Harini.K - Undergraduate Architecture Portfolio

Page 1

HARINI KESAVAN

PORTFOLIO Undergraduate Architecture Portfolio Selected works - 2014 - 2019


CV

Contact : +91 9944055083 E-mail : harin96@gmail.com Place : Chennai,India

Harini Kesavan

EDUCATION 2014 - 2019 2009 - 2014 2003 - 2009-

Bachelor of Architecture (B.Arch) - AMS Academy of architecture, Chennai. Mahatma Montessori, H.S.S , Madurai. Sri Jayendra Swamigal

WORK EXPERIENCE Khosla Associates , Bangalore December 2017 - April 2018 Architecture Intern KSM Architecture , Chennai June 2017 - October 2017 Architecture Intern

COMPETITION AND AWARDS 2018 - 1 st place

| FOAID India , Everest Design Competition - Earthquake proof Hospital

2018 - Participation | Home for All - International competition - Post disaster shelter 2019 - Participation | 24 Hours Competition - Linking Favelas to cities 2016 - 2 nd place

| NASA Panel Discussion - Comic Strip

2015 - 2 nd place

| Vertical studio Inter-college Competition - Memorial for Dr. Kalam

2015 - Participation | IGBC - Abode for Construction workers 2015 - Participation | Zonasa - SIDC - Preserving Heritage of Madurai

SOFTWARE SKILLS

INTERESTS

AutoCAD Trimble Sketchup Lumion Revit Architecture Adobe Photoshop Adobe inDesign

LANGUAGES KNOWN English, Hindi , Tamil , Sanskrit


CONTENTS

Selected works | 2014 - 2019

01

REPOSITORY OF FRAGRANCES

02

THE GREEN FUTURE

03

CARE AND CURE

04

INTERNSHIP WORKS

05

SOARING BOUNDLESSLY

06

ALONG THE LINE

07

BRIDGE THE GAP

08

BOX IT !

Thesis Project | Museum of Fragrances

Urban Design | Rejuvenation of T.Nagar

Everest Competition | Hospital design

Khosla Associates | KSM Architecture

Studio Project | Tennis Stadium

Studio Project | Architecture College

24 hrs Competition | Reconnecting Favelas

IGBC Competition | Temporary Housing

01 - 10

11 - 16

17 - 20

21 - 28

29 - 30

31 - 32

33 - 34

35 - 36


REPOSITORY OF FRAGRANCES TYPE PROGRAM LOCATION SEM

Academic individual work Museum of fragrances Andhra Pradesh 10

01 This thesis project is about thinking spaces in relation to smells. Odors play a critical role in connecting us with the surroundings Humans are capable of distinguishing millions of different smells through the smell receptors in the nose alone. Thus, this thesis proposes including the sense of smell in its spatial design process. The Repository of scent seeks to reify and blend the Indian perfume culture and International fragrance products through a experience museum and manufacturing area. The museum acts as a place for the collection of fragrances, experience the lingering fragrances and witness it being made in the factory.

|01


02 |


01 | Repository of fragrances | Museum | Academic work

OLFACTORY PERCEPTION

SITE DATA MACRO LOCATION

Every surrounding has smell . The one, the reader of this sheet, experiences at the moment of reading also has an odour. Every human being breathes approximately 30,000 times per day. 30,000 stimuli per day.

Sri city abuts the golden quadrilateral and is located between chennai and Tirupathi

Odours play a critical role in connecting us with the world around us. Different people can have completely different perceptions of the same smell.

Thalamus Olfactory Bulb Olfactory epithelium Nasal cavity

TOURIST LOCATION

Sri kalahasthi temple Pulicat bird Sathish dawan Tirupathi santuary space centre Thiruchanoor 30 Kms temple Tada Nagalapuram Falls

50 Kms 70 Kms 110 Kms

Amygdala Hippocamus

USER ANALYSIS

Passerby tourists on NH16

Human can recognize around 1 Trillion smells

Perfume experts / companies Sri city residents Tada tourists Factory customers Foreign embassy visitors

Fragrances are prepared by four major techniques. Expression, Steam distillation, Solvent extraction, enfluerage.

% Correct recognitions

Smells can be perceived by - shape theory and Vibration theory.

Retention interval in months

| 03

Sri city is a SEZ located in chittor district. It spreads across an area of 7500 acres with all infrastructure facilities pre designed and provided to the factories inside.


FORM DEVELOPMENT

| Museum form development

| Manufacturing area form development CONCEPT u2

principle axes that represent the orthonasal and retronasal tracts of humans intersect each other in the centre. uRetronasal

axis - The perception of smell through the nasal cavity uOrthonasal axis - The perception of smell through the oral cavity. BLOCK MODEL

MUSEUM ZONING

FACTORY ZONING

04 |


01 | Repository of fragrances | Museum | Academic work

AMENITIES & ADMIN

First floor lvl

AROMA GALLERY

Roof lvl

Sloping Roof

Class rooms and workshops

Ground floor lvl

| Museum walkway connecting all galleries.

Admin , museum

First floor level Connecting bridge to factory

| Bridge connecting the wheel gallery to other galleries

Ground floor level Aromatic plants for view

MEMORY GALLERY

Sloping Roof

| Memory gallery with suspended scent installations. First floor lvl

Touch panels and scent box

Ground floor level

Pebble court and touch panels

CULTURE GALLERY

Sloping Roof lvl

| 05

| Museum drop off zone and entry block view. Ground floor lvl

Altar and scent history/ culture

Culture gallery - Perfume and smoke marked the link between mortals and gods in all culture. This gallery lets the users experience a mystical journey. Memory gallery - Takes the visitors on a roller-coaster journey through their memories Aroma Gallery - Walk through the gallery to extract scents. This stroll initiates a story and dialogue between the visitors.


OLFACTORY CARTOGRAPHY

Amber, rosewater, Sandalwood, Jasmine, Myrrh, Frankincense, Patchouli, Myrtle, conifer resin,, pine, Lavender

Ylang ylang, Jasmine, Lavender, Rosemary, Sage, Peppermint, Chamomile, Rose germanium

Pine wood, Wet moss, Vetiver, Musk, Leather, Amber

Frangipani, Honeysuckle, Ylang Ylang, Jasmine, Champangi, Evening primrose, Lavender

P e t r i c h o r,f o o d scents, Childhood scentsCrayons, playthings

THE ALTAR

TWO SIDED

THE FOREST

AROMA

NOSTALGIA

Consists of a raised pedestal giving mystical vibes.

Two sided color coded installation that stimulates our emotions

Suspended wooden sticks diffusing scents

Flowering plants and herbs enclosed in open to sky glazing

Touch panels along with scent diffusers that stimulates our memory

SECTIONAL ISO

06 |


01 | Repository of fragrances | Museum | Academic work A

3

2

E

7

ed

4.7 5

B

2

0.D41 E

F

2

3.4

3 dw

alk

wa

y

3

34.7 5 16.4 3

ay kw

ture

2

4.19

7.53 e

la abov Pergo

lkway ed wa

POSE

IPU0mR

MULT

3.25

23.5 Open walkway 4.8

1

+0.45m

3

1

+0.60m

5.14

6 4.93

4

4.93

7 6.17

+0.60m

2.76

MUSEUM GROUND FLOOR PLAN

7

Top of roof lvl

+ 11.50m

FFF lvl

+ 5.75m

Plinth lvl

+ 0.60m

Ground lvl

+ 0.00m

ELEVATION - A Top of roof lvl + 11.00m

FFF lvl Plinth lvl Ground lvl

+ 5.75m + 0.60m + 0.00m

SECTION - AA Top of roof lvl

+ 12.00m

FFF lvl

+ 5.75m

Plinth lvl

+ 0.60m

Ground lvl

+ 0.00m

SECTION - BB

| 07

A

9

8

B A

E

F

K J G

H

4.04 6.5 B

11.08

5

1

5.9 Ramp5 4 6

9.18 5.79

2.58

10.8

4.0

ay

+0.60m

+0.60m +0.60m

1

0w.9alkw

2

3.8

5.07 30.72

3

D

A

tion

21.61 D

C

5.36

30.79E

F

G

8

H

+0.5

5m

1

A

g

B

11 4.1

4

+0.6

3

4.31

AZ

3

ered

HALL

4.2

9.65

Cov

18.483.25

4.93

7.46

Cover

3.67

3.13

15

16

22.96

PL

skin

2

29 16.0 .32 6

2

C

0m

+0.60m

13

7.45

+0.6

l

Fri

11.1 2

Rolling shutter

alla

wal

6

1

2

CE

4ating

10

1

14

4

Inst

Fea

7

G

r

AN

Sky abovlight e

6

3.9

Books section

2.9

nte

TR

wal

4

F

1 5.5

Se

+0.60m

Ramp

Museum shop 10

cou

EN

8 3

12 Servery

4.8

g

5

6

6

2 Tic ket

atin

7

4

7 Se

8.4

2.2

9

6

5m

5.2

2

4

7.8

21.14

5

8

1.0

vere

E

4

8 3.6

4

Co

5.2 4.01 5.31

1.3

3.99

2.73

11Cafe

5.08

6.8

1

N

+0.45m

2.56

21

2.8

4

ered

3.91

D

5

5

+0.4

Cov

M

Open walkway

24.64

5.07 5

spla

Open walkway

G

5

4

al di

G y dislass pla encl y os ed

7.11

2.84 15.2 L 20.3 JK 0.41H1.

3.5 4 5.6 6

4

Hardscape

y

C

4

8

+0.45m

lkway

ed wa

Cover

B

1.5

2

3

7

2.89

4.9 3 5.8 4

Translucent polycarbonate installation

spla

estr

15.9

A

C

l

2.1

al di

A

1

wal

Ramp

2.51

2.91

1

2.7

7

4

5.45

3.19

19.43

2

3.59

8.4

A diffuutom ser atic al di spla y

6

estr

lay

Ped

g

Butt join

lay

7.8

4.69

disp

Ped

phic

C GAULTU LLE RE RY +0.6 0m

5m

.69

t glazin

+0.45m

3

3

2.29

osed

R8.01

R5

E

disp

18.03

2.59 30.41 1.4 1.

+0.45m

4

26.35

encl

+0.45m

5 4

F

ss

Gra

3

12.25

5.6 pend

l

3

+0.7

Sky abovlight e

8.73

2.89

19.59

D

Sus

wal

y

14.42

GREENHOUSE - AROMATIC PLANTS

+0.45m

7

6

E

Gla

+0.60m

5

2

7.11

spla

r

2

1.97

+0.45m

20.7

3

phic

al di

Ped

+0.45m

4.03

Cover

+0.60m

3.69

41.21

6.55 ed

2

iring

9.7 Suspended diffuser

+0.45m

ay walkw

+0.60m

1

dw

Gra

estr

1

FRAGRANCE WHEEL GALLERY

8

EXPERIENCE LABORATORY

G

Ped

5.7

2.27

1

D

1

5.6

s an

Alta

4.8 2

7.74

2.08

5

C

user

UP

6

9

B

2

8

9

5

A

17.66

5

22.6 C

Diff

estr

10

5

5

In infoteract tab ive le

5

7.4

26.8

11

Viewing deck / connecting bridge above

5

7.7 A diffuutom ser atic

5.8

6.54

B

4 4.2.11 3

4 4

0m

6

6

12.6

5.5

3

8

+0.6

3.5

5

5

5.11

5.75

5

6.2

19 9 3.9

4

2

Sky abovlight e

ay

2.3

3.6

5

1

4.5

3 6.0

0m

4.27 36.4

0m

A

1

lkw

+0.6

3.47 3.7

2

+0.60m

1

Wa

7

6

12

ay

0m

13.0

24.93

1

Sus Woo pe dennded slat s

hw

+0.6

S Wathallo er w +0.3 body

+0.45m

Y4 LLER ORY GAEM M

21.9

1

Pat

3

6

3.62 1.62

Suspended diffuser

1

2

3.232

18.53

4.38

6.9

2.6

5

Glass enclosed display

D

.27

32.88

30.19 5.21

4.2

14.03

4

4.42

9.5

6.3

14

2.7 1.53

+0.4

C

2.9 4.12 5

le4court 5m

Pebb

9

2.92

panel

2

Touch

5.0 P rooump m

4.3

B

+0.60m

2 B

5.79 20.87

Wa

6.3

0.25

2

3

lkway

.04

9

ht Skylig e abov

A

15

1

2.5

3.62

4.85 5.38

6

1

5.09

E

3.62

5.71

D

7.95

26.248 16.0 8.23

A

2 2.6.84 1

4.5 5.38

0.46

2

CB

H


A

15

.04

B

5.0

9

6.3

2.92

4.2

14.03

2

32.88

30.19 5.21

ndal

24.93

5

16 Y4 LLER ORY GAEM M

E GAMOT LL2E ION +5.7 RY 5m

Sea

ting

4

Sky lig abov ht e

8

6.54

3.6

3366.4.4

9.4

E

2

4.27

+5.75m

AC Unit

1

2.6

7.4

7 11.9 6

26.8

11

9

4

3.9

2.3

R5

2

5.11 10

.69

5

GALLERY 3 THE WHEEL 5

1 5.1

41.21

R8

18.7

.01

4.03

6

2.89 30.41 1.4 1.

5

1

2.51 B

C

2.89

0.D41 E

2

F

41H 3.59 0. G 24.64

5

30 2.56

6.8

13

N

5.2

1.3

5

3.99

2.73

4.01 5.31 14

15.9

A

2.91

2.7

3.91

M

5.45

3.19

2.84 15.2 L JK 1.20.3

35.3

2.59

7.11

2

18.03

4 3

15

5.7

6

34.7

GREENHOUSE - AROMATIC PLANTS

7

Display laboratory

21

5

9

8

22.2 5

7.05

17

+5.75m

6.9

wal l In infoteract tabl ive e

3 De p roorivatio m n

7

it

AC un

6

12

C Emolored otio gr n st ap imulhic atiowall n po/ ds

3.47 3.7

21.9

1

5m

6

3.62 1.62

9.5 LT Panel room

.27

phic

ser

+5.7

D

14 Gra

diffu

3

3.23

18.53

4.27

one

9

2

Sta

4

Suspended diffuser

C

Ou AC un4tdit oor

3

+0.4

4

court le 19 5m

Pebb

3.9

11.15

5.79 20.87

4.96 panel

18

+0.60m

Glass enclosed display

5.8

2

ht Skylig above

Touch

Viewing deck / connecting bridge 1

6.3

1

2

6.2

3.62

4.85 5.38

5.8

E

1

7.95

D

4.5 5.38

19

0.46 3.62

19

CB

26.248 16.0 8.23

4.0

3

5.07 5.08 2.08 2

27.5

25.2

9

9

3.67

1

8 12

2.5

8

8

2

11

10

22.79

2.34

1

13.78

Toilets

18.73

4.93

7 7

7

3

30.79

5.14

6.86 5.07 30.72 2.23

3.74 4.93

29.8

12.8

10

4

15.21

E

MUSEUM FIRST FLOOR PLAN

4.8

7.45

22.96

K

6.17

4.31

J G

D

C B

| Aroma gallery view.

| Emotion block water-body view.

08 |


01 | Repository of fragrances | Museum | Academic work

0'0"

1.00 1.00

STAINLESS STEEL SUSPENSION CABLES

0'0"

SUSPENDED AROMATIC WOODEN SLATS

3.65

1.81

SPACE PROVIDED FOR PERFUME CARTRIDGE

40MM

40MM THICK FLAME FINISHED SADARHALLI STONE COPING FOR DECK WITH PLINTH BEAM AS PER 1/2" PROJECTION FROM WALL FINISH STRUCTURE FINISHED IN 12mm AS PER DETAIL

PATHWAY

0'0"

0.20

EXPOSED CEMENT PLASTER

0.04

FLOOR BASE AS PER STRUCTURE FINISHED IN EXPOSED CEMENT PLASTER

0.70

DETAIL 2

0.3

0.00

SECTION THROUGH EMOTION GALLERY

RAMMED EARTH

DETAIL 2

SECTION -BB

DECK FLOORING AS PER SPECIFICATION

0.02

0.3

3.65

SPONGE DIFFUSING MEDIUM FIXED IN THE SLAT

RAMMED EARTH

0.43

1.81

0.2

DETAIL 2

DETAIL - 1

DETAIL - 1

1.85

3.2mm thk SUSPENSION CABLE GOES TO STRUCTURE

0'0"

0.16 0.02

0.95

0.70

DETAIL - 2

CANOPY WITH CABLE COLLAR AS PER VENDOR SPEC.

PATHWAY

PATHWAY

0.00

12MM

FLOOR BASE AS PER STRUCTURE FINISHED IN EXPOSED CEMENT PLASTER

0'0"

5mm thk PERFUME DISPENSING TUBE CONNECTED TO DIFFUSING MEDIUM

| 09

WATER BODY

1.00 1.00

20 mm THK RED SANDERS WOOD

0'0"

0.20 0.04

WATER LEVEL AT 2" BELOW BUILDING FFL PLINTH BEAM AS PER STRUCTURE WITH 1 2" EXPOSED CEMENT PLASTER

0'0"

40MM

0.16

40MM THICK FLAME FINISHED SADARHALLI STONE COPING FOR DECK WITH 1/2" PROJECTION FROM WALL FINISH AS PER DETAIL

0.64

CANOPY WITH CABLE COLLAR AS PER VENDOR SPEC.

0.70

3.2mm thk SUSPENSION CABLE GOES TO STRUCTURE

FLOORING FOR PATWAY AS PER SPECIFICATION 40MM THICK FLAME FINISHED SADARHALLI STONE COPING WITH 12mm PROJECTION FROM WALL FINISH AS PER DETAIL WATER BODY WATER DEPTH = 0.62m EFFECTIVE DEPTH FROM DETAIL 2 ROUND FLOOR FFL= 0.70m

0'0"

12MM

FLOOR BASE AS PER WATER BODY PLINTH BEAM AS PER STRUCTURE STRUCTURE WITH 1 2" EXPOSED FINISHED IN EXPOSED CEMENT CEMENT PLASTER PLASTER

PATHWAY

0.64

WATER LEVEL AT 2" BELOW BUILDING FFL

PATHWAY

0.95

DECK FLOORING AS PER SPECIFICATION

DECK FLOORING AS PER SPECIFICATION

FLOORING FOR PATWAY AS PER SPECIFICATION 40MM THICK FLAME FINISHED SADARHALLI STONE COPING WITH 12mm PROJECTION FROM WALL FINISH AS PER DETAIL WATER BODY WATER DEPTH = 0.62m EFFECTIVE DEPTH FROM DETAIL 2 GROUND FLOOR FFL= 0.70m

0.70

WATER LEVEL AT 12mm BELOW COPING

1.85

DETAIL 1


5.11

6

5.43

4.23

12.78

5.25

4.42

0.4

25.08 5

7.38

18.56

5.02

1

19.1 4.47 5

6

7

5

2

6

6

7

6

7

+0.60m

2.91

28.73

18.83

7

2.09

11.84

51.87

6

4.6

4.89

| Food court entrance view.

