Power-point Presentation On Scope management plan

Page 1

Supreme Assignment Quality Services from Aussie Writers


Power-point Presentation On Scope management plan


Scope statement 

The scope of current project is to design new food package meeting the requirement of customers

It will have three dishes

Provided as per the requirement of customers


Stating the need 

Collecting the information

Meeting the specific needs of the customers

Accumulating the resources


Supreme Assignment Quality Services from Aussie Writers


Defining the scope 

The scope of project is to increase the sales turnover through introduction of new food package Product analysis has been used by Tesco to define the scope It was found that customers in need of ready-made package which can be delivered in less time


Creating the WBS 

The important depart is of operation

Research team will guide operation department

Production team work after the operation

Sales team reconnect with the research and development for providing customer feedback


Supreme Assignment Quality Services from Aussie Writers


Verifying scope 

The scope will be verified in accordance with feedback of the customers

Rate of profitability

Competitive edge of the business

It will be known on the basis of making comparison


Control scope 

 

The control phase is implemented through monitoring the actual performance Reduced the gap between actual and standard results All department will work on the gap exist between results


Supreme Assignment Quality Services from Aussie Writers


Cont... 

Customers feedback will be incorporated Profitability and sales turnover ratio will be measured against the standards Workforce will be provided training the bridge the gap


Supreme Assignment Quality Services from Aussie Writers


References Rees-Caldwell, K. and Pinnington, A.H., 2013. National culture differences in project management: Comparing British and Arab project managers' perceptions of different planning areas. International Journal of Project Management. 31(2). pp.212-227. Schwalbe, K., 2015. Cengage Learning.

Information technology project management.

Snyder, C. S., 2014. A Guide to the Project Management Body of Knowledge: PMBOK (ÂŽ) Guide. Project Management Institute.


Thank You


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.