GEEBAMU MONROVIA, LIBERIA DECEMBER, 2016 FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
TITLE PAGE Date Drawn by Checked by
A0
12-16-16 HART ROGERS PROF. BEAVERFORD
Scale
TABLE OF CONTENTS TABLE OF CONTENTS CONCEPT PRELIMINARY SKETCHES MODELS SITE PLAN COLOUR & MATERIALS
A1.0 A1.1 A1.2 A1.3 A1.4 A1.5
LIBRARY - FLOOR PLAN -FURNITURE PLAN - PLAN FINISH - ELEVATIONS - SECTIONS - DETAILS - 3D PERSPECTIVE
A2 A2.1 A2,2 A2.3 A2.4 A2.5 A2.6 A2.7
CLINIC - FLOOR PLAN - FURNITURE PLAN - PLAN FINISH - ELEVATIONS - SECTIONS - DETAILS - 3D PERSPECTIVE
A3 A3.1 A3.2 A3.3 A3.4 A3.5 A3.6 A3.7
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
TABLE OF CONTENTS Date Drawn by Checked by
A1.0
12-16-16 Author Checker
Scale
CONCEPT STATEMENT This project is responsive to the issue of nation building in Liberia, a country left decimated by past political, economic and health crises. The vertical linear plane is emphasized through design elements and natural light to create a commanding upward gesture of movement and ascension that speaks to a largely Christian community. This is symbolic of growth and development.The modular layout of the buildings signifies building blocks in recognition of the integral role the complex will play in restoring community pride, empowerment and energy. The colour palette and materials are informed by existing buildings in the community and the cultural preference for buoyant colours. The complex is designed to be a welcoming, social hub for the community that is accessible and open. The design elements attempt to be intriguing and playful to break down the potential institutional barriers that might intimidate or discourage usage.
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
CONCEPT STATEMENT Date Drawn by Checked by
A1.1
12-16-16 Author Checker
Scale
DESIGN INSPIRATION
SPATIAL PLANNING
BUBBLE DIAGRAM LIBRARY 1ST FLOOR: ZONED TO BE COMMUNAL, LOUD, FUN, MAKERSPACE/ALTERNATIVE LIBRARY PROGRAMMING, CHILDREN
ONE OF MANY RECEPTION DESK SKETCHES: EXPERIMENTING WITH CONNECTING PLANES TO DRAW THE EYEWARD, REPRESENTING COMMUNAL COHESION AND THE GROWTH ALLUDING TO DEVELOPMENT AND GROWTH, GEOMETRIC SHAPES INFORMED BY CHAIR NOTCHES
CHILDREN'S BOOKS: EXPERIMENTING WITH COLOUR CONNECTION BETWEEN CUSTOM CASE WORK AND PLANES, AS WELL AS THE "T" PROFILE CREATED BETWEEN THE CASEWORK, WALLS AND CEILING THAT MIRRORS THE BRIDGE FLOORING IN PLAN AND LINES PULLED FROM MY CHAIR. GEOMETRIC READING PODS SHAPE INSPIRED BY CHAIR NOTCHES.
