Trenching and excavation specialists since 1994

Rotech Subsea is the global leader in Controlled Flow Excavation (CFE) technology, delivering trenching, de-burial & backfilling solutions worldwide to the Oil & Gas and Energy sectors, using the latest range of patented RS equipment. For over two decades we have pioneered the development of cutting-edge subsea excavation technology. Dedication to innovation has seen Rotech continually evolve and enhance our specialised equipment to meet demand and deliver for the needs of many major clients in the subsea industry.

As a result, Rotech’s engineering teams have designed the latest range of RS tools with more power, enhanced jet profile, improved performance and safety, higher velocities, greater control and precision, improved stability and higher cutting capabilities.

The Rotech group are unique in that we are the only Subsea Excavation & Trenching company that Design, Manufacture and Operate our own equipment. we do not build equipment for anyone else. Innovate, Fabricate & Operate.

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk Who We Are

www.rotech.co.uk subseainfo@rotech.co.uk 01224 698698 TRS1 TRS2 TRS1-LD RS2-3 RS1LD-3 RS1 RS2 RS1LD RS1-3 RSGC RSG RSBG TRS2 Blade
Cable / Pipeline / Umbilical Trenching
Cable / Pipeline / Umbilical Deburial
Freespan & Sandwave Clearance
Backfilling and Burial
Jack Up Spud Can Clearing & Cleaning
UXO & Salvage Deburial
Rock Dump & Drill Cutting Removal
Harbour Clearance
Subsea Structure Foundation Access
Freespan Rectification
Debris Removal
Boulder Removal/Relocation Work
Cable Cutting and/or Recovery
Umbilical Cutting and/or Recovery
Pipeline Recovery
Rock Removal/Relocation
Seabed Remedial Works
Pre-Sweeping Shallow Water Our Tools

Applications

- Cable / Pipeline / Umbilical Trenching

- Cable / Pipeline / Umbilical Deburial

- Freespan & Sandwave Clearance

- Backfilling and Burial

- Jack Up Spud Can Clearing & Cleaning

- UXO & Salvage Deburial

- Rock Dump & Drill Cutting Removal

- Harbour Clearance

- Subsea Structure Foundation Access

Services

- Safer non-contact methods

- Controlled & Mass Flow Excavation

- Highly qualified & experienced operators

- Real time sonar monitoring of service

- Rotech Engineering & Fabrication

Max Jet Flow 1,700L/s

Max Jet Pressure 80kPa

Max Jet Power 85kW

Minimum Operating Depth 2.5m

Personnel

- 6 Rotech operators for 24hr operations - 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 80kPa

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
RS1 Controlled flow excavation system
patents pending Capabilities
+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
TRS1 Controlled flow excavation system
- Cable / Pipeline / Umbilical Trenching - Cable / Pipeline / Umbilical Deburial - Freespan & Sandwave Clearance - Backfilling and Burial - Jack Up Spud Can Clearing & Cleaning - UXO & Salvage Deburial - Rock Dump & Drill Cutting Removal - Harbour Clearance - Subsea Structure Foundation Access - Safer non-contact methods - Controlled & Mass Flow Excavation - Highly qualified & experienced operators - Real time sonar monitoring of service - Rotech Engineering & Fabrication - 6 Rotech operators for 24hr operations - 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 80kPa Applications Personnel Capabilities Services patents pending
Max Jet Flow 3,400L/s Max Jet Pressure 80kPa Max Jet Power 170kW Minimum Operating Depth 2.5m
+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk RS1-3 High Pressure Jet Trencher
-
Personnel Capabilities Services
- Cable/Pipeline/Umbilical Trenching - Cable/Pipeline/Umbilical Deburial - Freespan rectification - Backfilling & Burial - Jack up Spud Can Clearing & Cleaning - UXO & Salvage Deburial - Rock Dump & Drill Cutting Removal - Harbour Clearance - Subsea Structure deburial and access - Safer non-contact methods - Jet trenching solution for cohesive and noncohesive soils - Highly qualified and experienced operators - Real time sonar monitoring of service
6 operators for 24 hr operations Applications
Max RS1 Jet Outlet Pressure 80 kPa Max RS3 Jet Outlet Pressure 300 kPa Max RS1 Jet Flow 1,700 L/s Max RS3 Jet Flow 300 L/s Operating Depth 2.5m-300m*

