HECTOR GARCIA-CASTRILLO SELECTED WORKS
hgarciacastrillo@gmail.com | 407 319 2880
Rent The Runway - HQ WORKPLACE INTERIORS | Dumbo, Brookyln, NY Company: WEWORK, Powered by We Project Size: 60,660 USF Experience: DD, CD & CA Current Phase: Completed Role: Design Manager
OFFICE
CONF. (14X) RM
CONF. (3X) RM
CONF. (6X) RM
ADA PHONEROOM
BREAKOUT
HALL
A recently renovated pre-war building serves as the backdrop for Rent The Runway’s HQ space. For a company with a strong brand identity, there was a great opportunity to create a synergy between their culture, aesthetic and innovative workplace recommendations. Through their hypergrowth mode the intent was to establish enough flexibility in their space for a variety of team sizes and needs. In addition, retail specific spaces were created to align with their daily work-styles.
BREAKOUT
CREATIVITY RM
MDF
VESTIBULE ELEC
NIC
NIC
LIBRARY BATH W/ SHOWER
Floor Plan_CENTER OF GRAVITY FLOOR
© 2020 WeWork. Confidential & Proprietary
POWERED BY WE
FURNITURE PACKAGE
Diagram_MATERIAL & FURNITURE PALETTE
Photography_RECEPTION LOUNGE
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.comv | 407.319.2880
PROFESSIONAL | SOFTBANK - DC OFFICE
EXPOSED EUROPLY EDGE ELECTRICAL BOX
1 UP-05
1 UP-05
PL-11
PL-11 WD-3B
154 CONFIRMED by IFC FEB 06, 2020)
ELECTRICAL EXPOSED 1 BOX EUROPLY EDGE ELECTRICAL SHIPPED LOOSE BOX
EXPOSED EUROPLY EDGE ELECTRICAL 1 UP-05 BOX
SHIPPED LOOSE
UP-05
PL-11
WD-3B
PL-11 WD-3B
EXPOSED EUROPLY EDGE
EXPOSED EUROPLY EDGE
UP-05
UP-05
UP-05
UP-05
FABRIC PL-11 SEAM
FABRIC PL-11 SEAM
FABRIC PL-11 SEAM
FABRIC PL-11 SEAM
UP-05
UP-05
EXPOSED EUROPLY EDGE
WD-3B
EXPOSED EUROPLY EDGE
UP-05
EXPOSED EUROPLY EDGE
UP-05
UP-05
1 1 152
5403 4 [45'-0 3/4"] AS PER ARCH. SPECS
PLAN
FABRIC SEAM
FABRIC SEAM
SCALE: 1/2" = 1'-0"
UP-05
FABRIC SEAM
UP-05
FABRIC SEAM
UP-05
UP-05
UP-05
ED
Approval Stamp Date: March 23, 2020
1 1 152
V RO
5403 4 [45'-0 3/4"] AS PER ARCH. SPECS
P
AP
PLAN
SCALE: 1/2" = 1'-0"
ED
Approval Stamp Dated approval stamp and/or approval signature indicates that all of theMarch information this drawing has been agreed upon and Date: 23,in2020 supersede all previous specs including purchase order.
EXPOSED EDGE
EXPOSED EDGE
UP-05
WD-3B
1 314
2
WD-3B
2
WD-3B
WD-3B
IMPORTANT NOTES THIS SEATING AREA IS NOT TO BE ADA COMPLIANT ALL FRONT PANELS AT BENCH-BASE AND ALL OTHER PANELS IN CONTACT WITH THE FLOOR EXPOSED ARE SHIPPED LOOSE 2" HIGHER TO BE SCRIBED ON SITE EXPOSED UP-05 UP-05 UP-05 EDGE IFC TO LOCATE AND EDGE CUT ELECTRICAL ON SITE MT-10 WD-3B MT-10 WD-3B MT-10 METAL LINER SHIPPED LOOSE1TO ACCESS ELECTRICAL UNDERNEATH 1 1
18
WD-3B
WD-3B
P
WD-3B
WD-3B
FRONT ELEVATION
WD-3B
WD-3B
WD-3B
WD-3B
WD-3B
311 4
Other Qty
EXPOSED MT-10 EUROPLY EDGE
WD-3B 1 614
9
FRONT ELEVATION
1
SCALE: 1/2" = 1'-0"
METAL LINER
2 WD-3B
Structural modifications may develop due to material properties, the manufacturing processes and/or unforeseen constraints Dimensions are in inches unless noted otherwise noted
Unit:
Job. Number:
9th Floor (09.27) Common Nook Seating [MW-17]
19461
This drawing is protected by the copyright laws of Canada & The United States of America. Any unauthorized distribution in whole or in part without the written consent of IFC is prohibited.
By: fb
COPYRIGHT
mar11,20 1
revised planters, electrical & overall dimensions, resubmit
mar25,20 2
approved as noted
By
INTL Furnishings Canada Inc.
INTL Furnishings Canada Inc.
fb
WD-3B
MT-10
C
Abbreviation Legend ML = Melamine WS = Wood Solid WV = Wood Veneer COM = Customers Own Material TBD = To Be Determined PL = Plastic Laminate 201 County Court Blvd., Suite 603 Tel: (905) 670-7445 NTS = Not To (905) Scale 670-0445 EB = Edge Banding Brampton, ON Fax:
fb
L6W 4L2
Drawing No. 1 524 PANEL SHIPPED LOOSE TO ANCHOR BACK REST
PL-6
1 12
Rev. No.
A17
63 4
PL-6
2
INTL Furnishings Canada Inc.
.6
PL-6
C INTL manufacturing responsibilities including, but notCanada limited toInc. structural COPYRIGHT Furnishings
integrity, finish, production and delivery scheduling as well as Abbreviation Legend manufacturers warrantee are the sole responsibility of ML = Melamine WS = Wood Solid Hilltop WoodWorking WV = Wood Veneer COM = Customers Own Material Production will begin only after the receipt of deposit, all drawing, = Plastic Laminate = To Determined PLfinish & hardware approvals, asTBD well as theBe confirmation of all = Edge Banding NTS = Not EB dimensions & specs. Additional charges mayTo beScale incurred if any changes are made after approvals are received
WeWork 10 Jay Street, NY FLRS 7, 8, 9, 10
201 County Court Blvd., Suite 603 Brampton, ON L6W 4L2
1
Tel: (905) 670-7445 Fax: (905) 670-0445
Drawing No.
A17
Rev. No.
2
11 4
20
1 272
6
2
18 HOLD
1 [3'-1 1/2"] 372
UP-05
1 172
6
10
78
WD-3B
WD-3B
Structural modifications may develop due to material properties, the manufacturing processes and/or unforeseen constraints Dated approval stamp and/or approval signature indicates that all Dimensions are in inches unless noted otherwise noted of the information in this drawing has been agreed upon and all previous includinglaws purchase order. This supersede drawing is protected byspecs the copyright of Canada & The UnitedFurnishings States of America. Anyisunauthorized distribution whole INTL Canada Inc. functioning as a draftinginservice, or in part without the written consent IFC is prohibited.All project manager and/or sales agent forof the manufacturer.
Total QTY
2°
MT-10
EXPOSED EUROPLY EDGE
4
1 12
Attic Stock
WD-3B
18
83 8
Extra Qty
Issued Date: December 30, 2019 Revisions Date # Description
SHIPPED LOOSE 10" WIDE TO SCRIBE ON SITE
WD-3B
Order Qty
Project Name:
SCALE: 1/2" = 1'-0"
MT-10
AP
Production will begin only after the receipt of deposit, all drawing, finish & hardware approvals, as well as the confirmation of all dimensions & specs. Additional charges may be incurred if any changes are made after approvals are received
UP-05 1
-
EXPOSED EDGE
UP-05 MT-10
2
EXPOSED EDGE D-3B
EXPOSED EDGE
UP-05 1
WD-3B
FOLLOWING DOCUMENTS: 9 _rev_power_plans (1).pdf DATE: Dec 16, 2019
12
3
SHIPPED LOOSE
Fabrication Drawings_PANTRY NOOKS 83 8
1 632
1 172
WD-3B
Photography_PANTRY NOOKS
8 1 252
SECTION C
SCALE: 1-1/2" = 1'-0"
SHIPPED LOOSE 10" WIDE TO SCRIBE ON SITE
EXPOSED EUROPLY EDGE UP-05
WD-3B 1 12
EXPOSED EUROPLY EDGE
PL-11
1 38
1
18 HOLD
2 12
WD-3B
20
18
11 4
20
3 WD-3B
Production will begin only after the receipt of deposit, all drawing, finish & hardware approvals, as well as the confirmation of all dimensions & specs. Additional charges may be incurred if any changes are made after approvals are received Structural modifications may develop due to material properties, the manufacturing processes and/or unforeseen constraints Dimensions are in inches unless noted otherwise noted
6
1 314
∅3
AP
Dated approval stamp and/or approval signature indicates that all of the information in this drawing has been agreed upon and supersede all previous specs including purchase order. INTL Furnishings Canada Inc. is functioning as a drafting service, project manager and/or sales agent for the manufacturer. All manufacturing responsibilities including, but not limited to structural integrity, finish, production and delivery scheduling as well as manufacturers warrantee are the sole responsibility of Hilltop WoodWorking
371 2
MT-10
UP-05
OPENING FOR WIRES TO BE CUT ON SITE
1 94
171 2
2
ELECTRICAL BOX INSIDE PLANTER
D
VE
O PR
ELECTRICAL
℄
1 82
Approval Stamp Date: March 23, 2020
74 [6'-2"] PL-6
2°
12
.6
1 12
78
83 8
1 12
1
271 2
D-3B
EXPOSED EDGE
UP-05 1
V RO
INTL Furnishings Canada Inc. is functioning as a drafting service, project manager and/or sales agent for the manufacturer. All manufacturing responsibilities including, but not limited to structural integrity, finish, production and delivery scheduling as well as manufacturers warrantee are the sole responsibility of Hilltop WoodWorking
This drawing is protected by the copyright laws of Canada & The United States of America. Any unauthorized distribution in whole or in part without the written consent of IFC is prohibited.
COPYRIGHT WS = Wood Solid WV = Wood Veneer PL = Plastic Laminate EB = Edge Banding
C
INTL Furnishings Canada Inc.