+0.60m

2

7

+0.60m

9

8

3.73

22.35

10

3 34.82

2.13 0.6

11 12 14

5

3.43

22.8

4.5

13

7.96

15

+0.60m

16

19.1

4.41

+0.60m

4 17

+0.90m

| View inside the food court.

41.69 17 5.55

0.64

4

0.41.94

0.48 2.19 1.59

19.1 4.83

44.56

4.83

5.37 4.83

4.83

7.36

8.6

FOOD COURT FLOOR PLAN

9.9

9.9

9.9 50

3.84

4.51

0.57 2.3

30

7.06

7.95

2.3

5.08

2.88

7.05

2

4.56

2.62

6.25

5.16

55.31

8

4.56 8

4.23

40.04

4.31 8

8

4.23

32.31

5.14

10

9

5

3.77 27

18.16

248 .8

4.23

33.31

9.98

9

4.56

2

0

1

13.8

4.56

13.87

8

3

2.68

9.2

1.810.69 2.12

6.9 7

4.62

| Factory entrance view.

3.77

19.24 9.07

9.07 28.47 8.76 30

2

2

4

11

10

4.17

19.74

3

13

10

12

7.77

9.07

7.54

14

8

8

18.53

4

10 6

18.76

35.8

10

36.16

19.8

105.04

42.97

9.74

10

4

4.23

8

8

3.28

7

30

13.67

12.05

GROUND FLOOR PLAN

12.61

12.62

6

13

7

12.52

16

| Office block reception view.

7.23

49.73

54.74

12.52 11.88

15

14

4

7.23 7.23

49.00

8

12.52

68.26

5

17 16.01

12

7

7 7

9

0.2

3

16.77

2

38.38 19

20

10

9.87 10.12

18

11

10

1

A

9.9

20.29 B

9.9

C

9.9

20.85 3.84 D

E

7.36

F

80

FACTORY FLOOR PLAN

8.6

13 G

4.28

7.23 H

13.67

18.64 J

12.05

K

The factory is planned based on the flow of goods. It can be separated into three sections - Arrived goods,Shop floor and Packaging.

Top of roof + 10.00m lvl

FFF lvl

+ 4.5m

Plinth lvl

+ 0.60m

Ground lvl

+ 0.00m

FACTORY SECTION - AA

10 |


THE GREEN FUTURE TYPE PROGRAM LOCATION SEM

Academic team work (6) Urban design T.Nagar, Chennai. 10

02 The challenge in this urban study is to analyze the most problematic zones of Chennai, considering high traffic and pollution levels - choosing a site which can be made more pedestrian friendly and minimizing vehicular traffic. A green an d sustainable city is a community of residents, neighbors, workers and visitors who strive together to balance ecological, economic, and social needs to ensure clean, healthy and safe environment for all members of the society and for generations to come.

BASE MAP

Theagaraya Nagar (T’ Nagar) is the foremost commercial hub for shopping in Chennai today. It is also a major hub for intra-city bus services. Historically, it was a planned residential neighbourhood with roads and streets radiating from Panagal Park. The disorderly expansion of commercial hub is causing an alarming amount of vehicular and pedestrian congestion accounting to a huge amount of CO2 emissions in the locality, which needs to be addressed .

| 11

BUILDING TYPOLOGY The existing building types show an increase in commercial buildings. Residential Apartments have increased in number.


SPATIAL DYNAMICS

This map shows the fluid relationship between human beings and the space around us. The orange marked buildings are in the verge of changing to commercial areas in the forthcoming years.

| Temperature graph

| Pollution graph

| Ramasamy street

TREE PATTERNS

ROAD NETWORK MAPS Maximum pollution is caused by the exhaust from cars in T.nagar. Traffic congestion is at peak from 6.00pm - 7.00pm and 12.00pm -1:pm

A tree map with the position , count and densities was created. These images show the tree pattern and density in 3 predominant locations. Foreign trees

40%

Native trees

60%

| Panagal park intersection

| Venkatnarayana road

12 |


02 | The green future | Urban intervention | Academic work

| Plan showing the proposed interventions in study area.

PEDESTRIAN PLAZA

A pedestrian plaza with basement MLCP is proposed in the area in front of panagal park for the people visiting T.Nagar. The pedestrian plaza would serve as a public urban square, making people interact and relax.

| Axonometric view of urban square

| Top view of urban square

| 13

| Crossection through urban square

| View showing vehicular entry point to parking spaces

| View showing seating space and kiosks within the urban square


BREATHING BUS TERMINUS

The proposed vertical forest above the bus terminus helps in reducing the impact of the pollution emitted in the area. The circulation pattern in the existing bus terminus is regulated to avoid chaos and congestion present.

| View from north usman road

EXPLODED ISO VIEW

| Rear view of bus terminus

| View of entry ramp for MLCP

14 |


02 | The green future | Urban intervention | Academic work

SKY GARDENS

Vertical pod like sky gardens are proposed in the open pockets identified in highly dense areas in the study area. Intense vegetation with selective trees are proposed in the garden to reduce the pollution and heat in the surrounding area. | View inside the sky garden Green pod with shrubs and plants and landscape

75mm dia Steel poles supporting the pod base

200mm thk slab

L- Angle bracings to support the creeper system

Vein like steel supporting structure for pod

L- Angle bracings to support the creeper system

5m dia concrete column

Soil medium for plant growth Mesh system serves as support system for the creepers to grow on

Creeper with planting medium

| Exploded iso

| Green panel detail

Viewing deck + green landscape area

Vein like structural support

Pipline to carry runoff stormwater Elevator shaft

|Typical sky garden without core

|Typical sky garden with core

| View from the street overlooking the sky gardens

STREET MARKET SHOPPING AREA

This area comprises of regulated kiosk arrangement and circulation which creates an ease of movement amongst pedestrians. The shopping area comprises of street furnitures which enhances the pedestrian experience

| 15


PROPOSED INFINITY WALK

| Communal seating spaces

| Flower Garden

| Kids Plaza DETAILS Overall length- 550m Width- 10m Staircase width-2.5m No. of entry and exit points-3 at 225m interval Location: -Ranganathan street -Madley subway -Bus terminus

| Skywalk Entry point

| Section through sky walk

The overhead pedestrian infinity walk connects mambalam station with T.Nagar bus terminus. This enables the pedestrians to travel with ease without having to pass through the crowded ranganathan street.

| Rain garden

SCREENING AREA

This area acts as a public gathering place which screens teasers, advertisements and live matches streaming.

PEDESTRIAN CROSSING

Safe and regulated pedestrian crossing is provided for the pedestrians and vehicular movement is completely cut off in the market zone by inducing rotating panels.

DUSTBINS

Dust bins are placed at 50m intervals along the pedestrian pathways. 3 Types of dustbins are provided to segregate and recycle waste: Blue- Paper Waste Green- Perishable waste Red- Plastic Waste

16 |


CURE AND CARE Everest design challenge - Winning entry

TYPE PROGRAM LOCATION SEM

Competition (4 members) General Hospital Gujarat 09

03 The competition brief was to design a earthquake proof hospital for the people of bhuj in Gujarat district, which comes under seismic zone 5 category. The site was identified to be in an area with sparse medical facility, and hence this general hospital would help in uplifting the health and wellbeing of the people in the surrounding neighbourhood.

Sloped roof

The hospital is spread horizontally with abundant landscape and sloping roof. Base isolation technique is used to brace seismic impact.

First floor

Ground floor

Floor slab with columns

Base Isolation

AXONOMETRIC VIEW- OUT-PATIENT BLOCK

| 17


SITE PLAN

FORM EVOLUTION

SITE DETAILS LocationHaripar road,Bhuj, Gujarat, India. Site Area- 8000sq.m Total Built-up area- 3158 sq.m Permitted FSI- 1.0 Achieved FSI- 0.35

SEISMIC IMPACT MAPPING

200mmX200mm 200mmX60mm Star column MS box frame

Double glazing laminated safety glass

50mmX50mm MS box framework 12mm Heavy duty board (Jaali)

Sloped roof

7.5mm Cement wood plank

First floor

FACADE- JAALI DETAIL

Ground floor

7.5mm Cement wood plank 12 mm Heavy duty board

Floor slab with columns

Base Isolation

CORRIDOR PANEL DETAIL

AXONOMETRIC VIEW- CASUALTY BLOCK

18 |


03 | Care and cure | Hospital | Competition

Hollow drywall-112mm Hollow dry wall- 85 mm Sound insulated dry wall 200MM RCC Wall

GROUND FLOOR PLAN

| Connecting bridge view.

Terrace lvl 8.35m

First floor lvl 4.00m

Ground floor lvl 0.60m

SECTION THROUGH RECEPTION

Terrace lvl 8.35m

First floor lvl 4.00m

Ground floor lvl 0.60m

NORTH EAST ELEVATION

| 19

FIRST FLOOR PLAN

| Cafeteria view.


7.5mm Cement wood plank 75mm C-channel 75mm Rock-wool insulation 8mm Fiber cement board 9mm Heavy duty board 12.5 mm Gypsum plaster board Granite finish Tile fixing adhesive 9mm Thk Heavy duty board Absorbent layer Puf/ Lightweight foam Metal decking sheet ISMB 200

Medical air Oxygen Vacuum Nitrous Oxide

| Piping detail 4mm Standard ceiling (cement) 12.5 mm Gypsum plaster board 9mm Heavy duty board 75mm C-channel

| Reception jaali view.

7.5mm Cement wood plank 8mm Fiber cement board

Tile fixing adhesive 9mm Thk Heavy duty board 75mm C-channel Marble

| Consultation room detailed view. 4mm Standard ceiling (cement) 12.5 mm Gypsum plaster board 9mm Heavy duty board

| Corridor jaali view.

7.5mm Cement wood plank 75mm C-channel

Top loading plate Lead core

7.5mm Rock-wool insulation and sound insulation

Top fixing plate

Anti Static Vinyl flooring

Tile fixing adhesive 9mm Thk Heavy duty board

OPERATION THEATRE DETAILED VIEW

ISMB 200

| Operation theatre view. Steel shim Rubber layer Bottom loading plate

| Base isolation.

Base isolation technique is used in the foundation to prevent the building from collapsing during an earthquake.

4mm Standard ceiling (cement) 7.5mm Rock-wool insulation 75mm C-channel 8mm Fiber cement board 9mm Heavy duty board Granite finish Tile fixing adhesive 9mm Thk Heavy duty board Absorbent layer Metal decking sheet Puf/ Lightweight foam

| ICU detailed view.

ISMB 200

20 |


INTERNSHIP WORKS TYPE PROGRAM LOCATION SEM

Internship works Residence, Offices Various places 08, 09

04 I did my first internship at KSM Architecture chennai. I helped in making scheme drawings, electrical layouts, elevations and in physical model for multiple project typologies like apartments, offices, schools and factory. My second internship was at Khosla Associates , Bangalore. I helped in making detail drawings, working drawings for projects like residences and interiors for offices, apartments and restaurants.

Y1

Y2

B'

19'-2"

Y3

9'-4"

Y4

8'-8"

Y5

12'

120'

X1 11'-4"

HOME OFFICE ROOF

2' 3'-8"

E

1b 1a 1 4'-1"

2 3 4

6'

1'-9"

2'-8" 2'-4"

9'

A

10'-4"

6'

10'-4"

6'

1'-4"

12'-8"

2' 24'-4"

15'-8"

GRC JAALI ABOVE - A

39'-4" 3'

11'-4"

2'

20'-5" 1'-6"

4'-6"

4'

9'-5"

12'

SKYLIGHT BLW 4'-8"

2'

4'

7'-4"

G

13'-4"

3'

18'

1'-8"

17 2'

37'-8"

GRC JAALI ABOVE - C

6'-2" TOILET ROOF

RESTING ROOM ROOF

1c

1b

1a

1

6'

2'-8" 2'-4" 2

3

5'-4"

4

3'-8" 1'-4" 4'-4" 1'-5" 4'-2" 5

6

7

8

9

6'-8"

4' 11

10

8'-8" 12

1'-4" 13

13'-8" 13a

5'-8" 14

7' 15

16

F

| Roof plan N

4'-1" 1'-9"

E

F

E

| 21

15'-10"

26'-2"

2'

B

10'-4"

2'

SCREEN WALL DRIVER'S AREA

1'-

20'-9"

TOILET 12'0"x12'0" TILES

12'

3'-8"

12'-8"

8'-4" 4'

12'-8"

4'

5' 10'

20'

13'-8"

4'-6"

3'-4"

SKYLIGHT ABV

12'

12'

16'-4"

8'

2'-6"

12' 8' 13'-4"

2'

51'-8"

YOGA DECK 44'8"x12'0"

7'-8" 14'-4"

6'-10"

14'-6"

13'-10"

43' 22'-4"

16' 1'-4"

12'

14'-4"

SHOWER 3'-4"

WOODEN FLOORING

10'-4"

WALK IN WARDROBE 12'0"x13'8" WOODEN FLOORING

5'-3"

12'0"x13'10"

33'-6"

SANJAY KID 1 BEDROOM 20'5"x19'4" WOODEN FLOORING

3'

5'-2"

HER WALK-IN CLOSET

2'

PRIVATE PASSAGE MARBLE/KOTA FLOORING

12'-8"

5'-2"

3'

3'

3' 13'-4"

38'-2"

12'

20'

14'-6"

13'-10"

15'-2"

5'-2" 5'-2"

15'-2"

OPEN TO BELOW

7'

TILES

8'-2"

4'-10"

32'

15'-3"

15'-6"

LIFT

DN

44'-8"

45'-4"

1'-8" 6'-4" 3'

8'-4" 4'-10"

30'

3'-10"

12'

TOILET 12'0"x19'8"

4'-2"

5'

12'

HIS WALK-IN CLOSET

12'0"x13'10"

15'

4'-10"

5'

6'

12'-8"

GRC JAALI ABOVE - C

14'-4"

WOODEN FLOORING

D

T

15'

34'-4" WOODEN JAALI SCREEN

19'-4"

14'-2"

SANJAY MASTER BED SUITE 25'0"x32'0" WOODEN FLOORING

25'

7'-10"

10'-4"

3'-6"

11'

6'-6"

10'

10'

PRIVATE FOYER 11'X10'

CONCRETE FINISH

15' 23'-8"

WATER BODY BELOW

GRC JAALI 15' 10'-8"

11'-8"

1'-6"

15'

TERRACE 24'4"x15'0" DECK FLOORING

12'

4'-10"

7'-4"

7'-4"

12'

YOGA DECK 44'8"x12'0"

24'-4"

50'-5" 12'

WOODEN JAALI SCREEN

4'-6" 12' 3' 4'-6"

9'

4'-9"

4'

4'

40'-5"

142'-2"

4'-10"

3' 5'-11"

10'

10'-8" 5'

16'-6"

12' 14'-5"

VERANDAH BELOW 14'-5"

OPEN TO BELOW

4' 15'

15'

15'-9" 27'-1"

18'-10" 23'-8" 3'-3"

3' 8'-8"

12'

13'-4" 5'-6"

9'

20'

WALK IN WARDROBE 19'1" x 12' WOODEN FLOORING

5'-2"

4'-6"

TOILET 12' x 12' TILES

32'

S

WATER TANK ROOF

5'-8" 12'-1"

2'

5'-8" R

CAR PARKING ROOF

3'-8"

10'-10"

3'-6"

18'-8" 5'-5"

15'

8'-2"

FAMILY ROOM 33'8"x34'4" MARBLE/KOTA FLOORING

8'-2"

Q'

23'-8" 15'-6"

3'-8" 8' 3'-8"

18'-5"

3'-8"

OVE -UN CLA -ED -RO HEA

4'

33'-8"

6'-10"

JAALI

SLOPING ROOF 2

12'

CONCRETE FINISH

38'4"x15'0" DECK FLOORING

5'

5'

C

3'-4" 2'-8"1'-10" 3'-8" 2'-2"2'-4" 4'-4"

O P Q

12'

5'

32'-9"

3'

SKYLIGHT

21'-4"

2'-9" 7'-9" 4'-10"

187'-1"

12'-2" 27'-9"

17

16

15

TAPERING BEAM AS PER DETAIL @ 4' FROM THE COLUMN POSITION WITH CONCRETE FINISH 38'-8"

RAJESH BED-SUITE 32'9"" x 23'8"

32'

6'-8"

D'

D

2'-9" 5'-3"

7'-11"

SHOWER

L

N

PRIVATE CORRIDOR MARBLE/KOTA FLOORING

14'

14'

GRC JAALI ABOVE - D

OPEN TO SKY

COURTYARD 32'9"X14'0" KOTA FLOORING

39' 39'

A'

12'-8"

3'-6" 5'-3"

19'-4"

2' 2'-6" 8'-3"

17'-3"

2'-6" 2'

2'-5" 14'-8"

A

166'-1"

17'-3"

15'-6" VERANDAH BELOW

ROOF OF WALKWAY

A' 10'-3"

K

M

4'-2"

33'-5"

8'-6"

39'-8"

SLOPING ROOF 3

4'-7"

8' 16'-1"

28'-2"

GARDEN / LANDSCAPE GRC JAALI B

14

WOODEN FLOORING

3'-3"

GUTTER LINE

5' 2'

3'-11"

12'-1"

J C

10' 4'-10"

42'-3"

12'-9"

COURT SHOWER 9'7"X 12'

C'

12' 4'-2"

20'

RAJESH KID 1 BEDROOM 20'0"x17'3" WOODEN FLOORING

13'-11"

J'

B

10'

2'

GRC JAALI ABOVE - B

9'-8"

16'-10"

1'-10"

J'' ENTRANCE PORTICO

12'

3'

WALK IN WARDROBE 19' x 12' WOODEN FLOORING

4'-11"

13'-10"

SKYLIGHT ABV

SLOPING ROOF 1

15'-2"

14'-2"

12'-8"

12'

7'-10" 4'-2"

TOILET 13'10" x 12' TILES

4'-2"

GRC JAALI

F

H

MARBLE/KOTA FLOORING

3'-6"

18'-2"

12'

7'

DRY AGRA SANDSTONE WALLS H 13'-4"

3'-6"

4'-1"

12'-8"

9'-8"

RAJEEV KID 2 BEDROOM BELOW

D

G

B'

6'

20'

DEN B 20'0"x15'2" 15'-2"

4'-2"

FLAT ROOF

SLOPING ROOF 4

14'

18'-10"

1'

14'-6"

C

SLOPING ROOF 5

9'-8"

22'-4"

RAJESH KID(2) 22' 4"x15'2" WOODEN FLOORING

13'

15'-2"

8'-10"

31'

4'-6" 12'-8"

15'-2"

3'

EXTERIOR DRY AGRA STONE CLADDING AGRA SANDSTONE WALL (c)

SWIMMIMG POOL BELOW

PUJA BELOW

Y5

A'

WALK IN WARDROBE 12' x 19' WOODEN FLOORING

4'-6"

14'-6"

C'

E

12'

Y4

3'

26'-6"

B

YOGA DECK ROOF (BELOW)

8'-8"

Y3 DECK ROOF

13a

13

19'-8"

7'-10" 12'

TOILET 13' x 12' TILES

13'-10"

