STAGE 4 SUBMISSION FINAL CONCEPT November 2011
03
Design Direction
11
The Precinct
28
The Stadium
103 The Arena 133 The Indoor Training 155 Schedules
DESIGN DIRECTION
Design Direction - Vision
Stage 4 Submission - Final Concept - November 2011
page
DAGESTAN is a place of extreme natural beauty with a wealth of traditional craftsmanship and a glorious ancient heritage. The FC Anji football precinct and, in particular, the Stadium, becomes a landmark heralding the return of the republic to the global stage. The Stadium serves as a monument, a beacon in the landscape.
The treatment of the site provides ordered open public spaces and is a counterpoint to the existing dense and degraded urban landscape. Like the Spanish steps in Rome, the approach and plaza enables habitation and public interaction. The FC Anji football precinct generates social and economic upliftment for the region and attracts visi-
tors from far afield to experience the richness of the place. Most importantly it facilitates a common cultural identity around which citizens from diverse groups can feel a renewed sense of local pride.
4
Design Direction - The Preinct
Stage 4 Submission - Final Concept - November 2011
page
Derbent as a cultural and design reference The treatment of the sports precinct landscape is strongly influenced by the ancient city of Derbent in the south west of Dagestan. Known as the oldest inhabited city in the world - established over 5,000 years ago, Derbent is a UNESCO World Heritage site. “The city has an important strategic location as it forms a natural pass (the Caspian Gates) between the Caucasian foothills and the sea. For many centuries, it was thus in the position to control the traffic between Europe and the Middle East. As a result of this geographical particularity, the city developed between two parallel defense walls, stretching from the sea to the mountains.�
Our design references the gravitas of the stone structures and the way the Derbent Fort sits on its steep site and manages level changes to create a compact and secure inner zone. As a modern tourist destination these terraces and changes in grade create a sense of adventure and a variety of commercial opportunities.
level changes ensures the delivery of parking, seating and the complex hierarchy of arrival and access to facilities.
Site treatment of the precinct The FC Anji Football precinct becomes an element in its landscape. The entire site is landscaped to create areas that are elevated, on grade or excavated. This variety in grade facilitates varied experiences and resolves many of the operational requirements of the amenities in the precinct. Maximum use of
adventure - an experiential journey. A system of platforms, ramps and stairs guides the visitor through the hardscape allowing for interaction and pauses along the way.
The Approach and Stadium & Arena public space Just as a walk from sea to mountains involves meandering and exploration the approach from the canal in the East towards the Stadium and Arena is an
Level changes, terracing, indirect pedestrian routes and layered facades facilitate diverse experiences
5
Design Direction - The Preinct
Stage 4 Submission - Final Concept - November 2011
page
and commercial opportunities, and heighten the anticipation of arrival. Once they have climbed to the plaza visitors enjoy a structured, open space that allows for circulation to the Stadium and Arena and is also available to them as large public park.
are on grade with the pool of water around the stadium. This very effective natural barrier enforces the security required to keep the public away from the VIP and players secure zone and ensures visitors’ access to the stadium is through the designated Northern and Southern entrances.
The Training Facility and fields Further West is the training facility and an outdoor The training fields to the West of the sports precinct pitch that sinks into the landscape to create three
thousand seats on its embankments. The west stand seats are covered with an accessible green roof that will be used as a steep incline for training routines. With the Stadium as the focal point in the precinct it is necessary for this smaller stadium to be discreetly integrated into the landscape.
