Cover Depan
|| !"
Aceh Investment Opportunities
Gua Sarang, Sabang
Cover Depan
1
31
DAFTARISI
4 7 8 9
10 12 14 16 17
Foreword
Vision and Mission
WHY ACEH? Realization & Promotion Aceh Regional Spatial Plan (RTRW)
Aceh in Figures
Aceh Administrative Region
Population Population in Aceh
18 19
20 23 25 26 27
28 30
32 33
Economic Indicator
34
Export & Import
36
Investment Realization
Labor Force
Supporting Infrastructure Airport Total Aircraft and Passenger in Aceh Airports Seaport Aceh Seaport
37
39 41 47 50
52 55
56 57
Passenger Terminal Route of Crossing Ships, Goods, and Passengers at Ports in Aceh Malahayati Port Operations Internasional Seaport Krueng Geukueh - Kuala Langsa Sea Highway Route Network (T1), Pioneer Sea Transportation R1, Pioneer Sea Transportation R2
Station Road Energy/ Electricity Group Tariff, Power Limit, Consumption and kva Fees and Prepaid Electricity Clean Water Water Supply Pipeline Development Banking and Financial Institutions Banking and Financial Institutions in Banda Aceh
59 61
62 64
66 68 69 70 70 70
70 71 71 72
Hotels Hotel In Banda Aceh And Surrounding Areas Hospitals in Aceh Telecommunication 4 Potential Sectors
Energy & Infrastructure
Testimony: Investment Experience Businesspersons in Aceh
Infrastructure Trans Sumatra Toll Road Development Project Progress of the Implementation of the Cross - Sigli Banda Aceh and Langsa Binjai Toll Roads Langsa - Lhokseumawe Toll Road Technical Data Technical Data Lhokseumawe – Sigli Toll Road
73 74
75 76 77 78 80 81 82 83 84 85 86 95
Toll Road Technical Data Financial Data
Urban Railways Development POTENCY Vehicle Ownership Transportation (Travel Transport Mode) The requirement analysis Trip Purpose Spatial Pattern Analysis Potential Railway Line Plans Potential Hinterland Surround Line A Land Along a Street Railway Plan Line Estimation Cost of Monorail Construction Technology Chosen General Structure of Kpbu Banda Aceh Railways Project
96 97 98 99 100
101 102
104 105 106 108
Energy Testimony: Investment Experience
Energy 1. The potential of hydroelectric power in Aceh 2. Geothermal Power Plant (PLTP) in Aceh
Aceh Gas Infrastructure Development Plan Supply and Demand of Gas Projection
Agroindustry
Testimony: Investment Experience Plantations Palm Oil Palm Oil Industries in Aceh
109 110 110
111 113
114 115
116 117 118 120
121 122
Nagan Raya Cooking Oil Processing Industry Investment Opportunity/Activity: Contact Person:
Coffee Arabica Coffee Planted Area and Production
Robusta Coffee Aceh Coffee Processing Industry
Cacao Rehabilitation, Development of Cocoa Plantation and Processing Industry Transportation Supporting Infrastructure Contact Person:
Patchouli Patchouli Aceh (Crude Patchouli Oil)
124
129 134 135 137 137
138 139 140 141 142
144
145
Financial Review Of Aceh Crude Patchouli Oil
Aceh Tengah Pasta Sauces Processing Industry Development Contact Person:
Livestock
Beef Industry Aceh Besar Beef Industry Development Project
Fishery Idi Fishing Port Metro Mina ParkKuala Idi – East Aceh Concept of Development Area Site Plan Metro Mina Zone Contact Us:
146 147 148 149
151 152 152 152
153 153
154
Sawang Ba’U Fishing Port
Tourism Development
Testimony: Investment Experience in Accommodation Sector
Tourism Total Domestic and International Tourist Aceh
156 159 159
160 163 164 166
NAIC & BSB Nurul Arafah Islamic Center & Banda Aceh Business Center Supporting Facilities Project Development for Gemilang Tourism Project Nurul Arafah Islamic Center (NAIC) Investment Estimates: Banda Aceh Business Center (BSB) Contact Person:
Lhoknga Golf Course Development Aceh Besar
168 168
170 171
D A F T A R
Ie Seum Hot Spring Resort Tourism Development Investment Activities Contact Person: Pidie Lingkok Kuwieng Tourism Development Contact Person:
Banyak Islands Tourism Development The following are the potential investment that can be developed in Banyak Islands:
Registration Procedure Iupswa Eco-Tourism Business Development Licenses Contact Person:
Aceh Investment Development Zones
Testimony: Investment Experience
172 173 174 175
176 177 178 180 181 182 182
Aceh Investment Development Zones
184 186 187
Sabang Free Port and Free Trade Zone (FP & FTZ) Sabang Area Sabang Management and Development Agency
Development of Iboih and Gapang Marine Tourist Destination Development of the International Resort and Gua Sarang Golf Course Area Development of Meeting, Incentive, Convention, and Exhibition (MICE) Cluster and Iboih Condominium
Marina and Eco Resort Lhok Weng Development
Klah Island Marine Tourism Development Sabang Management and Development – One Stop Services Agency
189
190 191
Special Economic Zone (SEZ) Arun Lhokseumawe Investment Procedure in SEZ Facilities and Incentives Contact Person:
Aceh Industrial Estate (KIA) Ladong, Aceh Besar Investment Opportunities
193
Samudera Kutaraja Fishing Port, Banda Aceh
195
Frozen Tuna Processing Industry Development
201 202
Electronically Integrated Business Licensing Service
203
204 206
Contact Person:
e
u
n
Contact Person: CONTACT US INVESTMENT AND ONE STOP SERVICE AGENCY BY REGENY/ CITY IN ACEH PROVINCE dpmtsp.acehprov.go.id
I n v e s t
s i
A c e h
2 0 2 1
3
I S I
Foreword We
consider that the development of a region’s economy
The energy and infrastructure sectors can also be options
cannot be separated from the role of investment.
for you to invest in, especially in the new renewable energy
Investment is an important indicator as the main asset in
sector. The Government of Aceh continues to strive to improve
driving our potential in natural resources.
the development of infrastructure by inviting investors and
We understand that we cannot independently work to create welfare and prosperity in Aceh. We need the role of private
entrepreneurs to participate in construction of Aceh toll roads program, Airports and Urban Mass Transit (MRT).
sectors to develop and optimize downstream output of Aceh’s
In an effort to increase the convenience of investing, the
natural recourses, which definitely become the source of
Government of Aceh has developed four special economic
mutual benefit for the investor, increase region’s income and
zones, namely: Free Trade Zone, Free Sea Port Zones and
source of income to the community.
Sabang Free Port. Arun Lhokseumawe Special Economic Zone, Aceh Industrial Area and Kuta Radja Samudera Harbor,
We hope that the existence of investment will build new
with various incentives and facilities that we offer to develop
industrial centers in various leading sectors in Aceh, especially the development of the tourism industry which is the leading sector in Aceh. Aceh has tourist destinations that
business and guarantee the safety and convenience of investing in Aceh.
are scattered in almost all districts and cities with their own
Aceh is open to investment. The Government of Aceh is
uniqueness and beauty according to regions.
committed to providing ease of investing and improving the investment climate to make Aceh one of the investment
Moreover, the agro-industry sector in Aceh offers several excellent commodities including coffee, cocoa, palm oil and patchouli. Other superior sectors are fisheries and livestock
destinations in Indonesia. Thank you for your trust in investing in Aceh.
and it is our main priority to make high selling value products
4
from them through world-class processing standards by
GOVERNOR OF ACEH
involving SMEs as the business partners.
Ir. Nova Iriansyah, MT
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
K A T A
In manifesting Aceh as one of the investment
our determination in serving the investors. Hence,
destinations in Indonesia, the Regional
to overcome the obstacles that investors may
Government has prepared various facilities
encounter during obtaining accurate data and
needed by investors to invest in Aceh.
information regarding the potential investment
It is our commitment, The Aceh Investment and One-Stop Service Agency becomes the leader in welcoming investors to start their business in Aceh with guaranteed security provided by the Governor of Aceh and full support from all ranges of government and a warm welcome from the community. We are committed to serve all investors by providing accurate information pertaining to potential investments, coordinated with related agencies and institutions as well as providing fast,
P E N G A N T A R
in Aceh during this pandemic, we decided to prepare and publish the data and information in the form of soft file which people can easily access on our various digital platform. We expect that this “Aceh Investment Opportunities” book can be the primary reference for the investors to analyze potential resources and explore profitable investment oppor tunities. We welcome you to invest in Aceh. We would like to thank you for continuously taking part in developing potential investment in Aceh.
easy and accurate licensing services.
Dr. Aulia Sofyan
Even though this year the world is facing a
Head of Aceh Investment and One-Stop
COVID-19 pandemic, yet it has not discouraged
Services Agency
I n v e s t m e n t
Oe p up o nr t u I nn i vt ei se st
os fi
A c e h
2 0 2 1
5
Governor of Aceh office.
6
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
V I S I
&
Vision and Mission Vision:
Mission:
Realizing a peaceful and prosperous
Accelerate bureaucratic reform to
Aceh through a clean, fair and
achieve a clean and authoritative
serving government.
government in supporting the quality and equitable public service delivery Build and protect production centers as well as creative service industries that produce competitive products to increase employment and provide easy access to capital
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
7
M I S I
WHY ACEH?
Aceh is located at the most west of Sumatera
Our infrastructure is ready to connect your business
We have major commodities for your industries
We have the workforce for your need
We have a persuasive business climate
Aceh are close to most of ASEAN
The international airport, the top-ranked
Arabica coffee from Gayo Highland,
Supported by 20% of Aceh’s annual
Get to know experience of PT. Hutama
member with 500 million consumers,
seaport, the high-speed road.
cacao from Pidie Jaya and fishery in
budget for education to increase the
Karya and dozens of other national
uncounted investment opportunities for
Banda Aceh are among the best in
capacity of human recourse and to
and multinationals company that are
the investors.
Indonesia.
create a skilled workforce.
thriving in Aceh. We lay a red carpet for potential investors who want to expand their business in Aceh. We roll out the red carpet potential investors who wish to expand their business in Aceh.
8
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
R E A L I S A S I
Realization & Promotion
THE NETHER LANDS ENGLAND FRANCE UNITED STATES
Realizat]ion of Foreign Investment in 2019 to Aceh:
CAYMAN ISLAND
SPAIN
BRITISH VIRGIN ISLAND
GERMANY MOSCOW BELGIUM PEOPLE’S REPUBLIC OF CHINA
3. Singapore 4. Belgium
UNITED ARAB EMIRATES
THAILAND ACEH
Promotion of Aceh Investment to the Listed Country:
5. United States
1. United Arab Emirates
6. People's Republic of China
2. Saudi Arabia
7. North Korea
3. Moscow
8. Bristish Virgin Island
4. America
9. South Korea
5. Australia
10. Cayman Island
6. Germany
11. France
7. People's Republic of China
12. Spain
8. South Korea
13. The Netherlands
9. Malaysia
14. Thailand
10. Thailand
15. Australia
11. Singapore
16. England
12. India
SOUTH KOREA
INDIA
1. Malaysia 2. Afghanistan
P R O M O S I
NORTH KOREA
AFGHANISTAN
SAUDI ARABIA
&
MALAYSIA SINGAPORE
AUSTRALIA
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
9
Aceh Regional Spatial Plan (RTRW)
The Aceh regional spatial plan describes the plan for spatial structure of Aceh region which includes an urban system within its territory and it is connected to villages area within its service area and the Aceh regional infrastructure network system. The Aceh regional spatial plan covers protected areas and cultivation areas, the establishment of Aceh strategic areas and directions for the use of Aceh spatial layout.
Spatial Layout is a policy direction and strategy for spatial use in Aceh which is used as a reference for long-term planning.
One of the goals of spatial planning for the Aceh region is to create strategic area functions that support Aceh’s position as Indonesia’s main gateway.