1'-2"

6'-10"

9'-8" 13'-10" 19'

4'-2"

4'-2"

A

9'-4"

Y2 A''

12

11

14'-6"

DRY AGRA SANDSTONE WALLS G 13'-4"

5'-10"

SLOPING ROOF 8

B'

FLAT ROOF

19'-2"

2'-1"

7'

EXTERIOR DRY AGRA STONE CLADDING AGRA SANDSTONE WALL (b)

A'

FLAT ROOF

13'-4" 7'-10" 12'

2'-1"

7'

SLOPING ROOF 7

FLAT ROOF

X4

Y1 A''

GARDEN / LANDSCAPE

10

X5

DECK ROOF

GARDEN / LANDSCAPE

8 9

6 7

3'-8" 1'-4" 4'-4" 1'-5" 4'-7"

DROP OFF POINT 2

DECK ROOF

SLOPING ROOF 6

5

5'-4"

5'-8"

6'-2"

13'-10"

E

F

F

X2 X3

1c

YOGA DECK ROOF (BELOW)

GUEST ROOM/ STEAM ROOF

6'-2"

GUEST ROOM/ STEAM ROOF

181'-321"


Bilaspur house INTERNSHIP : Khosla Associates PROGRAM : Residence LOCATION : Bilaspur

5'-1"

4'-1" 1'-9" 1b

1a

1

6'

2'-8" 2'-4" 2

3

5'-4"

4

11'-4"

9'-4" 2'-8"

2' 3'-8"

11'-4"

4'-6"

5'-8" 13'-8"

8'

50'-8"

17'-6" 23'-4"

23'-4"

17'-8" 7'

4' 15'-3"

19'-4"

19'-4"

20'

6'-11"

8'-8" 1'-1"

6

8

7

9

10'

14'-9"

4'

8"

8'-8" 12

1'-4" 13

9'-8"

5' 17a

5'-8" 14

3'

3'

12'-4"

16

27'-5"

181'-321"

4'-2" 20a

20 SCREEN WALL

7'

TOILET 10'0"x 5'2"

7'-10"

20b

17'-11"

196'-021"

14'-8" 3'-8" 9' 10'-8"

10'-5"

3'-4" 2'-8" 3'-8" 2'-4" 4'-4" 2'-2" 1'-10"

AGRA SANDSTONE WALL C

3' 3'-8"

10'

7'-6" 21

2'-6" 21a

9'-3" 28'-4"

3'-1"

15'-5"

25'-3"

P Q Q' R

5' 7'-2"

3'

11'-7"

3' 23

22

AGRA SANDSTONE WALL D 55'-7"

10' HANDWASH 10'0"x 5'2"

10'

DRIVER'S AREA

7' 15

3'-8" 8' ' 17

3'-9"

N O

S

KOTA FLOORING

18a 19

18

12'-4"

CLOTHES DRYING 24'0"x 11'0"

11'

TOILET ABV

3'-6"

13'-11" 17'-9"

M

6'

1 24

2

3

4

5

6

T

CAR PARKING

10"

3'

KITCHEN STORE 14' x 15'4 KOTA FLOORING

3'-2" 3'

6'-8"

3'-2" 17'-8"

12'

3'-2"

PERGOLA ABV

LINE OF TOILET ABV

13'-8" 13a

9'-6"

3'

6'-4"

LAUNDRY 9'-4" x 25'-4"

12'-4"

4'

23'-8"

12'-8"

12'-8"

11'-6"

3'-8"

L

WALK IN ABV

16'-4"

4' 11

10'-4"

10' 3'

13'-10"

15'-8"

2'

11'

4'

12'-8"

12'-8"

10'

12'-7"

9'-11"

2' 3'-6"

3'-6" 2'-7"

3'-10"

3'-3"

7'-5"

K 12 ft DRIVEWAY PRE-CAST CONCRETE PERGOLA (To further detail)

14'-7"

D'

KOTA FLOORING

KOTA FLOORING

3'-6"

4'

7'-9"

KITCHEN 23'8"x19'4"

B

6'-8" 10

12'-8"

19'

20'

17'-9"

16'-5"

42'

17'-1"

COVERED WALKWAY

12'-8" 16'

14'-8"

24'-4"

8" 4'-4"

6'

4'

4'

17'-8"

2'

2'-4" 24'-4" GRC JAALI ABOVE - A

14'-8" 8" 8'-4" 8" 9"

12'-7"

6'

20'-1" 13'-8"

12'-8" 4'

F

E

N | First floor plan

UTILITY 15'0"x8'8"

UTILITY YARD

17

3'-8" 1'-4" 4'-4" 1'-5" 4'-2" 5

9'-8"

2'-3"

J'' J'

J

OPEN TO SKY

23'-8"

SKYLIGHT ABV 2'

GRC JAALI ABOVE - C

6'-2"

5'-9"

4' 2'

18'

9'-6"

10'-3"

C'

25'-5"

LINE OF COURTYARD ABV

COURT SHOWER

15'-10"

24

24'-4"

16' 12'-5"

6'-5"

6'-4"

3'

39'-11"

1c

6'-4"

8" 3' 5' 2'

15' 5'-10"

6'

3'-6"

H

RESTING ROOM 14'0"x 11'0"

8'-8"

9'-8"

DINING 25'5"x 19'4"

POWDER ROOM 12'0"x7'0" TILES

3'

15'

PANTRY 14'11"x9'8"

5'-9"

25'-4"

35'-7" 37'-7"

20'-9"

10'-6"

12'

37'-4" AGRA SANDSTONE WALL A

15'

53'

YOGA DECK 44'8"x12'0"

10'-4"

ENTRY VERANDAH

KOTA FLOORING

3' 7' 3'-4"

5'

G

3'

2'-4"

9"

3'-6" 8' 3'-4"

OPEN TO SKY

PLANTERS AT 2 LEVELS

JAALI ABOVE

17'-8" AGRA SANDSTONE WALL A

20'

20'

8" 6'-2"

14'-4" 7'-8"

3'-4"

4'

13'-10" 3'

2'-4"

DEN ABV

SADARHALLI FLOORING

5'

SHOWER

12'

17'-6"

16'

13'-10" 2'

ENTRANCE PORTICO

LVL +/- 0'0"

MAIN DOOR (To further detail)

3'

23

1'-1"

7'-8" 5'

3'

5'

15'-8"

9' 15'-6"

27'-9" AGRA SANDSTONE WALL

WOODEN JAALI SCREEN

4'-6"

6'-5"

6' 32' 1'-6"

32'-7" 22'-4"

1'-4"

6'

41'-5"

14'-5"

4'

14'

AGRA SANDSTONE WALL

5'-1" 3' 7'-8" 6' 9'-8" 4'-4"

9'-11" 9"

7'-10"

13'-10"

9'-7"

9'-11"

3'-8"

FLOATING STAIRCASE

5'

20'-4"

MARBLE/KOTA FLOORING

HANDWASH 12'0"x6'0" MARBLE/KOTA FLOORING 9' 3'

5'

T

3'

3'-4"

2'

3'-2" 7'-10"

15'-3" 4'-8"

GRC JAALI ABOVE - B 42'-3" 64'-11"

DOUBLE HEIGHT

PRIVATE CORRIDOR

14'-5"

17'-3"

49'-10"

3'-6" 13'-9"

DECK FLOORING

VERANDAH OPEN TO SKY

3' 6'

7'-6"

6'-10"

9'

2'-11"

4'-2"

3'

14'

8'-2" 17'

15'-9"

7'-6" 7'-4"

20'-8" 12' 10' 10"

GRC JAALI ABOVE - C

43'

46'-11"

GRC JAALI ABOVE - C

3'-4" 2'-8"1'-10" 3'-8" 2'-2"2'-4" 4'-4" 6'-8" 5'

5'

7'-8"

50' 16' 19'

19' 12'

4'-7" 14'

COURTYARD ABV

14'-8" 166'-1"

12'-8" 3'-8" 8' 9' 10'-8" 5'-8"

10"

3'-4" 2'-8" 3'-8" 2'-4" 4'-4" 2'-2" 1'-10"

4'-6"

8'-3"

LIFT

8"

5'-8"

WOODEN FLOORING 10'-4"

MARBLE/KOTA FLOORING

DRIVE THROUGH IN COBBLE STONE

UP

8'-7"

22

3'

HER WALK-IN CLOSET 12'0"x13'10"

25'-7"

SCREEN WALL

RESTING ROOM ROOF

3'

5'-2"

13'-4"

6'

5'-4"

8"

8'-4"

1'-4"

T

15'

1' dia MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS

14'

4'

8'-7"

21a

11'-7"

DRIVER'S AREA TOILET ROOF

3'

4'-6"

4'-10"

7'-11"

21

2'-6"

S

UP

TILES

4'-6"

5'-2"

WOODEN FLOORING

PAVERS

SADARHALLI ENTRANCE STEPS (To further detail)

11'-7"

20b

6'-8"

S CLOTHES DRYING BELOW

7'-6"

R

R

F

10'-9"

10'-3"

10'

TOILET 12'0"x19'8"

E

SCULPTURE

10'-6"

LVL + 1'6"

5'-2"

20a

20

7'-10"

Q'

P Q Q'

4'-10"

DOUBLE HEIGHT FOYER 20'0"x23'8"

PRIVATE PASSAGE 6'-4"

39'-6"

4'-2"

3'-8"

3'-8" 8' 3'-8" 9'

9'-4" 2'

12'-4"

P Q

15'-3"

13' 15'

1'-8" 6'-4" 1'-8" 3'

14'-4"

12'

4'-6" 4'-10"

JAALI ABOVE

DOUBLE HEIGHT

19'-10"

HIS WALK-IN CLOSET 12'0"x13'10"

D

3'-4"

COBBLE STONE WATERBODY 1 24'-4"

WATER BODY

WATER BODY

10"

18a 19

B

18

3'

33'-4"

2' 5'-6"

7'-10" 12'-8"

9'-4" 3'-10"

10'-4"

O

O

DRY AGRA STONE CLADDED WALLS (To further detail)

20'

8" WOODEN JAALI SCREEN

26' AGRA SANDSTONE WALL

WOODEN FLOORING

DRY AGRA SANDSTONE WALLS J

17a

3'

CAR PARKING ROOF

N

DECK FLOORING

COVERED WALKWAY

12'

RAJEEV'S MASTER BED SUITE 25'0"x32'0"

4'-2"

9'-8"

5'

10'-8"

16'-4" 19'

10' 2'-8"

8"7"

3' 1'-10"

8" 4'-8"

19'-8"

14'-11"

20'-4" 5'-11" 1'-3" 3'-6"

9'-4" 14'-6" 19'-4" 4'-6" 9'-4"

14'-4" 18'-8"

4'-9"

17'-2" 18'-6"

3'-2"

2'-5"

196'-021"

12'-8" 2' 15'-8" 24'-4" 8' 2' 5'-8"

3'-6"

6'-4"

6'-4"

3'-6" 1'-6" 5'

1'-6"

5' 19'

14'-4" 4'-8" 4'-4"

6'-11"

7'-1" 2'-6"

18'-7"

17'-3"

15'-6"

17'-11" 14'-8"

A

TOILET 17'2"x9'4" TILES

A'

GRC JAALI ABOVE - E UTILITY BELOW

KITCHEN STORE BELOW

M

GRC JAALI A - (To further detail)

WATERBODY 2 15'

VERANDAH

5'-8"

12' 33'-8"

MARBLE/KOTA FLOORING

3'-6"

6'

14'-2"

21'-6"

4'

26'

8"

D

8" SADARHALLI RIBBED GRANITE COLUMNS

PUJA 10' X 16'5"

4'

21'-4"

13'-8"

7'-4"

YOGA DECK 44'8"x12'0"

ALL COLUMNS TO HAVE A 4' OFFSET

11'

3'-3"

GRC JAALI

D'

WALK IN WARDROBE 21'4"x 9'4" WOODEN FLOORING 3'-6"

51'-8"

L

N

SADARHALLI FLOORING

GARDEN / LANDSCAPE AS PER LANDSCAPE CONSULTANT

24'-4"

5"

K

M

10'-9"

3'-9"

DRY AGRA STONE WALL

38'-8"

11'

3'-6"

9'-10"

24

23

22

28'-8"

7'-8" 10'

21'-11"

PRIVATE FOYER 11'0" X 10'0" WOODEN FLOORING

1'-6"

21a

GRC JAALI ABOVE - A

RAJEEV KID 1 BEDROOM 19'1" x 19'11" WOODEN FLOORING

13'-1"

21

'

4' 22'-2"

4'-1"

2'

4'-7"

9'

20b

C

PAVERS

10'-6"

20a

20

8"MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS

LIVING 33'-8"x34'-4"

19'-4"

18a 19

18

89'-8"

1'-8"

11'-8"

3'-5"

DRY AGRA SANDSTONE CLADDED WALL E

17a

17

16

OUTDOOR STONE PAVERS (To further detail)

LVL +1'6"

1

71'-5"

15

8'-9"

8'-7"

14' 14'-8"

7'-1"

2

LVL+4'6"

70'-5"

WATER LINE SAME

14

5'-4" 3'

SWIMMIMG POOL 52' x 19'

LVL 3'6"

GRC JAALI'S - (To further detail)

8" dia MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS (to further detail)

MARBLE/KOTA FLOORING

STEPPING STONE WITH GRASS IN BETWEEN

3

GARDEN / LANDSCAPE AS PER LANDSCAPE CONSULTANT

10'

4'-7"

C'

11'-2"

6 5

DECK SLAB, TO FURTHER DETAIL

9'-8"

WALK - IN WARDROBE 9'8"X 15'8" WOODEN FLOORING

C

LINE OF TOILET ABV

L

8

17

21'-4"

5'

14'-7"

4'-7"

PAVERS

4

6'-8"

5'-4"

J

52'-4"

H'

X7

14'

4'

24'-4"

17'-8" 4'

PRE-CAST CONCRETE PERGOLA (To further detail)

0"

Ø8

8'

1'-4"

KOTA FLOORING

J'

J'

K

10'-3"

17'-10"

2'-1"

10'-1"

5'-3"

5'

J

CUT OUT

'-1

8'

8'

-6"

14'-8"

PANTRY 21'4" x 9'4"

J''

DECK FLOORING , AS PER SPECIFICATION

7

11'-1" 9'-7"

WALK IN WARDROBE 9'8"x14'0" WOODEN FLOORING

9'-8"

TOILET 9'8"X 15'8" TILES

4'-5"

LINE OF COURT SHOWER ABV

X6

4'

Y7 18'-1"

9

SWIMMING POOL , AS PER DETAIL

13'-10"

SANJAY KID 2 BEDROOM 17'8"x19'4" WOODEN FLOORING

CUT OUT

C'

3'-6"

22'-2"

3'-10"

OPEN TO SKY

H

X4 X5

6'-9"

10'-2"

DECK FLOORING

21'-4"

SWIMMING POOL , AS PER DETAIL

9'-11"

32'-8" 22'-10"

6'-4"

6'-4" 3'-10" COURTYARD A 14'

LINE OF RAJESH BED SUITE ABV

14'-7"

42'-1"

17'-8"

4'

12'-3"

DEN A 14'8"x18'0" MARBLE/KOTA FLOORING

3' 5'

9'-8"

TOILET 9'8"x14'0" TILES

9'-8"

J''

DN

ALL COLUMNS TO HAVE A 4' OFFSET

5'

18'-10"

6' 9'-8"

9'

GRC JAALI

2' 20'

SLAB BELOW

16'

8'-8"

18'-10"

11' 4'-7"

5'

5'

H

10'-1"

YOGA DECK 42'x 10'

Y6

3 2 1

8"MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS

38'-8"

12'-10"

GRC JAALI ABOVE - A

ETRANCE PORTICO BELOW WATER BODY BELOW

OPEN TO BELOW MARBLE/KOTA FLOORING

G

10'-1"

GRC JAALI ABOVE - A

22'-4"

20'

4'-4"

F

G

26'

21'-4"

B

5'-4"

14'-5"

GRC JAALI ABOVE - A

10'-4"

X7

7'-5"

3'

16'-10" 18'-5"

4'-4"

F

GYM 40'9"X19'4"

19'-4"

7'

15'-2"

10'

5'-4" 11'-4" 20'-4"

MOTHERS BEDROOM 20'4"X19'0" WOODEN FLOORING

RAJEEV KID 2 BEDROOM 20'10"X17'3" WOODEN FLOORING

5'-1"

PUJA BELOW

LVL+1'6"

49'

15'

8'-10"

35'-4"

3'

12'

2'

4'

13'

YOGA DECK 19'4"x 31'

21' 3'-8"

7' 12'-8"

12'-8"

2'-8"

E

2'-8" 10'-7"

X3

42'-1"

3'-4"

3' 12'

5'

E

STRUTS TO SUPPORT THE SLOPING ROOFS

G'

X2

DECK FLOORING

5'-8"

D

D

GARDEN / LANDSCAPE

ERHEAD ROOF NDERSIDE TO BE WOODEN ADDING DGING IN ZINC OOF SLAB TO BE CLAD IN AT REFLECTIVE TILES

42'-1" 19'-6"

10'-7"

4'

24

19'-4"

2'-4" 4'

B'

49'-11"

23

22

X6

12

DROP OFF POINT 2 LVL +/- 0'0" UP

DECK DECK FLOORING

11'-10" 10'

"

'-3

4'

14'-11"

2'-8"

LVL +1'6"

41'-5"

120'9 X 7'4" DECK FLOORING

9'-6"

18'

23'-5" 24'-1"

29'-6"

A

27'-1"

12'

6'-6"

6'-10"

DEN ABV

4'-8"

21a

21

20'-8"

10'-4"

18

20b

22'

4'

7' 5'-10"

20' 14'-9"

5'

TOILET 12' x 15' TILES

WALK IN WARDROBE 12' x 19' WOODEN FLOORING

LINE OF WALK IN / TOILET ABV

18'

17'

A'

12'

WOODEN FLOORING

COURTYARD

Y5

49'-4"

15'-8"

STAR COLOUMNS PROVIDED AT 4' AT RECESSED CANTILEVERED FLOORS AS PER STRUCTURAL DETAILS

C

C

20a

12'

H'

13'-4"

C'

C'

11'-4"

X1

4'

HOME OFFICE 40'9" x 22'0"

9'

ROOF SLAB TO OFFSET 4' FROM TANGENT OF COLUMN

2'-6"

B

SWIMMIMG POOL BELOW

20

9'-4"

13a

12'

7'

CHANGING ROOM 11'4" x 10'8"

Y4

DECK DECK FLOORING

A''

13

DECK DECK FLOORING 2'-6"

21'-4"

8'-8"

Y3

3'-6"

20'-8"

LINE OF TOILET ABV

A

X7

18a 19

9'-4"

Y2

19'-2"

12

8'-8" 8'0" x 5'0"

6'-5"

8'

50'-8"

8'-11"

42'-1"

17a

6' 19'-10"

19'-2"

Y1

4'

B'

Y7

12'-9"

6'-9"

X5

11

A'

YOGA DECK ROOF

23'-4"

