How can we control the stone? -- a new stone construction technique
Huang Yewei 3035894371 Thesis Advisor : Kuo Jze Yi Mahter of Architecture 2022-2023 Thesis Report The University of Hong Kong
ACKNOWLEDGEMENT
It has been an exciting experience, a semester that has challenged me. I sincerely thank my advisor Kuo for his guidance and encouragement throughout the semester, for showing me the way when I was lost, helping me when I failed, and spurring me on when I was proud. Because of his continuous promotion during this semester, I have been able to achieve what I have. My two years at HKU have allowed me to learn from teachers such as Tao Zhu, Christian Lange, Sony Devabhaktuni, Li Hua, Jersey Poon and others. I want to thank them for their guidance during these two years. The final result was only possible with the help of Tong Sun, Jasmine Li, Billy Wong, June Zhu, Xiao Long, James Ip and Victor Cheng. I would like to thank them for their last-minute help sincerely. I would also like to express my gratitude to my family for all the help they could provided me during my two years of graduate studies. I want to thank them for always supporting me silently. Finally, I would like to thank all the people I have met during these two years of my graduate life at HKU for allowing me such a wonderful time.
2
CONTENTS
01/ Position Statement
3
02/ Agenda
9
Thoughts from the quarry Reflections on the material
03/ Urgency
17
Nature Construction Usage
04/Site Condition
21
05/Methodology & Structure
41
Phase1 Phase2 Phase3 Phase4 Phase5 06/ Significance
107
07/ Appendix
112
3
Fig.1 - Articulation of stone and wood
4
- POSITION STATEMENT -
It is a journey of exploration of stones and, at the same time, a reflection on the treatment of nature. Resource extraction is a necessary act for the development of the world, and today we are accustomed to deconstructing natural materials in the most economical way as industrialization has become very advanced. Therefore, stones are usually processed into standard industrialized forms, but this also destroys the original texture of the stones. Therefore, in the thesis, I want to explore a new way of controlling natural material like stone. How to realize the potential of such irregular natural products when confronted with them. It is an experiment to question how society uses natural materials nowadays and to find a way to handle them more respectfully.
KEY WORDS Stone | Nature | Construction Method | Quarry
5
Fig.2 -
6
Quarry in Huizhou,Guangdong
7
Fig.3 -
8
Quarry in Huizhou,Guangdong
- AGENDA Thoughts from the quarry The quarry is a common space brought by urban development. Human beings have an instinctive desire for this kind of space that shows the nature of nature in its nakedness. Modern quarries are a product of industrialization, and industrial means have deconstructed nature, allowing us to peel back the skin of nature and see the traces left by time in nature. For such a site full of conflicts, I cannot help but think about the relationship between humans and nature, industry and nature. Industrialization allows us to control many things that are beyond human capabilities. However, this deconstruction of industrialization has also broken many traces left by nature. With what attitude should we approach such actions? In the case of quarries, we slice and crush stones, thus transforming an otherwise uncontrollable natural product into an industrial scale and a common form that can be better utilized. Are there other attitudes than the most economical one?
9
Fig.4 -
10
Quarry in Huizhou,Guangdong
Reflections on the material "The sweat of production evaporates in the sweetness of consumption." Compared to the economic benefits of the industrial deconstruction of natural materials, we pay little attention to what happens to the source of raw materials. We seem accustomed to the idea that stone should be flaky, powdered, and lumpy. We don't really care or understand exactly how the stone was created, how it was mined, and what kind of shape it is. The correlation between the nature of the material and the end product has become blurred. We seem to have become accustomed to this industrialized language. But it is the material itself that is the most attractive. Like the stone shown in the picture, each stone has its characteristics and is unique due to the limitations of mining technology, which is why the products of nature are so fascinating. Can this uniqueness be demonstrated? We seem to have become accustomed to manipulating stones, but this may erase the irregularity of the form of the stone. Therefore, a new way of controlling the stone is necessary. How can we control the stone while preserving its characteristics? With the development of technology, is there a faster and gentler way to deal with such irregularities?
11
So it seems that this is an experiment using natural materials. What kind of attitude to nature? We have invented a lot of possibilities, including the common slicing and dicing of stones into common shapes. Alternatively, treat to stone by some more advanced means, allowing it to form a new way of building while ensuring a specific natural state. Alternatively, by cement and other adhesives to combine irregular stones. However, none of these is thinking about how to use the properties of stone. I plan to create a new technique of building with stone. A technique that respects and uses the properties of the stone. So this is an exploration of how to deal with nature, an experiment with new stone structures.
AREA REGENERATION AND BUILDINGS REUSE, ARZO - SVIZZERA
Fig.5 - AREA REGENERATION AND BUILDINGS REUSE Fig.6 - SGAE Central Office
12
SGAE Central Office, Ensamble Studio
Cyclopean-cannibalism-matter-designquarra-stone-wall, MIT, 2017
Beyond Bending, ETH, 2016
Attitude towards nature and experimentation If this is an experiment on using natural materials, then this experiment can treat a natural material with the most original and realistic attitude. Initially, I always hoped to have an ambitious goal to change many things. However, even studying the use of stone is a challenge. How to really understand the characteristics of a stone, how to use a stone rationally, how to preserve the traces of nature, how to reflect the relationship between nature and industrialization. These are the questions that I plan to explore in this thesis. The idea of respecting and understanding nature more is perhaps my initial idea this time.
Fig.7 - Cyclopean-cannibalism-matter-design-quarra-stone-wall Fig.8 - Beyond Bending
13
Fig.9-
14
Stone in Quarry
15
Fig.10 - Stone in Quarry
16
- URGENCY -
First, urgency is a rather evanescent concept in this thesis. It can be reflected from three perspectives: the perspective of treating nature, the perspective of construction, and the perspective of using.
Nature The industrialization has brought us many ways of deconstructing and reconstructing nature, yet these methods are all predicated on efficiency. So it is urgent to find a new attitude and approach to nature. Try to slow down and explore the possibilities that materials can offer us. If we can think about this project through the lens of the earth, then time will not be defined. The materials have developed a unique texture due to natural changes over hundreds of millions of years. If we try to respect these unique textures, it is also a response to the landscape and nature. The urgency of this project is more about reflecting on the relationship between architecture and the earth. We usually produce building materials through industrial processing while giving them artificial characteristics and timeliness. However, the relationship between architecture and nature is fragmented. If we can learn from nature and use the potential of natural materials to build, can we create a new language of architecture? This effectively blurs the concept of time. Natural materials bring the temporality of geological change into architecture, bringing a natural temporality to the building itself.
17
Construction Architecture can always be connected to the topic of construction. Although I am exploring the relationship between architecture and nature, this is not to say that I am against industrialization or technological means. On the contrary, it is because of the development of technology that there are more possibilities to control natural materials, so this must be a modern solution. For construction, unlike traditional stone buildings, it should be a lighter and faster way to build. This method may change the process and the process of construction. How to achieve a balance between nature and industrialization? What can be done to counteract the inconvenience and difficulty of building an object that is so irregular and uneven? This is the most fundamental question when dealing with natural materials. So these are the two extremes of the problem: to ensure that the material is in its most natural state and that the building process is convenient. So this expresses the tension in time as well. People only think about the possibilities of a new technology when it can be more convenient. This is exploring a new possibility of stone building, so it may not cover all aspects of a space design. However, I still try to allow people to think more about possibilities of using stone as a construction material.
Usage Any building needs to be used for a certain period. However, this is not a major point of discussion in this thesis. It could be a temporary building or a house made of stone. I want to keep some openness and uncertainty in this regard.
18
Fig.11 - Stone house in the quarry
19
Fig.12 - Quarry mining site
20
- SITE AND SITE CONDITION The beginning of the research A quarry in my hometown was the beginning of this thesis. The shock of nature motivated me to learn more about this quarry. So this quarry in Huizhou, Guangdong, provided the basis for my research. It is a quarry in progress, and like other quarries, the government has already planned for the future of this quarry. In this case, it includes the depth of mining, the extent of mining, the extent of blasting, etc. Therefore, to understand the material, one must also study many aspects, including the geology, the nature of the stone, how it is mined, etc. Based on a site that I was more familiar with, I started my research.
