Hanyu_Zhang_Portfolio

Page 1

H A NY U Z H A N G Architecture Portfolio Architectural projects from 2016 - 2020

张瀚予 zhyhelen0312@gmail.com (+61) 0411632016


HANYU ZHANG zhyhelen0312@gmail.com // 0411 632 016 GRADUATE OF ARCHITECTURE A determined and focused professional who wants to not only make a real difference to society but to also change lives and create buildings which lift the spirits of those who live in them. Hanyu has experience of being involved in the design and construction of multi-million hospitals and master planning.

Personal Information Age: 23 Birth Place: Guangzhou, China

Capable of working within a team or independently, Hanyu has a flexible and positive attitude who thrives working within a pressurized and deadline driven environment.

Nationality: Chinese Current Residence: Adelaide, South Australia

PERSONAL SKILLSET AND COMPETENCIES •

Basic knowledge of building regulations in Australia

Work as part of a team or individually

Proficient with BIM and Design programs (Revit Architecture and AutoCAD)

Resolve problems and issues that arise during design proposals and construction projects

CAD proficient and competent in conceptual design & technical skills

• •

Prioritize and plan effectively Highly motivated

SOFTWARE TOOLS •

AutoCAD Architecture (Proficient)

Adobe Photoshop (Proficient)

Revit Architecture (Proficient)

Adobe Illustrator (Proficient)

Rhino 6 (Proficient)

Adobe InDesign (Proficient)

Lumion (Proficient)

Maxwell Render (Competent)

Sketch Up (Proficient)

Cantonese (Professional)

LANGUAGES •

English (Competent)

Mandarin (Native)

ACHIEVEMENTS •

Graduated with a GPA of 6.3 in Master of Architecture

Highly commended for project “Undayak”, which aimed to conserve and rehabilitate Shed 26 in Port Adelaide

In-charge of product design for 2020 Laser Cutting Plant sale, which netted a profit of $2500 used in 2020 Final Year Exhibition (CONFLUENCE)

Generated one of six design iterations for Dianbai Hospital Stage 1 tender, which was won by Guangzhou Panyu Urban Architecture Design


EXPERIENCE SEP 2019 – TO SEP 2019 FREELANCE (INTERIOR RENOVATION) PLUS 82 LITE • •

Redesign the façade for Plus 82 Lite Brought in newfound interest to the area, which generated more profit for the restaurant

JUNE 2019 – MARCH 2020 ARCHITECTURAL INTERN (MASTERPLANNING, 3D DESIGN) GHD WOODHEAD • •

Assisted in the masterplan for Modbury Hospital which includes urban context modelling, topography and post-production video Built up base model for Weipa Airport

JANUARY 2018 – FEBRUARY 2018 ARCHITECTURAL INTERN (CONSTRUCTION DOCUMENTATION) GUANGZHOU PANYU URBAN ARCHITECTURE DESIGN CO. LTD • •

Conceptualized one of six facade design iterations for Dianbai Hospital for tendering Assisted in construction documentation to be handed over to Project Architect

EDUCATIONAL INSTITUTIONS MARCH 2019 – DECEMBER 2020 MASTER OF ARCHITECTURE, THE UNIVERSITY OF ADELAIDE 6.3 GPA MARCH 2016 – DECEMBER 2018 BACHELOR OF ARCHITECTURAL DESIGN, THE UNIVERSITY OF ADELAIDE 5.75 GPA JAN 2017 – FEB 2018 HAND SKETCHING TRAINING, LING JIAO DU STUDIO Free-hand Sketching Training SEPTEMBER 2012 – JULY 2015 YEAR 10 - 12, GUANGDONG GUANYU HIGH SCHOOL

ACTIVITIES MAR 2015 – JUN 2020 FEATURED IN THE ALL-IN EXHIBITION, THE UNIVERSITY OF ADELAIDE JULY 2020 – DEC 2020 FINAL YEAR COMMITTEE MEMBER, FINAL ARCHITECTURE EXHIBITION JUN 2019 – JUN 2020 LEVEL 1 MODEL MAKING TECHNICAL OPERATOR, THE UNIVERSITY OF ADELAIDE AUG 2015 – AUG 2019 OPEN DAY VOLUNTEER, THE UNIVERSITY OF ADEALAIDE