The following is the spatial pattern for the 2013-2033 RTRW Aceh: Protected area, with an area of
Cultivated area, with an area of
2,938,579.68 Ha
2,949,506.83 Ha
1 Protected Forest Area, Sabang.
10
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
00
R T R W
Fid
Aceh Spatial Pattern RTRW 2013-2033
Status
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Water Resource Assets Aquaculture Natural Reserves Horticulture Protected Forest Education Forest Production Forest Conversion Production Forest Limited Production Forest Public Forest Hankam Area Industrial Area Cultural Protective Area Peat Protected Area Geological Protected Area Sea Protected Area Mangrove Protected Area Water Intake Protection Area Sempadan Lake Protected Area Sempadan Beach Protected Area Integrated River Protected Area Tourism Area Mining Area
Cultivation Cultivation Protect Cultivation Protect Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Protect Protect Protect Protect Protect Protect Protect Protect Protect Cultivation Cultivation
Size According To The Body Stem Of 2013 Qanun RTRWA 43,760.00 300.00 1,790,626.00 555,948.00 15,578.00 141,876.00
Fid
Aceh Spatial Pattern RTRW 2013-2033
Status
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
Livestock Area Transmigration Area Great Plantations Community Plantations Rural Surface Urban Surface Agricultural Wetland Dryland Farming Suaka Marga Satwa Pinus Jantho Suaka Family Satwa Rawa Singkil Tahura Mountain Kapor Tahura Pocut Meurah Intan Tahura Teupah Selatan Isaq Living Park Mount Lauser National Park Kuta Malaka Natural Tourism Park Jantho Pine Natural Tourism Park Many Landland Natural Islands Park Many Sea Natural Tourism Park Natural Tourism Park Of Weh Island Land Natural Tourism Park Of The Weh Island Of The Sea Tpa Bodies Of Water
Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Cultivation Cultivation
Size According To The Body Stem Of 2013 Qanun RTRWA 12,931.00 393,013.00 761,572.00 89,847.00 58,489.00 252,063.00 436,729.00 15,374.00 81,836.00 1,485.00 6,218.00 920.00 86,320.00 624,651.00 1,549.00 2,614.00 24,693.00 205,725.00 1,250.00 5,275.00
5,610,642.00
Total
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
11
Aceh in Figures
Aceh
Jawa
70,65% 8,94%
Gayo
Batak
Alas
7,22%
3,29%
2,13%
1,49%
1,40%
1,11%
Singkil
Minangkabau
Lainnya
1,74%
1,99%
1,99%
Islam
Katholik
Protestan
Buddha
Hindu
98,22%
0,16%
0,80%
0,10%
0,01%
Capital City
Banda Aceh O
12
Simeulue Aneuk Jamee Tamiang
I n v e s t m e n t
O p p o r t u n i t i e s
O
o f
A
A c e h
I I
O
2 0 2 1
IA 201
Language
Indonesia Traditional Language
17
Guel traditional dance.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
13
Aceh Administrative Region The Government System in Aceh Province is implemented by levels of 2
Regency/City
Regency/City
Regency/City
Regency/City
Aceh Singkil
South Aceh
Southeast Aceh
East Aceh
Capital City
Capital City
Capital City
Capital City
Singkil
Tapaktuan
Kutacane
Sub-District
Sub-District
Sub-District
Sub-District
11
18
16
24
Village
Village
Village
Village
120
260
385
515
Regency/City
Regency/City
Regency/City
Regency/City
Regency/City
West Aceh
Aceh Besar
Pidie
Bireuen
Aceh Tengah
Capital City
Capital City
Capital City
Capital City
Meulaboh
Kota Jantho
Sigli
Bireuen
Sub-District
Sub-District
Sub-District
Sub-District
12
23
23
17
Village
Village
Village
Village
322
604
731
609
Regency/City
Simeulue Capital City
Sinabang Sub-District
10
and Village.
Village
138
Capital City
Takengon Sub-District
14 Village
295
14
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
I
A C E H
A D M I N I S T R A T I V E
Regency/City
Regency/City
Regency/City
Southwest Aceh
Gayo Lues
Aceh Tamiang
Capital City
Capital City
Capital City
Capital City
Blangpidie
Blangkejeren
Karang Baru
Suka Makmue
Sub-District
Sub-District
Sub-District
Sub-District
9
11
12
10
Village
Village
Village
Village
152
145
213
222
Regency/City
Regency/City
Regency/City
Regency/City
Regency/City
Regency/City
Bener Meriah
Pidie Jaya
Banda Aceh
Sabang
Langsa
Lhokseumawe
Subulussalam
Capital City
Capital City
Capital City
Capital City
Capital City
Capital City
Capital City
Calang
Simpang Tiga Reudeulong
Meureudu
Banda Aceh
Sabang
Langsa
Lhokseumawe
Singkil
Sub-District
Sub-District
Sub-District
Sub-District
Sub-District
Sub-District
Sub-District
Sub-District
9
10
8
9
2
5
4
5
Village
Village
Village
Village
Village
Village
Village
Village
172
233
222
90
18
66
68
82
Regency/City
A Capital City
Lhokseukon Sub-District
27 Village
852
Regency/City Regency/City
Aceh Jaya Capital City
R E G I O N I
Regency/City
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
15
Population Population is one of the indicators to support investment; the most important part in investment development, both as consumers of produced goods by investment activities or as partners and employees to support the realization of investment in Aceh. 5.371.532 Based on the Aceh Central Bureau of Statistic, total population in Aceh is 5.281.314 5.371.53 people in 2019.
5.189.469 5.096.248
5.001.953
2015 A
16
A A
2016 A
I n v e s t m e n t
A
A A
A
2017 A I
2018
Banda Aceh residents enjoy their afternoon with families at Blang Padang.
I A
O p p o r t u n i t i e s
2019
o f
A c e h
2 0 2 1
P O P U L A S I
Total Population by Regency/City in Aceh, 2019 Regency/City
2015
2016
2017
2018
2019
Simeulue
89.117
90.291
91.375
92.393
93.230
Aceh Singkil
114.518
116.712
119.490
121.681
124.099
South Aceh
224.897
228.603
231.893
235.115
238.080
Southeast Aceh
200.014
204.468
208.481
212.417
216.499
East Aceh
402.976
411.279
419.594
427.567
436.080
Aceh Tengah
196.090
200.412
204.273
208.505
212.489
West Aceh
193.791
197.921
201.682
205.971
210.110
Aceh Besar
392.584
400.913
409.109
417.302
425.220
Pidie
418.882
425.974
432.599
439.131
444.979
Bireuen
435.300
443.627
453.224
461.726
471.640
North Aceh
583.892
593.492
602.554
611.435
619.410
Southwest Aceh
140.689
143.312
145.726
148.111
150.389
87.881
89.500
91.024
92.602
94.100
Aceh Tamiang
278.324
282.921
287.007
291.112
295.010
Nagan Raya
155.070
158.223
161.329
164.483
167.289
86.385
87.622
89.618
91.087
92.889
Bener Meriah
136.821
139.890
142.526
145.086
148.180
Pidie Jaya
148.719
151.472
154.795
158.091
161.220
Banda Aceh
250.303
254.904
259.913
265.111
270.320
Sabang
33.215
33.622
33.978
34.571
34.870
Langsa
165.890
168.820
171.574
174.318
176.809
Lhokseumawe
191.407
195.186
198.980
203.284
207.200
Subulussalam
75.188
77.084
78.725
80.215
81.420
5.001.953
5.096.248
5.189.469
5.281.314
5.371.532
Gayo Lues
Aceh Jaya
TOTAL O
A
O I
I
I
A
A
A O
A I
I
Blang Padang, Banda Aceh.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
17
Economic I Gross Regional Domestic Product (GRDP)
Economic Growth 4,49% 4,28%
Economic Growth without Oil and Gas (%)
A
O I
4,18%
3,95
4,2%
3,29% -0,73% Year I
I
2015 A
2016
A
A O
A I
2017
2018
Year
Value of GRDP by Industrial Origins/ Productions (without Oil and Gas)
Value of GRDP by Industrial Origins/ Productions (with Oil and Gas)
2015
124.080,82
129.092.66
2016
132.614.00
136.843.82
2019
I
2017
141.076.46
145.806.92
2018
150.350.45
155.911.12
2019
158.555.41
164.210.64
O
18
I n v e s t m e n t
4,25
4,15%
4,13%
Economic Growth with Oil and Gas (%) O
4,26%
4,61%
Inflation
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A
A
O I A
I
I A O
A I
I
1,84 1,69
1,53
I (%, yoy) 2015 O
A
2016 A
O I A
2017 I
I
A O
2018 A I
2019 I
I N D I K A T O R
E K O N O M I
Export Year
Volume (Ton)
USD
2015
1.182.177.854
93.336.621
2016
315.445.662
56.069.045
2017
2.517.468.611
77.679.139
2018
5.089.636.869
138.628.891
7.594.536.779
166.556.777
Year
Volume (Ton)
USD
2015
149.058.410
116.817.672
2016
121.872.735
28.994.572
2017
92.321.035
39.313.804
2018
97.582.007
29.689.996
102.058.410
131.223.716
2019
Import
2019 O
Governor of Aceh, Ir. Nova Iriansyah, MT attended the releasing activity of Gayo Arabica Coffee Exports.
A
A
O I A
I
I
A O
A I
I
The Governor of Aceh released Gayo Arabica coffee exports at the KOPEPI Ketiara Cooperative to foreign countries.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
19
Realization
I
Realization January - September 2020 – According to Sector PMDN : Rp. 6.557,7 M
8.000.000.000.000 7.000.000.000.000
Mineral Industry Nonmetal; Rp271,8 M
6.000.000.000.000
Others; Rp655,2 M
4.000.000.000.000
Mining Sector; Rp582,1 M
3.000.000.000.000
Constructions; Rp3.811,6 M
1.000.000.000.000
Investment
2015
FDI Realization (Rp) Total Investment Realization NOTE:
20
I n v e s t m e n t
5.030.128.791.192
2016
3.796.798.933.644 1.680.960.823.950
669.959.916.000 5.700.088.707.192
2017
1.167.807.218.200 4.964.606.151.844
149.089.023.300 1.830.049.847.250
2015 1 USD = IDR 12,000
2017 1 USD = IDR 13,300
2019 1 USD = IDR 15,000
2016 1 USD = IDR 13,300
2018 1 USD = IDR 13,400
2020 1 USD = IDR 14,400
O p p o r t u n i t i e s
o f
A c e h
Food Sector; Rp450,9 M
Electricity, Gas, and Water; Rp790,4 Jt
2.000.000.000.000
DDI Realization (Rp)
Others; Rp655,2 M Mineral Industry Non-metal; Rp271,8 M
Food Sector; Rp446,7 M
5.000.000.000.000
PMDN + PMA : Rp. 7.060,1 M
2 0 2 1
2018
2019
TW I s.d III 2020
1.232.544.677.586
4.615.149.782.313
6.557.713.101.816
48.016.434.400
1.196.943.330.000
502.425.345.600
1.280.561.111.986
5.812.093.112.313
7.060.138.447.416
PMA : $34,8 (jt)/Rp.502,4 M Food Sector; $296.470
Others; $346.949
Mining Sector; $438.527 Food Crops, Plantation and Animal Husbandry; $1.827.231
Electricity, Gas, and Water;
$31.207.513
Mining Sector; Rp588,4 M Electricity, Gas, and Water;
Rp1.239,8 M
Constructions;
Rp3.811,6 M
I N V E S T M E N T
Realization Quarter III – 2020 : Based on the DALAKS ACEH Sector PMDN No
Business Field
Top 5 Sector PMDN January - September 2020
Top 5 Sector PMA January - September 2020
PMA Investment (Rp Million)
Project
3.811.580
354
1
Electricity, Gas and Water
No
Business Field
Investment (Rp Million)
Project
9.140.280
11
1
Construction
2
Electricity, Gas and Water
790.426
110
2
Mining
157.215
4
3
Mining
582.055
23
3
Chemical and Pharmaceutical Industry
142.361
1
4
Food Industry
446.679
62
4
Trade and Reparation
6.796
4
5
Non Metal and Mineral Industry
271.799
14
5
Food Industry
1.775
5
6
Chemical and Pharmaceutical Industry
246.483
15
6
Other Services
775
3
7
Food Crops, Plantation, And Animal Husbandry
128.753
83
7
-
1
8
Trade and Reparation
79.538
685
Transportation, Warehouse and Telecommunication
9
Housing, Industrial Estates and Offices
73.284
12
8
Food Crops, Plantation, And Animal Husbandry
-
3
10
Other Services
60.034
163
$ 9.449.202
32
11
Rubber and Plastics Industry
48.331
1
12
Hotels and Restaurants
13.638
20
13
