Evaluation of Factors Affecting Labor Productivity

Page 1

IJSTE - International Journal of Science Technology & Engineering | Volume 3 | Issue 07 | January 2017 ISSN (online): 2349-784X

Evaluation of Factors Affecting Labor Productivity by AHP Method Himanshu Agarwal PG Student Department of Civil Engineering ITM University, Gwalior, India

Sohit Agrawal Assistant Professor Department of Civil Engineering ITM University, Gwalior, India

Vaishant Gupta Assistant Professor Department of Civil Engineering ITM University, Gwalior, India

Dr. Mukesh Pandey Head of Dept. Department of Civil Engineering ITM University, Gwalior, India

Abstract This research paper represents the evaluation and identifying the factors affecting labor productivity of building construction projects and highway projects in Gwalior region. To do so, as per sample size many stakeholders are working in construction fields. They have analyzed all factors by Analytic hierarchy process (AHP). I have prepared a questionnaire survey format by AHP method and send this questionnaire form these stakeholders. 14 factors are evaluated through a complete literature review. These 19 factors are take in main three groups; Management, Human and external. After evaluate and identifying all factors, the top ten factors are carried out, those top ten factors are behaved negative role in construction industry in Gwalior region. These top five factors are given; Labor fatigue, Labor skill, Method of construction, communication between site management and labor, Late arrival and early quit & frequent unscheduled breaks. Keywords: AHP, Stakeholder, Questionnaire ________________________________________________________________________________________________________ I.

INTRODUCTION

Productivity is the major factor that affects the sequence of work, criteria and overall performance of any other organization, industries, factories etc. The ratio of outputs to inputs is called productivity. Construction field works and industrial works are maximum labor based with hand tools and equipments. The labor productivity is decreases the cost approximate 30% to 40% of overall total project cost. In the terms of economics “productivity is the ratio of output from production, per unit of input”. In construction industry, it is a small productivity sector because of a minimum number of technical tools is used and the maximum number of workers is unskilled. So that, in this sector to necessary a maximum number of tools to handle the maximum work for make a work is easy or simple and the skilled labor are used and provide a training for unskilled labor. II. OBJECTIVE  

To evaluate the most important factor those, behave negatively for labor productivity in the construction project. To find out the factors ranking by AHP criteria. No. 1. 1A 1B 1C 1D 2. 2A 2B 2C 2D 2E 2F 2G 2H 2I

Criteria

Human

Management

Table – 1 Frame Work of Factors Sub criteria Labor fatigue Labor skills Availability of experienced labor Labor motivation Labor supervision Method of construction Delay in payment Lack of construction managers leadership Late arrival, early quit and frequent unscheduled breaks Sequence of work Communication between Site Management and Labor Storage location Labor Interference and congestion