21
比例尺:
0
1:2000
20m
40m
60m
80m
534. 10
533. 5
533600
2620.2
533800
534000
534200
534600
534400
534800
图
2620.2
例
村庄 水塘 56.8
59.20
54.7
第四系残坡积层
Q 58.73
57.8
22
59.38
民房
第四系人工填土层
Q
58.94
58.86
58.88 58.84
Q 56.0
废弃加工场地
55.6
Ch
中石炭统黄龙组灰岩
Ⅱ
保有矿体出露范围及编号
58.89
59.01
水塘
26 20000
实测、推测地质界线
水塘
26 20000
58.99
H101
2016年采坑地表采集化学样位置
57.50
18
4
57.0
棚房(已空置) 棚房(已空置) 50.42
56.0
Ch
民房 砖
58.76 58.21
3
民房 水塘
12
1
水塘
本次取样位置及编号 4 3
建构筑物
民房58.10
水塘
57.28
H401 H405
57.73 57.55
H201
57.69
祖塘居委会
60.85
H420
H315
H210
H425
H320
H215
矿山杂物房 29 砖
57.11 H430
H325
村道 H435
H225
H330
57.56
H440 H445
57.51
H345
水塘
H350
57.29
H465
H365
H110
H370
H115
H375
H120
48%%D
H390
H135
68.0
B’
H165
100
5
122.0
160
6.2421
民房(已空置) 70
49.40
80 90
28
56.39
26 19400
56.05
说
56.31
56.23
4
1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。
56.79
支线
55.88 56.73
D’
49.77
55.96
1’
56.47 55.66
220kV仰昆甲乙线
80.0
明
56.15 56.18 56.22
100
110 120
55.86 53.6
108.0
124.5
Ch
120 110 100 90 80
A’
49.82
94.0
104.0
60
57.00 56.48
56.28 56.23
55.89
56.06
131.9323
120 110 100
90 80
60.0
面积0.1919km
57.19
56.43
56.61
55.98 56.21 56.08
55.90
49.87
70
56.4
38534282.77
56.60
56.39
56.02
2’
H175
53.6
150 140 130
38534529.35 38534513.83
2619935.03
56.92 56.74 56.70
56.54
5
H170
80 90 100 110 120 130 140 150
70
110
120 130 140 150 160 160.5
10k
H160
V黄
H155
80 90
80.0 60.0
2619545.57 2619735.38
8
56.81
沙线
3’
H150
砖3 矿山库房
70
山下
H145
56.9
Y
38534342.19 38534422.43
2619399.66
6 7
开采深度:+120.28m至+50m
56.66
C’
H140
矿山库房 2 砖
4
56.78
H385
H130
民房
ZK3 145.3m
38534018.20
2619343.32
5 56.65
57.10
4’
H380
H125
48%%D
57.06
38534049.71
2619778.53 2619578.02
4
6
38534204.37
2619861.16
2 3
57.21
ZK2 134.5m
Q
26 19600
56.84
H360
H105
Ⅰ
50%%D
水塘
160
56.95
H460
H355
民房 27
57.19
Ch
X
1
26
H455
46%%D
H101
3
原矿山门房
水塘
点号
57.09
H450
ZK1 133.4m
D
1
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)
57.16
H340
A 5
砖 6 原矿山办公生活区
57.24
57.34 57.14
H335
水塘 水塘 7
民房
53.0
57.75 57.21
H220
养殖场
57.63
7
H415
采空区
H310
H205
8
54.4
65.96
H410
Q
H305
水塘
26 19400
26 19800
祖塘小学
58.02
24
2557.74
H301
民房
50.76
水塘
采矿证范围及拐点编号
1
球
58.14
23 58.14
5'
民房
26 19600
2
6 7 8
2
10
前人施工矿钻孔及编号
58.18
5
水塘
棚房(已空置) 50.45
砖 9
Q
58.78
水塘
11
水塘
水塘
ZK1 58.72
1
50.98
26 19800
地质勘探线及编号
1
20
58.76
B
2
民房 水塘
砖
19
Ⅱ
14
13
民房
54.0
砖 砖 砖21 民房(已空置)
50.76
16
15
8
C
17
养殖场
56.0
高压线
84.0
55.81
70
121.5
55.59
80
55.24
90
Q
100 110
55.78 55.48
120 130 140
70 60
26 19200
55.71
147.8
26 19200
55.57
140
55.48 55.44 51.80
130
120
110kV仰周线
矿山地质地形图
2619.1
533600
533800
534000
534200
534400
534800
534600
1:2000
533. 5
80m
534800
534600
图
2620.2
0
1:2000
20m
40m
60m
534. 10
533600
2620.2
533800
534000
534200
534400
534600
534800
第四系残坡积层
Q
第四系人工填土层
56.8
Q
131.9323
L3=60m,B=8m,i=3%
外
线以 警戒
L3=197m,B=8m,i=8.9%
原有
600 35.4
支线 山下
至30 0m爆 破
沙线 V黄
搬迁
10k
束前
建结 线基
70
=8.7%
11
L2=197m,B=8m,i=89%
26.4
78 133.34
131.9323
108.0 124.5
124.5
Ch
80.0
84.0
高压线
84.0
55.59
55.48 55.71
26 19200
55.57
55.48 55.44
534600
534400
55.48 55.44
534800
03-A1
56.4
56.4
120 49.87
70
94.0
70
60 120 110 100 90 80
120 110 100 90 80
4
28
80.0
84.0
121.5
70
120 130 140
2’
55.88
53.6
2619.1 533. 5
533600
533800
533600
533800
56.78
56.60
高压线
84.0
56.43 57.00 56.48 56.3956.39
55.98 56.21 56.08
56.28
56.23
56.23 56.23
56.05
56.31 56.23 56.15 56.18
55.89
56.06
55.89 56.22
56.18 56.79
56.22
56.73
56.73
55.96
55.96 56.47
55.66
55.66
55.81 55.24
Q
55.78
55.81
55.59
55.78
55.24
55.59
55.48 55.71
55.57
55.48 55.71
55.57
55.48 55.44
Y 38534204.37 38534453.58 38534513.83
534400
534400
5
2619399.66
6
2619545.57
7
2619735.38
8
2619935.03
5
38534422.43 2619399.66
6
38534529.35 2619545.57
38534529.35
7 38534513.83 说 明2619735.38
38534513.83
8
38534282.77
2619790.86
38534189.78
D
2619719.34
D
38534156.98 2619719.34
38534156.98
E4
2619806.82
E4
38534184.57 2619806.82
38534184.57
1:2000 03-A1 56.43 1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 57.00 56.48《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 56.61 56.39 26 26 中的地形地质图 中的地形地质图 19400 19400 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 56.28 56.05 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 56.31 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 56.15 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。 56.79 3、采用山坡露天开采,公路开拓-汽车运输方案。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防护 线线内与爆破作业无关的一切人员,并采取相应的安全防护 措施。 56.47 措施。 5、矿山主要运输道路等级 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 度6.5%,最大 度6.5%,最大 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 1.0m,上底宽1.0m , ,上底宽1.0m, 1.0m 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×深 0.6m×0.5m(宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 弯地段,设置 弯地段,设置 26 26 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 19200
19200
534800
1:2000
1:2000
04-A1
04-A1
比例尺: 1:1000
160
说
ZK3 145.3m
S耗2=14248.83m 2Ⅰ ZK2 134.5m
ZK1 133.4m
140 138%%D
H1
矿区范围
120
+110m 110 设计开采范围
矿区范围
100
明
1、本图是根据广东省有色地质勘察院于2021年11月提交的《广东省龙门县平陵街道大围炉 石矿区水泥用石灰岩矿资源储量核实报告》中的地质剖面图及2022年6月份测量的矿山开采 现状图及现场踏勘资料综合绘制而成。 2、剖面位置见地形地质图中2--2'剖面。 3、采用山坡露天开采方式。 4、最终台阶高度15m(第四系残坡积层不大于5m),最终台阶坡面角55%%D(第四系残坡积层不 大于45%%D),最终帮坡角46%%D~55%%D,安全平台宽度4m,终了台阶较少,不设清扫平台。
设计开采范围
+95m
90
+80m 80
S保2=18527.10m 2Ⅰ
+65m
70 Ch 60
55°
S原保2=18567.80m 2Ⅰ
+50m
斜坡道
50 最低开采标高+50m
85m
88m
100.6m
40 30
136%%D 46%%D
20 10 0
X=2619800
X=2619600
Y=38534200
图 Q
Ch
X=2619400
Y=38534400
例
第四系
2016年储量核实前消 耗矿体范围
中石炭统黄龙组
2016年核实之后消耗矿 体范围
残坡积层
保有矿体
设计开采范围
灰岩
原矿区范围内保有矿体
矿区范围
ZK1 133.4m 85m
不整合界线
ZK1
138%%D 地层产状 48%%D
矿体截面积及编号
钻孔编号及孔口标高孔深
+50m 开采终了平台标高、台阶坡面角
施工钻孔位置及编号(平面图) 55°
H101
地表采样位置及编号
现 原
地质剖面图(1) (开采终了剖面图)
现、原地形
1:2000
说
高程(m)
05-A3
明
1、本图是根据广东省有色地质勘察院于2021年11月提交的《广东省龙门县平陵街道大围炉 石矿区水泥用石灰岩矿资源储量核实报告》中的地质剖面图及2022年6月份测量的矿山开采 现状图及现场踏勘资料综合绘制而成。 2、剖面位置见地形地质图中3--3'剖面。 3、采用山坡露天开采方式。 4、最终台阶高度15m(第四系残坡积层不大于5m),最终台阶坡面角55%%D(第四系残坡积层不 大于45%%D),最终帮坡角46%%D~55%%D,安全平台宽度4m,终了台阶较少,不设清扫平台。
比例尺:1:1000 138%%D 设计开采范围
设计开采范围 80
矿区范围
矿区范围
70
S耗3=4586.08m 2Ⅰ
S原耗3=4640.75m 2Ⅰ
60 S保3=2242.83m 2Ⅰ 50
Q
Q
235°
最低开采标高+50m
S原保3=2343.74m 2Ⅰ
Ch
40 30
136%%D 46%%D
20 10 0
Y=38534200
X=2619800
Y=38534400 X=2619600
图
例
Q
第四系
2016年储量核实前消 耗矿体范围
Ch
中石炭统黄龙组
2016年核实之后消耗矿 体范围
残坡积层
保有矿体
设计开采范围
灰岩
原矿区范围内保有矿体
矿区范围
ZK1 133.4m 85m
不整合界线
ZK1
136%%D 地层产状 46%%D
矿体截面积及编号
钻孔编号及孔口标高孔深
+50m 开采终了平台标高、台阶坡面角
施工钻孔位置及编号(平面图) 55°
H101
地表采样位置及编号
现 原
地质剖面图(2) (开采终了剖面图)
现、原地形
1:2000
Fig.13 - The government's plan for the quarry
22 比例尺: 1:1000 高程(m) 170
简易 道路 原有 矿山
C
+50m开采终了平台
06-A3
H • A1(+56.4m) 2 砖 矿山库房
4
I
56.9
3
砖 矿山库房
70
• A7(+65m)
L4=
200
70
m开
%
台
5
5
53.6
49.87
民房(已空置) 70
49.77
120
60 120 110 100 90 80
220kV仰昆甲乙线
80.0 108.0
124.5
60.0
4 沉砂池
49.40
80
90 110
28
49.82
94.0
104.0
70
56.4
非爆破开采区
了平
..3
122.0
160.5
150 140 130 120 110 100 90 80
采终
台
i=4
110 120 130 140 150 160
160
+50 m平
m,
68.0
100
26 19400
+65
矿山原有简易道路 m,B=8
80 90
80.0
38534422.43
38534282.77 2619935.03
170
150
3
Q 民房
19800
55.48 55.44
534800
534600
沉砂池 1 原矿山门房
水塘
高程(m)
130
5
砖 6 矿山办公生活区
53.0
水塘
110kV仰周线 534600
水塘
排水泵 • A0(+53.5m)
7
民房
水塘
26 19600
51.80
534200
水塘
6
5
开采终了平面图(地表防洪工程平面图) 开采终了平面图(地表防洪工程平面图) 534200
534000
+48.6m塘底
7
4
130
534000
L5=
A
H
I
57.19
56.61
56.39
56.02 55.98
56.21 56.08
55.86
高压线
Q
F E
38534422.43
爆破作业面积0.0909km 爆破作业面积0.0909km 基建终了平面图(安全设施布置图) 说 明 说 明
57.19
56.70
56.02
56.06
65.96
56.66
56.60
56.54
55.90
G
6
H
38534342.19
38534513.83
Ch
高压线
84.0 121.5
Q