BUBBLE DIAGRAM LIBRARY 2ND FLOOR: ZONED TO BE MORE QUIET, PRIVATE, STUDYING, ADULTS CUSTOM CHAIR, RECLAIMED WOOD, SEPTEMBER 2016: LINEAR, EMPHASIS OF VERTICAL PLANE, SIMPLE, DIGNIFIED, GEOMETRIC NOTCHES
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
PROCESS - LIBRARY Date Drawn by Checked by
A1.2
12-16-16 Author Checker
Scale
TOP LEFT TO BOTTOM RIGHT: FLOOR PATTERN EXPERIMENTATION THINKING ABOUT THE BRIDGE CONNECTION; INVERSE OF BRIDGE ON PLAN AS COLUMN PROFILE WITH BUILT-IN CASEWORK AND CUSTOM FURNITURE; 2ND FLOOR BALCONY READING AREA AND RECEPTION ELEVATION - CONSIDERING LIGHT, MATERIALS, COLOUR AND VIEWS
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
PROCESS - LIBRARY Date Drawn by Checked by
A1.2.1
12-16-16 Author Checker
Scale
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
PROCESS - LIBRARY Date Drawn by Checked by
A1.2.2
12-16-16 Author Checker
Scale
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
PROCESS - CLINIC Date Drawn by Checked by
A1.3
12-16-16 Author Checker
Scale
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
SITE PLAN Date Drawn by Checked by
A1.6
12-16-16 Hartley Rogers Prof. K. Beaverford
Scale
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
PLAN OF BUILDING COMPLEX - 1ST FLOOR Date Drawn by Checked by
A1.7
12-16-16 HART ROGERS PROF. K. BEAVERFORD
Scale
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
PLAN OF BUILDING COMPLEX - 2ND FLOOR Date Drawn by Checked by
A1.8
12-16-16 Author Checker
Scale
1
2
3
4
5
BALCONY ABOVE
6
1 A2.14
KEYNOTES
2
A
OFFICE 222
W/C 229
READING/ FLEX SPACE 233
SHOE STORAGE & HAND WASHING AREA 240
W/C 230
WORKSHOP 241
CUSTOM YELLOW BAMBOO SHOOT PARTITION
2
MOBILFLEX RETRACTABLE SECURITY GRILLE - ANNODIZED ALUMINUM, LOCKING
3
CUSTOM CASE WORK W/ CRAWL THROUGH OPENING, CHILDREN'S BOOKS OPEN TO COURTYARD
4
42" MASONRY PONY WALL
MEN'S W/C 243
CORRIDOR 253
A2.5 2
FLEX SPACE 231 -
-
OFFICE/ CONSULT ROOM 234
OFFICE/ CONSULT ROOM 236
RECEPTION 237
CORRIDOR 257
FILING ROOM 251 1
A2.5
OPEN TO ABOVE STORAGE 224
WOMEN'S W/C 242
4
CORRIDOR 252
CLASSROOM/ FLEX SPACE 223
B
LOBBY 235
UTILITY STORAGE 228
OFFICE 221
1
RECEPTION 238
ARTS AND CRAFTS 244
MAKERSPACE WORKSHOP 245
OPEN TO ABOVE
CORRIDOR 256
HELP DESK 247
LOBBY 239
1 CORRIDOR 255
CAFE KITCHEN 225
2
C
CORRIDOR 254
OFFICE 246
KID'S READING NOOK 248
ARTS & CRAFTS PROGRAM DESK
CHILDREN'S BOOK CIRCULATION DESK
1
CAFE SERVING BAR AND CASH 226
A2.6
3
CAFE SEATING 227
1 A2.5.1
1
1 A2.3
3
1
1
BRIDGE ABOVE
A2.4 2
-
CHILDREN'S BOOKS 249
3 CAFE PATIO SEATING 232
GARBAGE/ RECYCLING RECEPTACLE
1 A2
UPEXIT 1
D
CHILDREN'S OUTDOOR PLAY AREA 250 EXIT STAIRS 259
STAIRS 258
UP
LIBRARY 1ST FLOOR 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
1ST FLOOR LIBRARY PLAN Date Drawn by Checked by
A2
12-16-16 HARTLEY ROGERS PROF. K. BEAVERFORD
Scale
1/16" = 1'-0"
1
2
3
4
ADJUSTABLE HEIGHT WORKSTATIONS IN ACCORDANCE W/ ADA REQUIREMENTS
5
6
KEYNOTES
BALCONY MULTIPURPOSE SPACE 211
A
1
DATA BAR 210 RESOURCE CENTER 201
WOMEN'S WC 216
QUIET STUDY AREA 215
OPEN TO BELOW
COMMUNAL STUDY AREA 208
4
CIRCULATION/ HELP DESK 209
2
B
2
BOOKS 214
PROJECTOR SCREEN ON WHITEBOARD WALL
SEMINAR 218
COLLABORATIVE WORKSPACE 207
STACKABLE CHAIRS OPEN TO BELOW
READING CAROLS/ SEATING 206
4
PURELL HANDSANITIZER WALL MOUNT INSTALLED IN EACH ROOM OR MAJOR AREA - UP TO THE DISCRETION OF PROJECT MANAGER. TO BE PAINTED SAME COLOUR AS HOST WALL.