Other Industries
2.905
16
14
Wood Industry
965
3
15
Transportation, Warehouse and Telecommunication
786
33
16
Machinery, Electronics, Medical Instruments, Electrical Equipment, Precision, Optical and Watch Industries
319
1
17
Perikanan
63
10
18
Metal, Non-Machinery and Equipment Industry
50
3
19
Paper and Printing Industry
25
6
6.557.713
1.614
Total
R E A L I Z A T I O N
Total
1 Construction Rp. 3.811,6 M [58,12%] 354 Project
4 Food Industry Rp. 446,7 M [6,81%] 6 Project
2 Electricity, Gas and Water Rp. 790,4 M [12,05%] 110 Project
3 Mining Rp. 582,1 M [8,8%] 23 Project
5 Mineral Industry Non-metal Rp. 271,8 M [4,14%] 14 Project
1 Electricity, Gas and Water US$. 31.207.213 [89,44%] 56 Project 4 Mining US$. 438.527 [1,26%] 14 Project
2
3
Food Crops, Plantation, And Animal Husbandry US$. 1.827.231 [5,24%] 8 Project
Forest US$. 773.958 [2,22%] 1 Project
5 Food Industry US$. 296.470 [0,85%] 16 Project
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
21
I N V E S T M E N T
R E A L I Z A T I O N
Realization January - September 2020: Based on Location PMDN : Rp. 6.557,7 M East Aceh ; Rp241,3 M
PMDN + PMA : Rp. 7.060,1 M
Others; Rp615,0 M
Others; Rp810,8 M North Aceh; Rp409,2 M
North Aceh; Rp408,4 M West Aceh; Rp645,7 M
Realization January - September 2020: Based on Location
Aceh Besar; Rp3.912,3 M
Aceh Tengah; Rp735,0 M
Nagan Raya; Rp504,6 M Aceh Besar;
PMA : $34,8 (jt)/Rp.502,4 M Simeulue; $251.856
West Aceh; Rp672,0 M
Others; $857.489
Banda Aceh; $263.256 Aceh Tengah; $1.012.254
Aceh Tengah; Rp749,6 M
West Aceh; $1.827.731 Nagan Raya;
$30.678.062
Rp3.913,9 M
PMDN No
Field Effort
1
Aceh Besar
2
Aceh Tengah
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
PMA
Investment (Rp Million)
Project
No
Field Effort
3.912.263
119
1
Nagan Raya
735.042
10
2
West Aceh
No
Investment (Rp Million)
Project
30.678.062
12
1.827.731
6
1.012.254
8
Country
Investment
Project
31.054.573
23
1.827.231
2
1
Hongkong, RRT
2
Belgium
3
R.R. Tiongkok
809.258
17
4
Singapore
614.367
22
5
South Korea
240.320
18
6
Afghanistan
152.000
2
7
Cayman Island
88.291
2
8
Malaysia
58.816
17
9
Brazil
34.722
2
British Virgin Island
8.212
2
2.083
4
3
West Aceh
645.711
36
4
North Aceh
408.438
210
4
Banda Aceh
263.256
13
5
East Aceh
241.269
32
5
Simeulue
6
Pidie
200.062
3
251.856
11
Banda Aceh
617
East Aceh
7
115.091
6
152.347
7
8
Lhokseumawe
94.387
300
7
Lhokseumawe
142.361
2
Nagan Raya
62.797
21
Aceh Besar
112.975
12
10
9
8
10
Aceh Tamiang
48.800
68
9
Gayo Lues
104.306
7
11
France
11
Aceh Singkil
46.196
12
10
Pidie
88.346
5
12
Spain
775
2
11
Langsa
88.028
1
13
Brazil
0
2
3
Aceh Tengah
12
Bireuen
14.676
27
13
Simeulue
11.557
17
12
Southeast Aceh
58.816
4
14
The Nedherland
0
2
14
Subulussalam
6.332
24
13
North Aceh
54.225
6
15
England
0
3
15
Southwest Aceh
6.153
34
14
South Aceh
21.186
10
16
Australia
0
1
16
Langsa
4.953
16
15
Aceh Tamiang
21.047
2
17
United State
0
4
17
Pidie Jaya
1.519
33
16
Bener Meriah
10.000
3
$34.890.648
125
18
Gayo Lues
1.003
8
17
Sabang
2.858
5
19
Bener Meriah
905
8
18
Aceh Jaya
Aceh Jaya
11
3
20
509
694
19
Southwest Aceh
21
Southeast Aceh
50
6
300
2
Sabang
2
Aceh Singkil
22
0
20
0
6
6.557.713
1.614
$34.890.648
125
Total
22
Realization January - September 2020: Based on Country of Origin
Total
Total
Singapore; $614.367 RR Tiongkok; $614.367
South Korea; $240.320 Others; $344.899
Belgium; $1.827.231
Hongkong, RRT;
$31.054.573
L A B O R
Labor Force
The government of Aceh allocates 20 capital improvement. Through Aceh A the human resource is trained to be expert in specific sectors according of being your business partners.
F O R C E
Total of Labor Force by Sex (thousand) in Aceh, 2004-2019 Year
Male
Female
Total
2004
866,90
2.201,90
3.068,80
2005
1.074,10
544,90
1.619,00
2006
1.081,70
680,50
1.762,20
2007
1.125,60
687,90
1.813,50
2008
1.121,00
621,20
1.742,20
2009
1.153,50
639,90
1.793,40
2010
1.207,30
731,20
1.938,50
2011
1.251,50
749,70
2.001,20
2012
1.166,80
631,80
1.798,60
2013
1.294,20
739,90
2.034,10
2014
1.344,10
779,20
2.123,30
2015
1.378,90
804,00
2.182,90
Year
Inflation (%, yoy)
2016
1.418,00
839,90
2.257,90
2015
1,53
2017
1.419,00
869,70
2.288,70
2016
3,95
2018
1.454,90
898,50
2.353,40
2017
4,25
2018
1,84
2019
1.498,50
867,80
2.366,30
2019
1,69
O
A
A
O I A
I
I A O
A I
I
Construction workers.
Provincial Minimum Wage
O
A
A
O I A
I
I n v e s t m e n t
I A O
A I
I
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
23
L A B O R
F O R C E
Construction workers.
24
I n v e s t m e n t
O p p o r t u n i t i e s
Electrical maintenance workers in Aceh.
o f
A c e h
2 0 2 1
Supporting I
Indonesian Airways Garuda Indonesia at Sultan Iskandar Muda Airport.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
25
S U P P O R T I N G
I N F R A S T R U C T U R E
Airport Aceh’s air connectivity is supported by two international airports and 11 domestic airports. Aceh is connected to the direct flight of Banda Aceh-Pinang Island and Banda Aceh-Kuala Lumpur. As for domestic connectivity, Banda Aceh is connected to Medan, Jakarta and Batam.
26
Aceh’s regional connectivity serves
which are scattered in across 13 regencies/
routes, including the Lhokseumawe-
cities, both international and domestic airports.
Medan, Rembele-Medan, Nagan
The existence of these airports will support
Raya-Medan, Sabang-Medan, and
investment activities, especially in passenger
Sinabang-Medan routes.
services, loading and unloading of goods or cargo
Aceh already has 13 airports
in large quantities that will support your business.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Airline Services:
Sultan Iskandar Muda Airport, Blang Bintang, Aceh Besar.
S U P P O R T I N G
I N F R A S T R U C T U R E
Airport, Status, Coordinate, Runway Length (M) By Regency/City in Aceh Coordinate No Airport
Status
X
Y
Runway Length (M)
International
95,4206
5,51709
3000 x 45
Regency/City
1
Sulatan Iskandar MudaAceh Besar
2
Maimun Saleh
Sabang
Domestic
95,333333
5,866667
1850 x 50
3
Lasikin
Simeulue
Domestic
96,3272
2,411134
1400 x 30
4
Kuala Batee
Southwest Aceh
Domestic
96,791934
3,733585
1200 x 23
5
Malikussaleh
North Aceh
Domestic
96,949212
5,228797
1850 x 30
6
Teuku Cut Ali
South Aceh
Domestic
97,286895
3,171154
1274 x 23
7
Cut Nyak Dhien
Nagan Raya
Domestic
96,251593
4,043574
1800 x 30
8
Alas Leuser
Southeast Aceh
Domestic
97,865688
3,388788
1650 x 29,6
9
Rembele
Bener Meriah
Domestic
96,852238
4,721057
2250 x 30
10 T. Hamzah Fanshuri
Aceh Singkil
Domestic
97,966778
2,270036
1200 x 23
11 Patiambang
Gayo Lues
Domestic
97,35857
3,946613
810 x 23
12 Lhoksukon
North Aceh
Domestic
97,260066
5,067552
1115 x 23
Domestic
98,02454
4,52994
800 x 23
13 Airstrip Kuala Langsa Langsa
Total Aircraft and Passenger in Aceh Airports Year
Lasikin
Hamzah Fansuri
T. Cut Ali
Alas Leuser
SIM
Malikussaleh
Kuala Batu
Blang Kejeren
Cut Nyak Dhien
Rembele
Maimun Saleh
Total
Aircraft
1.008
86
93
186
10.399
915
335
236
1.278
678
342
15.556
Passenger
39.049
92
468
1.714
1.176.977
54.449
2.535
1.099
38.289
31.043
10.734
608
-
-
14
6.032
606
37
76
700
406
-
8.479
23.638
-
-
113
657.603
31.940
223
314
22.715
14.021
-
750.567
Ricinan
2018
Aircraft Jan-Ags 2019 Passenger I A
A A
1.356.449
*SIM: Sultan Iskandar Muda International Airport
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
27
S U P P O R T I N G
I N F R A S T R U C T U R E
Seaport
The important role of ports in supporting the economy, industry, trade, social and defense, and security sectors, requires comprehensive and synergic regulatory instrument support as a guideline in carrying out government programs. It is expected that the existence of ports in Aceh will encourage the success of investment development, tourism development, and regional strategic programs, one of which is regional development and regional connectivity in the archipelago. 28
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Loading and unloading activities at Malahayati Port.
S U P P O R T I N G
I N F R A S T R U C T U R E
Aceh has ports in 11 regencies or cities which are ready to support investment activities, as connections and gateways of sea routes between countries, between regions, and between islands in Aceh.
Malahayati port.
Malahayati port.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
29
S U P P O R T I N G
I N F R A S T R U C T U R E
Aceh Seaport No Seaport
Regency/City
1
Sabang
2
Operator
X
Y
Sabang
95,322732
5,881373
BPKS
Malahayati
Banda Aceh
95,526176
5,598071
Pelindo
3
Susoh
Southwest Aceh
96,657856
3,746372
UPP Susoh
4
Tapaktuan
South Aceh
97,18088
3,253258
UPP Tapaktuan
5
Lhokseumawe
North Aceh
97,039462
5,241067
Pelindo I
6
Idi
East Aceh
97,777403
4,959494
UPP Idi
7
Kuala Langsa
Langsa
98,020772
4,524259
Pelindo I
8
Calang
Aceh Jaya
95,572209
4,631652
UPP Calang
9
Meulaboh
West Aceh
96,13184
4,127333
Pelindo I
10
Singkil
Aceh Singkil
97,81228
2,26884
UPP Singkil
11
Sinabang
Simeulue
96,372628
2,482398
UPP Sinabang
O
30
Coordinate
A
A
O
I n v e s t m e n t
A IO A
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Malahayati port.
S U P P O R T I N G
I N F R A S T R U C T U R E
Passenger Terminal Aceh Passenger Terminal
Ulee Lheue Passenger Terminal, Banda Aceh.
Coordinate
No Seaport
Regency/City
Operator
Linear/Tramper
1
Balohan
Sabang
95,347271
5,826857
UPTD Balohan Port
Balohan - Ulee Lheue
2
Ulee Lheue
Banda Aceh
95,2949
5,565373
UPTD Ulee Lheue Port
Ulee Lheue - balohan & Ulee Lheue - Lamteng
3
Kuala Bubon
West Aceh
96,03847
4,20956
UPTD Meulaboh Port
Kuala Bubon - Sinabang
4
Lamteng
Aceh Besar
95,159203
5,642306
Aceh Besar Lamteng - Ulee Lheue Transportation Agency
5
Labuhan Haji
South Aceh
97,00107
3,547861
UPTD Labuhan Haji Port
Labuhan Haji - Sinabang
6
Singkil
Aceh Singkil
97,812678
2,268774
UPTD Singkil Port
Singkil - Island Banyak & Singkil - Gunung Sitoli
7
Island Banyak
Aceh Singkil
97,230928
2,230607
UPTD Singkil Port
Ferriage Island Banyak - Singkil
8
Sinabang
Simeulue
96,403346
2,455425
UPTD Sinabang Port
Lintas Sinabang - Labuhan Haji & Lintas Sinabang - Singkil
O
A
A
O
X
Y
A IO A
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
31
S U P P O R T I N G
I N F R A S T R U C T U R E
Route of Crossing BALOHAN
Ulee Lheue - Balohan
16 Mil
LAMTENG ULEE LHEUE
Ulee Lheue - Lamteng
BANDA ACEH
12 Mil
ACEH BESAR
Sabang Pulo Aceh
Banda Aceh
Meulaboh
Aceh Jaya Banda Aceh
Southwest Aceh
Meulaboh - Sinabang
120 Mil
Labuhan Haji
South Aceh
Labuhan Haji - Sinabang
80 Mil
Simeulue Aceh Singkil
Sinabang
Singkil
Singkil - Sinabang
113 Mil
PULAU BANYAK
Singkil - Pulau Banyak
Singkil - Gn. Sitoli
33 Mil Gn. Sitoli
32
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
59 Mil
Passenger Terminal Ulee Lheue.