120 130 140
70 60
26 19200
147.8
140
51.80
130
120
以外
以外
戒线
0m爆
支线 山下
至30
沙线
戒线
破警
0m爆
支线
至30
山下
55.86
53.6
56.65
56.78
56.66
140
51.80
533. 5
55.90
57.21
56.65
55.48 55.44
534800
147.8
130
2619.1
56.70
56.54
55.88
56.95
55.71 57.21
55.57
56.92 56.74
120 130 140
147.8
140
03-A1
沙线
B’
10k
B’ 5 2’
4 沉砂池
A
7 38534203.91
I 38534167.03 4 5
38534529.35
2619735.38
1、本图是根据广东省有色地质勘察院于2021年11月提交的 开采深度:+120.28m至+50m 面积0.1919km 开采深度:+120.28m至+50m 面积0.1919km 祖塘居委会 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 设计圈定的开采范围拐点坐标(国家2000坐标系) 设计圈定的开采范围拐点坐标(国家2000坐标系) 中的地形地质图 点号 Y X 点号 Y X 57.75 及建材广东省有色地质勘察院于 57.21 A 38534453.58 2619861.16 2619787.43 A 38534204.37 38534204.37 38534453.58 2619861.16 2619787.43 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 E 2619806.82 E 38534184.57 38534184.57 2619806.82 57.56 2、本图采用2000国家大地坐标系、1985国家高程基准,等 57.24 F 2619809.01 F 38534155.77 38534155.77 2619809.01 高距为2m。 G 2619722.51 G 38534114.10 38534114.10 2619722.51 3、采用山坡露天开采,公路开拓-汽车运输方案。 4H H 38534203.91 2619522.00 4 38534203.91 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 2619522.00 须撤出爆破警戒 4I I 38534167.03 2619470.21 4 38534167.03 2619470.21 线线内与爆破作业无关的一切人员,并采取相应的安全防护 4 2619343.32 4 38534342.19 38534342.19 2619343.32 措施。 5 2619399.66 5 38534422.43 38534422.43 2619399.66 5、矿山主要运输道路等级 26 26 19600 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 6 2619545.57 6 38534529.35 19600 38534529.35 2619545.57 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 7 2619735.38 7 38534513.83 38534513.83 2619735.38 度6.5%,最大 开采深度:+120.28m至+50m 面积0.1363km 开采深度:+120.28m至+50m 面积0.1363km 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高1.0m 26 ,上底宽1.0m爆破作业范围拐点坐标(国家2000坐标系) , 19200 爆破作业范围拐点坐标(国家2000坐标系) 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 点号 Y X 点号 Y X 0.6m×0.5m(宽×深 A 38534453.58 2619861.16 2619787.43 A 38534204.37 38534204.37 38534453.58 2619861.16 2619787.43 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 弯地段,设置 B 2619534.91 B 38534321.23 38534321.23 2619534.91 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 C 2619790.86 C 38534189.78
56.81
108.0
Ch
121.5
60
26 19200
V黄
采终
5
28
49.77
220kV仰昆甲乙线220kV仰昆甲乙线
搬迁
m开
了平 非爆破开采区 非爆破开采区 台
5
49.82 49.40
49.77
80.0
108.0 124.5
Ch
70 60
49.40
80
90 110
120
124.5
60.0
60
70
80
90
110
束前
%
5 49.87
民房(已空置) 民房(已空置) 沉砂池 49.82
94.0
104.0
120
F E
面积0.1363km
X 2619861.16 2619787.43
7
131.9323
以外
L3=197m,B=8m,i=8.9% 台
i=4
..3
%
53.6
160.5
150 140 130 120 110 100 90 104.0 80
60.0
26 19200
+65 了平 m平台 台
采终
m平
m,
..3
53.6
m开
+65
i=4
122.0
130 140 150 160
160
B=8
m,
68.0
100 110 120
122.0
160.5
10k
80 90 68.0
80.0
110 120
130 140 150 160
160 150 140 130 120 110 100 90 80
70
56.92 56.74
56.95
55.48 56.84
57.19 56.84
57.06
57.10
56.81
3’
破警
57.06
534600
3’
55.59
55.24
55.78 57.19
抽干积水
6
B
+50
束前
80 90
60.0
戒线
破警
0m爆
支线 山下
防物体打击
至30
沙线 V黄
搬迁
民房 27
抽干积水
110kV仰周线
534400
•+50 A7(+65m)
建结
26 19400
534800
1:2000
10k
原有
=8.7% L3=60m,B=8m,i=3% L3=94m,B=8m,i
+50m开采终了平台 +50m开采终了平台
B
• A7(+65m)
57.51
55.81
建结
26 19400
57.16
57.09
57.29
H
51.80
I 534200
57.24
56.47
57.51
线基
533. 5
明
1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告》 中的地形地质图 中的地形地质图 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。 3、采用山坡露天开采,公路开拓-汽车运输方案。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防护 线线内与爆破作业无关的一切人员,并采取相应的安全防护 措施。 措施。 5、矿山主要运输道路等级 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均坡 度6.5%,最大 度6.5%,最大 1.0m 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 1.0m 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 26 ,上底宽19200 1.0m, ,上底宽1.0m, 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×0.6m×0.5m 深 (宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 );在小曲率转弯处设限速警示标志。矿区道路在接口及转 弯地段,设置 弯地段,设置 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 安全行车警示标志、反光镜、外侧挡车堆等安全设施。
1:2000
束前
建结 线基 高压
10KV 民房 27
Q
C
H I
砖3 L4= L4= 矿山库房 200 200 m, m, 矿山原有简易道路 矿山原有简易道路 B=8
110kV仰周线 534600
55.86
2657.29
2619735.38
A
80 90 100 110 120 130 140 150
矿山
原有 道路
道路
简易
简易
C
3
Q
砖3 矿山库房
57.75 57.21
57.34 57.14
57.09
• A1(+56.4m) • A1(+56.4m) 2 砖 2 矿山库房 砖 矿山库房 534000
56.79
57.56
57.10
4
祖塘居委会 56.15
57.11 56.73 55.96
6 Q 民房
4
70
26 19400 65.96
57.63
56.31
56.18
57.11
26
2619399.66 2619545.57
点号
60.0
56.39 57.55 56.05
56.28
57.63
56.23
56.22
57.34 57.14
26 祖塘小学 19800
57.00 56.48 56.61
56.39 57.55
56.23
55.89
55.66 57.16
线基
说
原有
矿山
3
56.43
57.28
55.98 56.21 56.08
56.06
147.8
民房
533800
球
58.02 祖塘小学
58.02
57.28
56.02
57.69
村道
130
70
明
5
56.92 56.74
56.70 58.10
2557.74
140
80.0
说
26 19400
5
砖 砖 6 6 沉砂池 1 沉砂池 1 120 矿山办公生活区 矿山办公生活区 原矿山门房 原矿山门房 130 140
水塘
70
球
搬迁
民房
70 60
水塘
水塘
56.9
533600
56.60
23 58.14
24
55.90
G
设计圈定的开采范围 爆破作业界线 设计圈定的开采范围
B
2619343.32
5 6 7
水塘
38534114.10
A A 4H 2619522.00 26 D 爆破作业界线 20000 4I 2619470.21 C
38534529.35 6 2619545.57 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) B 38534473.93 2619469.93 点号 X Y 点号 X Y C 38534189.78 2619790.86 1 2619861.16 1 38534204.37 38534204.37 2619861.16 D 38534156.98 2619719.34 2 2619778.53 2 38534049.71 38534049.71 2619778.53 E4 38534184.57 2619806.82 3 2619578.02 3 38534018.20 38534018.20 2619578.02 26 爆破作业面积0.0909km 4 2619343.32 4 38534342.19 38534342.19 2619343.32
160
简易
道路
53.0
水塘
56.9
2619.1
B
爆破开采区
58.18
56.66
V黄
70
民房
水塘
53.0
53.6
高压线
C
2619722.51 E
D
26 19600
i=0
m,
B=8
m,
157
爆破作业范围拐点坐标(国家2000坐标系) 58.18
57.19
7
A
L6=70m,B=8m,i=6.2% G• A8(+54.4m) D +50m开采终了平台
.6%
矿山杂物房 29 砖
爆破安全警戒线 爆破安全警戒线
38534155.77
开采深度:+120.28m至+50m
Q
56.81
57.69
村道
55.88
1’
矿山原有简易道路
水塘
8
养殖场
38534184.57
缓坡段
2619809.01
G E
26 20000
58.21
57.21
56.65
56.78
57.73
7
2’
D’
20
沉砂池
抽干积水 非爆破开采区
Y 54.4
56.95 58.21
E
F
民房
9
民房
面积0.1919km
38534204.37 38534453.58
缓坡段 2619806.82
58.14
高压
38534156.98 38534184.57
02-A1 爆破作业面积0.0909km 爆破作业面积0.0909km
110kV仰周线
120
534400
534200
水塘
26 19600
38534189.78
38534184.57 2619806.82
基建终了平面图(安全设施布置图) 基建终了平面图(安全设施布置图) 534200
534000
80 90 100 110 120 130 140 150
160
26 19600
26 19200
38534473.93
38534189.78 2619790.86
38534156.98 2619719.34 总平面布置图
2619861.16 2619787.43
E
56.84
Q
水塘56.54 民房
58.10
2557.74 57.73
5
4
水塘
排水泵 排水泵 • A0(+53.5m) • A0(+53.5m)
3’23 24 5' 民房
58.14
5' A 水塘 B’
A
非爆破开采区
民房(已空置) 28 爆破开采区 爆破开采区
131.9323
38534473.93 2619469.93
水塘
121.5
120
4 2619806.82 E
70
以外
戒线 破警
0m爆
2619719.34 D
E4
58.14
+48.6m塘底
220kV仰昆甲乙线
80.0
84.0
7
F
i=0
m,
B=8
m, 157 L5= +48.6m塘底
L5=
108.0
Ch
120 110 100 90 80
7
80 90 100 110 120 130 140 150
10k
束前
建结 线基
高压 10KV
以外
戒线 破警
0m爆
支线
支线
山下
至30
山下
至30
沙线
沙线
V黄
V黄
搬迁
搬迁
10k
2619790.86 C
D
水塘
124.5
60
m,
157
49.77
120
水塘
60.0
L2=
• A2(+74m)
.6%
矿山杂物房 i=0 m, 29 砖 B=8
49.40
水塘
C’
B
+110m平台 防物体打击
L6=70m,B=8m,i=6.2% L6=70m,B=8m,i=6.2% G• A8(+54.4m) D G• A8(+54.4m) D +50m开采终了平台 +50m开采终了平台
.6%
矿山杂物房 29 砖49.82
水塘
58.76 57.10
58.78
19
砖 砖 砖21 民房(已空置)
水塘
抽干积水
水塘
2
10
水塘
沉淀池
+65m
X
A
4
57.06
A6(+105m) E 沉砂池 •防高处坠落 沉砂池
水塘
50.76
49.87
70
56.4
F
水塘
2i=8.9%
水塘
50.76
70 80
90
水塘防高处坠落
水塘
砖
38534513.83
2619735.38
棚房(已空置) 50.45
26 19800
38534529.35
2619545.57
开采终了台阶及标高 38534282.77 沉淀池 8 开采终了台阶及标高 2619935.03
点号
F
57.09
58.76 57.19
58.72 58.76
4’
抽干积水 非爆破开采区 抽干积水 非爆破开采区 53.6
8
养殖场
94.0
110
水塘
水塘
砖 截排水沟
1
2 50.98
50.76
57.75
57.24
57.51
58.99
57.29 58.76
58.72
6
58.78
民房
9
民房
养殖场
B=8
m,
120
例
38534342.19
Ⅱ
水塘
11
矿山基建运输道路 矿山基建运输道路 安全护栏或警戒带 安全护栏或警戒带
58.84
57.50
26
民房 27 19
Ⅱ
100 110
120