Abbreviation Legend ML = Melamine COM = Customers Own Material TBD = To Be Determined NTS = Not To Scale
WD-3B
233 8
66 [5'-6"]
SHIPPED LOOSE HIGHER TO TRIM ON SITE
SECTION D
SCALE: 1-1/2" = 1'-0"
8
CONCEALED FLANGE SECURING TABLE TO FLOOR TYP.
SHIPPED LOOSE HIGHER TO TRIM ON SITE
INTL Furnishings Canada Inc. 201 County Court Blvd., Suite 603 Brampton, ON L6W 4L2
Drawing No.
A17B
Photography_EMPLOYEE GARMENT RENTAL
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.comv | 407.319.2880
Tel: (905) 670-7445 Fax: (905) 670-0445
Rev. No.
2
Photography_BOARDROOM
PROFESSIONAL | SOFTBANK - DC OFFICE
Chase - Soho Retail Branch RETAIL | NYC, NY, USA Company: WEWORK, Powered by We Experience: CD & CA Current Phase: Completed Role: Design Manager This project consists of a 3500 SF bank retail branch in New York. The ethos of the design is centered on redefining the concept of banking - breaking away from the traditionally closed-off and impersonal banking journey and changing it for a more humane, and inviting user experience - pushing transparency and openness both physically and conceptually. The floor plan ensures the user trajectory is both private during long transactions and public for short-term visits. To humanize the deisgn, airy and natural materials are selected and complimented with pops of color that align to the bank’s branding identity.
Photography_ENTRY AREA
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
Floor Plan_GROUND LEVEL
Fabrication Drawings_VESTIBULE FACADE
PROFESSIONAL | CHASE - SOHO RETAIL BRANCH
Fabrications Drawings_TELLER DESK
Photography_VISITOR LOUNGE
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
Photography_TELLER DESK
Photography_LIBRARY WORKSTATIONS
PROFESSIONAL | CHASE - SOHO RETAIL BRANCH
Lounge
SoftBank - DC Office WORKPLACE INTERIORS | Washington, DC, USA Company: WEWORK, Powered by We Project Size: 10,000 USF Experience: Concept, DD, CD & CA Current Phase: Completed Role: Design Manager
1
Key Plan
This intimate office space of approximately 10,000SF was set in place for Softbank’s government affairs team in mind. Overlooking the White House and the Washington monument, the project’s prime location allows the host ing of government officials groups. As such, the floor plan provides views out and privacy for sensitive gatherings. Softbank’s Japanese origin plays a key role in the ethos of this space. Japanese elements of natural materials, clean lines and airy atmosphere mix with pops of color to create a pleasant but interesting office environment. 1
3
1
5
5
1 1 4 56
36
3
Photography_EXECUTIVE BOARDROOM 2
12
234
1 23
453
4 2
64
2
3 6 5
4
2 NW Washington, DC Design Package | 02/08/2019 | 1440 GDesign StreetPackage NW Washington, DC | 1440 G Street | 02/08/2019
22
Design Package | 02/08/2019 | 1440 G Street NW Washington, DC
5
K
Key Plan
6
1. 2. 3. 4.
k13 acoustic cei 6 wall paint felt wall panel wood fluted wains
5.
custom drapery f
4 Package | 02/08/2019 | 1440 G Street NW Washington,6. Design DC sisal carpet til 19 3
Diagram_MATERIAL & FURNITURE PALETTE
Street NWPackage Washington, DC Design | 02/08/2019 | 1440 G Street NW Washington, DC
4
17
D DWR,
Nelson Lamp
5
Key Plan
B
A
1. 2. 63. 4.
1. Key Plan 2. Custom,E15, CoffeeEnoki Table Side 3.
B
4. 5. 6.
custom wallpaper Arper, Steeve porcelain wall tile porcelain floor tile caesarstone countertop
porcelain backsplash millwork plastic laminate island countertop wood fluting porcelain floor tile
C
C
UO, Marte Hem,
Alle Tabl
Design Package | 02/08/2019 | 1440 G Street NW
Photography_ENTRY LOUNGE
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.comv | 407.319.2880
PROFESSIONAL | SOFTBANK - DC OFFICE
1
2
2
Furnishings
3
Client Meeting Lounge
1 3
4
1
17 1
2 4
5
2
17
Floor Plan_10TH FLOOR LAYOUT 3 5
2
6
3
1
4 6
Key Plan
1. 2.
porcelain backsplash millwork
3. 4.
plastic laminate island countertop
5. 6.
wood fluting porcelain floor tile
C
, DC
Key Plan
1. 2.
porcelain backsplash millwork
3. 4. 5
plastic laminate island countertop
5. 6.
1 3
4
17 17 2 4
1. Wallpaper
wood fluting porcelain floor tile
5
6
3 6
1. 2.
porcelain backsplash millwork
3. 4. 5. 6.
plastic laminate island countertop wood fluting porcelain floor tile
Fogia, Bollo Chair
4
Key Plan
37
porcelain HAY, Hackneybacksplash Sofa A1. 2. millwork 3. 4. 5. 6.
plastic laminate island countertop wood fluting porcelain floor tile
D Bludot, A
Key Plan
Coco
B 1.
custom wallpaper
2. 3. 4.
porcelain wall tile porcelain floor tile caesarstone countertop
Custom, Oa
Framery O
Design Package | 02/08/2019 | 1440 G Street NW Washington, DC
D Bludot,
Coco
Key Key PlanPlan
A
1. 2. 3.
custom wallpaper porcelain wall tile porcelain floor tile
4.
caesarstone countertop
Kartell, Max Beam
, DC
Photography_OFFICE PANTRY
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.comv | 407.319.2880
PROFESSIONAL | SOFTBANK - DC OFFICE
Toast Headquarters WORKPLACE INTERIORS | Boston, MA, USA Company: Powered by We, WeWork Experience: Concept, DD, CD & CA Current Phase: Complete Role: Design Manager Area: 108,000 USF
CONF ROOM - 6P CONF ROOM 14P
BREAKOUT
DEDICATED DESKS
BREAKOUT
FILE STORAGE
QUIET ROOM - 6P
HALLWAY
CONF ROOM - 4P CONF ROOM - 3P
HALLWAY
BREAKOUT CONF ROOM - 4P
BREAKOUT
CONF ROOM - 3P
DEDICATED DESKS
CONF ROOM - 3P
DEDICATED DESKS
BRAINSTORM CONF ROOM - 3P
ELEC QUIET ROOM - 6P
MECH ELEC
ELEC WALK-IN FRIDGE
STORAGE
BREAKOUT
CONF ROOM 10P
CONF ROOM 10P
UNISEX RESTROOM
DEDICATED DESKS
HALLWAY
CONF ROOM - 4P
MEN WOMEN
CONF ROOM - 3P
MEN
CONF CONF CONF - 3P CONF ROOM -ROOM 3P ROOM - 4P ROOM - 4P
STORAGE
CONF STORAGE ROOM - 3P STORAGE CONF ROOM - 3P
The design for Toast’s headquarters looks at the concept of work meeting hospitality to solve the needs of a company looking to attract the best tech talent and impress its restaurant clientele. The design pushes hospitality to the foreground by infusing quintessential aspects of coffee houses, pubs and restaurant to standard workplace programming such as reception, conference room and private offices. The material selection is expressive and honest mixed with wood treatments and concrete floors to create rich atmospheres.
CONF ROOM 10P
CONF ROOM - 4P
HALLWAY
STORAGE ROOM - 4P
MAIN LOUNGE
KITCHEN BOH
MECH
CONF ROOM - 4P
HALLWAY CONF CONF ROOM - 3P ROOM - 3P
DEDICATED DESKS
CONF
KITCHEN BOH
BOARDROOM
CONF ROOM - 4P
CONF ROOM - 3P CONF ROOM - 3P
HALLWAY
STORAGESTORAGE
MECH
CONF ROOM - 3P
QUIET ROOM
CONF PHONE BRAINSTORM BRAINSTORM ROOM - 3P BOOTH
MECH
PRINTER CONF ROOM - 4P
CONF CONF ROOM - 4P ROOM - 4P
CONF ROOM - 4P
HALLWAY
DEDICATED DESKS
COATS CONF ROOM - 4P
DEDICATED DESKS
DEDICATED DESKS
CONF ROOM - 3P
CONF ROOM - 6P
IT HELP DESK
CONF CONF CONF CONF ROOM - 4P ROOM - 4P ROOM - 4P ROOM - 3P
ELEVATOR LOBBY
CONF ROOM - 3P CONF ROOM - 3P
HALLWAY
UP
CONF ROOM - 3P CONF CONF CONF ROOM - 3PROOM - 4PROOM - 4P
STAIR 2
CLASSROOM
CONF ROOM - 4P
HALLWAY
TAF CLOSET
STORAGE
STAIR 3
STAIR 4
CONF ROOM - 6P
TEL/COM
RECORDING STUDIO
DN
RECEPTION
HALLWAY JAN CLOSET
JAN CLOSET
CONF ROOM - 3P CONF CONF TEAPOINT ROOM - 3P ROOM - 4P
IT STORAGE
MEN STORAGE MEN
WOMEN
CONF ROOM - 4P WOMEN
MEN
CLASSROOM COATS
BRAINSTORM DEDICATED DESKS
BRAINSTORM
ELEC
PRINTER
MECH
TEL/COM
BREAKOUT
CONF ROOM - 4P
MOTHER RM
CONF ROOM - 4P
MOTHER RM
CONF ROOM - 4P
CONF ROOM - 4P
CONF ROOM - 4P
ME STOR.
EE STOR.
ME LAB
EE LAB
BREAKOUT
DEDICATED DESKS
BREAKOUT
BRAINSTORM
CONF ROOM 10P
HALLWAY
CONF ROOM 10P
CONF ROOM - 3P
CONF ROOM - 3P STORAGE
CONF ROOM 10P
WATER FILTRATION
MECH
LIBRARY
CONF ROOM - 6P DEDICATED DESKS
?
DEDICATED DESKS CONF ROOM - 6P
CONF ROOM - 6P
CONF ROOM - 4P
HALLWAY
BOARDROOM
CONF ROOM - 6P
CONF CONF ROOM - 3P ROOM - 3P
CONF ROOM - 6P
CONF ROOM - 6P
HALLWAY
HALLWAY DEDICATED DESKS
ELEC
TEL/COM
QUIET ROOM - 6P BRAINSTORM
DEDICATED DESKS
UX LAB MECH
BREAKOUT
CONF ROOM - 6P
PHONE BOOTH
CONF ROOM - 3P
DEDICATED DESKS
QA LAB
WOMEN
STORAGE
MECH STORAGE
CONF ROOM - 4P
HALLWAY
MECH CLOSET
WELLNESS RM
HALLWAY
F&B STORAGE
DEDICATED DESKS
CONF ROOM - 6P
DEDICATED DESKS TEAPOINT
PRINTER MECH
CLASSROOM
CONF ROOM - 3P CONF ROOM - 3P
CONF ROOM - 6P
CONF ROOM - 3P
HALLWAY
BREAKOUT
BREAKOUT COATS CONF ROOM 14P
DEDICATED DESKS
COATS DEDICATED DESKS STORAGE
Floor Plan_8TH FLOOR 8TH FLOOR AOR Handoff Plan 1" = 20'-0"
5/23/2019 5:04:36 PM
1
UP DN
STAIR 1
UP
DN
DN
DN
Demolition Plan_8TH FLOOR
UP
DN DN
DN
Demolition RCP_8TH FLOOR
DN
DN
N
N
w | January 24, 2019 | Toast HQ & Proprietary.
N
75% Schematic Design Review | January 24, 2019 | Toast HQ © 2019 WeWork. Confidential & Proprietary.
Site Photo_PRE-DEMOLITION
Site Photo_POST-DEMOLITION
Site Photo_RECEPTION
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | TOAST HEADQUARTERS
8
OUTLINE OF SINK AND COUNTERTOP BELOW
WD-06
PF-02 PF-01
4
4
16
PF-01
16
8
1
PF-02
WD-06
WD-06
WD-11
WD-11
WD-11
WD-11
Approva
144 [12'] TO CEILING
WD-06
WD-06
AP-07 T-49-2-G-2 54-1/8"Wx81-7/8"Hx29-3/4D c/w 2.5" CASTERS
WD-06
TILES by G.C.
AP-07 T-49-2-G-2 54-1/8"Wx81-7/8"Hx29-3/4D c/w 2.5" CASTERS
MT-02
WD-06
PASSTHROUGH
AP-15
Production finish & dimensio c
SS-03
HD-1
TO MATCH WD-11 (STIKWOOD VANDYKE)
WD-11
WOOD PLANKS
STIKWOOD 5" WIDTHS
VANDYKE
PL-2B
PLASTIC LAMINATE
WILSONART 15505-31 TRACELESS
BLACK VELVET EUROPLY EDGE
PL-6
PLASTIC LAMINATE
WILSONART OR EQUAL CABINET INTERIOR
BLACK
ML-6 MT-02 SS-03
HD-1
HD-3
2
MELAMINE
WILSONART OR EQUAL CABINET INTERIOR
BLACK BLACK PVC EDGE
METAL LAMINATE
FORMICA - M2178 EUROPLY EDGE
BRUSHED STAINLESS STEEL
STONE
CAESARSTONE
RUGGED CONCRETE 4033 HONED
HARDWARE
EMTEK CADET KNOB 1-1/4" DIA 86322(US19)
HARDWARE
NICKEL
HARDWARE
BLUM OR EQUAL 165° SWING HINGE SOFT- SELF CLOSE
NICKEL
HARDWARE
RICHELIEU OR EQUAL CABINET LEVELER 4501090
BLACK
HARDWARE
RICHELIEU OR EQUAL LEVELER CLIP 226302G
ZINC
HARDWARE
RICHELIEU OR EQUAL CLIP BASE - KNOCK-IN 328305
ZINC
HARDWARE
MT-02 SS-03
HD-1
HILLTOP CUSTOM
BLACK CHAMPAGNE
WD-06
Project N
STAIR 3 S3
STAIR 2 S2
STAIR 4 S4DN
BLACK
MT-02
METAL LAMINATE
FORMICA - M2178 EUROPLY EDGE
BRUSHED STAINLESS STEEL
STONE
CAESARSTONE
RAW CONCRETE 4004 HONED
HARDWARE
EMTEK CADET KNOB 1-1/4" DIA 86322(US19)
FLAT BLACK
HARDWARE
BIFOLD DOOR ROLLER HAFELE 409.26.921
GALVANIZED
FRONT ELEVATION
jan15,20 4
IMPORTANT NOTES: WD-11 STICK-WOOD TO BE CUT AROUND VARIOUS OBSTRUCTIONS THIS PANTRY MAY NOT BE ADA COMPLIANT DUE TO ±1" UNEVEN FLOORING
8th Floor KEYPLAN
THIS DRAWING HAS BEEN CREATED USING THE FOLLOWING DOCUMENTS: PxWe_Toast_MA_401_Park_ACM_IFC_BIDSET_.pdf 190614_Toast_Millwork-Scope_Rev-5.pdf PxWe_Toast_BOS_401_Park_Floor plans with room numbers.pdf
TOE KICK SHIPPED IN 5" HIGH PIECES. INSTALLED ON SITE
Order Qty
Extra Qty
Attic Stock
Other Qty
ALUMINUM BRUSHED NICKEL
CUSTOM
FLAT BLACK POWDER COAT
1
TOAST HQ BOSTON, MA
PF-02
WD-06
Total QTY
Project Name:
OUTLINE OF SINK AND COUNTERTOP BELOW
PF-01
Job. Number:
PF-02 PF-01
Unit:
8th FLOOR COOP PANTRY BEER ISLAND (8C103)
Issued Date: July 24, 2019 Revisions Description Date #
By: ad By
4
4
BIFOLD DOOR TRACK HAFELE 904.84.250 BIFOLD DOOR CENTER HINGES HAFELE 354.22.631
METAL ANGLE BRACKETS
1
nov14,19 2
nov20,19 3
19329
HARDWARE
193
L6W 4L2
Drawing Date # oct18,19
1
HARDWARE
INT
201 Coun
BramptonD Issued
x2 6" FILLER PANELS SHIPPED LOOSE TO BE TRIMMED ON SITE
4
Finish CLEAR COAT 5 SHEEN
PL-6
WILSONART OR EQUAL CABINET INTERIOR
Site Photo_BOARDROOM
WD-06
SCALE: NTS
Description WALNUT FLAT CUT EUROPLY EDGE
PLASTIC LAMINATE
HD-1
WD-06
Job. Num
-
WOOD VENEER
SS-03
WD-06
AP-05 PG8061 23-9/16W 32-5/16H 23-7/16D
SCALE: 3/4" = 1'-0"
HAFELE TRASH MECHANISM 502.74.813 Specification Notes Type
IFC WD-06
WD-06
UP
(B-36-DD-ADA ONLY)
FLOATING SHELF BRACKET
HARDWARE
WW
PL-6
WD-06
25-3/4D
INSTALLER TO ENSURE DISHWASHER IS ON SITE 3 PRIOR TO INSTALLATION TO CONFIRM THAT OVERALL HEIGHT COMPLY WITH ADA STANDARDS
BLACK NICKEL BLACK
BLUM OR EQUAL 110° SWING HINGE SOFT- SELF CLOSE
WD-06
1CO
Elevation_PANTRY
HARDWARE
This draw Order United Sta or in p
WS = Woo Attic St WV = Woo PL = Plast EB = Edge
2
FLAT BLACK
CAM LOCK 188271290 52mm CAM 1881283 CYLINDER 18006011 ROSETTE 18129190
HD-3
Structural the man Dime
WD-11
AP-16 STANDUP BEVI
22" W THIS DRAWING HAS BEEN CREATED USING THE FOLLOWING DOCUMENTS: 61"H 22"D PxWe_Toast_MA_401_Park_ACM_IFC_BIDSET_.pdf AP-03 WD-06 WD-06 WD-06 125 190614_Toast_Millwork-Scope_Rev-5.pdf NG21"W AP-06 31"H room numbers.pdf PxWe_Toast_BOS_401_Park_Floor plans with TUC-24G-HC-FGD01 23"D 24W PxWe_Toast_MA_401_Park_ACM_ARCH_09-01-19_ (1).pdf 31-5/8H
8
ML-6 MT-02
WALNUT FLAT CUT CLEAR COAT 5 SHEEN EUROPLY EDGE
16
PL-2B PL-6
Description
WOOD VENEER
WD-06
CUSTOM FLOATING SHELF BRACKETS
PF-02
SS-03
8
WD-11
Type
IFC
PF-02
16
WW
Dated app of the in super
PASSTHROUGH
INTL Furn project m manufactur integrity, man
WD-11 Specification Notes WD-06
PASSTHROUGH
AP-15
WD-06
WD-06
WD-11
WD-11
WD-11
WD-11
Approva
WD-06
WD-06
WD-06
AP-09
TILES by G.C.
144 [12'] TO CEILING
COUNTERTOP SEAM
AP-07 T-49-2-G-2 54-1/8"Wx81-7/8"Hx29-3/4D c/w 2.5" CASTERS
AP-07 T-49-2-G-2 54-1/8"Wx81-7/8"Hx29-3/4D c/w 2.5" CASTERS
MT-02
WD-06
PASSTHROUGH
AP-15
PASSTHROUGH
INTL Furn project m manufactur integrity, man
AP-15
Production finish & dimensio c
WD-11
PF-02
Detail Plan_PANTRY & ISLAND
AP-16 STANDUP BEVI 22" W 61"H 22"D
PL-6 MT-02 SS-03
HD-1
IFC
Type
Description
Finish
WOOD VENEER
WALNUT FLAT CUT EUROPLY EDGE
CLEAR COAT 5 SHEEN
PL-6
PLASTIC LAMINATE
WILSONART OR EQUAL CABINET INTERIOR
BLACK
MT-02
METAL LAMINATE
FORMICA - M2178 EUROPLY EDGE
BRUSHED STAINLESS STEEL
STONE
CAESARSTONE
RAW CONCRETE 4004 HONED
HARDWARE
EMTEK CADET KNOB 1-1/4" DIA 86322(US19)
FLAT BLACK
HARDWARE
BIFOLD DOOR ROLLER HAFELE 409.26.921
GALVANIZED
HARDWARE
BIFOLD DOOR TRACK HAFELE 904.84.250
ALUMINUM
HARDWARE
BIFOLD DOOR CENTER HINGES HAFELE 354.22.631
BRUSHED NICKEL
METAL ANGLE BRACKETS
CUSTOM
FLAT BLACK POWDER COAT
WD-06
SS-03
HD-1
PF-02
SS-03
CUSTOM FLOATING SHELF BRACKETS
Approval Stamp
WD-06
WD-06
WD-06
WD-06
AP-05 PG8061 23-9/16W 32-5/16H 23-7/16D
AP-06 TUC-24G-HC-FGD01 24W 31-5/8H 25-3/4D
THIS DRAWING HAS BEEN CREATED USING THE FOLLOWING DOCUMENTS: PxWe_Toast_MA_401_Park_ACM_IFC_BIDSET_.pdf 190614_Toast_Millwork-Scope_Rev-5.pdf PxWe_Toast_BOS_401_Park_Floor plans with room numbers.pdf
WD-06
WD-06
WD-06
WD-06
Total QTY
TOE KICK SHIPPED IN 5" HIGH PIECES. INSTALLED ON SITE
1
Production will begin only after the receipt of deposit, all drawing, finish & hardware approvals, as well as the confirmation of all Attic Stock Other Qty dimensions & specs. Additional charges may be incurred if any changes are made after approvals are received Structural modifications may develop due to material properties, the manufacturing processes and/or unforeseen constraints Dimensions are in inches unless noted otherwise noted
Project Name:
This drawing is protected by the copyright laws of Canada & The United States of America. Any unauthorized distribution in whole or in part without the written consent of IFC is prohibited.
TOAST HQ INTL Furnishings Canada Inc. BOSTON, MA
WS = Wood Solid WV = Wood Veneer Job. Number: PL = Plastic Laminate EB = Edge Banding
SCALE: 3/4" = 1'-0"
19329
C
Abbreviation Legend ML = Melamine Unit: COM = Customers Own Material TBD = To Be Determined NTS = Not To Scale
8th FLOOR COOP PANTRY BEER ISLAND (8C103)
Issued Date: July 24, 2019 Revisions Description Date #
By: ad By
INTL Furnishings Canada Inc. 201 County Court BLVD- 603 Brampton, ON L6W 4L2
Drawing No.
Tel: (905) 670-7445 Fax: (905) 670-0445
Rev. No.
0
6
A09
(AP-04) NE1025 20-1/8Wx12H x16D
(AP-06) TUC-24G-HC 24"W x 31-5/8"H x 24-3/4"D
(AP-04) NE1025 20-1/8Wx12H x16D
(AP-04) NE1025 20-1/8Wx12H x16D
(AP-04) NE1025 20-1/8Wx12H x16D
6
Elevation_PANTRY ISLAND
CUSTOM SUPPORT BRACKETS Approval Stamp
Dated approval stamp and/or approval signature indicates that all of the information in this drawing has been agreed upon and supersede all previous specs including purchase order.
1 24 1 24
1 8
Structural modifications may develop due to material properties, the manufacturing processes and/or unforeseen constraints Dimensions are in inches unless noted otherwise noted This drawing is protected by the copyright laws of Canada & The United States of America. Any unauthorized distribution in whole or in part without the written consent of IFC is prohibited.
40
15
COPYRIGHT WS = Wood Solid WV = Wood Veneer PL = Plastic Laminate EB = Edge Banding
C
INTL Furnishings Canada Inc.
Abbreviation Legend ML = Melamine COM = Customers Own Material TBD = To Be Determined NTS = Not To Scale
1 22
3 4
1 114
34
OPEN BASE FOR ELECTRICAL CUT ON SITE
313 4
Production will begin only after the receipt of deposit, all drawing, finish & hardware approvals, as well as the confirmation of all dimensions & specs. Additional charges may be incurred if any changes are made after approvals are received
SS-03 COUNTERTOP TILE BY G.C
PANEL SHIPPED LOOSE
CUTOUT FOR PLUMBING
1 328
40
TILE BY G.C
373 4
373 4
1 22
TILE BY G.C
TILE BY G.C
62 1 524
5
34
3 4 1 24
1 24
CUTOUT FOR PLUMBING TILE BY G.C
40
43 4
INTL Furnishings Canada Inc. is functioning as a drafting service, project manager and/or sales agent for the manufacturer. All manufacturing responsibilities including, but not limited to structural integrity, finish, production and delivery scheduling as well as manufacturers warrantee are the sole responsibility of HILLTOP WOODWORKING
SS-03 COUNTERTOP
CUT OUT FOR KEGERATOR PLUMBING
1 12
62
3 4
SS-03 COUNTERTOP 62
INTL Furnishings Canada Inc.
4 14 3 4
1 362
SECTION A
SCALE: 1"=1'-0"
6 3 4
2
201 County Court BLVD- 603 Brampton, ON L6W 4L2
1 2
2
LEFT ELEVATION
SCALE: 1"=1'-0"
2 1
3 4
1 312
3 4
SECTION B
SCALE: 1"=1'-0"
1 144
3 4
1 24
6 3 4
2
RIGHT ELEVATION
SCALE: 1"=1'-0"
Drawing No.
A09A
Tel: (905) 670-7445 Fax: (905) 670-0445
Rev. No.
0
Site Photo_MAIN PANTRY
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
WS = Woo WV = Woo PL = Plast EB = Edge
Dated approval stamp and/or approval signature indicates that all of the information in this drawing has been agreed upon and supersede all previous specs including purchase order.
COPYRIGHT
(AP-06) TUC-24G-HC 24"W x 31-5/8"H x 24-3/4"D
Structural the man Dime
This draw United Sta or in p
INTL Furnishings Canada Inc. is functioning as a drafting service, project manager and/or sales agent for the manufacturer. All manufacturing responsibilities including, but not limited to structural Order Qty Extra Qty integrity, finish, production and delivery scheduling as well as manufacturers warrantee are the sole responsibility of HILLTOP WOODWORKING
FRONT ELEVATION
Site Photo_WORKSTATIONS
WD-11
CO
AP-03 NG 125 21"W 31"H 23"D
WD-06
Specification Notes WW WD-06
Dated app of the in super
PASSTHROUGH
PROFESSIONAL | TOAST HEADQUARTERS
INT
201 Coun Brampton L6W 4L2
Drawing
lle, KY
Humana - Waterside Offices WORKPLACE INTERIORS | Louisville, KY, USA Company: WEWORK, Powered by We Project Size: 110,000 USF Experience: Concept Design Current Phase: On Hold Role: Senior Architecture Lead/Design Manager Our intervention on Humana’s Waterside building targets levels 11 and 12 totalling an area of +/-108,000SF. The existing double height atria and skylights present a great opportunity to vertically connect the levels through a stepped seating design. Acting as central spaces, these “courtyards” are programmed according to their use; as one targets the arrival the other captures employee gathering activities. A destination lounge is located on the 12 floor focused on views to the Ohio river as backdrop. To maximize the use of daylight, all workstations are located at the perimeter of the floors and are organized in clusters to give the associates a sense of belonging to a dedicated neighborhood. Layout Strategy
2.) Activate Entry WS VIE ER RIV
Diagram_USER NEED & OFFERING
Layout Strategy
Layout Strategy
3.) Create Stair Connections & Circulation Arteries
4.) Locate Gathering Space Towards River
WS VIE ER RIV
WTS-12
WS VIE ER RIV
WTS-12
WS VIE ER RIV
WS VIE ER RIV
WTS-11
Diagram_EXISTING CONDITIONS Schematic Design | 08/27/2018 | 101 E Main St Louisville, KY
WS VIE ER RIV
WTS-11
Diagram_ACCESS OFF ELEVATORS Schematic Design | 08/27/2018 | 101 E Main St Louisville, KY
Diagram_VERTICAL CIRCULATION
Diagram_GATHER PROGRAMMING
Schematic Design | 08/27/2018 | 101 E Main St Louisville, KY
Concept Rendering_ENTRY AT ATRIUM
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | HUMANA - WATERSIDE OFFICES
Floor Plan_11TH FLOOR Layout Strategy
th
lle, KY
Floor Plan_12TH FLOOR Layout Strategy
Layout Strategy Vertically Integrated Floors
6.) Maximize Daylight at Workspaces & Offices WS VIE ER RIV
WTS-12
WS VIE ER RIV
WTS-11
Diagram_MEET PROGRAMMING Schematic Design | 08/27/2018 | 101 E Main St Louisville, KY
Diagram_OPEN WORKSTATIONS Schematic Design | 08/27/2018 | 101 E Main St Louisville, KY
Diagram_WELLNESS PROGRAMMING
Diagram_COMBINED PROGRAM
Schematic Design | 08/27/2018 | 101 E Main St Louisville, KY
Concept Rendering_PANTRY & LOUNGE
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | HUMANA - WATERSIDE OFFICES
SoftBank - Tokyo Headquarters Building WORKPLACE INTERIORS | Tokyo, Japan Company WEWORK, Powered by We Experience: Concept Design Current Phase: Under Construction Role: Design Manager
39F
Chairman Office
38F
SBG Boardroom
Given Tokyo’s dense city fabric, the Japanese corporate world is accustomed to working in high rise structures challenging connection and interaction between employees. Creating community and belonging in such setting became the key driver on this project. This project divides all levels into 3-floor “neighborhoods” equipped with equal amenities giving employees a consistent scale and proximity to colleagues. Like cities, each neighborhood Work in the towerNeighborhood is uniquely designed giving users a sense of belonging and wayfinding. Program Distribution
37F
SBG Office
36F
SBG Office & Subsidiaries
35F
SBG Office & Subsidiaries
34F
SBKK Office
33F
SBKK Office
32F
President’s Office & SBKK Office
31F 30F
SBKK Office SBKK Cafe, Event Space
29F
SBKK Office Support, Interview & Training
28F
SBKK Office & Wellness
27F
SBKK Highly Security L3 Office Area
26F
SBKK Office
25F
SBKK Office
24F
SBKK Office
MAX 2100 SBKK 23F EMPLOYEES PER 22F SBKK NEIGHBORHOOD
14% 44%
SBKK Office
20F
Executive Meeting & SBKK Office
21F - 23F SBKK Office 17F
24% 8%
15F - 17F SBKK Office 16F 12F - 14F
FLOOR - 13 24%
11 13 14
12
CURRENT HQ TYP. FLOOR
15F 14F
SBKK Office SBKK Office
13F
SBKK Office
12F
SBKK Office + Subsidiaries WeWork WeWork WeWork
36%
44%
11F 10F
24% 16%
21% 27%
09F Work Neighborhoods Distribution
5%
Key Moments
08F
Incubation
07F
Mechanical
06F
03F Sky 05F Main Entry Lounge Bridge 04F 12 Connecting Stair Access 03F 13 Meeting Rooms 11
15
FLOOR - 12 14% 44% 24% 8%
Diagrams_3 FLOOR NEIGHBORHOOD
Office
21F
31F - 33F SBKK Guest Meeting Rooms 19F 18F SBKK Guest Meeting Rooms + CBC 24F - 25F
FLOOR - 14 15
Office
Commercial, Sky Lobby Program Key GATHER Trading Center MEET
Trading Center WORK CIRCULATE Trading, Commercial, Lobby
01F B1F
Parking
02F Working Clusters
15
Secondary Lounges
02F
WORKING
CLUSTERS Trading Center, Commercial Commercial, Lobby
14
Street Level Access
28
Diagrams_PROGRAM STACKING
+
Envisioning | 18/10/23 | SoftBank Takeshiba HQ | 1-7-1 Kaigan, Minato-ku, Tokyo
Envisioning | 18/10/23 | SoftBank Takeshiba HQ | 1-7-1 Kaigan, Minato-ku, Tokyo
34
Concept Rendering_MAIN LOUNGE
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | SOFTBANK - TOKYO HEADQUARTERS
Humana - Collaboration Hub WORKPLACE INTERIORS | Louisville, KY, USA Company: WEWORK, Powered by We Project Size: 28,000 USF Experience: Concept Design Current Phase: On Hold Role: Design Manager The Collaboration Hub is a 27,017 SF intervention 3 floor of an existing gym andSpatial conference center building. The second level becomes the main access Insights Summary floor and collaborating center for multidisciplinary teams to work on special projects. All gathering and lounge areas surround the exterior courtyard and sit strategically beneath existing skylights to maximize daylight. The third floor houses Humana’s Digital Center of Excellence team providing open workstations, meeting and breakout spaces. The fourth floor serves as a creative brainstorm lab for associates to collaborate in offsite gatherings.
Floor Plan_2ND FLOOR
Breakout Whiskey Bar
JOHN Long Term
Community Bar - Medium
A user who needs a team space for a project with outside consultants for 3 months or is part of the consumer experience team permanently stationed at the hub.
USER 1
Pantry - Typical
Library Pantry - Teapoint 9AM
Agile Breakout
Team Room 9:30AM
11:30AM
1:00PM
5:00PM
Diagrams_USER CASE STUDY
Schematic Design | 11/16/2018 | 150 S 5th St Louisville, KY
Schematic Design | 11/16/2018 | 150 S Concept Rendering_MAIN LOUNGE
5th St Louisville, KY
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | HUMANA - COLLABORATION HUB
Vancouver House - Exterior MIXED USE DEVELOPMENT | Vancouver, Canada Firm: BIG Architects Experience: SD, DD, CD & CA Current Phase: Completed Role: Architect Vancouver House will be part of a new phase in city’s short but successful history of urban policy. It will mark the entry point to downtown Vancouver from Granville Bridge, forming a Gateway to the city. The tower and base are a reinvention of the local typology, known as “Vancouverism.” In this typology, slender tower are coupled with mixed-use podiums and street walls that define human-scale urban environments. The aim is to preserve view cones through the city while activating the pedestrian’s street. Negotiating a difficult site trisected by the Granville overpass and burdened by setbacks, the design for Vancouver House seeks to optimize the conditions for its future inhabitants - in the air as well as on the streets. 1. EXTERIOR WALL ASSEMBLY BETWEEN FLOOR SLABS: WW-1 / WW-1B, UNLESS OTHERWISE NOTED (UON). 2. ALUMINUM PANELS: AP-1A, UON. 3. BALCONY EDGES: AP-1C, UON. 4. GUARDRAIL: GR-1, UON. 5. HOLD 2C AT RAILING AP-1C, TYP.
6
6
6
6
M
L
1
M
A1-618
1. EXTERIOR WALL ASSEMBLY BETWEEN FLOOR SLABS: WW-1 / WW-1B, UNLESS OTHERWISE NOTED (UON). 2. ALUMINUM PANELS: AP-1A, UON. 3. BALCONY EDGES: AP-1C, UON. 4. GUARDRAIL: GR-1, UON. 5. HOLD 2C AT RAILING AP-1C, TYP.
K
21
ISSUED FOR
ISSUED FOR
L
VARIES, SEE 3/A1-407
K
2
A1-618 A1-618
510 ; TYP.
A1-618
510 ; TYP.
510 ; TYP.
VARIES, SEE 3/A1-407 ISSUED FOR
510 ; TYP.
ISSUED FOR
GR-1
GR-1
7
1900
1
1
HOLD 2‐B
AD-306
AP-1C
AP-2A
AP-2A
EXTERIOR
AP-1C
EXTERIOR
TYP
1
TYP TYP
11
GLE-5
AD-247
GR-1
GR-1
HOLDHOLD 2‐D 2‐D
R-3
R-3 HOLD 2‐C
AD-313
1
AD-307 AP-1C AP-1C
R-3
R-6
AD-255
AD-307
HOLD 2‐B HOLD 2‐A
AP-2A
R-3
HOLD 2‐B
AP-2A HOLD 2‐B
HOLD 2‐A
HOLD 2‐A
AP-1A
2
2
3
SCALE: 1 : 20
TYP
1
7
7
5
GR-1 TYP
1
A1-620
ELEVATION - EWS 06B - TOWER EAST LOWER TYPICAL SECTION - EWS 06B - LOWER TYPICAL BALCONY
2
SCALE: 1 : 20
SCALE: 1 : 20
3
SCALE: 1 : 20
SCALE: 1 : 20
4
SCALE: 1 : 20
4
AD-249
M
7
TYP GR-1
1
HOLD 2‐D
AD-256 AP-1C
1
INTERIOR
1
TYP
1
1
TYP
TYP
1
HOLD 2‐A
C:\Users\ghs\Documents\Shared_BIG-DLG_BH_AR_BLDG1-2_Envelope_ghs.rvt
HOLD 2‐C
HOLD 2‐B
R-3
HOLD 2‐D
AP-2A
INTERIOR EXTERIOR
1
1
AD-253 HOLD 2‐A
1
HOLD 2‐A
HOLD 2‐C
AP-2A
AP-2A
4
6
1
AP-1A SIM TO HEAD WW CONDITION
1
TYP
1
AD-255 R-3
HOLD 2‐A
HOLD 2‐A
5
7
AP-1A
E.Q.
AP-1C E.Q.
AP-1C
AP-1C
WW-2
INTERIOR
06‐08
AP-1A
AP-1A
SEE PARTIAL ELEVATIONS FOR WINDOWS
06‐41
06‐41
SEE PARTIAL ELEVATIONS FOR WINDOWS
WW-2
EQ
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
ELECTRICALLENGINEER NEMETZ (S/A) & ASSOCIATES LTD. 2009 WEST 4th AVENUE VANCOUVER, BC, CANADA V6J 1N3 VARIES, SEE 3/A1-407 Tel: 604.736.6562
ENVELOPE CONSULTANT MORRISON HERSHFIELD LIMITED SUITE 310 - 4321 STILLCREEK DRIVE BURNABY, BC, CANADA V5C 6S7 Tel: 604-454-0402 AP-1A
NEMETZ (S/A) & ASSOCIATES LTD. 2009 WEST 4th AVENUE VANCOUVER, BC, CANADA V6J 1N3 Tel: 604.736.6562
LANDSCAPE MECHANICALARCHITECT ENGINEER
LANDSCAPE ARCHITECT
PFS STUDIO INTEGRAL GROUP 1777 SUITEWEST 180 - 3rd 200AVENUE GRANVILLE STREET VANCOUVER, VANCOUVER, BC, BC, CANADA CANADA V6J V6C1K7 1S4 Tel: Tel: 604.736.5168 604.687.1800
ENVELOPE CONSULTANT ELECTRICAL ENGINEER MORRISON HERSHFIELD LIMITED NEMETZ (S/A) & ASSOCIATES LTD. SUITE 310 - 4th 4321 STILLCREEK DRIVE 2009 WEST AVENUE BURNABY, BC,BC, CANADA V5CV6J 6S71N3 VANCOUVER, CANADA Tel: Tel: 604-454-0402 604.736.6562
PFS STUDIO 1777 WEST 3rd AVENUE VANCOUVER, BC, CANADA V6J 1K7 Tel: 604.736.5168
5
ENVELOPE CONSULTANT
K
A1-618
MORRISON HERSHFIELD LIMITED SUITE 310 - 4321 STILLCREEK DRIVE BURNABY, BC, CANADA V5C 6S7 Tel: 604-454-0402
510 ; TYP
CURTAINWALL CONSULTANT LANDSCAPE ARCHITECT
CURTAINWALL CONSULTANT
BVDA FACADE ENGINEERING LTD. PFS STUDIO 107 S 1777TORONTO WEST 3rd ST AVENUE UXBRIDGE, ON, CANADA 1H4 VANCOUVER, BC, CANADAL2P V6J 1K7 Tel: Tel: 905.852.5195 604.736.5168
BVDA FACADE ENGINEERING LTD. 107 TORONTO ST S UXBRIDGE, ON, CANADA L2P 1H4 Tel: 905.852.5195
CIVIL CONSULTANT ENVELOPE CONSULTANT
CIVIL CONSULTANT
HUNTER LAIRD ENGINEERING LTD. MORRISON HERSHFIELD LIMITED 300 - 65310 RICHMOND STREET DRIVE SUITE - 4321 STILLCREEK NEW WESTMINSTER, BC,V5C CANADA BURNABY, BC, CANADA 6S7 V3L 5P5 Tel: Tel: 604.525.4651 604-454-0402
BVDA FACADE ENGINEERING LTD. 107 TORONTO ST S UXBRIDGE, ON, CANADA HOLDL2P 2‐C1H4 Tel: 905.852.5195
BVDA FACADE ENGINEERING LTD. 107 TORONTO ST S UXBRIDGE, ON, CANADA L2P 1H4 Tel: 905.852.5195
CIVIL CONSULTANT FLOOR 12
CIVIL CONSULTANT
KEYPLAN LINE OF 2‐C HOLD CURB BEHIND PANEL FLOOR 58 T.O.S. +157.5 m
HUNTER LAIRD ENGINEERING LTD. 300 - 65 RICHMOND STREET NEW WESTMINSTER, BC, CANADA V3L 5P5 Tel: 604.525.4651
KEYPLAN
KEYPLAN HOLD 2‐C
FLOOR 12 T.O.S. +41.5 m
HUNTER LAIRD ENGINEERING LTD. 300 - 65 RICHMOND STREET NEW WESTMINSTER, BC, CANADAAP-1C V3L 5P5 Tel: 604.525.4651
HOLD 2‐B
LINE OF CURB BEHIND PANEL
WW-2
2‐B HOLD
N
AP-1A
SEAL
EQ
EQ
EQ
1
GR-1
GR-1
HOLD 2‐C
N
SEE PARTIAL ELEVATIONS FOR WINDOWS GR-1
AP-1A HOLD 2‐D
AD-255
SIM TO HEAD WW CONDITION
WW-2
WW-2 GR-1
AP-1C
GR-1
SEAL
SEAL
EQ
HOLD 2‐C
TYP
AP-1C
AP-1C
HOLD 2‐A
SCUPPER BEHIND AP-1C PANEL 2‐C HOLD
AP-1A
AP-2B
FLOOR 57 T.O.S. +154.6 m
AP-1C
AP-1C
AP-1C
5
SECTION - EWS 06A - MID TYPICAL JULIET BALCONY ELEVATION - EWS 06A - TOWER EAST MID TYPICAL
SCALE: 1 : 20
6
8
SCALE: 1 : 20
SCALE: 1 : 20
LINE OF CURB BEHIND PANEL
6
ELEVATION - EWS 06A - TOWER EAST MID TYPICAL SCALE: 1 : 20
ELEVATION - EWS 06C - UPPER ELEVATION TYPICAL- EWS 06C - UPPER TYPICAL SCALE: 1 : 20
8
SCALE: 1 : 20
N
SEAL
AP-1C
GR-1
GR-1
FLOOR 11 T.O.S. +38.6 m
AP-2A
SCALE: 1 : 20
GLOTMAN SIMPSON CONSULTING ENGINEERS 1661 WEST 5th AVENUE VANCOUVER, BC, CANADA V6J 1N5 Tel: 604.734.8822
INTEGRAL GROUP SUITE 180 - 200 GRANVILLE STREET VANCOUVER, BC, CANADA V6C 1S4 Tel: 604.687.1800
AP-1A
SEE PARTIAL ELEVATIONS FOR WINDOWS
EQ
2‐B HOLD
7
STRUCTURAL ENGINEER
ELECTRICAL STRUCTURALENGINEER ENGINEER
WW-2
2‐B HOLD
COLLABORATING ARCHITECT
BIG NYC 601 W. 26th ST. SUITE 1255 NEW YORK, NY, USA 10001 Tel: 347.549.4141
STRUCTURAL ENGINEER
HUNTER LAIRD ENGINEERING T.O.S. +41.5 m LTD. 300 - 65 RICHMOND STREET NEW WESTMINSTER, BC, CANADA V3L 5P5 Tel: 604.525.4651 HOLD 2‐B
AP-1C E.Q.
TYP.
FLOOR 58 T.O.S. +157.5 m
AP-2B
SECTION - EWS 06C - UPPER SECTION TYPICAL- EWS 06C - UPPER TYPICAL SCALE: 1 : 20
E.Q.
E.Q.
2‐C HOLD
Enlarged Section & Elevation_UPPER EAST FACADE SCALE: 1 : 20
E.Q.
AD-255 HOLD 2‐B
R-3
AP-2A
SCALE: 1 : 20
510 ; TYP
GR-1
GR-1
AP-1A
06‐08 AP-1C
AP-1C
HOLD 2‐B
GLOTMAN DIALOG SIMPSON CONSULTING ENGINEERS 1661 5th AVENUE 406 - WEST 611 ALEXANDER STREET VANCOUVER, VANCOUVER, BC, BC, CANADA CANADA V6J V6A 1N5 1E1 Tel: Tel: 604.734.8822 604.255.1169
CURTAINWALL CONSULTANTKEYPLAN CURTAINWALL CONSULTANT
TYP.
AP-1C
HOLD 2‐B
LINE OF CURB BEHIND PANEL
INTEGRAL BIG NYC GROUP SUITE 200 SUITE GRANVILLE 601 W.180 26th- ST. 1255 STREET VANCOUVER, BC, CANADA NEW YORK, NY, USA 10001 V6C 1S4 Tel: Tel: 604.687.1800 347.549.4141
AP-1C
SECTION - EWS 06A - MID TYPICAL JULIET SECTION - EWS 06A - MID TYPICAL BALCONY BALCONY
CTION_EWS 06C - SWINGSECTION_EWS DOOR 06C - SWING DOOR
510 ; TYP
AP-1A
AP-1A
AP-1C
AP-1C
WW-2
WW-2
AD-252 GR-1 AD-255
HOLD 2‐D
ARCHITECT OF RECORD
HOLD 2‐B
SCUPPER BEHIND PANEL
DIALOG 406 - 611 ALEXANDER STREET VANCOUVER, BC, CANADA V6A 1E1 Tel: 604.255.1169
BIG NYC 601 W. 26th ST. SUITE 1255 NEW YORK, NY, USA 10001 Tel: 347.549.4141
WW-2
VARIES, SEE 3/A1-407 TYP
HOLD 2‐B
1
R-3
HOLD 2‐C
AP-1C
STRUCTURAL ARCHITECT OFENGINEER RECORD
PFS STUDIO 1777 WEST 3rd AVENUE VANCOUVER, BC, CANADA V6J 1K7 Tel: 604.736.5168
AD-252 GR-1
GR-1
INTERIOR GR-1
TYP
HOLD 2‐B HOLD 2‐D
OWNER
HOWE STREET PROPERTY INC. 1067 WEST CORDOVA STREET, SUITE 501 VANCOUVER, BC, CANADA V6C 1C7 Tel: 604.685.8986
FLOOR 35 T.O.S. +96.6 m
TYP
AD-253 HOLD 2‐B
AP-1C BIG NYC HOWE STREET PROPERTY INC. 601 26th ST. SUITE 1255 1067W. WEST CORDOVA STREET, SUITE 501 NEW YORK, NY, USA 10001 V6C 1C7 VANCOUVER, BC, CANADA Tel: 347.549.4141 Tel: 604.685.8986
BEHIND PANEL ARCHITECT OF RECORD
LANDSCAPE ARCHITECT
K
TYP
AD-246
GR-1
DEVIATIONS FROM THE CONTRACT DOCUMENTS WITHOUT WRITTEN APPROVAL FROM THE CONSULTANT ARE SUBJECT TO CORRECTION AT THE CONTRACTOR'S EXPENSE.
N
HOLD 2‐C
AP-1C
K
R-3
HOLD 2‐C
EXTERIOR
1
R-3
VARIES, SEE 3/A1-407
510 ; TYP
INTERIOR
EXTERIOR TYP
1
HOLD 2‐D
AP-1C TYP
510 ; TYP
L
HOLD 2‐A
AP-2A
AD-246
GR-1
HOLD 2‐C
HOLD 2‐D
INTERIOR
1
AD-252
510 ; TYP
A1-620
AD-251
INTERIOR GR-1
GR-1
AD-246
GR-1
1
AD-255
K
AP-2B
HOLD 2‐A
1
L
7
54
WW-2
HOLD 2‐D
AP-1C
AD-251
AD-248 INTERIOREXTERIOR
AD-246
AD-252
TYP
AP-2B
HOLD 2‐B
EXTERIOR EXTERIOR
HOLD 2‐A
AP-2A
EXTERIOR
TYP
6
A1-620
1
R-3
R-3
HOLD 2‐C
7 M
A1-620
AP-1C
HOLD 2‐B
REPORT INCONSISTENCIES AND OMISSIONS TO THE CONSULTANT FOR CLARIFICATION BEFORE COMMENCING WITH THE WORK.
HOLD 2‐C
COLLABORATING ARCHITECT OWNER
HOWE STREET PROPERTY INC. 1067 WEST CORDOVAHOLD STREET, 2‐B SUITE 501 OF ROOF V6C 1C7 VANCOUVER,TOP BC, CANADA Tel: 604.685.8986 T.O.S. +163.3 m
INTEGRAL GROUP SUITE 180 - 200 GRANVILLE STREET VANCOUVER, BC, CANADA V6C 1S4 Tel: 604.687.1800
A1-618 A1-618
ISSUED FOR TENDER DIALOG ISSUED FOR TENDER DIALOG ISSUED FOR FLOOR 32 REVIEW ISSUED FOR COLLABORATIVE TRADE PRICING - ENVELOPE ISSUED FOR COLLABORATIVE TRADE DIALOG PRICING - ARCHITECTURAL REVISION / DRAWING ISSUE REVIEW
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. VERIFY DIMENSIONS. DO NOT SCALE THIS DRAWING.
WW-2 AP-1A EQ
GLOTMAN SIMPSON CONSULTING ENGINEERS NEMETZ GLOTMAN SIMPSON CONSULTING (S/A) & ASSOCIATES LTD. ENGINEERS 1661 WEST 5th AVENUE 1661 WEST 4th 5th AVENUE 2009 VANCOUVER, BC, CANADA V6J 1N5 1N5 VANCOUVER, BC, CANADA V6J 1N3 Tel: 604.734.8822 604.734.8822 Tel: 604.736.6562
M
VARIES, SEE 3/A1-407
TYP
AD-255 HOLD 2‐D
AP-1A
AP-2B AP-1C
AP-2A
1
1
AD-256
SIM
HOLD 2‐A
HOLD 2‐C
AP-2B
6
A1-620
510 ; TYP
HOLD 2‐B AD-253 HOLD 2‐D
HOLD 2‐A
HOLD 2‐C
HOLD 2‐B HOLD 2‐A
GR-1 R-3
HOLD 2‐C
SIM
1
R-3
TYP
1
AD-246
GR-1
HOLD 2‐D
AP-1C
HOLD 2‐C
HOLD 2‐B AD-253
R-3
TYP
1
L
3
A1-618
510 ; TYP
GR-1
AD-246
METRIC
OWNER
MECHANICAL ENGINEER
4
M
AD-249
7
SCALE: 1 : 20
SCALE: 1 : 20
1
5
REVISION / DRAWING ISSUE REV. YYYY-MM-DD REVIEW REVISION / DRAWING ISSUE REVIEW DEVIATIONS FROM THE CONTRACT DOCUMENTS WITHOUT WRITTEN APPROVAL FROM THE CONSULTANT ARE SUBJECT TO EQ EQ CORRECTION AT THE CONTRACTOR'S EXPENSE.
DIALOG2‐B HOLD 406 - 611 ALEXANDER STREET VANCOUVER, BC, CANADA V6A 1E1 Tel: 604.255.1169
ELEVATION - EWS 06B - TOWER EAST LOWER TYPICAL
3
SCALE: 1 : 20
ELEVATION - EWS 06 - TOWER ELEVATION EAST CROWN - EWS 06 - TOWER EAST CROWN
A1-620
AD-246
GR-1
HOLD 2‐D
2‐B HOLD
2014-11-06 YYYY-MM-DD
THIS DRAWING IS COPYRIGHTED AND MUST NOT BE USED, REPRODUCED, OR REVISED WITHOUT WRITTEN PERMISSION.
ALL 4DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. ISSUED FOR TENDER 2015-03-09 DIALOG ISSUED FOR TENDER DIALOG VERIFY ISSUED FOR TENDER 3 DIMENSIONS. 2015-03-02 DIALOG ISSUED FOR TENDER DIALOG DO NOT SCALE THIS DRAWING. ISSUED FOR COLLABORATIVE 2 TRADE 2014-12-15 ISSUED FOR COLLABORATIVE TRADE PRICING - ENVELOPE PRICING - ENVELOPE REPORT INCONSISTENCIES ANDFOR OMISSIONS TO THE CONSULTANT ISSUED FOR COLLABORATIVE 1 TRADE 2014-11-06 DIALOG ISSUED COLLABORATIVE TRADE DIALOG FOR CLARIFICATION BEFORE COMMENCING WITH THE WORK. PRICING - ARCHITECTURAL PRICING - ARCHITECTURAL
LINE OF CURB
2015-03-09 2015-03-02 2015-02-01 2014-12-15
1
METRIC
THIS DRAWING IS COPYRIGHTED AND MUST NOT BE USED, REPRODUCED, OR REVISED WITHOUT WRITTEN PERMISSION.
THIS DRAWING IS COPYRIGHTED AND MUST NOTTHIS BE USED, DRAWING IS COPYRIGHTED AND MUST NOT BE USED, REPRODUCED, OR REVISED WITHOUT WRITTEN PERMISSION. REPRODUCED, OR REVISED WITHOUT WRITTEN PERMISSION.
OWNER 2‐C HOLD
AP-1C
5 4 3 2
REV.
METRIC
ENGINEER COLLABORATING ARCHITECTMECHANICAL COLLABORATING ARCHITECT
GR-1 TYP
2014-11-06 YYYY-MM-DD
METRIC
FLOOR 35 T.O.S. +96.6 m
TOP OF ROOF T.O.S. +163.3 m SCUPPER BEHIND PANEL
AP-1C
2015-03-09 2015-03-02 2014-12-15
1
ISSUED FOR TENDER DIALOG ISSUED FOR TENDER DIALOG ISSUED FOR FLOOR 32 REVIEW ISSUED FOR COLLABORATIVE TRADE PRICING - ENVELOPE ISSUED FOR COLLABORATIVE TRADE DIALOG PRICING - ARCHITECTURAL YYYY-MM-DD REVISION / DRAWING ISSUE REVIEW 2014-11-06
ARCHITECT OF RECORD
2‐C HOLD
AP-1C
AP-1C
4 3 2
REV.
HOLD 2‐B
2015-03-09 2015-03-02 2015-02-01 2014-12-15
DIALOG DEVIATIONS FROM THE CONTRACT DOCUMENTSDEVIATIONS WITHOUT FROM THE CONTRACT DOCUMENTS WITHOUT HOLD 2‐C 406 - 611 ALEXANDER STREET LINE OF CURB WRITTEN APPROVAL FROM THE CONSULTANT ARE WRITTEN SUBJECT APPROVAL TO FROM THE CONSULTANT ARE SUBJECT TO CANADA V6A 1E1 CORRECTION ATPANEL THE CONTRACTOR'S EXPENSE.VANCOUVER, CORRECTION BC, AT THE CONTRACTOR'S EXPENSE. BEHIND Tel: 604.255.1169
AP-2A
1
AD-250
E.Q.
LINE OF CURB BEHIND PANEL
AP-1C AP-2B
SECTION - EWS 06 - WINDSCREEN SECTION GLAZING - EWS 06 - WINDSCREEN GLAZING
3
1
HOWE STREET PROPERTY INC. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE ALL DIMENSIONS NOTED. ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. 1067 WEST CORDOVA STREET, SUITE 501 VERIFY DIMENSIONS. VERIFY DIMENSIONS. VANCOUVER, BC, CANADA V6C 1C7 DO NOT SCALE THIS DRAWING. DO NOT SCALE THIS DRAWING. SCUPPER GR-1 Tel: 604.685.8986 REPORT INCONSISTENCIES REPORT CONSULTANT INCONSISTENCIES AND OMISSIONS TO THE CONSULTANT BEHIND PANEL AND OMISSIONS TO THE FOR CLARIFICATION BEFORE COMMENCING WITH FOR THECLARIFICATION WORK. BEFORE COMMENCING WITH THE WORK.
TYP.
AP-1C
AP-1C AP-1A
AP-2B
AP-2A
SCALE: 1 : 20
E.Q.
HOLD 2‐A
3
1
E.Q.
HOLD 2‐B
SECTION - EWS 06B - LOWER SECTION TYPICAL - EWS BALCONY 06B - LOWER TYPICAL BALCONY
1
AD-246
E.Q. TYP.
AP-1C
SCUPPER GR-1 E.Q.BEHIND PANEL
AD-255
AD-273
AP-1C
E.Q.
WW-2
EQ
AP-1C
GR-1
GR-1
SIM TO HEAD WW CONDITION
1
1
AP-1C
AP-2A
SECTION - EWS 06 - DOOR AT SECTION WINDSCREEN - EWS 06 - DOOR AT WINDSCREEN
E: 1 : 20
AD-273
WW-2 SEE PARTIAL ELEVATIONS FOR WINDOWS AP-1A WW-2
EQ
GR-1
GR-1
HOLD 2‐C
1
WW-2 AP-1A EQ
GR-1
Enlarged Section & Elevation_MIDDLE EAST FACADE
AL BALCONY
CALE: 1 : 20
R-3
CR‐A HOLD
06‐47
SEE PARTIAL SEE PARTIAL ELEVATIONS FOR ELEVATIONS WINDOWS FOR WINDOWS
SEE PARTIAL ELEVATIONS FOR WINDOWS
GR-1
SIM TO SILL WW CONDITION
HOLD 2‐D
5 4 3 2
AP-1C
06‐72
HOLD 2‐C
HOLDHOLD 2‐A 2‐A
AP-1C AP-2A
WW-2 AP-1C
FLOOR 36 T.O.S. +99.5 m
AP-1C
PARAPET +166.36HOLD m 2‐B
REV.