5
RAMPART DEMOUNTABLE SOLID WALL W/ MOODACOUSTIC VERTICAL FABRIC PANELS. FRAME TO BE PAINTED TO MATCH WALL.
6
RAMPART DEMOUNTABLE SOLID WHITE WALL W/ FROSTED YELLOW GLASS INSERT.
STORAGE 204
RESERVED FLOORSPACE IN ROWS FOR WHEELCHAIRS
MOBILE LOW BOOKSHELF
COMMUNAL OFFICE 203
6
IPAD RENTAL STATION FOR ACCESS TO ELECTRONIC BOOK DATABASE
SEMINAR 219
C PRIVATE OFFICE 203A
3
5
COMPUTER LAB 202
OFFICE/ SERVER ROOM 202A
SKYLIGHTS: METAL FRAME, DOUBLE GLAZED, LOW THERMAL GAIN GLAZING
OPEN TO BELOW
DATA BAR 213
DATA BAR 212
2
MEN'S W/C 217
1
IPAD RENTAL STATION: ALLOWS FOR PATRONS TO ACCESS THE LIBRARY'S ELECTRONIC BOOK DATABASE ANYWHERE ON SITE
A2.4
PRIVATE OFFICE 203B
-
BRIDGE TO CLINIC
EXIT STAIRS
DN
EXIT STAIRS 220
DN 205
D PHOTOCOPY/ PRINT AREA
1 A2.1
LIBRARY 2ND FLOOR 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
2ND FLOOR LIBRARY PLAN Date Drawn by Checked by
A2.1
12-16-16 HART ROGERS PROF. K. BEAVERFORD
Scale
1/16" = 1'-0"
C
1 A2.6
3 1
A2.4
-
2
5
A2.3
LIBRARY 1ST FLOOR - KIDS BOOKS CALLOUT 1/8" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
FINISH PLAN - CHILDREN'S BOOKS Project number Date Drawn by Checked by
0001
A2.3
12-16-16 Author Checker
Scale
1/8" = 1'-0"
2016-12-18 3:09:50 PM
1
6
2 A2.4
1
-
A2.7
---
---
1
Elevation 2 - a 1/4" = 1'-0"
A2.4
Elevation 1 - b 1/4" = 1'-0"
---
T cto ie g n ri h y p o C 7 0 t2
3 A2.4
Elevation 1 - c 1/4" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
INTERIOR ELEVATIONS CHILDREN'S BOOKS Date Drawn by Checked by
12-16-16 Author Checker
Scale
A2.4 1/4" = 1'-0"
---
1 A2.5
2
EAST ELEVATION LIBRARY LOBBY 1/4" = 1'-0"
A2.5
FACULTY OF ARCHITECTURE MID1 IDES 7200
RECEPTION DESK ELEVATION 1/2" = 1'-0"
GEEBAMU
INTERIOR ELEVATIONS Date Drawn by Checked by
A2.5
12-16-16 Author Checker
Scale
As indicated
419"
329"
74"
136"
136"
--CUSTOM YELLOW PARTITION WALL INSTALLED BETWEEN CASEWORK NO WALL APART FROM CASEWORK - OPEN TO COURTYARD
33"
EQEQEQEQEQEQEQEQEQEQEQEQ
33"
57" CHILD CRAWLTHROUGH
1 A2.5.1
DOOR
CHILDREN'S BOOK'S WEST WALL ELEVATION 1/4" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
CHILDREN'S BOOKS WEST ELEVATION Date Drawn by Checked by
A2.5.1
12-16-16 Author Checker
Scale
1/4" = 1'-0"
DECORATIVE WOOD BOOKENDS SECURED TO SHELF W/WOOD SCREWS
2 A2.6
2"
4"
3 A2.6
15"
17"
6" 3"
9"
33"
9"
3" 6"
15"
15"
136 1 A2.6
2
Elevation 3 - a 3/4" = 1'-0"
A2.6
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
Section 3/4" = 1'-0"