2619469.93 B
C
2
10
民房 水塘
8
54.4
104.0
100 110
534000
533800
B
水塘
10
9
民房 122.0
160.5
54.4
.9%
m,
防高处坠落
E
抽干积水
例 38534018.20 图
开采深度:+120.28m至+50m
3
14
12
民房
设计圈定的开采范围拐点坐标(国家2000坐标系)
58.88
59.01
58.99
57.50
8
19
20 20 砖 砖 砖 砖21 民房(已空置) 砖 砖21 民房(已空置) • A5(+96.8m) 矿山原有简易道路 矿山原有简易道路
Ⅱ
1 i=2
I
L1=抽干积水 水塘 砖 197 m, 矿山库房 B=8 矿山原有简易道路 m,
矿山
戒线 破警
55.24 55.48
55.71
55.57
51.80
130
59.01
需拆除 • A4(+95m)
8
防高处坠落
• A3(+77.5m)
1
50.98
3
68.0
水塘
110 120 130 140 150 160
160 150 140 130 120 110 100 90 80
50.76
3 H
2 砖 矿山库房
50.45
水塘
80 90
80.0
砖
C 50.76
3 2• A1(+56.4m) 2
131.9323
56.47
55.81
55.59
55.78
砖
100
26 19400
50.98
11
水塘
棚房(已空置) 棚房(已空置) 50.45
70
26 19800
38534422.43
100
56.79
56.73
55.66
55.81
55.78
38534282.77
56.05
56.15 56.18
55.96 56.47
Q
明38534513.83
60.0
56.39 26 19400
56.31
56.15
56.79
56.73
140
说
38534282.77 2619935.03
57.00 56.48
56.28
56.05
56.31 56.23
56.18
56.22
55.96
26 19800
38534342.19
38534529.35
38534513.83 2619735.38
80 90 100 110 120 130 140 150
35.4 600
以外
支线 山下
至30
沙线
搬迁
V黄
0m爆
56.28
56.23 56.23
55.89 56.22
56.06
55.66
38534018.20
38534422.43 2619399.66 38534529.35 2619545.57
56.61
56.39 56.39
55.98 56.21 56.08
56.23
55.89
38534342.19 2619343.32
2619399.66 5
2619735.38 7 2619935.03 8
56.43
57.00 56.48 56.61
56.39
56.02 55.98
56.21 56.08
56.06
38534018.20 2619578.02
2619343.32 4
2619545.57 6
11
57.0
50%%D
Q
水塘
4
水塘 水塘
砖
14
12
民房 民房
90
533800
533600
57.19
56.43
56.70
56.02
2619578.02 3
水塘
砖
16
民房 民房 砖
13 54.0 水塘 民房
56.9
38534049.71
+65m
祖塘居委会
58.88
57.16
57.0
3
17
16
15
12
民房
2619343.32
6
65.96 57.63
58.94
58.86
8 50.76
16
民房 民房 砖 13
民房
58.89
57.34
水塘
50.42
17
养殖场 民房 民房 砖
14
13
民房
2619578.02
57.14
防高处坠落
水塘
18
5
养殖场
54.0 56.0
90
533600
水塘 水塘
• A0(+53.5m)
Ch
3 4
7 57.55 58.73
59.38 58.94
58.86
80
533. 5
水塘
18
50.42
Ch水塘
15
水塘
38534049.71
图
17
养殖场
反光镜
Y 38534204.37
5 矿区范围及拐点编号 矿区范围及拐点编号 38534422.43 截排水沟 2619399.66
57.21
砖 6 棚房(已空置) 棚房(已空置) 1 棚房(已空置) 棚房(已空置)原矿山门房 矿山办公生活区
56.0
水塘
50.42
Ch
设计圈定的开采范围
6 5
2619861.16 2619778.53
2620.2
57.56
15
8
56.60 57.19
56.54
55.90
56.0
7
4
57.0
棚房(已空置) 棚房(已空置) 56.0
A
H
X
1 2
534. 10
2620.2
57.28
59.38
57.69
村道
58.89
水塘
民房
53.0
反光镜
534.2610 19800
57.73
7 60.85
水塘
废弃加工场地
水塘
6
F E
防物体打击标志
59.20
民房
22
57.11
80
2619.1
533. 5
废弃加工场地
55.6
26 20000
7
7
1:2000
55.24
Q
100 110
100 110
2619.1
02-A1
53.6
56.66
56.60
55.86
147.8
51.80
02-A1
1:2000
55.86
56.78
56.66
534800
120 130 140
147.8
130
总平面布置图 总平面布置图
57.21
56.65
56.78
高压线
90
1:2000
55.71
55.48 55.44
59.20
58.73
民房
22
70
120 130 140
140
534800
建结 线基
高压 53.6
56.70
56.84
57.21
55.57 56.65
Q
D
爆破开采区
70
121.5
90
534800
55.90
55.88
110kV仰周线 534600
56.54
10k
26.4
409
1’
26 19600
55.48
57.19 56.84
56.92 56.74
水塘
54.7
采空区
G
534800
高压
856
B’ 2’
55.88
D’
38534189.78
1、本图是根据广东省有色地质勘察院于2021年11月提交的 开采深度:+120.28m至+50m 面积0.1919km 开采深度:+120.28m至+50m 面积0.1919km 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 设计圈定的开采范围拐点坐标(国家2000坐标系) 设计圈定的开采范围拐点坐标(国家2000坐标系) 》中的地形地质图 点号 X Y 点号 X Y 及建材广东省有色地质勘察院于 A 38534204.37 38534453.58 2619861.16 2619787.43 A 38534204.37 38534453.58 2619861.16 2619787.43 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 E 38534184.57 2619806.82 E 38534184.57 2619806.82 2、本图采用2000国家大地坐标系、1985国家高程基准,等 F 38534155.77 2619809.01 F 38534155.77 2619809.01 高距为2m。 G 38534114.10 2619722.51 G 38534114.10 2619722.51 3、采用山坡露天开采,公路开拓-汽车运输方案。 4H 38534203.91 H 2619522.00 4 38534203.91 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 2619522.00 须撤出爆破警戒 4I 38534167.03 I 2619470.21 4 38534167.03 2619470.21 线线内与爆破作业无关的一切人员,并采取相应的安全防 4 38534342.19 2619343.32 4 38534342.19 2619343.32 护措施。 5 38534422.43 2619399.66 5 38534422.43 2619399.66 265、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 38534529.35 6 2619545.57 6 19600 38534529.35 2619545.57 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 38534513.83 7 2619735.38 7 38534513.83 2619735.38 坡度6.5%,最大 开采深度:+120.28m至+50m 面积0.1363km 开采深度:+120.28m至+50m 面积0.1363km 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 26 1.0m ,上底宽1.0m爆破作业范围拐点坐标(国家2000坐标系) , 19200 爆破作业范围拐点坐标(国家2000坐标系) 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 点号 X Y X Y 0.6m×0.5m(宽×深点号 A 38534204.37 38534453.58 2619861.16 2619787.43 A 38534204.37 38534453.58 2619861.16 2619787.43 );在小曲率转弯处设限速警示标志。矿区道路在接口及 转弯地段,设置 38534513.83 7 2619735.38 7 38534513.83 2619735.38 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 38534529.35 6 2619545.57 6 38534529.35 2619545.57
56.81
108.0
Ch
120 110 100 90 80
121.5
70 60
4
1’
80
120 110 100 90 80
70 60
26 19200
28
D’
49.77
220kV仰昆甲乙线220kV仰昆甲乙线
56.92 56.74
38534473.93
160
9.20 11
L2=197m,B=8m,i=89%
L3=60m,B=8m,i=3%
i=8.7%
L3=94m,B=8m,
344 60.5
133.34
4
49.40 49.77
56.81
56.95
55.78
57.06
57.10
4’
C’
38534529.35
534800
534600
2557.74 54.7
非爆破开采区
10KV
70 60
28
49.82
49.40
B’ 5 2’
49.87
民房(已空置) 民房(已空置)
60.0
60
222
87.5
49.87
49.82
70 80
90
80.0
57.06
534600
3’
26 20000
26 19600
A
H
I 38534513.83 4 5
2619469.93 2619790.86
534600
民房58.10
10KV
56.4
60.0
26 19200
53.6
94.0
110
120
57.51
55.59
5 6
59.20
水塘
18
爆破安全警戒线
G
防高处坠落标志
球 祖塘小学
58.02
24
水塘
矿山杂物房 29 砖
Q
120
56.4
5 53.6
70
80
90
110
120
57.16
57.09
55.24 56.95
57.19
非爆破开采区 非爆破开采区
68.0
94.0
104.0
57.24
56.47
57.51
57.10
3’
57.75 57.21
57.56
57.24
55.81
4’
122.0
104.0
57.16
57.29
6
C’ B110kV仰周线
B
65.96
56.79 57.75 57.21 56.73
民房 27
6
100
130 140 150 160 160.5
160 150 140 130 120 110 100 90 80
80
8
8
275.780
275.780
26 19200
• A5(+96.8m)
26 19400
56.05
祖塘居委会
56.15
56.18
57.56
57.09
• A3(+77.5m)
120
122.0
160.5
民房 27
Q
防高处坠落
• A5(+96.8m)
110
120
130 140 150 160
160 150 140 130 120 110 100 90 80
70
51.80
祖塘居委会
55.96
束前
120
80 90 68.0
80.0
110
70
70
26 19400
H
• A3(+77.5m)
I
10KV
高压
26 19400
防高处坠落
50%%D
H
56.28 65.96
57.63 56.31
56.23
57.11
57.34 57.14
70
55.48
55.48 55.44
说 明
70
55.59
55.71
55.57
55.48 55.44
明
1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 》中的地形地质图 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。 3、采用山坡露天开采,公路开拓-汽车运输方案。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防 线线内与爆破作业无关的一切人员,并采取相应的安全防 护措施。 护措施。 5、矿山主要运输道路等级 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 坡度6.5%,最大 坡度6.5%,最大 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 26 1.0m,上底宽 ,,上底宽1.0m, 1.0m 19200 1.0m 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×0.6m×0.5m 深 (宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及 );在小曲率转弯处设限速警示标志。矿区道路在接口及 转弯地段,设置转弯地段,设置 安全行车警示标志、反光镜、外侧挡车堆等安全设施。 安全行车警示标志、反光镜、外侧挡车堆等安全设施。
C
50%%D
I
L1=
F E
G 38534204.37 38534453.58
6
2619545.57
B
38534049.71 2619778.53
村庄
水塘
56.0
58.14
A534400 村庄
534400
100
55.81 55.24
55.48 55.71
55.57
60.0
100
56.47
C
3
防高处坠落 防高处坠落 .9% .9% i=2 i=2 +110m平台 +110m平台 m, m, 防物体打击 防物体打击 防高处坠落 B=8 防高处坠落 B=8 m, m, • A6(+105m) •防高处坠落 A6(+105m) L1= 120 534200 534400 防高处坠落 120 197 砖3 197 L2= L2= m, m, 矿山库房 B=8 B=8 m, m, 矿山原有简易道路 矿山原有简易道路 • A2(+74m) i=8 i=8 • A2(+74m) .9% .9%
砖3534000 矿山库房
55.6
38534529.35
Y A
H
534400
民房
废弃加工场地
26 20000
58.18
点号
534200
56.8
57.8
Q
面积0.1363km
X F E
7 G 2619861.16 2619787.43
I 2619735.38 4 5
6
60.0
56.39
57.55
57.63
56.22 57.11
55.86
安全护栏或警戒带
I
Q 58.76
80m
58.84
安全护栏或警戒带 爆破作业界线 38534513.83 2619735.38 安全护栏或警戒带
7
C
2619778.53 2
26 4 19800
57.00 56.48 56.61
56.39 57.55
56.23
55.89
57.34
26 57.29
爆破作业界线
警示标志
防高处坠落 58.72
60m
56.0
100
55.81 55.59
55.78
80 90
80.0
说
26 19400
56.05
56.15
56.79
