GROUND CONDITIONS PART 2 ARCH10003
2018
SEM2
-
Design
Lloyd Hsieh - 996484 Studio 7, Wednesdays 1p.m. Studio leader - Douglas Wan
Studio
Alpha
09:00
12:00
15:00
SPATIAL TEMPORAL DIAGRAM - DENSITY
Recored on the 10th AUG 2018
e al e Fe m al
M
SPATIAL TEMPORAL DIAGRAM Recored on the 10th AUG 2018
09:00
Walking
12:00
Sitting
15:00
Standing Still / Waiting
Traffic flow Short study Talking Waiting Eating Using phone
1200 1500 0900
MSD SITE SHADOW MAP - AUGUST Lloyd Hsieh, Joseph Li, & Lina Zackariya
N
01
3
5
SCALE 1:500 @A3
10
20
09:00 12:00 15:00
The Dark Teal Areas: accessible areas where the shadows of the three differnt times overlapped provide a general sense of which areas are shaded for most of the day
N
01
3
5
SCALE 1:500 @A3
10
20
Note: I’ve lined up the drawings vertically to make sure that the measurements are correct and correspond between the two. They are laid out side by side for the sake of the uniform landscape format.