3
Peg Feet
A2.6
1 1/2" = 1'-0"
BOOKCASE PARTITION DETAILS Date Drawn by Checked by
A2.6
12-16-16 Author Checker
Scale
As indicated
1" 11"
12"
8"
WHITE STONE (LOCALLY SOURCED) INLAY
42"
7"
2"
WHITE SOLID SURFACE COUNTERTOP
9"
24"
7"
ALUMINUM ROLLER TRACKS
30"
USG TOPO SUSPENDED CEILING PAINTED WHITE
12"
3"
TWO 5/8" GB ON PLYWOOD. OUTER GB PAINTED WHITE; INNER 4" EXPOSED GB PAINTED GOLDEN YELLOW
WOOD FRAMING SECURED W/ SCREWS (TYPICAL) AND CONSTRUCTION GRADE ADHESIVE
4" S/S TOEKICK 4"
4"
2"
11"
METAL BRACE
3"
S/S DRAWER PULLS
1" 2"
3"
5"
2" 1" 1"
13"
1"1"1" 2"
2"
17"
1"
WOOD BASE TO BE PAINTED TO MATCH CABINETS
25"
1 A2.7
2
BULKHEAD DETAIL 1" = 1'-0"
A2.7
FACULTY OF ARCHITECTURE MID1 IDES 7200
RECEPTION MILLWORK SECTION 1" = 1'-0"
GEEBAMU
DETAILS Date Drawn by Checked by
A2.7
12-16-16 Author Checker
Scale
1" = 1'-0"
GEEBAMU
CHILDREN'S BOOKS PERSPECTIVE FACING NORTH
Project number Date Drawn by Checked by
0001
A2.8
12-16-16 Author Checker
Scale
2016-12-18 3:10:42 PM
FACULTY OF ARCHITECTURE MID1 IDES 7200
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
LIBRARY 1ST FLOOR RECEPTION LOBBY FACING 12-16-16 Date SOUTH PERSPECTIVE Drawn by Checked by
Author Checker
Scale
A2.9 12" = 1'-0"
A
POLISHED CONCRETE LIGHT YELLOW DYE POLISHED CONCRETE SULFUR YELLOW DYE DURAL STAINLESS STEEL TACTILE STRIPS POLISHED CONCRETE LIGHT GREY DYE
B POLISHED CONCRETE DARK GREY DYE
C
D
A2.10
LIBRARY 1ST FLOOR FINISH PLAN 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
LIBRARY FLOOR FINISH PLAN - 1 Project number Date Drawn by Checked by
0001
A2.10
12-16-16 Author Checker
Scale
1/16" = 1'-0"
2016-12-18 3:10:50 PM
1
-
A
-
B
C
A2.5.1
1
A2.4
-
D
A2.11
LIBRARY 2ND FLOOR FINISH PLAN 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
LIBRARY FLOOR FINISH PLAN - 2 Project number Date Drawn by Checked by
0001
A2.11
12-16-16 Author Checker
Scale
1/16" = 1'-0"
2016-12-18 3:10:53 PM
1
256"
77"
171"
144"
203"
574"
26"
65"
279"
108"
EQ EQ EQ EQ
88"
36"
49"
54"
245"
108"
EQ EQ EQ 33" 23" EQ EQ EQ EQ
300"
300"
65"
144"
22" EQ EQ EQ
131"
36"
EQ EQ EQ EQ 42"
115"
97"
170" 28"
113"
297" 24"
58"
26"
203"
150"
212"
26"
218"
24"
150"
249"
291" 222"
137"
172"
290"
313"
92"
67"
133"
133" 186"
109"
150"
90"
87"
24"
85"
150"
91"
22"
EQ
EQ
EQ
EQ
EQ
80" 46"
145"
210"
337"
193"
86"
90"
101"
72"
274"
189"
59"
333"
59"
36"
153"
72"
39"
154"
88"
78"
102"
77" 89"
47"
33"
66" 25" 63"
210"
1123"
OPEN TO ABOVE