56.73 55.96 56.47
60.0
26 56.39 19400
56.28 56.31
56.18 56.79
56.73
1
原矿山门房
Q
• A1(+56.4m) • A1(+56.4m) 2 砖 2 矿山库房 砖 矿山库房
56.43
57.28
55.98 56.21 56.08
56.06
束前
4
26 祖塘小学 19800
58.02 祖塘小学
58.02
57.28
56.02
40m
23 58.14 534200
水塘
警示标志 爆破安全警戒线 爆破安全警戒线
A 防高处坠落
防物体打击 防物体打击标志 反光镜 防物体打击标志
2
球
57.19
80m20m
E
F
50.76
设计圈定的开采范围 防高处坠落标志 防高处坠落标志 设计圈定的开采范围
3 56.92 56.74
57.69
建结
民房
球
60m0
1:2000
村庄
56.8 57.8
8
养殖场 56.0
160
道路 简易 原有
3
130
80 90 100 110 120 130 140 150
56.05
56.3156.23 56.15 56.18
56.22
55.96
55.66
道路
道路 1
原矿山门房
147.8
140
57.00 56.48 56.61
56.39 56.39 56.28
56.23 56.23
55.89 56.22
简易
简易
120 130 140
Q
56.43
57.00 56.48
55.98 56.21 56.08
56.06
原有
原有
砖
4
70
533. 5 56.43
56.61
56.39
56.02
矿山
矿山
5
6
民房
533800
70
80m
B
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 20m
比例尺:
水塘
民房
9
民房
54.4
沉淀池
56.0
56.60
2
10
水塘
水塘 534000
截排水沟
38534167.03
38534422.43
爆破作业范围拐点坐标(国家2000坐标系) 点号
55.66
26
水塘
38534155.77
38534342.19
D 38534156.98 2619719.34 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) E4 38534184.57 2619806.82 点号 Y X 点号 Y X 爆破作业面积0.0909km 1 38534204.37 38534204.37 2619861.16 1 2619861.16
56.66
村道55.90
线基
砖
60
水塘
533600
60m
56.0
58.78
水塘40m
0
1:2000
B
警示标志
58.18
防物体打击
高压
5
6
80
矿山办公生活区 70 矿山办公生活区 水塘
水塘
56.9
2619545.57
A A 26 D 7 20000爆破作业界线 C
防高处坠落 58.18
比例尺:
120
173.56
222.0
59
100 民房 90
53.0
水塘
56.9
78
70
160
民房
水塘
53.0
26 19200
2619.1
53.6
B
534000
533800
38534184.57
38534203.91
沉淀池
56.78
56.81
需拆除 需拆除 • A4(+95m)
C
26 19600
58.21
57.21
56.65
57.14
10KV
38534184.57
• A4(+95m)
L3=60m,B=8m,i=3%
38534156.98
38534184.57 2619806.82
L3=197m,B=8m,i=8.9%
38534189.78
38534156.98 2619719.34
4 2619806.82 E
高压线
57.69
55.88
1’
爆破开采区
L3=60m,B=8m,i=3%
戒线 破警
0m爆
38534473.93
38534189.78 2619790.86
2619719.34 D
水塘
L3=197m,B=8m,i=8.9%
以外
以外
戒线 破警
0m爆
支线
支线
山下
至30
山下
至30
沙线
沙线
V黄
V黄
搬迁
搬迁
10k
10k
束前
束前
建结
38534529.35
38534473.93 2619469.93
2619790.86 C
56.60
57.19
220kV仰昆甲乙线
• A0(+53.5m)
H145
建结
水塘
26 19600
Y 38534204.37 38534453.58 38534513.83
38534529.35 2619545.57
2619469.93 B
E4
• A0(+53.5m)
7
村道
60.85
4
台
线基
X
38534204.37 38534453.58 2619861.16 2619787.43 38534513.83 2619735.38
2619545.57 6
D
水塘 84.0
H145
线基
Y
点号
2619735.38 7
B
80.0
121.5
40m
54.7
100 110
26 19600
7 110
57.73
7 2’
采空区 60.85
28
防高处坠落
533800
533600
砖
56.84
Q
56.70
民房58.10 56.54 2557.74
57.73
5
Q
民房(已空置)
爆破开采区
108.0
Ch
120
7
24
民房58.10 水塘 57.74
D
防高处坠落
水塘 124.5
60
23 58.14
24
A
水塘
B’25 G
49.77
水塘
120
水塘
60.0
A
非爆破开采区 Q 采空区
D
58.14
23 58.14
• A2(+74m) .9%
水塘
矿山杂物房 49.8229 砖 49.40
90
20m
534200
90
X
2619861.16 2619787.43 A
7 6
C
矿山杂物房 29 砖
70 80
70
56.4
F
i=8
非爆破开采区 非爆破开采区
G
49.87
94.0
110
台
高压
38534529.35 38534513.83 面积0.1363km
2
50.76
8
养殖场 水塘
=8.7%
38534513.83 2619735.38
F
197 水塘 m, B=8 m,
矿山原有简易道路
58.14
=8.7%
38534529.35 2619545.57
2619735.38 7
砖 矿山机修间
2
水塘
53.6 50.76
8
养殖场
B
民房
9
民房
122.0
54.4
104.0
58.78
沉淀池
54.0
7
4308
• A6(+105m)
防物体打击
2619545.57 6
50.45
10
民房 水塘
9
民房
120
水塘
68.0
10
100
水塘 110 130 140 150 160 160.5
160 15054.4 140 130 120 110 100 90 80
120
2619522.00 2619470.21 2619343.32 2619399.66
6
E
D
56.95 58.21
57.19
Q
58.76
123.
水塘
i=2
m,
B=8
m,
E
L1=
E
26 20000
57.09
58.76
57.06 58.76
57.10
防物体打击
6 7
棚房(已空置) 棚房(已空置) 50.45 水塘
80 90
80.0
砖
60.0
水塘
I
E
L3=94m,B=8m,i
38534167.03
38534422.43
L0=
2619809.01
缓坡段
开采深度:+120.28m至+50m 57.29
58.76
58.72
6 58.78
基建平
10KV
砖
38534184.57
38534342.19
70
26 19800
26 19400
38534204.37 38534453.58
38534342.19 2619343.32 38534422.43 2619399.66
3 水塘
58.99
26
民房
58.72
533600
Y
2619806.82
4H
4 5
57.51
57.50
19
矿山原有简易道路 矿山原有简易道路
X
E F
缓坡段
57.24
59.01
58.99
57.50
46%%D
8
.9%
缓坡段
A
C
防物体打击
棚房(已空置) 50.45
533. 5 2620.2
57.75
4I
Ch 19
20 20 砖 砖 砖 砖21 民房(已空置) 砖 砖21 民房(已空置) • A5(+96.8m)
• A3(+77.5m)
1
L3=94m,B=8m,i
38534203.91
80 90 100 110 120 130 140 150
38534114.10
38534203.91 2619522.00 38534167.03 2619470.21
2619343.32 4 2619399.66 5
80 90 100 110 120 130 140 150
600
600
35.4
38534155.77
38534114.10 2619722.51
H 2619522.00 4
160
11
35.4
38534155.77 2619809.01
2619722.51 G
50.98
11
水塘
H
基建平
10KV
26 19800
Y
38534184.57 2619806.82
2619809.01 F
4H
11
水塘
8
50.76
1
100
78
面积0.1919km
X
38534204.37 38534453.58 2619861.16 2619787.43
2619806.82 E
G
4 5
点号
矿山基建运输道路 矿山基建运输道路 截排水沟 G 38534114.10 2619722.51
58.84
534000
57.8
80
L2=197m,B=8m,i=89%
Y
点号
2619861.16 2619787.43 A
F
50.98
4
水塘
砖
C 50.76
• A1(+56.4m) 矿山库房 2 砖
水塘
砖 533. 26 5 19800 2620.2
行车转弯警示限速标志 行车转弯警示限速标志 基建台阶及标高 基建台阶及标高 A 38534204.37 38534453.58 2619861.16 2619787.43 +105m
+105m
祖塘居委会 58.88
533800
70
L2=197m,B=8m,i=89%
38534282.77
砖
38534282.77
58.89
533600
2620.2
100
L3=60m,B=8m,i=3%
38534282.77 2619935.03
X
A E
A
除
需拆
8.4824
• A4(+95m)
133.4m
57.0
3
0035 149.
截排水沟
D
20
1 50.98
100 110
L3=60m,B=8m,i=3%
2619935.03 8
开采深度:+120.28m至+50m 面积0.1919km 开采深度:+120.28m至+50m
水塘 56.9
2619935.03
例2619735.38图 38534513.83 例
8
19
砖 砖 砖21 民房(已空置)
矿山原有简易道路
水塘
11
H145
38534513.83
57.0
1
原矿山门房
Q
水塘 12
民房 民房
行车转弯警示限速标志
22
58.21
8 50.76
16
民房 民房 砖
12
民房 水塘
设计圈定的开采范围拐点坐标(国家2000坐标系)
65.96 57.63
58.94
58.86 58.88
• A0(+53.5m)
D
140.1164
167.0802
16
民房 民房 砖
14
水塘 民房
54.0
56.0
开采深度:+120.28m至+50m 面积0.1919km 矿区范围及拐点编号 行车警示及限速标志 矿区范围及拐点编号 行车警示及限速标志
57.55 58.73
58.94
58.86
村道58.89
57.16
17
16
13
38534422.43
57.28
58.73
316.5831 59.38
59.38
57.69
61.1470
行车警示及限速标志
基建台阶及标高
矿山基建运输道路
55.6 E
26 20000
14
13
民房
54.0
38534049.71
38534342.19
台
38534422.43 38534529.35
38534513.83 2619735.38
I 2619470.21 4
15
14
12
民房
15
38534204.37
38534018.20
38534529.35
图7 26534. 10 19800 2620.2
2620.2
57.73
7
59.01
50.42
17
养殖场 民房 民房 砖
13
民房
54.0 56.0
2619578.02
17
养殖场
Y
2619778.53
2619399.66 2619545.57
90
i=8.7%
养殖场 15
38534342.19
38534422.43 2619399.66 38534529.35 2619545.57
534800
59.20
+105m
56.66
56.70
56.23
55.78
Ch
56.0
爆破作业面积0.0909km 爆破作业面积0.0909km
55.98
59.20
22民房
8
i=8.7%
38534342.19 2619343.32
2619399.66 5 2619545.57 6 2619735.38 7
点号
55.66
534800
534600
民房58.10
60.85
+105m
L3=94m,B=8m,
水塘
0
1:2000
例
矿区范围及拐点编号
Q
58.76
57.0
50.42
56.0
X 2619861.16
2619343.32
5 6
基建平
2619343.32 4
6 7
26 19600 爆破作业范围拐点坐标(国家2000坐标系) 爆破作业范围拐点坐标(国家2000坐标系)
56.78
57.19
55.89
水塘
水塘
50.42
56.0
水塘
38534204.37
160
856
59
59
222.0
222.0
173.56
173.56
856
38534018.20
2.3%
409
+105m
57.50
爆破作业界线
球 534. 10
祖塘小学
58.02
24 534600
水塘
水塘
18 5 民房 18 砖 6 棚房(已空置) 棚房(已空置) 250.9131 棚房(已空置) 矿山办公生活区棚房(已空置)
53.0
Y
38534049.71
38534018.20 2619578.02
26 8 19800
水塘 水塘 水塘
水塘 水塘 7
X
38534049.71 2619778.53
,i=
L3=94m,B=8m,
534400
水塘
80
26 19600
57.21
56.65
56.78
56.60
56.21 56.08
56.06
A
54.7
B=8m
409
534200
58.94
水塘
70
56.95
废弃加工场地
水塘
56.0
Y
38534204.37 2619861.16
56.84
57.21
56.65
56.66
56.02
村庄
22民房
25m,
26.4
534000
56.8
棚房(已空置) 棚房(已空置)
A
57.21
L0=1
26.4
废弃加工场地
55.6
26 20000
26 19600
爆破作业界线
56.92 56.74
56.54
55.90
534400
村庄
275.780
56.84
534400
爆破开采区
2.3%
78
533800
533. 5
2620.2
58.73 59.38
5
2
57.56
110kV仰周线 534600
534800
534600
58.99
B
点号
57.11
,i=
133.34
51.80
130
59.01
水塘
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)
57.14
B=8m
133.34
26 20000
A
点号
56.81
55.86
Q
534400
原有道路
5
2619578.02 3
4
58.18
4
D
矿山杂物房 29 砖
25m,
55.86
53.6
56.70
55.90
55.88
110kV仰周线 534400
140
59.20
+105m
57.51
51.80
534200
147.8
比例尺:
534400
废弃加工场地
55.6
26 20000
100
57.19
57.06
57.10
55.24
Q
Q
120 130 140
70 60
26 19200
58.89
18
Q 58.76
2557.74 54.7
非爆破开采区
G
208.0718
Q
建构筑物
原有道路
Ch
58.72
80m
水塘
100
53.6
56.54
56.92 56.74
高压线
51.80
53.
