Planning&Management

Page 1

Study Purposes only

Name of the municipal council Address Name and Address of the municipal council

To be completed by the municipal council Property No. Building No. Street No House Letter

Aalborg Kommune

Floor

Boulevarden 13 Postbox 462 9100 Aalborg

Door

Flat No.

Building case No.

Building Regulations BR08 x

Application for building permit Building Notice

Property

See guidelines

Street Name

House No.

Freder Høj

1

Title No.

Sorthøj project Nature of the works X New build

Extension

Other

A short description of the work which is to be completed (ex. one family house, attached house, garage, shop, workshop, demolition of building, changing of partition walls, change of use, erection of signs, sunshade, wind turbines, farm buildings etc.)

Four-storey building in Hasseris will house the following: a basement with a gym, a hair salon on the ground floor, 1st and 2nd floor apartments for total 4 families, and a penthouse apartment with a terrace. There will be 5 balconies to the south side accompanied by wooden cladding to suit the area. A flat roof will carry a ventilation aggregate. The building itself has area of 1093 m², with a budget over 24 million DDK. Construction of the project currently is dead-lined to end in the beginning of year 2013.

The works demands no dispensation The works demands dispensation (A substantiated application for dispensation must be attached)

Necessary appendices must be attached the application (see guidelines) Applicant (architect, engineer or the like) Name, address, phone number and CVR number

Date and signature

UP Architecture Porthusgade 1, Aalborg 9000, Denmark Representative: Marianne Proomet

5/23/2012 MP

Owner of the property in accordance with the land charges register The owner’s signature is demanded, unless applicant in some way documents his right to complete the building works Name, address, phone number and CVR number Date and signature

EDC-gruppen a/s Jens Hansen Mynstersvej 5, 1827 Frederiksberg C, Denmark

5/23/2012 JH

Application for building permit page 1 of 2


Guidelines – Study purpose only, for further information see chapter 1 Administrative provision in BR08 The following building works must not be commenced without a permit from the municipal council: Unless otherwise provided in 1.7 or 1.9, building work may not commence without the permission of the municipal council Garages, carports, sheds, green houses and roofed-over terraces and similar structures may be carried out subject to a building notice being submitted to the municipal council as long as the total area does not exceed 50 square meters, see paragraph 1.7 in BR08. The conversion and other alterations to buildings as example one family houses, summer houses, carports, sheds or greenhouses, which do not entail the increase of the floor area or significant changes of use, see paragraphs 1.9 BR08 The application for a building permit must include a clear description of the work to be carried out. It should normally include: a. Necessary information for the identification of the property, building or unit b. Information on any provision of the Building Act, the Building Regulations, easements and other building guidelines with which the project may be in conflict. The application must contain a substantiated application for any necessary exemptions or permissions. c. Information on the proposed use of the building and, in case of conversions and changes of use, information on the previous use. d. Information as to the extent to which the works have been designed under the less restrictive provisions on conversion work, see part 3, Design, layout and fitting out in BR08. e. Information clarifying how measures essential for construction and necessitated by climatic conditions have been implemented, see paragraph 4.1 in BR08. f. Information relating to buildings covered by 7.2, Energy Parameters for new buildings in BR08, the calculated energy needs of the building, documentation demonstrating compliance with the energy parameters; and information on low energy class, where appropriate. The application must include a statement concerning the existing buildings which are of importance for the consideration of the application. Application for a building permit must be made in writing to the municipal council. The application must be accompanied by relevant drawings stating the scale used. The application and supplementary documentation may be submitted in digital form provided the municipal council has the facility for receiving and reading such electronic documents and drawings the municipal council may stipulate detailed technical requirements for the use of digital communication on the municipality’s website, including acceptable forms of digital signatures, see paragraph 1.3 and 1.4 in BR08 Building works subject to service of a building notice before commencement The following building works may be carried out subject to a building notice being submitted to the municipal council (paragraph 1.7 I BR08) - Garages, carports, outbuildings, greenhouses, roofed-over terraces and similar structures; and plant and equipment houses for electronic communications networks or services of no more than 50 m² - Extensions to garages, carports, outbuildings, greenhouses, roofedover terraces and similar structures; and plant and equipment houses for electronic communications networks or services, provided the area after the extension does not exceed 50 m². - Wind turbines - Individual conversions and other structural alterations that only affect a single residential unit of no more than 150 m², such individual conversions or alterations may not entail any expansion of the area. - Satellite antennas/dishes with a diameter of more than 1.0 m. - farm buildings and agriculture-related buildings on agricultural, forestry and horticultural holdings which either do not require a rural zone permit or only require permission under section 36(2) of the Planning Act. - Demolition of buildings not covered by 1.10. If the municipal council has not responded within two weeks of receipt of the notice, the building work may commence. The building notice must include the postal or the BBR address and the title number, The building notice must include a clear description of the work to be carried out; and drawings – with the scale marked and a specification appended – showing the location of the buildings on the site, its height, length and width, its distance to boundaries and other buildings on site, and indicating the materials chosen for the external walls and roofing.

