How can we control the stone?--a new stone construction technique-1

Page 1

How can we control the stone? -- a new stone construction technique

Huang Yewei 3035894371 Thesis Advisor : Kuo Jze Yi Mahter of Architecture 2022-2023 Thesis Report The University of Hong Kong


ACKNOWLEDGEMENT

It has been an exciting experience, a semester that has challenged me. I sincerely thank my advisor Kuo for his guidance and encouragement throughout the semester, for showing me the way when I was lost, helping me when I failed, and spurring me on when I was proud. Because of his continuous promotion during this semester, I have been able to achieve what I have. My two years at HKU have allowed me to learn from teachers such as Tao Zhu, Christian Lange, Sony Devabhaktuni, Li Hua, Jersey Poon and others. I want to thank them for their guidance during these two years. The final result was only possible with the help of Tong Sun, Jasmine Li, Billy Wong, June Zhu, Xiao Long, James Ip and Victor Cheng. I would like to thank them for their last-minute help sincerely. I would also like to express my gratitude to my family for all the help they could provided me during my two years of graduate studies. I want to thank them for always supporting me silently. Finally, I would like to thank all the people I have met during these two years of my graduate life at HKU for allowing me such a wonderful time.

2


CONTENTS

01/ Position Statement

3

02/ Agenda

9

Thoughts from the quarry Reflections on the material

03/ Urgency

17

Nature Construction Usage

04/Site Condition

21

05/Methodology & Structure

41

Phase1 Phase2 Phase3 Phase4 Phase5 06/ Significance

107

07/ Appendix

112

3


Fig.1 - Articulation of stone and wood

4


- POSITION STATEMENT -

It is a journey of exploration of stones and, at the same time, a reflection on the treatment of nature. Resource extraction is a necessary act for the development of the world, and today we are accustomed to deconstructing natural materials in the most economical way as industrialization has become very advanced. Therefore, stones are usually processed into standard industrialized forms, but this also destroys the original texture of the stones. Therefore, in the thesis, I want to explore a new way of controlling natural material like stone. How to realize the potential of such irregular natural products when confronted with them. It is an experiment to question how society uses natural materials nowadays and to find a way to handle them more respectfully.

KEY WORDS Stone | Nature | Construction Method | Quarry

5


Fig.2 -

6

Quarry in Huizhou,Guangdong


7


Fig.3 -

8

Quarry in Huizhou,Guangdong


- AGENDA Thoughts from the quarry The quarry is a common space brought by urban development. Human beings have an instinctive desire for this kind of space that shows the nature of nature in its nakedness. Modern quarries are a product of industrialization, and industrial means have deconstructed nature, allowing us to peel back the skin of nature and see the traces left by time in nature. For such a site full of conflicts, I cannot help but think about the relationship between humans and nature, industry and nature. Industrialization allows us to control many things that are beyond human capabilities. However, this deconstruction of industrialization has also broken many traces left by nature. With what attitude should we approach such actions? In the case of quarries, we slice and crush stones, thus transforming an otherwise uncontrollable natural product into an industrial scale and a common form that can be better utilized. Are there other attitudes than the most economical one?

9


Fig.4 -

10

Quarry in Huizhou,Guangdong


Reflections on the material "The sweat of production evaporates in the sweetness of consumption." Compared to the economic benefits of the industrial deconstruction of natural materials, we pay little attention to what happens to the source of raw materials. We seem accustomed to the idea that stone should be flaky, powdered, and lumpy. We don't really care or understand exactly how the stone was created, how it was mined, and what kind of shape it is. The correlation between the nature of the material and the end product has become blurred. We seem to have become accustomed to this industrialized language. But it is the material itself that is the most attractive. Like the stone shown in the picture, each stone has its characteristics and is unique due to the limitations of mining technology, which is why the products of nature are so fascinating. Can this uniqueness be demonstrated? We seem to have become accustomed to manipulating stones, but this may erase the irregularity of the form of the stone. Therefore, a new way of controlling the stone is necessary. How can we control the stone while preserving its characteristics? With the development of technology, is there a faster and gentler way to deal with such irregularities?

11


So it seems that this is an experiment using natural materials. What kind of attitude to nature? We have invented a lot of possibilities, including the common slicing and dicing of stones into common shapes. Alternatively, treat to stone by some more advanced means, allowing it to form a new way of building while ensuring a specific natural state. Alternatively, by cement and other adhesives to combine irregular stones. However, none of these is thinking about how to use the properties of stone. I plan to create a new technique of building with stone. A technique that respects and uses the properties of the stone. So this is an exploration of how to deal with nature, an experiment with new stone structures.

AREA REGENERATION AND BUILDINGS REUSE, ARZO - SVIZZERA

Fig.5 - AREA REGENERATION AND BUILDINGS REUSE Fig.6 - SGAE Central Office

12

SGAE Central Office, Ensamble Studio


Cyclopean-cannibalism-matter-designquarra-stone-wall, MIT, 2017

Beyond Bending, ETH, 2016

Attitude towards nature and experimentation If this is an experiment on using natural materials, then this experiment can treat a natural material with the most original and realistic attitude. Initially, I always hoped to have an ambitious goal to change many things. However, even studying the use of stone is a challenge. How to really understand the characteristics of a stone, how to use a stone rationally, how to preserve the traces of nature, how to reflect the relationship between nature and industrialization. These are the questions that I plan to explore in this thesis. The idea of respecting and understanding nature more is perhaps my initial idea this time.

Fig.7 - Cyclopean-cannibalism-matter-design-quarra-stone-wall Fig.8 - Beyond Bending

13


Fig.9-

14

Stone in Quarry


15


Fig.10 - Stone in Quarry

16


- URGENCY -

First, urgency is a rather evanescent concept in this thesis. It can be reflected from three perspectives: the perspective of treating nature, the perspective of construction, and the perspective of using.

Nature The industrialization has brought us many ways of deconstructing and reconstructing nature, yet these methods are all predicated on efficiency. So it is urgent to find a new attitude and approach to nature. Try to slow down and explore the possibilities that materials can offer us. If we can think about this project through the lens of the earth, then time will not be defined. The materials have developed a unique texture due to natural changes over hundreds of millions of years. If we try to respect these unique textures, it is also a response to the landscape and nature. The urgency of this project is more about reflecting on the relationship between architecture and the earth. We usually produce building materials through industrial processing while giving them artificial characteristics and timeliness. However, the relationship between architecture and nature is fragmented. If we can learn from nature and use the potential of natural materials to build, can we create a new language of architecture? This effectively blurs the concept of time. Natural materials bring the temporality of geological change into architecture, bringing a natural temporality to the building itself.

17


Construction Architecture can always be connected to the topic of construction. Although I am exploring the relationship between architecture and nature, this is not to say that I am against industrialization or technological means. On the contrary, it is because of the development of technology that there are more possibilities to control natural materials, so this must be a modern solution. For construction, unlike traditional stone buildings, it should be a lighter and faster way to build. This method may change the process and the process of construction. How to achieve a balance between nature and industrialization? What can be done to counteract the inconvenience and difficulty of building an object that is so irregular and uneven? This is the most fundamental question when dealing with natural materials. So these are the two extremes of the problem: to ensure that the material is in its most natural state and that the building process is convenient. So this expresses the tension in time as well. People only think about the possibilities of a new technology when it can be more convenient. This is exploring a new possibility of stone building, so it may not cover all aspects of a space design. However, I still try to allow people to think more about possibilities of using stone as a construction material.

Usage Any building needs to be used for a certain period. However, this is not a major point of discussion in this thesis. It could be a temporary building or a house made of stone. I want to keep some openness and uncertainty in this regard.

18


Fig.11 - Stone house in the quarry

19


Fig.12 - Quarry mining site

20


- SITE AND SITE CONDITION The beginning of the research A quarry in my hometown was the beginning of this thesis. The shock of nature motivated me to learn more about this quarry. So this quarry in Huizhou, Guangdong, provided the basis for my research. It is a quarry in progress, and like other quarries, the government has already planned for the future of this quarry. In this case, it includes the depth of mining, the extent of mining, the extent of blasting, etc. Therefore, to understand the material, one must also study many aspects, including the geology, the nature of the stone, how it is mined, etc. Based on a site that I was more familiar with, I started my research.

21


比例尺:

0

1:2000

20m

40m

60m

80m

534. 10

533. 5

533600

2620.2

533800

534000

534200

534600

534400

534800

2620.2

村庄 水塘 56.8

59.20

54.7

第四系残坡积层

Q 58.73

57.8

22

59.38

民房

第四系人工填土层

Q

58.94

58.86

58.88 58.84

Q 56.0

废弃加工场地

55.6

Ch

中石炭统黄龙组灰岩

保有矿体出露范围及编号

58.89

59.01

水塘

26 20000

实测、推测地质界线

水塘

26 20000

58.99

H101

2016年采坑地表采集化学样位置

57.50

18

4

57.0

棚房(已空置) 棚房(已空置) 50.42

56.0

Ch

民房 砖

58.76 58.21

3

民房 水塘

12

1

水塘

本次取样位置及编号 4 3

建构筑物

民房58.10

水塘

57.28

H401 H405

57.73 57.55

H201

57.69

祖塘居委会

60.85

H420

H315

H210

H425

H320

H215

矿山杂物房 29 砖

57.11 H430

H325

村道 H435

H225

H330

57.56

H440 H445

57.51

H345

水塘

H350

57.29

H465

H365

H110

H370

H115

H375

H120

48%%D

H390

H135

68.0

B’

H165

100

5

122.0

160

6.2421

民房(已空置) 70

49.40

80 90

28

56.39

26 19400

56.05

56.31

56.23

4

1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。

56.79

支线

55.88 56.73

D’

49.77

55.96

1’

56.47 55.66

220kV仰昆甲乙线

80.0

56.15 56.18 56.22

100

110 120

55.86 53.6

108.0

124.5

Ch

120 110 100 90 80

A’

49.82

94.0

104.0

60

57.00 56.48

56.28 56.23

55.89

56.06

131.9323

120 110 100

90 80

60.0

面积0.1919km

57.19

56.43

56.61

55.98 56.21 56.08

55.90

49.87

70

56.4

38534282.77

56.60

56.39

56.02

2’

H175

53.6

150 140 130

38534529.35 38534513.83

2619935.03

56.92 56.74 56.70

56.54

5

H170

80 90 100 110 120 130 140 150

70

110

120 130 140 150 160 160.5

10k

H160

V黄

H155

80 90

80.0 60.0

2619545.57 2619735.38

8

56.81

沙线

3’

H150

砖3 矿山库房

70

山下

H145

56.9

Y

38534342.19 38534422.43

2619399.66

6 7

开采深度:+120.28m至+50m

56.66

C’

H140

矿山库房 2 砖

4

56.78

H385

H130

民房

ZK3 145.3m

38534018.20

2619343.32

5 56.65

57.10

4’