patents pending

Applications

- Ultra Shallow Water

- Cable / Pipeline / Umbilical Trenching

- Cable / Pipeline / Umbilical Deburial

- Freespan & Sandwave Clearance

- Backfilling and Burial

- Jack Up Spud Can Clearing & Cleaning

- UXO & Salvage Deburial

- Rock Dump & Drill Cutting Removal

- Harbour Clearance

- Subsea Structure Foundation Access

Capabilities Services

- Safer non-contact methods

- Jet Trenching

- Controlled & Mass Flow Excavation

- Highly qualified & experienced operators

- Real time sonar monitoring of service

- Rotech Engineering & Fabrication

Max Jet Flow 1,300L/s

Max Jet Pressure 140kPa

Max Jet Power 145kW

Minimum Operating Depth 1m

Personnel

- 6 Rotech operators for 24hr operations

- 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 140kPa

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
RS1-LD Jet trencher

TRS1-LD Jet trencher

patents pending

Applications

- Ultra Shallow Water

- Cable / Pipeline / Umbilical Trenching

- Cable / Pipeline / Umbilical Deburial

- Freespan & Sandwave Clearance

- Backfilling and Burial

- Jack Up Spud Can Clearing & Cleaning

- UXO & Salvage Deburial

- Rock Dump & Drill Cutting Removal

- Harbour Clearance

- Subsea Structure Foundation Access

Capabilities Services

- Safer non-contact methods

- Jet Trenching

- Controlled & Mass Flow Excavation

- Highly qualified & experienced operators

- Real time sonar monitoring of service

- Rotech Engineering & Fabrication

Max Jet Flow 2,600L/s

Max Jet Pressure 140kPa

Max Jet Power 290kW

Minimum Operating Depth 1m

Personnel

- 6 Rotech operators for 24hr operations

- 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 140kPa

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk RS1LD-3 Hybrid jet trenching system
-
-
-
-
-
-
-
-
-
-
-
operators for
operations Applications Personnel Capabilities Services
- Cable/Pipeline/Umbilical Trenching - Cable/Pipeline/Umbilical Deburial
Freespan Rectification
Backfilling & Burial
Jack up Spud Can Clearing & Cleaning
UXO & Salvage Deburial
Rock Dump & Drill Cutting Removal
Harbour Clearance
Subsea Structure deburial and access - Safer non-contact methods
Jet trenching solution for cohesive and noncohesive soils
Highly qualified & experienced operators
Real time sonar monitoring of service
6
24hr
Max RS1LD Jet Outlet Pressure 140kPa Max RS3 Jet Outlet Pressure 300kPa Max RS1LD Jet Flow 1,300 L/s Max RS3 Jet Flow 300 L/s Operating Depth 2m-300m*

patents pending

Applications

- Decommissioning

- Shallow Water

- Cable / Pipeline / Umbilical Trenching

- Cable / Pipeline / Umbilical Deburial

- Freespan & Sandwave Clearance

- Backfilling and Burial

- Jack Up Spud Can Clearing & Cleaning

- UXO & Salvage Deburial

- Rock Dump & Drill Cutting Removal

- Harbour Clearance

- Subsea Structure Foundation Access

Services

- Safer non-contact methods

- Controlled & Mass Flow Excavation

- Highly qualified & experienced operators

- Real time sonar monitoring of service

- Rotech Engineering & Fabrication

Capabilities

Max Jet Flow 4,000L/s

Max Jet Pressure 60kPa

Max Jet Power 130kW

Minimum Operating Depth 1.5m

Personnel

- 6 Rotech operators for 24hr operations

- 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 60kPa

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
RS2 Controlled flow excavation system

Max Jet Flow 8,000L/s

Max Jet Pressure 60kPa

Max Jet Power 260kW

Minimum Operating Depth 1.5m

- 6 Rotech operators for 24hr operations - 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 60kPa

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
- Decommissioning - Shallow Water - Cable / Pipeline / Umbilical Trenching - Cable / Pipeline / Umbilical Deburial - Freespan & Sandwave Clearance - Backfilling and Burial - Jack Up Spud Can Clearing & Cleaning - UXO & Salvage Deburial - Rock Dump & Drill Cutting Removal - Harbour Clearance - Subsea Structure Foundation Access - Safer non-contact methods - Controlled & Mass Flow Excavation - Highly qualified & experienced operators - Real time sonar monitoring of service - Rotech Engineering & Fabrication
TRS2 Controlled flow excavation system
Applications Personnel Capabilities Services patents pending
+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk RS2-3 Hybrid jet trenching system
-
-
-
-
-
-
-
-
methods -
-
operators -
service - 6 operators for 24hr operations
Personnel Capabilities Services
- Cable/Pipeline/Umbilical Trenching - Cable/Pipeline/Umbilical Deburial
Freespan Rectification
Backfilling & Burial
Sandwave Removal
Jack Up Spud Can Clearing & Cleaning
UXO & Salvage Deburial
Rock Dump & Drill Cutting Removal
Harbour Clearance
Subsea Structure Deburial and Access - Safer non-contact
Jet trenching solution for cohesive and non cohesive soils
Highly qualified & experienced
Real time sonar monitoring of
Applications
Max RS2 Jet Outlet Pressure 60kPa Max RS3 Jet Outlet Pressure 300kPa Max RS2 Jet Flow 4000 L/s Max RS3 Jet Flow 300 L/s Operating Depth 3m-300m*