6
Design Direction - The Stadium
Stage 4 Submission - Final Concept - November 2011
page
The Stadium design As spectators make the journey up to the plaza they are met with the sight of two simple but awe-inspiring cubic forms in the landscape. Their meander terminates at the plaza where two minimalist gleaming white boxes, one dominating the other in scale and presence rest. At night the two translucent boxes glow from within creating beacons that are visible for miles. The stadium box sits within a pool of water – reflecting the light envelope in its surface and evoking mountain pools. Water cascades from one level to another adding an element of sound and movement to the still white box floating above it. Spectators pass be-
neath the pool to enter the stadium on the Northern and Southern elevations, into the ingress gates, enclosed space reminiscent of a mountain cave. From there they access ramps on all four corners of the stadium, ascending these to the stadium concourse. This creates a unique experience of moving from the Northern and Southern plaza dominated by the water feature and cascades into the glowing interior of
access points to the upper plaza means this space can be used as public space or for special events as the need requires. The play on opposites – dark and light, reflective and matt, heavy and light, hard and soft – increases the elemental tension and power of the Stadium’s presence. It becomes a monument, inspiring national pride and is a symbol of the regeneration of the re-
the envelope. Stairs from the main plaza to an upper plaza allow visitors to be on the same level as the pool of water. An outdoor screen is mounted onto the stadium envelope here allowing spectators to watch the game with the big screen reflected in the pool. Controlled
gion. Stadium circulation VIPs, players and match officials enter at level 0 on the West of the stadium in the secure zone. Level 1 accommodates the media, retail and admin-
7
Design Direction - The Stadium
Stage 4 Submission - Final Concept - November 2011
page
istrative functions of the stadium. Flexibility of design at this level means that areas such as the mixed zone and media box can double as conference space when matches are not being played. Spectators enter the stadium from level 1 on all four corners of the stadium. From here they make their way one level up to the concourse for seats in the stadium bowl or continue higher to a suite or seats in the upper stands. Ramps on the 4 corners of the stadium operate as the vertical circulation for the stadium. As spectators climb these they overlook the water and the public space plazas below through the glazed corners of the stairwell atriums.
On concourse level there are views across the bowl from the concessions and sanitary facilities, allowing spectators using amenities to still feel connected to the atmosphere on the pitch and to the scale of the stadium. Sanitary facilities and concessions are arranged opposite each to ensure these lines of sight and to create a feeling of a high street on the concourse. On the upper concourse sanitary facilities and concessions are together on the inside of the concourse, under the stands above, and stacked above the amenities on the concourse below for plumbing and services. This design allows light from the faรงade into the upper concourse.
Stadium Atmosphere Delivering the drama and atmosphere that will attract people from all over the world to watch a live match is key to the bowl design. A deep lower tribune is carved out of the landscape to create a tight space where intimacy and excitement are heightened. The legacy tribune is achieved by removing the North and South stands on the upper level (30% of seats). The best seats on the East and West sides of the upper stands remain to maintain bowl atmosphere.
8
Design Direction - The Arena
Stage 4 Submission - Final Concept - November 2011
page
The unconventional use of a rectangular box instead of a round envelope is used in both Stadium and Arena. The Stadium and Arena compliment each other and the repetition of their design elements reinforces the power of the overall design concept for the precinct.
of heavy and light, matt and reflective. The gravitas of the solid base that hugs the ground is balanced with the light translucent box floating above it and the reflective polished stone on the plaza is balanced with the matt translucent envelope.
While the overall look and feel of the two buildings is The Arena design affirms that of the Stadium – a the same the Arena responds to its operational resmaller member of the same family. quirements with variations in circulation design. Pitch Similar to the Stadium, the Arena explores the duality level dictates level 0 in the Stadium and Arena and
as the stands are different in the two buildings their entrance levels vary. Most of the vertical circulation for the Arena is managed outside the building in the external hardscape - spectators climb up from plaza level to access the Arena entrance on the East and from here circulate in the spacious translucent atrium that faces the canal, lake and Caspian Sea.
9
Design Direction - The Indoor Training
Stage 4 Submission - Final Concept - November 2011
page 10
The heritage of Greco-Roman freestyle wrestling in Dagestan is referenced in the design of the training facility, paying homage to Dagestan’s dominance in the sport on the world stage. The training facility is to the south west of the sports precinct, past the training fields. Its form sits on its site like a pair of wrestlers, interlocked in a moment
of perfect counter balance. As with the Stadium and Arena, it expresses a dynamic duality, a Yin & Yang relationship, between its elements - light and dark, light and heavy, void and solid. Large double volume spaces above the indoor pitch and swimming pool on the North elevation and the
upstairs terrace form glazed framed voids. Single volume spaces accommodating administrative and medical facilities are low slung solid blocks in the South elevation. As with the adjacent stadia, a limited colour and materials palette adds to the simplicity and dynamism of the form.