H380

H125

48%%D

57.06

38534049.71

2619778.53 2619578.02

4

6

38534204.37

2619861.16

2 3

57.21

ZK2 134.5m

Q

26 19600

56.84

H360

H105

50%%D

水塘

160

56.95

H460

H355

民房 27

57.19

Ch

X

1

26

H455

46%%D

H101

3

原矿山门房

水塘

点号

57.09

H450

ZK1 133.4m

D

1

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)

57.16

H340

A 5

砖 6 原矿山办公生活区

57.24

57.34 57.14

H335

水塘 水塘 7

民房

53.0

57.75 57.21

H220

养殖场

57.63

7

H415

采空区

H310

H205

8

54.4

65.96

H410

Q

H305

水塘

26 19400

26 19800

祖塘小学

58.02

24

2557.74

H301

民房

50.76

水塘

采矿证范围及拐点编号

1

58.14

23 58.14

5'

民房

26 19600

2

6 7 8

2

10

前人施工矿钻孔及编号

58.18

5

水塘

棚房(已空置) 50.45

砖 9

Q

58.78

水塘

11

水塘

水塘

ZK1 58.72

1

50.98

26 19800

地质勘探线及编号

1

20

58.76

B

2

民房 水塘

19

14

13

民房

54.0

砖 砖 砖21 民房(已空置)

50.76

16

15

8

C

17

养殖场

56.0

高压线

84.0

55.81

70

121.5

55.59

80

55.24

90

Q

100 110

55.78 55.48

120 130 140

70 60

26 19200

55.71

147.8

26 19200

55.57

140

55.48 55.44 51.80

130

120

110kV仰周线

矿山地质地形图

2619.1

533600

533800

534000

534200

534400

534800

534600

1:2000

533. 5

80m

534800

534600

2620.2

0

1:2000

20m

40m

60m

534. 10

533600

2620.2

533800

534000

534200

534400

534600

534800

第四系残坡积层

Q

第四系人工填土层

56.8

Q

131.9323

L3=60m,B=8m,i=3%

线以 警戒

L3=197m,B=8m,i=8.9%

原有

600 35.4

支线 山下

至30 0m爆 破

沙线 V黄

搬迁

10k

束前

建结 线基

70

=8.7%

11

L2=197m,B=8m,i=89%

26.4

78 133.34

131.9323

108.0 124.5

124.5

Ch

80.0

84.0

高压线

84.0

55.59

55.48 55.71

26 19200

55.57

55.48 55.44

534600

534400

55.48 55.44

534800

03-A1

56.4

56.4

120 49.87

70

94.0

70

60 120 110 100 90 80

120 110 100 90 80

4

28

80.0

84.0

121.5

70

120 130 140

2’

55.88

53.6

2619.1 533. 5

533600

533800

533600

533800

56.78

56.60

高压线

84.0

56.43 57.00 56.48 56.3956.39

55.98 56.21 56.08

56.28

56.23

56.23 56.23

56.05

56.31 56.23 56.15 56.18

55.89

56.06

55.89 56.22

56.18 56.79

56.22

56.73

56.73

55.96

55.96 56.47

55.66

55.66

55.81 55.24

Q

55.78

55.81

55.59

55.78

55.24

55.59

55.48 55.71

55.57

55.48 55.71

55.57

55.48 55.44

Y 38534204.37 38534453.58 38534513.83

534400

534400

5

2619399.66

6

2619545.57

7

2619735.38

8

2619935.03

5

38534422.43 2619399.66

6

38534529.35 2619545.57

38534529.35

7 38534513.83 说 明2619735.38

38534513.83

8

38534282.77

2619790.86

38534189.78

D

2619719.34

D

38534156.98 2619719.34

38534156.98

E4

2619806.82

E4

38534184.57 2619806.82

38534184.57

1:2000 03-A1 56.43 1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 57.00 56.48《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 56.61 56.39 26 26 中的地形地质图 中的地形地质图 19400 19400 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 56.28 56.05 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 56.31 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 56.15 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。 56.79 3、采用山坡露天开采,公路开拓-汽车运输方案。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防护 线线内与爆破作业无关的一切人员,并采取相应的安全防护 措施。 56.47 措施。 5、矿山主要运输道路等级 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 度6.5%,最大 度6.5%,最大 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 1.0m,上底宽1.0m , ,上底宽1.0m, 1.0m 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×深 0.6m×0.5m(宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 弯地段,设置 弯地段,设置 26 26 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 19200

19200

534800

1:2000

1:2000

04-A1

04-A1

比例尺: 1:1000

160

ZK3 145.3m

S耗2=14248.83m 2Ⅰ ZK2 134.5m

ZK1 133.4m

140 138%%D

H1

矿区范围

120

+110m 110 设计开采范围

矿区范围

100

1、本图是根据广东省有色地质勘察院于2021年11月提交的《广东省龙门县平陵街道大围炉 石矿区水泥用石灰岩矿资源储量核实报告》中的地质剖面图及2022年6月份测量的矿山开采 现状图及现场踏勘资料综合绘制而成。 2、剖面位置见地形地质图中2--2'剖面。 3、采用山坡露天开采方式。 4、最终台阶高度15m(第四系残坡积层不大于5m),最终台阶坡面角55%%D(第四系残坡积层不 大于45%%D),最终帮坡角46%%D~55%%D,安全平台宽度4m,终了台阶较少,不设清扫平台。

设计开采范围

+95m

90

+80m 80

S保2=18527.10m 2Ⅰ

+65m

70 Ch 60

55°

S原保2=18567.80m 2Ⅰ

+50m

斜坡道

50 最低开采标高+50m

85m

88m

100.6m

40 30

136%%D 46%%D

20 10 0

X=2619800

X=2619600

Y=38534200

图 Q

Ch

X=2619400

Y=38534400

第四系

2016年储量核实前消 耗矿体范围

中石炭统黄龙组

2016年核实之后消耗矿 体范围

残坡积层

保有矿体

设计开采范围

灰岩

原矿区范围内保有矿体

矿区范围

ZK1 133.4m 85m

不整合界线

ZK1

138%%D 地层产状 48%%D

矿体截面积及编号

钻孔编号及孔口标高孔深

+50m 开采终了平台标高、台阶坡面角

施工钻孔位置及编号(平面图) 55°

H101

地表采样位置及编号

现 原

地质剖面图(1) (开采终了剖面图)

现、原地形

1:2000

高程(m)

05-A3

1、本图是根据广东省有色地质勘察院于2021年11月提交的《广东省龙门县平陵街道大围炉 石矿区水泥用石灰岩矿资源储量核实报告》中的地质剖面图及2022年6月份测量的矿山开采 现状图及现场踏勘资料综合绘制而成。 2、剖面位置见地形地质图中3--3'剖面。 3、采用山坡露天开采方式。 4、最终台阶高度15m(第四系残坡积层不大于5m),最终台阶坡面角55%%D(第四系残坡积层不 大于45%%D),最终帮坡角46%%D~55%%D,安全平台宽度4m,终了台阶较少,不设清扫平台。

比例尺:1:1000 138%%D 设计开采范围

设计开采范围 80

矿区范围

矿区范围

70

S耗3=4586.08m 2Ⅰ

S原耗3=4640.75m 2Ⅰ

60 S保3=2242.83m 2Ⅰ 50

Q

Q

235°

最低开采标高+50m

S原保3=2343.74m 2Ⅰ

Ch

40 30

136%%D 46%%D

20 10 0

Y=38534200

X=2619800

Y=38534400 X=2619600

Q

第四系

2016年储量核实前消 耗矿体范围

Ch

中石炭统黄龙组

2016年核实之后消耗矿 体范围

残坡积层

保有矿体

设计开采范围

灰岩

原矿区范围内保有矿体

矿区范围

ZK1 133.4m 85m

不整合界线

ZK1

136%%D 地层产状 46%%D

矿体截面积及编号

钻孔编号及孔口标高孔深

+50m 开采终了平台标高、台阶坡面角

施工钻孔位置及编号(平面图) 55°

H101

地表采样位置及编号

现 原

地质剖面图(2) (开采终了剖面图)

现、原地形

1:2000

Fig.13 - The government's plan for the quarry

22 比例尺: 1:1000 高程(m) 170

简易 道路 原有 矿山

C

+50m开采终了平台

06-A3

H • A1(+56.4m) 2 砖 矿山库房

4

I

56.9

3

砖 矿山库房

70

• A7(+65m)

L4=

200

70

m开

%

5

5

53.6

49.87

民房(已空置) 70

49.77

120

60 120 110 100 90 80

220kV仰昆甲乙线

80.0 108.0

124.5

60.0

4 沉砂池

49.40

80

90 110

28

49.82

94.0

104.0

70

56.4

非爆破开采区

了平

..3

122.0

160.5

150 140 130 120 110 100 90 80

采终

i=4

110 120 130 140 150 160

160

+50 m平

m,

68.0

100

26 19400

+65

矿山原有简易道路 m,B=8

80 90

80.0

38534422.43

38534282.77 2619935.03

170

150

3

Q 民房

19800

55.48 55.44

534800

534600

沉砂池 1 原矿山门房

水塘

高程(m)

130

5

砖 6 矿山办公生活区

53.0

水塘

110kV仰周线 534600

水塘

排水泵 • A0(+53.5m)

7

民房

水塘

26 19600

51.80

534200

水塘

6

5

开采终了平面图(地表防洪工程平面图) 开采终了平面图(地表防洪工程平面图) 534200

534000

+48.6m塘底

7

4

130

534000

L5=

A

H

I

57.19

56.61

56.39

56.02 55.98

56.21 56.08

55.86

高压线

Q

F E

38534422.43

爆破作业面积0.0909km 爆破作业面积0.0909km 基建终了平面图(安全设施布置图) 说 明 说 明

57.19

56.70

56.02

56.06

65.96

56.66

56.60

56.54

55.90

G

6

H

38534342.19

38534513.83

Ch

高压线

84.0 121.5

Q

120 130 140

70 60

26 19200

147.8

140

51.80

130

120

以外

以外

戒线

0m爆

支线 山下

至30

沙线

戒线

破警

0m爆

支线

至30

山下

55.86

53.6

56.65

56.78

56.66

140

51.80

533. 5

55.90

57.21

56.65

55.48 55.44

534800

147.8

130

2619.1

56.70

56.54

55.88

56.95

55.71 57.21

55.57

56.92 56.74

120 130 140

147.8

140

03-A1

沙线

B’

10k

B’ 5 2’

4 沉砂池

A

7 38534203.91

I 38534167.03 4 5

38534529.35

2619735.38

1、本图是根据广东省有色地质勘察院于2021年11月提交的 开采深度:+120.28m至+50m 面积0.1919km 开采深度:+120.28m至+50m 面积0.1919km 祖塘居委会 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 设计圈定的开采范围拐点坐标(国家2000坐标系) 设计圈定的开采范围拐点坐标(国家2000坐标系) 中的地形地质图 点号 Y X 点号 Y X 57.75 及建材广东省有色地质勘察院于 57.21 A 38534453.58 2619861.16 2619787.43 A 38534204.37 38534204.37 38534453.58 2619861.16 2619787.43 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 E 2619806.82 E 38534184.57 38534184.57 2619806.82 57.56 2、本图采用2000国家大地坐标系、1985国家高程基准,等 57.24 F 2619809.01 F 38534155.77 38534155.77 2619809.01 高距为2m。 G 2619722.51 G 38534114.10 38534114.10 2619722.51 3、采用山坡露天开采,公路开拓-汽车运输方案。 4H H 38534203.91 2619522.00 4 38534203.91 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 2619522.00 须撤出爆破警戒 4I I 38534167.03 2619470.21 4 38534167.03 2619470.21 线线内与爆破作业无关的一切人员,并采取相应的安全防护 4 2619343.32 4 38534342.19 38534342.19 2619343.32 措施。 5 2619399.66 5 38534422.43 38534422.43 2619399.66 5、矿山主要运输道路等级 26 26 19600 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 6 2619545.57 6 38534529.35 19600 38534529.35 2619545.57 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 7 2619735.38 7 38534513.83 38534513.83 2619735.38 度6.5%,最大 开采深度:+120.28m至+50m 面积0.1363km 开采深度:+120.28m至+50m 面积0.1363km 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高1.0m 26 ,上底宽1.0m爆破作业范围拐点坐标(国家2000坐标系) , 19200 爆破作业范围拐点坐标(国家2000坐标系) 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 点号 Y X 点号 Y X 0.6m×0.5m(宽×深 A 38534453.58 2619861.16 2619787.43 A 38534204.37 38534204.37 38534453.58 2619861.16 2619787.43 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 弯地段,设置 B 2619534.91 B 38534321.23 38534321.23 2619534.91 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 C 2619790.86 C 38534189.78

56.81

108.0

Ch

121.5

60

26 19200

V黄

采终

5

28

49.77

220kV仰昆甲乙线220kV仰昆甲乙线

搬迁

m开

了平 非爆破开采区 非爆破开采区 台

5

49.82 49.40

49.77

80.0

108.0 124.5

Ch

70 60

49.40

80

90 110

120

124.5

60.0

60

70

80

90

110

束前

%

5 49.87

民房(已空置) 民房(已空置) 沉砂池 49.82

94.0

104.0

120

F E

面积0.1363km

X 2619861.16 2619787.43

7

131.9323

以外

L3=197m,B=8m,i=8.9% 台

i=4

..3

%

53.6

160.5

150 140 130 120 110 100 90 104.0 80

60.0

26 19200

+65 了平 m平台 台

采终

m平

m,

..3

53.6

m开

+65

i=4

122.0

130 140 150 160

160

B=8

m,

68.0

100 110 120

122.0

160.5

10k

80 90 68.0

80.0

110 120

130 140 150 160

160 150 140 130 120 110 100 90 80

70

56.92 56.74

56.95

55.48 56.84

57.19 56.84

57.06

57.10

56.81

3’

破警

57.06

534600

3’

55.59

55.24

55.78 57.19

抽干积水

6

B

+50

束前

80 90

60.0

戒线

破警

0m爆

支线 山下

防物体打击

至30

沙线 V黄

搬迁

民房 27

抽干积水

110kV仰周线

534400

•+50 A7(+65m)

建结

26 19400

534800

1:2000

10k

原有

=8.7% L3=60m,B=8m,i=3% L3=94m,B=8m,i

+50m开采终了平台 +50m开采终了平台

B

• A7(+65m)

57.51

55.81

建结

26 19400

57.16

57.09

57.29

H

51.80

I 534200

57.24

56.47

57.51

线基

533. 5

1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 中的地形地质图 中的地形地质图 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。 3、采用山坡露天开采,公路开拓-汽车运输方案。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防护 线线内与爆破作业无关的一切人员,并采取相应的安全防护 措施。 措施。 5、矿山主要运输道路等级 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 度6.5%,最大 度6.5%,最大 1.0m 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 1.0m 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 26 ,上底宽19200 1.0m, ,上底宽1.0m, 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×0.6m×0.5m 深 (宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 弯地段,设置 弯地段,设置 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 安全行车警示标志、反光镜、外侧挡车堆等安全设施。

1:2000

束前

建结 线基 高压

10KV 民房 27

Q

C

H I

砖3 L4= L4= 矿山库房 200 200 m, m, 矿山原有简易道路 矿山原有简易道路 B=8

110kV仰周线 534600

55.86

2657.29

2619735.38

A

80 90 100 110 120 130 140 150

矿山

原有 道路

道路

简易

简易

C

3

Q

砖3 矿山库房

57.75 57.21

57.34 57.14

57.09

• A1(+56.4m) • A1(+56.4m) 2 砖 2 矿山库房 砖 矿山库房 534000

56.79

57.56

57.10

4

祖塘居委会 56.15

57.11 56.73 55.96

6 Q 民房

4

70

26 19400 65.96

57.63

56.31

56.18

57.11

26

2619399.66 2619545.57

点号

60.0

56.39 57.55 56.05

56.28

57.63

56.23

56.22

57.34 57.14

26 祖塘小学 19800

57.00 56.48 56.61

56.39 57.55

56.23

55.89

55.66 57.16

线基

原有

矿山

3

56.43

57.28

55.98 56.21 56.08

56.06

147.8

民房

533800

58.02 祖塘小学

58.02

57.28

56.02

57.69

村道

130

70

5

56.92 56.74

56.70 58.10

2557.74

140

80.0

26 19400

5

砖 砖 6 6 沉砂池 1 沉砂池 1 120 矿山办公生活区 矿山办公生活区 原矿山门房 原矿山门房 130 140

水塘

70

搬迁

民房

70 60

水塘

水塘

56.9

533600

56.60

23 58.14

24

55.90

G

设计圈定的开采范围 爆破作业界线 设计圈定的开采范围

B

2619343.32

5 6 7

水塘

38534114.10

A A 4H 2619522.00 26 D 爆破作业界线 20000 4I 2619470.21 C

38534529.35 6 2619545.57 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) B 38534473.93 2619469.93 点号 X Y 点号 X Y C 38534189.78 2619790.86 1 2619861.16 1 38534204.37 38534204.37 2619861.16 D 38534156.98 2619719.34 2 2619778.53 2 38534049.71 38534049.71 2619778.53 E4 38534184.57 2619806.82 3 2619578.02 3 38534018.20 38534018.20 2619578.02 26 爆破作业面积0.0909km 4 2619343.32 4 38534342.19 38534342.19 2619343.32

160

简易

道路

53.0

水塘

56.9

2619.1

B

爆破开采区

58.18

56.66

V黄

70

民房

水塘

53.0

53.6

高压线

C

2619722.51 E

D

26 19600

i=0

m,

B=8

m,

157

爆破作业范围拐点坐标(国家2000坐标系) 58.18

57.19

7

A

L6=70m,B=8m,i=6.2% G• A8(+54.4m) D +50m开采终了平台

.6%

矿山杂物房 29 砖

爆破安全警戒线 爆破安全警戒线

38534155.77

开采深度:+120.28m至+50m

Q

56.81

57.69

村道

55.88

1’

矿山原有简易道路

水塘

8

养殖场

38534184.57

缓坡段

2619809.01

G E

26 20000

58.21

57.21

56.65

56.78

57.73

7

2’

D’

20

沉砂池

抽干积水 非爆破开采区

Y 54.4

56.95 58.21

E

F

民房

9

民房

面积0.1919km

38534204.37 38534453.58

缓坡段 2619806.82

58.14

高压

38534156.98 38534184.57

02-A1 爆破作业面积0.0909km 爆破作业面积0.0909km

110kV仰周线

120

534400

534200

水塘

26 19600

38534189.78

38534184.57 2619806.82

基建终了平面图(安全设施布置图) 基建终了平面图(安全设施布置图) 534200

534000

80 90 100 110 120 130 140 150

160

26 19600

26 19200

38534473.93

38534189.78 2619790.86

38534156.98 2619719.34 总平面布置图

2619861.16 2619787.43

E

56.84

Q

水塘56.54 民房

58.10

2557.74 57.73

5

4

水塘

排水泵 排水泵 • A0(+53.5m) • A0(+53.5m)

3’23 24 5' 民房

58.14

5' A 水塘 B’

A

非爆破开采区

民房(已空置) 28 爆破开采区 爆破开采区

131.9323

38534473.93 2619469.93

水塘

121.5

120

4 2619806.82 E

70

以外

戒线 破警

0m爆

2619719.34 D

E4

58.14

+48.6m塘底

220kV仰昆甲乙线

80.0

84.0

7

F

i=0

m,

B=8

m, 157 L5= +48.6m塘底

L5=

108.0

Ch

120 110 100 90 80

7

80 90 100 110 120 130 140 150

10k

束前

建结 线基

高压 10KV

以外

戒线 破警

0m爆

支线

支线

山下

至30

山下

至30

沙线

沙线

V黄

V黄

搬迁

搬迁

10k

2619790.86 C

D

水塘

124.5

60

m,

157

49.77

120

水塘

60.0

L2=

• A2(+74m)

.6%

矿山杂物房 i=0 m, 29 砖 B=8

49.40

水塘

C’

B

+110m平台 防物体打击

L6=70m,B=8m,i=6.2% L6=70m,B=8m,i=6.2% G• A8(+54.4m) D G• A8(+54.4m) D +50m开采终了平台 +50m开采终了平台

.6%

矿山杂物房 29 砖49.82

水塘

58.76 57.10

58.78

19

砖 砖 砖21 民房(已空置)

水塘

抽干积水

水塘

2

10

水塘

沉淀池

+65m

X

A

4

57.06

A6(+105m) E 沉砂池 •防高处坠落 沉砂池

水塘

50.76

49.87

70

56.4

F

水塘

2i=8.9%

水塘

50.76

70 80

90

水塘防高处坠落

水塘

38534513.83

2619735.38

棚房(已空置) 50.45

26 19800

38534529.35

2619545.57

开采终了台阶及标高 38534282.77 沉淀池 8 开采终了台阶及标高 2619935.03

点号

F

57.09

58.76 57.19

58.72 58.76

4’

抽干积水 非爆破开采区 抽干积水 非爆破开采区 53.6

8

养殖场

94.0

110

水塘

水塘

砖 截排水沟

1

2 50.98

50.76

57.75

57.24

57.51

58.99

57.29 58.76

58.72

6

58.78

民房

9

民房

养殖场

B=8

m,

120

38534342.19

水塘

11

矿山基建运输道路 矿山基建运输道路 安全护栏或警戒带 安全护栏或警戒带

58.84

57.50

26

民房 27 19

100 110

120

2619469.93 B

C

2

10

民房 水塘

8

54.4

104.0

100 110

534000

533800

B

水塘

10

9

民房 122.0

160.5

54.4

.9%

m,

防高处坠落

E

抽干积水

例 38534018.20 图

开采深度:+120.28m至+50m

3

14

12

民房

设计圈定的开采范围拐点坐标(国家2000坐标系)

58.88

59.01

58.99

57.50

8

19

20 20 砖 砖 砖 砖21 民房(已空置) 砖 砖21 民房(已空置) • A5(+96.8m) 矿山原有简易道路 矿山原有简易道路

1 i=2

I

L1=抽干积水 水塘 砖 197 m, 矿山库房 B=8 矿山原有简易道路 m,

矿山

戒线 破警

55.24 55.48

55.71

55.57

51.80

130

59.01

需拆除 • A4(+95m)

8

防高处坠落

• A3(+77.5m)

1

50.98

3

68.0

水塘

110 120 130 140 150 160

160 150 140 130 120 110 100 90 80

50.76

3 H

2 砖 矿山库房

50.45

水塘

80 90

80.0

C 50.76

3 2• A1(+56.4m) 2

131.9323

56.47

55.81

55.59

55.78

100

26 19400

50.98

11

水塘

棚房(已空置) 棚房(已空置) 50.45

70

26 19800

38534422.43

100

56.79

56.73

55.66

55.81

55.78

38534282.77

56.05

56.15 56.18

55.96 56.47

Q

明38534513.83

60.0

56.39 26 19400

56.31

56.15

56.79

56.73

140

38534282.77 2619935.03

57.00 56.48

56.28

56.05

56.31 56.23

56.18

56.22

55.96

26 19800

38534342.19

38534529.35

38534513.83 2619735.38

80 90 100 110 120 130 140 150

35.4 600

以外

支线 山下

至30

沙线

搬迁

V黄

0m爆

56.28

56.23 56.23

55.89 56.22

56.06

55.66

38534018.20

38534422.43 2619399.66 38534529.35 2619545.57

56.61

56.39 56.39

55.98 56.21 56.08

56.23

55.89

38534342.19 2619343.32

2619399.66 5

2619735.38 7 2619935.03 8

56.43

57.00 56.48 56.61

56.39

56.02 55.98

56.21 56.08

56.06

38534018.20 2619578.02

2619343.32 4

2619545.57 6

11

57.0

50%%D

Q

水塘

4

水塘 水塘

14

12

民房 民房

90

533800

533600

57.19

56.43

56.70

56.02

2619578.02 3

水塘

16

民房 民房 砖

13 54.0 水塘 民房

56.9

38534049.71

+65m

祖塘居委会

58.88

57.16

57.0

3

17

16

15

12

民房

2619343.32

6

65.96 57.63

58.94

58.86

8 50.76

16

民房 民房 砖 13

民房

58.89

57.34

水塘

50.42

17

养殖场 民房 民房 砖

14

13

民房

2619578.02

57.14

防高处坠落

水塘

18

5

养殖场

54.0 56.0

90

533600

水塘 水塘

• A0(+53.5m)

Ch

3 4

7 57.55 58.73

59.38 58.94

58.86

80

533. 5

水塘

18

50.42

Ch水塘

15

水塘

38534049.71

17

养殖场

反光镜

Y 38534204.37

5 矿区范围及拐点编号 矿区范围及拐点编号 38534422.43 截排水沟 2619399.66

57.21

砖 6 棚房(已空置) 棚房(已空置) 1 棚房(已空置) 棚房(已空置)原矿山门房 矿山办公生活区

56.0

水塘

50.42

Ch

设计圈定的开采范围

6 5

2619861.16 2619778.53

2620.2

57.56

15

8

56.60 57.19

56.54

55.90

56.0

7

4

57.0

棚房(已空置) 棚房(已空置) 56.0

A

H

X

1 2

534. 10

2620.2

57.28

59.38

57.69

村道

58.89

水塘

民房

53.0

反光镜

534.2610 19800

57.73

7 60.85

水塘

废弃加工场地

水塘

6

F E

防物体打击标志

59.20

民房

22

57.11

80

2619.1

533. 5

废弃加工场地

55.6

26 20000

7

7

1:2000

55.24

Q

100 110

100 110

2619.1

02-A1

53.6

56.66

56.60

55.86

147.8

51.80

02-A1

1:2000

55.86

56.78

56.66

534800

120 130 140

147.8

130

总平面布置图 总平面布置图

57.21

56.65

56.78

高压线

90

1:2000

55.71

55.48 55.44

59.20

58.73

民房

22

70

120 130 140

140

534800

建结 线基

高压 53.6

56.70

56.84

57.21

55.57 56.65

Q

D

爆破开采区

70

121.5

90

534800

55.90

55.88

110kV仰周线 534600

56.54

10k

26.4

409

1’

26 19600

55.48

57.19 56.84

56.92 56.74

水塘

54.7

采空区

G

534800

高压

856

B’ 2’

55.88

D’

38534189.78

1、本图是根据广东省有色地质勘察院于2021年11月提交的 开采深度:+120.28m至+50m 面积0.1919km 开采深度:+120.28m至+50m 面积0.1919km 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 设计圈定的开采范围拐点坐标(国家2000坐标系) 设计圈定的开采范围拐点坐标(国家2000坐标系) 》中的地形地质图 点号 X Y 点号 X Y 及建材广东省有色地质勘察院于 A 38534204.37 38534453.58 2619861.16 2619787.43 A 38534204.37 38534453.58 2619861.16 2619787.43 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 E 38534184.57 2619806.82 E 38534184.57 2619806.82 2、本图采用2000国家大地坐标系、1985国家高程基准,等 F 38534155.77 2619809.01 F 38534155.77 2619809.01 高距为2m。 G 38534114.10 2619722.51 G 38534114.10 2619722.51 3、采用山坡露天开采,公路开拓-汽车运输方案。 4H 38534203.91 H 2619522.00 4 38534203.91 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 2619522.00 须撤出爆破警戒 4I 38534167.03 I 2619470.21 4 38534167.03 2619470.21 线线内与爆破作业无关的一切人员,并采取相应的安全防 4 38534342.19 2619343.32 4 38534342.19 2619343.32 护措施。 5 38534422.43 2619399.66 5 38534422.43 2619399.66 265、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 38534529.35 6 2619545.57 6 19600 38534529.35 2619545.57 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 38534513.83 7 2619735.38 7 38534513.83 2619735.38 坡度6.5%,最大 开采深度:+120.28m至+50m 面积0.1363km 开采深度:+120.28m至+50m 面积0.1363km 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 26 1.0m ,上底宽1.0m爆破作业范围拐点坐标(国家2000坐标系) , 19200 爆破作业范围拐点坐标(国家2000坐标系) 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 点号 X Y X Y 0.6m×0.5m(宽×深点号 A 38534204.37 38534453.58 2619861.16 2619787.43 A 38534204.37 38534453.58 2619861.16 2619787.43 );在小曲率转弯处设限速警示标志。矿区道路在接口及 转弯地段,设置 38534513.83 7 2619735.38 7 38534513.83 2619735.38 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 38534529.35 6 2619545.57 6 38534529.35 2619545.57

56.81

108.0

Ch

120 110 100 90 80

121.5

70 60

4

1’

80

120 110 100 90 80

70 60

26 19200

28

D’

49.77

220kV仰昆甲乙线220kV仰昆甲乙线

56.92 56.74

38534473.93

160

9.20 11

L2=197m,B=8m,i=89%

L3=60m,B=8m,i=3%

i=8.7%

L3=94m,B=8m,

344 60.5

133.34

4

49.40 49.77

56.81

56.95

55.78

57.06

57.10

4’

C’

38534529.35

534800

534600

2557.74 54.7

非爆破开采区

10KV

70 60

28

49.82

49.40

B’ 5 2’

49.87

民房(已空置) 民房(已空置)

60.0

60

222

87.5

49.87

49.82

70 80

90

80.0

57.06

534600

3’

26 20000

26 19600

A

H

I 38534513.83 4 5

2619469.93 2619790.86

534600

民房58.10

10KV

56.4

60.0

26 19200

53.6

94.0

110

120

57.51

55.59

5 6

59.20

水塘

18

爆破安全警戒线

G

防高处坠落标志

球 祖塘小学

58.02

24

水塘

矿山杂物房 29 砖

Q

120

56.4

5 53.6

70

80

90

110

120

57.16

57.09

55.24 56.95

57.19

非爆破开采区 非爆破开采区

68.0

94.0

104.0

57.24

56.47

57.51

57.10

3’

57.75 57.21

57.56

57.24

55.81

4’

122.0

104.0

57.16

57.29

6

C’ B110kV仰周线

B

65.96

56.79 57.75 57.21 56.73

民房 27

6

100

130 140 150 160 160.5

160 150 140 130 120 110 100 90 80

80

8

8

275.780

275.780

26 19200

• A5(+96.8m)

26 19400

56.05

祖塘居委会

56.15

56.18

57.56

57.09

• A3(+77.5m)

120

122.0

160.5

民房 27

Q

防高处坠落

• A5(+96.8m)

110

120

130 140 150 160

160 150 140 130 120 110 100 90 80

70

51.80

祖塘居委会

55.96

束前

120

80 90 68.0

80.0

110

70

70

26 19400

H

• A3(+77.5m)

I

10KV

高压

26 19400

防高处坠落

50%%D

H

56.28 65.96

57.63 56.31

56.23

57.11

57.34 57.14

70

55.48

55.48 55.44

说 明

70

55.59

55.71

55.57

55.48 55.44

1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 》中的地形地质图 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。 3、采用山坡露天开采,公路开拓-汽车运输方案。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防 线线内与爆破作业无关的一切人员,并采取相应的安全防 护措施。 护措施。 5、矿山主要运输道路等级 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 坡度6.5%,最大 坡度6.5%,最大 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 26 1.0m,上底宽 ,,上底宽1.0m, 1.0m 19200 1.0m 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×0.6m×0.5m 深 (宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及 );在小曲率转弯处设限速警示标志。矿区道路在接口及 转弯地段,设置转弯地段,设置 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 安全行车警示标志、反光镜、外侧挡车堆等安全设施。

C

50%%D

I

L1=

F E

G 38534204.37 38534453.58

6

2619545.57

B

38534049.71 2619778.53

村庄

水塘

56.0

58.14

A534400 村庄

534400

100

55.81 55.24

55.48 55.71

55.57

60.0

100

56.47

C

3

防高处坠落 防高处坠落 .9% .9% i=2 i=2 +110m平台 +110m平台 m, m, 防物体打击 防物体打击 防高处坠落 B=8 防高处坠落 B=8 m, m, • A6(+105m) •防高处坠落 A6(+105m) L1= 120 534200 534400 防高处坠落 120 197 砖3 197 L2= L2= m, m, 矿山库房 B=8 B=8 m, m, 矿山原有简易道路 矿山原有简易道路 • A2(+74m) i=8 i=8 • A2(+74m) .9% .9%

砖3534000 矿山库房

55.6

38534529.35

Y A

H

534400

民房

废弃加工场地

26 20000

58.18

点号

534200

56.8

57.8

Q

面积0.1363km

X F E

7 G 2619861.16 2619787.43

I 2619735.38 4 5

6

60.0

56.39

57.55

57.63

56.22 57.11

55.86

安全护栏或警戒带

I

Q 58.76

80m

58.84

安全护栏或警戒带 爆破作业界线 38534513.83 2619735.38 安全护栏或警戒带

7

C

2619778.53 2

26 4 19800

57.00 56.48 56.61

56.39 57.55

56.23

55.89

57.34

26 57.29

爆破作业界线

警示标志

防高处坠落 58.72

60m

56.0

100

55.81 55.59

55.78

80 90

80.0

26 19400

56.05

56.15

56.79

56.73 55.96 56.47

60.0

26 56.39 19400

56.28 56.31

56.18 56.79

56.73

1

原矿山门房

Q

• A1(+56.4m) • A1(+56.4m) 2 砖 2 矿山库房 砖 矿山库房

56.43

57.28

55.98 56.21 56.08

56.06

束前

4

26 祖塘小学 19800

58.02 祖塘小学

58.02

57.28

56.02

40m

23 58.14 534200

水塘

警示标志 爆破安全警戒线 爆破安全警戒线

A 防高处坠落

防物体打击 防物体打击标志 反光镜 防物体打击标志

2

57.19

80m20m

E

F

50.76

设计圈定的开采范围 防高处坠落标志 防高处坠落标志 设计圈定的开采范围

3 56.92 56.74

57.69

建结

民房

60m0

1:2000

村庄

56.8 57.8

8

养殖场 56.0

160

道路 简易 原有

3

130

80 90 100 110 120 130 140 150

56.05

56.3156.23 56.15 56.18

56.22

55.96

55.66

道路

道路 1

原矿山门房

147.8

140

57.00 56.48 56.61

56.39 56.39 56.28

56.23 56.23

55.89 56.22

简易

简易

120 130 140

Q

56.43

57.00 56.48

55.98 56.21 56.08

56.06

原有

原有

4

70

533. 5 56.43

56.61

56.39

56.02

矿山

矿山

5

6

民房

533800

70

80m

B

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 20m

比例尺:

水塘

民房

9

民房

54.4

沉淀池

56.0

56.60

2

10

水塘

水塘 534000

截排水沟

38534167.03

38534422.43

爆破作业范围拐点坐标(国家2000坐标系) 点号

55.66

26

水塘

38534155.77

38534342.19

D 38534156.98 2619719.34 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) E4 38534184.57 2619806.82 点号 Y X 点号 Y X 爆破作业面积0.0909km 1 38534204.37 38534204.37 2619861.16 1 2619861.16

56.66

村道55.90

线基

60

水塘

533600

60m

56.0

58.78

水塘40m

0

1:2000

B

警示标志

58.18

防物体打击

高压

5

6

80

矿山办公生活区 70 矿山办公生活区 水塘

水塘

56.9

2619545.57

A A 26 D 7 20000爆破作业界线 C

防高处坠落 58.18

比例尺:

120

173.56

222.0

59

100 民房 90

53.0

水塘

56.9

78

70

160

民房

水塘

53.0

26 19200

2619.1

53.6

B

534000

533800

38534184.57

38534203.91

沉淀池

56.78

56.81

需拆除 需拆除 • A4(+95m)

C

26 19600

58.21

57.21

56.65

57.14

10KV

38534184.57

• A4(+95m)

L3=60m,B=8m,i=3%

38534156.98

38534184.57 2619806.82

L3=197m,B=8m,i=8.9%

38534189.78

38534156.98 2619719.34

4 2619806.82 E

高压线

57.69

55.88

1’

爆破开采区

L3=60m,B=8m,i=3%

戒线 破警

0m爆

38534473.93

38534189.78 2619790.86

2619719.34 D

水塘

L3=197m,B=8m,i=8.9%

以外

以外

戒线 破警

0m爆

支线

支线

山下

至30

山下

至30

沙线

沙线

V黄

V黄

搬迁

搬迁

10k

10k

束前

束前

建结

38534529.35

38534473.93 2619469.93

2619790.86 C

56.60

57.19

220kV仰昆甲乙线

• A0(+53.5m)

H145

建结

水塘

26 19600

Y 38534204.37 38534453.58 38534513.83

38534529.35 2619545.57

2619469.93 B

E4

• A0(+53.5m)

7

村道

60.85

4

线基

X

38534204.37 38534453.58 2619861.16 2619787.43 38534513.83 2619735.38

2619545.57 6

D

水塘 84.0

H145

线基

Y

点号

2619735.38 7

B

80.0

121.5

40m

54.7

100 110

26 19600

7 110

57.73

7 2’

采空区 60.85

28

防高处坠落

533800

533600

56.84

Q

56.70

民房58.10 56.54 2557.74

57.73

5

Q

民房(已空置)

爆破开采区

108.0

Ch

120

7

24

民房58.10 水塘 57.74

D

防高处坠落

水塘 124.5

60

23 58.14

24

A

水塘

B’25 G

49.77

水塘

120

水塘

60.0

A

非爆破开采区 Q 采空区

D

58.14

23 58.14

• A2(+74m) .9%

水塘

矿山杂物房 49.8229 砖 49.40

90

20m

534200

90

X

2619861.16 2619787.43 A

7 6

C

矿山杂物房 29 砖

70 80

70

56.4

F

i=8

非爆破开采区 非爆破开采区

G

49.87

94.0

110

高压

38534529.35 38534513.83 面积0.1363km

2

50.76

8

养殖场 水塘

=8.7%

38534513.83 2619735.38

F

197 水塘 m, B=8 m,

矿山原有简易道路

58.14

=8.7%

38534529.35 2619545.57

2619735.38 7

砖 矿山机修间

2

水塘

53.6 50.76

8

养殖场

B

民房

9

民房

122.0

54.4

104.0

58.78

沉淀池

54.0

7

4308

• A6(+105m)

防物体打击

2619545.57 6

50.45

10

民房 水塘

9

民房

120

水塘

68.0

10

100

水塘 110 130 140 150 160 160.5

160 15054.4 140 130 120 110 100 90 80

120

2619522.00 2619470.21 2619343.32 2619399.66

6

E

D

56.95 58.21

57.19

Q

58.76

123.

水塘

i=2

m,

B=8

m,

E

L1=

E

26 20000

57.09

58.76

57.06 58.76

57.10

防物体打击

6 7

棚房(已空置) 棚房(已空置) 50.45 水塘

80 90

80.0

60.0

水塘

I

E

L3=94m,B=8m,i

38534167.03

38534422.43

L0=

2619809.01

缓坡段

开采深度:+120.28m至+50m 57.29

58.76

58.72

6 58.78

基建平

10KV

38534184.57

38534342.19

70

26 19800

26 19400

38534204.37 38534453.58

38534342.19 2619343.32 38534422.43 2619399.66

3 水塘

58.99

26

民房

58.72

533600

Y

2619806.82

4H

4 5

57.51

57.50

19

矿山原有简易道路 矿山原有简易道路

X

E F

缓坡段

57.24

59.01

58.99

57.50

46%%D

8

.9%

缓坡段

A

C

防物体打击

棚房(已空置) 50.45

533. 5 2620.2

57.75

4I

Ch 19

20 20 砖 砖 砖 砖21 民房(已空置) 砖 砖21 民房(已空置) • A5(+96.8m)

• A3(+77.5m)

1

L3=94m,B=8m,i

38534203.91

80 90 100 110 120 130 140 150

38534114.10

38534203.91 2619522.00 38534167.03 2619470.21

2619343.32 4 2619399.66 5

80 90 100 110 120 130 140 150

600

600

35.4

38534155.77

38534114.10 2619722.51

H 2619522.00 4

160

11

35.4

38534155.77 2619809.01

2619722.51 G

50.98

11

水塘

H

基建平

10KV

26 19800

Y

38534184.57 2619806.82

2619809.01 F

4H

11

水塘

8

50.76

1

100

78

面积0.1919km

X

38534204.37 38534453.58 2619861.16 2619787.43

2619806.82 E

G

4 5

点号

矿山基建运输道路 矿山基建运输道路 截排水沟 G 38534114.10 2619722.51

58.84

534000

57.8

80

L2=197m,B=8m,i=89%

Y

点号

2619861.16 2619787.43 A

F

50.98

4

水塘

C 50.76

• A1(+56.4m) 矿山库房 2 砖

水塘

砖 533. 26 5 19800 2620.2

行车转弯警示限速标志 行车转弯警示限速标志 基建台阶及标高 基建台阶及标高 A 38534204.37 38534453.58 2619861.16 2619787.43 +105m

+105m

祖塘居委会 58.88

533800

70

L2=197m,B=8m,i=89%

38534282.77

38534282.77

58.89

533600

2620.2

100

L3=60m,B=8m,i=3%

38534282.77 2619935.03

X

A E

A

需拆

8.4824

• A4(+95m)

133.4m

57.0

3

0035 149.

截排水沟

D

20

1 50.98

100 110

L3=60m,B=8m,i=3%

2619935.03 8

开采深度:+120.28m至+50m 面积0.1919km 开采深度:+120.28m至+50m

水塘 56.9

2619935.03

例2619735.38图 38534513.83 例

8

19

砖 砖 砖21 民房(已空置)

矿山原有简易道路

水塘

11

H145

38534513.83

57.0

1

原矿山门房

Q

水塘 12

民房 民房

行车转弯警示限速标志

22

58.21

8 50.76

16

民房 民房 砖

12

民房 水塘

设计圈定的开采范围拐点坐标(国家2000坐标系)

65.96 57.63

58.94

58.86 58.88

• A0(+53.5m)

D

140.1164

167.0802

16

民房 民房 砖

14

水塘 民房

54.0

56.0

开采深度:+120.28m至+50m 面积0.1919km 矿区范围及拐点编号 行车警示及限速标志 矿区范围及拐点编号 行车警示及限速标志

57.55 58.73

58.94

58.86

村道58.89

57.16

17

16

13

38534422.43

57.28

58.73

316.5831 59.38

59.38

57.69

61.1470

行车警示及限速标志

基建台阶及标高

矿山基建运输道路

55.6 E

26 20000

14

13

民房

54.0

38534049.71

38534342.19

38534422.43 38534529.35

38534513.83 2619735.38

I 2619470.21 4

15

14

12

民房

15

38534204.37

38534018.20

38534529.35

图7 26534. 10 19800 2620.2

2620.2

57.73

7

59.01

50.42

17

养殖场 民房 民房 砖

13

民房

54.0 56.0

2619578.02

17

养殖场

Y

2619778.53

2619399.66 2619545.57

90

i=8.7%

养殖场 15

38534342.19

38534422.43 2619399.66 38534529.35 2619545.57

534800

59.20

+105m

56.66

56.70

56.23

55.78

Ch

56.0

爆破作业面积0.0909km 爆破作业面积0.0909km

55.98

59.20

22民房

8

i=8.7%

38534342.19 2619343.32

2619399.66 5 2619545.57 6 2619735.38 7

点号

55.66

534800

534600

民房58.10

60.85

+105m

L3=94m,B=8m,

水塘

0

1:2000

矿区范围及拐点编号

Q

58.76

57.0

50.42

56.0

X 2619861.16

2619343.32

5 6

基建平

2619343.32 4

6 7

26 19600 爆破作业范围拐点坐标(国家2000坐标系) 爆破作业范围拐点坐标(国家2000坐标系)

56.78

57.19

55.89

水塘

水塘

50.42

56.0

水塘

38534204.37

160

856

59

59

222.0

222.0

173.56

173.56

856

38534018.20

2.3%

409

+105m

57.50

爆破作业界线

球 534. 10

祖塘小学

58.02

24 534600

水塘

水塘

18 5 民房 18 砖 6 棚房(已空置) 棚房(已空置) 250.9131 棚房(已空置) 矿山办公生活区棚房(已空置)

53.0

Y

38534049.71

38534018.20 2619578.02

26 8 19800

水塘 水塘 水塘

水塘 水塘 7

X

38534049.71 2619778.53

,i=

L3=94m,B=8m,

534400

水塘

80

26 19600

57.21

56.65

56.78

56.60

56.21 56.08

56.06

A

54.7

B=8m

409

534200

58.94

水塘

70

56.95

废弃加工场地

水塘

56.0

Y

38534204.37 2619861.16

56.84

57.21

56.65

56.66

56.02

村庄

22民房

25m,

26.4

534000

56.8

棚房(已空置) 棚房(已空置)

A

57.21

L0=1

26.4

废弃加工场地

55.6

26 20000

26 19600

爆破作业界线

56.92 56.74

56.54

55.90

534400

村庄

275.780

56.84

534400

爆破开采区

2.3%

78

533800

533. 5

2620.2

58.73 59.38

5

2

57.56

110kV仰周线 534600

534800

534600

58.99

B

点号

57.11

,i=

133.34

51.80

130

59.01

水塘

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)

57.14

B=8m

133.34

26 20000

A

点号

56.81

55.86

Q

534400

原有道路

5

2619578.02 3

4

58.18

4

D

矿山杂物房 29 砖

25m,

55.86

53.6

56.70

55.90

55.88

110kV仰周线 534400

140

59.20

+105m

57.51

51.80

534200

147.8

比例尺:

534400

废弃加工场地

55.6

26 20000

100

57.19

57.06

57.10

55.24

Q

Q

120 130 140

70 60

26 19200

58.89

18

Q 58.76

2557.74 54.7

非爆破开采区

G

208.0718

Q

建构筑物

原有道路

Ch

58.72

80m

水塘

100

53.6

56.54

56.92 56.74

高压线

51.80

53.

高压线

80m

Q

设计圈定的开采范围

6

H I

E

C

60m

58.14

56.8

240.0937

Q

L0=1

B’ 2’

55.88

1’

56.81

40m

534200

90

4308

水塘 80m 20m

60m 0

23 58.14

534200

80

123.

40m

57.34

B

2619778.53 2

7

3 20m

E

F

2

56.8

214.8165 57.8

8

100 110

B’

5 2’

4

60m

56.0

2.3%

57.75 57.21

57.56 57.24

57.16

56.95

57.19

57.06

57.10

水塘

水塘

57.09

57.29

民房

6 4308

1’

1’

220kV仰昆甲乙线

河道、水系

A

E

58.78

0

比例尺: 1:2000

56.0

70

民房

534000

1:2000

6

4

X

2619861.16 1

开采深度:+120.28m至+50m 面积0.1363km 开采深度:+120.28m至+50m

B

40m

22民房

,i=

65.96

祖塘居委会

57.75

57.24

57.51

123.

28

7

H

C

1 2 3

点号 65.96

57.63

祖塘居委会

57.11

57.34 57.14

57.09

26 57.29

比例尺:

50.76

55.6

A

E

I

E

B

4I

8.4824

478

200.2540 534000

水塘

民房

9

54.4

56.0

设计圈定的开采范围拐点坐标(国家2000坐标系) 设计圈定的开采范围拐点坐标(国家2000坐标系) 57.55

57.63

316.5831

村道

拆 26 需

6

5

4

28

49.77

84.0 121.5

120

V黄 沙线 山下 支线

10k

120

GF

1

216.4

棚房(已空置) 50.45

533800

建构筑物

57.28

57.55

316.5831 57.69

61.1470

• A6(+105m)

民房(已空置)民房(已空置)

D’

49.40

80.0 108.0

Ch

54.7

B=8m 25m,

57.28

2557.74

57.69

非爆破开采区 非爆破开采区

• A2(+74m)

2’ 4

70

80 90

110 120 124.5

120 110 100 90 80

28

49.82

94.0

104.0

60

533600

村庄

爆破安全警戒线 26 20000

20

1

2

6790

3754

矿山

水塘 533800

533600

100

+74m)

120 110 100

90 80

60.0

533. 5

58.84

D

19

砖 砖 砖21 民房(已空置)

矿山原有简易道路

78

197. 50.98

222.

2.3%

民房58.10

57.73

7

村道

B

B’ 5

2619.1

02-A1

58.88

.12

2442

,i=

26 祖塘小学 19800

58.02 祖塘小学

58.02

24

民房58.10 水塘

20m

534200

输电线路

L0=1

9.20 11

GF

A

D

23 58.14

24

61.1470

Ch

.9%

B

+110m平台

非爆破开采区

民房(已空置)

70

56.4

534800

58.86

218

294.

269.0 224

B=8m 25m,

58.14

57.73

建构筑物

原有道路 设计圈定的开采范围 设计圈定的开采范围

5

爆破作业界线

60.85

• A3(+77.5m) • A3(+77.5m)

i=2

160

70

80 90 100 110 120 130 140 150

160

533600

Ch

57.16

m,

• A2(+74m)

i=8 .9%

49.87

1 534600

水塘

59.01

民房

L0=1

9.20

4

4

A水塘

0

1:2000

534000

533800

57.8

58.21

50.76

16

水塘

11

10

输电线路

河道、水系

点号

57.21

• A6(+105m)

26 19200

534. 10

533600

2620.2

14

12

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)

58.18

57.56

133.4m

H145

6

H

爆破开采区

B=8

台 基建平

26 A 20000 7

E

I

E

58.18

57.11

Ch

+105m

GF

C

• A5(+96.8m) • A5(+96.8m)

2.3%

26 20000

58.21

Q

57.34

m,

m,

53.6

100 110

59.01

58.99

57.14

120

防高处坠落 防物体打击

•防高处坠落 A6(+105m)

B=8

122.0

160.5

90

26 533. 5 19800 2620.2

图 例

58.76

Q

23 58.14

L1=

55.48 55.71

534400

矿区范围及拐点编号

58.84

58.76

2557.74

9%

B=8

m,

120

L2=

m,

110

120 130 140 150 160

160 150 140 130

80

新建矿山运输道路 新建矿山运输道路 河道、水系

5

H

55.59

55.78

58.94

58.76

8

17

民房 砖

民房

矿区范围及拐点编号 矿区范围及拐点编号输电线路

58.78

58.14

=2.

56.47

533. 5

2620.2

57.0

50.42

养殖场

养殖场

水塘

,i

26 19400

70

水塘

民房57.8

58.84

D

E

C

,i=

534800

59.38

58.99

58.73

58.21

=8m

B=8m 25m,

59.01

58.76

I,B

534200

59.20

新建矿山运输道路

58.88

爆破安全警戒线爆破安全警戒线

58.72 58.76

58.78

20m

56.73 55.96

55.66

1:2000

58.89

58.94

58.86

57.50

58.72

1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防 护措施。 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 坡度6.5%,最大 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 1.0m,上底宽1.0m, 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及 转弯地段,设置 安全行车警示标志、反光镜、外侧挡车堆等安全设施。

100

水塘

58.89

58.99 57.50

矿山原有简易道路 矿山原有简易道路

8.4824

26 19400

8

2620.2

2620.2

19

20 20 砖 砖 砖 砖21 民房(已空置) 砖 砖21 民房(已空置)

1

46%%D

534000

533800

56.8

废弃加工场地

水塘

需拆

m,

防高处坠落

197

矿山原有简易道路 68.0

100 56.39

55.86

275.780

533. 5

534. 10

2620.2

59.38 58.94

58.84

46%%D

100 110

534800

图 58.73 59.38

58.86

58.88

• A4(+95m)

90

534600

534400

56.0

59.20

22

民房

• A4(+95m)

.9%

i=2

I L1=

砖3 矿山库房

80 90

80.0 60.0

• A5(+96.8m)

• A3(+77.5m)

• A1(+56.4m) 2 砖 矿山库房

4

70

80

534800

534600

58.89

133.4m

民房

38534184.57

H

56.9

70

6.2421

6.2421

01-A1

01-A1

54.7

7

100

H175

H175

1:2000

砖 534. 10

534600

60.85

需拆 • A4(+95m)

防高处坠落

80m

Q

534800

534800

249.0

A

L0=1

H390

H170

H170

60m

57.50

爆破开采区

2.3%

H385

H165

H165

534600

534600

采区

2619806.82

50%%D

Q

爆破作业面积0.0909km

58.84

559

水塘

E4

水塘

水塘

56.05

56.79

533. 5

58.73

民房

8

38534156.98

C

3

57.19

56.18

55.24

54.7

18

19

38534189.78

57.00 56.48

56.15

58.88

13

8

,i=

H380

H160

H160

40m

村庄

54.0

50.76

B=8m

H375

H155

H155

20m

534200

56.8

15

59.20

38534473.93

2619719.34

图 534000

棚房(已空置) 棚房(已空置)

水塘

38534529.35

2619469.93 2619790.86

总平面布置图 533600

01-A1

534. 10

533800

水塘

22

38534513.83

2619545.57

B

56.43

56.31

56.23

56.22

55.57

比例尺: 0

比例尺: 1:2000

533600

56.0

民房

38534204.37 38534453.58

2619735.38

6

D

2619.1

534800

533. 5 2620.2

26 19200

26 19200

Ch

水塘

25m,

H370

534600

110kV仰周线

56.0

54.7

L0=1

H365

H390

H390

H150

H150

56.47

55.48 55.44

80m

村庄

2619861.16 2619787.43

7

C

55.48 55.71

55.57

55.6

534400

1

原矿山门房

110kV仰周线

534400

1:2000

26 20000

村庄

L3=60m,B=8m,i=3%

H465

H360

H385

H385

H145

H145

534200

55.59

55.24 55.48

534400

534400

i=8.7% L3=94m,B=8m,

H460

H380

H380

H140

H140

534000

矿山地质地形图 矿山地质地形图

534200

A

56.61

56.28 56.23

55.89

147.8

55.81

55.59

1:2000

60m

80 90 100 110 120 130 140 150

H455

H375

H375

H135

H135

533800

22

40m

矿山办公生活区

说 明

58.86

80m 20m

水塘

• A0(+53.5m) 5

6

53.0

56.60

56.39 55.98

56.21 56.08

56.06

55.48 55.44

矿山地质地形图 533600

民房

60m 0

56.66

56.02

51.80

51.80

40m

防高处坠落

水塘

民房

水塘

26 19600

Y

56.92 56.74

130

水塘

20m

60.85

爆破开采区

水塘

38534422.43 38534529.35 38534513.83 面积0.1363km

X

56.81

56.70

55.48 55.44

57.8

1:2000

2619735.38

D

1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 》中的地形地质图 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。

55.96

56.47

55.81

110kV仰周线

0

2619399.66 2619545.57

55.78

55.78

55.71

尺:

57.21

56.65

56.54

Q

120 130 140

70 60

5 6 7

采空区

G 矿山杂物房 29 砖

养殖场

爆破作业范围拐点坐标(国家2000坐标系)

55.81

51.80

50.76

8

54.4

26 19400

56.05

55.66

55.24

534400

53.6

26 19600

点号

高压线

130

38534167.03

56.84

140

140

水塘

38534184.57

38534342.19

56.15

56.79

56.73

55.86

Q

55.48 55.44

534200

220kV仰昆甲乙线

110kV仰周线

55.57

34200

1’

49.77

84.0 121.5

26 19200

26 19200

409

H450

55.48 55.71

55.57

4

49.40

80.0 108.0

Ch

38534203.91

56.78

55.90

10KV 高压

H445

H370

H370

H130

H130

支线

H440

100 110

55.78

28

55.88

70

80 90

110 120 124.5

38534114.10

2619522.00 2619470.21 2619343.32

面积0.1919km

2619.1

26 56.39 19400

56.18

55.96

B’ 2’

49.82

94.0

104.0

38534155.77

2619722.51

53.6

53.6

51.80

120 110 100

90 80

70

56.4

2619809.01

4I 4

Q

57.00 56.48

56.28 56.31

56.15

56.79

1’

非爆破开采区

.9%

2619806.82

G

非爆破开采区

56.61

56.39 56.39

56.05

56.3156.23

56.18

56.22

• A2(+74m)

i=8

5

120 110 100 90 80

533. 5

56.28

56.23 56.23

55.89 56.22

56.06

m,

民房(已空置)

55.59

55.24

B=8

49.87

60

Q

B

• A6(+105m)

m,

53.6

55.81

90

H465

H465

H365

H365

H125

H125

山下

H435

6.2421

56.47

55.86

147.8

m, 120

L1= 197

矿山原有简易道路 68.0

122.0

160.5

150 140 130

53.6

80

H460

H460

H360

H360

H120

沙线

H430

H175

55.96

1’

高压线

120 130 140

60

38534529.35

.9%

i=2

m,

B=8

I L0=

砖3 矿山机修间

4308

120 130 140 150 160

160

57.06

57.10

123.

110

民房

9

7 56.95

6

100

26 19400

1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。

E

开采深度:+120.28m至+50m

• A3(+77.5m)

• A1(+56.4m) 矿山库房 2 砖

4

70

80 90

80.0 60.0

26 19400

A

2

10

水塘

E

F

民房

F

4H

57.51

57.29

57.19

• A5(+96.8m)

水塘

57.09

26

民房

Ch

H

56.9

56.39

56.05

60.0

26 19200

38534422.43

民房

面积0.1919km

57.19

70

H455

H455

H355

H355

H115

10k V黄

H425

H355

H170

H450

H450

H350

H350

H110

38534282.77

149.

46%%D

矿山原有简易道路

水塘

57.75

57.24

20

水塘

棚房(已空置) 50.45

56.43

57.00 56.48

55.98 56.21 56.08 56.23

55.89

56.06

55.66 131.9323

H420

H350

H165

H445

H445

H345

H345

H105

38534513.83

2619935.03 38534282.77

C

0035

57.00 56.48

56.79

55.66

70

38534342.19

2619735.38 38534513.83

8 2619935.03

57.19

57.19

56.43

56.61

56.39

56.02 55.98

56.21 56.08

55.86

H415

H345

H160

H340

H340

H101

D’

38534049.71 38534018.20

2619399.66 38534422.43 2619545.57 38534529.35

7 2619735.38

8

需拆

8.4824

• A4(+95m)

133.4m

3

Q

56.43

56.18

56.73

D’

220kV仰昆甲乙线

167.0802

水塘

水塘

56.15

4

49.77

84.0

56.60

56.60

56.70

56.02

55.90

高压线

Q

2619343.32 38534342.19

5 2619399.66 6 2619545.57

7

56.92 56.74

56.92 56.74

56.54

55.88 56.73

1’

2619578.02 38534018.20

5 6

28

A’

49.82 49.40

80.0

121.5

1

原矿山门房

38534422.43

38534513.83 38534282.77

108.0

Ch

120 110 100 90 80

祖塘居委会

57.16

D

140.1164

250.9131

38534529.35

2619735.38 2619935.03

56.31

56.23

56.22

38534204.37 38534453.58

村道

水塘

• A0(+53.5m) 5

砖 6 矿山办公生活区

53.0

56.61

56.28 56.23

55.89

Y

2619861.16 2619787.43

57.21

56.60

56.39 55.98

56.21 56.08

56.06

X

A

19

砖 砖 砖21 民房(已空置)

1

11

水塘

砖 26 19800

面积0.1919km

点号

57.63

316.5831

57.69

8 50.76

50.98

61.1470

57.11

7

民房

水塘

26 19600

38534342.19

2619343.32 2619399.66 2619545.57

7 8

开采深度:+120.28m至+50m

56.66

56.02

55.88

100

H440

H440

H335

H335

D’

2619778.53 38534049.71

4 2619343.32

60

38534018.20

56.92 56.74

55.90

70 80

90 110

120 124.5

60.0

56.81

56.81

56.70 56.54

H410

H340

H155

H435

H435

H330

H225

H225

H330

C’

3’

B’

55.88

Y 38534204.37

104.0

70

56.4

YX

2619861.16 38534204.37

开采深度:+120.28m至+50m 开采深度:+120.28m至+50m 面积0.1919km

56.66

56.66

2’

4

H150

H430

H430

H325

0

H220

H325

A’

线

56.78

56.78

B’

5 2’

5

28

2 2619778.53 3 2619578.02

4

57.21

56.65

56.65

57.10

4’

55.90

28

1 2619861.16

26 2 19600 3

26 19600

56.84

57.06

57.06

4’

3’

4 A’

民房(已空置)民房(已空置)

56.95

56.95

57.19

57.21

6

6

C’

5

5

H335

H145

H425

H425

H320

H215

H320

57.29

57.29

56.84

ZK3 145.3m

X 点号

点号 1

57.10

48%%D

48%%D

H140

H420

H420

H210

H315

H315

民房 27

民房 27

48%%D

ZK3 145.3m

H135

H415

H415

H205

H310

H310

57.51

57.51

94.0

90 80

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)

57.16

57.09

57.19

Ch

ZK2 134.5m

57.24

57.14

57.16

26

38534049.71

56.81

56.70

56.54

2’

49.87

民房(已空置)

38534204.37

2619778.53 2619578.02

6

56.78

5

53.6

120 110 100

57.56

57.56 57.24

57.34

57.34 57.14

57.09

26

50%%D

48%%D

H330

H130

H410

H410

H201

122.0

57.21

38534282.77

57.14

56.65

C’

5

120 130 140 150 160 160.5

150 140 130

57.75

57.75

村道

村道

46%%D

H125

H405

H405

H305

H305

祖塘居委会

祖塘居委会

57.11

57.11

38534513.83

2619935.03

60.85

爆破开采区

水塘

Y

2619861.16

2 3

5

57.06

B’

110

65.96

65.96

57.63

57.63

57.69

X

1

57.10

4’

3’

68.0

100

26 19400

57.55

57.55

46%%D

H405

H120

H401

H401

H301

H301

ZK1 133.4m

矿山库房 2 砖 砖3 矿山库房

70

80 90

80.0 60.0

57.28

57.28

2557.74

160

Ch

H401

H115

民房58.10

57.69

60.85

点号

26 19600

4

6

48%%D

ZK3 145.3m

56.9

26 19800

26 祖塘小学 19800

58.02 祖塘小学

58.02

24

57.73

7

7

60.85

57.21

ZK2 134.5m

H110

23 58.14

5'

民房58.10 水塘 2557.74

采空区

4

建构筑物

建构筑物

58.14

58.14

23 58.14 24

水塘

57.73

Q

H325

民房

2619735.38

16

水塘 12

民房 水塘

设计圈定的开采范围拐点坐标(国家2000坐标系)

水塘

56.95

57.21

48%%D

1

7 8

7 8

57.56

56.84

ZK2 134.5m

2

6

38534422.43

17

民房 民房 砖

14

13

民房

54.0 56.0

38534342.19

38534529.35

65.96

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)

57.29

15

38534049.71 38534018.20

2619578.02

2619399.66 2619545.57

开采深度:+120.28m至+50m

57.55

57.34

57.51

26

民房 27

26 19800

57.73

7

D

矿山杂物房 29 砖

57.09

46%%D

50%%D

Q

4 3 5

采矿证范围及拐点编号 采矿证范围及拐点编号

2 1

水塘

采空区

H105

水塘

前人施工矿钻孔及编号 前人施工矿钻孔及编号

5 6

G

208.0718

养殖场

57.0

50.42

养殖场

Y 38534204.37

2619778.53

2619343.32

5 6

57.28

2557.74

水塘

8

54.4

57.19

Ch

本次取样位置及编号 本次取样位置及编号

水塘

Q

3

58.18

58.18

58.78

7 8

5'

%%D

D

1

原矿山门房

水塘

非爆破开采区

祖塘小学

58.02

民房58.10

57.24

57.16

水塘 ZK1 133.4m

5

砖 6 原矿山办公生活区

53.0

2

50.76

57.75

58.14

24

214.8165

祖塘居委会

57.11

57.34

X 2619861.16

2

23 58.14

A

240.0937

57.14

H101

Q

Q

58.76

58.76

4 3

ZK1 133.4m

A

民房

水塘

26 19600

ZK1

ZK1 58.72

58.72

57.69

村道

点号

3

E

F

60.85

H320

H225

1 地质勘探线及编号 地质勘探线及编号

21

58.78

水塘

H220

20

21

H215

19

20

1

H315

H210

8

19

砖 砖 砖 砖 砖 砖 民房(已空置) 民房(已空置)