X4

7'-8"

10

8'0" x 5'0"

8'-4"

13'

8'

8 9

6 7

3'-8" 1'-4" 4'-4" 1'-5" 4'-7"

A''

X6

Y6

5

5'-4"

8'-8" 8'-8"

3'

2'-8" 2'-4"

LINE OF WALK IN WARDROBE ABV

GYM ROOF

X7

2' 3'-8"

2 3 4

6'

1'-9"

5'-8"

4'-1"

4'-4"

E

1b 1a 1

10'-8"

3'

2'-6" 5'-4"

6'

13'-8"

X6 YOGA DECK ROOF

6'-2"

X5

41'-5"

WOODEN FLOORING

20'-1"

2' 3'-8"

1c

X4

5'-8"

DECK ROOF

X3

X3

CHANGING ROOM 11'4" x 10'8"

26'-5"

3'-4"

8'-2"

8'-2"

10'-8"

14'-4"

GUEST TOILET 8'8"x14'4"

8'

GUEST BEDROOM 18'6"x22'0"

Y7

42'-1"

4'

3'

COURTYARD 29'-6"

X2

4'

11'-4"

STEAM ROOM 8'0" x 10'8"

41'-5"

9'

4' 8' 1'-7"

3'

G'

F

X2

Y6

29'-6"

120'-1" 11'-10"

5'-6" 1'-7"

2'-10" 4'-1" 7'-7"

3'-9"

4'

Y5

12'

4'

11'-2" 18'-6"

11'-4"

ROOF OFFEST @ 4' FROM THE TANGENT OF STONE COLUMNS

11'-4"

HOME OFFICE ROOF

3'-7"

2'

Y4

8'-8"

49'-10"

4'

X1

4'

Y3

9'-4"

B'

Y2

19'-2"

ROOF SLAB TO OFFSET 4' FROM THE WALL LINE

X1

9'-4"

B'

Y1

Y7

41'-5"

A

Y6

29'-6"

'-1"

10' 11'-4"

15'-4"

| Ground floor plan

22 |


04 | Bilaspur house,Westbridge capital | Khosla associates | Internship works

X3

X2

11'-4"

3'-8"

X5

X4

2'

C'

X7

X6

5'-8"

8'

20'

D

C

14'-9"

12'-8"

AMENITIES BLOCK

H

12'-8"

8'

J

J'

J''

3'-8"

3'-8"

10'-8"

ORGANIC CUTOUTS IN ROOF SLAB

S

6'-8"

T

5'

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

8'-3"

14'

COURTYARD FLOORING WITH OUTDOOR PAVERS AS PER SELECTION

8'

8'

PRIVATE PASSAGE 1'

COURTYARD

10'

4'

BEAM AS PER STRUCTURAL DETAILS UNDER THE COURT IN UTILITY AREA

10'

10'

12'

DOUBLE HEIGHT FOYER

19'

COVERED WALKWAY

YOGA DECK

GRC JAALI E - (AS PER COMPOSITION AND DESIGN)TO FURTHER DETAIL

15'-11"

3'-6"

5'

8'-4"

2'

2'

2'

SWIMMING POOL (TO FURTHER DETAIL)

7'-6"

R

11'-6"

2'-6"

Q'

3'-4"

10'

FOLDING DOOR, TO FURTHER DETAIL

EXPOSED PLAIN CEMENT PLASTER FINISH 12'

1'-10"

MAIN DOOR - (TO FURTHER DETAIL)

3'-6"

A 28'-10"

2'-4"

3'-8"

MAIN BLOCK MAIN DOOR - (TO FURTHER DETAIL)

2'

1'-6"

Q

2'-8"

P

O

2'-2"

3'-10"

A

GRC JAALI A- TO FURTHER DETAIL

4'

WOODEN DECK FLOORING FOR YOGA DECK

N

2'-4"

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

STAR COLOUMNS FOR DOUBLE HEIGHT FOYER SPACE UNDERSIDE OF SLAB IN EXPOSED PLAIN CEMENT PLASTER FINISH

INVERTED BEAM AS PER STRUCTURAL DRWAING

TAPERED SLAB AS PER DETAIL FOR ENTRANCE SLAB

4'-6"

M

4'-4"

SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD

FLAT ROOF FOR THE AMENITIES BLOCK @ 14'2"

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOF AS PER STRUCTURAL DETAIL

10' 14'-2"

5'-8"

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOF AS PER STRUCTURAL DETAIL

SLOPING ROOF UNDERSIDE CLAD WITH KAPOOR SAL WOOD

8" dia MONOLITH SADARHALLI GRANITE STONE COLUMNS (to further detail)

L

K

9'

6"X6" ZINC EDGE CAPPING OF CUTOUTS IN SLOPING ROOFS ( TO FURTHER DETAIL)

COVERED WALKWAY

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

26'-6" 2'-8"

G

14'-8"

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

10'

F

E

17'-11"

31'-3"

X1

MARBLE/KOTA FLOORING

DOUBLE HEIGHT PRIVATE PASSAGE

DINING

SWIMMING POOL

| Section BB C'

C

14'-8"

17'-11"

2'-3"

14'-9"

14'-8"

5'-8"

7'-1"

12'-8"

2'-6"

10'

7'-6"

COVERED WALKWAY

2'-6"

1'

BEAM AS PER STRUCTURAL DETAILS UNDER THE COURT IN UTILITY AREA

10'

MARBLE/KOTA FLOORING DINING

20'

PRIVATE CORRIDOR

14'-9"

FAMILY ROOM

17'-11"

14'-10"

14'-8"

23'-8"

7'-1"

12' 10' 2'

7'-6"

6'-10"

G

H

D

7' SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD 2' PROJECTING CHAJJAS

3'-8"

SLOPING ROOF 7

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

8'

3'-8"

FLOORING IN MARBLE OR KOTA FOR COMMON AREAS -PRIVATE PASSAGE

J

J'

J''

L

K

SANJAY'S HER WALK-IN CLOSET 9'

13'

10'-8"

3'

5'-8"

4'-4"

MAIN BLOCK

8'

8'

3'-10"

15'-11"

WOODEN FLOORING FOR ALL BEDROOMS (AS PER SELECTION)

10' 8'

8'

10'

10'

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

4'-11"

PRIVATE CORRIDOR

18'-10"

7'-1"

2'-6"

2'

5'

TOP SURFACE CLAD WITH

B'HEAT REFLECTIVEA TILES 6'-10"

A'

SLOPING ROOF 3

5'-10"

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

SANJAY'S HER WALK-IN CLOSET

2' PROJECTING CHAJJAS

2'

8'

8' RAJEEV'S MASTER BED-SUITE

HIS WALK-IN CLOSET

RAJESH KID (2)WALK IN CLOSET

COURTYARD FLOORING WITH OUTDOOR PAVERS AS PER SELECTION

2'

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

10'

WOODEN FLOORING FOR ALL BEDROOMS (AS PER SELECTION)

8' MOTHERS BEDROOMWALK IN WARDROBE

SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD

STAR COLUMNS TO SUPPORT WOODEN FLOORING FOR CANTILEVERED ROOMS ALL BEDROOMS (AS PER AS PER STRUCTURAL DETAIL SELECTION)

2'

HER WALK-IN CLOSET

10'

7'-6"

12' 8'

12'

RAJEEV'S KID 2 BEDROOM

RAJEEV'S KID 1 TOILET

RAJEEV'S KID 1 TOILET

RAJEEV'S KID 1 - BEDROOM

RAJEEV'S MASTER BED-SUITE

RAJESH KID (2) RAJEEV'S BEDROOM

RAJESH KID (1) WALKRAJEEV'S IN WARDROBE 4'-7"

5'

7'-6"

12'

10'

12'

12'-4"

1'-6"

YOGA DECK

5'-8"

2'

7'-6"

6'

10' 1'-8"

LIVING

1' 9'-8"

2'

2'

4'-4"

RAJESH KID (1) BEDROOM

COURTYARD

RAJESH BED SUITE

PRIVATE CORRIDOR

7'-10"

2' 1'

MOTHERS BEDROOM

16'

7'-6"

33'-2" 10'

RAJESH WALK IN WARDROBE

SANJAY'S MASTER BED-SUITE

SANJAY'S MASTER BED-SUITE

C

2'-6"

YOGA DECK

1'-6" 2'-8"

1'-8"

SLOPING ROOF 7 FLOORING IN MARBLE OR KOTA FOR COMMON AREAS -PRIVATE PASSAGE

3'

3'

SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD 2' PROJECTING CHAJJAS

FLOORING IN WOOD FOR THE BEDROOMS

13' 3'

A''

7'

6"X6" ZINC EDGE CAPPING 2' OF SLOPING ROOFS ( TO FURTHER DETAIL)

SLOPING ROOF 6

12'

D

T

6'-8"

8'-10"

3'

8'

5'-8"

23'-8"

S

R

3'-4"

B 7'

5'-1" SLOPING ROOF - UNDERSIDE CLAD WITH SANJAY'S KAPOOR SAL WOOD HIS WALK-IN CLOSET FAMILY ROOM

FAMILY ROOM

14'-10"

7'-6"

10'

Q'

1'-10" 2'-8"

SLOPING ROOF 2

8'

10'

12'

C'

3'-6"

CUTOUT IN ROOF

PRIVATE CORRIDOR

Q

P 3'-8"

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

12'-8"

6"X6" ZINC CAPPING AT EDGES OF THE ROOF CUTOUTS OF SLOPING ROOFS ( TO FURTHER DETAIL)

GRC JAALI B

B

2'-4" 2'-2"

TOP SURFACEC CLAD WITH HEAT REFLECTIVE TILES SLOPING ROOF 1 17'-11"

14'-8"

A

SLOPING ROOF 5

8'-10" 12'

D

E

F

G

H

O

N

M 4'-4"

15'-5"

3'-8"

L

K

8' 10'-8" 5'-8" 6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL) 6"X6" ZINC CAPPING AT EDGES OF THE ROOF CUTOUTS OF SLOPING ROOFS ( TO FURTHER DETAIL)

1'-4"

9'

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING 3'-8" 12'-8" ROOFS8' 6"X6" ZINC EDGE CAPPING (AS PER STRUCTURAL DETAIL) OF SLOPING ROOFS ( TO FURTHER DETAIL)

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

30'-8"

DEN B

8'-2"

10'

11'-10"

10'10'

3'-8"

12'

GRC JAALI B10'-8" BY VENDOR AS PER COMPOSITION AND DESIGN

J''

J

J'

J'' 9'

MOTHERS BEDROOMTOILET

DECK SLAB (TO FUTHER DETAIL)

A

A' 7'

5'-10"

CLIENT

DRAWING STATUS

C'

B

B' 8'-10"

6'-10"

7'

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

F 14'-8"

G

12'-8" GRC JAALI A BY VENDOR AS PER COMPOSITION AND DESIGN

H

J'

J''

3'-8"

9'

3'-8"

SLOPING ROOF 4

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

GRC JAALI B BY VENDOR AS PER COMPOSITION AND DESIGN

5' 2'-4"

DRAWN BY

J

N

O

2'-4" 2'-2"

P 3'-8"

Q 1'-10" 2'-8"

Q' 3'-4"

S

R

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES SLOPING ROOF 3

2'

2' 16'-1"

12'

14'

B DEN B

PRIVATE CORRIDOR

5'-1" PRIVATE CORRIDOR

14'-10"

3'

FAMILY ROOM

23'-8"

SANJAY'S HIS WALK-IN CLOSET

FAMILY ROOM

DATE

2' PROJECTING CHAJJAS

12'

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

8'

REVISIONS

FLOORING IN WOOD FOR THE BEDROOMS

2' 3'

LIVING

PRIVATE CORRIDOR

1'-6"

SL. NO.

SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD 2' PROJECTING CHAJJAS

FLOORING IN MARBLE OR KOTA FOR COMMON AREAS -PRIVATE PASSAGE

SANJAY'S HER WALK-IN CLOSET

8'-10"

MOTHERS BEDROOM

DATE

5'

SLOPING ROOF 2

3'-6"

8'-2"

T

6'-8"

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES SLOPING ROOF 1

12'

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

M 4'-4"

DEALT BY

A

GRC JAALI B

MARBLE / KOTA FLOORING FOR COMMON AREAS - PRIVATE CORRIDORS / PASSAGE

L

K

8' 10'-8" 5'-8" 6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL) 6"X6" ZINC CAPPING AT EDGES OF THE ROOF CUTOUTS OF SLOPING ROOFS ( TO FURTHER DETAIL)

10'-4" METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

2'-6"

10' 31'-6" 2'-8"

E

17'-11"

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

SLOPING ROOF 6

10'

D

C 12'-8"

DRAWING TITLE

8'

A''

DATE

12' 10'

REVISIONS

2'

SL. NO.

8'

DATE

CLIENT

DRAWING STATUS

DRAWING TITLE

COURTYARD FLOORING WITH OUTDOOR PAVERS AS PER SELECTION

BEAM AS PER STRUCTURAL DETAILS UNDER THE COURT IN UTILITY AREA

DINING

8'

J'

3'

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

H 3'-8"

12'

14'

5'-8"

G

12'-8" GRC JAALI A BY VENDOR AS PER COMPOSITION AND DESIGN

SLOPING ROOF 4

J

4'-11"

2'-8" 2'-4"

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS

(AS PER STRUCTURAL DETAIL) L K M

FLAT ROOF (TO FURTHER DETAIL) 2'-6"

MARBLE / KOTA FLOORING FOR COMMON AREAS - PRIVATE CORRIDORS / PASSAGE 14'-4" 4'

10'-4" GRC JAALI TO COVER THE WATER TANK

F 14'-8"

15'-9"

6'-8"

1'-10"

7'-6"

10'2'-3"

1'-8"

4'-5"

17' METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

N

SLOPING ROOF 6 3'-4" 2'-8" 1'-10" 3'-8" 2'-2" 2'-4" 4'-4" GRC JAALI C BY VENDOR AS PER COMPOSITION AND DESIGN

E

17'-11"

GRC JAALI E - (AS PER COMPOSITION AND DESIGN)TO FURTHER DETAIL

MARBLE/KOTA FLOORING

DOUBLE HEIGHT PRIVATE PASSAGE

2'

Q

O TOP SURFACE P CLAD WITH HEAT REFLECTIVE TILES

2'-4"

5'

Q'

12'-8"

12' 10'

R

D

C

7'

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

1'

DEALT BY

DOUBLE HEIGHT FOYER

2' 3'-10"

S

T

8" dia MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS (to further detail)

8'-10"

2'

| Section FF

C'

B

B' 6'-10"

16'-1"

A 5'-10"

T

5'

10'

4'

SWIMMING POOL

A'

S

COURTYARD

DRAWN BY

12'

7'-6"

1'-6"

2'-6"

8'-4"

COVERED WALKWAY

YOGA DECK

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

5'

PRIVATE PASSAGE

DRAWING TITLE

19'

4'-6"

3'-6"

14'

MOTHERS BEDROOMTOILET

2'

DRAWING STATUS SWIMMING POOL (TO FURTHER DETAIL)

OUTDOOR PAVERS AS PER SELECTION

8'-3" 3'-6"

28'-10"

12'

2'

CLIENT

12'

10' 14'-2"

DATE

TOP SURFACE CLAD WITH HEAT COURTYARD FLOORING WITH REFLECTIVE TILES

2'

MOTHERS BEDROOMWALK IN WARDROBE

FOLDING DOOR, TO FURTHER DETAIL

R

Q'

11'-6"

8" dia MONOLITH SADARHALLI GRANITE STONE COLUMNS (to further detail)

A

2' 2'

26'-6" 2'-8"

EXPOSED PLAIN CEMENT PLASTER FINISH SL. NO. REVISIONS

10'

10'

A

DECK SLAB (TO FUTHER DETAIL)

7'

5'

4'-7"

GRC JAALI A- TO RAJEEV'S KID 2 FURTHER DETAIL BEDROOM

UNDERSIDE OF SLAB INVERTED BEAMRAJEEV'S AS KID 1 IN EXPOSED PLAIN PER STRUCTURAL TOILET CEMENT PLASTER DRWAING FINISH

RAJEEV'S KID 1TAPERED SLAB AS PER DETAIL TOILET FOR ENTRANCE SLAB

RAJEEV'S KID 1 - BEDROOM

RAJEEV'S MASTER BED-SUITE

2'

1' 8'

10'

METAL STRUTS TO SUPPORT CANTILEVERED RAJEEV'S MASTER BED-SUITE SLOPING ROOF AS PER STRUCTURAL DETAIL

STAR COLOUMNS FOR DOUBLE HEIGHT FOYER SPACE

12'

7'-6"

12'

10'

12'

7'-6"

12'-4" YOGA DECK

5'-8" SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD 5'

FLAT ROOF FOR THE AMENITIES BLOCK @ 14'2"

Q

3'-8" 1'-10" 2'-8" 3'-4" SLOPING ROOF - UNDERSIDE CLAD6'-8" WITH KAPOOR SAL WOOD

2'

6'

P

O

2'-2"

STAR COLUMNS TOFURTHER SUPPORT WOODEN FLOORING FOR MAIN DOOR - (TO CANTILEVERED ROOMS ALL BEDROOMS (AS PER DETAIL) AS PER STRUCTURAL DETAIL SELECTION)

RAJESH KID (2)WALK IN CLOSET

HER WALK-IN CLOSET

8'

9'-8"

2'

4'-4"

HIS WALK-IN CLOSET

31'-3"

7'-10"

2'-4" 10' 10' 1'-6"

1'-8"

SLOPING ROOF UNDERSIDE CLAD WITH KAPOOR SAL WOOD

RAJESH KID (2) RAJEEV'S BEDROOM

RAJESH KID (1) WALKRAJEEV'S IN WARDROBE

LIVING

N

2'-4"

2' PROJECTING CHAJJAS

MAIN DOOR - (TO FURTHER DETAIL)

7'-6"

16'

RAJESH KID (1) METAL STRUTS TO SUPPORT CANTILEVERED SLOPING COURTYARD ROOF AS PER STRUCTURALBEDROOM DETAIL

RAJESH BED SUITE ORGANIC CUTOUTS IN ROOF SLAB 7'-6"

PRIVATE CORRIDOR

2' 1'

MOTHERS BEDROOM

2'

C

RAJESH WALK IN WARDROBE

SANJAY'S MASTER BED-SUITE

M

FLOORING IN WOOD FOR THE BEDROOMS

2'

3' 6"X6" ZINC EDGE CAPPING OF CUTOUTS IN SLOPING3'ROOFS ( TO FURTHER DETAIL)

A''

A'

SLOPING ROOF 3

5'-10"

6"X6" ZINC EDGE CAPPING 2' OF SLOPING ROOFS ( TO FURTHER DETAIL)

12'-8"

2'-6"

COVERED WALKWAY

10'

TOP SURFACE CLAD WITH

8'-10"

SLOPING ROOF 6

5'-1" SLOPING ROOF - UNDERSIDE CLAD WITH SANJAY'S KAPOOR SAL WOOD HIS WALK-IN CLOSET FAMILY ROOM

5'-8"

5'

B'HEAT REFLECTIVEA TILES

B 7'

3'

8'

10'

12'

12'

12'-8"

3'

F

CUTOUT IN ROOF

PRIVATE CORRIDOR

18'-10"

C'

3'-6"

E

T

6'-8"

15'-5"

8'

D

C

S

R

3'-4"

15'-9"

B

30'-8"

C'

GRC JAALI B

Q'

1'-10" 2'-8"

1'-4"

6"X6" ZINC CAPPING AT EDGES OF THE ROOF CUTOUTS OF SLOPING ROOFS ( TO FURTHER DETAIL)

8'

X7

X6

Q

P 3'-8"

SLOPING ROOF 2

SLOPING ROOF 5

2'-6"

33'-2" 1'-6" 2'-8"

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

A''

REVISIONS

COURTYARD FLOORING WITH OUTDOOR PAVERS AS PER SELECTION

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

12'-8"

2' 3'-10"

DEN B 5'-8"

10'

11'-10"

10'10'

A

2'-4" 2'-2"

TOP SURFACEC CLAD WITH HEAT REFLECTIVE TILES SLOPING ROOF 1 17'-11"

14'-8"

O

N

M 4'-4"

12'

2'

8'-2"

WOODEN DECK FLOORING FOR YOGA DECK

| 23

GRC JAALI E - (AS PER COMPOSITION AND DESIGN)TO FURTHER DETAIL

WOODEN FLOORING FOR ALL BEDROOMS (AS PER SELECTION)

10'

4'

10'

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

4'-11"

3'-8"

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES 1'-8" YOGA DECK SANJAY'S MASTER BED-SUITE

DATE

31'-6"

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

COURTYARD

12'

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

D

E

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING 3'-8" 12'-8" ROOFS8' 6"X6" ZINC EDGE CAPPING (AS PER STRUCTURAL DETAIL) OF SLOPING ROOFS ( TO FURTHER DETAIL)

L

K

8' 10'-8" 5'-8" 6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL) 6"X6" ZINC CAPPING AT EDGES OF THE ROOF CUTOUTS OF SLOPING ROOFS ( TO FURTHER DETAIL)

F

G

H

J'' 3'-8"

4'-11"

11'-4"

3'-8"

8'

9'

J

J'

J'' 9'

SLOPING ROOF 4

J'

GRC JAALI B10'-8" BY VENDOR AS PER COMPOSITION AND DESIGN

8'-10"

STAR COLUMNS TO SUPPORT CANTILEVERED ROOMS AS PER STRUCTURAL DETAIL

H 3'-8"

4'

SL. NO.