S U P P O R T I N G
I N F R A S T R U C T U R E
Ships, Goods, and Passengers at Ports in Aceh Ship (Unit)
Seaports
Goods (Ton)
Passenger (Person)
Domestic Ulee Lheue, Malahayati, Lhoknga
2.967
2.185.199
811.340
Balohan
2.343
79.977
703.654
Singkil dan Island Banyak
550
86.023
66.443
Sinabang
477
162.873
82.835
Krueng Geukueh
350
318.019
-
Meulaboh
261
1.135.253
20.819
Tapak Tuan
170
39.103
51.339
Calang
69
29.540
2.303
Susoh
33
9.573.747
-
Kuala Idi
20
-
-
Kuala Langsa
10
5.311
-
International
Passenger Terminal Ulee Lheue.
Balohan
98
1.550
26.653
Meulaboh
94
5.092.891
-
Krueng Geukueh
59
21.116
-
Ulee Lheue, Malahayati, Lhoknga
5
10.163
-
Kuala Langsa
4
3.128
-
O
A
A
O
A IO A
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
33
S U P P O R T I N G
I N F R A S T R U C T U R E
MALAHAYATI PORT OPERATIONS
Sabang
24 M il
Malahayati (Feeder) 25
M il
94.422 Ton
Lhokseumawe
7
I
8
i
l
35.340 Ton
27
2
unload
M
•
50
1.025.751 Ton
M
Belawan (Hub)
il
Export
779.460 Ton
Tapaktuan
Load
PERIOD JAN - AGUST 2019 7 A container ship with a capacity of 100 TEUs of 1800 GT 7 Long voyage 1 round voyage: 9 days SOURCE: ACEH TR ANSPORTATION AGENCY
34
I n v e s t m e n t
O p p o r t u n i t i e s
Malahayati Seaport, Aceh Besar
o f
A c e h
2 0 2 1
S U P P O R T I N G
I N F R A S T R U C T U R E
Malahayati Seaport, Aceh Besar
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
35
S U P P O R T I N G
I N F R A S T R U C T U R E
Internasional Seaport Based on the Regulation of the Minister of Trade Number 24 Year 2019
Krueng Geukueh
Kuala Langsa
Type of Imported Products
Type of Imported Products
Food & Beverage
Food & Beverage
Electronic
Electronic
Children toys
Apparel
Footwear
Textile Goods
SOURCE: ACEH TR ANSPORTATION AGENCY
Krueng Geukueh Seaport, North Aceh.
36
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
Sea Highway Route Network (T1), Pioneer Sea Transportation R1, Pioneer Sea Transportation R2
Sabang
DESCRIPTION:
3
Routes T-1, R-1, & R-2
Sinabang
R-1
Tanjung Priok - 997 - Lhokseumawe - 114 Malahayati - 24 - Sabang - 227 - Tapaktuan 875 - Tanjung Priok
Sinabang - 105 - Meulaboh - 105 - Sinabang 66 - Tapaktuan - 64 - Island Banyak - 33 Singkil - 33 - Island Banyak - 64 - Tapaktuan 66 - Sinabang
1
Tanjung Priok
Calang Meulaboh
1800 GT
KM.Sabuk Nusantara 74/2000 GT
4
2 0 2 1
Route Networks and Miles
Ship Name /Weight
1 6 2
A c e h
T-1
Lhokseumawe
2 13
Tapaktuan
8 4 3
Calang
R-2
Calang - 140 - Sinabang - 105 - Meulaboh 105 - Sinabang - 66 - Tapaktuan - 66 Sinabang - 140 - Calang
KM. Sambuk Nusantara 110/1200 GT
5
3
7
o f
2.
Tanjung Priok
SOURCE: ACEH TR ANSPORTATION AGENCY
4
Sinabang Singkil
SOURCE: ACEH TR ANSPORTATION AGENCY
P.Banyak
6 5
5
Tanjung Priok
O p p o r t u n i t i e s
1.
Base
Line R - 2
I n v e s t m e n t
No.
Route Code
Line T - 1 Line R - 1
2
Malahayati
I N F R A S T R U C T U R E
37
S U P P O R T I N G
I N F R A S T R U C T U R E
R-2 Pioneer Sea Transportation Production Data 100
To n
80 60 40 20 0 Calang - Sinabang
Sinabang - Meulaboh
Meulaboh - Sinabang
Sianbang - Tapaktuan
Tapaktuan - Sinabang
Number of Tracks Voyage-1
Voyage-2
Voyage-3
SOURCE: ACEH TR ANSPORTATION AGENCY
38
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Voyage-4
Voyage-5
Voyage-6
Voyage-7
Voyage-8
Voyage-9
Voyage-10
Sinabang - Calang
S U P P O R T I N G
I N F R A S T R U C T U R E
Station The station is one of the transportation nodes, which is absolutely necessary for an area transportation layout. There are 6 (Six) Freight Terminals in Aceh Province: No.
Station
Regency/City
1
Santan Station
Aceh Besar
2
Kandang Station
Lhokseumawe
3
Meulaboh Station
West Aceh
4
Sigli Station Type B
Pidie
5
Bireuen Station Type B
Bireuen
6
Bener Meriah Station
Bener Meriah
SOURCE: ACEH TR ANSPORTATION AGENCY
Santan Truck Station, Aceh Besar.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
39
S U P P O R T I N G
I N F R A S T R U C T U R E
Loading and unloading activities at the Santan Truck Station.
40
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
I N F R A S T R U C T U R E
Road Road infrastructure 2 and Cities in Aceh has well connected access across cities. The Aceh Government is committed to improving road facilities to support economic activity and investment in Aceh. Blang Bintang - Indrapuri Toll Road.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
41
S U P P O R T I N G
I N F R A S T R U C T U R E
Length of Road by Level of Government Authority, Type of Road Surface and Road Conditions (km) in Aceh Province, 2019 Level of Government Authority (Km) Regency/City
Road Conditions (Km)
State
Province
Regency/ City
Total
Paved
Gravel
Land
Total
Good
Averaged
Damaged
Badly
Simeulue
65
222
80
768
117
4
101
222
111
10
101
-
222
Aceh Singkil
68
92
395
555
56
1
35
92
58
2
33
-
92
South Aceh
168
77
981
1.226
22
27
27
77
39
0,40
37
-
77
Southeast Aceh
72
52
1.130
1.254
23
2
27
52
20
1
18
13
52
East Aceh
107
107
1.549
1.764
92
4
11
107
61
5
41
-
107
Aceh Tengah
197
145
801
1.144
128
5
12
145
138
1
6
-
145
West Aceh
56
146
682 w
885
144
2
-
146
141
3
2
-
146
Aceh Besar
185
171
1.279
1.635
119
20
33
171
120
11
24
16
171
Pidie
144
124
1.015
1.283
124
-
-
124
108
8
7
-
124
Bireuen
105
5
1.208
1.318
5
-
-
5
2
1
3
-
5
North Aceh
77
76
2.033
2.186
76
-
-
76
67
6
2
-
76
Southwest Aceh
64
31
749
844
20
-
-
20
21
1
9
-
31
Gayo Lues
124
152
840
1.115
131
11
-
141
135
8
9
-
152
Aceh Tamiang
42
44
968
1.054
18
21
10
49
26
2
17
-
45
Nagan Raya
180
48
924
1.152
48
16
-
64
45
-
1
-
46
Aceh Jaya
134
25
551
711
14
-
12
25
12
7
13
-
32
Bener Meriah
57
118
1.309
1.484
71
-
-
71
89
2
22
-
114
Pidie Jaya
38
23
521
582
13
27
20
60
20
0,21
1
-
21
Banda Aceh
34
23
707
764
23
-
10
33
22
0
-
-
23
Sabang
52
6
145
202
6
-
-
6
6
-
-
-
6
Langsa
29
21
611
661
3
-
18
21
21
-
-
-
21
Lhokseumawe
40
3
412
456
3
-
-
3
3
-
-
-
3
Subulussalam
63
73
474
610
29
5
39
73
32
3
17
20
73
2.102
1.782
19.766
23.650
1.282
145
355
1.782
1.297
72
363
49
1.781
2019 O
42
Type of Road Surface (Km)
A
O I
I n v e s t m e n t
I
I
A
O p p o r t u n i t i e s
A
A O
o f
A c e h
A I
I
2 0 2 1
Total
S U P P O R T I N G
I N F R A S T R U C T U R E
Central Route Aceh Tengah - Gayo Lues. I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
43
S U P P O R T I N G
I N F R A S T R U C T U R E
(Left) Toll Gate. (Right) Trans Sumatra Toll Road, Blang Bintang - Indrapuri Section.
44
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
I N F R A S T R U C T U R E
(Right) South West National Road. (Left) Provincial Road in Central Aceh.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
45
S U P P O R T I N G
I N F R A S T R U C T U R E
Two PLN electric Company technician installed electric cable.
46
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
Energy/Electricity
SIGLI
BP : 43.3 MW B ACEH
BP : 106.3 MW PLTD L BATA
of 514.74 MW, which will meet the electricity needs to support investment activities in Aceh.
SAMALANGA
BP : - MW
PLTD PP
22 MW
Aceh’s current electricity condition is in surplus with a total power of 641.7 MW and a peak load
I N F R A S T R U C T U R E
JANTHO
PLTMG ARUN (LNG) PLTMG ARUN 2 (LNG)
8 MW
184 MW
BP : 6.3 MW
BIREUN
ARUN
BP : 63.4 MW
PANTON LABU
BP : 18 MW IDIE
LHOKSEUMAWE
BP: 22.5 MW
19.8 BP : 51.2 MW
PLTD CTR
8 MW
ACEH JAYA
55 MW
KKA
LANGSA
20 MW
BP : 23 MW TUALANG CUT
TAKENGON
MEULABOH
BP : 23.1 MW
BP : 18.6 MW NAGAN RAYA BP : 21.9 MW
BP: 22.7 MW
PLTU MEULABOH 1,2
BLANGKEJEREN
2x110 MW
GI P BRANDAN (SUMUT) BLANGPIDIE
BP: 14.6 MW
KUTACANE
BP : 15 MW
GI BRASTAGI (SUMUT)
TAPAKTUAN KOTA FAJAR
GI SIDIKALANG (SUMUT) SUBULUSSALAM
BP : 11.7 MW
Power Kit 641,7 MW
Transfer SBU 184 MW
Total Capable Power 474,56 MW
Peak Load 514,74 MW
Reserved Supply 139,1 MW
SINABANG (ISOLATED)
150 kV transmission Substation SBU Interconnection Kit Isolated System SINGKIL
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
47
S U P P O R T I N G
I N F R A S T R U C T U R E
A
Year 2016
Group Tariff Social
Year 2017
Year 2018
Year 2019
201 % Cust Growth 2017
201 % Cust Growth 2018
% Cust Growth 2019
37.917
41.172
43.571
46.098
8,58
5,83
5,8
1.157.061
1.200.091
1.250.058
1.303.772
3,72
4,16
4,3
Business
89.364
104.186
117.040
126.489
16,59
12,34
8,07
Industry
2.213
2.669
3.012
3.236
20,61
12,85
7,44
Public
9.743
10.815
12.496
13.510
11
15,54
8,11
4
199
246
263
4.875
23,62
6,91
1.296.302 1.359.132
1.426.423
1.493.368
4,85
4,95
4,69
Households
Service Special/ Multifunction TOTAL O
48
201
I n v e s t m e n t
A
I A
O
A
O p p o r t u n i t i e s
Electric steam power plant, Nagan Raya.