H101 2016年采坑地表采集化学样位置 2016年采坑地表采集化学样位置

水塘

57.63

7

18

56.0

《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)

58.18

4

民房

9

民房

57.56

水塘 水塘

H101

1

478

200.2540

10

水塘 65.96

57.21

7 58.21

58.21

57.28

2557.74

采空区

实测、推测地质界线 实测、推测地质界线

26 20000

26 20000

58.99

58.76

58.76

8

矿山杂物房 29 砖

养殖场

59.01

59.01

58.99

C

50.76

8

54.4

58.89

57.50

57.50

50.76

保有矿体出露范围及编号 Ⅱ 保有矿体出露范围及编号

H205

58.84

58.84

1

第四系人工填土层 第四系人工填土层 Q

Ch 中石炭统黄龙组灰岩 中石炭统黄龙组灰岩

58.88

58.88

3

水塘

Q

Ch

H310

58.94

58.86

H201

58.94

58.86

58.89

水塘

216.4

水塘

57.73

Q

11

棚房(已空置) 50.45

26 19800

民房58.10

57.55

59.38

59.38

民房

4

民房

9

民房

H305

22

22

2

10

水塘

58.73

26 19800

祖塘小学

58.02

24

水塘

23 58.14

5'

87.5

砖 第四系残坡积层

第四系残坡积层 Q

Q

民房

1

水塘

58.14

水塘

棚房(已空置) 50.45

26 19800

59.20

59.20

58.73

4

H301

水塘

54.7

54.7

2620.2

2620.2

V黄 沙线 山下 支线

534800

534800

村庄

村庄 水塘

534600

534600

10k

534400

534400

11

水塘

砖 534. 10

534. 10

534200

简易

3754

棚房(已空置) 棚房(已空置)

爆破作业界线 B

Ch Q 58.76

58.78

水塘

222.

原有道路

A

C

58.72

1

6790

50.98

1

2

197.

224

559

水塘

5

4

E D

20

矿山原有简易道路 .12 78

2442

269.0

设计圈定的开采范围

6

H I

58.21

19

218

294.

水塘

民房 水塘

建构筑物

砖 砖 砖21 民房(已空置)

民房

14

12

7 8

水塘

防物体打击

56.0

50.76

16

民房 砖 13

民房

54.0

采矿证范围及拐点编号

8

17

养殖场 15

2 1

9.20

Ch

本次取样位置及编号 4 3 5 6

道路

前人施工矿钻孔及编号

58.18

矿山

Q 58.76

58.78

249.0

34200

59.20

22民房

Q 废弃加工场地

55.6

26 20000

58.76

57.0

50.42

56.0

ZK1 58.72

水塘

7

56.0

建构筑物

A

E

GF

57.50

18

棚房(已空置) 棚房(已空置)

地质勘探线及编号

1

20

1

344

19

B

2 50.98

26 20000

58.99

2016年采坑地表采集化学样位置

58.76 58.21

水塘

水塘

60.5

80m

砖 砖 砖21 民房(已空置)

50.76

3

民房

14

12

民房 60m

河道、水系

爆破安全警戒线

59.01

L3=94m,B=8m,i

59

222.0 856

水塘

道路

H101

173.56

水塘

222

民房 砖 13

民房

54.0

40m

8

C

17 16

15

20m 80m

新建矿山运输道路 58.89

56.0

废弃加工场地

55.6

26 20000

简易

保有矿体出露范围及编号

实测、推测地质界线

58.99

4

57.0

50.42

养殖场

56.0

0 60m

40m

村庄

输电线路

原有

中石炭统黄龙组灰岩

26 20000

57.50

18

棚房(已空置) 棚房(已空置)

Ch

20m 1:2000

534400

水塘

矿区范围及拐点编号 58.94

58.84

Ch

58.89

59.01

水塘

56.0

000 比例尺:0

80m

54.7

57.8

59.38

58.88

58.84

Q

水塘

60m

534200

56.8 58.73

22

民房 58.86

56.0

废弃加工场地

534000

59.20

54.7

57.8

58.88

55.6

533800

533600

2620.2

水塘

Q 58.73 59.38 58.94

40m

533. 5

2620.2

村庄 59.20

58.86

20m

80m

533. 5

村庄

22

民房

26 20000

0

比例尺: 1:2000

534400

水塘 54.7

矿山

60m

534200

56.8 57.8

70

40m

比例尺:

534000

533800

80 90 100 110 120 130 140 150

20m

534. 10

533600

160

0

比例尺: 1:2000

533. 5 2620.2

01-A1

2619.1

533600 533. 5

533800

534000

534200

534400


Fig.14 - Stone house in the quarry

23


T3x Upper Majiya Xiaoping Formation

Farm 0

Forest

River Farm Forest

160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0

Geological Map 1:2000

C2h Middle Carboniferous Huanglong Formation

Original Topographic 1:2000

River

150m

50

0

Geological Faults

150 m

50

C2h Middle Carboniferous Huanglong Formation

Original Topographic 1:2000

T3x Upper Majiya Xiaoping Formation 0

50

150m

Geological Faults

-50

-100

-150

-200

-250 Q el+dl Debris Accumulation Layer

Geological Section 1:500

Powdered Crystalline Dolomite 0

Crystalline Tuff Shale Conglomerate Geological Faults

C2h Middle Carboniferous Huanglong Formation

Original Topographic 1:2000

Geological Map 1:2000

T3x Upper Majiya Xiaoping Formation 0

50

150m

Geological Faults

0

50

150 m

160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0

-50

-100

-150

-200

Geological Map 1:2000 0

50

-250

150 m

Q el+dl Debris Accumulation Layer

Geological Section 1:1000

Powdered Crystalline Dolomite Crystalline Tuff Shale Conglomerate Geological Faults

Fig.15 - Oringinal Quarry Plan Fig.16 - Quarry Geological Plan Fig.17 - Quarry Geological Section

24

0

25

75 m

25

75 m


River Farm Forest

Therefore, for the nature of this site, the process of change and the reasons for the change are the entry point to understanding this quarry. Therefore, I started my research on the geological formation and change of this site and made a series of geological drawings and drawings of the changes of the site with the available survey materials.

Stage 1 Artisanal Mining 1960s

Different Mining Stages Plan 1:2000

Stage 2 Blasting Mining 1970-80 Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020

160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0

Stage 1 Artisanal Mining 1960s

0

50

150 m

Different Mining Stages Plan 1:2000

Stage 2 Blasting Mining 1970-80 Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020

0

50

150 m

-50160 150 140 130 120 -100110 100 90 80 70 -150 60 50 40 30 20 -200 10 0

-250 -50

Stage 1 Artisanal Mining 1960s

Different Mining Stages Section 1:2000

Stage 2 Blasting Mining 1970-80 -100

Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020

0

50

150 m

-150

-200

-250

Stage 1 Artisanal Mining 1960s

Different Mining Stages Section 1:2000

Stage 2 Blasting Mining 1970-80 Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020

0

50

150 m

Fig.18 - Different Mining Stages Plan Fig.19 - Different Mining Stages Section

25


Fig.20 - Aerial photo of drone

26


However, while people seem to control everything precisely, each stone shows different forms and textures. So when I went to the site and touched the stones, I felt they had a unique charm. How can they be fully utilized? It may come from my intuition of nature, so I put aside some big planning information and tried to understand the site visually and in detail. Then I scanned the entire site with a drone and got a digital model. This helped me get a better understanding of the site. The drone captured many angles that I couldn't see, which helped me reacquaint myself with the site. Furthermore, it recorded some information that was not visible on the drawings. Moreover, at this point, I also realized that scanning is the process of reconstructing an irregular natural object.

Fig.21 - Scanning Model

27


Fig.22 - 3D printing site

28


29


With the help of this technique, it is possible to obtain information about the irregular site in constant change, and it is possible to get much information that the drawings cannot provide. As a result of this scanning, I also made a nodal drawing of this quarry. The different texture from different mining techniques; the different sizes of stones from different mining techniques; the different orientations of the site and the different slopes from different mining techniques, etc. The scanning results allow an irregular site to be mapped and calculated. This makes it possible to control an irregular site or an irregular skin.

Fig.23 - Site Information

30


31


Excavator Section 1:100 0

1

5 m

Stone Detail Section 1:10

Fig.24 - Section of different mining methods

32

Excavator Section 1:100 0

1

5 m

Stone Detail Section 1:10


Blasting Section 1:100 0

1

Oringinal Section 1:100 5 m

Stone Detail Section 1:10

0

1

5 m

Stone Detail Section 1:10

33


Fig.25 - Stone transportation

34


At the same time, I have noticed that the stone, the main character in the quarry, seems to be forgotten more often than not. We seem to care more about the space in the quarry, the extraction of the stones. But there is a lack of attention to the stones themselves. However, in the process of scanning the site, I also found that the stone actually represents the site better. It expresses the evolution of the site over hundreds of millions of years of natural development and has its own unique charm. And also, they take on a specific scale and shape because of the technology used to extract them. However, with the next series of industrial processing, the characteristics of these stones were erased. What attitude should we take towards these stones? It seems to be a topic worth discussing. Based on this intuition, I chose some stones from the site and brought them back to Hong Kong. I think this is also the most meaningful step in my thesis. When the stones in the quarry leave the quarry, what can they be used for?

35


Fig.26 - Stone in the quarry

36


This is the story of the quarry site, where everything seems to have been created by an impulse for nature. And every step that follows is due to the love of the site, or intuition. But it is still unknown where these intuitions will lead. The question that remains is, what can the stone bring? How can we control such an irregular object?

37


Fig.27 - Stone scanning result

38


39


Fig.28 - Stone scanning

40


- METHODS AND STRUCTURE -

Based on previous experience with site scanning, scanning is an effective operation to control such an irregular object. Therefore, I scanned, recorded and numbered each of the 42 stones I brought back from the site. However, it was not easy to find a controlled reference system when dealing with such a natural object form. How to find this entry point became the first problem to be solved.

41


Fig.29 - Stone cutting

42


43


Perhaps we can start by cutting a stone to get to know it better. Moreover, when using the waterjet, how to position the stone and determine the position of the cut, which seems to have been trying to control a stone. With the help of the scanned file, the stone can be well supported by a 3D-printed base and placed at a suitable angle. When the stone can be fixed at a specific orientation, an irregular stone can begin to be controlled. The 3D-printed base at the bottom is the object used to control the stone. Is there any other way to control the stone? Or what can be said of controlling a stone? Perhaps the first definition is that if a stone can be placed at a fixed orientation or if a specific direction can be found on an irregular stone, it can be considered to be in control of an irregular stone. In the face of the industrialization of stones, this attempt, I think is an attempt to find some control points on the irregular surface according to the characteristics of the stone.

Fig.30 - Stone cutting

44


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.