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

5'

DOUBLE HEIGHT PRIVATE PASSAGE

2'

5'-8"

G

12'-8" GRC JAALI A BY VENDOR AS PER COMPOSITION AND DESIGN

12'

14'

X3 X5 DETAIL) X4(TO FURTHER FLAT ROOF

X2 2'-6"

MARBLE / KOTA FLOORING FOR COMMON AREAS - PRIVATE CORRIDORS / PASSAGE 14'-4" 4'

10'-4" GRC JAALI TO COVER THE WATER TANK

F 14'-8"

J

(AS PER STRUCTURAL DETAIL) L K M

SLOPING ROOF 6 2'-8" 1'-10" 3'-8" 2'-2" 2'-4" 4'-4" GRC JAALI C BY VENDOR AS PER COMPOSITION AND DESIGN

3'-4"

1'-10"

7'-6"

10'2'-3"

1'-8"

4'-5" 2'-8" 2'-4"

31'-6"

17' METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL X1 DETAIL)

METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS

N

E

17'-11"

2'

5'

6'-8"

Q

O TOP SURFACE P CLAD WITH HEAT REFLECTIVE TILES

2'-4"

8" dia MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS (to further detail)

Q'

R

12'-8"

16'-1"

S

D

C

7'

AMENITIES BLOCK

DATE

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

SELECTION)

3'-6"

12'

7'-6"

12'

8'-10"

6'-10"

5'

C'

B

B'

5'-10"

T

REVISIONS

T

5'

OUTDOOR PAVERS AS PER SELECTION

3'-10"

2'

2'

2'

26'-6" 2'-8" 10' 14'-2" 1'-6"

A

A'

| Section EE

SL. NO.

S

SWIMMING POOL

7'

DATE

R

Q'

TOP SURFACE CLAD WITH HEAT COURTYARD FLOORING WITH REFLECTIVE TILES

PRIVATE PASSAGE

DOUBLE HEIGHT FOYER

COVERED WALKWAY

YOGA DECK

Q

3'-8" 1'-10" 2'-8" 3'-4" SLOPING ROOF - UNDERSIDE CLAD6'-8" WITH KAPOOR SAL WOOD

8'-3" 3'-6"

8'-4"

19'

4'-6"

P

O

2'-2"

MAIN DOOR - (TO FURTHERWOODEN FLOORING FOR ALL BEDROOMS (AS PER DETAIL)

RAJESH KID (2)WALK IN CLOSET

2'

SWIMMING POOL (TO FURTHER DETAIL)

N

2'-4"

11'-6"

8" dia MONOLITH SADARHALLI GRANITE STONE COLUMNS (to further detail)

4'-4"

MAIN BLOCK

MOTHERS BEDROOMTOILET

EXPOSED PLAIN CEMENT PLASTER FINISH

A''

REVISIONS

A MOTHERS BEDROOMWALK IN WARDROBE

DECK SLAB (TO FUTHER DETAIL)

WOODEN DECK FLOORING FOR YOGA DECK

SL. NO.

10'

FOLDING DOOR, TO FURTHER DETAIL

4'

DATE

A

GRC JAALI A- TO RAJEEV'S KID 2 FURTHER DETAIL BEDROOM

UNDERSIDE OF SLAB INVERTED BEAMRAJEEV'S AS KID 1 IN EXPOSED PLAIN PER STRUCTURAL TOILET CEMENT PLASTER DRWAING FINISH

RAJEEV'S KID 1TAPERED SLAB AS PER DETAIL TOILET FOR ENTRANCE SLAB

RAJEEV'S KID 1 - BEDROOM

RAJEEV'S MASTER BED-SUITE

4'-7"

5'-8"

MAIN DOOR - (TO FURTHER DETAIL)

8' 8'

12'

STAR COLOUMNS FOR DOUBLE HEIGHT FOYER SPACE

12'

10'

METAL STRUTS TO SUPPORT CANTILEVERED RAJEEV'S MASTER BED-SUITE SLOPING ROOF AS PER STRUCTURAL DETAIL

5'-8" SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD 5'

FLAT ROOF FOR THE AMENITIES BLOCK @ 14'2"

7'-6"

12'

10'

12'

7'-6"

12'-4" YOGA DECK

3'

RAJESH KID (2) BEDROOM

RAJESH KID (1) WALK IN WARDROBE 2'

6'

2'-4" 10' 10' 1'-6"

1'-8"

10'-8"

M

2'

9'-8"

2'

4'-4"

RAJESH BED SUITE ORGANIC CUTOUTS IN ROOF SLAB 7'-6"

SLOPING ROOF 7

L

K

9'

13'

31'-3"

7'-10"

2'

16'

SLOPING ROOF UNDERSIDE CLAD WITH KAPOOR SAL WOOD

3'-8"

7'-6"

C

RAJESH KID (1) METAL STRUTS TO SUPPORT CANTILEVERED SLOPING COURTYARD ROOF AS PER STRUCTURALBEDROOM DETAIL 2' 1' 1'

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

RAJESH WALK IN WARDROBE

SANJAY'S MASTER BED-SUITE

8'

3' 6"X6" ZINC EDGE CAPPING OF CUTOUTS IN SLOPING ROOFS ( TO FURTHER DETAIL)

D

2'-6"

33'-2" 2'-8"

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES 1'-8" YOGA DECK SANJAY'S MASTER BED-SUITE

J

J'

J''

3'-8"

2'

8'

10'

12'

10'

11'-10"

17'-11"

18'-10"

3'

AMENITIES BLOCK 10'

12'-8"

7'

TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

H

28'-10"

20'

G

15'-9"

8'

F

E

CUTOUT IN ROOF

3'-10"

5'-8"

5'-10"

SLOPING ROOF - UNDERSIDE CLAD WITH KAPOOR SAL WOOD

2'

2'

D

C

A''

A'

6'-10"

6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL)

SLOPING ROOF 6

8'

3'-8"

1'-10"

2'-4"

11'-4"

14'-4"

4'

4'-11"

30'-8" 1'-8"

C'

X7

X6

4'-11"

4'-5"

7'-6"

X3 X5 DETAIL) X4(TO FURTHER FLAT ROOF

X2

A

B' 8'-10"

6"X6" ZINC CAPPING AT EDGES OF THE ROOF CUTOUTS OF SLOPING ROOFS ( TO FURTHER DETAIL) SLOPING ROOF 5

X1

B 7'

12'-8"

15'-11"

8' 3'-8" 12'-8" 6"X6" ZINC EDGE CAPPING OF SLOPING ROOFS ( TO FURTHER DETAIL) TOP SURFACE CLAD WITH HEAT REFLECTIVE TILES

D

E

F

G

H

J'' 3'-8"

15'-5"

9'

10'

J'

10'-8" METAL STRUTS TO SUPPORT CANTILEVERED SLOPING ROOFS (AS PER STRUCTURAL DETAIL)

GRC JAALI TO COVER THE WATER TANK

17'

J

K 5'-8"

8'

L

M

1'-4"

N

12'

O

P

2'-8" 1'-10" 3'-8" 2'-2" 2'-4" 4'-4" GRC JAALI C BY VENDOR AS PER COMPOSITION AND DESIGN

14'

3'-4"

8'

6'-8"

2'

Q

Q'

R

5'

10'

S

T

8" dia MONOLITH RIBBED SADARHALLI GRANITE STONE COLUMNS (to further detail)

RAJEEV'S HIS WALK-IN CLOSET

RAJEEV'S HER WALK-IN CLOSET

DRAWN BY

DEALT BY


Westbridge capital INTERNSHIP : Khosla Associates PROGRAM : Office interiors LOCATION : Bangalore

EXISTING WINDOWS BEHIND

15'-341" 3'-641"

Projecting Wall cladded with veneer on 3 sides

GROOVE

1021" 7"

6" 214"

4'-041"

3'-7"

EXISTING SLAB

10'-9"

3'-7"

3'-7"

3'-7" EXISTING WINDOWS

3'-243"

3'-321"

3'-321"

3'-321"

3'-321"

3'-321"

OPEN

OPEN

OPEN

OPEN

OPEN

3

4

5

6

7

FALSE CEILING AT 9'-6" FROM F.F.L IN FLUTED VENEER (Finished as per architects approval) LETTERS IN BRUSHED BRASS PART SLATTED WALL WITH CLEAR & FROSTED GLASS (As per detail) clear glass

6'-521"

1 1 2" 24"

eq

eq

241"

FINANCE BEHIND

241"

241"

241"

eq

eq

6'-521"

FIRE ESCAPE DOOR 6'-512" WIDE SLIDING DOOR TO SLIDE TOWARDS THE RIGHT SIDE

eq

JAALI DOOR - JD1 2 14" WIDE 34" DEPTH WOODEN FRAMES POLISHED TO ASH WOOD

141"

3'-11"

7"

1 14" WIDE 34" DEPTH WOODEN FRAMES POLISHED TO ASH WOOD

eq

321"

eq eq eq

FFL

321"

SOLID BACKING WITH PATTERN

CURVED JAALI

A

PART SLATTED WALL 321"

321"

TO ALIGN WITH EXISTING FACADE WINDOW FRAMES

321"

321"

3'-321"

40'-541" 3'-321"

MEETING OR COURIER

241"

WALL BEHIND RECEPTION TABLE

241"

241"

241"

241"

RECEPTION JAALI SCREEN UNFOLDED ELEVATION JAALI SCREEN A

JAALI DOOR - JD1

FFL SOLID BACKING WITH PATTERN

241"

241"

CURVED JAALI

MEETING OR COURIER

241"

241"

114"

2" 721" 1'-5"

RECEPTION

EXISTING WINDOW

FIRE EXIT

1 4"

3'-834"

1'-834 "

SOLID BACKING WITH 19MM THK PLY CORE,CLADDED WITH 4MM WALNUT VENEER AS PER SELECTION 19mm THK PLY CORE 141"X34"SOLID WOOD PROJECTION 3"X241" SOLID WOOD WALNUT BOTTOM FRAME WITH 12" GROOVE IN THE BOTTOM

FFL

GROOVE

5"

2" DIA EXISTING RAIL /PiPE (between window mullions)

9'-741"

3'-1134"

3"

1 41" THK SOLID WOOD TURNS OVER THE HANDRAIL

3'-421"

18'-034" 15'-134"

8'-521"

1'-312"

2" DIA EXISTING RAIL /PIPE (between window mullions)

IN TERRAZZO

321"

1'-341"

6" DEEP VENEER TILL GLASS

9'-312" as per exs. from FFL

CLEAR GLASS INSET

10'-9"

4'

clear glass

PART SLATTED WALL WITH FROSTED GLASS (As per detail)

SOLID BACKING JAALI WALL WITH ASH VENEER (As per detail)

SOLID BACKING WITH PATTERN

2 41" WIDE 34" DEPTH WOODEN FRAMES POLISHED TO ASH WOOD

GROOVE

SOLID BACKING WITH 19MM THK PLY CORE,CLADDED WITH 4MM WALNUT VENEER AS PER SELECTION

EXISTING WINDOW

4'-041"

F.C @ 9'6"

JD1

JD1 8'5" X 13'9"

1 4"

groove

EXISTING WINDOW

SERVICE (COURIER, ETC) OR MEETING

5'-1021"

1 14" THK SOLID WOOD TURNS OVER THE HANDRAIL 1 4"

1 41" THK SOLID WOOD TURNS OVER

534"

4'-041"

F.C @ +9'6"

6" LENGTH PLY BAND ON TOP

B

8'

3'-6"

8'-341"

3'-321"

9'-943"

"

11

4'-

3'-321"

5'-241"

3'-4" 3'-4"

3'-321"

3'-534"

PART SLATTED WALL

3'-321"

114"

SOLID BACKING WITH PATTERN

PLAN OF JAALI SCREEN A 1021" RECEPTION JAALI SCREEN UNFOLDED ELEVATION 4'-7" 4'-434"

3'-321" 24'-1041"

1'-1"

15'-021"

3'-321"

334"

6'-521"

JAALI A PART SLATTED AS PER DWG NO (WTB D1)

15'-021" 13'-834"

6'-512" WIDE SLIDING DOOR TO SLIDE TOWARDS THE RIGHT SIDE

13'-11"

B

3'-721"

4'-041"

A

321"

3'

SOLID BACKING WITH PATTERN

3'-7"

4'

3'-234"

FIRE ESCAPE DOOR

A

3'-7"

18'-134" 15'-2"

JD1

SOLID BACKING WITH PATTERN

A

3'-7"

4'-934"

534"

3'-7"

12' 6' 9'-6"

PART SLATTED WALL

1 4"

3'-641"

SVD2

+ 9'6"

3'-641"

6"

2'-6"

3'-641"

6"

+ 12'

COLUMN IN TERRAZO

8'-041"

25'-5"

CROSS SECTION - AA

UNFOLDED ELEVATION OF RECEPTION JAALI SCREEN , LOOKING FROM MEETING /COURIER ROOM SIDE

| Reception jaali detail

24 |


04 | Westbridge capital | Khosla associates | Internship works PARTITION LEGEND

LIFT-12

LIFT-13

SL.NO HVAC SHAFT

LIFT-14

AHU

LIFT-11

1 2

P-1A

4"

P-1B

3 34"

3

P-2

4

P-3

3 34" 5"

VOID

STAIRCASE AREA

LIFT-10

DN

LIFT-15

UP

ENTRY

PASSAGE

JAALI?

AHU

HVAC SHAFT

LIFT-9

SERV LIFT

AHU

DUCT

DWG NO:

JAALI

A

SOLID GYPSUM BOARD WITH PAINT ON BOTH SIDES SOLID GYP WITH PAINT ON ONE SIDE AND VENEER ON ONE

WTB-4

METAL CLADDED

WTB-4

GLASS PARTITION WALLS

WTB-4

C

GLASS PARTITION WALLS

WTB-4

D

P-4 7" 5 SURFACE FINISHES

LIFT LOBBY

LIFT-16

WOOD TYPE

THICKNESS

1

IN-SITU TERAZZO - FOR COLUMNS , AS INDICATED

2

PAINT FOR SOLID GYP WALL , AS PER ARCHITECTS SELECTION / APPROVED SAMPLE - P1

3

VENEER PANELLED WALL , REFER DETAIL DWG NO . WALNUT VENEER (As per selection)

B

SLIDIN

DOORS

3'-2"

15'

5'-1"

5"

5"

5'-7"

8'

9'-

L3-OC

11'-6"

19'-8"

L3-OC

L3-CT L3-TVL

5'-8"

7'-5"

3 SIDES K TERAZZO

14'-10"

65'-8"

49'-4"

10'-4"

E

10 11'

9

10'-4"

10

J'

5'-4" 3'-1" 3'-5" 5'-4"

16'-1"

8

3'-5"12'-9"

12'-9"

FOYER 11'-5"

11'-5"

8'-5" 3'-6"

12'

3'-6"

3'-9" 8'-5"

3'

16'-7"

7

12'-9"

12'-9"

23'-4"

6

10'-10"

JAALI WALL

3'-6"

3'-9" 6'-4"3'-6"

13'-9"

10'-10" 1'-11"

13'-9"

12

11

C 11'

D

5'-2" 11

C' 10 11'

9

CABIN 16

CABIN 16

3' 3'-5" 5'-2"

3'-5"11'-11" 9

10

6'-4"

9'-3"

3'-6"

49'-4"

JAALI WALL

65'-8"

11'-11" 80'-7"

D

8

E

8

65'-8"

13'-8"

E

2'

8'-9"

32'-1"

5

4

5

4

14 10

8'-6"8

11'

10

3'-1"

5'-4" 11

12

13

3'-9" 9

-6"

12'-0" EXISTING SLAB LVL + @ 12' FT FROM FFL EXISTING WALL

11

8'-7"

8 8'-7"

9

11' 73'-1"

10

5'-4" 7

7

12'-9"

12'-9"

9

3'-5" 6

8 5

6 12'-9" 5

6

4

5

10'-10" 7

12'-9"

4'-11" 1'-11" 10'-10"

6

4'-11"

I

I'

6'

7'-6"

LOCATI

M

N

3'-4"

2'-6"

N3'-6"

NORTH

3'-4"

CABIN

10'-4"

3'-4"

2'-6"

SCALE

3'-6"

1/8" =

CABIN 8

9'-6"

CABIN 9

M

L

E

23'-4"

G

6'-1"

E

F

15'-10" K

14'-10"

14'-10"

14'-10"

3'-6"

23'-4" L

L

K

14'-10" 3'-4"

16'-1"

M

10'-4"

3'-4"

N

10'-4" 4'-6"

M

N

7'-4" 4'-6"

