The Northern Rivers Times ED180

Page 12

The Northern Rivers Times

December 21, 2023

12 NEWS

Murwillumbah District Hospital Enhances Patient Experience with Nearly $2 Million Renovation

By Jeff Gibbs Patients and staff at Murwillumbah District Hospital are reaping the rewards of extensive upgrades, courtesy of a comprehensive renovation project nearing $2 million in completion. The Minister for Regional Health, Ryan Park, highlighted the significance of these improvements, emphasizing the transformative impact on the hospital’s facilities. The renovation initiatives primarily focused on enhancing critical areas within the hospital, including the emergency department’s triage zone and reception, the medical imaging reception, and the palliative care room. Minister Park emphasized the paramount importance of these upgrades, elucidating how they ease accessibility for

patients and streamline the hospital’s operations. “Transforming the emergency department means that anyone seeking urgent care will encounter a far more navigable and accessible environment, significantly benefiting our local community,” stated Minister Park. The renovations also extend to the medical imaging department, fostering a more conducive atmosphere for both patients and staff, facilitating smoother patient flow while creating an inviting ambiance. Furthermore, the upgrades prioritize inclusivity, rendering the emergency department and medical imaging areas more accessible for individuals with disabilities, thereby promoting equitable healthcare access for all. The significant investment underscores

a dedication to the hospital’s future, recognizing its pivotal role in delivering exemplary patientcentred care, an aspect deeply cherished by the local community. Member for Lismore, Janelle Saffin, echoed these sentiments, particularly highlighting the renovated palliative care room as a testament to the hospital’s commitment to patient comfort and support. “The revamped palliative care room has been crafted as a serene sanctuary, designed to ensure patients, their families, and carers experience comfort and solace within the hospital’s walls,” expressed Ms. Saffin. Notably, the space has been tailored to encourage connection and tranquillity, boasting scenic views of the picturesque Tweed valley.

DEFG!E

HFIE!

Shop 1, 31 Burringbar St, Mullumbimby

Clarence Valley Council Embraces New Rate Peg Methodology Set by IPART The annual determination of the rate peg by the Independent Pricing and Regulatory Tribunal (IPART) holds significant weight for councils across New South Wales, shaping their financial framework for the upcoming fiscal year. This year, IPART introduced a new rate peg methodology for the 2024/2025 financial year, considering several key factors in its calculation. The novel rate peg methodology, structured by IPART, takes into careful consideration multiple components. It amalgamates the Base Cost Change, encapsulating alterations in employee, asset, and operating costs, along with a population factor derived from past demographic changes. Additionally, an Emergency Services Levy factor and a catch-up adjustment for variations in the superannuation guarantee rate were factored into the deliberation. The resultant rate peg across NSW for the upcoming financial year, after integrating the population factor, spans from 4.5% to 8.2%, with the Base Cost Change accounting

!""#$%&'()&*'+,"-($%$(.)&*'+" )+/"0)*+&$+)+1$"'2"&*03$(" /$14%,"&*03$("%1($$+%," 3$+15$%,"3'6$%")+/"2$+1$%7 !""8$14"%)+/*+9,"1:$)+*+9" )+/"%$):*+9 !"";*95"-($%%<($"=)%5*+9 !"">'+1($&$"1:$)+*+9")+/" %$):*+9

!"#$%"&'$()*+*,-.."/0$()*1-0())2*-3&"%*+*-4"/('"%5 67-&"*89::*;;<*=<=*-/*:>:8*9;9*89= &-/'7"/&/$?"/#@%"0A#"()B0-.B(C* 333B%"0A#"()B0-.B(C

for 3.9% of this range. For the Clarence Valley Local Government Area (LGA), IPART has set a rate peg of 4.7%, comprising a 3.9% Base Cost Change, with 0.2% attributed to Population Growth and 0.4% allocated for the Superannuation adjustment. This determination by IPART will steer the formulation of the 2024/2025 draft Budget by the Council’s staff. Scheduled for consideration by the Council in early 2024, the draft Budget will subsequently undergo a public exhibition period. The Council will then wield the prerogative in finalizing the budgets, including the determination of the rate peg for the forthcoming financial year. Laura Black, the General Manager of Clarence Valley Council, expressed her contentment with IPART’s adoption of the new methodology, emphasizing its alignment with the

augmented costs borne by the Council to uphold the anticipated service standards and facilities within the community. “While acknowledging the financial strains some ratepayers might face, compromising on service provisions or scaling down service levels below community expectations is not a sustainable option,” remarked Laura Black. She emphasized the Council’s intent to base their draft plans on the full rate peg allowed, affirming that the ultimate decision on applying the rate peg lies with the Council during their deliberations on the 2024/2025 Operational Plan. The introduction of the new rate peg methodology signifies a concerted effort to navigate the fiscal landscape in a manner that aligns with the Council’s commitment to delivering essential services while balancing the fiscal responsibilities toward the community.

!"!"#$%&'()*+ #$%&"'()*+, !"-.+/01/"2(3)"40/5+. ,%-."/*.)0*$%)"%!"# !"6 78+.0+)9+,"'$.:+.&"'()*+, ,%-.*1021%3')*$%-'0+

02 6642 8600


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.