The project can be broken down into three stages over the forthcoming year. This prevents creating unachievable expectations of the project when funding is yet to be secured.
O
N
1 Install a waste collection with provision of bins and fencing to protect them.
D
J
PLANNING & FUNDRAISING
STRATEGY
F
M
A
2 Prevent further erosion of the river by diverting the flow
of water and reinforcing the riverbank with either concrete and/or gabion, which will also expand the useable space of the riverbank.
M
J
J
A
3 Create a social space on the new reinforced riverside which we will design and build with the villagers. The breakdown of stages prevent creating unachievable expectations as the success of gaining funding is unknown. Below is an example of the garden furniture that the carpenters of the village have designed and are now constructing to sell to the public. These pieces could potentially be used to make up a potential play area.