In the case of farm buildings and agriculture-related buildings and wind turbines, the application must include, in addition to the information set out in 1.7(4), a drawing showing any existing and/or proposed drainage pipes and their connections to the building, and nay permits by other legislation. In the case of individual conversions and alterations, the building notice must include, in addition to the information set out in 1.7(4), a drawing showing the structures that are to be altered and new service connections to existing stack pipes, details of previous use; and clarification of whether the design of the works is in accordance with the less restrictive provisions on conversion work; supplementary by report on the existing structures and other construction issues relevant to the processing of the application In the case of demolition, the building notice must contain, in addition to details on the address and title number of the property and building identification, information on the approximate height and surface area of the building. The municipal council may impose guidelines for the demolition in each individual case. All appendices must be dated and clearly state, who is responsible for their preparation. The application/notice must be dated and signed by the property’s owner, unless the applicant documents his right to complete the project. Access/Accessibility (see 3.2 in BR08) Accessibility for all means, inter alia, that buildings must be accessible, laid out and fitted for everyone, irrespective of their disability. The requirements have the same legal standing as all other requirements in the building regulations and should be considered when the building is designed. Accessibility requirements include: - Level access to units and to any lifts on the ground floor - Entry telephones and intercom systems - Toilets suitable for all including those with impaired mobility - Appropriate design of corridor and ramps - Appropriate design of stairs - Appropriate design of guarding - Appropriate design of landings by entrances - Appropriate design of landings by ramps - Lifts in buildings with 3 floors and above. Insurance A developer, whom builds a new building primary for dwelling use, must insure the building against building damages. Documentation for an offer of this insurance must be attached to the application/notice. Fees The municipal council may charge for permits, temporary permissions and notices pursuant to the Building Regulations. The municipal council may also charge for exemptions in respect of building works that do not require a building permit or notice. The municipal council may decide not to make any charge, or only to charge fees for certain types of works. Fees may not be charged for notices or exemptions in respect of farm buildings and agriculture-related buildings for the agricultural occupations. The method for calculating and charging is determined by the municipal council. The fee is payable when the permit or exemption is granted. If the fee is calculated on the basis of construction costs, it is payable as soon as the fee can be calculated accordingly. In the case of notices in accordance with the building regulations, the fee is payable on submission of the building notice The municipal council may withhold the permit or exemption until the fee has been paid.

Application for building permit page 2 of 2


ID

Task Mode 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Task Name

Duration

Start

Finish

PredeceResource Names

Finish Slack 16

Tender schedule for Sorthøj project Mobilisation Plot preparation Site clearance Excavation Foundation Basement wall and floor Installing pipe system around building Basement services Gr. Fl services installations 1st floor services´ 2nd floor services 3rd floor services Ground floor slabs 1st floor slabs 2nd floor slabs 3rd floor slabs Roof slabs Staircase basement‐gr.fl. Staircase ground fl.‐1st floor Staircase 1st and 2nd floor Staircase 2nd and 3rd floor Gr. Fl loadbearing wall 1st floor loadbearing walls 2nd floor loadbearing walls 3rd floor loadbearing walls Basement column Gr. Fl column 1st floor columns 2nd floor column 3rd floor columns and beams 1st floor balcony 2nd floor balcony 3rd floor balcony Basement windows and doors