WW-2
WW-2
R-6
SIM TO HEAD WW CONDITION
1
HOLD 2‐C
FLOOR 36 T.O.S. +99.5 m
AP-1CPARAPET +166.36 m
06‐47 06‐72 INTERIOR
AP-1A
GLE-5 GR-1 AP-1C
1
R-3
HOLD 2‐C HOLDHOLD 2‐B 2‐B
AP-1C
TYP
1
GR-1
510 ; TYP
CR‐A HOLD
AD-255
TYP
1
AP-1C
SIM TO HEAD WW CONDITION
1
SF-2 AD-246
SIM TO SIM TO SILL WWSILL WW 1 CONDITION CONDITION
R-3 R-3
TYP
AP-1C
AD-254
HOLDHOLD 2‐C 2‐C
1
AP-1A
510 ; TYP
AP-1C
EXTERIOR
AD-255 AD-253
R-6
AP-1C
AP-2B
AP-2A
TYP SF-2
1
AD-247
1
R-6
AP-2A
EXTERIOR
GLE-5
AD-253 R-6
AP-2AAP-2A
WW-2
L GR-1
HOLD 2‐C
INTERIOR
TYP
1
SF-2
L GR-1
VARIES, SEE 3/A1-407
AP-1C
AP-1C
EXTERIOREXTERIOR COVERED BALCONY INTERIOR
GLE-5
GR-1 GR-1
1
AP-1C
EXTERIOR COVERED BALCONY EXTERIOR
GR-1
WW-2 AP-1A
A1-620
VARIES, SEE 3/A1-407
HOLD 2‐A
AD-246 AD-247
AD-246
SIM TOGR-1 SILL WW CONDITION
M 3
GR-1
A1-620
R-3 510 ; TYP
HOLD 2‐B
SIM TO HEAD WW CONDITION SIM TO AD-253 HEAD WW 1 AP-2A CONDITION AD-254 EXTERIOR
AP-2A
3
A1-620
A1-620
HOLD 2‐C
1
EXTERIOR
TYP SF-2
1
AD-246
AP-1A
1
AD-275 510 ; TYP
HOLD CR‐B
AP-2A
EXTERIOR COVERED BALCONY EXTERIOR
1
AP-1C
AP-1C AP-2AAP-1C AP-2B AP-2B HOLD CR‐A
AP-1A HOLD CR‐A
INTERIOR EXTERIOR COVERED BALCONY
M 2
1
A1-620
A1-620
HOLD 2‐D
1
AD-277 AD-275
HOLD CR‐D
HOLD 2‐B HOLD CR‐B HOLD 2‐A
HOLD 2‐A
N 2
1
7
1900
1
AD-277
HOLD CR‐D AP-1C
SIMAP-1C TO HEAD WW HOLD CR‐A CONDITION
1 2 AD-253
R-3
TYP
1
AD-275
AP-1C
HOLD CR‐B
AP-1C
N
R-3
HOLD 2‐C
AD-275
AD-277
7
1900
HOLD 2‐D
TYP
TYP
1
HOLD 2‐C
AD-277 HOLD CR‐D
GR-1
7
1900
HOLD 2‐D
TYP
SCUPPER BEHIND PANEL HOLD 2‐B
GR-1
VANCOUVER HOUSE BUILDINGS 1 & 2
HOLD 2‐C
FLOOR 11 T.O.S. +38.6 m
1480 HOWE STREET,AP-1C VANCOUVER, BC, CANADA
HOLD 2‐B
2‐C HOLD
VANCOUVER HOUSE VANCOUVER HOUSE FACADE - EWS 06A+B FLOOR 57 T.O.S. +154.6 m LOWER BUILDINGS 1 & 2EAST BUILDINGS 1 &&2MIDDLE 2‐B HOLD
1480 HOWE STREET, VANCOUVER, BC, CANADA LINE OF CURB BEHIND PANEL
1480 HOWE STREET, HG DRAWN: 8:37:57 PM PLOT DATE: 3/8/2015 VANCOUVER, BC, CANADA
CHECKED:
VH
A1-618
FACADE - EWS 06+C FACADE - EWS 06+C EAST CROWN & EAST UPPER CROWN & UPPER TENDER PACKAGE:
DRAWN: HG PLOT DATE: 3/8/2015 8:40:10 PM
REVISION:
CHECKED:
TENDERREVISION: PACKAGE:
04073
04073
4
FACADE - EWS 06A+B EAST LOWER & MIDDLE DRAWN: HG PLOT DATE: 3/8/2015 8:37:57 PM
CHECKED:
VH
A1-618 TENDER PACKAGE:
REVISION:
VH
A1-620A1-620 04073
1480 HOWE STREET, VANCOUVER, BC, CANADA
Photography_NORTH FACADE 5 5
CHECKED: HG VH DRAWN: PLOT DATE: 3/8/2015 8:40:10 PM
TENDER PACKAGE:
VANCOUVER HOUSE BUILDINGS 1 & 2
04073
REVISION:
4
PhotographyLSITE PLAN AERIAL
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | VANCOUVER HOUSE
OUTER LITE LITE OUTER OFFSET BEYOND BEYOND OFFSET SPACER FRIT FRIT ON ON SPACER #2 BEGINNING BEGINNING AT AT #2 MULLION MULLION GALV STEEL SHEET METAL BACK PAN FASTENED AND SEALED COLUMN TO MULLION COLUMN
INTERIOR FINISH WALL; SEE INTERIORS
INTERIOR FINISH WALL; SEE INTERIORS
IGU
SWING DOOR; SEE DOOR SCHEDULE FOR FINISH AND TYPE
WW-1B
LINE LINE OF OF SILL SILL EDGE EDGE BELOW BELOW GUARDRAIL; GR-1 GR-1 GUARDRAIL; LINE LINE OF OF CURB CURB BELOW BELOW
LINE OF CURB BELOW
WW-1 WW-1 OUTER LITE OFFSET BEYOND SPACER FRIT ON #2 BEGINNING AT MULLION
FORMED FORMED METAL METAL PANEL; PANEL; AP-1A AP-1A
LINE OF SILL EDGE BELOW
COLUMN INTERIOR FINISH INTERIOR FINISH WALL; SEE SEE INTERIORS INTERIORS WALL;
GUARDRAIL; GR-1 LINE OF CURB BELOW
IGU IGU WW-1 WW-1B WW-1B FORMED METAL PANEL; AP-1A
INTERIOR FINISH WALL; SEE INTERIORS INS-1; INS-1; 100MM 100MM FORMED FORMED METAL METAL PANEL; PANEL; AP-2A AP-2A
IGU WW-1B
WW-2 WW-2 LINE LINE OF OF CURB CURB BELOW BELOW FORMED FORMED METAL METAL PANEL; PANEL; AP-1A AP-1A INS-1; 100MM BALCONY BALCONY PAVERS PAVERS BELOW BELOW FORMED METAL PANEL; AP-2A GUARDRAIL; GUARDRAIL; GR-1 GR-1 FORMED METAL METAL FORMED PANEL; AP-1A AP-1A PANEL;
Detail Plans_TYPICAL EAST FACADE BALCONY
WW-2
Axonometric_FACADE STEPPING
LINE OF CURB BELOW FORMED METAL PANEL; AP-1A
BALCONY PAVERS BELOW GUARDRAIL; GR-1 FORMED METAL PANEL; AP-1A
Photography_WEST FACADE
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
Photography_AMENITY POOL
PROFESSIONAL | VANCOUVER HOUSE
Vancouver House - Interiors MIXED USE DEVELOPMENT | Vancouver, Canada Firm: BIG Architects Experience: SD, DD, CD & CA Current Phase: Completed Role: Architect The interiors for Vancouver House take cues from the tower’s envelope. The cool, gray tones of the aluminum panels are coupled with a copper color material that act as liners at balcony walls on the east, west and south sides of the tower. This juxtaposition between cool and warm creates depth and personality that infiltrates the interior and becomes integral to the narrative of the project. The tower lobby is presented as a gallery space showcasing a stair, reception desk and mailboxes as self standing sculptures materialized in blackened steel.
Photography_LOUNGE ROOM
Interior Elevations_TOWER LOBBY
Photography_TOWER LOBBY
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | VANCOUVER HOUSE
Detail Drawings_FEATURE ISLAND
Photography_FEATURE ISLAND
Photography_PENTHOUSE KITCHEN
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | VANCOUVER HOUSE
970 Market St. MIXED USE DEVELOPMENT | San Francisco,CA Firm: BIG Architects Experience: Concept Design and SD Current Phase: N/A Role: Architect Situated prominently on Market Street at the meeting point of four different neighborhoods, 970 Market Street stiches different communities together and serves as the first step towards a new performing arts district in the Mid-Market area of San Francisco. Driven by the programmatic need for individual identities and a response to the site and shadow envelope, the massing of 970 Market Street is split into two individual program volumes, one hotel and one residential, which are connected by a collection of performing arts programs at the base. Inside, a sky-lit atrium creates an opportunity for synergy between the different programs.
Exterior Rendering_AERIAL VIEW
Facade Elevation and Section_PRECAST CONCRETE PANELS
Studies_FACADE DESIGN
Facade Elevation and Section_RAINSCREEN GFRC PANELS
Exterior Rendering_BUILDING FACADE ALONG MARKET STREET
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | 970 MARKET ST
University of Chicago Residential Commons DORMITORY & RESIDENCE HALL | Chicago, IL Firm: BIG Architects Experience: Design Build Competition Current Phase: N/A Role: Architect The site for the new North Campus Residence Hall and Dining Commons offers a unique opportunity to create gateways to the campus that strengthen the connectivity between local community and the university while providing a new identity to the north edge of the campus. The design proposes to build two interlocking volumes; one for each Community within the Residence Hall. The interlocking volumes naturally define two inner private courtyards for each residence Community and two public open spaces of different scales, characters and functions.
Program Axon_RETAIL
Exterior Rendering_AERIAL VIEW
Program Axon_DINING HALL
Perspective_TYPICAL DORMITORY
Program Axon_COMMONS
Program Axon_DORMITORIES
Perspective_COMMONS
Exterior Rendering_DORMITORY ENTRY
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
PROFESSIONAL | UNIVERSITY OF CHICAGO RESIDENTIAL COMMONS
Modularity Overhead AQUATIC CENTER & SPA | Lady Bird Lake, Austin, TX Studio: Design VI; Spring 2010 Critic: Danelle Briscoe Software Used: Rhino, Vray, AutoCAD, and Adobe Creative Suite The synergy of conceptual and pragmatic components as a design challenge results in the creation of fluid modular patterns that allow light and passive ventilation into the 21st century aquatic center. The premise of this project is the creation of an aquatic center in the Town Lake area of Austin. From a pattern investigation the creation of a modular system in a particular element of the building led the primary concept of the overall project. As the structure and layout of the project developed, the insertion of a passive ventilation system is added as another layer of function to the roof modules. As well, based on the sun angles in Austin, the modules are oriented northward in order to only allow ambient light into the building. Thus, the overall interior condition of the complex is highlighted by repetitive punctures that give the building the character and personality desired.
Perspective_POOL ATRIUM
Diagram_PROCESS OF MODULAR ROOF PERFORMANCE
Perspective_ENTRY ON TOWN LAKE DOCKS
STREET LEVEL
WATER EDGE LEVEL
Cross Section A_SPECTATOR SEATING, OLYMPIC POOL, LIFEGUARD OFFICE AND MECHANICAL ROOM
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
ACADEMIC | OVERHEAD MODULARITY
Subtractive Trajectories PUBLIC PLAZA/METRO ENTRANCE, DANCE STUDIO & DOJO | Paris, France Studio: Advanced Design: Paris Studio; Fall 2011 Critics: Danilo Udovicky, John Blood, Elizabeth Danze In Collaboration with: Julie Huynh Software Used: Rhino, Vray, AutoCAD, and Adobe Creative Suite In transitory spaces, users often pass through barren areas, neglecting to acknowledge the potential of their trajectories. The paths people choose become the basis of their experiences. Such an idea may be conceptually applied to the intervention in the space encompassing the Stalingrad metro station; hurried Parisians constantly flow in and out through underground access points, but rarely is there a reason to pause. By mapping these trajectories, bounded shapes become program and leftover voids become designated paths. The interwoven system of connected pathways intends to accentuate the goal of the individual, and linear courses emphasize its strict, direct routes.
Perspective_METRO EXIT INTO PLAZA
Diagram_DIFFERENT TRAJECTORIES ON SITE
Perspective_PLAZA CENTER
Longitudinal Section_DOJO, PLAZA/METRO ENTRANCE, AND DANCE STUDIO
HECTOR GARCIA-CASTRILLO | hgarciacastrillo@gmail.com | 407.319.2880
ACADEMIC | SUBTRACTIVE TRAJECTORIES
THANK YOU!