EXTREME II Site and aerial shot
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II
Part 4
Transportation and movement
Legend M Underground Trains ( u-bahn ) Main Road
Inner Road
DonauKanal
Highway
DonauDanube
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Transportation and movement
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Transportation and movement
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Geometry
Drawing Lines
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II
Part 4
Preliminary The shapes found in the geometry will act as the floor. The drawing lines of the geometry will be used as the foundation of the structure.
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II
Part 4
Distribution
Shapes found in the Geometry
To create the change of state. To express a fluidity of form.
Rigid
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Massing
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Massing
Program Floor Area ( approx m2)
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Experimentation / Idea development Facade Treatment.
Part 4
Template. To experiment with the idea of the parabola. To collect and to direct sound
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Experimentation / Idea development Facade Treatment.
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Experimentation / Idea development Facade Treatment.
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Experimentation / Idea development
Site treatment. External. Outdoor plaza
Part 4
IKMAL IKRAM ARIFFIN S3077092
SIAL
EXTREME II Experimentation / Idea development
Site treatment. External. Outdoor plaza
Part 4
Site treatment. Levels for dierent heights To experiment with the entrance to the tower.
IKMAL IKRAM ARIFFIN S3077092
SIAL