95 days

Mon 10/1/12 Thu 2/28/13

5 days 4 days 3 days 4 days 10 days 20 days 10 days

Mon 10/1/12 Mon 10/8/12 Mon 10/8/12 Fri 10/12/12 2 Fri 10/12/12 Wed 10/17/12 3 Wed 10/17/12 Wed 10/24/12 4 Wed 10/24/12 Wed 11/7/12 5 Thu 11/8/12 Fri 12/7/12 6 Fri 12/7/12 Fri 12/28/12 7

Site manager Earth and Concrete Earth and Concrete Earth and Concrete Earth and Concrete Earth and Concrete Plumber

5 days 3 days 3 days 3 days 3 days 5 days 4 days 4 days 4 days 4 days 3 days 3 days 3 days 3 days 3 days 3 days 3 days 3 days 2 days 2 days 2 days 2 days 4 days 4 days 4 days 3 days 3 days

Wed 1/2/13 Wed 1/9/13 Mon 1/14/13 Thu 1/17/13 Wed 1/23/13 Wed 1/2/13 Wed 1/9/13 Tue 1/15/13 Tue 1/22/13 Mon 1/28/13 Wed 1/9/13 Mon 1/14/13 Thu 1/17/13 Wed 1/23/13 Wed 1/2/13 Mon 1/7/13 Thu 1/10/13 Tue 1/15/13 Wed 1/2/13 Wed 1/9/13 Tue 1/15/13 Tue 1/22/13 Mon 1/28/13 Fri 2/1/13 Thu 2/7/13 Thu 2/14/13 Fri 1/4/13

Wed 1/9/13 Mon 1/14/13 Thu 1/17/13 Wed 1/23/13 Mon 1/28/13 Wed 1/9/13 Tue 1/15/13 Tue 1/22/13 Mon 1/28/13 Fri 2/1/13 Mon 1/14/13 Thu 1/17/13 Wed 1/23/13 Mon 1/28/13 Mon 1/7/13 Thu 1/10/13 Tue 1/15/13 Mon 1/21/13 Thu 1/3/13 Fri 1/11/13 Thu 1/17/13 Thu 1/24/13 Fri 2/1/13 Thu 2/7/13 Thu 2/14/13 Tue 2/19/13 Wed 1/9/13

Plumber Plumber Plumber Plumber Plumber Element contract FL Element contract FL Element contract FL Element contract FL Element contract FL Element contract STA Element contract STA Element contract STA Element contract STA Element contract WL Element contract WL Element contract WL Element contract WL Element contract COL Element contract COL Element contract COL Element contract COL Element contract COL Element contract BAL Element contract BAL Element contract BAL Carpenter

8 9 10 11 12 8 14 15 16 17 14 19 20 21 8 23 24 25 8 14,27 15,28 16,29 17,30 31 32 33 27

Gr. Fl windows and doors 4 days 1st floor windows and doors 4 days 2nd floor windows and doors 4 days

Wed 1/9/13 Tue 1/15/13 Tue 1/22/13

Tue 1/15/13 35 Tue 1/22/13 36 Mon 1/28/13 37

39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

3rd floor windows and doors Curtain wall Base. Interior walls Gr. Fl interior walls 1st floor interior walls 2nd floor interior walls 3rd floor interior walls Cladding Roof construction Terrace construction Basement finishes Gr. Fl finishes 1st floor finishes 2nd floor finishes 3rd floor finishes Electrical work Site finishing

Mon 1/28/13 Fri 2/1/13 Wed 1/9/13 Fri 1/11/13 Wed 1/16/13 Wed 1/23/13 Mon 1/28/13 Mon 2/4/13 Fri 2/1/13 Thu 2/14/13 Wed 1/23/13 Mon 1/28/13 Thu 1/31/13 Tue 2/5/13 Mon 2/11/13 Tue 2/5/13 Tue 2/19/13

