CURICULUM VITAE SURNAME GIVEN NAME DATE OF BIRHT AADRESS MOBILE E-MAIL EDUCATION: 2006 2010 NOW EXPERIENCE: APR 2013 – SEPT 2013 NOV 2012 SEPT 2009 – AUG 2010 JAN 2010 – JUN 2010 MAY 2008 – SEPT 2009 MAY 2006 – MAY 2008 JUNE ‘09, JUNE ’10, JUNE ’11
/ PILK / HENRY / 1st JUNE, ‘85 / RUNEBERGS ALLE 44, 2860 SØBORG / +45 31 10 12 75 / hr.pilk@gmail.com
SPOKEN LANGUAGES IT COMPENTENCE DRIVING LICENCE INTERESTS
/ ENGLISH (EXCELLENT); ESTONIAN (EXCELLENT); FINNISH (AVARAGE); DANISH (AVARAGE) / Microsoft Office Products, MS Project, Autodesk Revit, AutoCAD, Google Sketch Up / B-CATEGORY / reading, music, movies, computers, Internet, technology, architecture, sporting, hiking etc.
/ TALLINN ART GYMNASIUM / TALLINN UNIVERSITY / UNIVERSITY COLLEGE NORDJYLLAND / INTERNSHIP / ACTIVE BUILDING PROJECT / TEACHER (Arts and crafts) / RECEPTIONIST / RECEPTIONIST / MANAGER ON DUTY / VOLUNTEER
(RESTORER) (ARTWORK AND TECHNOLOGY) (ARCHITECTURE TECHNOLOGY & CONSTRUCTION MANAG.)
SRV KINNISVARA AS VIETNAM TALLINN ENGLISH COLLEGE DOMINA MANAGEMENT HOTEL 3 SISTERS HOTEL VANAWIRU ROSKILDE FESTIVAL
(REAL ESTATE DEVELOPMENT) (COMPETITION) (EDUCATION) (HOTEL/TOURISM) (HOTEL/TOURISM) (HOTEL/TOURISM)
Basis of integrated project is the construction of two storey single family house devided into two period -Scheme Design -Detail Design One.
Interconnected design process for a n i ndustrially produced cons truction, from concept a nd des ign to production a nd a s sembly on construction site.
Interdisciplinary project on the basis of self-initiative is processes involved in the design of construction through the design phases from Brief Design to Detail Design Two.
Competition aim to create a project of example house of very low energy class building in tropical climate of Vietnam.
Renovation and extension conept of student dormitorio in the center of Aalborg. Aim to creat a balance in living spaces and to add more functionality for the whole building.
Residential Building is a part of an development area in J천ekaare, Tartu. It is a winning scheme by the architect Thomas Pucher. First building is completed in 2008, I have executed a second building as my final project.