Project: Svenstrup Sportshall
4779
4984
5051
4284 2969 4414 2100
2100 2600
2100
3084 2600
0
0
-201
NORTH FACADE
12512
5059
5059
2120 2600
-198 0
SOUTH FACADE
12511
12510
SVENSTRUP SPORTS HALL 5058
5050
4355 2058
2083 2600 0 -269
EAST FACADE
0
-294 -199
WEST FACADE
0
0
2600
Case
Detail Design 2
Drawing name
Elevations
Drawing nr
(99)01.02
Scale
1:100
Date
02.12.11
Drawn by
Marianne Proomet
Checked by
Hana Jergusova Henry Pilk
Project: Svenstrup Sportshall
MATERIALS 1
Concrete wall element 420mm: reinforced concrete 140 mm insulation 200 mm front panel (concrete) 80 mm U-value: 0.20W/m²K Fire resistance: REI 60A2 s1, d0 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Steel panel element 120 mm: exterior and interior steel leaf of 0,5 mm insulation 119 mm U-value: 0.20W/m²K Fire resistance: REI 60A2 s1, d0
23
78604
6878
2100
2A
As interior wall, the same element is covered with plasterboard.
3
Interior loadbearing wall elements: 200 mm and 150 mm reinforced concrete
2100
4
Non-loadbearing interior wall elements: 150 mm concrete
1840
1.
5
Columns: 300 x 300 x 2600 mm
6
Beams: 300 x 700 mm (length of beams are on drawing)
7
Roof trusses: glue-laminated arch 200 x 940 mm
1778
8
178
915 250
8
1930
2385
Pre-kitchen
293 915
1829
1669
1400
915 593
9533
2828
28 m² 2444
2908
3500
795
Hole in wall as entrance.
3.
9893
1400
2854
1843
27 m²
29656
2100
Technical room
1930
4257
45 m²
3168
1930
Kitchen
1930
Storage
1829 480
915
15740
915
3600
1829
900
2100
890
31 m² 6500
SECTION 2 4758
900
2100
900
2100
915 130 Corridor 73 m²
900
2100
900
2100
900
2100
900
2100
900
85 0 R
1387
2375
2375 4893
8 m²
2100
900
2100
900
2100
130 915
4855
900
2100
4.
Corridor 72 m²
900
2100
900
2100
900
2100
900
2100
900
81256
450
2100
900
2100
450
Entrance 136 m²
2100
900
2100
900
2100
900
2100
900
2100
6. Beam: 1000 mm
5.
8
4855
1387
Toilet W
3162
3.
63 m² 3950 1829
915
2400
6. Beam: 5200 mm
3.
Women changing room
63 m² 2350
130
5 m²
Men changing room
2350
915 130
Handicap toilet
4.
3950
293915
2350
1609 2100
915 1885
1785
4855
8 m²
63 m² 2350
393915
493 915
Women changing room
63 m²
8 m²
8 m² 915 993
Preroom Men changing room
915
8 m²
693 915 693
1387
2375
1593
Preroom
Toilet M
2100
3151
1387
2400
8 m² 893 915 1768
3151
Toilet M
Toilet W
1400
6000
Toilet W
741 963 915 988
3320
4034
2100
915
67 m²
9600
15760
7.
Corridor
4180
915
2400
915493
27 m²
3.
202 1829 202
910
425
2408
6. Beams: 6000 and 6200 mm
5300
53921 4170
3600 Cafeteria 184 m²
693 915 693
3675
3600 11958
5 m²
5810
85 0 R
800 800 725
6546
Toilet M
6
1829
5.
2350 3.
Handicap toilet
39256
84 m²
25 m²
66 m²
2100
8 m²
136 m²
Information
Gangway
900
3678 6000
Staff room
Meeting room
1556 m²
264 1829 264
8
Q
14265
Sports hall for aprox. 1000 people
264 1829 264
57 m²
2100 3600
235 1830
2093 2400
Technical room for ventilation
2400
5263
721 915 721
2400
8
P
8000 2400
2A.
Women toilet 21 m²
2100 3600
Staff toilet
693 915 693
2400 10456
O
4480 3000
8 m²
8 21 m²
N
1493 915 1118
2400
Room
2100 3000
7.
250
M
3220
6000
8
5824
6000
3740
6000
2100
3000
2100
428
3000
3760
2400
L
6000
3343
2400
K
20800
2400
1930
2400
J
3600
2452
2400
39176
2400
H
6000
5119
2400
2400
28720
F
2100
3000
2635
2400
E
3000
293 915 1218
2400
D
6000
28853
2400
C
I
24436 3675 2.