Fri 2/1/13 Wed 2/13/13 Fri 1/11/13 Wed 1/16/13 Wed 1/23/13 Mon 1/28/13 Mon 2/4/13 Tue 2/19/13 Thu 2/14/13 Fri 2/22/13 Mon 1/28/13 Thu 1/31/13 Tue 2/5/13 Mon 2/11/13 Thu 2/14/13 Mon 2/18/13 Thu 2/28/13

Project: Tender schedule for proje Date: Thu 6/7/12

Oct '12 30

7

14

21

28

Nov '12 4

11

18

25

Dec '12 2

9

16

23

Jan '13 30

6

13

20

27

Feb '13 3

10

17

24

Mar '13 3

10

0 days

36 37 38

4 days 7 days 2 days 3 days 4 days 3 days 5 days 10 days 8 days 6 days 3 days 3 days 3 days 3 days 3 days 8 days 7 days

23

Carpenter Carpenter Carpenter

0 days 0 days 0 days 0 days 0 days 0 days 0 days

Site manager Earth and Concrete Earth and Concrete Earth and Concrete Earth and Concrete Earth and Concrete Plumber Plumber Plumber Plumber Plumber Plumber Element contract FL Element contract FL Element contract FL Element contract FL Element contract FL Element contract STA Element contract STA Element contract STA Element contract STA Element contract WL Element contract WL Element contract WL Element contract WL Element contract COL Element contract COL Element contract COL Element contract COL Element contract COL Element contract BAL Element contract BAL Element contract BAL Carpenter

15 days 15 days 15 days 15 days 15 days 0 days 0 days 0 days 0 days 4 days 15 days 15 days 15 days 15 days 20 days 20 days 20 days 20 days 0 days 6 days 4 days 2 days 0 days 0 days 0 days 0 days 0 days

Carpenter Carpenter Carpenter

4 days 4 days 4 days

38 Carpenter 39 Carpenter 27,35 Carpenter 2 41 Carpenter 2 42 Carpenter 2 43 Carpenter 2 44 Carpenter 2 45 Carpenter 2 18 Carpenter 3 47 Carpenter 3 43 Painter and decorator 49 Painter and decorator 50 Painter and decorator 51 Painter and decorator 52 Painter and decorator 51 Electrician 53,54,1Earth and Concrete

Carpenter

4 days 4 days 0 days 0 days 0 days 0 days 0 days 0 days 4 days 4 days 1 day 1 day 1 day 3 days 3 days 1 day 0 days

Carpenter Carpenter 2 Carpenter 2 Carpenter 2 Carpenter 2 Carpenter 2 Carpenter 2 Carpenter 3 Carpenter 3 Painter and decorator Painter and decorator Painter and decorator Painter and decorator Painter and decorator Electrician Earth and Concrete