Applications

- Seabed Remedial Works

- Sandwave Clearance

- Pre-Sweeping

- Shallow Water

- Jack Up Spud Can Clearing & Cleaning - Harbour Clearance

- Subsea Structure Foundation Access

Capabilities

Max Jet Flow 5,500L/s

Max Jet Pressure 40kPa

Width of Jet 4m

Minimum Operating Depth 1.5m

Personnel

- Safer non-contact methods

- Controlled & Mass Flow Excavation

- Highly qualified & experienced operators

- Real time sonar monitoring of service

- 6 Rotech operators for 24hr operations

- 2 additional Rotech operators are supplied to operate the jetting system for soils in excess of 40kPa

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
Services TRS2 Blade Controlled flow excavation

Applications

- Debris Removal

- Boulder Removal/Relocation Works

What’s Included

- Can be configured for ROV hydraulic supply

- Optional 2x ROV hot stab connections

- Grab transit/Vessel sea-fastening frame

- Operating manual

- Industry standard ¾” wing type hydraulic connectors

- Single leg sling and masterlink supplied for deployment

- Grab can be operated by a standard HPU and powered umbilical reel

Arm Capacity 3.0 m³

Payload 15 Te Weight 4800 kg No. of arms 5

Pressure 200 Bar Flow 40-110 l/min

Height Open 3500 mm Height Closed 2800 mm Width Open 2620 mm Width Closed 3680/4040 mm

- 2 operators for 24hr operations

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk RSBG
Orange Peel Grab
Personnel Capabilities

Applications

- Cable Cutting and/or Recovery

- Umbilical Cutting and/or Recovery

- Pipeline Recovery

- Rock Removal/Relocation

- Cutting of Cable/Umbilical up to 260mm

- Cutting of Wire Rope up to 8”

Services

- Real Time Sonar Monitoring for locating product

- Subsea Camera and Lights

Capabilities

Maximum flow 70l/min

Maximum pressure 350 Bar SWL (Vertical) 12Te SWL (Horizontal) 5Te

Maximum grip force 50kN Minimum grab diameter 50mm Maximum grab diameter 1,100mm Operating depth 0-200m

- Various Guillotine Cutters available for different products.

Personnel

- 2 operators for 24hr operations

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
RSG-C Rotech Subsea Grab Tool with Integrated Cutter

Applications

- Cable Recovery - Umbilical Recovery - Pipeline Recovery - Rock Removal/Relocation

Maximum flow 70l/min Maximum pressure 350 Bar SWL (Vertical) 20Te SWL (Horizontal) 5Te Maximum grip force 50kN Minimum grab diameter 50mm Maximum grab diameter 1,100mm Operating depth 0-200m

- Real-time sonar monitoring for locating product - Subsea camera and lights - 2 Operators for 24hr operations

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
RSG Rotech Subsea Grab Tool
Personnel Capabilities Services

Rotech Subsea were contracted by Jan De Nul to provide the TRS1LD Jet Trenching tool to carry out Post-Lay Trenching works on OWF in Taiwan. The scope of work consisited of burying a total of 21 cables (4 Export, 17 Array) to client specification of 2.0m DoL. The project will be completed in 2 phases.

The TRS1LD was selected by Jan De Nul due to its unparallelled technical and performance capabilities resulting in increased productivity and a reduction on the projects total costs. The subsea spread of equipment was mobilised on the Willem De Vlamingh as well as being mobilised on the Grand Canyon II and deployed using the ships crane. Water Depths ranged from 8.0m - 29.0m LAT.

Phase 1 of the project was a success with 4 Export Cables and 7 Array cables being buried to client specification with ease. Soil conditions were described as soft sands however, we experienced large sections of stiff clay with shear strengths up to 80kPa. Despite this, the TRS1LD excelled and still achieved Jan De Nuls burial specifications. The TRS1LD lowered the cable with 2 passes at an average rate of 4m/min and reaching speeds of up to 10m/min in some sections.

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk
CASE STUDY TRS1LD - Jan De Nul
TRS1LD - Post-Lay Cable Trenching Q2,Q3 2020 - Willem De Vlamingh & Grand Canyon II and Cable Routes

Rotech Subsea were contracted by Subsea 7 to provide the TRS1 Jet Trenching tool to carry out Post-Lay Trenching works in Offshore Australia. The scope of work consisited of burying 6000m of 118mm diameter umbilical, to client specification of 0.6m Top of Cable.

The subsea spread of equipment was mobilised in January 2021 on the Seven Eagle and was deployed using the vessel crane. The TRS1 was operated in water depths up to 50m LAT, experiencing soil conditions of medium to coarse grained sand as well as harder, more cohesive soils.

The project was a great sucess with Subsea 7 delighted in the TRS1’s technical and performance capabilities. The umbilical was easily trenched to client specification with the Rotech Equipment being operational for only 22 hours for the entire proejct. In the soft soil areas, a trench depth between 1.3m - 1.6m BOT was achieved at a progress rate of 4m/ min. In the harder areas, depths betwen 1.0m - 1.3m BOT were observed at a progress rate of 3m/min. These depths were all achieved with only 1 Pass.

The TRS1’s unparalled capabilities allows for excellent productivity thus leading to a reduction on the projects total costs. A successful project for all parties, and Rotech Subsea look forward to future collaborations with Subsea 7.

Subsea 7

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk CASE
TRS1 - Subsea 7
STUDY
Reference Alex Cliffrod, Senior Project Engineer, TRS1 - Post-Lay Umbilical Trenching Q1, 2021 - TRS1 Deployment on the Seven Eagle & TRS1 during Subsea Operations

FPOC/Flexible/Umbilical Post Lay Jet Trenching Q1 2019 / TRS1LD CFE SPREAD

Rotech Subsea Ltd were contracted by SAIPEM as part of a Power-Fibre Optic Cable (PFOC) and Flexible and umbilical Post Lay Jet Trenching Project. The Rotech Subsea TRS1LD tool c/w HP Jets was selected by Saipem for this workscope due to advanced Technical capabilities and cutting ability in stiff soils.

The spread of equipment was mobilised on the Mubarak Multicat Vessel to complete the post lay trenching of various FPOC, flexible pipelines and umbilicals.

TRS1LD performance was as expected and Rotech Subsea delivered as promised in soils in excess of 200kPa undrained shear strength

Each Product was lowered to 1m Top of Pipe/Top of Cable below the adjacent seabed level. The post lay trenching operations were completed whilst progressing at a rate averaging 3m/minute.

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk CASE
TRS1LD - SAIPEM
STUDY

TRS2- Sandwave Clearance Q3, 2020 - Excavation Lines carried out by TRS2 & TRS2 Deployment

Rotech Subsea are contracted by Seaway 7 to provide the TRS2 CFE tool for Sandwave Clearance operations at OWF located in Taiwan. The scope of work is to be completed in 2 phases with phase 1 having being completed in the third quarter of 2020. Phase 2 is to commence in the early stages of 2021.

The TRS2 was selected by Seaway 7 due to its high volume output performance making it the ideal tool for sandwave clearance due to its ability to displace large amounts of subsea material. The Rotech Equipment was mobilised on the Topaz Installer and operated in water depths of between 5m-10m.

Phase 1 of the project was a success. The TRS2 was utilised for seabed lowering excavations. The TRS2 tool was used to carry out 25 grid Line excavations, lowering the seabed to allow vessel access to the worskite during spring tides. The sections to be levelled varied in height ranging between 0.4m - 1.8m. Rotech carried out excavations at speeds between 4m/min - 10m/min. Rotech look forward to returning to Yunlin Offshore Wind Farm to complete Phase 2 of the project in 2021.

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk CASE STUDY TRS2 - Seaway 7

TRS1LD & Jets - Cable Burial Q3 2019 - TRSL1D & JETS SPREAD ON OSV RELUME

Rotech Subsea were contracted by Orsted to provide the TRS1LD Jet Trenching tool - equipped with HP jets - to carry out cable burial at OWF located in the Irish Sea. Rotech Subsea took control of all operations for this project from chartering the vessel to contracting all relevant parties required to carry out a successful excavation project. The TRS1LD was selected by Orsted due to its unparallelled technical and performance capabilities resulting in increased productivity and a reduction on the projects total costs.