OPEN TO ABOVE
101" 145"
57"
32"
67"
63"
69"
23"
77"
64"
30" 44"
88"
C
109"
23" 87"
39" EQ EQ EQ EQ EQ EQ
237"
256"
66"
313"
B
25"
97" 25"
38" 38" 77"
110"
70"
122"
26"
A
96"
D 26"
A2.12
LIBRARY 1ST FLOOR PARTITION PLAN 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
LIBRARY 1ST FLOOR PARTITION PLAN -1
Project number Date Drawn by Checked by
0001
A2.12
12-16-16 Author Checker
Scale
1/16" = 1'-0"
2016-12-18 3:11:00 PM
1
403"
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
LIBRARY 2ND FLOOR PARTITION PLAN Date Drawn by Checked by
A2.13
12-16-16 Author Checker
Scale
PRECEDENT REFERENCES Ameican Libraries Magazine.(2015). “2015 Library Design Showcase.” Retrieved on November 9, 2016. https://americanlibrariesmagazine.org/2015/09/01/2015-library-design-showcase/ Archdaily. (2016). "Salam Centre for Cardiac Surgery." Retrieved on Oct. 10, 2016. (http://www.archdaily.com/19061/salam-centre-for-cardiac-surgery-studio-tam-associati) CBC (2015). "Ghana Library Designed by Halifax Architects Opens". Retrieved on Novemeber 7, 2016. http://www.cbc.ca/news/canada/nova-scotia/ghana-library-designed-by-halifax-architects-opens-1.3068896 Deezeen (2015). "Children's Library Munyinga Africa." Retrieved on Oct. 10, 2016. (http://www.dezeen.com/2014/01/14/childrens-library-muyinga-africa-rammed-earth-walls-bc-architects/) Kenniff, Thomas-Bernard. (2016).“Field of Dreams” Canadian Architect. Retrieved on November12, 2016. https://www.canadianarchitect.com/features/field-of-dreams/
PERSPECTIVE IMAGE SOURCES: PERSPECTIVE 1 PERSPECTIVE 2 PERSPECTIVE 3
FACULTY OF ARCHITECTURE MID1 IDES 7200
GEEBAMU
REFERENCES Date Drawn by Checked by
A3.6
12-16-16 Author Checker
Scale
A
KEYNOTES EXIT STAIRS 2
UP
UP 3
XRAY 101
MORGUE PICKUP
MORGUE 128
1
CUSTOM YELLOW BAMBOO SHOOT PARTITION
2
MOBILFLEX RETRACTABLE SECURITY GRILLE - ANNODIZED ALUMINUM, LOCKING
3
NELCO LEAD MEDICAL WALL SHIELDING
3
B
INFUSION STAND
BRIDGE ABOVE
COURTYARD - OUTDOOR WAITING AREA 131
VENTILATOR
ER AMBULANCE RECEIVAL & PICKUP
COURTYARD - OUTDOOR WAITING AREA 130
DIALYSIS 102
ER TREAMENT 127
GLOVE DISPENSER TOWEL DISPENSER RECEPTACLE
BIOHAZARD CONTAINER
LAB FRIDGE
C
OVERHEAD RETRACTABLE PRIVACY CURTAIN
W/C 102A
2
COLOUR WALL
SPECIMEN COLLECTION BOX
HAZARDOUS WASTE BIN REGULAR WASTE BIN
1
1
UP
CONSULT ROOM CONSULT ROOM EXAM ROOM 108 109 112 MEN'S W/C 105
WOMEN'S W/C 106 1
A3.4 CONSULT ROOM CONSULT ROOM EXAM ROOM 110 111 113
F.E.C.