1225
2400 2400
B
G
1980
2325 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1209 1191 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 348
6000
1613
1510 6000
A
3278
1272
4120
3780 9600
SECTION 1
Case
Detail Design 2
Drawing name
Floor plan
Drawing nr
(23)01.01
Scale
1:100
Date
16.11.11
Drawn by
Marianne Proomet
Checked by
Hana Jergusova Henry Pilk
Project: Svenstrup Sportshall
Following roof plan is showing the position of arches and roof boxes in smaller mesh. Materials:
1
2
3
4
460 200
5
5760
200
5800
6
7
8
200
5800
200
9
5800
10
200
5800
11
200
5800
12
13
14
200
5800
200
15
5800
200
16
5636
200
17
3600
18
3600
19
3600
20
21
3600
22
3600
1
Portal frame Arches 200 x 940 mm in the foot of the portal. Height in the highest point 12 000 m Arch startes with the height of 5000 mm, in the degree of 28.
2
Anchoring of frame Steel connection for wind bracing in the edges of the sports hall.
3
Binder Glue-laminated binder of 150 mm
4
Roof boxes The distance between the trusses in the boxes are from 1200 mm. The boxes are prefabricated.
23
3600
3000
A 2.
7033
B 9900
1.
C
150
4.
D
7067
E
F
150
9500
3.
28728
G
7043
H 12200
I 3300
300
3300
300
2850
150
300
9630
J
6657
K
L SECTION 2
12324 5200
M
9900
10140
O
10440
N
4.
P 300
3800
300
3300
300
Q 10000 1600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3000
SECTION 1
Case
Detail Design 2
Drawing name
Roof plan
Drawing nr
(27)01.01
Scale
1:100
Date
18.11.11
Drawn by
Marianne Proomet
Checked by
Hana Jergusova Henry Pilk
Project: Svenstrup Sportshall
Foundation under concrete walls: 1100 x 420 mm
1
2
3
6000
6000
4
5
2325
6
3675
6000
7 3000
8 3000
9 6000
10 3600
11 2400
12 6000
13 3000
14 3000
15
16
6000
17
6000
6000
18
19 3600
20 2400
21
22
Foundation under interir loadbearing walls: 1100 x 150 mm
23
6000
Foundation under steel elements: 1100 x 200 mm
6000
Pad foundation: 1000 x 1000 x 900 mm
2400
200
968
A
40
78828
616
4900
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
4820
Material used: reinforced cast in situ concrete
605 245
53941
23933
9533
2400
B
2400
C
150
2400
D
2400
E
420
29656
9450
28863
2400
G
27120
28760
2400
F
H 2400
14325
3600
3600
2408
2400
I
2400
9533
9525
2400
J
K
L 4900
5000
1000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
4820
605
SECTION 2
23958
150
1000
270
2400
200
616 775
2400
12028
M
9600
9408
2400
O
9583
10456
2400
N
P 65933
14333
1400
3886
3886
420
2400
81256
A
9600
A
SECTION 1
3
1:50
1100
4
600
Q
600
600
600
Section A-A Stepping of foundation for drainage pipe.
Case
Detail Design 2
Drawing name
Foundation plan
Drawing nr
(12)01.01
Scale
1:100
Date
14.11.11
Drawn by
Marianne Proomet
Checked by
Hana Jergusova Henry Pilk
Project: Svenstrup Sportshall
Materials
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
1.
Metal roof Profile 5 mm, soft insulation 160 mm (heighest point 200 mm), metal profile 5 mm Ceiling - wooden laths
2.
Portal frame glue-laminated 200 x 940 mm
3.
Roof box Roofing felt covering, plywood 15 mm, metal profile 5 mm, rafter 450 mm, dpm Connecting truss 300 mm Ceiling - 50 mm insulation, battens 50 mm, plasterboard ceiling 12 mm
4.
Concrete wall element Front panel 80 mm concrete, 200 mm soft insulation, 140 mm concrete in back panel with reinfocement
5.
Interior loadbearing wall 100 mm with reinforcement
6.
Metal wall with framing Steel profile 5 mm, soft insulation 110 mm, profile 5 mm, 50 mm for framing
7.
Floor Gravel 230 mm, hard insulation 150 mm, 100 mm concrete Floor in sportshall - wooden board system Moisture barrier, packing 30 mm, battens 39 x 40 x 3364 mm, and on top 26 x 60 mm Wooden board covering 22 x 129 x 3700 mm Tile flooring - Moisture barrier, screed 6 mm, waterproofing, tiles 12 mm
8.
Ventilation ducts
9.
Foundation of 200 mm and hard insulation for cold bridges 160 mm
Q
12512
1.
11305
8012
2.
10. Pad foundation 900 x 1000 x 1000 mm under rafters 11. Foundation under load bearing walls 150 mm (reinforced) 12. Windows in hall (1200 mm)
13600
4779 5032
4680
3.
1200
1512
4744 8.
3010
2780
2435
4242 12.
2184 4744
2600
2120 2600
0
-200
6100
4. 5.
6.
2600
4500
3041
0
10.