THE PRECINCT
The Precinct - Design Direction
Stage 4 Submission - Final Concept - November 2011
page 12
anticipation, adventure, flexibility
The Precinct - Renders
Stage 4 Submission - Final Concept - November 2011
page 13
The Precinct - Renders
Stage 4 Submission - Final Concept - November 2011
page 14
The Precinct - Precinct Plan
Stage 4 Submission - Final Concept - November 2011
page 15
The Precinct - Precinct Plan Sectional 3D
Stage 4 Submission - Final Concept - November 2011
page 16
Stadium
Commercial Space
Training Fields
Training Fields
Parking
The Precinct - Precinct Plan Sectional 3D Detail
Stage 4 Submission - Final Concept - November 2011
page 17
Screen Viewing Plaza
Commercial Space
Stadium
The Precinct - Precinct Plan Sectional 3D Detail
Stage 4 Submission - Final Concept - November 2011
page 18
Stadium
Stadium VIP/Players’ Drop Off
Training Fields
Parking
The Precinct - Precinct Plan Sectional 3D
Stage 4 Submission - Final Concept - November 2011
page 19
Arena Entrance Plaza
Arena VIP/Players Drop-off
Arena
Screen Viewing Plaza
Stadium Entrance Plaza
Stadium
The Precinct - Precinct Plan Sectional 3D Detail
Stage 4 Submission - Final Concept - November 2011
page 20
Arena Entrance Plaza
Arena VIP/Players’ Drop Off
Arena
Stadium
Stadium Entrance Plaza
The Precinct - Precinct Plan Sectional 3D Detail
Stage 4 Submission - Final Concept - November 2011
page 21
Screen Viewing Plaza
Stadium Entrance Plaza
Stadium
Stadium Entrance Plaza
Stage 4 Submission - Final Concept - November 2011
page 22
Stage 4 Submission - Final Concept - November 2011
page 23
Stage 4 Submission - Final Concept - November 2011
page 24
Stage 4 Submission - Final Concept - November 2011
page 25
Stage 4 Submission - Final Concept - November 2011
page 26
Stage 4 Submission - Final Concept - November 2011
page 27
THE STADIUM
The Stadium- Design Direction
Stage 4 Submission - Final Concept - November 2011
page 29
elemental, contrast, powerful
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 30
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 31
The Stadium- Alternative Facade - Render
Stage 4 Submission - Final Concept - November 2011
page 32
The Stadium- Alternative Facade - Render
Stage 4 Submission - Final Concept - November 2011
page 33
The Stadium - Facade Video Screen
Stage 4 Submission - Final Concept - November 2011
FlexDOT ™ page 34
The Stadium- Viewing Distance Diagram
Stage 4 Submission - Final Concept - November 2011
page 35
The Stadium- Stadiums Sectors Diagram
Stage 4 Submission - Final Concept - November 2011
page 36
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 37
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 38
The Stadium- Alternative Facade - Render
Stage 4 Submission - Final Concept - November 2011
page 39
The Stadium- Alternative Facade - Render
Stage 4 Submission - Final Concept - November 2011
page 40
The Stadium- Solar Study
Stage 4 Submission - Final Concept - November 2011
page 41
March
June
September
December
The Stadium- Sightlines Analysis
Stage 4 Submission - Final Concept - November 2011
page 42
The Stadium- Sightlines Analysis
Stage 4 Submission - Final Concept - November 2011
page 43
The Stadium- Seating Bowl 3D View - World Cup 45 000 seats
Stage 4 Submission - Final Concept - November 2011
page 44
The Stadium- Seating Bowl 3D View - Legacy 33 000 seats
Stage 4 Submission - Final Concept - November 2011
page 45
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 46
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 47
The Stadium- Sections
Stage 4 Submission - Final Concept - November 2011
page 48
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Cross Section
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Long Section
The Stadium- Sections - Main Stand
Stage 4 Submission - Final Concept - November 2011
page 49
Level 4 +29m Level 3 +24m Level 2 +19.5m Level 1 +15.5m Level 0 +12m
The Stadium- 3D Sections
Stage 4 Submission - Final Concept - November 2011
page 50
Cross Section
Long Section
The Stadium- 3D Cross Section - Detail