IO A
o f
A c e h
2 0 2 1
S U P P O R T I N G
I N F R A S T R U C T U R E
(Above Left) The process of working Peusangan Hydropower plant. (Lower Left) Gas Engine Power Substation in Ladong, Aceh Besar. (right) Peusangan Hydropower plant tunnel, Bireuen.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
49
S U P P O R T I N G
I N F R A S T R U C T U R E
Group Tariff, Power Limit, Consumption and kVA Fees and Prepaid Electricity Reguler Group Tariff
Power Limit
Consumption Fee (IDR/kWh) & Cost kVA)
Prepaid (IDR/kWh)
R-1/TR
1,300 VA
1.467,28
1467,28
R-1/TR
2,200 VA
1.467,28
1467,28
R-2/TR
3,500 VA s.d 5,500 VA
1.467,28
1467,28
R-3/TR
6,500 VA ke atas
1.467,28
1467,28
B-2/TR
6,500 VA s.d 200 KVa
1.467,28
1467,28
Block WBP = K x 1,035.78 Block LWBP = 1,035.78 kVArh = 1,114.74 ****) Block WBP = K x 1,035.78 Block LWBP = 1,035.78 kVArh = 1,114.74 ****) Block WBP dan Block LWBP = 996.74 kVArh = 996.74 ****)
B-3/TM
above 200 KVa
I-3/TM
above 200 Kva
I-4/TT
30,000 Kva ke atas
P-1/TR
6,600 VA s.d 200 Kva
1476,28
P-2/TM
above 200 KVa
Block WBP = K x 1,035.78 Block LWBP = 1,035.78 kVArh = 1,114.74 ****)
P-3/TR
-
1.467,28
L/TR, TM, TT
-
1.644,52
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
-
1467,28
SOURCE : PT. PLN (PERSERO) 29 MARET 2018
50
-
2 0 2 1
1467,28
Peusangan hydropower development progress.
Note : Tariffs can change from time to time in accordance with the stipulations of the Minister of Energy and Mineral Resources WBP : Peak Load Time LWBP : Outside Peak Load Time Excess reactive power consumption (kVArh) charges are imposed in case the monthly ****) : Average power factor is less than 0.85 (eighty lia per liter)
S U P P O R T I N G
I N F R A S T R U C T U R E
Peusangan hydropower development progress.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
51
S U P P O R T I N G
I N F R A S T R U C T U R E
Clean Water Water is one of the main requirements in investment activities. Aceh already has 23 Regional Water Supply Companies (PDAMs) as a source of clean water that can be used to support investment activities. However, we still open opportunities for investment development in this sector.
Utilization of clean water at the A
52
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
I N F R A S T R U C T U R E
Krueng Aceh.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
53
S U P P O R T I N G
I N F R A S T R U C T U R E
Customer
Number of Customers, Tariffs, Production Volume, Distribution Volume, Sold Volume and Non-Revenue Water Regional Water Supply Companies (PDAM) by Regency/ City in Aceh, 2019.
SOURCE: REGIONAL MANAGEMENT OF THE ASSOCIATION OF INDONESIAN WATER SUPPLY COMPANIES (PERPAMSI) ACEH PROVINCE
54
I n v e s t m e n t
Production Distribution Volume Volume (m3) (m3)
Sold Volume (m3)
Regency/City
Regional Water Supply Companies (PDAMs)
Simeulue
PDAM Tirta Fulawan
40
2.957
105
1.788
4.890
6.500
514.053
508.900
344.055
164.845
Aceh Singkil
PDAM Tirta Singkil
44
3.766
159
1.072
5.041
1.800
1.645.488
1.445.904
914.686
531.218
South Aceh
PDAM Tirta Naga Tapaktuan
95
3.687
278
1.047
5.107
5.107
1.763.928
1.269.539
656.783
612.756
Southeast Aceh
PDAM Tirta Agara Kutacane
20
2.020
90
31
2.161
2.300
3.811.079
3.153.600
1.220.752
1.932.848
East Aceh
PDAM Tirta Peusada
241
11.328
1.312
316
13.197
3.000
3.665.175
3.501.383
2.420.138
1.245.037
Aceh Tengah
PDAM Tirta Tawar
51
6.209
1.605
2.432
10.297
2.500
1.796.446
1.796.446
1.458.076
338.370
West Aceh
PDAM Tirta Meulaboh
15
4.361
266
6.102
10.744
3.227
388.800
356.400
104.445
251.955
Aceh Besar
PDAM Tirta Mon Tala
310
29.430
3.885
3.970
37.595
4.206
13.669.034
12.627.208
9.293.139
3.334.069
Pidie
PDAM Tirta Mon Krueng Baro
72
7.273
894
1.195
9.434
3.600
2.343.686
2.146.756
1.310.793
835.963
Bireuen
PDAM Tirta Krueng Peusangan
441
20.544
2.210
1.718
24.913
2.000
7.724.105
7.003.853
4.785.938
2.217.915
North Aceh
PDAM Tirta Mon Pase
612
26.242
2.851
7.290
36.995
5.794
11.434.914
10.220.490
5.376.892
4.843.598
Southwest Aceh
PDAM Gunoeng Kila
5
1.308
1
1.251
2.565
4.000
625.320
625.320
15.279
610.041
Gayo Lues
PDAM Tirta Sejuk
45
5.280
205
753
6.283
1.000
3.689.712
3.374.352
1.025.723
2.663.989
Aceh Tamiang
PDAM Tirta Tamiang
209
15.229
1.699
473
17.610
4.195
6.328.949
5.939.430
3.772.491
2.166.939
Nagan Raya
PDAM Simpang Peut
-
-
-
-
-
-
-
-
-
-
Aceh Jaya
BLUD SPAM Tirta Mon Mata
89
6.376
186
2.549
9.200
1.609
1.509.222
1.026.562
1.026.562
482.660
Bener Meriah
PDAM Tirta Beungi
45
4.563
26
126
4.760
2.643
2.410.560
2.410.560
1.111.910
1.298.650
Pidie Jaya
PDAM Tirta Krueng Meureudu
100
6.502
444
391
7.437
3.055
2.091.888
2.049.840
1.014.169
1.077.719
Banda Aceh
PDAM Tirta Daroy
431
40.360
9.204
12.415
62.410
4.758
23.537.332
22.935.283
14.434.227
8.501.056
Sabang
PDAM Tirta Aneuk Laot
45
5.919
643
233
6.840
3.660
2.990.938
2.770.134
1.978.568
791.566
Langsa
PDAM Tirta Keumeuneng
147
13.069
1.435
2.882
17.533
3.666
5.570.005
5.295.376
3.183.489
2.386.516
Lhokseumawe
PDAM Ie Sare Beurata
18
1.832
11
-
1.861
3.588
271.825
271.825
238.927
32.898
Subulussalam
PDAM Kota Subulussalam
16
1.384
2
25
1.427
500
738.720
320.779
274.958
463.762
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Social
Large Rumah Commerce Tangga / Industry / Port
NonTotal Active Customer
Tariff (Rp)
Non Revenue Water (NRW) (m3)
S U P P O R T I N G
I N F R A S T R U
C T U R E
Water Supply Pipeline Development 1. The water supply pipeline system is developed to meet basic needs of the community, industry and other business activities for drinking water; 2. Increasing the water supply production capacity by: a. addition of existing pipeline; and b. increase the capacity of existing installations. 3. Development of the water supply pipeline system is carried out through: a. installation of new distribution pipelines; and b. construction of a new drinking water treatment plant.
Water reservoir for Tirta Daroy Water Company.
4. Development of a water supply pipeline system can be built by a regional system including:
Banda Aceh - Aceh Besar; Lhokseumawe - North Aceh, Langsa - East Aceh, and between other regencies / cities.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
55
S U P P O R T I N G
I N F R A S T R U C T U R E
Banking and Financial I Banking has an important role in investment activities. Aceh already has both state-owned and private banks, as well as regional governmentowned banks that will facilitate investment activities and are likely to be your partners in developing investment in Aceh.
BRI Branch Banda Aceh.
56
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
Banking and Financial Institutions in Banda Aceh
With the Financial Services Authority O
In Aceh there are 31 banks and financial institutions that can bridge your business transactions, see the attachment for bank names below:
and. Able protect the interests of
Indonesian Bank (IB) Aceh Province Representative Office
Bank Central Asia (BCA) Syariah
Bank BII (Maybank)
Bank Swamitra
Bank Mandiri
Bank Aceh Syariah
Bank Permata
BPR Mustaqim
Bank Mandiri Syariah
Bank Tabungan Negara (BTN)
Bank Permata Syariah
PRS Hikmah Wakilah
Bank Negara Indonesia (BNI)
Bank Tabungan Negara (BTN) Syariah
Bank Mega Syariah
LKMS Mahirah Muamalah
Bank Negra Indonesia (BNI) Syariah
Bank Tabungan Pensiun Negara (BTPN)
Bank Panin
BPR Berlian
Bank Rakyat Indonesia (BRI)
Bank Muamalat
Bank Pundi
Jamkrindo Kanca Aceh
Bank Rakyat Indonesia (BRI) Syariah
Bank Bukopin
Bank CIMB Niaga
Ulamm (Lembaga Keuangan)
Bank Central Asia (BCA)
Bank Danamon
Bank Sinarmas
I N F R A S T R U C T U R E
Indonesian Bank, Banda Aceh.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
57
S U P P O R T I N G
I N F R A S T R U C T U R E
Indonesian Bank, Banda Aceh.
58
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
S U P P O R T I N G
Hotels
I N F R A S T R U C T U R E
Total of Accommodations, Available Rooms and Beds in Classified Hotel by Regency/Municipality in Aceh Province, 2017 – 2019 Stars Hotel
Aceh’s hotel sector is supported by national and international connection level, such as the Bencoolen and Kyriad .
Hotel Hermes Palace.
Aceh already has hotels from 5 stars to non-budget in 23 regencies/cities along with the focus of the Aceh Government in developing the tourism sector, additional hotels are needed. Therefore, Aceh is still highly open to the opportunity of developing hotels, MICE, condominiums, and other accommodations.
Non-budget and other accommodations
Regency/City
Accommodation
Rooms
Beds
Accommodation
Rooms
Beds
Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah West Aceh Aceh Besar Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017
1 1 1 1 2 13 1 2 1 23 25 18
25 75 36 60 125 1.294 64 120 87 1.886 1.965 1.457
35 135 59 114 212 2.323 106 238 125 3.347 3.328 2.444
20 23 10 15 6 26 16 13 12 8 1 11 8 7 2 4 3 4 67 137 12 16 7 428 434 319
321 266 198 233 89 440 324 197 199 347 11 143 169 133 52 70 28 48 1.700 1.113 277 423 115 6.896 7.020 6.644
481 467 392 352 172 723 546 309 366 569 19 260 293 240 92 133 36 86 3.024 1.443 498 748 215 11.464 11.631 11.176
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
59
S U P P O R T I N G
I N F R A S T R U C T U R E
Swimming Pool Hermes Palace Hotel.
60
I n v e s t m e n t
O p p o r t u n i t i e s
Hermes Palace Hotel, Banda Aceh.
o f
A c e h
2 0 2 1
Receptionist at Hermes Palace Hotel.
S U P P O R T I N G
I N F R A S T R U C T U R E
Hotel In Banda Aceh And Surrounding Areas Budget Hotel/Non
Hermes Palace Hotel.
88 Hotel Atjeh
Arabia Hotel
Al Fatih Hotel
Afaris House
Ayani Hotel
Daka Hotel
Kuala Radja Hotel
Grand Arabia Hotel
Diana Hotel
Mars Hotel
Grand Nanggroe Hotel
Grand Lambhuk Hotel
Siwah Hotel
Grand Permata Hati
Hip Hop Hotel
Kriyad Muraya Hotel
Hotel 61
Oasis Atjeh Hotel
Lading Hotel
Kumala Hotel
Sei Hotel
Madinah Hotel
Mekkah Hotel
Sulthan Hotel International
Oyo 1630 Hotel Ring Road
Medan Hotel
The Pade Hotel
Oyo 884 Rumoh PMI Hotel
Hermes Palace Hotel
Oyo 1845 GM Inn Hotel Oyo 854 UB Caisar Hotel Poma Hotel Prapat Hotel Rasamala Hotel Seventeen Hotel Thayyiba Hotel Kyriad Muraya Hotel.
Ayani Hotel.
Wisata Hotel
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
61
S U P P O R T I N G
I N F R A S T R U C T U R E
Hospitals in Aceh
General Hospital
Special Hospital
Simeulue
1
-
Aceh Singkil
1
-
South Aceh
1
-
Southeast Aceh
2
-
East Aceh
3
-
Aceh Tengah
2
-
West Aceh
4
-
Aceh Besar
2
-
Pidie
5
-
Bireuen
6
-
North Aceh
2
-
Southwest Aceh
1
-
Gayo Lues
1
-
Aceh Tamiang
2
-
Nagan Raya
1
-
Aceh Jaya
1
-
Bener Meriah
2
-
Pidie Jaya
1
-
Banda Aceh
11
2
Aceh has hospitals in all
Sabang
2
-
regencies / cities, but the
Langsa
4
-
construction of new hospitals is
Lhokseumawe
10
-
still widely open to be developed,
Subulussalam
1
-
especially international hospitals
2019
66
2
that provide complete and up-to-
2018
55
12
date services.