CONTENTS 01

SAMSARA

Final Year Studio (M), 2020

02

EPIPHANY

Studio Architecture (M), 2020

03

UNDAYAK

Studio Culture (M), 2019

04

OPULENCE

Studio Urbanism (M), 2019

05

FORESIGHT

Design Studio 6, 2018

06

DIANBAI HOSPITAL

07

PERSONAL SKILLS

CEMETERY: THE CYCLE OF DEATH AND REBIRTH

MIXED USE OF OFFICE AND HOTEL DEVELOPMENT

REDEVELOPMENT OF SHED 26: A MULTI-DISPLINARY TRAINING CENTRE

LUXURY CAR VENDING MACHINE PROVING VARIOUS URBAN EXPERIENCE

RECREATION AREA ABOVE UPGRADED MOTORCYCLE PARK IN VICTORIA SQUARE

Internship, 2018

FACADE DESIGN & ARCHITECTURAL DOCUMENTATION

HOBBIES AND SKILLSETS



EPIPHANY 01 Studio Architecture(M) 2020 Year 5

Mixed use of Office and Hotel Development Content: Historical and site conditional research Construction documentation Renders



DESIGN APPROACH Epiphany is a mixed-use office and hotel on 57 Wyatt Street, Adelaide. Wyatt Street has a strong office culture and is located within Adelaide City Council’s Central Business Policy Area, which boasts a serious potential for developing the proposed program.

00. Maximun Block

01. Substraction: Set Back

02. Substraction: View

03. Substraction: Sunlight

Adapting outside and inside as the design theme, vegetation is planned to be extended from outdoor to indoor. The perforated brick facade of the cafe acts as a soft boundary, and the large balcony area of the hotel at the upper level also created a transition zone of outside and inside space. The proposed louvered facade of office levels and triangular enveloped facade with the integration of mesh to aluminum panels of hotel levels provide intimated sunlight control with the east-facing site.

01- E P I P H A N Y- 2020

ROOM TYPE

Business Short Stay Studio (No Balcony) 25 m2

Couple/Small Family Stay 1 Bedroom + Balcony 84m2

8

Couple Short Stay Studio + Balcony 42 m2

Family Stay

2 Bedroom + Balcony 127 m2


PROGRAMMES

Rooftop Terrace Rooftop Garden Gym Sauna Water Catchment Vertical Axis Turbines

Hotel

01- E P I P H A N Y- 2020

3560m2 Studio x 26 1 Bedroom x 8 2 Bedroom x 4 Passive Ventilation Local VAV Plant Rooms

Office 2522 m2 Double Skin Facade

Cafe 727 m2 Cafe and small restaurant Brick perforated facade

9


FACADE DETAILS Facade Details & Sunlight Control - Hotel

1

3

2

4

1

Steel frame

3

Cladding panel

2

Metal mesh

4

Planter box

01- E P I P H A N Y- 2020

East

North - East

North

Low angle shading with more coverage 600mm plant height 4m set back for balcony

Low angle shading with less coverage 500mm plant hight

High angle shading with least coverage 400mm plant hight

Summer sun Winter sun

Perforated Brick Details - Cafe

Reinforced concrete column Perforated recycled brick Steel bar through bricks Metallic gasket L-shaped steel plate, welded with concrete and steel column

10


01- E P I P H A N Y- 2020

Street View

Cafe

11


SECTION AA (NORTH-SOUTH)

