24x7 Water Supply & Distribution Jain Irrigation’s Experience

Page 1

24x7 Water Supply & Distribution Jain Irrigation’s Experience Venue: India Water Week Date: 9th April 2013

Total Solution Provider For All Your Piping Needs Concept To Commissioning


Present Water Supply Systems in India is Un-sustainable  Intermittent, operation of valves zone-wise  Irregular, no assured water supply  Leakages  Possibility of contamination during No Supply time  Low supply pressure, requires individual pumping  Free of Cost or per Yearly Fixed Cost  Tendency of public to waste more water  Maintenance results in stoppage of water supply for entire ward


Only Solution to Current Scenario !! 24 x 7 Water Supply & Distribution System


What is 24 x 7 ? ďƒ˜ Continuous Water Supply with Constant Positive Pressure so that user may draw the water 24 hours a day & 7 days a week


Why 24x7 is Sustainable & Successful ?  No Leakages in the network  No Contamination of water  Assured Water supply to all levels of society  Negligible Wastage of water by public  Unauthorized connections can be restricted  Consumption is reduced - effective use of water  Pay As You Go charging basis  Regular Revenue Generation  ULTIMATELY - Customer is HAPPY


Experience of Jain Irrigation in 24x7 • Supplied, Installed, Commissioned 24x7 Water Supply & Distribution Systems in the state of Karnataka (Year 2008) 

Four major cities in Karnataka: Hubli, Dharwad, Belgaum & Gulbarga

 24 x 7 System is working satisfactorily since 4 years

World Bank Assisted Karnataka Urban Water Sector Improvement Project (KUWASIP) www.wsp.org/sites/wsp.org/files/publications/WSP_Karnataka-watersupply.pdf


House Service Connection 24 x 7 Water Supply Karnataka : Gulbarga City


23,655 House Service Connections provided


Typical House Service Connection (24 x 7 Water Supply Scheme)


House Service Connections Provided in 4 Major Cities (Karnataka) City

No of Population Existing No of New Demo ( 2001 Connections Properties Connections Zones Censes) Replaced

Belgaum

2

74,361

7,518

4,918

2,163

Gulbarga

1

62,982

3,810

1,996

2,014

Hubli

1

82,337

12,327

9,458

1,767

Dharwad

1

Total

5

2,19,680

23,655

16,372

5,944


Water Tariff for Volumetric based Billing

Water consumption up to 8,000 liters = Rs 48 per month Water consumption up to 15,000 liters = Rs 120 per month Water consumption up to 25,000 liters = Rs 250 per month Water consumption beyond 25,000 liters = Rs 300 per month

for Gulbarga City (Karnataka)


Results of 24x7 Water Supply

Water consumption is reduced by 40% to 50% (with assured water supply, LPCD demand is reduced in 8 months) Operation and Maintenance Cost is reduced by 30% to 40%  Revenue of Corporation increased by 4 to 6 times Loss of Water reduces from 50% to 11% Belgaum: 11%, Gulbarga: 3%

Safe, Corrosion & Contamination free Continuous Water Supply is assured to Customer


Total Length of PE pipes Installed PE pipe outer diameter (mm)

Hubli (m) Dharwad (m)

BelgaumSouth (m)

BelgaumNorth (m)

Gulbarga (m)

Total (m)

20

30,744

-

23,485

23,355

13,485

91,069

32

292

-

742

584

574

2,192

63

40,673

20,846

19,648

29,382

22,159

132,708

110

18,206

7,246

13,204

10,760

14,356

63, 772

160

5,875

3,528

4,046

4,662

4,506

22,656

200

1,315

627

761

423

2,324

5,449

315

1,677

1,217

880

987

1,549

6,310

400

-

-

-

-

1,438

1,438


Why only PE pipes ?  PE (Poly Ethylene)  Pipe available in coil form hence number of joints are reduced  Joints are Monolithic (no external filler material is added at joints) Leak & Contamination-free supply  Life of pipe is 100 years  Corrosion free water is available  Easy for taking branch connection (for taking new connections)  House Service Connection is also an integral part of PE system  Acidic or Alkaline soil-state environment do not affect PE pipe (pH ranging from 1 to 14)


24x7 Water Supply & DistributionKarnataka Project Execution Photographs


No Heavy Lifting Equipments Needed For Secondary Site Transportation

PE pipes

Gulbarga City (Karnataka)


PE pipe Light in Weight Facilitate Easy Transportation


PE pipe Light in Weight Facilitate Easy Transportation


Faster Installation using PE pipes in Coil

PE pipe in Coil up to 1 km length


Easy & Fast Installation in Crowded Area

PE pipe

PE Pipe jointing outside trench saves Trench cost Gulbarga City (Karnataka)


Inherent Flexibility of PE pipes Simplifies Installation Without Disturbing Existing Utilities

PE pipe


Typical PE Piping Network


Typical Network of PE Pipes


24 x 7 House Service Connections (Karnataka)


In Any Piping Network, Joint is the Weakest Link but PE Pipe is Exception to This Law


Un-account For Water (UFW) in Existing Water Supply Network up to 50%


Failure of CementConcrete Road because of Under-Road Leaking Pipeline Mumbai (Kala Chowki) 23rd February 2010


Strength & Flexibility of 1600mm diameter Butt Fusion Jointed PE Pipeline (Total Weight of Pipeline = 1308 Tonne)

PE Pipe Joints Ready To Accommodate Similar Earthquake Movements

Place: Minjur, Chennai


Toughness & Resistance to Weathering Forces Place: Nemmeli, Chennai

PE Pipe Joints Ready To Accommodate Similar Earthquake Movements


1700 tonne / 1 km PE Pipeline Floating in Open Sea

Place: Minjur, Chennai


Hydro Testing of PE Pipeline


Hydro Testing of PE Pipeline


Hydro Testing of PE Pipeline


PE Pipes Service Life of 100 years


PE Pipe Service Life of 100 years Certificate from: Testing and Research Institutes in Austria