Stage 4 Submission - Final Concept - November 2011
page 51
The Stadium- 3D Long Section - Detail
Stage 4 Submission - Final Concept - November 2011
page 52
The Stadium- Alternative Facade - Sections
Stage 4 Submission - Final Concept - November 2011
page 53
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Cross Section
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Long Section
The Stadium- Alternative Facade - Section - Main Stand
Stage 4 Submission - Final Concept - November 2011
page 54
Level 4 +29m Level 3 +24m Level 2 +19.5m Level 1 +15.5m Level 0 +12m
The Stadium- Alternative Facade - 3D Sections
Stage 4 Submission - Final Concept - November 2011
page 55
Cross Section
Long Section
The Stadium- Alternative Facade - 3D Cross Section Detail
Stage 4 Submission - Final Concept - November 2011
page 56
The Stadium- Alternative Facade - 3D Long Section Detail
Stage 4 Submission - Final Concept - November 2011
page 57
The Stadium- Level 0 Floor Plan +12m
Stage 4 Submission - Final Concept - November 2011
page 58
The Stadium- Level 1 Floor Plan +15.5m
Stage 4 Submission - Final Concept - November 2011
page 59
The Stadium- Level 2 Floor Plan +19.5m
Stage 4 Submission - Final Concept - November 2011
page 60
The Stadium- Level 3 Floor Plan +24m
Stage 4 Submission - Final Concept - November 2011
page 61
The Stadium- Level 4 Floor Plan +29m - World Cup
Stage 4 Submission - Final Concept - November 2011
page 62
The Stadium- Level 4 Floor Plan +29m - Legacy
Stage 4 Submission - Final Concept - November 2011
page 63
The Stadium- Seating Bowl Plan - World Cup
Stage 4 Submission - Final Concept - November 2011
page 64
The Stadium- Seating Bowl Plan - Legacy
Stage 4 Submission - Final Concept - November 2011
page 65
The Stadium- Roof Plan
Stage 4 Submission - Final Concept - November 2011
page 66
The Stadium- Sections - World Cup
Stage 4 Submission - Final Concept - November 2011
page 67
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Cross Section
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Long Section
The Stadium- Sections - Legacy
Stage 4 Submission - Final Concept - November 2011
page 68
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Cross Section
Level 4 Level 3 Level 2 Level 1 Level 0
+29m +24m +19.5m +15.5m +12m
Long Section
The Stadium- 3D Plan - Level 0
Stage 4 Submission - Final Concept - November 2011
page 69
The Stadium- 3D Plan - Level 1
Stage 4 Submission - Final Concept - November 2011
page 70
The Stadium- 3D Plan - Level 2
Stage 4 Submission - Final Concept - November 2011
page 71
The Stadium- 3D Plan - Level 3
Stage 4 Submission - Final Concept - November 2011
page 72
The Stadium- 3D Plan - Level 4
Stage 4 Submission - Final Concept - November 2011
page 73
The Stadium- 3D Plan - Seating Bowl
Stage 4 Submission - Final Concept - November 2011
page 74
The Stadium- 3D Plan -Roof
Stage 4 Submission - Final Concept - November 2011
page 75
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 76
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 77
The Stadium- Circulation Precinct
Stage 4 Submission - Final Concept - November 2011
page 78
The Stadium- Circulation Level 0
+12m
Stage 4 Submission - Final Concept - November 2011
page 79
The Stadium- Circulation Level 1 +15.5m
Stage 4 Submission - Final Concept - November 2011
page 80
The Stadium- Circulation Level 2 +19.5m
Stage 4 Submission - Final Concept - November 2011
page 81
The Stadium- Circulation Level 3 +24m
Stage 4 Submission - Final Concept - November 2011
page 82
The Stadium- Circulation Level 4 +29m World Cuo
Stage 4 Submission - Final Concept - November 2011
page 83
The Stadium- Circulation Level 4 +29m Legacy
Stage 4 Submission - Final Concept - November 2011
page 84
The Stadium- Players’ Area Plan
Stage 4 Submission - Final Concept - November 2011
page 85
The Stadium- Media Area Plan
Stage 4 Submission - Final Concept - November 2011
page 86
The Stadium- Section - Main Stand
Stage 4 Submission - Final Concept - November 2011
page 87
Level 4 +29m Level 3 +24m Level 2 +19.5m Level 1 +15.5m Level 0 +12m
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 88
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 89
The Stadium- Alternative Facade - Render
Stage 4 Submission - Final Concept - November 2011
page 90
The Stadium- Alternative Facade - Render
Stage 4 Submission - Final Concept - November 2011
page 91
The Stadium- VIP Lounge Plan
Stage 4 Submission - Final Concept - November 2011
page 92
The Stadium- VIP Lobby Render
Stage 4 Submission - Final Concept - November 2011
page 93
The Stadium- VIP Lounge Render
Stage 4 Submission - Final Concept - November 2011
page 94
The Stadium- Typical Suite Plan
Stage 4 Submission - Final Concept - November 2011
page 95
The Stadium- Typical Suite Elevation
Stage 4 Submission - Final Concept - November 2011
page 96
The Stadium- Typical Suite Elevation
Stage 4 Submission - Final Concept - November 2011
page 97
The Stadium- Players Change Room
Stage 4 Submission - Final Concept - November 2011
page 98
The Stadium- Press Conference Room
Stage 4 Submission - Final Concept - November 2011
page 99
The Stadium- Mixed Zone
Stage 4 Submission - Final Concept - November 2011
page 100
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 101
The Stadium- Render
Stage 4 Submission - Final Concept - November 2011
page 102
THE ARENA
The Arena - Design Direction
Stage 4 Submission - Final Concept - November 2011
page 104
tension, proportion, high performance
The Arena - Render
Stage 4 Submission - Final Concept - November 2011
page 105
The Arena - Render
Stage 4 Submission - Final Concept - November 2011
page 106
The Arena - Sightlines Analysis
Stage 4 Submission - Final Concept - November 2011
page 107
The Arena - Sightlines Analysis
Stage 4 Submission - Final Concept - November 2011
page 108
The Arena - Sightlines Analysis - Suite
Stage 4 Submission - Final Concept - November 2011
page 109
The Arena - Bowl Configuration Diagrams
Stage 4 Submission - Final Concept - November 2011
page 110
Ice Hockey
Basketball
Gymnastics
Exhibition
The Arena - Sections
Stage 4 Submission - Final Concept - November 2011
page 111
Level 2 +22m Level 1 +17.5m
Level 0 +12m
Cross Section
Level 2 +22m Level 1 +17.5m
Level 0 +12m
Long Section
The Arena- 3D Cross Section
Stage 4 Submission - Final Concept - November 2011
page 112
The Arena- 3D Cross Section - Detail
Stage 4 Submission - Final Concept - November 2011
page 113
The Arena- 3D Long Section
Stage 4 Submission - Final Concept - November 2011
page 114
The Arena- 3D Long Section - Detail
Stage 4 Submission - Final Concept - November 2011
page 115
The Arena - Level 0 Floor Plan +12m
Stage 4 Submission - Final Concept - November 2011
page 116
The Arena - Level 1 Floor Plan +17.5m
Stage 4 Submission - Final Concept - November 2011
page 117
The Arena - Level 2 Floor Plan +22m
Stage 4 Submission - Final Concept - November 2011
page 118
The Arena - Roof Plan
Stage 4 Submission - Final Concept - November 2011
page 119
The Arena - Sections
Stage 4 Submission - Final Concept - November 2011
page 120
Level 2 +22m Level 1 +17.5m
Level 0 +12m
Cross Section
Level 2 +22m Level 1 +17.5m
Level 0 +12m
Long Section
The Arena- 3D Plan - Level 0
Stage 4 Submission - Final Concept - November 2011
page 121
The Arena- 3D Plan - Level 1
Stage 4 Submission - Final Concept - November 2011
page 122
The Arena- 3D Plan - Level 2
Stage 4 Submission - Final Concept - November 2011
page 123
The Arena- 3D Plan - Roof
Stage 4 Submission - Final Concept - November 2011
page 124
The Arena - Render
Stage 4 Submission - Final Concept - November 2011
page 125
The Arena - Render
Stage 4 Submission - Final Concept - November 2011
page 126
The Arena - Circulation Precinct
Stage 4 Submission - Final Concept - November 2011
page 127
The Arena - Circulation Level 0 +12m
Stage 4 Submission - Final Concept - November 2011
page 128
The Arena - Circulation Level 1 +17.5m
Stage 4 Submission - Final Concept - November 2011
page 129
The Arena - Circulation Level 2 +22m
Stage 4 Submission - Final Concept - November 2011
page 130
The Arena - Section - Main Stand
Stage 4 Submission - Final Concept - November 2011
page 131
The Arena - Foyer Render
Stage 4 Submission - Final Concept - November 2011
page 132
THE INDOOR TRAINING
The Indoor Training - Design Direction
Stage 4 Submission - Final Concept - November 2011
page 134
minimal, balanced, strong
The Indoor Training - Render
Stage 4 Submission - Final Concept - November 2011
page 135
The Indoor Training - Render
Stage 4 Submission - Final Concept - November 2011
page 136
The Indoor Training - Render
Stage 4 Submission - Final Concept - November 2011
page 137
The Indoor Training - Render
Stage 4 Submission - Final Concept - November 2011
page 138
The Indoor Training - 3D Section
Stage 4 Submission - Final Concept - November 2011
page 139
The Indoor Training - 3D Section
Stage 4 Submission - Final Concept - November 2011
page 140
The Indoor Training - Level 0 Floor Plan +23m
Stage 4 Submission - Final Concept - November 2011
page 141
The Indoor Training - Level 1 Floor Plan +23m
Stage 4 Submission - Final Concept - November 2011
page 142
The Indoor Training - Roof Plan
Stage 4 Submission - Final Concept - November 2011
page 143
The Indoor Training - Cross Sections
Stage 4 Submission - Final Concept - November 2011
page 144
Level 1 +23m
Level 0 +19m
Cross Section 1
Level 1 +23m
Level 0 +19m
Cross Section 2
The Indoor Training - Long Section
Stage 4 Submission - Final Concept - November 2011
page 145
Long Section
Level 1 +23m
Level 0 +19m
Long Section Detail 1
Level 1 +23m
Level 0 +19m
Long Section Detail 2
The Indoor Training - 3D Plan - Level 0
Stage 4 Submission - Final Concept - November 2011
page 146
The Indoor Training - 3D Plan - Level 1
Stage 4 Submission - Final Concept - November 2011
page 147
The Indoor Training - 3D Plan - Roof
Stage 4 Submission - Final Concept - November 2011
page 148
The Indoor Training - Circulation Precinct
Stage 4 Submission - Final Concept - November 2011
page 149
The Indoor Training - Circulation Level 0
Stage 4 Submission - Final Concept - November 2011
page 150
The Indoor Training - Circulation Level 1
Stage 4 Submission - Final Concept - November 2011
page 151
The Indoor Training - Change Rooms Detail
Stage 4 Submission - Final Concept - November 2011
page 152
The Indoor Training - Render
Stage 4 Submission - Final Concept - November 2011
page 153
The Indoor Training - Render
Stage 4 Submission - Final Concept - November 2011
page 154
SCHEDULES
Schedules - Areas Summary
Stage 4 Submission - Final Concept - November 2011
page 156
Schedules - Building Gross Areas
Stage 4 Submission - Final Concept - November 2011
page 157
Schedules - Cost Estimate Summary
Stage 4 Submission - Final Concept - November 2011
page 158
Schedules - Cost Estimate Stadium
Stage 4 Submission - Final Concept - November 2011
page 159
Schedules - Cost Estimate Arena
Stage 4 Submission - Final Concept - November 2011
page 160
Schedules - Cost Estimate Indoor Training
Stage 4 Submission - Final Concept - November 2011
page 161
Schedules - Cost Estimate Outdoor Training
Stage 4 Submission - Final Concept - November 2011
page 162
Schedules - Project Timeline - Stadium
Stage 4 Submission - Final Concept - November 2011
page 163
Schedules - Project Timeline - Arena
Stage 4 Submission - Final Concept - November 2011
page 164
Stadium Feasibility Report
Stage 4 Submission - Final Concept - November 2011
page 165
Stadium Income Generators In today’s completive market, diversification of income streams has become an imperative for any club or stadium operator. Apart from the most obvious form of income, namely ticket sales, there are a number of other income generating opportunities available for clubs and operators. These include: • Club Seats • Luxury Suites • Stadium naming rights • Parking • Advertising • Concessions • Restaurants • Facility Tours • Retail Stores Club Seats The concept of club seats has been around since the 1980’s. Club seats are wide luxury seats that are
located in a position that offer the best view of the game. The seats are leased at an annual fee and leased for a period of 10 years. The spectators occupying club seats are given preferential treatment which includes amenities such as screens to watch
broaden the income stream. Parking Parking takes up valuable space and can be used as a quick income generator. Parking is usually charged at an hourly rate or can be bought at a flat rate for an
replays and air-conditioning for matches during warm weather. Luxury Suites The luxury suites, or sky boxes as they have come to be known, are enclosed areas where spectators can enjoy a game at the highest level of comfort. These venues are leased at an annual fee. Luxury suites have become the second biggest income steam for profession sports franchises. Stadium Naming Rights The selling of naming rights has become a lucrative income generator for professional sports franchises. The naming right allows the buying entity to rename the entire stadium. The naming rights for entrances and walkways can also be sold to other entities to
entire season. Parking can also be hired out to adjacent venues during non-match days, provided that adequate stadium security measures are in place. Advertising The demand for advertising at sports events has turned every part of a stadium into potential advertising space. The most common of these are advertising boards on the perimeter of the playing field. However, advertising space can be sold at the entrance of stadiums and on the walls of walkways and ablutions. Concessions Clubs can sell the rights for the sale of food, beverages, publications and souvenirs to an operator of
Stadium Feasibility Report
Stage 4 Submission - Final Concept - November 2011
page 166
their choosing. Operators will pay a large sum to be the exclusive retailer of food and beverage at a venue that attracts hundreds of thousands of spectators per year. Restaurants Unlike a concessions stand, a restaurant can remain open even on days when there are no matches. Having a restaurant on the stadium property will attract visitors to the venue on non match days and ensures that the facility is profitable even in the off season. Facility Tours Many sports fans are interested in what goes on behind the scenes in a stadium. Stadium tours will afford them insight into this aspect of the sport. Fans are willing to pay for this behind the scenes experience. Stadium tours can be used as an income generator during non match days. Retail Stores
A retail store that is open all year round is a valuable source on income for a club. The store can sell club kit and other souvenirs and memorabilia that are associated with the club. There is a certain sense of euphoria and nostalgia attached to buying an item related to the club from the club’s home ground. Clubs should maximize on this inherent emotive appeal.
undercover parking which improves vehicle access, security and provides a dedicated revenue stream. The additional space created by level changes is also used to maximize retail and commercial space. This expands the functional profile of the stadium, contributing to its success as a lifestyle and leisure attraction. The open theatre viewing platform (at the upper plaza level) expands on this concept; creating inclusive civic space around the stadium which Income Generators within the FC ANJI MAKHACH- will attract passers-by with open-air live event covKALA SPORTS CITY erage of games within the stadium. This open theThe FC ANJI MAKHACHKALA SPORTS CITY em- atre space becomes instantly profitable and income ploys a number of the above methods to maximize generating by virtue of the increased foot traffic and the financial feasibility and the functional longevity of ‘charged’ atmosphere. Functional improvements inthe stadium. Context (specifically the topography) clude the flexibility of media areas to double-up as a becomes a primary contributing factor in determin- conferencing venue on non-match days. ing income generating opportunities. An otherwise difficult topographical condition is used to maximize
Render
Stage 4 Submission - Final Concept - November 2011
page 167
Render
Stage 4 Submission - Final Concept - November 2011
page 168