01- E P I P H A N Y- 2020

Flinders Street

12


Pantry

01- E P I P H A N Y- 2020

Grenfell Street

Pantry

3rd Floor Plan

5th Floor Plan

Office

Office 1:250 0

2.5

13

5

7.5

10m


02

01

03

05

04

06

07

08

09

27787

3906

3906

10

10692

4838

4838

3433

1440

3433

3433

4100

5346

5346

1153

6790

SET OUT POINT

443

A

WT.01 200

4140

UP

2790

2610

MULTI-STORY CAR PARK

D.03 DT.02

2213 2719

B

WT.02

B-B

110

A301 4140

1350

3277 1350

WT.01 200 1440

WT.02 495

110

WT.01

C 1395

236

112

CON.01

200

WT.03

1816

1800

WT.04

FFL 46.000

WT.01

CON.01

D.06 DT.03

D.05 DT.03

STORAGE

LOBBY

200

NE.01 A201

FFL 46.000 CON.01

3983

1746

200

110

A-A

1260

2610

6192

UP

WT.01

A300

WT.05

D.04 DT.02

D

D.01 DT.01

30 D.08 DT.03

20229

720

D.07 DT.04

A-A A300

WT.02

CON.01 1784

WT.04 112

95

13

UP

2213

95

22

FFL 46.000 CON.01

2022

2404

W.G-01 G.01

3983

CAFE

90

D.02 DT.01

1170

WT.02

WT.02

WT.02

WT.02

WT.02

110

110

110

110

110

E

95

22

90 95

13

1302

1710

1302

1710

1302

1710

1302

3983

3124

3316

3882

PAV.01

F

01- E P I P H A N Y- 2020

2770

B-B

-

A301

EE.01

GROUND FLOOR PLAN 1:400 @A3

01

02

A200

03

4340

04

4340

05

5375

06

5375

07

3815

08

3815

09

3815

10

5940

5940

5740

2594

2277

1000

1212

WT.01 200

A 1209

W.G-02 G.02

2900

PAV.02

236

4600

WT.03

D.09 DT.02

1907

4018

UP B-B A301

1907

2459

296 DT.03

B

D.13 DT.05

CON.01

3940

400

3925

400

4990

400

3075

1900

400

3415

400

1635

1779

400

1907

3627

WT.04 400

112

3415

4600

3641

W.G-03

W.G-08

G.02

G.01 WT.03 1907

236 WT.01

WT.01

WT.01

200

200

200

WT.04 112

C

996 121

2

4665

WT.01

WT.03

WT.03

WT.03

200

236

236

236 D.14 DT.06

1907

7 190

D.16 DT.03

CON.01

WT.03

WT.04

112

D.15 DT.05

CON.01

7

190

D.21 DT.03

2459

WT.03

190

236

7

WT.03

W.G-09

236

WT.04

G.01

5548

112

112

236

CON.01

D.26 DT.03

WT.04

WT.03

D

APARTMENT 2 (STUDIO)

4426

CON.01

A300

D.17 DT.06

APARTMENT 3 (2 BEDROOM)

UP

1

D.22 DT.06

WT.04

A-A

236

112

2900

433

D.10 DT.02

D.25 DT.03

APARTMENT 4 (1 BEDROOM)

4426

DN

CON.01

D.19 DT.03

CON.01

WT.03 236

A201

CON.01

W.G-10

8

4009

D.27 DT.06

A-A A300

368

G.01

7

WT.04

G.01

112

D.11 DT.01

E

7

2192

6

627

D.12 DT.01

W.G-07

190

7 190

D.24 DT.03

NE.01

APARTMENT 1 (STUDIO)