Task

Summary

External Milestone

Inactive Summary

Manual Summary Rollup

Finish‐only

Split

Project Summary

Inactive Task

Manual Task

Manual Summary

Deadline

Milestone

External Tasks

Inactive Milestone

Duration‐only

Start‐only

Progress

Page 1


Resource Name Site manager Earth and Concrete Plumber

Unscheduled Tasks

30, '12 M T W Mobilisation

T

F

S

Oct 7, '12 S M T

W

T

Plot preparation

F

S

Oct 14, '12 S M T

Site clearance

W

T

F

Excavation

S

Oct 21, '12 S M T

W

T

F

Foundation

S

Oct 28, '12 S M T

W

T

F

S

Nov 4, '12 S M T

W

T

F

S

Nov 11, '12 S M T

W

T

F

S

Nov 18, '12 S M T

W

T

F

S

Nov 25, '12 S M T

W

T

F

S

Dec 2, '12 S M T

W

T

F

S

Dec 9, '12 S M T

W

T

F

S

Dec 16, '12 S M T

W

T

F

S

Dec 23, '12 S M T

W

T

F

S

Dec 30, '12 S M T

W

T

F

S

Jan 6, '13 S M T

W

T

F

S

Jan 13, '13 S M T

W

T

F

S

Jan 20, '13 S M T

W

T

F

S

Jan 27, '13 S M T

W

T

F

S

Feb 3, '13 S M T

W

T

F

S

Feb 10, '13 S M T

W

T

F

S

Feb 17, '13 S M T

Basement wall and floor Installing pipe system around building

Basement services

Carpenter

Gr. Fl services installations

1st floor services´

2nd floor services

Basement windows and doors

Gr. Fl windows and doors

1st floor windows and doors

Painter and decorator

3rd floor services

2nd floor windows and doors

3rd floor windows Curtain wall and doors

Basement finishes

Gr. Fl finishes 1st floor finishes

2nd floor finishes

Electrician Ground floor slabs

1st floor slabs Staircase basementgr.fl.

Element contract WL

Gr. Fl loadbearing wall

Element contract COL

Basem ent col

1st floor loadbearing

2nd floor slabs Staircase Staircase 1st and 2nd ground fl.-1st floor

2nd floor loadbearing walls

Gr. Fl column

3rd floor slabs

Roof slabs

Staircase 2nd and 3rd floor

3rd floor loadbearing walls 1st floor columns

2nd floor col

Element contract BAL

Carpenter 3

3rd floor finishes

Electrical work

Element contract STA

Carpenter 2

T

Site finishing

Element contract

Element contract FL

W

3rd floor columns and beams 1st floor balcony

Base. Interior

Gr. Fl interior walls

1st floor interior walls

2nd floor interior walls

3rd floor interior walls

2nd floor balcony

3rd floor balcony

Cladding

Roof construction

Terrace construction

F

S

Feb 24, '13 S M T

W

T

F

S

M S


Budget - Sorthøj project Owner

Private

Project costs for

Sorthøj project

Building phase

Scheme Design

Index

126.8

Area ( m2 ):

1093

A Site costs

kr.

11,065,000.00

B Construction costs

kr.

9,554,000.00

C Administration costs

kr.

3,851,000.00

Total project cost ( new index )

kr.

24,470,000.00

25 % VAT

kr.

6,117,500.00

Total project cost (Incl. VAT)

kr.

30,587,500.00

Total project cost / m² ( Incl. VAT )

kr.

27,985.00


Budget - Sorthøj project The buildings total cost consists of 3 main components: A. Site, B. Construction og C. Administration.

A.

Site 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Land purchase. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connections to sewer, water, district heating and electricity* . . . . . . . . . . . . . . . . . . . . . . . . . Connection charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ground adjustment* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Extra foundation and piling* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ground consolidation * (internal roads and car park) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Construction and planting of communal garden* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fees, taxes and interest charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other (specify) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unforseeable expenses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total site costs (transferred to front page)

B.

C.

8,969,600 85,000 844,000 269,088 896,960 11,065,000

Construction 11. Total expenditure craftsmen* (Excl. pkt. 12) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (Successive calculation or building part estimates) 12. Garages, car port and shed* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13. Special winter measures* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14. Unforseen expenses* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8,599,937

Total construction costs (transferred to front page)

9,554,000

100,000 197,111 657,035

Administration 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32.

Total consultancy costs (lanning and follow-up). . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fees for trade supervision and construction management . . . . . . . . . . . . . . . . . . . . . Fees for other consultants assigned to the project. . . . . . . . . . . . . . . . . . . . . . . . . . . Soil investigation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Surveyor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Press, advertisements etc, jf. ABR 89. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Construction case fees / manager. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Management fess Building loan interest. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drying out. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Guarantee commission, registration and stamp duties, etc. . . . . . . . . . . . . . . . . . . . . Contribution to Construction Injury Fund. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . State promille fee. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Local Authority fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Insurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Building approval. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site water and electicity use. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other (specify) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total administration costs (transferred to front page) *) Fee amounts.

1,368,000 761,800 1,000,000 23,280 25,635 197,110 80,000 70,000 32,852 98,555 65,704 13,141 16,426 32,852 32,852 32,852 3,851,000


B - Construction costs (brutto) Project: Client: Pricebook:

Page:

Sorthøj project Private

Date:

Red 2008 Pos. V&S nr. Text (1) Substructures (10)21.05 Excavation (12)11.30 Foundation (2) Primary elements (21)11.05 Basement wall (21)31.05 Exterior concrete panel (21)35.32 Exterior wooden wall (22)23.15 Interior loadbearin wall (22)24.50 Interior wall with insulation (23)21.10 Floor deck (24)35.35 Stairs (25)24.51 Column (25)24.70 Beam (26)34.05 Balcony (3) Completions (31)22.35 Single flush doors (31)24.55 Double flush doors (31)45.10 Windows (35)11.05 Ceiling (37)65.35 Parapet eaves (37)71.05 Drainage pipe (horiz.) (37)71.10 Downpipe (4) Applied finishes (40)45.10 Terrace construction (43)22.06 Floor covering - tiles (43)25.10 Floord covering - wooden (47)19.20 Flat roof construction (5) Services (50)12.05 Incpection chamber (50)22.02 Drainage pipes (59)52.05 Wastewater (59)52.10 Sanitarequipment (59)53.05 Water installations (59)56.10 Disctrict heating (59)57.05 Ventilation sum (6) Electrical/mechanical services (66)11.07 Elevator (69)63.05 Electrical installations

Index:

Unit

5/22/2012 126.8 Quantity

Control

Sem 4 project

Price

m³ lbm

1067 kr. 94 kr.

lbm m² m² m² m² m² stk lbm lbm stk

78 547 472 233 898 1016 5 17 18 5

stk stk stk m² lbm lbm lbm

Total price

147.00 560.00

156,849.0 52,640.0

kr. kr. kr. kr. kr. kr. kr. kr. kr. kr.

5,672.00 2,010.00 2,400.00 1,386.00 615.00 661.00 60,500.00 1,340.00 699.00 27,700.00

442,416.0 1,099,470.0 1,132,800.0 322,938.0 552,270.0 671,576.0 302,500.0 22,780.0 12,582.0 138,500.0

50 11 42 887 65 65 30

kr. kr. kr. kr. kr. kr. kr.

5,500.00 26,000.00 4,600.00 468.00 200.00 481.00 1,530.00

275,000.0 286,000.0 193,200.0 415,116.0 13,000.0 31,265.0 45,900.0

lbm m² m² m²

59 352 487 232

kr. kr. kr. kr.

490.00 1,670.00 649.00 1,032.00

28,910.0 587,840.0 316,063.0 239,424.0

stk lbm m² m² m² m² m²

2 1000 1093 1093 1093 1093 1093

kr. kr. kr. kr. kr. kr. kr.

5,500.00 85.00 90.00 220.00 178.00 490.00 47.00

11,000.0 85,000.0 98,370.0 240,460.0 194,554.0 535,570.0 51,371.0

stk m²

1 kr. 326,000.00 1093 kr. 476.00

326,000.0 520,268.0

SUMMARY Index in book: 2008 Index today: May 2012 Index difference Geographical Variation Total with variations with index with geographical var.

1

Case nr

9,401,632 119.5 128.6 9.1 kr. 0.85

715,940.18 Nordjylland

kr.

10,117,572.18

kr.

8,599,936.35


Budget according to trades Project Sorthøj Date 5/23/2012 Earth and Concrete (10)21.05 Excavation m³ (12)11.30 Foundation lbm (21)11.05 Basement wall lbm

1067 kr. 94 kr. 78 kr.

147.00 560.00 5,672.00 Total:

156,849.0 52,640.0 442,416.0 651,905.0

Element ‐ floor, balcony (23)21.10 Floor deck (26)34.05 Balcony

m² stk

1016 kr. 5 kr.

661.00 27,700.00 Total:

671,576.0 138,500.0 810,076.0

stk

5 kr.

60,500.00

302,500.0

lbm

17 kr.

1,340.00

22,780.0

lbm

18 kr.

699.00

12,582.0

m² m² m²

547 kr. 472 kr. 233 kr.

2,010.00 2,400.00 1,386.00 Total:

1,099,470.0 1,132,800.0 322,938.0 2,555,208.0

1 kr.

326,000.00

326,000.0

Element ‐ stairs (24)35.35 Stairs Element ‐ columns (25)24.51 Column Element ‐ beam (25)24.70 Beam Element ‐ walls (21)31.05 Exterior concrete panel (21)35.32 Exterior wooden wall (22)23.15 Interior loadbearing wall

Element ‐ additional stk (66)11.07 Elevator Carpenter (22)24.50 Interior wall with insulationm² (31)22.35 Single flush doors stk (31)24.55 Double flush doors stk (31)45.10 Windows stk (35)11.05 Ceiling m² (37)65.35 Parapet eaves lbm (40)45.10 Terrace construction lbm (43)25.10 Floord covering - wooden m² (47)19.20 Flat roof construction m² (43)22.06 Floor covering - tiles m² Plumber (37)71.05 (37)71.10 (50)12.05 (50)22.02 (59)52.05 (59)52.10 (59)53.05 (59)56.10 (59)57.05

Drainage pipe (horiz.) Downpipe Incpection chamber Drainage pipes Wastewater Sanitarequipment Water installations Disctrict heating Ventilation sum

Electrician (69)63.05 Electrical installations

898 50 11 42 887 65 59 487 232 352

kr. kr. kr. kr. kr. kr. kr. kr. kr. kr.

615.00 5,500.00 26,000.00 4,600.00 468.00 200.00 490.00 649.00 1,032.00 1,670.00 Total:

552,270.0 275,000.0 286,000.0 193,200.0 415,116.0 13,000.0 28,910.0 316,063.0 239,424.0 587,840.0 2,906,823.0

lbm lbm stk lbm m² m² m² m² m²

65 30 2 1000 1093 1093 1093 1093 1093

kr. kr. kr. kr. kr. kr. kr. kr. kr.

481.00 1,530.00 5,500.00 85.00 90.00 220.00 178.00 490.00 47.00 Total:

31,265.0 45,900.0 11,000.0 85,000.0 98,370.0 240,460.0 194,554.0 535,570.0 51,371.0 1,293,490.0

1093 kr.

476.00

520,268.0


Project Control Case nr.:

Page:

By:

UP

Case: Multistory apartment building in Hasseris area Doc.nr.:

1

Area/Location/Identifikation: Phase:

Brief

Outline Proposal

Scheme design

DD1

DD2

Nr.: 1

Activity/Toppic: Basement plan

Ref.:/ Drawing nr..: (99)3.1

Approwed Date:

Sign:

28.04.12

UP

28.04.12

UP

28.04.12

UP

28.04.12

UP

28.04.12

UP

28.04.12

MP

28.04.12

MP

28.04.12

MP

28.04.12

MP

28.04.12

HP

28.04.12

HP

28.04.12

HP

Reference/ Comment:

2

Ground floor plan

(99)3.2

3

1st floor plan

(99)3.3

4

2nd floor plan

(99)3.4

5

3rd floor plan

(99)3.5

6

Roof plan

(99)3.6

7

Section A-A

(99)2.1

8

Section C-C

(99)2.3

9

Ground floor story partition

(23)3.1

10

1st floor story partition plan

(23)3.2

11

2nd floor story partition plan

(23)3.3

12

Foundation plan

(12)3.1

Nr.: 1

Comment: Drawing number is missing.

2

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

3

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

4

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

5

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

6

Drawing number is missing.

7

Wrong drawing name, drawing number is missing, more dimensions should be shown, section names are missing.

8

Wrong drawing name, drawing number is missing, section names are missing, callout names are missing.

9

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

BPS Quality Assurence 6


10

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

11

Drawing number is missing, section names are missing (A-A, B-B, C-C). Missing wall parts for technical shafts.

12

Drawing number is missing.

Date: Copy :

28.04.12

Made by

UP

Date:

28.04.12

Bem.:

Changes made to DD1 drawings.

Seen/appr.:

MP, HP

BPS Quality Assurence 6