SUMMARY 1. Brief Introduction about GMW 2. Case Study :: Generation loss due to Trash & Maximised Return on Investment through customised solutions 3. Installations of TRCM’s & Hydro-Mechanical Equipments
BRIEF INTRODUCTION
EXPERIENCE
MANUFACTURING FACILITY
COVERED FABRICAION AREA
COMMONLY ENCOUNTERED TYPE OF TRASH
GRASS
LOGS
CASE STUDY
SITE VIEW OF CHIPLIMA HEP, ORISSA BEFORE INSTALLATION OF GMW HYDRAULIC TRCM 75 T Gantry Obstructing Movement of TRCM on Intake
Weeds Chocked Intake
RAIL TRACK FOR EXISTING GANTRY
RAIL TRACK FOR EXISTING GANTRY
RAIL TRACK FOR TRCM
75 T EXISTING GANTRY CRANE
SIDE VIEW OF TRCM RAIL TRACK FOR EXISTING GANTRY
TELESCOPIC BOOM WITH 20 M DEPTH
GRAB WITH LIFTING CAPACITY OF 1500 KG
TOP VIEW OF TRCM
FRONT VIEW OF TRCM
UNLOADING POSITION OF TCRM
TRCM WITH HYDRAULIC TELESCOPIC BOOM FOR CHIPLIMA HEP (72 MW) , ORISSA INSTALLED IN MAY 2010
MORE THAN 5 YEAR EXPERIENCE OF SUCCESSFUL WORKING & TROUBLE FREE OPERATION
MACHINE IS STILL WORKING IN GOOD CONDITION TILL DATE AND INCREASES GENERATION OF THE PROJECT
GRAPPLER USED FOR LIFTING OF FLOATING TRASH OPERATED BY JOYSTICK
INSTALLATION OF GMW TRCM IS AN ACHEIVEMENT FOR OHPC LTD
GENERATION BEFORE INSTALLATION OF GMW MAKE TRCM
INCREASE IN GENERATION AFTER INSTALLATION FOR CHIPLIMA HEP, 72 MW
After AfterInstallation InstallationofofTRCM,2011 TRCM,2011
INTAKE OF CHUKKHA HEP, BHUTAN BEFORE INSTALLATION OF TRCM
Trash Racks
Gantry and Rope Drum Hoist on Intake obstructing movement of TRCM
TRASH & TRASH RACKS IN CHUKKHA HEP, BHUTAN Log Boom barrier destroyed during Flood Season
INTAKE VIEW OF CHUKKHA HEP
RAIL ARRANGEMENTS FOR TRCM FOR CHUKKHA HEP
SIDE VIEW OF TRCM FOR CHUKKHA HEP
FRONT VIEW OF TRCM
TRCM INSTALLED IN NOV. 2009, GIVING GOOD PERFORMANCE TILL DATE
MORE THAN 5 YEARS EXPERIENCE OF SUCCESSFUL WORKING AND STILL UNDER OPERATION AT CHUKKHA PROJECT
GRAPPLER LIFTING HEAVY LOGS
Grappler Lifting heavy Logs
MORE THAN 30 NOS. OF TRASH TROLLEY IN A SINGLE DAY IN RAINY SEASON ACHIEVED HIGHER GENERATION GAIN Collection of Trash in Trash Trolley
Disposal of Trash through Trash Trolley
INTAKE OF KURICHHU HEP, BHUTAN
TOP VIEW OF INTAKE
INTAKE GATE RAIL FOR TRCM
TRASH RACK
SIDE VIEW OF TRCM
GRAB WITH 1200 KG LIFTING CAPACITY
12 T GANTRY CRANE FOR LIFTING OF INTAKE SERVICE GATE
TELESCOPIC BOOM
GRAPPLER CRANE FOR LIFTING OF LOGS & FLOATING TRASH
GANTRY CRANE
HYDRAULIC CYLINDER HYDRAULIC BOOM HYDRAULIC GRAppLER
GRAB
PATENT CERTIFICATE OF HYDRAULIC TRCM
INSTALLATION OF GMW MAKE TRASH RACK CLEANING MACHINES AT VARIOUS HYDRO-PROJECTS IN INDIA & OVERSEAS
NATHPA JHAKRI HEP (1500 MW, H.P)
TEESTA CANAL FALL HEP, SILLIGURI.
TRCM UNDER OPERATION
STEEL STRUCTURE SPECIFICALLY CREATED FOR MOVEMENT OF TRCM
TRCM INSTALLED AT NYABARONGO HEP, RAWANDA (AFRICA)
TRCM UNDER OPERATION
BHAVANI KATTLAI BARRAGE-I
TALA HEP (1020 MW), BHUTAN
AD HYDRO PROJECT (192 MW), HIMACHAL PRADESH
TRCM WITH GRAPPLER INSTALLED AT LARJI HEP, 126 MW, HIMACHAL PRADESH ON NOV. 2007
MORE THAN 8 YEARS OF INSTALLATION, MACHINE IS STILL WORKING IN GOOD CONDITION
WORK 24X7 IN RAINY SEASON AND TAKE OUT MORE THAN 45 NOS OF TRASH TROLLEY IN A SINGLE DAY.
HYDRAULIC STEEL STRUCTURES
RADIAL GATES WITH HYDRAULIC FLAP & 50 T HYDRAULIC HOIST AT KEMPHOLE HEP, KARNATAKA
21 NO. OF 15MX9M VERTICAL GATES FOR BARRAGE OF BHAVANI KATLAI -1 HEP, TAMIL NADU
\
\
SURGE SHAFT GATE OF SIZE 6.00M X4.71 & HEAD OF 108M AT MANERI BHALI HE PROJECT , UTTARANCHAL
BONNET GATE
RADIAL GATES OF MALANA 窶的I , HEP 100 MW
HM WORK UNDER INSTALLATION AT SAINJ HEP 100 MW
3 NOS. OF AUTOMATIC FLOAT OPERATED RADIAL GATES INSTALLED AT MUKERIA-II HEP.
9M X9.3M HIGH HEAD RADIAL GATE UNDER CONTROL ASSEMBLY FOR 1200MW TEESTA III HEP
11M X14.76M LBST RADIAL GATE FOR TEESTA III UNDER CONTROL ASSEMBLY
Hydraulic Cylinders to simulate Gate motion.
11.0 M X 15.38 M CHUTE SPILLWAY RADIAL GATE WITH 20M HEAD
11.0 M X 14.76 M LBST-2 RADIAL GATE (DURING INSTALLATION ) AT TEESTA-III HEP, SIKKIM
MANTAINANCE GATE OF TEHRI HYDRO DEVELOPMENT CORPORATION LTD..
GANTRY /EOT CRANES AND ROPE DRUM HOIST
GANTRY CRANE INSTALLED AT CHUKHA HEP, BHUTAN
GANTRY CRANE INSTALLED AT MALANA HEP (100 MW),HP
SHOP TESTING OF GANTRY CRANE FOR TEESTA 窶的II HEP
EOT INSTALLED AT KPCL RAICHUR
80 T CAPACITY ROPE DRUM HOIST WITH VERTICAL LIFT OF 96 M FOR BAGLIHAR HEP, J&K .
130 T ROPE DRUM HOIST IN LBST-2 TEESTA 窶的II HEP