198

CON.01 G.01

1907

G.02

G.02

2000

112

CON.01

W.G-04

W.G-05

WT.04

W.G-11

W.G-06 G.01

190

7

D.18 DT.06 780

2

112

7

WT.04

112

4426

190

7

PAV.02

4110

7

190

PAV.02

D.20 DT.06

WT.04

190

7

190

D.23 DT.06

D.26 DT.06

PAV.02

190

7

451

7 190

190

0

7

1002

7

190

1212

A600

2368

1296

100

1184

1184

100

2432

10154

1907

1907

1907

1907

3809

1907

1907

1907

A200 B-B A301

14

HOTEL TYPICAL FLOOR PLAN 1:400 @A3

3821

1907

EE.01

-

PD.02

2550

2109

1907

3732

1907

F


D

E

A-A

F

4426

4426

A300 7469 SD.01 A500

1500

4050

1000

1224

SD.03 A500

Level 16

1150

775

RL 102.000

Level 15 CL

305x165x40mm UB

RL 101.225

762

WT.04

WT.06

PLASTER BOARD CEILING

112

100 50 x 50mm TRIANGULAR STEEL TUBE TO SUPPORT FACADE STRUCTURE

400x400mm CONCRETE COLUMN

WT.03 236

D.22 DT.06

2725

5mm SOLID ALUMINIUM FACADE CLADDING PANEL WELDED TO CUSTOM C CHANNEL

D.22 DT.06

D.21 DT.03

SD.02 A500

50 x 50mm SHS FRAMING TO SUPPORT ALUMINIUM PANEL

616 175mm CONCRETE SLAB

930

430mm BLOCK WALL 850x85x16mm TIMBER STRIP FLOORING

255mm POLISH SCREED FINISH

Level 15

775

RL 98.500

Level 14 CL RL 97.725 400 STEEL OUT TRIGGER BOLDED TO CONCRETE SLAB SUPORTTING FACADE STRUCTURE

TAPPED BEAM TO SUPPORT BALCONY

A-A

01- E P I P H A N Y- 2020

A300

DS.01 DETAIL SECTION 01 A301 1:100 @A3

D

E

F

4426

4426

7469

630

1000

1200

PD.02 A600

LIVING ROOM 1500

762

510x800mm GLAZED BALUSTRADE FIXED TO MAISONRY WALL

WT.04 112

5mm SOLID ALUMINIUM FACADE CLADDING PANEL FIXED TO 50 x 50mm SHS FACADE FRAMING 3mm PERFORATED METAL PANEL FIXED TO 50 x 50mm SHS FACADE FRAMING

06 PLANTER BOX

D.21 DT.03

124mm PARTITION WALL

50 x 50mm SHS FRAMING TO SUPPORT FACADE PANELS

15x430mm MAISONRY WALL

PD.03

EXTERIOR

A600

3815

B-B

D.22 DT.06

APARTMENT 3 (2 BEDROOM)

A301

B-B

BALCONY

D.23 DT.06

PAV.02

CON.02

A301

WT.03 236

WT.04 112 WT.03

16mm FIRE RATED PLASTER BOARD 400x400mm REINFORCED CONCRETE COLUMN

236

236mm FIRE RATED PARTITION WALL

PD.01

WT.04

A600

112 WT.04 112

400

05 400

CORRIDOR

SHARED BALCONY

DP.01 DETAIL PLAN 01 A101 1:100 @A3

15


SECTION DETAILS

E

75mm FIXED

850x85 25mm SCREED POLISH FINISH

LEVEL RL 102 175mm CONCRETE SLAB

15mm FIXED

305x165x40mm UB

PD.02 A600

10mm

TAPPE

STEEL CONNECTOR TO SUPPORT AND ANCHOR STEEL BEAM TO CONCRETE COLUMN

35mm

01- E P I P H A N Y- 2020

28mm FURRING CHANNEL FIXED TO PLASTERBOARD CEILING WITH COUNTERSUNK SCREWS

100mm

DOUB

SD.01 FACADE SECTION DETAIL 01 A401 1:10 @A3

510x800mm GLAZED BALUSTRADE

GLASS SPIGOT FIXED INTO CONCRETE WALL STEEL SHEET CAPPING

RIGID INSULATION DRAIN PIPE TO PLANTER BOX MESH DRAIN SYSTEM COVER 10mm GLASS REINFORCED CONCRETE FIXED TO MAISONRY 75mm ANODISED ALUMINIUM SKIRTING FIXED TO GLASS REINFORCED CONCRETE 850x85x16mm TIMBER STRIP FLOORING

SD.02 PLANTER BOX SECTION DETAIL 02 A401 1:10 @A3

16


F 60x10mm SHS FIXED TO STEEL OUT TRIGGER AND CONNECT TO ANGLE ADAPTOR TO SUPPORT FACADE STRUCTURE

m ANODISED ALUMINIUM SKIRTING D TO DOOR FRAM

5x16mm TIMBER STRIP FLOORING ANGLE ADAPTOR CONNECT TO TRIANGULAR STEEL TUBE

L 16 2.000

LEVEL 16 RL 102.000 50 x 50mm L SHAPE PLATE BOLTED TO SHS, CONNECTING ALUMINIUM PANEL AND SHS 5mm SOLID ALUMINIUM FACADE CLADDING PANEL WELDED TO CUSTOM C CHANNEL

m ANODISED ALUMINIUM SHEET D to 35mm TOPHATS 50 x 50mm SHS FRAMING TO SUPPORT ALUMINIUM PANEL

50 x 50mm TRIANGULAR STEEL TUBE TO SUPPORT FACADE STRUCTURE

m PLASTER BOARD

ED BEAM TO SUPPORT BALCONY

PD.01 A600

01- E P I P H A N Y- 2020

m TOPHATS FIXED TO 50mm STEEL STUD

SD.03 FACADE SECTION DETAIL 03 A401 1:10 @A3

m WINDOW FRAME

BLE GLAZING

STEEL SHEET CAPPING TIMBER PACKING TO SUPPORT CAP

10mm GLASS REINFORCED CONCRETE FIXED TO MAISONRY 20 x 120 x 190mm MANSONARY BLOCK SOLID FILLED WITH CONCRETE WATER PROFF MEMBRANE LAYER FIXED TO MANSONRY BLOCK 18mm THK DRAINAGE CELL OVER WATER PROFFE LAYER

