CLIENT:
CONTRACTOR:
CORPORACION VENEZOLANA DE GUAYANA (CVG) (EPS CEMENTO CERRO AZUL, CA)
EHDASSE SANAT CORPORATION
CERRO AZUL 1 MTPY CEMENT PLANT
(CERRO AZUL CEMENT CONSORTIUM)
CONSULTANT:
SANO Project No.
SANO Document No.
Rev.
85-2099
49D–C2–ST-002
A
Structural Calculation Report for Top Structure of Clinker Silos & Clinker Transport Conveyor (491DP2) Project Document No. :
A4-06107-49D-01-C2ST002
H.Roshanaei Prepared
K.Saberi Checked
S.Sepanji Approved
For Filing Description
05-July-09 Date
A Rev.