-1100
-900
-587
7.
10.
-490
11.
-1100
1100
1100
7.
9.
-1100
Case
Detail Design 2
Drawing name
Section 1
Drawing nr
(99)02.01
Scale
1:50
Date
22.11.11
Drawn by
Marianne Proomet
Checked by
Hana Jergusova Henry Pilk
Project: Svenstrup Sportshall
Materials
1
2
3
4
5
6
7
8
9
10
11
12
13
14
12500
16
17
18
19
20
21
22
23
7400
5100
2612
4.
-20
4.
Interior loadbearing wall 100 mm with reinforcement
5.
Floor Gravel 230 mm, hard insulation 150 mm, 100 mm concrete Tile flooring - Moisture barrier, screed 6 mm, waterproofing, tiles 12 mm
6.
Foundation of 200 mm and hard insulation for cold bridges 160 mm
7.
Foundation under load bearing walls 150 mm (reinforced)
8.
Interior wall concrete element 100 mm
3.
5.
-490
6. -1100
Concrete wall element Front panel 80 mm concrete, 200 mm soft insulation, 140 mm concrete in back panel with reinfocement
2.
2.
2210
8. 0
3.
2855 6200
Ventilation aggregator
Roof box Roofing felt covering, plywood 15 mm metal profile 5 mm, rafter 450 mm, dpm Connecting truss 300 mm Ceiling - 50 mm insulation, battens 50 mm, plasterboard ceiling 12 mm
7.
1100
2612
3.
2.
2244
5035
-194 0
Metal roof Profile 5 mm, soft insulation 160 mm (heighest point 200 mm), metal profile 5 mm
1.
7465 13600 6135
15
1.
6.
Case
Detail Design 2
Drawing name
Section 2
Drawing nr
(99)02.02
Scale
1:100
Date
22.11.11
Drawn by
Marianne Proomet
Checked by
Hana Jergusova Henry Pilk
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
C:\Users\Marianne\Desktop\A1paperATCM-logo-2985.png
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case Drawing name Drawing nr Scale Date Drawn by
Checked by
Outline proposal Site plan 4 1:500 10.10.2011
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
D:\UCN\building project\outline proposal\logo.png
Project: Svenstrup Sportshall
P
Emergency Phone
E
Extinguisher First Aid Kit Lighting Fence Concrete mixer
W S TW
Waste container Storage container Tent Workshop Excavator Truck
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Mobile lift Mobile crane
Number of workers on site.......max 20 Capacity of dining room...................20 Showers.............................................2 (one shower necessary for every 10 people) Toilets................................................3 (one toilet necessary for every 15 people) Basins................................................4 (one basin necessary for every 5 people)
Building Site Task
Case Drawing name Drawing nr Scale Date
Phase 1- foundation (99)1.2 1:250 18.11.2011
Drawn by
Marianne Proomet Checked by
Hana Jergusova, Henry Pilk
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Fresh water Sewage Electricity
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case Drawing name
DD 2 Drainage plan
Drawing nr
(52).1.1
Scale
1:500
Date
11.11.2011
Drawn by Hana Jergusova Checked by Henry Pilk PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall /h
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Ventilation Plan
Drawing nr
(57)01.01
Scale
1:200
Date
28th Nov '11
Drawn by
Henry Pilk
Checked by Marianne Proomet Hanka Jergusova PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Connection
Drawing nr
(21)5.2
Scale
1:5
Date
5th Dets '11
Drawn by
Henry Pilk
Checked Checked by by
Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Keypoint
Drawing nr
(27)5.2
Scale
1:5
Date
11th Dets '11
Drawn by
Henry Pilk
Checked Checked by by
Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Roof Keypoint
Drawing nr
(27)5.4
Scale
1:5
Date
3rd Dets '11
Drawn by
Henry Pilk
Checked by Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Fastener
Project: Svenstrup Sportshall
Elastic Joint Sealing Compound Sealing Compound
Steel Sandwich Panel
3
3 Modular width 1200
Modular width 1200
Case
Detail Design 2
Drawing name
Wall Keypoint
Drawing nr
(21)5.5
Scale
1:5
Date
13th Dets '11
Drawn by
Henry Pilk
Checked by Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Steel Sandwich Panel
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Steel Rail
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Wall Keypoint
Drawing nr
(21)5.3
Scale
1:5
Date
13th Dets '11
Drawn by
Henry Pilk
Checked by Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Wall Keypoint
Drawing nr
(27)5.5
Scale
1:5
Date
14th Dets '11
Drawn by
Henry Pilk
Checked by Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Case
Detail Design 2
Drawing name
Window
Drawing nr
(21)5.6
Scale
1:5
Date
5th Dets '11
Drawn by
Henry Pilk
Checked Checked by by
Marianne Proomet Hanka Jergusova
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Project: Svenstrup Sportshall
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT