4. Csaba Katalin

Page 1

spazio giovani alla frontiera


table of contents 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.

Cover Table of contents Conception Arrangement of buildings, relationship between different areas Casa Rossa and the Slovenian area - commercial axis, Connection between the University and SGF - the youth axis Connection between SGF and Slovenian sport areas - recreation axis, Connection between Psychiatry and SGF main building - research axis Arrangement of SGF area, conception Functions of buildings, functions of the park in SGF Conception drawings and views of SGF main building Conception drawings of SGF buildings Sustainability 1. table 2. table 3. table Economic efficiency, cost estimation, Summary



SUBC L A I ERC COMM A ROSS A S A C Y ITAL

ENTE

R

A ROSS A S CA VENIA SLO

UCTS

OD N PR ULIA

FRI CE,

PLA RKET

ER

IV

UN

A E, M TRAD

G

TY

SI

UN

YO

PE

CU

,

LE

OP

LT

BI KE

UR

AL

RO AD ,

SG F

ID

BR GE , EN

SI

, T SU URI BC ST EN IC TE AL R ,

LE OP PE AS S2 , IC ES

SI

SP

I

OR

T,

RE

CR

EA

TI

SP

ON

,

VE

OR

RT

OI

BI

T

ZZ

A

RE S

EA R

CH ,

HE

AL TH

SE RV

I

EN CE

CE

PS FO YC RM HI ER AT RY

I

MAP

1:2000


CASA ROSSA

URBANIZATION

APARTMENTS

MARKET, PROGRAMS, FESTIVAL ON THE BORDER

MIXED FUNCTION, OFFICIES, SERVICES, APARTMENTS

APARTMENTS, HOTEL, PANSION

PEDESTRIAN AND BIKE ROAD TO SGF


NEW SURFACE ON THE LINE OF OLD WATERCOURSE

PEDESTRIAN AND BIKE ROAD

WATER FALL REMAINING VINEYARDS NEW BRIDGES

PEDESTRIAN BRIDGE ABOVE ROAD GATE OF CASA ROSSA

BANKING REMAINING AGRICULTURAL YARDS, AND SPORT COURTS PEDESTRIAN AND BIKE NET

FESTIVAL AND RECREATION AREA RECREATION AREA

SPORT CENTER HEALTH SERVICES IN THE FIRST PART OF NEW BUILDING

SPORT COURTS

ASS2 OFFICES SPORT DEVELOPMENT SCIENCE PARK



research

church

youth center

hospital museum

8.

house of music

hotel **** pose theatre

2.

kindergarten

5.

pavilion, basic courses 6.

3.

4a .

7.

sport center

.

4b

turist hostel restaurant

health services

ASS2 offices


1. POSITIONS OF FUNCTIONS - PROPORTIONS

E

EN

TI

RE

LE

NG

HT

OF

NEAR TO A.S.S. BUILDINGS AND THE UNDERGROUND PARKING AREA

CENTRAL LOCATION, USED BOTH BY VISITORS AND A.S.S.-WORKERS

CENTRAL LOCATION, INDIRECT CONNECTION WITH AREAS OF YOUTH CENTER

CENTRAL LOCATION, CLOSE CONNECTION WITH THE PARK

CONNECTION WITH THE SLOVENIAN TERRITORY - EUROCAMPUS

2. LOCALIZATION OF DIFFERENT FUNCTIONS BU

IL

HOSPTAL, HEALTH CENTER

RESARCH

DI

NG

YOUTH HOSTEL

THEATER

YOUTH CENTER

HOUSE YOUTH OF MUSIC CENTER

RESEARCH

YOUTH YOUTH CENTER RESEARCH CENTER

RESEARCH

RESTAURANT UNDERGROUND CARPARK

3. PASSAGES

UNDERGROUND NETWORK USING FOR SERVICES

PARKING SYSTEM 340 PARKING PLACES

EX-BORDER

TH

PARKING LEVEL FINISHED BEFORE WATERCOURSE

H

FORMER MORTUARY - HOSPITAL MUSEUM

UG

BRANCH

RO

RESEARCH AREA 30%

WATER SURFACE ABOVE UNDERGROUND LEVEL

TH

YOUTH CENTER 30%

DRIVE-WAY

"

POSE THEATER, HOUSE OF MUSIC 10%

HOSTEL

TH

YOUTH HOSTEL 10% RESTAURANT 5%

PATH TO THE CHURCH

"P A

HOSPITAL, HEALTH SERVICES 15%


Infections building (building n. 5) -> KINDERGARTEN

public spaces exhibition rooms offices

Functional section

services

Morgue (building n. 8) -> HOSPITAL MUSEUM RESEARCH

RESEARCH

YOUTH CENTRE BASIC COURSES

RESEARCH

HOUSE OF MUSIC

YOUTH CENTRE BASIC COURSES

offices

POSE THEATRE

public spaces

POSE THEATRE OFFICES

services

YOUTH, TURIST HOSTEL

Services Block (building n. 7) -> SPORT CENTER INFO SLOVENIA

YOUTH CENTRE BASIC COURSES

YOUTH CENTRE BASIC COURSES

RESEARCH

RESEARCH

YOUTH CENTRE

RESEARCH

YOUTH CENTRE BASIC COURSES

YOUTH CENTRE BASIC COURSES

YOUTH CENTRE

POSE THEATRE

RESTAURANT

WELFARE YOUTH CARE ISSUES

RESEARCH

badminton HOUSE OF MUSIC

1st level

HOUSE OF MUSIC

YOUTH CENTRE BASIC COURSES

POSE THEATRE

POSE THEATRE OFFICES

YOUTH, TURIST HOSTEL

changing rooms

YOUTH, TURIST HOSTEL

services

RESEARCH

services volleyball

WELFARE YOUTH CARE ISSUES

squash public spaces

WELFARE YOUTH CARE ISSUES INFIRMARY HALTH SERVICES

basketball INFO, EXHIBITION

rooms

WELFARE YOUTH CARE ISSUES INFIRMARY HALTH SERVICES

services

rooms

New SGF main building (building no.1)

Groundfloor

Former Sanatorium building (building no.2) -> HOTEL

2nd level


IO

N

BU

LD

LE

TE

SG

F

IN

AR

G

EA

BUILDING LEVELS

LS PA

NE

LS NE LA

R

PA R

SO

LA

RESERVE STORMWATER

REDUCED LIGHTING POWER DENSITY USE OF TASK LIGHTING

EN

NATURAL VENTILLATION THROUGH OPENING WINDOWS REDUCED THERMAL LOSSES, SOLAR CONTROL GLAZING BIKE RACKS SMART CONTROLS CONNECTION OF CHILLED BEAMS

SS

MP

EXTERNAL SHADING TO SUD-EAST

CO

ER

GY

SU

PP

LY

UNDERGROUND PARKING

US

IN

G

ENERGY SUPPLY USING UNDERGROUND NETWORK

UN

DE

RG

RO

UN

D

NE

TW

OR

K

HEAT PUMP

S

R

CT

MI

FO

FE

EM

LY

EF

PP

ND

SU

LA

GY

IS

ER

AT

EN

HE

RS

CE

VE

DU

RE

CO

ZE

RO

SO

R LA SO

OF

LS

RO

NE

N

PA

EE

R

PA

ROOF

GR

SO LA

NE

LS

SUSTAINABLE BUILDING

E STORAGE AND COLLECTION OF RECYCLABLES PROVISION FOR CHARGING POINTS FOR PLUG IN VEHICLES

GROUND COOLING

SUBSURFACE GROUNDWATER


Step 1.

Investment of development of SGF area

Urban Development

SGF Area building

Possibility of development of Casa Rossa in Italy – 25.000 sqm Possibility of development of Casa Rossa in Slovenia – 18.000 sqm Arrangement/regulation plan of the area must be prepared. Public areas and sites to be sold must be indicated. Public utilities shall be reconstructed. Building sites must be sold out. The development is based upon private capital. The incoming profit shall cover both the self-part for developing SGF, and also cover the base-capital for city investments related to SGF. Step 2. Detailed development conception for SGF area shall be prepared. For instance a proposal:

new SGF building indoors covered outdoors underground parking and ug. network sun power plant on roof renovated houses Hotel Sport Center ASS offices Kinder garten Hospital Museum Church Club houses

Summary

m2 Euro/m2

14 800 5 500 8 100 7 200

1400 € 20 720 000 400 € 2 200 000 800 € 6 480 000 300 € 2 160 000

9 400 3 800 6 200 840 1 060 800 1 020

1500 € 14 100 000 800 € 3 040 000 300 € 1 860 000 800 € 672 000 500 € 530 000 500 € 400 000 500 € 510 000

Public utility Park ASS2 ASS2

MUNICIPARITY

€ 1 000 000 145 000

40

receipts of realization of Casa Rossa support for proposals EU or Gov. 40% investment

operate payable functions

develop

let or sell buildings

Hotel Sport Center Youth Hostel Restaurant To rent officies for design, research To rent places for programs Parking

€ 5 800 000 € 59 472 000 € 22 000 000

Euro/year 9 400 3 800 1 800 900 5 400

€ 300 000 € 100 000 € 150 000 € 220 000 € 320 000 € 30 000 € 280 000 € 1 400 000

5 400 1 000 1 000 6 200 840 1 060 800 1 020 145 000

€ 150 000 € 150 000 € 100 000 € 400 000 € 40 000 € 50 000 € 20 000 € 20 000

functions making costs

operate kultural functions

operate free health services

Youth center Theatre House of music Staff officies Kinder garten Hospital Museum Church Club houses Park

average profit rate of return

Conception of the plan is to express the definite connection between Slovenian and Italian areas with the means of architecture. Two subcentres are formed within the city: the Commercial Centre is the surrounding area of Casa Rossa; the Centre of Culture, Touristic and Research is the former hospital area. Development of Casa Rossa square and of the related Slovenian parts can be realized basically on business grounds. Traditional commercial functions can be placed here, such as periodical and permanent markets, shops, service units. This Commercial Area at the border is to be specialized on mainly the local producers’ goods. Above these ground-floor functions apartments can be developed. The longitudinal shaped market square is suitable for occasional programs, fairs. The former hospital area can be developed both on business ground and on non-profit ground by municipality. Business capital, enterpreneurs should be involved to develop hotel and youth hotel functions, restaurants, some of health services, research units and indoor recreation facilities. Business development shall make profit to finance cultural functions and on the other hand cultural, environmental and touristic functions, programs shall provide a suitable environment to attract capital. We connected the SGF and the University area by pedestrian and cycle path. We put the health service functions on the territory of former Psychiatric Hospital. We lined a sports and recreation axis to Slovenian sport fields beside the stream.

€ 23 788 800 € 13 683 200

functions providing profit Non-profit LTD. develop, operate

Euro

€ 50 000 € 980 000

33

€ 420 000 year

The SGF Area The present main building could be sustainable only after drastic reconstruction. The building itself represents the municipal hospital in Gorizia and around. Its meaning and spaces are not suitable for the new functions and can not be transformed. Therefore the main building shall be demolished. We keep the other buildings located in the park since they can be utilized because of their small sizes, technical conditions, architectural values. We place a new landmark-type building on the area which gives a new characteristics and orientation to the whole park. The building rearranges the park itself together with the planned functions. The building accomodates all functions related to youth. It is organized along a street parallel to the longitudinal axis. Its interior spaces can be changed flexible, it can be adapted to the constantly changing demands, but still remaining compact and preserving its landmark. The park is a living, pulsating program area. The colourful, diversified park full of life is disciplined and regularized by the architectural characteristics.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.