PD.03 A600

FLASHING SET IN MORTAR AND OVER STEEL OUT TRIGGER

LEVEL 15 RL 98.500

STEEL OUT TRIGGER BOLDED TO CONCRETE SLAB SUPORTTING FACADE STRUCTURE TAPPED BEAM TO SUPPORT BALCONY

17


PLAN DETAILS 50 x 50mm SHS FRAMING TO SUPPORT ALUMINIUM PANEL

5mm SOLID ALUMINIUM FACADE CLADDING PANEL WELDED TO CUSTOM C CHANNEL

40 x 20 x 1580mm CUSTOM C CHANNEL WELDED TO TRIANGULAR STEEL TUBE

50 x 50mm TRIANGULAR STEEL TUBE TO SUPPORT FACADE STRUCTURE

01- E P I P H A N Y- 2020

50 x 50mm L SHAPE PLATE BOLTED TO SHS, CONNECTING ALUMINIUM PANEL AND SHS

PD.01 FACADE PLAN DETAIL 01 A500 1:10 @A3

18


10mm ANODISED ALUMINIUM SHEET FIXED to 35mm TOPHATS

10mm PLASTER BOARD

50mm STEEL STUD

10mm TIMBER COVER

06

TO CONNECT TO STEEL BEAM AND WALL

SEALANT JOINTTIMBER COVER AND STEEL SHEET 400 x 400mm REINFORCED CONCRETE COLUMN

28mm FURRING CHANNEL FIXED TO PLASTERBOARD CEILING

21mm TOPHATS RAIL

01- E P I P H A N Y- 2020

WITH COUNTERSUNK SCREWS

PD.02 PLAN DETAIL 02 A500 1:10 @A3

SOIL DRAIN PIPE TO PLANTER BOX MESH DRAIN SYSTEM COVER

WATER PROFF MEMBRANE LAYER FIXED TO MANSONRY BLOCK 20 x 120 x 190mm MANSONARY BLOCK SOLID FILLED WITH CONCRETE

RIGID INSULATION 10mm GLASS REINFORCED CONCRETE FIXED TO MAISONRY

18mm THK DRAINAGE CELL OVER WATER PROFFE LAYER RIGID INSULATION

STEEL OUT TRIGGER BOLDED TO CONCRETE SLAB SUPORTTING FACADE STRUCTURE

METAL GRATE CAT WALK

PD.03 PLANTER BOX PLAN DETAIL 03 A500 1:10 @A3

19


SAMSARA 02 Final Year Studio (M) 2020 Year 5

Cemetery: The Cycle of Death and Rebirth Content: Thesis research, Parametric modelling Architectural documentation,Renders



DESIGN APPROACH ‘Samsara’ in a Buddhist expression for the cycle of death and rebirth. It gives name to a contemporary cemetery that aims to strengthen the connection between the living, the dead and nature. The idea of Samsara is to bring the past to the present by flipping traditional codes of commemoration upside down. Instead of people bringing flowers to a tombstone, it is the cemetery that provides flowers which the visitors can take home to remember their loved ones. Flowers replace the traditional tombstone and become a present from the dead to the living. The often barren fields of tombstones are replaced by an urban park, a field of flowers where people can relax and enjoy visiting their loved ones.

Concept-Life Cycle A sectional model of what happens when human beings are dead and buried underground? Bodies are recomposed by microorganisms and nourish the greens above.

MAPPING & 3D TRANSLATION 02- SAMSARA- 2020

TOPOGRAPHY (GROUND LEVEL)

01. Path Sketching

02. Offset

05. Patching

05-1. Patching 01

03. Trim

04. Undulate

05-2. Patching 02

05-3. Patching 03

FUNCTIONAL SPACE (UNDERGROUND)

Patterns were extracted from the path sketch.