2017
-
-
Regency/City
Jumlah rumah sakit umum & rumah sakit khusus menurut Regency/City di Aceh, 2019
Hospitals are a complete health service facility for individuals. The availability of hospitals is extremely needed to provide health insurance for all entities, both the general public and workers in various investment sectors.
O
62
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A
I
I
A
A
A O
A I
I
Meuraxa General Hospital.
Cardiat Hybrid Operating Suite
S U P P O R T I N G
I N F R A S T R U C T U R E
Aceh Government Mental Hospital, Banda Aceh.
Zainal Abidin General Hospital, Banda Aceh.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
63
S U P P O R T I N G
I N F R A S T R U C T U R E
Telecommunication Cellular and Internet Network Provider in Aceh
Telecommunication is a technology network which is needed in the development of investment activities. The presence of telecommunications will accelerate all processes
Download Speed : 4G
data transmission accurately and efficiently. Aceh has several telecommunications providers ready to support investment activities. I
64
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Download Speed: Overall
Download Speed: 4G
Latency
S U P P O R T I N G
Telkom Tower, Sinbun Sibreh, Banda Aceh.
I N F R A S T R U C T U R E
Telkom tower, Takengon, Aceh Tengah.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
65
4 Potential Sectors 66
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Iboih, Sabang.
4
I the keys to enhancing the economic A focusing in four major 1 A 2 I
Energy & Infrastructure
Agro-industry
Tourism Development
P O T E N T I A L
S E C T O R S
Aceh Investment Development Zones These four sectors have a strong foundation to be developed. Coffee, Patchouli, Cacao, Coconut, and Palm Oil are main commodities of Aceh. Furthermore, the fishery is also a potential investment to be explored in Aceh.
A I Development Zones.
In accelerating the realization of investment as well as improving the investment climate, we are striving to facilitates licensing service accordance with the procedure, improving infrastructure and security. Therefore, Aceh will be perfect for your future investment. Visit to the Embassy of the United Arab Emirates.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
67
Energy & Infrastructure Indrapuri Toll Gate
68
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Testimony
Testimony
I Businesspersons in Aceh
In accordance with Presidential Regulation
The people from North Sumatra Province will easily
No. 117 of 2015, currently PT. Hutama
access tourism located in Banda Aceh, so that it will
Karya (Persero) is in charge to costruct
affect Aceh’s community income. In addition, through
the Trans Sumatra Toll Road (JTTS) along
this freeway, the level of comfort and safety can be felt
± 2,765 Km which is integrated from
by toll road users and reduce the crime rate in national
Lampung Province to Aceh Province.
roads. Hutama Karya is grateful for the support that has been given by the Regional
The existence of Trans Sumatra Toll Road is expected to improve accessibility
Government and the people of Aceh, especially in the
between regions, to facilitate logistics and
process of providing land so that the construction of
to boost the economy of Sumatra Island.
the Sigli - Banda Aceh Toll Road can be carried out
The existence of the Trans Sumatra Toll
smoothly.
Road, especially in Aceh Province (Sigli -
Indrapuri IC, Sigli - Banda Aceh Toll Road
Banda Aceh Toll) will be able to drive the
Budi Harto
tourism sector.
Director of PT Hutama Karya (Persero)
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
69
E N E R G Y
&
I N F R A S T R U C T U R E
Infrastructure Trans Sumatra Toll Road Development Project Progress of the Implementation of the Cross - Sigli Banda Aceh and Langsa Binjai Toll Roads The Trans Sumatra Toll Road (JTTS) for the Sigli
section of Indrapuri - Blang Bintang has been fully
- Banda Aceh Section has a total length of 74 Km,
operational since it was inaugurated by President
with an estimated investment value of Rp. 12,354
Joko Widodo on August 25, 2020.
Trillion. The Sigli - Banda Aceh Toll Section has 6 (six)
Banda Aceh - Sigli Toll Road.
70
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Interchange (IC) or Simpang Susun (SS) sections and
The Trans Sumatra Toll Road (JTTS) Binjai - Langsa
is equipped with 6 (six) toll sections namely section
Section has a total length of 131 Km, with an
1 Sigli - Seulimun (25 Km), section 2 Seulimun -
estimated investment value of Rp. 23,354 Trillion.
Jantho (6 Km)), section 3 Jantho - Indrapuri (16
The Binjai - Langsa section has 5 (five) Interchange
Km), section 4 Indrapuri - Blang Bintang (14 Km),
(IC) or Simpang Susun (SS) sections. Until now, the
section 5 Blang Bintang - Kuto Baro (8 Km) and
development progress is in the Binjai - Pangkalan
section 6 Kuto - Baro - Baitussalam (5 Km). Until
Brandan section (58 km) with construction progress
now, development progress has reached 61%
reaching 16%. Langsa - Lhokseumawe Toll Road
construction and 76% land acquisition. The 14 km
Langsa - Lhokseumawe Toll Road Map.
E N E R G Y
&
I N F R A S T R U C T U R E
Langsa - Lhokseumawe Toll Road Technical Data Location of construction: South Sumatra and Jambi Provinces Main road length Design Speed
: 134,888 Km
: 100 Km/Hour
Number of Lines: Initial Stage Final Stage Median Type Max Slope Max Super elevation
:2
x 2 Lanes : 2 x 3 Lanes : Double Median Concrete Barrier : 3% : 8%
Pavement Type: Main road Access Langsa - Lhokseumawe Toll Road Map
Cross
Rest Area Location
The width of the road: Road width Outer Shoulder Width
Crossings
Rest Area Type A : Sta. 95+900 (1 pair) Next to Access Road Idi Rayeuk (1 piece)
: 3,6 m
: 3,0 m
No Description
Total
1
Underbridge (River Bridge)
16
2
Overpass
17
3
Overpass Simpang Susun
2
4
Box Underpass Simpang Susun
1
Interchange Location
4
Box Underpass
99
IC Idi Rayeuk (Sta.
: ± 3,7 km
5
Underpass (Traffic Bridges, Utilities and Railways)
15
: ± 2,73 km
6
Box Culvert
Inner Shoulder Width
: 1,5 m
Rest Area Type B : Sta. 28+700 (1 pair)
Median Width : 5,5 m (Including Shoulder Inside) Widening Direction
: Outward
* Data is still in the process of calculation and study, there may be changes
48+856) IC Lhoksukon (Sta. 102+225) IC Lhokseumawe (Sta. 134+412)
: ± 1,65 km
405
: Rigid
Pavement : Rigid Pavement : Flexible Pavement
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
71
E N E R G Y
&
I N F R A S T R U C T U R E
Technical Data Lhokseumawe – Sigli Toll Road
Lhokseumawe - Sigli Toll Road Map.
Illustration
72
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E N E R G Y
Toll Road Technical Data
Total Rest Area
Location of construction : Aceh Main road length Speed Design
Province : 157 Km : 100 Km/Hour
Final Stage Median Type Max Slope Max Super elevation
IC Bireuen
:2
x 2 Lanes : 2 x 3 Lanes : Double Median Concrete Barrier : 3% : 8%
Access Cross
Lhokseumawe – Sigli Toll Road Maps
: Rigid
Pairs
Interchange Location IC Meuredue IC Lamlo
: Sta.
46+000 : Sta. 105+300 : Sta. 143+000
Location of Rest Area
Pavement Type: Main road
I N F R A S T R U C T U R E
* Data data masih dalam proses perhitungan dan kajian, dimungkinkan adanya perubahan
Number of Lines: Initial Stage
:4
&
Pavement : Rigid Pavement : Flexible Pavement
Rest Area Type A (6 Ha) : Sta 1+000 (1 pair) Sta. 41+000 (1 pair) Sta. 81+000 (1 pair) Sta. 121+000 (1 pair)
The width of the road: Road width Outer Shoulder Width Inner Shoulder Width Median Width (Including Shoulder Inside)
Widening Direction Total Interchange
: 3,6
m : 3,0 m : 1,5 m : 5,5 m : Outward :3
Pieces
Illustration
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
73
E N E R G Y
&
I N F R A S T R U C T U R E
Financial Data Langsa – Lhokseumawe (134,8 Km)
Lhokseumawe – Sigli (157 Km) : Rp 27.725
Investment
: 0,41%
IRR
: Rp
NPV
M
: Rp 23.681
Investment
: 2,01%
IRR
-22.668 M
M
: Rp -18.216 M
NPV
Concession Period: 40 Years (2022 – 2062) Project Financial Structure: 1. Debt 2. Equity (PMN) * Data is still in the process of calculation and study, there may be changes
Lhokseumawe – Sigli Development Plan (Km) 2021 2022 22
40
Langsa – Lhokseumawa Development Plan (Km) 2023 2024 56
2021 2022
39
34
SOURCE: PT. HUTAMA K ARYA
74
I n v e s t m e n t
SOURCE: PT. HUTAMA K ARYA
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
40
2023 2024 40
21
Illustration
E N E R G Y
&
I N F R A S T R U C T U R E
Urban Railways Development Why Are Urban Railways Necessary?
URBANIZATION: The existence of trains and station nodes has become the center of new economic activities for the society around Banda Aceh City.
will result in congestion in urban areas. The V/C ratio in 2021 shows a value of >0.85 on several roads in the City of Banda Aceh and will expand in the following years (Hendra, 2017). THE INCREASING USE OF FUEL: The rapid growth of vehicles has not been controlled.
Decree of the Minister of Transportation of the Republic of Indonesia Number Kp 2128 of 2018 concerning the National Railway Master Plan
City of Banda Aceh as PKN
Qanun No. 19/2013
Banda Aceh City as PKN
The Inter-City Railway Network is Developed to Connect: PKN with centers of activities in neighbor countries; between PKN;
cities of Banda Aceh, Medan, Pekan Baru, Padang, Palembang,
The Urban Railway Network is Developed to:
Governor Regulation Number 58 of 2014 concerning Aceh Railway Master Plan.
hexafluoride in the atmosphere.
PP No. 13/2017
Banda Aceh City as PKW
PKW with PKN or between PKW
temperature of the earth’s surface is the result
hydrofluorocarbons, perfluorocarbons, and sulfur
Presidential Regulation No. 13/2012
The development of urban railway and its services include the Bandar Lampung and Batam.
such as; carbon dioxide, methane, nitrous oxide,
Illustration
Regulation Support:
GLOBAL WARMING: The increase in average of the increase of greenhouse gas emissions,
Presidential Regulation No. 13 Regarding Amendments to PP. NO. 26 of 2008 concerning Spatial Layout (RTRWN)
URBAN CHALLENGES: The inability of road capacity to keep up with the growth of vehicles
Direction of Spatial Policy
In addition to the intercity railways service, an urban railway network will also be built in the city of Banda Aceh along 52
Menghubungkan Kawasan perkotaan dengan bandar udara Mendukung aksesibilitas Kawasan perkotaaan PRESIDENTIAL REGULATION NUMBER 13 Year 2012 Regarding the Spatial Plan for the Sumatra Island
km in order to anticipate the increase of congested traffic
Aceh Qanun No. 19 of 2013 concerning the 2013-2033 Aceh
TRAFFIC ACCIDENTS: Total Accidents in Banda Aceh
movement in the city of Banda Aceh. The railway line connects
Regional Spatial Plan
City and Aceh Besar were 211 in 2018 and 257 in 2019.
the Banda Aceh city with SIM Airport.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
75
E N E R G Y
&
I N F R A S T R U C T U R E
POTENCY
No
Total Population
Sub-District
2015
2016
2017
2018
2020
2025
2030
2035
2040
BANDA ACEH CITY 1
Jaya Baru
24561
25012
25503
26013
27075
29922
35823
36547
40391
2
Banda Raya
23034
23459
23919
24398
25394
28064
33599
34278
37883
Demographics of Greater
3
Baiturrahman
35363
36013
36721
37455
38984
43084
51580
52622
58157
Banda Aceh
4
Lueng Bata
24660
25114
25607
26119
27185
30044
35969
36696
40555
5
Kuta Alam
49706
50618
51614
52645
54793
60556
72499
73963
81742
6
Kuta Raja
12872
13107
13365
13632
14188
15681
18773
19152
21167
7
Syiah Kuala
35817
36477
37193
37938
39486
43639
52245
53301
58907
8
Meuraxa
19040
19388
19770
20166
20989
23196
27771
28332
31312
9
Ulee Kareng
25250
25716
26221
26745
27836
30764
36831
37575
41527
10
Kuta Cot Gile
13783
14075
14363
14651
15249
16853
20176
20584
22749
25767
28477
34094
34782
38440
28007
30953
37057
37806
41782
13350
14755
17664
18021
19917
Population growth from 20152018 reached 25% However, it is predicted that population growth in 2040 is estimated to increase and reach 55.2% of the total population in 2018.