LOBBY 107A
F.E.C.
LABORATORY 103
LOBBY 107C
GARAGE DOOR WASTE RECEIVAL & LOADING
TREATMENT ROOM 115
TREATMENT ROOM 126
1
1
PRESCRIPTION PICKUP/PAYMENT
COLOUR WALL
PHARMACY CLERICAL 104B HEAD PHARMACIST'S OFFICE HEAD PHARMACIST'S 104A OFFICE
WASTE STORAGE 125 NURSE STATIONS 124
ADMIN/RECORDS ROOM 105A
D
TREATMENT ROOM 114
LOBBY 107C
LOBBY 107B
PHARMACY/DISPENSARY 104
ADMIN/RECOREDS ROOM 105B LOBBY 107C RECEPTION 106A
UNIVERSAL UNIVERSAL W/C W/C 118 119
INJECTION CLINIC 117 INJECTION CLINIC WAITING AREA 116
UTILITY STORAGE 120
MEDICAL STORAGE EXAM ROOM 121 122
MEDICINE & SUPPLY STORAGE
ISOLATION ROOM 123
-
E
UP
PRESCRIPTION DROPOFF/PAYMENT
2
PHARMACY CONSULT, PRESCRIPTION INQUIRIES
BALCONY ABOVE
1 A3.2
1
1 A3
2
3
4
5
6
7
CLINIC FLOORPLAN 1 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
GEEBAMU CLINIC FLOOR 1
Project Name
Drawn by
Date
Checked by
A3
12-16-16 Hart Rogers Dr. K. Beaverford
Scale
1/16" = 1'-0"
A EXIT STAIRS 223
EXIT STAIRS 222
DN
DN
FIRE RATED WALL SEPARATION AS PER CODE
W/C 220A
BRIDGE TO LIBRARY CLINIC ADMIN/ FINANCE OFFICE 201
B
BOARDROOM 202
Room 231
WARD 4 220
C TRAINING ROOM STAFF 203
RECEPTION 207 MEN'S W/C 224
D STAFF LOCKERS
OPEN TO BELOW
WOMEN'S W/C 225
LOBBY 208
RECORDS 207A
W/C 215A
STORAGE STORAGE WASTE CLEAN 213 214 W
WAITING AREA 209
NURSE STATION 216
TEACHING STATION TRAINING ROOM PUBLIC 205
E
MULTIPURPOSE ROOM 206
STORAGE 218B
OPEN TO BELOW
PATIENT CARE RECEPTION AND WAITING AREA 210
MATERNITY CLASSES/ FLEX TRAINING SPACE 206C
YOGA MATS
2
3
W/C 219A
MEDICAL STORAGE AND SANITATION
BALCONY OUTDOOR WAITING AREA 212
4
WARD 2 218
W/C 218B
EXERCISE BALLS
1
WARD 3 219
CORRIDOR 228 STORAGE 206B
A3.1
WARD 1 CORRIDOR ISOLATION UNIT 226 217
DN
STAFF LOUNGE 204
1
W/C 217A
NURSE APT. SUITE 215
D
MEDICINE STORAGE
DN
CORRIDOR 229
WOMEN'S STAFF MEN'S STAFF CHANGE ROOM CHANGE ROOM 204B 204A
NURSE VIEWING ROOM 219
CORRIDOR 227
CORRIDOR 230
OVERHEAD RETRACTABLE PRIVACY CURTAIN
5
NURSE STATION
6
7
CLINIC FLOORPLAN 2 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
GEEBAMU CLINIC FLOOR 2
Project Name
Drawn by
Date
Checked by
A3.1
12-16-16 Hart Rogers Dr. K. Beaverford
Scale
1/16" = 1'-0"
F3
C
W2
W2
LEGEND OF SYMBOLS
F1
W1
F1
P
WALL PAINT
W
WALL TYPE
F
FLOOR FINISH
W1
P2
P1
P2
P3
P2
P4
P2
D
F4 F1
F2
F2
P2
P3
P2
P2
P2
W3
W1
F1
F1
E
