Iret - Evere Square - hooox Real Estate Communication

Page 1

EVERE

SQUARE



6 GOOD REASONS TO CONSIDER THIS UNIQUE INVESTMENT OPPORTUNITY A mixed integrated development of 50.000m²

more info

100% LET – Long-term leases (average of 18 years)

more info

Excellent & Visible location

more info

A site with a long-term potential

more info

Limited landlord obligations

more info

Based on the experience of Iret Development

more info



DEVELOPMENT

5

ONE OF THE LARGEST TRIPLE-A MIXED DEVELOPMENTS IN BRUSSELS

42.130m² TOTAL LAND

49.801m²

MIXED DEVELOPMENT

FULLY LET

A,B,C: D: E: F:

BMW Level 3 communications Krefel, RTL, Radio Nostalgie Maserati, Cipac

C D

F

B A E



TENANCY


8

AAA TENANTS :

MASERATI KRËFEL RTL CIPAC LEVEL 3 COMMUNICATIONS BMW BENELUX RADIO NOSTALGIE MAJOR TENANTS BY AREA SIZE

MAJOR TENANTS BY RENT (€)

Maserati

Level 3

1.800.000 1.600.000 1.400.000 1.200.000

Cipac

1.000.000 800.000 600.000

Krëfel

400.000 200.000

Maserati

Krëfel

Level 3

Cipac

0

BMW

BMW


TENANCY SCHEDULE

9

BUILDING

AREA (M²)

TENANT

PARKINGS

START RENT

FIRST BREAK

YEARS

RENT/YEAR (€)

A-B-C

27.968

BMW

346*

20/07/2014

9/08/2032

18

1.966.193

D

5.250

Level 3

40

2/04/1999

30/06/2017

3

505.371

E

2.500

Krëfel

60

24/01/2014

23/01/2032

18

316.300

F

12.268

CIPAC

135

1/03/2014

29/02/2032

18

700.000

F

1.815

Maserati

13

1/06/2014

31/05/2032

18

124.475

E: parking

RTL

40

1/5/2014

30/04/2017

3

36.000

E: parking

RTL

16

1/1/2015

30/04/2017

3

12.000

E: parking

Nostalgie

14

1/5/2014

30/04/2019

5

13.272

Total * Incuded in Surface

49.801

664

3.673.610 €


BMW BELUX

Tenant :

BMW BELUX SA (100% subsidiary of BMW Group). www.bmw.be

Agreement :

32-year Lease Hold (“Emphytéose”) with a renegotiation of the rent (‘canon’) after 18 years

Surface :

27.968m² retail, workshop, parking and offices (including 346 parkings) : •

Buildings A & B (New Construction) = 15.508m²

Building C (Redevelopment) = 12.460m²

Start of agreement :

20 January 2014

Start of rent :

20 July 2014

Start of Activity :

September 2014

First rent :

1.966.193,-EUR (Base rent : 1.900.000,-EUR)

Indexation:

Yearly. Base = health index (October 2011)

Landlord Obligations

Only reparation of structure of Building being for the Landlord + guarantee of construction companies

for these reparations during 10 years.

Bank Garantee :

1.900.000,-EUR (yearly indexed health index)

Tenant investment :

+/- 25.000.000,-EUR, i.e. all the works as from casco delivery by the landlord.

FIRST BREAK: 18 YEARS * Incuded in Surface

TOTAL SPACE: 27.968 M²

€ 1.966.193 RENT/YEAR

346* PARKING SPACES


11


MASERATI ACG

Tenant :

ACG Maserati Brussels NV. www.acgmaserati.be

Agreement :

18-year lease

Surface :

1.815 m² showroom and workshop + 13 outside parkings

Start of agreement :

1 June 2014

Start of rent :

1 June 2014

Start of Activity :

September 2014

First rent :

124.475,-EUR

Indexation:

Yearly. Base = health Index (January 2014)

Landlord Obligations

Only reparation of structure of Building being for the Landlord.

Bank Garantee :

6 months of rent (yearly indexed health index)

Tenant investment :

Est. 1.000.000,-EUR

FIRST BREAK: 18 YEARS

TOTAL SPACE: 1.815 M²

€ 124.475 RENT/YEAR

13 PARKING SPACES


13


LEVEL 3 COMMUNICATIONS

Tenant :

Level 3 Communications NV. www.level3.com

Agreement :

Ongoing lease agreement since 1 july 1999. Next break 2017-2023-2029

Surface :

5.250m² of datacenter and offices

Start of agreement :

1 July 1999

Actual rent :

505.371,-EUR

Indexation:

Yearly. Base = health Index.

Landlord Obligations

Only reparation of structure of Building (without the roof) being for the Landlord.

Bank Garantee :

6 months of rent (yearly indexed / health index)

Tenant investment :

+/- 40.000.000,-EUR (without IT-equipment)

NEXT BREAKS: ‘17, ‘23, ‘27

TOTAL SPACE: 5.250 M²

€ 505.371 RENT/YEAR

40 PARKING SPACES


15


KRËFEL

Tenant :

Krëfel NV. www.krefel.be

Agreement :

• Building: Usufruct Agreement (“Usufruit”) 30 years with break option after 18 years

• Parkings: Lease agreement of 18 years

Surface :

2.500m² Retail surface + 60 parkings (23 outside and 37 inside)

Start of agreement :

24 january 2014

Start of rent :

24 januari 2014

Start of Activity :

April 2014

First rent :

316.300,-EUR

Indexation:

Yearly. Base = health Index (December 2013)

Landlord Obligations

Only reparation of structure of Building being for the Landlord.