3'-6"

12'-6"

3'-6"

16'-1" 15'-10" 12'-8" CABIN 4 8' 8' 8' 16'-1" H G 15'-10"

16' 15'-8" 12'-6"

3'-6"

WORKSTATIONS

G

I' J'

JJ'

3'-3"

7'

3'-6" EXISTING SLAB

EXISTING WALL METAL CLADDING

EXISTING WALL METAL CLADDING

3'-6"

12'-0" EXISTING SLAB LVL @ EXISTING 12 + SLAB LVL @ 12 FT FROM FFL FT FROM FFL

8'

8'

4

6'-4"

H

2

3'

8' SECTION B

194'

G

I

+_ 0'-0"(FFL) J'

I'

I'

8'

5

3

4

5

6

14'-10" 1'-11" 2' 4'-11"

6'-5"4'-11"

3'

PRINTER/PEON/ +_ 0'-0"(FFL) J ZONE 2 SERVICE

2 J'

8'-6"

3

3' 66'-1"

14'-10"

9'-6"

N

M

10'-4"

10'-10"

SECTION A

6'-7"

N

4'-6" M

7

8

12'-9"

12'-9"

2J

8

10'-4"

12'-9"

5

3

4

K

eq eq

20'

6'-8" 8'-6"

11'-9"

6'-2"eq

M L O U N6'-2" GE N

6'-8" 7

7

6

SCREEN WALL ( TO BE DETAILED)

4

6'-5" 6'-8"

eq 8'-6"

CONFERENCE L

20'

5

6

6'-5" 7'

IN - SITU33'-5" TERRAZZO FLOORING33'-5"

SECTION SECTION F-F' F-F' 3

8'-6"

SECTION A

CONFERENCE

SCREEN WALL ( TO BE DETAILED)

4

8'-6"

6'-7" 7'

eq 8'-6"

eq eq WORKSTATIONS 70'-7" 65'-7" 66'-1" PRINTER/PEON/59'-11" K SERVICE ZONE 2 70'-7" 6'-9" 6' 6'-9" 65'-7" 59'-11" eq

L

6'-8"

11'-9"

PLATFORM FOR SC

8

PLAT

8

1'-11" 6'-5"2 2

EXISTING SLAB EXISTING WALL

EXISTING SLAB LVL @ 12 FT FROM FFL

+ 12'-0"

2'

3 4'-11" 4

5

10'-10" 6

7

12'-9"

1'-11" 6'-5"

2'

4'-11"

M

8

IN - SITU TERRAZZO FLOORING

5 IN - SITU 6TERRAZZO FLOORING 7 IN - SITU TERRAZZO FLOORING

2

6'-5"

M

L

7

6

1'-11" 10'-10"

N

PLATFORM FOR SCULPTURE PLATFORM FOR SCU

L

14'-10"

WORKSTATIONS

3'

6'-5" 3

M

L

+ 12'-0"

6'

194' WORKSTATION ( AS PER DETAIL) I

2'

9'-6"(FFL) 9'-6"(FFL) 3'-6" FALSE CEILING FALSE CEILING 8' FROM FFL @9'6" FROM FFL @9'6"

8'

L

K

3 2

3'-6"

SECTION B

10MM THK GLASS PANELS

6'-2" E 6'-10"

K

14'-10"

6'-1"

E

103'-11"

J

2

16'-1" 15'-9"

6'-2"

91'-9"

F

K

J'

8'-6"

23'-8" 23'

1

CABIN 2

8'-4"

7'

MEETING ROOM

8'-6" 8'-6"

SECTION A

103'-11" IN - SITU TERRAZZO FLOORING

K

6'-1" I'

9'-7"

8'-6"91'-9" 8'-6"

J

7' I

IN - SITU TERRAZZO FLOORING SECTION A F

70'-7" 65'-7"

J

J'

3'-3"

70'-7" 65'-7"

23'-8" 23'

3'-6"

8'-4"

SCREEN WALL ( TO BE SCREEN DETAILED) WALLIN( -TO SITU BE TERRAZZO DETAILED) FLOORING IN - SITU TERRAZZO FLOORING

I'

9'-7"

59'-11"

3'-4"

7'

MEETING ROOM

8'-4"

CABIN 3

8'-6" 16' 15'-8" 66'-1"

WORKSTATIONS

66'-1"

59'-11" H

I

3'-4" 8'-4"

CABIN 3

12'

3'-6"

CABIN 43'-6"

I

I

6'-4"

2'

N

14'-10" WINDOW

K

J

194'

H IN TERRAZO G IN TERRAZO FFL - FLOOR FFL - FLOOR

4

5

M

L

RECEPT DUCT DOOR SINGLE DOOR SERVICE DOOR SINGLE DOOR SERVICE EN L M AHUN SERVICE DOOR DOUBLE DOOR E E D 14'-10" DOOR SINGLE DOOR 10'-4" 4'-6" Z PRINTER SERVICE L K 23'-4" 16'-1" 16'-1"M CAFE/LO SERVICE DOOR DOUBLE DOOR

F

6'-9"

JJ'

6'-1" 7'

SECTION B

I'

EXISTING SLAB

3

2'

3'-4"

3'-6"

2

8

3'-5"

DWG NO

L

5'-6"

8'-10" 14'-7"

DEALT BY

J

IN - SITU TERRAZZO FLOORING IN - SITU TERRAZZO FLOORING

8'-6"

W1

14'-10"

WTB 1(R7)

6'-5"

2 3

SVD1

SVD2 K SVD3 SVD4 23'-4" SVD5

F

14'-10"

2 1

CABIN 8

8'-10" 3'-6" 14'-7" 30'

DESCRIPTION

15'-10"

WORKSTATION ( AS PER DETAIL)

12

13

3'-9"

3'-2"

12' J'

H

CABIN 5

8' 8' 194' 9'-11" 15'-11" I' SECTION BI 16'

SECTION SECTION D-D' D-D' 14

K

G

9'-7"

I' J'

I

12'-8" 3'-6"

6'-9"

12'-3"

F 3

K

3'-6"

CABIN 10

6'-9"

H

2

10MM THK GLASS PANELS

CABIN 13

2'-6"

2'-6"

I'

7' 3'-3"

H

Utillity

CABIN 13

12'-3" 6

Utillity

J 15'-10"

3'-6"

I

3'-3"

I'

6'-5"

8'-9" 3'-6"

4'-6" 7'-4"

2'-6"

7'

H

9'-11"

G

32'-1"

34'-11" 12'-9" 6

7

4'-11"6'-5"

10'-4" 4'-6"

CABIN 8 CABIN 9

11'-4" 3'-6" 3'-6" 14'-6" 30'

ITEM

65'-7"

CABIN 11

I

7'

6'-9"

JAALI SCREEN 15'-10" REFER SEPERATE 4 FOR 2 DETAIL 3 ELEVATION

3

5

4'-11" 2' 1'-11"

49'-4" CABIN 14 F

CABIN 14

34'-11" 12'-9"

7

4

6

9'-3" 3'-6"

3'-6" CABIN 15

CABIN 15

13'-8" 80'-7"

5

7F

9'6" 9'6" 6'-1"

CABIN 12

3'-6"

H

JAALI SCREEN 15'-10" REFER SEPERATE ELEVATION F FOR DETAIL

7

N 79'-11"

VERANDAH

V-IP3

9'-6"

12' 9'-6"

6'-4"

G

23'-4"

8

FOYER

C'

9'6"

WORKSTATION ( AS PER DETAIL) WORKSTATION ( AS PER DETAIL)

E

M

THIS DRAWING IS3'-6" COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN

9'-7"

J'

GH

G

F

16'-1"

9

6'-1"

J' 15'-10"

DATE

12' 9'-6"

2'-6"

J

6'-4"

F

E

D

3'0"+3'0" 3'-3"5'+5' I' 6'-9"

194' K

F

J

G

7'

3'-6"

9'-7" 3'-3"

32'-1"

L

E

J'

NO. 2 1

65'-7"

CABIN 9

3'-6" 11'-4" 14'-6"

3'-6"

J

D1

4'-4"

Q

2'-6" 9'-6"

12'

9'-6"

12' 9'-6"

9'-7"

SD1

ALL M SIDES TERAZZO N

V-AC1

3'-6"

65'-8"

49'-4"

7'

7'-5"

L

3'-6

V-AC1

CABIN 10

9'-6" 3'-6"

M

8'-1" K 39'-1"

32'-1"

3 34

L3-TL

V-AC1

3'-6"

15'-11" 16' 8' 6'

LOUNGE

7'

L

3'-6"

I

CABIN 5

6'

9'-7"

L3-AC2

81'-9"

CABIN 10

9'-6"

8'-1"

1'-4"

6'

CURVED GLASS

7'

5'-8"

3'-6" 11'-4" 14'-6"

05-03-18

I'

H

6'-9" 9'-7"

3'-4"CURVED GLASS

9'-4"

9'-6"

8'-1" 39'-1"

L3-AC2

8'-1" 32'-1"

L

14'-10"

11'-10"

W1

6'-11"

SD1

V-AC1

9'-6"

3'-4"

18'-5"

D

L

12' 9'-6"

12' 9'-6" 2'-6"

2'-6"

7'-9"

LOUNGE

L3-S1

L3-R

L3-OC

2'-6"

HEIGHT 8'0"J 9'6"

3'8HG 41"+3'8 41"

I

J'

6'

L3-HL

L3-TVU

L3-CN

PRN-AT

3'-6"

3'-4"

9'-4"

3'-4"

6'-9"

L3-AC1

POCKET DOOR DWG NO - WTB PD1 L3-CT w/ TV concealed

L3-TVL

L3-OC

SING FIXED PANE

L3-CN

9'-6"

2'-6" 9'-6" 2'-6"

2'-6"

9'-6"

JAALI SCREEN JAALI SCREEN 15'-10" 15'-10" REFER SEPERATE REFER SEPERATE 3'-4" 3'-4" ELEVATION FOR DETAIL ELEVATION FOR DETAIL

7'-9"

GLASS SLIDING DOOR

19'-11"

2'-9"

3 34"P2 3'-2"

5" P3

L3-TVU L3-OC

WEST BRIDGE OFFICE-MAIN LAYOUT 3'-6"

H

6'-1"

GH

WIDTH 3'0" JJ' 6'11"

I

3'-6"

3'-3"

7' J

14'-10" G

L3-TL

2'-6"

23'-4"

12'

2'-6"

12

K F

D1

3'-8"

SD1

L3-AC1

L3-OC

DRAWING TITLE

I'

J'

6'-1"

80'-6" 3'-6

7'-11" 7'-9"

39'-1"

4'-9"

2'

LOUNGE 39' 1" X 20'0"

19'-11"

PRN-BS

14'-10"

5'-1"

6'-1"

STEP DOWN PLATFORM FOR

7'

M

1'-4"

5'-3"

7'

L3-MT

PRN-TL

14'-10"

3'-4"

30'-1"

GLASS SLIDING DOOR SD 2 (As per detail DWG (WTB-D7)

39'-10" 8'-1" 7'-9" 3'-8" 3'-8"

SD1

L3-OC

3 34"P2

K

2'-6"

11

FINANCE 2

C CABIN 4

CABIN 4

13

3'-4"

I'

G J

F

7'

3'-6"

I

J' I'

J'J

14'-10"

14'-10"

7'-9"

13'-9" 3'-6" 80'-6"

9'-11" 15'-11" 16' 6'-3" 194' H

12'

23'-4" 3'-4"

13'-11"

14

J

4" P1A

2'-621"

24'

8'-1"

12'-7" 12 3'-6"12'-6" 3'-6" 12'-8" 12'-8"3'-6" 12'-6" 8'-4" 7' 8'-4" 8'-4" 7' 8'-4" 6'-10" CABIN 4 3'-6" 11'-4" 3'-6" MEETING 11'-4"MEETING 3'-6" 3'-6" 8'-10" CABIN 4 9'-6" CABIN 3 CABIN 3 14'-6" CABIN 2 CABIN 2 ROOM 12'-6" 12'-8" 14'-6" ROOM 14'-7" CABIN 9 CABIN 12 CABIN 11 CABIN 10 CABIN 8 30' 37'-2" 16'-1" 194' 16'-1" 16' 16' 23'-8" 23'-8" 16'-1" 16'-1" 65'-7" 15'-10" 6'-10" 15'-10"3'-6" 23' 23'11'-4" 15'-9" 15'-9" 9'-6"15'-8" 3'-6"15'-8" 3'-6" 11'-4" 3'-6" 3'-6" 8'-10" 12'-6" 12'-8" 14'-6"FLOORING 14'-6" 14'-7" IN - SITU TERRAZZO IN - SITU TERRAZZO FLOORING N M 194' I' I J' J K L 30' 37'-2" 91'-9" 91'-9" 194' I F F E E D H HG G 65'-7" 103'-11" 103'-11"

UTILITY

9'-6"

7'-9"

D

5'-9"

11'

SECTION C-C' B

K

2'-3"

1 6'-1"

D

5'-6"

8'-5"

16'-7"

PRN-VC

3'-6" 11'-4" 14'-6"

12'-8" 37'-2"

CONFERENCE9'-7" ROOM

3'-6"

11

9'-6" 13'-11"

16'-7"

9'-6"

9'-6"

D

+ 0'-0"(FFL) B

L

10'-4"

JAALI WALL

9'-7" 6'-9"

2'-6"

12'

D

10'-4"

3'-1" 8'-7"

SECTION C-C'

+ 0'-0"(FFL)

9'-6"

9'-6"

9'-6"

N

O

C'

FINANCE 2

9'-6" 3'

M

20'-2" 13'-9"

6' 9'-11" 15'-11" 15'-5"16'

K

8'-1"

80'-6"

N 8'-7"

O

I'

SERVER ROOM

UTILITY

G

14'-10"

CABIN 6 JAALI WALL

8'-7"

C'

8'-6" 8'-7"

12'

3'

12'

3'-6"

194'

LOCATION

I

6'-9"

F

E

3'-6"

8'-7"

6'

ALL SIDES TERA

2

PRN-AC

CABIN 11

194'

9'-6" 3'-6"

12'-8" 37'-2"

CONFERENCE, MEETING& I' I H LOUNGE 3'-3" 9'-7"

3'-6"

C'

2'-6" 9'-6"

12'

2'-6"

20'-2"

FOYER

9'-7"

2'-3"

W-HL

3'-6"

CABIN 11

3'-6" 9'-6"

H 3'-3" 9'-7"

6'-3"CABIN 5

GLASS SD 1 (As per

12

W-HL

3

L3-OC

PRN-ST

PRN-AC

PRN-OC

2'-51 2"

2'-3" 1'-4"

3'-6"

RECEPTION

G 7' 3'-3"

CABIN 5

5'-1"

225'-10"

12'

2'-6"

12

EXISTING WALL

SOLID BACKING WITH PATTERN _

eq

P

C

8'-10"

9'-6"(FFL)

12'-0"PART SLATTED + 12'-0" EXISTING SLAB LVL +EXISTING SLAB LVL FALSE CEILING @ 12' FT FROM FFL @ 12' FT FROMWALL FFL@9'6" FROM FFL EXISTING WALL EXISTING WALL 9'-6"(FFL) EXISTING WALL 9'-6"(FFL) FALSE CEILING FALSE CEILING @9'6" FROM FFL @9'6" FROM FFLPART SLATTED SOLID BACKING WALL WITH PATTERN _ + 0'-0"(FFL)

3'-6"

CABIN 14

14'-9"

14'-9"

2'-641"

6' 5'-1"

W-HL

4'-3"

8'-10"

20'-1" 7'-8" 5" P3

6'-1" PRN-AT

I I I' I' J' POWDER ROOM &KITCHEN

I

6'-9"

14'-9"

4" P1A

14'-9" 7"P4

2'

11'-3"

14'-9"

7"P4

2' 2'

4" P1B

Q

7'-6"

20'-1"

8'-5" 3'-6"

8'-1"

6'

J

2'-6"

3'-6"

P

5'-9"

+ 12'-0"

16'-1"

eq

194'

H J' I'

4'-3"

3'-6"

11

3'-8"

5'-9"

PRN-D

2'-6"

FOYER

C

149'-6"(FFL) 13 12 13 FALSE CEILING 12'-0" @9'6" FROM FFL EXISTING SLAB LVL + 3'-9" @ 12' FT FROM 8'-6" 3'-9" FFL

9

3'-6"

3'-6" 7"P4

P2 3

50'-10" 6' 6'-4" 3'-6"

4" P1A 12'-5"

EQ

2'

5" P3

5" P3 4'-8"

P1B

PRN-VC

3'-6"

3" JAALI

3" JAALI

11'-5"

2'

8'-9"

4'-5"

3 4"

9'-3" 4'-5"

3'-6"

12'-5"

EQ EQ

12'-5"

2'-2"

3'-6"

3'-6"

8'-1" 16'-7"

4" P1A

D

14'-6"

4'-2"

3' 9'-3" 7'-4"

3'-6"

13'

EQ

8'

6"

12'-3"

4" P1A

5'

5'

3'

3'

CL-S

-H

" '-3 "

4'-8"

3

PRN-TL

3 4"

9'-6"

8'-4"

C' C

C

B

12'

16'

9'-6"

8'-7"

12'

B

9'-6"

6'-5"

D1

PRN-BS

6'-1" 7'

3'-4"

CABIN 12

3'-6" 6'-10" 12'-6"

194'

8'-10"

10

CURVED GLASS

CABIN 5 15'10" x 16'7"

2'-6"

20'-2"

13'-11"

B

| 25

PRN-ST

JJ'

3'-6"

CABIN 12

6'-10" 12'-6"

12'

3'-6"

Q

13

59'-11"

6'-2"

PRN-AC

PRN-VC

PRN-OC

2'-3" 1'-4"

3'-6"

Q

7' 9'-7"

K

M

4'-6"

9'-6"

eq

CABIN 7

8'-4"

B

16'-1"

CABIN 6

FINANCE 2

3'

10'-4" eq

8'-1" 7' 39'-1"

L

10'-4" N

5'-1"

EXECUTION

15'-5"

9'-6" 12'

9'-6"

20'-2"

+_0'-0"(FFL) FINANCE 2

8'-4"

12' 9'-6"

9'-6"

6" 12'

8'-4"

13'-11"

14

7' 3'-3"

PRN-AT

3'-4"

REVISION 7

CABIN 14

4"

L

7'-4" E

6'-3"

F

M

O

eq CABIN 7

SECTION B-B' SECTION SECTION C-C' C-C' SECTION B-B'

+ 0'-0"(FFL)

3'-6"

PRN-AC

I' J'

DRAWING STATUS

LOUNGE

7' 8'-1" 39'-1"32'-10"

L

4'-6"

UTILITY

6'-3"

5'-6"

8'

10

4"

9'6" HIGH , P2 METAL CLADDED WALL MERGING INTO PORTAL (AS PER ELEVATION AA)

6'-2"

PRN-D

2'-6"

UTILITY

15'-5"