The subsea spread of equipment was mobilised on the OSV Relume and deployed using the ships crane. Two separate cables (WOW03 & WOW04) - totalling approximately 3.5km in length - were to be trenched to Orsted specification of 2.0m TOC in the soft sand areas and to 1.0m TOC in the Stiff Clay areas. Water depth ranged from -2.0m to +14.0m LAT.

The project was a success,with the cables trenched to Orsted Specification at an average rate of 4m/min in the soft sand areas and 2m/min in the stiff clay.

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk CASE
STUDY TRS1LD & Jets - Orsted

CASE STUDY

TRS2 & RSG - Maersk Supply Services

TRS2 & RSG- Structure De-Burial & Recovery Q3, 2020 - Rotech Equipment & the Structure to De-bury

Rotech Subsea were contracted by Maersk Supply Services to provide the TRS2 CFE tool for Jacket Template & Well-head De-burial in the Tyne Field. The Rotech RSG grab system was also used to assist in the recovery of a PLET Structure in the Southern North Sea.

The TRS2 was selected by Maersk Supply Services due to its high volume output performance making it the ideal tool for De-burial due to its ability to fluidise and displace large amounts of sediment. The Rotech Equipment was mobilised on the Maersk Inventor and operated in water depths of approximately 17m.

The project was a success. The TRS2 de-buried the Jacket Template and Wellhead with ease reaching up to 5.5m deburial depth. This was achieved in Dense Sand soils. The TRS2 was also additionally used for backfilling operations, minimising the effect on the seabed by filling the excavated area with the removed sediment allowing for NSBL to be achieved. The Rotech Grab operations were also a sucess with the grab being utilised to lift the cuts of the PLET into a subsea Basket.

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk

RS1-2 - Remedial Cable Burial Operations

Rotech Subsea were contracted to assist with remedial cable burial operations on x3 offshore wind farms offshore Germany. Rotech provided the RS1-2 Hybrid Controlled Flow Excavator (CFE) equipment spread to carry out this scope.

Rotech were to carry out:

• Remedial Cable burial in various locations along multiple cables

• x1 cable to be buried to 1.5m Depth of Lowering

• All other cables to be buried to 3m Depth of Lowering – Reasonable endeavours.

Project Information:

Water Depth - 3m– 13m

Scope - Cable Burial Soils - Silty Sands with intermittent hard layers Currents - Up to 2.4 Kts max

General Sea State - 0.25 – 1m Hs

Rotech’s Scope of Work was to lower existing export cables on each worksite to client specific depths. Wind farm 1 - 1.5mtrs DOL, Wind Farm 2 & 3 the spec was maximum 3m DOL or best endeavours should the material being excavated be too hard. Prior to the project it was known possible hard and cemented areas could be encountered along the route.

The RS1-2 was deployed from the vessel crane of single fall wire, the equipment was deployed over the starboard side of the vessel.

Vessel forward & aft deck winches were used for our orientation tuggers. These were routed through snatch blocks fixed to pad eyes on the extended outriggers.

The RS1-2 remained suspended above the seabed / cable and in line with the cable to complete all trenching operations. The vessel’s DP positioning system was used to move the CFE tool along the cable RPL routes/areas that required trenching works. The RS1 tool was the lead excavator. USBL transponders fitted to the tool provided accurate data on the location of the RS1-2 to ensure operations were completed in the correct locations.

Trench depth was monitored real time using a sonar imager mounted to the CFE tool to confirm the trench depth and when the cable had been buried to the correct specification for the remedial burial works. Once Rotech completed their scope, the client surveyed the area using separate survey equipment to confirm that the completed trenching ops met the required specifications.

Results

On Windfarm 1 - 1.5m Depth of Lowering was achieved with two passes. On Windfarms 2 & 3 the average DOL was 2 – 2.5mtrs. The mobility of the seabed was very active on these sites as confirmed by the client reps data with some areas gaining/losing up to 6mtrs over a season. This was completed in 2 passes and was passed off by client.

Rotech Crew and the vessel deck crew worked very well together with good communication which lead to safe & efficient tool launch and recovery operations, and overall project success.The RS1-2 hybrid tool worked very well and performed as expected and achieved the excavation specifications required by the client

+44 (0) 1224 698698 | subseainfo@rotechsubsea.co.uk | www.rotechsubsea.co.uk CASE STUDY RS1-2
Rotech Subsea Rotech House Whitemyres Avenue Aberdeen AB16 6HQ T: +44 (0) 1224 698698 E: subseainfo@rotech.co.uk W: www.rotech.co.uk The global leader in Jetting & Controlled Flow Excavation (CFE) Technology Trenching, Seabed Clearance & IRM

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.