ACEH BESAR REGENCY 11
Mesjid Raya
23290
23785
24271
24757
12
Darussalam
25316
25853
26384
26909
13
12067
31983
12575
12827
15782
16116
16445
16774
17459
19295
23100
23567
26045
15
Blang Bintang Krueng Barona Jaya Peukan Bada
17422
17792
18156
18520
19276
21303
25504
26020
28756
16
Lhoknga
16552
16904
17250
17596
18314
20240
24232
24721
27321
17
Darul Imarah
52073
53177
54264
55350
57609
63668
76224
77764
85942
18
Darul Kamal
7553
7713
7870
8028
8356
9234
11056
11279
12465
19
Ingin Jaya
31318
12232
32637
33290
34649
38293
45845
46771
51690
Total
465459
474534
484128
493813
513966
568021
680042
693781
766748
14
O
76
I n v e s t m e n t
P R O J E C T I O N
O p p o r t u n i t i e s
A
o f
AI
A c e h
A
I
2 0 2 1
A I A
I
O A
O I
A
O
I
Simpang lima, Banda Aceh.
E N E R G Y
&
I N F R A S T R U C T U R E
Vehicle Ownership The number of private vehicle ownership from
This indicates that as the economy develops
2014 to 2018 has increased every year, with
and income levels increase, the level of vehicle
an average increase of 3.86% per year. While
ownership will also increase. The increase
in 2018, the number of private vehicles owned
in vehicle ownership has a drastic impact on
increased by 16.33% from 2014.
increasing traffic volume, causing traffic jams.
Total Private Vehicle Ownership 227193
232455
3%
220019
2% 0%
212108 199829
13% 29%
2014
2015
2016
2017
A
I A
IA
A A
A
Private car Walking / Bicycle
53%
Becak Trans Kutaraja Online Transportation
2018
Private vehicle ownership in 2018 is increased 3% from previous year.
O
Motorcycle
Figure of Transportation used in Aceh- Source: Consultant Survey Results
201
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
77
E N E R G Y
&
I N F R A S T R U C T U R E
Transportation (Travel Transport Mode) Motorcycles and private cars are the most common
The average percentage of domestic and international
transportation which are used for travel. It is
passengers in Sultan Iskandar Mud International Airport and
accounted that approximately 53% of respondents
Ulee Lheue Seaport have increased respectively by 7% for
use motorcycles and 29% use private cars.
domestic passengers and 2% for international passengers,
Meanwhile, only 18% of public transportation such as
and 13% for port passengers. This is strongly influenced by the
Trans Koetaradja, becak, and online transportation are
Government policies and the programs: improving the tourism
used by the society. The existence of urban railways is
sector in Banda Aceh and Sabang City by holding international
expected to increase the use of public transportation
and national events, and maintaining and developing
and decrease traffic jams.
infrastructure and service networks in the transportation sector.
Total Passenger of Sultan Iskandar Muda Airport Total Domestic Passenger (2010-2018)
991330 1012543
Total International Passenger (2010-2018)
805442 547147
565646 609494
661780
210521 256654 163045
577143 612109
79892
91860
88927
96388
105007 129985
Ulee Lheue Passenger Terminal.
2010 2011 2012 2013 2014 2015 2016 2017 2018 The percentage growth of domestic passenger in Sultan Iskandar Muda Airport is 7%.
78
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2010 2011 2012 2013 2014 2015 2016 2017 2018 The percentage growth of international passengers at Sultan Iskandar Muda Airport is 2%.
2 0 2 1
E N E R G Y
&
I N F R A S T R U C T U R E
The average percentage growth of Ulee Lheue 1 11 0 201
Total Passenger of Ulee Lheue Port 468818 418897 377442 312807 140175
129205
103354 61349
2015
2015
Kapal Cepat O
A
A
2015
2015
Kapal Lambat O
A IO A
201
Ulee Lheue Passenger Terminal.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
79
80 O
I n v e s t m e n t O I A AI
O p p o r t u n i t i e s A
o f O I A
A c e h 2 0 2 1 I
.S
Sp
ba ya -
ura
-S
pe
ng
ta
Ba
rab ay a
Su .L ue
p.
ra
-K ot a bo ta
m
Ja
Sp
ta
Ba
p.
-S
pe
es
M
O O I A AI A I A O I A I O O I A AI A
Sp
O I A I
ng
.L ue
Sp
ta
Ba
rab ay a
Su
0
ba ya -
0
p.
0
ura
500
e
500
-S
500
ta p
1000
ta
1000
bo
Ko ta
ra
1500
Ba
am
.J
Sp
e-
es
M
1500
.S
ng
.L ue
Sp
I A
Ko ta -
ta p
p.
Ko ta
ay a
ra b ra -
es -S bo
am
.J
Sp
Ko ta
.M
Sp
Su
2000 8433
p.
2000
7828
Ko ta
2500
7202
-S
2500 11411
ay a-
2500
10478
Ko ta
Traffic Flow at Daily Hours (smp)
17284
ur ab
Traffic Flow at Peak Hour (Afternoon) 19626
.S
Traffic Flow at Peak Hour (Morning) 21363
Sp
ur ab ay aKo Ko ta -S ta p. Su ra ba Sp ya .M es ra -K Ko ot ta a -S Sp p. .J M am es ra bo t a Ko pe ta -K -S ot p. a Sp Ja .L m ue bo ng ta Ba pe ta Sp -S .S p. Su ura rab ba ya ay a -S p. Lu en gB ata
.S
ng
.L ue
Sp
I A
Sp
Ko ta
p.
-S
Ko ta
ay a
Ko ta
ra b
ra -
es
Su
bo ta
am
.J
Sp
Ko ta
.M
Sp
p.
-S
ay a-
&
Ko ta
ur ab
.S
Sp
E N E R G Y I N F R A S T R U C T U R E
The requirement analysis
Characteristics of Traffic
2000
1500
1000
E N E R G Y
Trip Purpose 3000 2110
1914
2000
2113
1555
2586
Ulee Lheue Ferry Port
1092
1000 37
121
73
461
8
Tsunami Museum
et oW or W k or kt oH om Ho e m et oS ch Sc oo ho l ol to Ho m Ho e m et oO th Ot er he rt oH om W e or k to W or W k or k to Ot he Ot t he rt oW or Ot k he rt oO th er
0
Baiturrahman Great Mosque
Ho m
Graph of distribution based on the purpose of trip O
O
I
I
O
A
AA
O
I
A 201
A
O
A IO
15
Polda Aceh
5
3
Baiturrahim Mosque
49
6
2
RSUDZA
Syiah Kuala University
10
9 Abulyatama University
7 4 14
DESCRIPTION: 1 = Leung Bata 2 = Baiturrahman 3 = Kuta Raja 4 = Banda Aceh 5 = Syiah Kuala 6 = Kuta Alam 7 = Jaya Baru 8 = Meuraxa 9 = Ulee Kareng 10 = Darussalam 11 = Blang Bintang 12 = Krueng Barona Jaya 13 = Lambaro 14 = Mata Ie 15 = Lhoeknga 16 = Krueng Raya 17 = Lampenerut
UIN Arraniry
Aceh KODAM Governor's Office Iskandar Muda
Simpang 7 Ulee Kareng
13
Batoh Bus Terminal
17
1
Simpang Lambaro
I N F R A S T R U C T U R E
DESIRE LINE TO BANDA ACEH CITY CENTER
16
Travel Destination Graph
&
Bandara Sultan Iskandar Muda
12
Source: FS urban railways in Aceh Province and its surroundings
NEEDS
ANALYSIS (2)
11
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
81
E N E R G Y
&
I N F R A S T R U C T U R E
Spatial Pattern Analysis Sub-District Type of Allocation of Space Transverse Blang Bintang
Airport Area, Urban Settlements, Agricultural Wetland
Ingin Jaya
Urban Settlements, Agricultural Wetland
Lueng Bata
Trade and Service Area, Office Area, Residential Area
Baiturrahman
Trade and Service Area, Office Area, Cultural Heritage Area, Green Open Space
Meuraxa
Trading Area, Residential Area, River Side, Port Area
Based on the results of the spatial overlay pattern
mostly in the spatial design of trade and service areas and residential areas
82
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E N E R G Y
&
I N F R A S T R U C T U R E
Potential Railway Line Plans
M E S J I D R AYA
BAITUSSALAM
DARUSSALAM SYIAH KUALA
K U TA R A J A K U TA A L A M
A
C MEURAXA ULEE KARENG K R U E N G B A R O N A J AYA BAITURRAHMAN
B
K OTA B A R O
L U E N G B ATA J AYA B A R U
PEUKANBADA
Line Plan
Length (Km)
Route
Line A
16,86
SIM Airport-Modal Bangsa-Bakoi-Pagar air-Lueng Bata-Grand Mosque-Lampaseh-Ulee Lheue Port
Line B
20,70
Krueng Cut-Darussalam-Bakoi-Pasar Lambaro-Wali Nanggroe-Sp. Lampeuneurut-Keutapang-City Centre
Line C
11,93
Lam Ujong-Sp. Mesra- Government Office Center -City Center
B A N D A R AYA
DARUL IMARAH
I N G I N J AYA
B
BLANG B I N TA N G
A
LHOKNGA DARULKAMAL
S I M PA N G T I G A
SUKAMAKMUR
M O N TA S I K
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
83
E N E R G Y
&
I N F R A S T R U C T U R E
Potential Hinterland Surround Line A Line
SYIAH KUALA
STASIUN 7 (ULEE LHEUE) BAITUSSALAM
Sub-District
Station Location
Potential Area
Blang Bintang
SIM Airport Station and Lambaro Station
International Airport Area, Trade and Service, Education, Religious Buildings, Residential Area
Ingin Jaya
Bakoi Station and Pagar Air Station
Tagelan/planted area and irigation area
Lueng Bata Station
Residential area, Trade and Service, Education, Religious Buildings, Offices, PLTD, Sport Field, Transportation
Masjid Raya Station
Residential area, Trade and Service, Education, Religious Buildings, Offices, PLTD, Sport Field, Transportation, Defense / Military, Museums, Health, Markets
Ulee Lheue Station
Residential area, Trade and Service, Education, Religious Buildings, Offices, PLTD, Sport Field, Health, Cultural Heritage, Green Spaces
STASIUN 4 (PAGAR AIR) DARUSSALAM STASIUN 1 (BANDARA SIM) K U TA R A J A K U TA A L A M
A A
STASIUN 3 (LAMBARO) MEURAXA ULEE KARENG BAITURRAHMAN
PEUKANBADA
KRUENG BARONA J AYA
K OTA B A R O
Lueng Bata
L U E N G B ATA
J AYA B A R U
Line A
A
STASIUN 6 (MASJID RAYA) I N G I N J AYA DARULIMARAH
Baiturrahman
B L A N G B I N TA N G
STASIUN 5 (LEUNGBATA)
Meuraxa
STASIUN 2 (MODAL BANGSA)
LHOKNGA
DARULKAMAL
S UKAMAKMUR
M O N TA S I K
K U TA M A L A K A
84
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E N E R G Y
The location of the railway line (line A) is selected by considering the optimization of land use, the potential for area development and the projection of passenger movements in the hinterland around the railway line.
Residential (M2)
Ricefield (M2)
As for the location of stations, apart from
Station 1
-
20.000
Station 2
8.054
11.946
Station 3
6.916
13.084
Station 4
4.730
15.270
Station 5
10.492
9.508
Station 6
7.200
account the need for local and international travel connectivity such as airports, ports, terminals and Trans Koetaradja Buses.
Line A Plan (Length 16,86 Km
International transportation type; SIM and Ulee Lheue Port Through development areas Connecting the activity center in Banda Aceh City and Aceh Besar Regency Catchment area is relatively further than sea area
12.800
Station 7
20.000
Depo
35.000
Railway Track Line Corridor
I N F R A S T R U C T U R E
Land Along a Street Railway Plan Line Utilization
considering the railway line, it also takes into
&
Total Description:
46276
98.625
83.668
236.233
Ulee Lheue Station
SIM Airport Station Modal Bangsa Station Lambaro Station Pagar Air Station Leung Bata Station Grand Mosque Station Ulee Lheue Station
Leung Bata Station
Pagar Air Station I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
85
E N E R G Y
&
I N F R A S T R U C T U R E
Estimation Cost of Monorail Construction
Cost of monorail construction in Line A with railway length is 16,86 Km and estimated to reach 5,78 Trillion (381.000.000 USD). The and reaches Rp. 16,97 Trillion (1.113.304.892 USD).