高压线
80m
Q
设计圈定的开采范围
6
H I
E
C
60m
58.14
56.8
240.0937
Q
L0=1
B’ 2’
55.88
1’
56.81
40m
534200
90
4308
水塘 80m 20m
60m 0
23 58.14
534200
80
123.
40m
57.34
B
2619778.53 2
7
3 20m
E
F
2
56.8
214.8165 57.8
8
100 110
B’
5 2’
4
60m
56.0
2.3%
57.75 57.21
57.56 57.24
57.16
56.95
57.19
57.06
57.10
水塘
水塘
57.09
57.29
民房
6 4308
1’
1’
220kV仰昆甲乙线
河道、水系
A
E
58.78
0
比例尺: 1:2000
56.0
70
民房
534000
1:2000
6
4
X
2619861.16 1
开采深度:+120.28m至+50m 面积0.1363km 开采深度:+120.28m至+50m
B
40m
22民房
,i=
65.96
祖塘居委会
57.75
57.24
57.51
123.
28
7
H
C
1 2 3
点号 65.96
57.63
祖塘居委会
57.11
57.34 57.14
57.09
26 57.29
比例尺:
50.76
55.6
A
E
I
E
B
4I
8.4824
478
200.2540 534000
水塘
民房
9
54.4
56.0
设计圈定的开采范围拐点坐标(国家2000坐标系) 设计圈定的开采范围拐点坐标(国家2000坐标系) 57.55
57.63
316.5831
村道
除
拆 26 需
6
5
4
28
49.77
84.0 121.5
120
V黄 沙线 山下 支线
10k
120
GF
1
216.4
棚房(已空置) 50.45
533800
建构筑物
57.28
57.55
316.5831 57.69
61.1470
• A6(+105m)
民房(已空置)民房(已空置)
D’
49.40
80.0 108.0
Ch
54.7
B=8m 25m,
57.28
2557.74
57.69
非爆破开采区 非爆破开采区
• A2(+74m)
2’ 4
70
80 90
110 120 124.5
120 110 100 90 80
28
49.82
94.0
104.0
60
533600
村庄
爆破安全警戒线 26 20000
20
1
2
6790
3754
矿山
水塘 533800
533600
100
+74m)
120 110 100
90 80
60.0
533. 5
58.84
D
19
砖 砖 砖21 民房(已空置)
矿山原有简易道路
78
197. 50.98
222.
2.3%
民房58.10
57.73
7
村道
B
B’ 5
2619.1
02-A1
58.88
.12
2442
,i=
26 祖塘小学 19800
58.02 祖塘小学
58.02
24
民房58.10 水塘
20m
534200
输电线路
L0=1
9.20 11
GF
A
D
球
23 58.14
24
61.1470
Ch
.9%
B
+110m平台
非爆破开采区
民房(已空置)
70
56.4
534800
58.86
218
294.
269.0 224
B=8m 25m,
球
58.14
57.73
建构筑物
原有道路 设计圈定的开采范围 设计圈定的开采范围
5
爆破作业界线
60.85
• A3(+77.5m) • A3(+77.5m)
i=2
160
70
80 90 100 110 120 130 140 150
160
533600
Ch
57.16
m,
• A2(+74m)
i=8 .9%
49.87
1 534600
水塘
59.01
民房
L0=1
9.20
4
4
A水塘
0
1:2000
534000
533800
57.8
58.21
50.76
16
水塘
11
10
输电线路
河道、水系
点号
57.21
• A6(+105m)
26 19200
534. 10
533600
2620.2
14
12
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)
58.18
57.56
133.4m
H145
6
H
爆破开采区
B=8
台 基建平
26 A 20000 7
E
I
E
58.18
57.11
Ch
+105m
GF
C
• A5(+96.8m) • A5(+96.8m)
2.3%
26 20000
58.21
Q
57.34
m,
m,
53.6
100 110
59.01
58.99
57.14
120
防高处坠落 防物体打击
•防高处坠落 A6(+105m)
B=8
122.0
160.5
90
26 533. 5 19800 2620.2
图 例
58.76
Q
23 58.14
L1=
55.48 55.71
534400
例
矿区范围及拐点编号
58.84
58.76
2557.74
9%
B=8
m,
120
L2=
m,
110
120 130 140 150 160
160 150 140 130
80
例
新建矿山运输道路 新建矿山运输道路 河道、水系
5
H
55.59
55.78
58.94
58.76
8
17
民房 砖
民房
砖
矿区范围及拐点编号 矿区范围及拐点编号输电线路
58.78
58.14
=2.
56.47
533. 5
2620.2
图
57.0
50.42
养殖场
养殖场
水塘
,i
26 19400
70
水塘
民房57.8
58.84
D
E
C
,i=
534800
59.38
58.99
58.73
58.21
=8m
B=8m 25m,
59.01
58.76
I,B
534200
59.20
新建矿山运输道路
58.88
爆破安全警戒线爆破安全警戒线
58.72 58.76
58.78
20m
56.73 55.96
55.66
1:2000
58.89
58.94
58.86
57.50
58.72
除
明
1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 3、采用山坡露天开采,公路开拓-汽车运输方案。 4、爆破安全距离为200m;下坡方向300m,矿山爆破时,必 须撤出爆破警戒 线线内与爆破作业无关的一切人员,并采取相应的安全防 护措施。 5、矿山主要运输道路等级 Ⅲ级采用双车道,路面宽8.0m,两侧各设路肩宽 0.5m,最小转弯半径15m,回头弯最小转弯半径15m,平均 坡度6.5%,最大 坡度不大于9.0%。道路外侧设挡车堆,断面为梯形:高 1.0m,上底宽1.0m, 下底宽2.0m;内侧设置截排水沟,断面为矩形,净尺寸 0.6m×0.5m(宽×深 );在小曲率转弯处设限速警示标志。矿区道路在接口及 转弯地段,设置 安全行车警示标志、反光镜、外侧挡车堆等安全设施。
100
水塘
58.89
58.99 57.50
矿山原有简易道路 矿山原有简易道路
8.4824
说
26 19400
8
2620.2
2620.2
19
20 20 砖 砖 砖 砖21 民房(已空置) 砖 砖21 民房(已空置)
1
46%%D
534000
533800
56.8
废弃加工场地
水塘
需拆
m,
防高处坠落
197
矿山原有简易道路 68.0
100 56.39
55.86
275.780
533. 5
534. 10
2620.2
59.38 58.94
58.84
46%%D
100 110
534800
图 58.73 59.38
58.86
58.88
• A4(+95m)
90
534600
534400
56.0
59.20
22
民房
• A4(+95m)
.9%
i=2
I L1=
砖3 矿山库房
80 90
80.0 60.0
• A5(+96.8m)
• A3(+77.5m)
• A1(+56.4m) 2 砖 矿山库房
4
70
80
534800
534600
58.89
133.4m
民房
38534184.57
H
56.9
70
6.2421
6.2421
01-A1
01-A1
54.7
7
100
H175
H175
1:2000
砖 534. 10
534600
60.85
需拆 • A4(+95m)
防高处坠落
80m
Q
534800
534800
249.0
A
L0=1
H390
H170
H170
60m
57.50
爆破开采区
2.3%
H385
H165
H165
534600
534600
采区
2619806.82
50%%D
Q
爆破作业面积0.0909km
58.84
559
水塘
E4
水塘
水塘
56.05
56.79
533. 5
58.73
民房
8
38534156.98
C
3
57.19
56.18
55.24
54.7
18
19
38534189.78
57.00 56.48
56.15
58.88
13
8
,i=
H380
H160
H160
40m
村庄
54.0
50.76
B=8m
H375
H155
H155
20m
534200
56.8
15
59.20
38534473.93
2619719.34
图 534000
棚房(已空置) 棚房(已空置)
水塘
38534529.35
2619469.93 2619790.86
总平面布置图 533600
01-A1
534. 10
533800
水塘
22
38534513.83
2619545.57
B
56.43
56.31
56.23
56.22
55.57
比例尺: 0
比例尺: 1:2000
533600
56.0
民房
38534204.37 38534453.58
2619735.38
6
D
2619.1
534800
533. 5 2620.2
26 19200
26 19200
Ch
水塘
25m,
H370
534600
110kV仰周线
56.0
54.7
L0=1
H365
H390
H390
H150
H150
56.47
55.48 55.44
80m
村庄
2619861.16 2619787.43
7
C
55.48 55.71
55.57
55.6
534400
1
原矿山门房
110kV仰周线
534400
1:2000
26 20000
村庄
L3=60m,B=8m,i=3%
H465
H360
H385
H385
H145
H145
534200
55.59
55.24 55.48
534400
534400
i=8.7% L3=94m,B=8m,
H460
H380
H380
H140
H140
534000
矿山地质地形图 矿山地质地形图
534200
A
56.61
56.28 56.23
55.89
147.8
55.81
55.59
1:2000
60m
80 90 100 110 120 130 140 150
H455
H375
H375
H135
H135
533800
22
40m
砖
矿山办公生活区
说 明
明
58.86
80m 20m
水塘
• A0(+53.5m) 5
6
53.0
56.60
56.39 55.98
56.21 56.08
56.06
55.48 55.44
矿山地质地形图 533600
说
民房
60m 0
56.66
56.02
51.80
51.80
40m
防高处坠落
水塘
民房
水塘
26 19600
Y
56.92 56.74
130
水塘
20m
60.85
爆破开采区
水塘
38534422.43 38534529.35 38534513.83 面积0.1363km
X
56.81
56.70
55.48 55.44
57.8
1:2000
2619735.38
D
1、本图是根据广东省有色地质勘察院于2021年11月提交的 1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 》中的地形地质图 及建材广东省有色地质勘察院于 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。 高距为2m。
55.96
56.47
55.81
110kV仰周线
0
2619399.66 2619545.57
55.78
55.78
55.71
尺:
57.21
56.65
56.54
Q
120 130 140
70 60
5 6 7
采空区
G 矿山杂物房 29 砖
养殖场
爆破作业范围拐点坐标(国家2000坐标系)
55.81
51.80
50.76
8
54.4
26 19400
56.05
55.66
55.24
534400
53.6
26 19600
点号
高压线
130
38534167.03
56.84
140
140
水塘
38534184.57
38534342.19
56.15
56.79
56.73
55.86
Q
55.48 55.44
534200
220kV仰昆甲乙线
110kV仰周线
55.57
34200
1’
49.77
84.0 121.5
26 19200
26 19200
409
H450
55.48 55.71
55.57
4
49.40
80.0 108.0
Ch
38534203.91
56.78
55.90
10KV 高压
H445
H370
H370
H130
H130
支线
H440
100 110
55.78
28
55.88
70
80 90
110 120 124.5
38534114.10
2619522.00 2619470.21 2619343.32
面积0.1919km
2619.1
26 56.39 19400
56.18
55.96
B’ 2’
49.82
94.0
104.0
38534155.77
2619722.51
53.6
53.6
51.80
120 110 100
90 80
70
56.4
2619809.01
4I 4
Q
57.00 56.48
56.28 56.31
56.15
56.79
1’
非爆破开采区
.9%
2619806.82
G
非爆破开采区
56.61
56.39 56.39
56.05
56.3156.23
56.18
56.22
• A2(+74m)
i=8
5
120 110 100 90 80
533. 5
56.28
56.23 56.23
55.89 56.22
56.06
m,
民房(已空置)
55.59
55.24
B=8
49.87
60
Q
B
• A6(+105m)
m,
53.6
55.81
90
H465
H465
H365
H365
H125
H125
山下
H435
6.2421
56.47
55.86
147.8
m, 120
L1= 197
矿山原有简易道路 68.0
122.0
160.5
150 140 130
53.6
80
H460
H460
H360
H360
H120
沙线
H430
H175
55.96
1’
高压线
120 130 140
60
38534529.35
.9%
i=2
m,
B=8
I L0=
砖3 矿山机修间
4308
120 130 140 150 160
160
57.06
57.10
123.