Bank Garantee :

4 months of rent (yearly indexed / health index)

Tenant investment :

Est. 2.500.000,-EUR

FIRST BREAK: 18 YEARS

TOTAL SPACE: 2.500 M²

€ 316.300 RENT/YEAR

60 PARKING SPACES


17


CIPAC

Tenant :

CIPAC NEW SA. www.cipac.be

Agreement :

18-year lease agreement

Surface :

12.268m² retail-warehousing + 87 int. parkings and 48 outside parkings

Start of agreement :

1 March 2014

Start of rent :

1 March 2014

Start of Activity :

June 2014

First rent :

700.000,-EUR

Indexation:

Yearly. Base = health Index (December 2013)

Landlord Obligations

Only reparation of structure of Building being for the Landlord.

Bank Garantee :

6 months of rent (yearly indexed / health index)

Tenant investment :

Est. 1.800.000,-EUR

FIRST BREAK: 18 YEARS

TOTAL SPACE: 12.268 M²

€ 700.000 RENT/YEAR

135 PARKING SPACES


19


OTHER PARKING TENANTS (BUILDING E)

Tenant :

RTL - www.rtl.be

Parkings :

40 + 16

Rent : 48.000,-EUR Lease :

9-year lease as from 1 May 2014 (break after 3 and 6 years)

Tenant :

RADIO NOSTALGIE - www.nostalgie.be

NRJ - www.nrj.be Parkings :

14

Rent : 13.272,-EUR Lease :

9-year lease as from 1 May 2014 (break after 5 years)


21


22


23

LOCATION


Antwerpen

Amsterdam Antwerpen

A12

E19

Brussels Airport E40 Brugge Gent Oostende

E40 Leuven Luik Maastricht Aken

evere

Square

E19

E411 Namur Luxembourg

Charleroi Mons Paris

1. RTBF-VRT 2. METRO: Diamant 3. Gare Meister

evere

Square

N ÉO .L AV

EYE ER UST AUG AAN RSL

2

1

E40

N

3

A JE OS

RD NA RTS ÉO AE L . M AV OM M

GR

D

ES QU AC IN .J G AV EOR G

SÉE AUS H C

IN UVA O L E


PERFECT LOCATION

25

OTHER BRANDS SUCCESFULLY REPRESENTED IN THIS AREA:

AUDI CITROテ起

M E R C E D E S VOLKSWAGEN

RTL TESLA KIA

BUS CHAUSSテ右 DE LOUVAIN: 50M

METRO DIAMANT: 850M

TRAIN STATION MEISER: 1000M

HIGHWAY E40: 800M

By train - By car: 1.53 h 2.15 h

1.5 h 4.25 h 1.22 h 3.20 h

0.42 h 0.45 h

evere evere Square Square

LONDON

PARIS

BRUSSELS

ANTWERP

AMSTERDAM



TOWNPLANNING


FOTO BUURT?


A SITE WITH POTENTIAL

29

According to the Brussels Townplanning (PRAS) the site is located in a “ZEMU” zone (Zones d’Entreprises en Milieu Urbain), being an industrial zone in an urban environment. This townplanning also allows the development of residential real estate on the site, giving it an additional future potential.

Le PRAS démogRAPhique - BRochuRe exPLicAtive

Pôle Mommaerts-Reyers

ZEMU ZONES 23



SPECS



TECHNICAL SPECIFICATIONS All buildings of Evere Square have been constructed on casco-based agreements, meaning that the landlord only has the responsability of the structure of the buildings. The different tenants have executed themselves the entire fit-out and techniques.

Architect:

FCM Architects and Atelier de l’Arbre d’Or

Landscaping architect:

Linears

Contractors:

Cordeel and Bolckmans

Contractor fit-out BMW:

Jansen Finishings

Control of the works:

Seco

Construction and environmental permits obtained in 2013-2014 Historical soil pollution (pollution Orphenline): Soil remediation will be executed by Iret Development => Bankguarantee constituted by IRET Development and accepted by the IBGE-BIM (502.000,- EUR). The soil remediation installation has been integrated in the landscaping (coordinated with BMW).

33


34


35


PRIME DEVELOPER

Iret Development is an international real estate Developer of offices, residential space and retail. Conscious of the growing importance of mobility, flexibility and environment, Iret Development focuses on mixed urban projects with a major emphasis on sustainability. Our activities include public private partnerships. Today, Iret Development manages an active development pipeline totalling over 400.000m². Iret Development can look back on a rich track-record of succesful real estate developments (around 1.000.000m²), among others through its former affiliated company Robelco. Iret Development is a subsidiary of Inter Real Estate Trusty Comm. VA.

Iret Development SA-NV Tour & Taxis Havenlaan / Avenue Du Port 86C – 103 t brussels www.Iretdev.be ast@iretdev.be +32 2 402 46 00


37 Tour&Taxis - Brussels

Rive Gauche - Charleroi

X-Antwerpen - Antwerp


DISCLAIMER The information in this brochure has been provided by Iret Development on the condition that you have signed a confidentiality agreement, to which we refer you for details. Every consultant who receives this brochure must have signed this agreement. It is strictly forbidden to disclose any or all of the information herein to any third party without the prior written permission of Iret Development. The information herein is for indicative purposes only, in the context of a potential sale as determined by Iret Development’s board of directors. Š IRET Development




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.