Extracted Pattern - Path

Extracted Pattern - Floor

Combination


SAMSARA VS TRADITION TRADITION

SAMSARA

TRADITION

SAMSARA

Visiting deceased with flowers

Visit the deceased with nothing

Tombstone as the symbol of the death

Flowers as the symbol of the death

Flowers to the deceased

Pick / Buy flower on site

Flower as gifts from living to deceased

Flowers as the gift from deceased to the living

Return with flowers

Deceased decaying below

Flowers growing above deceased

Flowers bloom in the vase / garden

Tombstone vault extruding upward

Reverse tombstone vaulting downwards

Flowers placed in front of the tombstone

Flowers wilt in the next day

02- SAMSARA- 2020

Garden View


REBIRTH CYCLE

The Cycle Begins

The Laying In

The body laid to rest with wood chips, alfalfa, and straw.

The Vessel 02- SAMSARA- 2020

Microbes break down the body producing nutrient dense soil in 30 days

The Soil

Each body creates one cubic yard of soil (0.7 m3).

Forest

Option A Soil is donated to site

Family/Friend Option B Soil delivered to home.

On site Soil serves nursery, Blooming plants will be moved to flower pavilion.


Cafe

Church

Longitudinal Section 0 1 2

4m

02- SAMSARA- 2020

Flower Pavilion


02- SAMSARA- 2020

N

Basement 1 Plan 0

N

5

10

20m

Basement 2 Plan 0

5

10

20m


AXONOMETRIC DIAGRAM GROUND LEVEL

LIFT/ FIRE EXIT

BASEMENT 1

PEDESTRIAN VEHICLE

FLOWER PAVILION

NURSERY FLOWER PAVILION

BASEMENT 2 CREMATION CHURCH/ CEREMONY HALL EXHIBITION CAFE

CONSULTATION OFFICE

BASEMENT 3 STORAGE (RECOMPOSE MATERIAL) SOIL COLLECTION BODY STORAGE VEHICLE RECEPTION

02- SAMSARA- 2020

FLOWER SHOP


UNDAYAK 03 Studio Culture(M) 2019 Year 4


REDEVELOPMENT OF SHED 26: A MULTI DISPLINARY TRAINING CENTRE Content: Historical building redevelopment Historical and site conditional research Architectural documentation Renders


DESIGN APPROACH “Undayak” is the combination with “undulate” and “kayak.” The program is an undulated training centre with two kayak slalom courses. Inspired by the site wind mapping in terms of contour, the program itself creates a topography in and around Shed 26 that allows people to get in and go around. As a multidisciplinary training centre, Undayak consists of kayak channels for public and professional training, storage/reception, kayak gym, club room, skate bowl, and running track. 0 3 - U N D AYA K - 2 0 1 9

The shed will be taken out of the roof panels, removed central crane supporting system, and added new openings for public entrances. The new combination allows Shed 26 to act as a mysterious ‘factory’ that attracts pass-by to take a detour instead of an abandoned structure.

N Site Plan 0

20

40m

1:2000

The idea behind is based on the multiple activities around Shed 26, such as bicycling, running, and boat picnic. Cedar Woods also make the harbor activities as a selling point. However, there is a little recreational area around the inner harbor.Undayak will surely meet the new residence’ demand.

