CONVERSION OF DEVSARI HEP(252 MW) FROM STORAGE TO RUN OF THE RIVER SCHEME ON TECHNICAL,SOCIOECONOMIC AND ENVIROMENTAL ISSUES

BY: R.N.MISRA,DIRECTOR (CIVIL),SJVN LTD. DEEPAK NAKHASI,GM(CIVIL DESIGNS),SJVN LTD K.L.AUMTA,AGM(CIVIL DESIGNS),SJVN LTD HARSH B MEHTA, Sr. ENGINEER ,SJVN LTD.

DATED : 11/04/2013


Scope of the presentation

Salient features of the present Run of the river scheme

Various Alternative Studies

Comparison of various alternatives

Conclusion


Salient features of the present run of the river scheme Installed capacity

252 MW

State

Uttarakhand

District River Type of scheme Dam site

Chamoli Pinder Run of the river 1.75 km d/s of confluence of River Pinder and Kail Ganga

Dam Height

35 m(above RBL)

Type of dam

Concrete gravity

Confluence of river Pinder and Kail Ganga

View of dam site


Salient features of the present run of the river scheme FRL MDDL Gross Storage

El 1300 m El 1295 m 9.02 MCM

Live Storage HRT Length Design Discharge Powerhouse Location Tail water level Design Energy

3.21 MCM 17.9 km 120.76 cumec Near Simli gad El 1046.5 m 936.9 MU

Layout Plan of the project


Various Alternatives Studies Alternative 1: 90 m high dam at 1.75 Km D/S of confluence of River Pinder and Kail Ganga having FRL= El 1370 m with TWL= El 1120 m and HRT Length =12.445 km. Alternative 2: 60 m high dam at 1.75 Km D/S of confluence of River Pinder and Kail Ganga having FRL= El 1325 m with TWL= El 1120 m and HRT length=12.445 km. Alternative 3: 35 m high dam at 1.75 Km D/S of confluence of River Pinder and Kail Ganga having FRL = El 1300 m with TWL = El 1120 m and HRT length =12.445 km. Alternative 4: 35 m high dam at 1.75 Km D/S of confluence of River Pinder and Kail Ganga having FRL =El 1300 m with TWL =El 1046.5 m and HRT length=17.9 km.


Various Alternatives Studies Alternative1: 90m high dam and HRT 12.44 km long with TWL El 1120 m Installed Capacity 250 MW Dam Location

1.75 Km d/s of confluence Of River Pinder and Kail Ganga

Dam height

90m

FRL

El 1370m

Submergence

522 Ha

Gross Storage

192 MCM

Live Storage

83.5 MCM

HRT Length

12.445 km

Design Discharge

120.76 Cumec

Powerhouse

Underground

Tail water Level

El 1120 m

Design Energy

890MU


Various Alternatives Studies a) Geological Factor • •

• •

Geological conditions of reservoir area are not suitable for 90 m high dam due to presence of : Multiple shears, active/dormant slides, debris/creep zone and disturbed rock strata on right bank of Pinder River above EL 1300 m and same shall be affected by reservoir fluctuation. Severe slope instability along right bank of Pinder river Presence of two major tectonic planes near confluence of Kail ganga and Pinder river.

Geological map of reservoir area


Various Alternatives Studies b) Socio-economic & Environmental factors •Submergence area: 522 ha. •Approx. more than 20,000 trees under submergence •Affected villages in submergence-13 nos. •Affected population-5000 nos.(approx.) •Submergence of huge cultivable /agricultural land, roads and important religious structures

Populated town under submergence


Various Alternatives Studies

Religious places under submergence

Huge cultivable/agricultural under submergence

Dense forest under submergence


Various Alternatives Studies Alternative 2: 60 m high dam and HRT 12.44 km long with TWL El 1120 m Installed capacity

201 MW

Dam Height

60m

Dam Location

1.75 Km d/s of confluence Of River Pinder and Kail Ganga

FRL

El 1325 m

Submergence

220 ha

Gross Storage

65.32 MCM

Live Storage

28.64 MCM

HRT Length

12.445 Km

Design Discharge

120.76 cumec

Powerhouse

Underground

Tail water Level

El 1120 m

Design Energy

753.36 MU


Various Alternatives Studies a)Geological factors Geological conditions of reservoir area are not suitable for 60 m high dam due to presence of : • Toes of two major slides, one on left bank of Kail Ganga and other on right bank of Pinder get submerged and affected by reservoir fluctuation • Multiple shears, creeping areas along with cultivated lands/old slide debris/talus and active & dormant slides and disturbed rock strata above EL 1300 m. • Tectonic planes near confluence of Kail Ganga and Pinder river.

b)Socioeconomic & Environmental factors •Submergence area: 220 ha. •Approx. 10,000 trees will be submerged /destroyed. •Affected villages to be displaced-3 nos. •Affected population-2000 nos.(approx.) •Submergence of roads and important religious structures The road leading from Dewal to Melkhet and beyond upto the border connecting number of villages shall get submerged at many reaches on route. Prachin nanda devi temple at Purna and Shiv mandir near Devsari bridge.