W2
W3
3
1 A3.2
W2
F3
4
CLINIC FLOOR 1 - LOBBY FINISH PLAN 1/8" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
CLINIC FINISH PLAN RECEPTION/LOBBY FLOOR 1
Project Name
Drawn by
Date
Checked by
12-16-16 Author Checker
Scale
A3.2 1/8" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
CLINIC FINISH PLAN RECEPTION/LOBBY FLOOR 2
Project Name
Drawn by
Date
Checked by
12-16-16 HART ROGERS PROF. K. BEAVERFORD
Scale
A3.3
---
A
---
Level 3 E
D
C
272"
B
Level 2 136"
Level 1
T cC ie g tn p o yri 7 0 t2 h
0"
1 A3.4
SECTION CENTRAL LOBBY CLINIC 1 : 100
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
SECTION CENTRAL LOBBY SPACE CLINIC
Project Name
Drawn by
Date
Checked by
A3.4
12-16-16 HART ROGERS PROF. K. BEAVERFORD
Scale
1 : 100
1
2
3
4
5
6
7
1951" 312"
78"
63"
114"
545"
432"
406"
128"
84"
140"
81"
72"
750"
210"
248"
104"
158"
253"
31" 117"
158"
118"
45"
127"
175"
290"
244"
123"
79"
58"
104"
179"
82"
73"
48"
169"
126"
D 36"
115"
31" 31" 31" 32" 31" 29" 31" 29" 31" 29" 31"
72"
213"
139"
84"
178" 302"
72"
40"
70"
210"
71"
221"
370"
95"
107"
167"
75"
234"
42"
273"
98"
173" 52" 76"
26"
159" 6"31"
316"
312"
127"
178"
52"
198"
37" 31"
1143"
161"
168"
264"
270"
127"
217"
257"
B
C
111"
132" 43" 36"3"
31" 38" 34" 37" 33" 43" 31" 45" 31" 36" 31"
46"
94"
38"
141"
36"
114"
156"
6"31" 36" 31"
113"
A
E EQ EQ EQ EQ EQ EQ 42" 23" 36"
192"
36"
52"
541"
281"
217"
130"
1 A3.6
108"
105"
31"
93"
46" 31"
74"
36"
61"
152"
54"
74"
341"
286"
178"
189"
70"
36"
45"
271"
106"
118"
CLINIC PARTITION PLAN FLOOR 2 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
CLINIC PARTITION PLAN FLOOR 2
Project Name
Drawn by
Date
Checked by
A3.6
12-16-16 HART ROGRES PROF. K. BEAVERFORD
Scale
1/16" = 1'-0"
A
B
C
D
E
1
1 A3.10
2
3
4
5
6
7
CLINIC FLOOR FINISH PLAN - 1 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
CLINIC FLOOR FINISH PLAN - 1
Project Name
Drawn by
Date
Checked by
A3.10
12-16-16 HART ROGERS PROF. K. BEAVERFORD
Scale
1/16" = 1'-0"
A
B
C
D
E
1
1 A3.11
2
3
4
5
6
7
CLINIC FLOOR FINISH PLAN - 2 1/16" = 1'-0"
FACULTY OF ARCHITECTURE MID1 IDES 7200
Geebmau
CLINIC FLOOR FINISH PLAN - 2
Project Name
Drawn by
Date
Checked by
A3.11
12-16-16 HART ROGERS PROF. K. BEAVERFORD
Scale
1/16" = 1'-0"
PERSPECTIVE: CLINIC LOBBY FACING WEST
PERSPECTIVE: CHILDREN'S BOOKS FACING READING NOOK