Glenville Railway Station

North Elevation 1:250

Semaphore Rd

East Elevation 1:250 30


PROGRAM DISTRIBUTION & CIRCULATION

Skate bowl Platform Bathroom Kayak Gym Yoga Studio / Kayak Club Room Cafe

0 3 - U N D AYA K - 2 0 1 9

Program Distribution

Circulation Running Kayak Pedastrian

FORM GENERATION

00. Wind Mapping

01. 3D Translation

02. Variation

03. Scale

05. Materiality

06. Topography

07. Active Engagement

Wind from the ocean Wind from the land

04. Spaces

31


SECTIONS

Glenville Railway Station

0 3 - U N D AYA K - 2 0 1 9 Port Creek

32


Section BB 0

4

8m

1:400

0 3 - U N D AYA K - 2 0 1 9

Deck

Semaphore Rd

Section AA 0

4

8m

1:400

33


PLANS

Section AA

0 3 - U N D AYA K - 2 0 1 9

Section BB

Section BB

N

Ground Level Plan 0

34

5

10m

1:500

Section AA


0 3 - U N D AYA K - 2 0 1 9

Section AA

Section BB

Section BB

N

First Level Plan 0

5

10m

1:500

Section AA

35


RENDERS

0 3 - U N D AYA K - 2 0 1 9

Exterior View

Skate bowl 36


0 3 - U N D AYA K - 2 0 1 9

Kayak Gym

Aerial View

37


OPULENCE 04 Studio Urbanism(M) 2019 Year 4


LUXURY CAR VENDING MACHINE PROVIDING VARIOUS URBAN EXPERIENCE Content: Retail & urban mixed used development Ground floor activation Axonometric drawings


DESIGN APPROACH

Grey Street

Newmarket Street

North Terrace

Rose Street West Terrace

Park 25

Opulence is a proposed luxury car vending machine located at the intersection of West Terrace and Hindley Street. The superior location ensured a certain amount of visitors around the day. Neighbouring the Ferrari Adelaide and Adelaide BMW allowed Opulence to have the potential of connecting the existing car retail business district and develop the area to be Adelaide’s new Luxury car retail centre. Opulence aims to create a new city landmark. The innovative retail idea can attract more visitors than the conventional one. Opulence is also aimed to create a new retail experience for customers: Everyone can admire the cars outside; however, you are the only person that can touch and feel it closely.

04- OPULENCE- 2019

Hindley Street

Ferrari Adelaide

BMW ADELAIDE

N Site Plan 0

SITE ANALYSIS

20

40m

1:2000

Opulence created a few detours for a pedestrian on the ground floor, attracting them to come inside the building. Costumers are preferred to book their visits, and they will go through the introduction, consultation, and configuration area, which location on the ground floor. There is also a cafe (first floor) and a sightseeing lift open to the public, which attracts more potential visitors and makes full use of the cars locates at the top.

Site

Existing Car Retailers

CAR RETAILERS 40

Site

CIRCULATION


FORM GENERATION

01. Massing

02. Cutting

03. Substraction

04. Rotate

05. Pixelate

06. Simplify

04- OPULENCE- 2019

HINDLEY STREET VIEW

07. Final Form

DIAGRAMS

Circulation : Vehicle

Circulation : Pedestrian

Program : Showrooms

Program : Configuration

41


STRUCTURE ISOMETRIC

Hi

nd

le

y

St

04- OPULENCE- 2019

04. CONFIGURATION

05. CAR STORAGE

42

06. CAR SHOWROOM

re

et


il

ip

St

re

et

01. RECEPTION

02. CONSULTATION

04- OPULENCE- 2019

Ph

03. VR TEST ROOM

t

s We

T

e

ac

r er

43


Rose Street Section BB

West Terrace

6

5 4

7

5

3 8

1

1 2

2

Section AA

Section AA

3 4 5

04- OPULENCE- 2019

6 7

Section BB

8

Introduction Consultation Configuration Customise area Lounge Workshop Pantry Sightseeing lift

Hindley Street

BMW/ Ferrari Adelaide

N Ground Floor Plan 0

5

10m

1:500

Ferrari Adelaide Rose Street

Hindley Street

BMW Adelaide

North Terrace

Section BB (NORTH SOUTH) 0

44

10

20m

1:1000


Rose Street Section BB

West Terrace

9

10

10

8

Section AA

8 9

Section BB

10

Sightseeing lift Public Cafe Outdoor sitting

Hindley Street

BMW/ Ferrari Adelaide

N First Floor Plan 0

5

10m

1:500

04- OPULENCE- 2019

Section AA

Royal Adelaide Hospital

West Terrace

Newmarket Street

Park 25

Grey Street

Section AA (EAST WEST) 0

10

20m

1:1000

45


FORESIGHT 05 Design Studio III 2018 Year 3


RECREATION AREA ABOVE THE UPGRADED MOTOR PARK Content: Historical and Site Conditional Research Existing Vegetation Measurement Architectural Documentation


05- F O R E S I G H T- 2018

Victoria Square

48

North-South Section 0

2

4

8m 1:200


DESIGN APPROACH The design is located at the northwest corner of Victoria sq, a current motorcycle parking area in Adelaide. Foresight is a multi-function area combined with canopy and recreation zone. Foresight is more than an architectural structure; it cooperates with existing vegetation and encourages people to get close to nature. Reorganizing the motorcycle parking area, Foresight lowers down one meter under the ground level for aesthetic purpose and creates a one-way entrance and exit.