110
明
民房
9
7 56.95
6
100
26 19400
说
1、本图是根据广东省有色地质勘察院于2021年11月提交的 《广东省龙门县 平陵街道大围炉石矿区水泥用石灰岩矿资源储量核实报告 》中的地形地质图 及建材广东省有色地质勘察院于 2022年6月份测量的矿山开采现状图及现场 踏勘资料综合绘制而成。 2、本图采用2000国家大地坐标系、1985国家高程基准,等 高距为2m。
E
开采深度:+120.28m至+50m
• A3(+77.5m)
• A1(+56.4m) 矿山库房 2 砖
4
70
80 90
80.0 60.0
26 19400
A
2
10
水塘
E
F
民房
F
4H
57.51
57.29
57.19
• A5(+96.8m)
砖
水塘
57.09
26
民房
Ch
H
56.9
56.39
56.05
60.0
26 19200
38534422.43
民房
面积0.1919km
57.19
70
H455
H455
H355
H355
H115
10k V黄
H425
H355
H170
H450
H450
H350
H350
H110
38534282.77
149.
46%%D
矿山原有简易道路
水塘
57.75
57.24
20
水塘
棚房(已空置) 50.45
56.43
57.00 56.48
55.98 56.21 56.08 56.23
55.89
56.06
55.66 131.9323
H420
H350
H165
H445
H445
H345
H345
H105
38534513.83
2619935.03 38534282.77
C
0035
57.00 56.48
56.79
55.66
70
38534342.19
2619735.38 38534513.83
8 2619935.03
57.19
57.19
56.43
56.61
56.39
56.02 55.98
56.21 56.08
55.86
H415
H345
H160
H340
H340
H101
D’
38534049.71 38534018.20
2619399.66 38534422.43 2619545.57 38534529.35
7 2619735.38
8
除
需拆
8.4824
• A4(+95m)
133.4m
3
Q
56.43
56.18
56.73
D’
220kV仰昆甲乙线
167.0802
水塘
水塘
56.15
4
49.77
84.0
56.60
56.60
56.70
56.02
55.90
高压线
Q
2619343.32 38534342.19
5 2619399.66 6 2619545.57
7
56.92 56.74
56.92 56.74
56.54
55.88 56.73
1’
2619578.02 38534018.20
5 6
28
A’
49.82 49.40
80.0
121.5
1
原矿山门房
38534422.43
38534513.83 38534282.77
108.0
Ch
120 110 100 90 80
祖塘居委会
57.16
D
140.1164
250.9131
38534529.35
2619735.38 2619935.03
56.31
56.23
56.22
38534204.37 38534453.58
村道
水塘
• A0(+53.5m) 5
砖 6 矿山办公生活区
53.0
56.61
56.28 56.23
55.89
Y
2619861.16 2619787.43
57.21
56.60
56.39 55.98
56.21 56.08
56.06
X
A
19
砖 砖 砖21 民房(已空置)
1
11
水塘
砖 26 19800
面积0.1919km
点号
57.63
316.5831
57.69
8 50.76
50.98
61.1470
57.11
7
民房
水塘
26 19600
38534342.19
2619343.32 2619399.66 2619545.57
7 8
开采深度:+120.28m至+50m
56.66
56.02
55.88
100
H440
H440
H335
H335
D’
2619778.53 38534049.71
4 2619343.32
60
38534018.20
56.92 56.74
55.90
70 80
90 110
120 124.5
60.0
56.81
56.81
56.70 56.54
H410
H340
H155
H435
H435
H330
H225
H225
H330
C’
3’
B’
55.88
Y 38534204.37
104.0
70
56.4
YX
2619861.16 38534204.37
开采深度:+120.28m至+50m 开采深度:+120.28m至+50m 面积0.1919km
56.66
56.66
2’
4
H150
H430
H430
H325
0
H220
H325
A’
线
56.78
56.78
B’
5 2’
5
28
2 2619778.53 3 2619578.02
4
57.21
56.65
56.65
57.10
4’
55.90
28
1 2619861.16
26 2 19600 3
26 19600
56.84
57.06
57.06
4’
3’
4 A’
民房(已空置)民房(已空置)
56.95
56.95
57.19
57.21
6
6
C’
5
5
H335
H145
H425
H425
H320
H215
H320
57.29
57.29
56.84
ZK3 145.3m
X 点号
点号 1
57.10
48%%D
48%%D
H140
H420
H420
H210
H315
H315
民房 27
民房 27
Ⅰ
48%%D
ZK3 145.3m
H135
H415
H415
H205
H310
H310
Ⅰ
57.51
57.51
94.0
90 80
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系) 《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)
57.16
57.09
57.19
Ch
ZK2 134.5m
57.24
57.14
57.16
26
38534049.71
56.81
56.70
56.54
2’
49.87
民房(已空置)
38534204.37
2619778.53 2619578.02
6
56.78
5
53.6
120 110 100
57.56
57.56 57.24
57.34
57.34 57.14
57.09
26
50%%D
48%%D
H330
H130
H410
H410
H201
122.0
57.21
38534282.77
57.14
56.65
C’
5
120 130 140 150 160 160.5
150 140 130
57.75
57.75
村道
村道
46%%D
H125
H405
H405
H305
H305
祖塘居委会
祖塘居委会
57.11
57.11
38534513.83
2619935.03
60.85
爆破开采区
水塘
Y
2619861.16
2 3
5
57.06
B’
110
65.96
65.96
57.63
57.63
57.69
X
1
57.10
4’
3’
68.0
100
26 19400
57.55
57.55
46%%D
H405
H120
H401
H401
H301
H301
ZK1 133.4m
矿山库房 2 砖 砖3 矿山库房
70
80 90
80.0 60.0
57.28
57.28
2557.74
160
Ch
H401
H115
民房58.10
57.69
60.85
点号
26 19600
4
6
48%%D
ZK3 145.3m
56.9
26 19800
26 祖塘小学 19800
58.02 祖塘小学
58.02
24
57.73
7
7
60.85
57.21
ZK2 134.5m
H110
23 58.14
5'
民房58.10 水塘 2557.74
采空区
4
建构筑物
建构筑物
球
球
58.14
58.14
23 58.14 24
水塘
57.73
Q
H325
民房
2619735.38
16
水塘 12
民房 水塘
设计圈定的开采范围拐点坐标(国家2000坐标系)
水塘
56.95
57.21
48%%D
1
7 8
7 8
57.56
56.84
ZK2 134.5m
2
6
38534422.43
17
民房 民房 砖
14
13
民房
54.0 56.0
38534342.19
38534529.35
65.96
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)
57.29
15
38534049.71 38534018.20
2619578.02
2619399.66 2619545.57
开采深度:+120.28m至+50m
57.55
57.34
57.51
26
民房 27
26 19800
57.73
7
D
矿山杂物房 29 砖
57.09
46%%D
Ⅰ
50%%D
Q
4 3 5
采矿证范围及拐点编号 采矿证范围及拐点编号
2 1
水塘
采空区
H105
水塘
前人施工矿钻孔及编号 前人施工矿钻孔及编号
5 6
G
208.0718
养殖场
57.0
50.42
养殖场
Y 38534204.37
2619778.53
2619343.32
5 6
57.28
2557.74
水塘
8
54.4
57.19
Ch
本次取样位置及编号 本次取样位置及编号
水塘
Q
3
58.18
58.18
58.78
7 8
5'
%%D
D
1
原矿山门房
水塘
非爆破开采区
祖塘小学
58.02
民房58.10
57.24
57.16
水塘 ZK1 133.4m
5
砖 6 原矿山办公生活区
53.0
2
50.76
57.75
球
58.14
24
214.8165
祖塘居委会
57.11
57.34
X 2619861.16
2
23 58.14
A
240.0937
57.14
H101
Q
Q
58.76
58.76
4 3
ZK1 133.4m
A
民房
水塘
26 19600
ZK1
ZK1 58.72
58.72
57.69
村道
点号
3
E
F
60.85
H320
H225
1 地质勘探线及编号 地质勘探线及编号
21
58.78
水塘
H220
20
21
Ⅱ
H215
19
20
1
H315
H210
8
19
砖 砖 砖 砖 砖 砖 民房(已空置) 民房(已空置)
Ⅱ
H101 2016年采坑地表采集化学样位置 2016年采坑地表采集化学样位置
水塘
57.63
7
18
56.0
《采矿许可证划定》的矿区范围拐点坐标(国家2000坐标系)
58.18
4
民房
9
民房
57.56
水塘 水塘
H101
1
478
200.2540
10
水塘 65.96
57.21
7 58.21
58.21
砖
57.28
2557.74
采空区
实测、推测地质界线 实测、推测地质界线
26 20000
26 20000
58.99
58.76
58.76
8
矿山杂物房 29 砖
养殖场
59.01
59.01
58.99
C
50.76
8
54.4
58.89
57.50
57.50
50.76
保有矿体出露范围及编号 Ⅱ 保有矿体出露范围及编号
H205
58.84
58.84
1
第四系人工填土层 第四系人工填土层 Q
Ch 中石炭统黄龙组灰岩 中石炭统黄龙组灰岩
Ⅱ
58.88
58.88
3
水塘
Q
Ch
H310
58.94
58.86
H201
58.94
58.86
58.89
水塘
216.4
水塘
57.73
Q
11
棚房(已空置) 50.45
26 19800
民房58.10
57.55
59.38
59.38
民房
4
民房
9
民房
H305
22
22
2
10
水塘
58.73
26 19800
祖塘小学
58.02
24
水塘
砖
23 58.14
5'
87.5
砖 第四系残坡积层
第四系残坡积层 Q
Q
民房
1
水塘
球
58.14
水塘
棚房(已空置) 50.45
26 19800
例
59.20
59.20
58.73
4
图
例
H301
水塘
54.7
54.7
图
2620.2
2620.2
V黄 沙线 山下 支线
534800
534800
村庄
村庄 水塘
534600
534600
10k
534400
534400
11
水塘
砖 534. 10
534. 10
534200
简易
3754
棚房(已空置) 棚房(已空置)
爆破作业界线 B
Ch Q 58.76
58.78
水塘
222.