G GLASSF SLIDING CAFE / LOUNGE DOOR J DOUBLE J' J REFER SEPERATE 15'-10" JAALI DOOR ELEVATION FOR DETAIL F 14'-10" 14'-10" 6'-1" 6'-1" 7' DOUBLE DOOR SD2 SLIDING DOORCAFE / LOUNGE REFER SEPERATE 15'-10" 23'-4"PD1 POCKET DOORELEVATION SLIDING JAALI FOR DETAIL

14'-10"

2'-6"

2'-6" 2'-6"

9'-6"

6"

2'-6"

12'

9'-6"

5'-9"10'-4"

CABIN 14

E N

8'-2" D

D

eq

eq

WITH PATTERN _ + 0'-0"(FFL) + 0'-0"(FFL)

EXISTING SLAB LVL @ 12' FT FROM FFL

9'-7" 3'-3"

1'-4"

2'-6"

SD1(R1) K

K

23'-4"

E

M

7'-4"

P

8'-10" 5'-9"

N

O

12'-1" C'

C' C

eq

9'-6"(FFL) 9'-6"(FFL) SLIDING JAALI FALSE CEILING FALSE CEILING 10MMFROM THK GLASS @9'6" FROM FFL @9'6" FFL PANEL FFL - FLOOR IN TERRAZO +_0'-0"(FFL) SLIDING JAALI PART SLATTED PART SLATTED WALL WALL

3'

C

9'-6"

9'-6"(FFL) FALSE CEILING 8'-10" @9'6" FROM FFL 12'-0" EXISTING SLAB LVL + @ 12' FT FROM FFL 10MM THK 12'-0" GLASS 12'-0" EXISTING SLAB LVL +EXISTING SLAB LVL + 9'-6"(FFL) PANELFALSE @ 12' FT FROM FFL @ 12' FT FROMCEILING FFL @9'6" FROM FFL

14

P1B

PRN-VC

I

3 SIDES TERAZZO

2'-3"

DESCRIPTION F H H G SINGLE SOLID GDOOR DOOR FIRE ESCAPE DOOR DOUBLE SHUTTER DOOR

WESTBRIDGE OFFICE

D

8'-2"

12'

B

2'-6"

B

M

C'

Q 12'-0"

2'-6"

O N

O

P

12'-1"

SOLID BACKING

4

9'-6"

P

C

Q

5'-1"

3'-6"

P

B

3'-4"

D1

9'6" HIGH , P2 METAL CLADDED WALL MERGI AS PE

24' 8'

8'

CABIN 8 14'7" X 14'9"

4"

11'-4"

TO BE CONFIRMED

4 SIDES TERAZZO

3'-8"

12'-8"

15'-10"

3 34"

PROJECT REVISION NO 3'-4" 3'-4" 7'-9" 3'-4" 7'-9" 3'-4" 3'-4" 3'-4" 6' 6' 2'-6" 6' SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE. 4" CURVED GLASS CURVED GLASS

8'-1" 7'

80'-6"

9'-6"

Q

8'-1" 3'-6"

80'-6"

2'-6"

Q

ITEM F D4 F1

32'-10" LOUNGE

3'-6" 8'-7" 20'-2" 16'-1"

4" 15'-5"

CAFE/LOUNGE

D

2'-3" 1'-4"

12'

8'-7" 8'-7" 20'-2"

C'

5'-1"

9'-6"

8'-7" 3'-6"

13'-11"

C

3'-4"

12' 9'-6"

3'-6" 8'-4"

CAFE/LOUNGE

CABIN 14

CLIENT

CABIN 6 FOYER

9'-6"

20'-2"

9'-6"

12'

FINANCE 1

SECTION A-A'

SECTION SECTION B-B' B-B'

9'-6"

CABIN 6 16'-1"

SECTION A-A' B

12'

FOYER

Paint finish as per selection

CABIN 7 13'-11"

0'-0"(FFL) 8'-4" +_8'-4" 20'-2"

IN TERRAZO EXISTING WALL FFL - FLOOR EXISTING WALL

6'-9" 9'-7"

MT-TL

W-HL

CO-HL

CABIN 4 15'10 x 16'7"

PRN-BS

I'

I

PRN-OC

5'-6"

3'-6"

PARTITION [ TO BE DETAILED ]

D1

PRN-TL

PRN-VC

H

PRN-D

W-HL

5

6'-2"

UPDATED ACCORDING 3'-6"TO SITE

MR.SANDEEP SINGHAL 6'

2'-6"

2'-6"

9'-6" 12'

FINANCE 1

CABIN 7

12'

EXISTING WALL

SOLID BACKING WITH PATTERN

9'-6"

12'

2'-6"

2'-6"

9'-6" 9'-6"

6"

9'-6"

6"

2'-6"

12'-0" 9'-6"(FFL) XISTING SLAB LVL + EXISTING SLAB LVL SL.NO REVISION @ 12' FT FROM FFL @ 12' FT FROM FFL FALSE CEILING @9'6" FROM FFL 1 REVISION8. REVISION- WORKSTATION UPDATE ALONG WITH PARTITION CABIN 8,9,10+-12'-0" DOOR POSITIONS HAVE BEEN CHANGED EXISTING SLAB LVL LEADING TO THE VERANDAH REMOVED AND ADDITION OF WALL 2 REVISION9'-6"(FFL) 9'-6"(FFL) @ 12' FT DOOR FROM FFL FALSE CEILING FALSE CEILING REVISION- RECEPTION FIRE ESCAPE DOOR ADDED, JAALI UPDATED SOLID3BACKING @9'6" FROM FFL @9'6" FROM FFL COLUMN AND SLATTED JAALI CLOSED (RECEPTION) 4 REVISION- GAP BETWEEN 9'-6"(FFL) 3'-4" 3'-4" eq eq eq eq MOVED 3'-6" 7'-9" 3'-6" 7'-9" PART5SLATTED REVISIONMEETING LOUNGE - TV UNIT / Paint POCKET DOOR WALL POSITION FALSE CEILING / eq finish as per selection eq eq WALL , DOOR SCHEDULE REVISED eq 6 REVISION@9'6" DOORS FROM FFL 10MM THK GLASS 10MM THK GLASS 7 REVISION- ACCESS CONTROL POINTS INDICATION ADDED PANEL PANEL ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT EXISTING WALLSOLID BACKING

2'-3" 1'-4"

9'-6"

2'-6"

NO. 1 2 1 L 21 E 4 14'-10" 1

2'-6"

ITEM DESCRIPTION LOCATION WIDTH HEIGHT B C' C C' D D C 5'11" E MD1 B MAIN DOOR DOUBLE DOOR RECEPTION 7'10"E 3'6" 9'0" RECEPTION&CAFE JD1 JAALI DOOR SINGLE DOOR B D E C C' JD2 JAALI DOOR SINGLE DOOR FOYER 3'0" 9'0" L Q Q P P O O N M N M 8'-10" GLASS 5'-9" 10'-4" 1 to 16 9'6" DOOR SINGLE 3'6"16'-1" D1 DOOR CABINS B C 4'-6" 10'-4" 10'-4" 12'-1" 12'-1" 8'-2" SERVER,C'DB,PRINTER 8'-2"7'-4" 7'-4" D ZONE 14'-6" SINGLE SOLID DOOR DOOR 3'0" 9'6" D2 12'-0" EXISTING SLAB LVL + @ 12' FT FROM FFL 8'-10" 10'-4" 16'-1"9'6" DOOR TO CO-WORKS DOOR5'-9" DOOR SINGLE GLASS 3'0" D3 + 12'-0"

PART SLATTED SOLID BACKING SLIDING JAALI WALL WITH PATTERN +_ 0'-0"(FFL)

2'-6"

4"

CAFE/LOUNGE

Capital

16'-1"

5'-1"

2'-6"

DOOR SCHEDULE | Floor planA-A' - Westbridge SECTION SECTION A-A'

SOLID BACKING WITH PATTERN _

6'-9"

D1

PRN-ST

PRN-AC

PRN-VC

GH 33" high

3'-10" 4"

27'-10"

6'-1"

15'-8"

3 34" P1B

MT-OC

MT-OC

3'-10"

9

D1 SOLID DOOR (AS PER DETAIL DWG WTB-D5)

3'-6"

CABIN 3 15' 8" x 16'7"

Detail as discussed on Site

9'-6"

CAFE/LOUNGE

FOYER

16'-1"

3'-4"

9'-6"

FOYER

13'-11"

2'-3" 1'-4"

9'-4"

FINANCE 1

32'-10"

EXISTING SLAB LVL + @ 12' FT FROM FFL

6'-1"

MT-D

GMT-OC

MT-OC

9'-6"

1'-4"

5'-1"

CORTEN STEEL 6' ELEVATION OO) CORTEN 6' (AS PER STEEL CLADDING

32'-10"

8'-4"

5" P3

PRN-AT

3'-4"

9'-6" 12'

FINANCE 1

SOLID BACKING

+_0'-0"(FFL)

42'-9"

C

-T

2'

23'-4"

2'-3"

2'-6"

5'-1"

2'-6"

3'-4"

9'-6"

Paint finish as per selection

12' 9'-6"

12'

Paint finish as per selection

2'-3"

1'-4"

3

PATTERN 0'-0"(FFL) +_WITH +_ 0'-0"(FFL)DESIGN / PATTERNS TO BE TAKEN FROM LATEST DWG D2 DT: 15-2-18 ALL FINAL JAALI

LOOR IN TERRAZO FFL - FLOOR IN TERRAZO +_0'-0"(FFL)

MT-OC

F

PRN-D

3'-6"

shaft

PRN-VC

12'-6"

MT-OC

MT-OC

CAFE / LOUNGE CAFE / LOUNGE 3 SIDES TERAZZO PRN-OC REFER SEPERATE 15'-10" REFER SEPERATE 15'-10" ELEVATION FOR DETAIL ELEVATION FOR DETAIL

9'-6"

8'-3"

2'-6"

9'-6"(FFL)

13'-11"

SLIDING JAALI

16'-7"

16'-7"

3'-6"

PRN-AT

PRN-VC

F

EXISTING WALL

SOLID BACKING WITH PATTERN

10'-5"

5'-8" 11'-9" 5'-8" E

5'

3 34"P2

3'

4" P1

23'-4" 3'-5"

MT-OC

3 34" P1B

8

6

CO-HL

D1

MT-TL

MEETING ROOM 23' X 16' 7"

28" high

CABIN 2 15' 9" x 16'7"

9'-4"

EXISTING WALL

5" P3

3'

D2

3 34"P2

12'-6" 25'

16'-1"

2'-6"

2'-6"

PART SLATTED WALL

12'

SOLID BACKING

PART SLATTED WALL

2'-6"

9'-6"(FFL) FALSE CEILING @9'6" FROM FFL

SOLID BACKING

PRN-BS

W-HL

DROP PANEL OVERHEAD

JAALI B SOLID BACKING WITH PATTERN AS PER DWG NO (WTB D1)

3'-6"

CABIN 9 14' 6" X 14' 9"

5'-6" 5'-6" 3'-6" 11'-4" 65'-7" 70'-7" WORKSTATION ( As per detail D8) 56'-1" 8'-1" 8'

14'-7"

4"P1A

12 W O R K S T A T I O N S

3' RECESSED CEILING ABOVE

104'

3'-8"

23'

7

16'-6"

eq

SD1

3'-8"

P1B

PRN-TL PRN-D PRN-OC

8' D1

CO-HL

91'-9" 8'-4"

7'

PAINT FINISH

VP-VC

4

14'-6"

D1

D1 SOLID DOOR (AS PER DETAIL DWG WTB-D5)

24' 8'

4

5' 4"P1A

V-IP3

12'

FALSE CEILING @9'6" FROM FFL

3

PRN-VC

3 4"

8'-4"

6'-1"

PRN-AC

E SVD4

2'

16'-1"

12'-6"

10'-4"

CO-HL

5" FRAME GLASS PARTITION WALL GLASS SLIDING DOOR SD 1 (As per detail DWG (WTB-D6)

3'-6"

15'-9"

PRN-ST PRN-AC

CABIN 1 15' 9" x 16'7"

PRN-BS

E

2'-9"

5'-9"10'-4"

6'-1" D1

15'-9"

PRN-AC

PRN-TL

4'-11" 8'-4" 4"P1A

4'-6"

J O

12'-7"

12'

5'

3'-6"

7" P4

VP-VC

16'-1" 49'-6"

4'-7"

9'-6"

3 SIDES TE CL

6'

BS

6"

8'-10" 5'-9"

3'-6"

4'-7"

3'-6"

9'-6"

CABIN 10 14' 6"X 14' 9"

D1

5'-

3'

3'-6"

6'-4" PRN-ST

12'-0" 12'-0" +EXISTING SLAB LVL + @ 12' FT FROM FFL

JD1

2'-10"

D1

5'

BS

14'-6"

5'-6"

8'-1"

VP-OC

CL-TL

VP-VC

16'-7"

8'-10" EXISTING SLAB LVL @ 12' FT FROM FFL

VP-D CL-AC

CL-AC

JAALI B PART SLATTED AS PER DWG NO (WTB D1)

PRN-VC

ELEC + UPS ROOM 8' 4" X D 12 '-6"

D

C'

CL-R

D1

6'-6" 6'-10"

2'-6"

VP-VC

CABIN 11 12'6" x 14'9"

3 34"P1B

3'

C' C

3 4" P1B

7" P4

6'-6"

D1

15'-5"

7'-6"

CABIN 16 15'5" x 12'3" 3

CA-VC

CA-VC

CABIN 12 12'6"x 14'9" (guest cabin)

19'-11"

D2

C

CL-CC

VP-BS

VP-TL

CL-CT

4"P1A

4'

PRINTER/ PEON ZONE 1 8' 3" X 12 ' - 6"

B

C

CL-C

3'-10" eq

5" P3

10'-3"

JAALI SCREEN B (WTB-D1)

VP-OC VP-D

ALL SIDES TERAZZO

12" HIGH , P2 METAL CLADDED WALL AS PER ELEVATION BB (WTB-2A)

6'-1"

8'-4"

VP-VC

CL-TL

VP-BS

CA-MD

6'-3"

4'

C B

TO BRING TO YOUR NOTICESANTOSH

B

CL-AC

CL-AC

5'

7" P4

VP-VC

CL-CC

3" JAALI

F-SU

9'6" HIGH , P2 METAL CLADDED WALL AS PER DETAIL DWG NO (WTB-D4)

1'-3 3 4"

6"

CL-HL1

F-AC

"

PAINT FINISH (As per selection)

3 34" P1B

VP-OC

'-8

F-OC

CABIN 15 15'5" x 12'3"

CL-CC

L1

3'-10" eq

3'-6"

CL-T

16

F-VC

7'-6"

12'-8"

VP-TL

CA-OC

2 SIDES TERAZZO

7'-8"

8' D1

2'

15'-5"

VP-D

R-SW

F-AC

TO BE PROVIDED

ALL SIDES TERAZZO

CL-CC

F-CT

7" P4

F-MD

11'

CL-CC

CL-BS

D1

13'-11"

FINANCE 2 14' X 11' 2"

F-VC

CL-T

D1 SOLID DOOR (AS PER DETAIL DWG WTB-D5)

3'-6"

5'

VP-VC

VP-BS

5'

7" P4 9'6" HIGH , P2 METAL CLADDED WALL MERGING INTO PORTAL (AS PER ELEVATION AA)

16'-7"

16'-1" F-S

D1

10'-5"

VP-OC

VP-TL

7" P4

F.C

VP-VC

CL-PT

F-S

ALL SIDES TERAZZO

5'

CL-CC

CL-HL1

F-SU

F-OC

VP-D

CL-HL1

F-HL

F-MD

42" HIGH GYP . PARTITION

CL-T

FINANCE 14' X 19' 1"

19'-2"

K

14 15'5" x 12'3"

32'-10"

F-AC

F-CT

15'-5"

3 34" P1BCABIN

CL-WF

26'-9"

F-OC

42" HIGH GYP . PARTITION

7'-6"

CL-HL CL-HL CL-HL CL-HL CL-HC CL-HC CL-HC CL-HC CL-HC

12'-6"

VP-TL

CA-BS

3 34"P2

2'

VP-BS

VP-TL

CL-CC

13'-11" F-OC

CL-BC

AI TO DETAIL

F-AC

F-MD

10'-7"

CAFE/LOUNGE 32'8" X 42'9"

CL-CC

D1

4" P1A

5'-3"

CL-CC

CL-HL1

F-R

D1

3'-6"

VP-VC

JAALI B PART SLATTED AS PER DWG NO (WTB D1) CL-T

VP-VC

VP-OC

3"JAALI

5" P3

5'-3" 4'-10" F-MD

10'-4"

JAALI B PART SLATTED AS PER DWG NO (WTB D1)

VP-D

14'-9"

by woodville marble/civil by AI

CL-CC

3" JAALI

FOYER 16' 5" X 26'9"

7" P4

5'-8"

11'-1"

F-VC

6'

P

GLASS 7'-6"

7'-8"

FINANCE 1 14' X 11'

F-VC

F-FT

3 34" P1B

UTILITY/ PRINTER 6'-3"

7'-9"

15'-5"

CABIN 13 15'5" x 12'3"

6" MASONRY WALLS

CL-CC

CL

F-MD

F-OC

A

A

D4

2'

CL-T

S P A C E

VENEER ON HOLD

L

2'

'-8" R10

10

'-5 "

10'-6"

13'-5"

CL

JAALI A PART SLATTED AS PER DWG NO (WTB D1)

JAALI A PART SLATTED AS PER DWG NO (WTB D1)

13'-11"PAINT FINISH

F-SU

D4

F-SW

E

6'-11"

3'-31 2"

14'-1"

KITCHEN 14'0" X 8'

12'-5"

10

40'-5"

3'-31 2"

X 2'

12'-412"

0'-8

3'-31 2"

2X

2'

R1

3'-31 2"

5'-8"

3'-31 2"

11'-7"

3'-31 2"

3" JAALI

3'-31 2"

X

POWDER ROOM 12'5" X 8'0"

CL-HL1

23'-5"

R-L1

FIRE ESCAPE DOOR 3'-31 2"

8'-10"

8'-10" JAALI A SOLID BACKING WITH PATTERN AS PER DWG NO (WTB D1)

40'-6"

R-SW

7'-7"

4'-10"

R-S

JAALI SCREEN A (WTB-D1)

7'-6"

9'-103 4"

"

R10

11"

1"

4'-1

8'

R-AC

R-CT

1'-1"

512"

R-CT

5'-6"

3'-6"

1'-101 2"

R-AC

2'-53 4"

5'-10"

" '-5 16

5'-11"

11'-6"

3'

F.C

VP-BS

VP-TL

4'-2"

B

JD2

3'-9"

7'-3"

3 SIDES TERAZZO

R-L2

5'-101 2"

4'-11"

8'

5'

7'-8"

SVD5

JAALI B SOLID BACKING WITH PATTERN AS PER DWG NO (WTB D1)

2'-9"

23'-4"

5'-2"

SVD3

R-R

JD1

8'5" X 13'9"

10'-9"

1'

RECEPTION / WAITING AREA 42'2" X 23'4"

