRCASE ST-8
DRIVEWAY
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=158mm, T=900mm Nosing=25mm, Number=15
FFL. ±28.05
O TURFING
mm
6100
ACK SETB ILDING
2 nos. of 75 Ø waste pipe from floor below
BU
R.C. roof slab
P mm
6100
MET PERI
NG ANTI
ER PL
2
75.40
20" 51'
287°
500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
PELAN ARAS TANAH SKALA 1 : 200
R.c ramp at gradients 1:30 to engr's detail
EXIT TO PARK & RIDE AT GROUND LVL
./ work experiences
0.828
20" 6
51' 287°
TURFING
./! Proposed Development! KANVAS SOHO 640 UNIT! for! SUNTRACK RAVEN SDN BHD! DO Submission Preparation / Design Development
FROM BASEMENT 1
FI FI
N
R.c ramp at gradients 1:30 to engr's detail
500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
3000mm PERIMETER PLANTING
200mm thk. R.C shearwall c/w skim coat and paint on both sides to engr's details to engr's detail
R.C. staircase to engr's detail with 900mm high m.s railing and cement render finish with nonslip nosing tiles. R=166.7mm, T=255mm Nosing=25mm, Number=18
6100mm BUILDING SETBACK
J
500mm high r.c. parapet wall to engr's detail with 700mm high steel balustrade m.s. railing
DP FA BG
STAIRCASE ST-B2
200mm thk. R.C shearwall c/w skim coat and paint on both sides to engr's details to engr's detail
BOUNDARY LINE
HR/WR TANK
TURFING
RAMP DN FROM 1ST FLOOR 1:8 GRADIENT Green wall to landscape arch's detail
R.c ramp to engr's detail
FFL. ±28.20
!
hanis abd razak hanisabdrazak@gmail.com 7
6 5a
! ! 5
N
4
3
2
1
ROOF LEVEL
7TH. FLR LEV
6TH. FLR LEV
5TH. FLR LEV
4TH. FLR LEV
3RD. FLR LEV
2ND. FLR LEV
1ST. FLR LEV
GRD. FLR LEV GRD. LEV
KERATAN A-A SKALA : 1 : 150
A
B
C
ROOF LEVEL
7TH. FLR LEV
6TH. FLR LEV
5TH. FLR LEV
4TH. FLR LEV
3RD. FLR LEV
2ND. FLR LEV
1ST. FLR LEV
DEWAN BADMINTON
GRD. FLR LEV GRD. LEV
KERATAN B-B SKALA : 1 : 150
./! Proposed Renovation and Refurbishment at :! SRI GARDEN INTERNATIONAL SCHOOL ! for! Taylors education group! Schematic Design / Design Development