Various Alternatives Studies Alternative 3: 35 m high dam and HRT 12.44 km long with TWL El 1120 m Installed Capacity

176 MW

Dam height

35m(above RBL)

Dam Location

1.75 Km d/s of confluence River Pinder and Kail Ganga

FRL

El 1300m

Submergence

82 Ha

Gross storage

9.02 MCM

Live storage

3.21 MCM

HRT Length

12.44KM

Design Discharge

120.76Cumec

Powerhouse

Underground

Tail water Level

El 1120m

Design Energy

646MU


Various Alternatives Studies a)Geological factors •

No multiple shears, active/dormant slides and disturbed rock strata problem.

All creeping areas and cultivated land remain above FRL El 1300 m and none of them affected by reservoir fluctuation.

b)Socio-economic & Environmental factors •

Submergence area -82 ha.

Affected villages due to submergence of only part of 1 village and affected population is only 26 families.

Does not involve submergence of any historical/religious places and public structures or any existing road.

About less than 2000 trees affected in submergence area.


Various Alternatives Studies Alternative 4: 35 m high dam and HRT 17.9 km long with TWL El 1046.5 m Installed Capacity 252 MW Dam height

35m

Dam Location

1.75 Km d/s of confluence Of River Pinder and Kail Ganga

FRL

El 1300m

Submergence

82 Ha

Gross storage

9.02 MCM

Live storage

3.21 MCM

HRT Length

17.9 km

Design Discharge 120.76 Cumec Powerhouse

Underground

Tail water Level

El 1046.5 m

Design Energy

936 MU


Various Alternatives Studies a)Geological factors •

No multiple shears, active/dormant slides and disturbed rock strata problem in reservoir area.

All creeping areas and cultivated land remain above FRL El 1300 m and none of them affected by reservoir fluctuation.

Chances of RIS remains less with minimum depth of water column.

b)Socio-economic & Environmental factors •

Submergence area:

Affected villages due to submergence of only part of 1 village and affected population is only 26.

Does not involve submergence of any historical/religious places and public structures or any important roads.

About less than 2000 trees affected in submergence area.

This alternatives involves least socio- economic and environmental problem and maximum power benefit.

82 ha.


Details

Alternative 1

Alternative 2

Alternative 3

Alternative 4

Location

1.75 km d/s of

1.75 km d/s of

1.75 km d/s of

1.75 km d/s of

confluence

confluence

confluence

confluence

Dam Height

90m

60m

35m

35 m

FRL

El 1370m

El 1325m

El 1300m

El 1300 m

MDDL

El 1355m

El 1310m

El 1295m

El 1295m

Gross

192MCM

65.32 MCM

9.02 MCM

9.02 MCM

Live Storage

83.5 MCM

28.64 MCM

3.21 MCM

3.21 MCM

HRT Length

12.445km

12.445 km

12.445 km

17.9 km

Design

120.76Cumec

120.76 Cumec

120.76 Cumec

120.76 cumec

D/s of Pranmati

D/s of Pranmati

D/s of Pranmati

Near Simli Gad

Nallah

Nallah

Nallah

I.C.

250 MW

201 MW

176 MW

252MW

TWL

El 1120m

El 1120m

El 1120m

El 1046.5 m

Energy

890 MU

753.60 MU

646 MU

936.9 MU

Storage

Discharge PH Location

16

Comparison of various alternatives


Comparison of various alternatives Details Submergence area Population

Alternative 1

Alternative 2

Alternative 3

Alternative 4

522 ha

220 ha

82 ha

82 ha

5000

2000

100

100

20,000

10,000

Less than 2000

Less than 2000

trees

trees

affected due to

Numbers of trees involve

17

submergence


Conclusion

Keeping in view various technical, Socio economic and Environmental considerations and views of GSI Alternative “4� with 35 m high concrete dam having 17.9 km long HRT is considered for adoption and implementation.


19

THANK YOU