Foresight is also a wish to boom the surrounding commercial area such as a cafe and barbershop. The place was planned to be a commercial area and failed at the beginning of the 21st century. 24 trees were planted along the walkway to create a coffee plaza but unfortunately failed again.

05- F O R E S I G H T- 2018

With universal stair access, Foresight provides people different experiences using different surface material and floor height. The surface material is changing from the harsh metal grate to the smooth trampoline from south to north. The non-walkable area covered by tree branches is designed to be plywood seating, allowing people to stay longer.

Foresight as a wish to predict what will be needed in the future; hopefully, it can attract more people to come and stay around the area with an enjoyable experience.

Franklin Street

Plan Parking Level

49


King William Street

Franklin Street

Franklin Street

SITE CONDITION

Cafe & Barber

Victoria Square

Cafe 05- F O R E S I G H T- 2018

Cafe N

Location Plan 0

50

40m 1:2500

The cafes beside the site are not as popular as those to the south. Thousands of pigeons gather around because people feed them in the grass area off and on, although the city council bans it.

DESIGN CONCEPT

01. Motorcycle Parking

As there is no canopy, the motorcycles randomly parks around as there are no parking lot line drawn on ground

05. Circulation

Creating universal access and stairs in-between the canopy pieces

50

25

Victoria Square is the central square in Adelaide city. Bus and tram stations are surrounding the square. The site is currently a motorcycle parking area, and there is a high demand for the parking lots during weekdays. 20 Plane trees remained along the walkway between the triangular grass area and the commercial area.

02. Canopy

Creating a canopy to provide shading

06. Parking

Lower one metre down the parking level for aesthetics

03. Shaping

Cutting the canopy according to sunlight position and viewing angles. This allows people alighting the bus to see the cafe and shop

07. Protection

Create flower beds to protect the tree roots. Seatings are added in-between the flower bed

04. Height

Raising different pieces of canopy up and down according to the measured tree trunks height

08. Structure

Tree trunk- like concrete column support the canopy structure


05- F O R E S I G H T- 2018

Site Analysis & Solution

Vegetation

24 trees were planted to create a coffee plaza eariler

Pigeon

Thousands of pigeons can be unfavorable. People keeps feeding them

Metal Grate

Metal grate on canopy allows food drop down to the ground. Avoid pigeon to gather and stay.

Material Transition

Suface material changes from harsh metal, timber grate, concrete and plastic to smooth trampoline

51


05- F O R E S I G H T- 2018

N

0

section

N section

52

Parking Level Plan 5

10

40m 1:500

Canopy Level Plan 0

5

10

40m 1:500


53

05- F O R E S I G H T- 2018


06- D I A N B A I H O S P I TA L - 2017

54

DIANBAI HOSPITAL

Internship Project

06


06- D I A N B A I H O S P I TA L - 2017

THE RENOVATION OF THE LAGEST PUBLIC HOSPTIAL IN DIANBAI, GUANGDONG Content: Group work Facade design & architecture documentation, Renders 55


06- D I A N B A I H O S P I TA L - 2017

Gound Floor Plan

56


06- D I A N B A I H O S P I TA L - 2017

Fifth Floor Plan (Inpatient)

Section

57


07- PERSONAL SKILLS

07 58

PERSONAL SKILLS Hobbies


59

07- PERSONAL SKILLS


07- PERSONAL SKILLS

60

Figure 1

Figure 2


07- PERSONAL SKILLS

Figure 3-4

Figure 5-6

Figure 1 Project Samsara

- Working model

Figure 2 Subject Representation 3 - Final model

Figure 3-4 Laser-cutting Sale

Jewellery holders, earrings, and coasters

Figure 5-6 Final Year Exhibition laser cut signboards

Figure 7 Laser-cutting Sale

plant tags and planter holders

Figure 7 61


Architectural projects from 2016 - 2020

Produced and edited by Hanyu Zhang @ 2020

张瀚予 zhyhelen0312@gmail.com (+61) 0411632016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.