1 | In Focus: Land Reclamation We are committed to rehabilitate old deposit areas of previous operators (before we acquired the Kassandra Mines) and currently we reclaim areas in Stratoni and Olympias. The Olympias rehabilitation project is one of the largest environmental rehabilitation projects in Greece, through which we remove old tailings, waste rock and polluted soil, restore the original relief, improve soil health and revegetate areas.
Old Land Olympias - Area Platia Phire
2.8
2012
hectares total area
• Removed old waste rock at 80% of the area • Restored original terrain height and slope • Planted vegetation • Used the location for the new Olympias paste plant, which prevents additional land disturbance.
Olympias - Old Arsenopyrite Stockpile
3.2
2005
hectares total area
• Removed all contaminated soil • Rehabilitated and planted vegetation at 70% of the area • Rehabilitate and plant vegetation in remaining 30% by 2021.
Olympias - Historic Tailings Pond
30
2005
hectares total area
• Removed contaminated soil and old tailings • Removed and reprocessed 2.4 million tonnes of old wet tailings (tailings deposited as dry-stack) and 0.3 million tonnes of residues and contaminated soil through our Kokkinolakkas TMF • Reclaimed 150 hectares up to date • Planted vegetation.
Tailings Pond
Current landscape
50
Hellas Gold
Current landscape