Benchmarking of Irrigation Projects in Maharashtra

Page 1

Benchmarking of Irrigation Projects in Maharashtra Dr.Sanjay Belsare Superintending Engineer & Dy.Secretery, Water Resource Department , Government of Maharashtra 05/10/13

1


Requirements for performance improvement • Commitment of policy makers - State Water Policy. • Broader awareness – MMISF Act, 2005 Trainings/ Workshops • Leadership State level Core group. • Involvement of users – Benchmarking of WUA • Data collection and its validation – Water Audit. • Involvement of managers – Action taken reports • Incentives and disincentives – Proposed 05/10/13

2


Drivers for Benchmarking • Increasing water scarcity & competition between various sectors of water use. • Need to improve the productivity of water in the agriculture sector (Rs/m3) • Need to achieve financial sustainability of irrigation schemes & phase out State subsidy. • Need to establish a basis of accountability of the service providers. • Need to promote participatory management of schemes by the users. 05/10/13 3


In Maharashtra the categorisation for BM is done as Categorisation of sub basins on the basis of per hectare availability of water. Exercise conducted for major, medium and minor projects separately.

05/10/13

4


Number of Projects Covered Year

Major Medium Minor Total Indicators

2000-01

6

-

-

6

15

2001-02 2002-03 2003-04

30 49 49

26 142 144

28 61 69

84 254 262

10 11 12

2004-05

49

144

69

262

12

2008-09 2009-10 05/10/13

48 50

145 166

69 1052

262 1288

12 12 5


Indicators The indicators are for a) System Performance b) Financial Indicators c) Agricultural Productivity d) Environmental Aspects e) Social Aspects 05/10/13

6


Indicators Selected Sr. No Indicator

Objective

System Performance 1

1a 2

Annual Irrigation Water Supply per unit Irrigated Area Annual Area Irrigated per unit of Water Supplied Potential Created and Utilised

To improve Efficiency

Water

Use

-doTo improve utilisation potential developed

of

Agricultural Productivity 3

Output per unit Irrigated Area

4

Output per unit Irrigation 05/10/13 water supply

To improve irrigated agricultural production To improve water.

productivity of 7


Contd.. Financial Indicators 5 Cost Recovery To make the system Ratio sustainable. 6 O&M Cost per To minimise the O&M cost. unit Area

self

7 O&M Cost per To minimise cost of supply of unit water water. supplied 05/10/13

8


8

Revenue per unit of To use water efficiently & Water Supplied economically. 9 Assessment To check whether water Recovery Ratio charges for different uses are recovered fully or not. a) Irrigation b) Non irrigation Environmental Aspects 10 Land Damage Index To monitor land damage Social Aspects 11

Equity Performance To ensure equity distribution of water

05/10/13

in

9


Presentation of Results Particulars No.of Projects ICA covered Reporting Format

05/10/13

Year 2002 6

Year 2003 84 12,98,960

Year 2004 254

Year 2008 262

24,71,370 24,76,461

Individual Individual Grouped projects projects by type grouped @ circle by type & level region

Grouped by type & plan group of basin10


How Are the Results Shared •

Annual benchmarking report is published

Report is available on websites (www.mahawrd.org www.mwrdc.org)

Circle wise results are reviewed meetings among water providers.

State, Regional seminars/workshops are conducted.

Reports are circulated to NGOs working in the field of public awareness about water 05/10/13

& in

11


Lessons So Far  

Useful management tool Improvement of Water Use Efficiency

Increase in revenue.

Improvement in overall performance

Step towards self sustainability. 05/10/13

12


Water Use Efficiency 250

Ha/Mcum

200 150 100 50 0 200001

200102

200203

200304

200405

200506

200607

200708

200809

200910

201011

Year

ISP on Canals 05/10/13

ISP on Wells 13


O & M Cost and Recovery

Rs. Crores

900 800

803

700

709

627

600 500

490

400

450 377

300 200

195

378 333

448 376

453 413

494 416

673

745 746

555 466

252

100 0 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

Year O&M Expenditure 05/10/13

Recovery 14


Recent developments Introduction of two new indicators Water Delivery Capacity Index - Ratio

1. of maximum discharge let through the main canal to it’s design capacity 2. PIM Index - Ratio of area handed over to WUA to potential created. Land Damage Index will be dropped. Base year for agriculture prices will be 2005-06. 05/10/13

15


Recent developments…………Cont’d The region wise target values for Annual water use per unit irrigated area shall be based on past experience of major and medium projects. The targets for O&M Cost per unit Area and O&M Cost per unit water supplied will be revised considering rise in pay scales of staff. The indicators O & M Cost per unit Area and O & M Cost per unit Water Supplied shall be analysed for operation cost and maintenance cost separately.

05/10/13

16


New Indicators for WUA 1.Assessment Recovery Ratio. 2.O & M cost per unit area irrigated. 3.Output per unit water use. 4.Gender Participation 5.Potential utilised 05/10/13

delineated

v/s

Potential 17


Next Steps 

Extending it further to Division and section level

Comparison with International schemes

Increasing participation of users in benchmarking process

05/10/13

National

and

18


Thanks

05/10/13

19


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.