原有道路
A
C
58.72
1
6790
50.98
1
2
197.
224
559
水塘
5
4
E D
20
矿山原有简易道路 .12 78
2442
269.0
设计圈定的开采范围
6
H I
58.21
19
218
294.
水塘
民房 水塘
建构筑物
砖 砖 砖21 民房(已空置)
民房
14
12
7 8
水塘
防物体打击
56.0
50.76
16
民房 砖 13
民房
54.0
采矿证范围及拐点编号
8
17
养殖场 15
2 1
9.20
Ch
本次取样位置及编号 4 3 5 6
道路
前人施工矿钻孔及编号
58.18
矿山
Q 58.76
58.78
249.0
34200
59.20
22民房
Q 废弃加工场地
55.6
26 20000
58.76
57.0
50.42
56.0
ZK1 58.72
水塘
7
56.0
建构筑物
A
E
GF
57.50
18
棚房(已空置) 棚房(已空置)
地质勘探线及编号
1
20
1
344
19
Ⅱ
B
2 50.98
26 20000
58.99
2016年采坑地表采集化学样位置
58.76 58.21
水塘
水塘
60.5
80m
砖 砖 砖21 民房(已空置)
50.76
3
民房
14
12
民房 60m
河道、水系
爆破安全警戒线
59.01
L3=94m,B=8m,i
59
222.0 856
水塘
道路
H101
173.56
水塘
222
民房 砖 13
民房
54.0
40m
8
C
17 16
15
20m 80m
新建矿山运输道路 58.89
56.0
废弃加工场地
55.6
26 20000
简易
保有矿体出露范围及编号
实测、推测地质界线
58.99
4
57.0
50.42
养殖场
56.0
0 60m
40m
村庄
输电线路
原有
中石炭统黄龙组灰岩
Ⅱ
26 20000
57.50
18
棚房(已空置) 棚房(已空置)
Ch
20m 1:2000
534400
水塘
矿区范围及拐点编号 58.94
58.84
Ch
58.89
59.01
水塘
56.0
000 比例尺:0
80m
54.7
57.8
59.38
58.88
58.84
Q
水塘
60m
534200
56.8 58.73
22
民房 58.86
56.0
废弃加工场地
534000
例
59.20
54.7
57.8
58.88
55.6
533800
533600
2620.2
图
水塘
Q 58.73 59.38 58.94
40m
533. 5
2620.2
村庄 59.20
58.86
20m
80m
533. 5
例
村庄
22
民房
26 20000
0
比例尺: 1:2000
534400
水塘 54.7
矿山
60m
534200
56.8 57.8
70
40m
比例尺:
534000
533800
80 90 100 110 120 130 140 150
20m
534. 10
533600
160
0
比例尺: 1:2000
533. 5 2620.2
01-A1
2619.1
533600 533. 5
533800
534000
534200
534400
Fig.14 - Stone house in the quarry
23
T3x Upper Majiya Xiaoping Formation
Farm 0
Forest
River Farm Forest
160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0
Geological Map 1:2000
C2h Middle Carboniferous Huanglong Formation
Original Topographic 1:2000
River
150m
50
0
Geological Faults
150 m
50
C2h Middle Carboniferous Huanglong Formation
Original Topographic 1:2000
T3x Upper Majiya Xiaoping Formation 0
50
150m
Geological Faults
-50
-100
-150
-200
-250 Q el+dl Debris Accumulation Layer
Geological Section 1:500
Powdered Crystalline Dolomite 0
Crystalline Tuff Shale Conglomerate Geological Faults
C2h Middle Carboniferous Huanglong Formation
Original Topographic 1:2000
Geological Map 1:2000
T3x Upper Majiya Xiaoping Formation 0
50
150m
Geological Faults
0
50
150 m
160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0
-50
-100
-150
-200
Geological Map 1:2000 0
50
-250
150 m
Q el+dl Debris Accumulation Layer
Geological Section 1:1000
Powdered Crystalline Dolomite Crystalline Tuff Shale Conglomerate Geological Faults
Fig.15 - Oringinal Quarry Plan Fig.16 - Quarry Geological Plan Fig.17 - Quarry Geological Section
24
0
25
75 m
25
75 m
River Farm Forest
Therefore, for the nature of this site, the process of change and the reasons for the change are the entry point to understanding this quarry. Therefore, I started my research on the geological formation and change of this site and made a series of geological drawings and drawings of the changes of the site with the available survey materials.
Stage 1 Artisanal Mining 1960s
Different Mining Stages Plan 1:2000
Stage 2 Blasting Mining 1970-80 Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020
160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0
Stage 1 Artisanal Mining 1960s
0
50
150 m
Different Mining Stages Plan 1:2000
Stage 2 Blasting Mining 1970-80 Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020
0
50
150 m
-50160 150 140 130 120 -100110 100 90 80 70 -150 60 50 40 30 20 -200 10 0
-250 -50
Stage 1 Artisanal Mining 1960s
Different Mining Stages Section 1:2000
Stage 2 Blasting Mining 1970-80 -100
Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020
0
50
150 m
-150
-200
-250
Stage 1 Artisanal Mining 1960s
Different Mining Stages Section 1:2000
Stage 2 Blasting Mining 1970-80 Stage 3 Excavator Mining 1990-2010 Stage 4 Blasting+Excavator Mining 2020
0
50
150 m
Fig.18 - Different Mining Stages Plan Fig.19 - Different Mining Stages Section
25
Fig.20 - Aerial photo of drone
26
However, while people seem to control everything precisely, each stone shows different forms and textures. So when I went to the site and touched the stones, I felt they had a unique charm. How can they be fully utilized? It may come from my intuition of nature, so I put aside some big planning information and tried to understand the site visually and in detail. Then I scanned the entire site with a drone and got a digital model. This helped me get a better understanding of the site. The drone captured many angles that I couldn't see, which helped me reacquaint myself with the site. Furthermore, it recorded some information that was not visible on the drawings. Moreover, at this point, I also realized that scanning is the process of reconstructing an irregular natural object.
Fig.21 - Scanning Model
27
Fig.22 - 3D printing site
28
29
With the help of this technique, it is possible to obtain information about the irregular site in constant change, and it is possible to get much information that the drawings cannot provide. As a result of this scanning, I also made a nodal drawing of this quarry. The different texture from different mining techniques; the different sizes of stones from different mining techniques; the different orientations of the site and the different slopes from different mining techniques, etc. The scanning results allow an irregular site to be mapped and calculated. This makes it possible to control an irregular site or an irregular skin.
Fig.23 - Site Information
30
31
Excavator Section 1:100 0
1
5 m
Stone Detail Section 1:10
Fig.24 - Section of different mining methods
32
Excavator Section 1:100 0
1
5 m
Stone Detail Section 1:10
Blasting Section 1:100 0
1
Oringinal Section 1:100 5 m
Stone Detail Section 1:10
0
1
5 m
Stone Detail Section 1:10
33
Fig.25 - Stone transportation
34
At the same time, I have noticed that the stone, the main character in the quarry, seems to be forgotten more often than not. We seem to care more about the space in the quarry, the extraction of the stones. But there is a lack of attention to the stones themselves. However, in the process of scanning the site, I also found that the stone actually represents the site better. It expresses the evolution of the site over hundreds of millions of years of natural development and has its own unique charm. And also, they take on a specific scale and shape because of the technology used to extract them. However, with the next series of industrial processing, the characteristics of these stones were erased. What attitude should we take towards these stones? It seems to be a topic worth discussing. Based on this intuition, I chose some stones from the site and brought them back to Hong Kong. I think this is also the most meaningful step in my thesis. When the stones in the quarry leave the quarry, what can they be used for?
35
Fig.26 - Stone in the quarry
36
This is the story of the quarry site, where everything seems to have been created by an impulse for nature. And every step that follows is due to the love of the site, or intuition. But it is still unknown where these intuitions will lead. The question that remains is, what can the stone bring? How can we control such an irregular object?
37
Fig.27 - Stone scanning result
38
39
Fig.28 - Stone scanning
40
- METHODS AND STRUCTURE -
Based on previous experience with site scanning, scanning is an effective operation to control such an irregular object. Therefore, I scanned, recorded and numbered each of the 42 stones I brought back from the site. However, it was not easy to find a controlled reference system when dealing with such a natural object form. How to find this entry point became the first problem to be solved.
41
Fig.29 - Stone cutting
42
43
Perhaps we can start by cutting a stone to get to know it better. Moreover, when using the waterjet, how to position the stone and determine the position of the cut, which seems to have been trying to control a stone. With the help of the scanned file, the stone can be well supported by a 3D-printed base and placed at a suitable angle. When the stone can be fixed at a specific orientation, an irregular stone can begin to be controlled. The 3D-printed base at the bottom is the object used to control the stone. Is there any other way to control the stone? Or what can be said of controlling a stone? Perhaps the first definition is that if a stone can be placed at a fixed orientation or if a specific direction can be found on an irregular stone, it can be considered to be in control of an irregular stone. In the face of the industrialization of stones, this attempt, I think is an attempt to find some control points on the irregular surface according to the characteristics of the stone.
Fig.30 - Stone cutting
44