Gmw presentation

Page 1


SUMMARY 1. Brief Introduction about GMW 2. Case Study :: Generation loss due to Trash & Maximised Return on Investment through customised solutions 3. Installations of TRCM’s & Hydro-Mechanical Equipments


BRIEF INTRODUCTION


EXPERIENCE


MANUFACTURING FACILITY


COVERED FABRICAION AREA


COMMONLY ENCOUNTERED TYPE OF TRASH


GRASS


LOGS


CASE STUDY


SITE VIEW OF CHIPLIMA HEP, ORISSA BEFORE INSTALLATION OF GMW HYDRAULIC TRCM 75 T Gantry Obstructing Movement of TRCM on Intake

Weeds Chocked Intake


RAIL TRACK FOR EXISTING GANTRY

RAIL TRACK FOR EXISTING GANTRY

RAIL TRACK FOR TRCM

75 T EXISTING GANTRY CRANE


SIDE VIEW OF TRCM RAIL TRACK FOR EXISTING GANTRY

TELESCOPIC BOOM WITH 20 M DEPTH

GRAB WITH LIFTING CAPACITY OF 1500 KG


TOP VIEW OF TRCM

FRONT VIEW OF TRCM

UNLOADING POSITION OF TCRM


TRCM WITH HYDRAULIC TELESCOPIC BOOM FOR CHIPLIMA HEP (72 MW) , ORISSA INSTALLED IN MAY 2010


MORE THAN 5 YEAR EXPERIENCE OF SUCCESSFUL WORKING & TROUBLE FREE OPERATION


MACHINE IS STILL WORKING IN GOOD CONDITION TILL DATE AND INCREASES GENERATION OF THE PROJECT

GRAPPLER USED FOR LIFTING OF FLOATING TRASH OPERATED BY JOYSTICK


INSTALLATION OF GMW TRCM IS AN ACHEIVEMENT FOR OHPC LTD


GENERATION BEFORE INSTALLATION OF GMW MAKE TRCM

INCREASE IN GENERATION AFTER INSTALLATION FOR CHIPLIMA HEP, 72 MW


After AfterInstallation InstallationofofTRCM,2011 TRCM,2011


INTAKE OF CHUKKHA HEP, BHUTAN BEFORE INSTALLATION OF TRCM

Trash Racks

Gantry and Rope Drum Hoist on Intake obstructing movement of TRCM


TRASH & TRASH RACKS IN CHUKKHA HEP, BHUTAN Log Boom barrier destroyed during Flood Season


INTAKE VIEW OF CHUKKHA HEP


RAIL ARRANGEMENTS FOR TRCM FOR CHUKKHA HEP


SIDE VIEW OF TRCM FOR CHUKKHA HEP


FRONT VIEW OF TRCM


TRCM INSTALLED IN NOV. 2009, GIVING GOOD PERFORMANCE TILL DATE


MORE THAN 5 YEARS EXPERIENCE OF SUCCESSFUL WORKING AND STILL UNDER OPERATION AT CHUKKHA PROJECT


GRAPPLER LIFTING HEAVY LOGS

Grappler Lifting heavy Logs


MORE THAN 30 NOS. OF TRASH TROLLEY IN A SINGLE DAY IN RAINY SEASON ACHIEVED HIGHER GENERATION GAIN Collection of Trash in Trash Trolley

Disposal of Trash through Trash Trolley


INTAKE OF KURICHHU HEP, BHUTAN


TOP VIEW OF INTAKE

INTAKE GATE RAIL FOR TRCM

TRASH RACK


SIDE VIEW OF TRCM

GRAB WITH 1200 KG LIFTING CAPACITY

12 T GANTRY CRANE FOR LIFTING OF INTAKE SERVICE GATE

TELESCOPIC BOOM


GRAPPLER CRANE FOR LIFTING OF LOGS & FLOATING TRASH


GANTRY CRANE

HYDRAULIC CYLINDER HYDRAULIC BOOM HYDRAULIC GRAppLER

GRAB


PATENT CERTIFICATE OF HYDRAULIC TRCM


INSTALLATION OF GMW MAKE TRASH RACK CLEANING MACHINES AT VARIOUS HYDRO-PROJECTS IN INDIA & OVERSEAS


NATHPA JHAKRI HEP (1500 MW, H.P)


TEESTA CANAL FALL HEP, SILLIGURI.


TRCM UNDER OPERATION

STEEL STRUCTURE SPECIFICALLY CREATED FOR MOVEMENT OF TRCM


TRCM INSTALLED AT NYABARONGO HEP, RAWANDA (AFRICA)


TRCM UNDER OPERATION


BHAVANI KATTLAI BARRAGE-I


TALA HEP (1020 MW), BHUTAN


AD HYDRO PROJECT (192 MW), HIMACHAL PRADESH


TRCM WITH GRAPPLER INSTALLED AT LARJI HEP, 126 MW, HIMACHAL PRADESH ON NOV. 2007


MORE THAN 8 YEARS OF INSTALLATION, MACHINE IS STILL WORKING IN GOOD CONDITION


WORK 24X7 IN RAINY SEASON AND TAKE OUT MORE THAN 45 NOS OF TRASH TROLLEY IN A SINGLE DAY.


HYDRAULIC STEEL STRUCTURES


RADIAL GATES WITH HYDRAULIC FLAP & 50 T HYDRAULIC HOIST AT KEMPHOLE HEP, KARNATAKA


21 NO. OF 15MX9M VERTICAL GATES FOR BARRAGE OF BHAVANI KATLAI -1 HEP, TAMIL NADU


\

\


SURGE SHAFT GATE OF SIZE 6.00M X4.71 & HEAD OF 108M AT MANERI BHALI HE PROJECT , UTTARANCHAL


BONNET GATE


RADIAL GATES OF MALANA 窶的I , HEP 100 MW



HM WORK UNDER INSTALLATION AT SAINJ HEP 100 MW


3 NOS. OF AUTOMATIC FLOAT OPERATED RADIAL GATES INSTALLED AT MUKERIA-II HEP.


9M X9.3M HIGH HEAD RADIAL GATE UNDER CONTROL ASSEMBLY FOR 1200MW TEESTA III HEP


11M X14.76M LBST RADIAL GATE FOR TEESTA III UNDER CONTROL ASSEMBLY

Hydraulic Cylinders to simulate Gate motion.


11.0 M X 15.38 M CHUTE SPILLWAY RADIAL GATE WITH 20M HEAD


11.0 M X 14.76 M LBST-2 RADIAL GATE (DURING INSTALLATION ) AT TEESTA-III HEP, SIKKIM


MANTAINANCE GATE OF TEHRI HYDRO DEVELOPMENT CORPORATION LTD..


GANTRY /EOT CRANES AND ROPE DRUM HOIST


GANTRY CRANE INSTALLED AT CHUKHA HEP, BHUTAN


GANTRY CRANE INSTALLED AT MALANA HEP (100 MW),HP


SHOP TESTING OF GANTRY CRANE FOR TEESTA 窶的II HEP


EOT INSTALLED AT KPCL RAICHUR


80 T CAPACITY ROPE DRUM HOIST WITH VERTICAL LIFT OF 96 M FOR BAGLIHAR HEP, J&K .


130 T ROPE DRUM HOIST IN LBST-2 TEESTA 窶的II HEP


THANK YOU

GMW (PVT.) LTD.