C O W O R K S

CLAD WITH WOOD AND MARBLE

TOILET DOORS TO BE DETAILED

6'-10"

3'-10"

HM

SERVICE (COURIER, ETC) OR MEETING

15'-1"

VIRASP

1'

R-SW

PHE SHAFT CLADDED WITH VENEER (FULL HEIGHT) WITH SIGNAGE FROM TSK

FOUNDER WALL

MAIN DOOR TO DETAIL

42'-8"

SVD2

4' 8'-5"

13'-9"

5'-11" 42'-2"

1'

18'-1"

3'-9"

24'-6"

SVD1

8'-5"

15'-9"

3" JAALI

MD1

R-RT

15'-2" 10'

JAALI A SOLID BACKING WITH PATTERN & SIGNAGE (EMBEDDED IN PATTERN) AS PER DWG NO (WTB D1)

SOLID BACKING WITH PATTERN

R-WF

10'-10"

12'-9"


DEN JAALI'S LOCATION

DWG NO:

RECEPTION

WTB- D1

CAFE

WTB- D1

I

VOID

NG WOOD SCREEN CABIN 6 & 7

WTB- D2

CONFERENCE

WTB- D2

S WITH ACCESS CONTROL

2'

3' 2'

3'

2'

3'

3'

SERVER 13'9" X 5'8" SD2

6'-0" x 1'-0" DB

WATER TAP , AS DISCUSSED AT SITE VISIT

5'-6"

D3

D2

7" P4

C-TVU

C-T

3'-8" 6'-7"

13'-21 2"

C-OC

6'-8"

3 34" P2

ALL SIDES TERAZZO

21' L1-ST L1-TL

25'-4"

SLIDING JAALI C (WTB-D2)

3'-6"

8'-4" eq

5'-7"

SINGLE 16'-9" FIXED GLASS PANEL

PC-AC

PC-R

19'-9"

PC-MD

4"P1A

PC-EC

3'-6"

20'-2" PC-VC

V-AC2

D1

5'-7"

P

V-AC2

V-AC1

CL

8'-2"

PC-HL

PC-VC

PC-MD

PC-EC

3'-5" M

8'-1"

4'-10"

Q 3 SIDES TERAZZO

V-AC1 CL

12'-1"

8'-5"

V-T1

V-AC2

V-AC2

V-AC1

J O

EXISTING SLAB

V-AC1

2'-6"

V-IP3

3" 3" GAP FOR FRAMEWORK SUPPORTING BOOKSHELF

METAL CLADDING

NO. 1 7'10" 1 P 7'10" 1 C 12'-1"1 8'0" P8'-10" 9'6" 1 8'-2" 9'6" 1

HEIGHT

9'-6" 12'

R1

EXISTING SLAB

METAL CLADDING

8' THK GLASS 10MM PANELS

EXISTING SLAB FALSE CEILING IN FLUTED VENEER METAL CLADDING 10 MM THK GLASS PANELS SLIDING JAALI

12' 12'

16'-1" 15'-9"

COLOUMS IN TERRAZO SERVICE ZONE 1

C

8'-4"

VERANDAH

B

Blue paint finish on wall as per approved shade

FFL - VERANDAH CERAMIC TILES

+8'-0" C'

C

8'-7"

B

1'-8"

TERAZZO COLUMNS

3'-1"

8'-7"

8'-6"

N 9

10

12' Q

12

12'-9"

3'-5"

12'-9"

9

5'-4"

4"

14

5'-4" 10

3'-1"

3'-5"

5'-4"

8'-7" 11

11'

3'-1"

8'-6" 12 8'-7"

DRAWER

Counter top in Aqua(Accu) Pulco Marble

1'-10"

1'-10"

8'

1'-10"

+ 6"(FFL) +_ 0'-0" Flooring in Aqua(Accu) Pulco (8'4"x5'7" lot size)Marble

ELEVATION-A 13

12

11

11'

-6"

8

13

TERAZZO COLUMNS

10

4"

8'-7"

TFORM FOR SCULPTURE

9

3'-2"

6'-4"

Vanity counter by Virasp

2'-321"

8'-5" TERAZZO COLUMNS

P

11

VERENDAH

Q

20'-3"

19'-9" 11'

VERANDAH

8'-7"

P

O

3'-2"

Wall clad with Aqua(Accu) PulcoMarble FLOS lights (IC Lights Ceiling/Wall 1F3179059) by DEFA Blue paint finish on wall as per approved shade Mirror by Virasp Gessi-Cono-45407wall-mounted tumblerholder&45431wall-mounted soap dispenser holder Gessi-Cono-45004-Tall body basin mixer Gessi- Cono -45901Counter washbasin in white european ceramic

6"

CULPTURE

5"

CABIN 6

O

FALSE CEILING IN METAL CLADDED VENEER FFL FLUTED - VERANDAH CERAMIC 10 MMTILES THK COLOUMS TOUGHENED GLASS IN TERRAZO SLIDING JAALI COLOUMS IN TERRAZO FFL - VERANDAH CERAMIC TILES WOODEN FLOORING FOR CABIN 6 CERAMIC TILES FOR VERANDAH FLOORING

VERANDAH

11'-10"

20'-3"

6'-10"

FALSE CEILING IN EXISTING SLAB FLUTED VENEER METAL CLADDED

12'

9'-6" 9'-6"

N

FALSE CEILING IN FLUTED VENEER EXISTING SLAB

METAL IN CLADDED COLOUMS TERRAZO

9'-6"

12' 6'-10"

EXISTING SLAB

2'-6"

12'

19'-9"

7"

14

3'-9"

8'

5'-4"

13

12'-1"

2'-5"

3'-5"

Q 12

11

8'-2"

2'-721"

11'

1'-8"

6"

10

7'-4"

4'-8"

6"

9

12' 11'-6"

12'-1" P

O

2'-5"

4'-6"

Q

8'-2"

N

4'-8"

6'-6"

P

O

7'-4"

12'

N

FALSE CEILING @8'0" FROM FFL

4'-221"

Q

14

3'-9"

8'-6"

REVISIONS

13

14

3'-9"

EXISTING SLAB METAL CLADDED

8'

20'-3"D P

1 4"

C'

SLIDING DOOR IN WOOD

METAL CLADDED

8'-4"

6"

9'-6" D

6'

CABIN 1

6'

+11'-6"FROM FFL 12'-8"

METAL CLADDED

SERVICE ZONE 1

CABIN 1

6'-7"

METAL CLADDED 10MM THK GLASS PANELS

FALSE CEILING SLIDING IN DOOR IN FLUTED VENEER WOOD

12' 11'-6"

2'-5"

6'-7"

10'-1" 16'-1" 3'-6" 15'-9"

REFLECTED 10"

EXISTING SLAB

12'

2'-6"

9'-6"

EXISTING SLAB

10MM THK GLASS EXISTING SLAB PANELS

6'

10'-1"

O

8'-10"

6'

3'-6"

16'-1" 15'-9"

5'-9"

Q

12'-1"

| PowderPLANroom elevation and image - Westbridge Capital POWDER ROOM

B

C

2'-4"

10'-4"

P

Flooring in Aqua(Accu) Pulco Marble Blue paint finish on wall as per approved shade

DL 03

12'-8"

8'-10" C'

8'-2"

12'-7"

B

C

5'-9"

D

12'-7"

Q

P C'

D4

4'-221"

1'-8"

Blue paint finish on wall as per approved shade Blue paint finish on wall as per approved shade

1'-6"

O

10'-4"

CABIN 2

8' Q

Gessi-Cono-45407wall-mounted tumblerholder&45431wall-mounted soap dispenser holder Gessi-Cono-45004-Tall body basin mixer FLOS lights (IC Lights Ceiling/Wall 1F3179059) by DEFA Wall clad with Aqua(Accu) Pulco Marble Mirror unit by Virasp Gessi- Cono -45901Counter washbasin in white european ceramic Counter top in Aqua(Accu) Pulco Marble Vanity unit by Virasp

B

A

FFL - FLOOR IN PATTERNED TILES

B

C

D

16'-1"

EQ

1'

N

"

VERANDAH

P C'

X

10"

O

D

O

8'

SERVICE ZONE 1 CONFERENCE

8'-4" 22'-2"

2X

10 MM THK GLASS PANELS FFL - FLOOR INSLIDING JAALI PATTERNED TILES COLOUMS IN TERRAZO

SLIDING DOOR IN WOOD VERANDAH

22'-2" 6'

16'-1" 15'-9" 5'-6"

N

11'-3"

9'-6"

12'

6'-7"

X EQ

6"

12'

0"

EXISTING SLAB

CONFERENCE

CABIN 1

10'-1"

1'-8"

Q

12'-1"

FALSE CEILING IN CLADDED TO A THIRD IT HAS BEEN LOANED. 2'-6" PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICHMETAL FLUTED VENEER 8' COLOUMS IN TERRAZO

3'-6" 5'-6"

4'-8"

321"

2'-6" 6'

=1'

4'-8"

621"

5'-9"

4'8.5"

7'-4"

B

2'-6"

N 54'-6"

1'-8"

Q

2'

D

ZONE 7'-4" 1 OUGE N10'-4"

4'0" 6'10" C' 2'0" 8'-2" 4'11" O

2'-2"

O

8'-4"

NTRANCE UN

8'

Q

P

3'2"

421"

WIDTH

O

11'-3"

ION

TION

Wall to be filled up

FFL - FLOOR IN PATTERNED TILES

8'

eq

VERANDAH

22'-2"

8'-4"

N

10 MM THK GLASS PANELS SLIDING JAALI COLOUMS IN TERRAZO

CONFERENCE

eq

11'-3"

F 9'-6"

FALSE CEILING IN FLUTED VENEER

8'

8'-4"

O

5'-7" 17'

PC-VC

20'-2" PC-VC

11'-8"

5'-7"

PC-BS

PC-AC

PC-AT

3'-6"

PC-AT

1

PC-CT

PC-AC

CABIN 7 20' X 19'9"

PC-HL

PC-VC

P1B

5'-7"

PC-S

PC-R

PC-VC

C B

8'-2" eq

5'-7"

PC-TL

PC-BS

PC-CT

SLIDING JAALI C (WTB-D2)

16'-8"

eq

D1

5'-7"

CL

19'-9"

17' 5'-7" PC-S

CABIN 6 20' X 19'9"

3 4"

4'-10" 3'-9" VERANDAH V-IP2

L1-AC

L1-CT

7"P4

CL

PC-AC

K'

11'-8"

7"P4

F.C eq

6"

C-TL

L1-ST L1-TL

L1-S1 L1-R

5'-7"

GLE 17'-1" D GLASS EL

C-OC V-IP2

C-TL

PC-TL

V-AC3

GLASS SLIDING JAALI DOOR SD 3 As per detail DWG (WTB - D8)

C-OC

13'-3"

C-OC

SD1

M.S FRAMEWORK WITH TROUGH FOR PLANTERS (AS PER DETAIL DRAWING)

CL

C-OC

C-OC

L1-AC

6"

3'-8"

C-OC

C-OC

9'6" HIGH , P2 METAL CLADDED AS PER DETAIL DWG NO (WTB-D4)

1

7'

C-OC

C-OC

SLIDING JAALI D (WTB-D2)

A'

C-OC

3'-8"

32'-9"

SD1

CARPETED AREA

eq

C-OC

9'-5"

3'-8"

33'-5" 7'

C-OC

C-OC

S SLIDING DOOR r detail DWG (WTB-D6) 15'-8"

SCULPTURE

13'-3"

13'-3"

13'-21 2"

3 34" P2

6'-51 2"

CL

7" P4 9'-8"

8' VERANDAH V-AC3

ING INTO PORTAL ER ELEVATION AA

W-HL

V-IP2

C-OC

C-OC

F.C

P'

7" P4

CONFERENCE 21' 0" X 32' 9"

eq

5'-6"

AZZO

ACCESS TO VERANDAH

CONFERENCE ROOM WALL EXTENDED

SLIDING JAALI D (WTB-D2)

2'-6"

4"P1A

3'

19'-7"

eq

15'-2"

D2

2 SIDES TERAZZO

DB / PRINTER / PEON ZONE 2 19'7"X 6'0"

6'

5'-6" 3 34"P2

4'-6"

3'

3'

4'-9"

11'-8"

4" P1A

N

GLASS

F

ERAZZO

N

STP EXHAUST SHAFT

FHC

DATE

THIS DRAWING IS COPYRIGHT. IT IS THE PROPERTY OF KHOSLA ASSOCIATES AND IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED

CLIENT

MR:SANDEEP SINGHAL PROJECT

WESTBRIDGE OFFICE

ELEVATION-B

26 |

DRAWING TITLE

POWDER ROOM DRAWING STATUS


04 | Propel industries | KSM Architecture | Internship works

Propel industries INTERNSHIP : KSM Architecture PROGRAM : Office LOCATION : Coimbatore

Spaces can be felt and can be understood better when they are envisioned three dimensionally. A more conventional yet better way of expressing spaces and their uniqueness is by making a physical model. This model was made for the proposed office area of propel industries as a part of the internship program at KSM Architecture.

Gargoyles drain the water from the roof. There are two landscape Miyawaki trees to block visual connectivity of the office from the berms , one at the entrance and one near the security block. exterior areas.

| 27


Propel industry is engaged in stone shaping field. The client’s requirement was to design a climate responsive office complex abutting an existing office building. The proposed office for propel industries is horizontally spread instead of vertical development and has abundant green cover and relaxing spaces. The proposed structures are stone cladded to represent their field of expertise.

Landscape edge along the exterior road.

Walkways have slab projection , which is finished with ISMB

28 |


SOARING BOUNDLESSLY TYPE PROGRAM LOCATION SEM

Academic individual work Tennis stadium Chennai, Tamil Nadu 06

05 The growth of metropolitan cities depends on the facilities provided for its inhabitants and how these facilities uplift the surrounding urban spaces. Stadiums are one such integral part of any city. They entwine people from different cultural backgrounds all over the world by using sports as the key element. One such sport is tennis , for which this proposed stadium is built for. Located in chennai, this new stadium would be a new landmark for this growing city. Biomimicry is the process of imparting the functional and spatial characteristics of bio-organisms. The thought of a jellyfish flowing through spaces endlessly depicts a sports person’s journey. The stadium is designed based on the systematical functioning of jellyfish. Food and water are important for survival on this planet. but jellyfish being an exception feeds and excretes water through the same organ, which is similar to the stadium in which the people visiting it are the ones that give life to it. Like water, the people approach the stadium radially to reach the vomitoriums and exit through the same.

The spectator use zones in the site are shown. The Spectator parking is divide into two zones to reguaccess points to the stadium are in a radial arrange- late the traffic and the flow of vehicles during peak ment. hours.

Ample open green spaces are provided all across Practice courts are given separate access and the site and are radial along the outer concourse. placed in such a manner to avoid intruders during practice.

Ample open green spaces are provided all across VVIP and VIP person access to the stadium is septhe site and are radial along the outer concourse. arated from the public to provide them privacy and security .

| 31

SITE ZONING


GROUND FLOOR PLAN

FIRST FLOOR PLAN

SEATING PLAN

Ferro-cement blocks , casted as circles are provided in the outermost layer.

SECTION -AA

Translucent fiberglass fabric, envelopes the skeletal structure.

SECTION - BB

Thin layer of steel mesh throughout the perimeter holds the skin stable.

Steel box sections with trusses and ribs in the centre acts as the load bearing

| Interior view of the stadium

Transparent with a few spots, the skin of the stadium resembles the epidermis of the jellyfish. The concrete blocks play with light and shadow inside the stadium.

The three tier built portion of the stadium which is enclosed by the skin. EXPLODED ISO

32 |


ALONG THE LINE TYPE PROGRAM LOCATION SEM

Academic individual work Architecture college Tamil Nadu 05

06 The first step towards architectural education begins at college level. The spatial organization, the way their education atmosphere revolves , the environmental impact the building has and the nuances of the built and unbuilt spaces inspire the young minds to think and pave way for a better society. Most importantly, sharing and discussing is an integral part of the curriculum and the proposed school of architecture is built with interaction as its base. Taking interaction between students as the core element of architecture course, the campus in designed with ample gathering spaces. As a starting point of the design process, a noise level analysis was made, based on which the various functional spaces were arranged. Near the main road where the noise decibel is highest, entry and parking is provided as it can act as a buffer-zone.

Site plan

| 33


Form Development

Ground floor plan

The rectangular module is repeated.

The central space is a courtyard and the macro-level interaction space.

Common place in-between the classrooms are made as balconies.

Balconies serve are micro level interaction spaces between every studio.

The blocks are arranged to enable free air flow inside.

Workshops are centrally placed for overall ease of participation

First floor plan

| View showing the central courtyard with gallery seating

Second floor plan

Every element in the design has its own unique character; Inspired from the De Stijl movement, Colors: red, blue, yellow,white and black are used to bring out the individuality of structural elements in the campus. De Stijl has had different variations through the years, but the movement started by architect Piet Mondrain emphasizes on the use of only vertical and horizontal lines.

Section -AA

| The balconies between the studios and the canteen.

34 |


BRIDGE THE GAP TYPE PROGRAM LOCATION SEM

Competition Rejuvenation of Favelas Brazil 09

07 The favelas have always been isolated from the cities. This proposal aims to solve this problem by introducing bridges that connect the city with favela and aims at including the favelas in the master plan of the city. The idea behind is to maintain the vibrancy of the existing Favelas, while retrofitting them with infrastructure facilities. It is based on the principle of Transit oriented development. The columns that support the bridges act as the community’s nodal points and consists of a watch-tower for improved security, a powerhouse that distributes electricity from city to the Favelas with cables that run along the bridges. Hospitals, Schools and administration offices are provided surrounding the columns of the bridges.

| 29

The sub-pedestrian pathway on the bridge lead to the arterial pathways which are made safe by the overlooking of the watchtowers.

The proposed dwelling units made of movable lightweight concrete are placed in harmony with the existing structures supporting the pedestrian pathways and have solar panels. The pathways have pockets of communal spaces, making the area more vibrant and provides interaction within the community


Section through Nodal point on the bridge

30 |


BOX IT ! TYPE Competition team work(5) PROGRAM Temporary house module LOCATION Transportable

08 The competition brief was to design a comfortable living space for construction workers which is low cost adaptable to all environmental conditions. Construction workers are mostly migrant workers , who don’t have a definite place to go after a days work. This proposal would give them a place to call ‘ Home’. Keeping in mind the important condition of cost efficiency, bagasse board is used. Bagasse board ,is a recycled product is used to reduce the cost. The structure is temporary and easy for packaging and transporting.

Rectangular form is structurally stable and enables various nations of module.

combi-

Generative clustering enables planning flexibility and multiple planning layout can be produced.

| 35

| Exploded view of module


ASSEMBLY & PACKAGING

Multiple modules can be combined to accommodate large families

Simple construction methods enable ease in assembly

Exterior and interior components are segregated

All components can be packed easily by the inhabitants and shipped

| Detail of foundation

| Section of a module

36 |


THANK YOU

References

Ar.Arvind - +91 9600025027 Ar.Uma - +91 9003097801


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.