86
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Total trips in corridor line of railway planned in 2027:
17,170 (Peak Hour) 171,700 (Daily) + 30% SIM Airport Passengers + 30% Ulee Lheue Port
Railway Length
Cost
Travel Time
No
Line Plan
Km
Rp (Million)
Minutes
1
Line A
16,86
5.781.760
25
2025 – 2035 = 5.0%
2
Line B
20,70
7.098.602
31
2030 – 2040 = 4.5%
3
Line C
11,93
4.091.127
17
2040 – 2050 = 4.0%
Total
49,49
16.971.489
73
2050 – 2060 = 3.5%
The calculation cost for line B and C is done by rough count method based on assumption calculation component cost in line A. Illustration
Expected Total Passengers in Line A
Passengers
Passenger Trip Growth:
Percentage of TRAIN used = 10% In 2027 And Increase 0.5% Every Year, 30% By 2067
E N E R G Y
Railway Financial Components
The Cost of Passenger PSGR/DAY
2027
2032
2037
2042
2047
2052
17,170
27,392
41,951
60,992
86,865
118,896 160,727 209,983 258,485
2057
2062
2066
No
7
10
15
22
30
40
52
65
HEADWAY
9
6
4
3
2
1
1
1
Rp.Million/ km
Description
A
The Number 4 Of Trains 14
I N F R A S T R U C T U R E
I 10 00
A
YEARS
&
Rp. Million
CAPEX
5.781.760
1
Land Use
1.313.860
2
Civil Works (Line, Stasion, dan Depo)
195.000
3
Electrical, Rolling stock, Telecommunication & signals
70.000
Per km
265.000
Cost 16,86 km
4.467.900
B
OPEX 1
Illustration
O
112.680
Cost O&P 16,86 km
112.680
Line Length
16,86 Km
Durration of Travel
25 Minutes
Waiting Time
Initial Station : 5 Minutes Other Stations : 1 Minutes
User Cost
Rp. 10.500 per Km
A
AI
A
I A
O I
A
O
I
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
87
E N E R G Y
&
I N F R A S T R U C T U R E
The Economic Analysis DISCOUNT RATE (%) Economic Feasibility
8.00
9.63
10.00
NET PRESENT VALUE - NPV (Milyar IDR)
18,968.29
14,145.32
13,259.51
BENEFIT COST RATIO – BCR
1.34
1.00
0.93
ECONOMIC INTERNAL RATE OF RETURN - FIRR (%)
9.63
NPV > 0, EIRR > The rate of interest set is the project economically that feasibly operated
Illustration
88
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E N E R G Y
&
I N F R A S T R U C T U R E
The Financial Analysis DISCOUNT RATE (%) Economic Feasibility
7.00
8.00
9.00
NET PRESENT VALUE - NPV (Milyar IDR)
18.724,50
14,466.30
11.154.29
BENEFIT COST RATIO – BCR
1.32
1.02
0.79
FINANCIAL INTERNAL RATE OF RETURN - FIRR (%)
8.00
NPV > 0, FIRR
Total cost of travel in line A 1 0 0 202 the percentage of people 10 0 0 20 1
project financially O
A
AI
A
I A
O I
A
O
I
Illustration
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
89
E N E R G Y
&
I N F R A S T R U C T U R E
I
A
000
Railways Financial Components No
Description
A
Rp. Million/ km
CAPEX Areas
2
Civil Works (Line Station, dan Depo)
195.000
3
Electrical, Rolling stock, Signal and Telecommunication
70.000
1.313.860
A
Per km
265.000
Cost 16,86 km
1
90
I n v e s t m e n t
4.467.900
OPEX Cost O&P 16,86 km
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
16,86 Km
Travel Time
25 Minutes
Waiting Time
Initial Station : 5 Minutes Other Stations: 1 Minutes
User Cost
Rp. 5.000 per Km
5.781.760
1
B
Rp. Million
Line Length
112.680 112.680
O
O
A I
AI
A
I A
O I
E N E R G Y
The Economic Analysis
O
DISCOUNT RATE (%)
ECONOMIC FEASIBILTY
8.00
9.63
10.00
FINANCIAL FEASIBILITY
3.00
4.10
5.00
NET PRESENT VALUE - NPV (Milyar IDR)
18,968.29
14,145.32
13,259.51
NET PRESENT VALUE - NPV (Milyar IDR)
20,399.00
14,186.90
10,400.07
BENEFIT COST RATIO – BCR
1.34
1.00
0.93
BENEFIT COST RATIO – BCR
1.44
1.00
0.73
ECONOMIC INTERNAL RATE OF RETURN - FIRR (%)
9.63
FINANCIAL INTERNAL RATE OF RETURN - FIRR (%)
4.10
economically that feasibly operated A
AI
A
I A
O I
A
O
NPV > 0, EIRR < interest rate set is project I
I N F R A S T R U C T U R E
The Financial Analysis
DISCOUNT RATE (%)
NPV > 0, EIRR > The rate of interest set is the project
&
which financially not feasible
I n v e s t m e n t
Total travel cost for Line A is Rp. 00 assumption that in 202 public travels using 10 0 0 20 2
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
91
E N E R G Y
&
I N F R A S T R U C T U R E
Las Vegas Monorail, United States of America
Technology Chosen Tokyo Monorail, Jepang
Illustration
92
I n v e s t m e n t
Railways
6 train/railways
Width
3,038 mm (9 ft 11.6 in)
Height
4,362 mm (14 ft 3.7 in)
Doors
2 pairs per side
Maximum Speed
80 km/J (50 mph)
Traction system
Resistor control
Power output
Illustration
70 kW x 24
Minimum radius
< 60 m (200 ft)
Acceleration
3.5 km/h/s
Electrification
750 V DC third rail
Deceleration
4.0 km/h/s (service), 4.5 km/ h/s (emergency)
Operating speed
50 mph (80 km/j)
Electric system(s)
750 V DC
Capacity
224 Passengers Interior
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E N E R G Y
KL Monorail, Malaysia
Cross Section
&
I N F R A S T R U C T U R E
Interior
Body
Body
Bogie
Bogie
1,3
4,7 Illustration
Wikipedia
750 V DC Third rail
EQUATION FIELD: BF ORIGINAL SOIL ELEVATION DISTANCE
+14.000 +13.000 14.588 14.400 1.6890.056
6.837
7.303
2.223
I n v e s t m e n t
14.255
Electrification
+15.000
14.913
8,6 km (5,3 mil)
14.989
Line Lenghth
+16.000
0.041
60 km/j (37mph)
15.103
Operating Speed
+17.000
14.809
430 Passengers
The pile width is planned to be 2.0 m
+18.000
0.150
Capacity
6,0
1.969 15.080
4 train/railways
0.286 14.754
Railways
Illustration
0.278
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
93
E N E R G Y
&
I N F R A S T R U C T U R E
Train Minimum Standard
3 vehichles
Overall Width
2.35 m (per Vehicle) Type A 3.0 m Type B 5.5 m
Single Vehicle Lengths
Type C 7.3 m Middle cars 3.2 ton
Vehicle Weight
Illustration
End Cars 3.5 ton
Width at Surface
1.2 m Wide Concrete Slab
Width Of Elevated
1.1 m
Minimum Clearance Height Under Beam and Cantilever
4.5 m
Gradient (Slope)
12%
Minimum Horizontal Curve
38 m
Minimum Vertical Curve
300 m
Maximum Speed
100 km/h Type A 6 seated + wheel chair Type B 10 kursi + 25 standees
Vehicle Capacity
Type C 18 seated + 25 standees O
94
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A A
O O AI A
O IA IO
A 2000
E N E R G Y
General Structure of KPBU Banda Aceh Railways Project Ministry of Transportation
Ministry of Finance
Business Entity
Investor(s)
AMDAL
2022
PROCUREMENT
2024
STAR UP & MAINTENANCE
2023
CONSTRUCTION
2027
PJPK (Aceh Government)
Agreement Regress
KPBU Agreement
Penjaminan
Lenders
I N F R A S T R U C T U R E
STAGE OF IMPLEMENTATION
2019
Application for Feasibility Support
&
Debt
Project Company
Equity Infrastructure Services
Providing Support
Construction and O&M Contracts Payment Rates (Option 1)
FEASIBILITY STUDY
2021
ENGINEERING DESIGN
Contractor
Payment Rates (Option 2)
User
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
95
Hydropower plant Peusangan, Bireuen.
Energy 96
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Testimony
Testimony
Partner:
I Experience significant increase in growth of electrical
It is designed with a run-off river type with a cascade
The development of Hydropower plant Peusangan 1 and
During the Covid-19 pandemic, the
energy in Aceh Province and North
system using a regulating weir and two power houses.
2 is expected to bring benefits to the PLN and local areas,
Government of Aceh Tengah Regency
Sumatra are followed by gradually increase in
The total fall height from upstream to downstream is
including:
has cooperated and supported us to
population and economic growth. This has been
around 411.3 m. The installed generating capacity is 88
continue the construction processes
demanding huge investment in development
MW and is expected to produce up to 327.2 GWh per
of new power plants to fill the gap between
year. Peusangan 1 and 2 hydropower plant construction
power demand and supply system. Responding
work is divided into 4 job lots, namely:
1. Driving the economy wheels; the existence of Peusangan 1 and 2 hydropower plant will improve the quality and reliability of electricity supply in the Aceh Tengah regency and its surroundings to support the development of regional potential. 2. The operation of the Peusangan 1 and 2 hydropower plant will provide local revenue (PAD) from water use charges which can reach Rp. 1.96 billion / year (annual production = 327.2 GWH)
plant has reached 80.58% in September
3. Bringing up new tourism potentials related to the Peusangan hydropower plant, such as water tubing in the River Channel area, educational tours, etc.
be fully operational in 2022.
to that, the Government of Indonesia gives high priority in utilizing renewable energy and regional primary energy. Aceh Province has great potential for hydro power as an energy source.
1. Lot I – Main Civil Works by Hyundai E&C & PT. PP (Persero) Tbk. J / V 2. Lot II – Metal Works by PT. Wijaya Karya (Persero) Tbk. & PT. Amarta Karya (Persero) J / O 3. Lot III – Electromechanical Works by Andritz Hydro
Hydropower plant Peusangan 1 and 2 is the first largest hydropower project built in Aceh Province, utilizing the Peusangan river that flows from Laut Tawar Lake in Takengon City.
GmbH 4. Lot IV – 150 kV Transmission Line and Substations by PT. BBS & PT. KBI J / V
of the Peusangan 1 and 2 hydropower plant following the Covid-19 prevention protocols. As a result, the progress of the Peusangan 1 and 2 hydropower 2020 with total investment value up to the third quarter of 2020 reaching IDR 3,644,863,588,800, and it is expected to
Nanda Dani Andrianto
4. The operation of Hydropower plant Peusangan 1 and 2 can reduce BPP and increase the renewable energy mix as per the Government program.
Manager of UPP KITSUM 5
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
97
E N E R G Y
&
I N F R A S T R U C T U R E
Energy In an attempt to meet national electricity needs,
Indonesia merupakan salah satu negara dengan
Mr. President Jokowidodo has launched the
Indonesia is a country with abundant renewable
“35.000 MWe for Indonesia” program. This
energy potential. This potential can be used to
program is a form of government commitment to
substitute fossil energy if it is properly managed
create energy independence by optimally utilizing
and utilized,. Renewable energy is produced from
the sources of renewable energy as a substitute
energy resources that will not run out naturally, even
for fossil energy sources. There are diverse
if managed properly. Aceh offers 2 (two) primary
sources of fossil energy found on earth such as
sources of renewable energy, namely water and
petroleum, natural gas and coal which gradually
geothermal energy.
decrease and eventually run out as they are being used continuously.
The sources of fossil energy found on earth
out because they are used continuously.
Peusangan Hydropower plant, Bireuen.
98
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
To meet the demand for electricity, it is necessary
Aceh Governor’s Recommendation Application Process Issuing the Business Identification Number (NIB) that has been approved
Recommendation
Preparing Feasibility
by the Ministry of Law and
form from district
Study Report
Human Rights, NPWP, and
or city government
other permits in accordance with the OSS system
to build generating facilities by utilizing the potential of primary energy sources in Aceh. Most of it currently uses fossil energy sources (petroleum, gas and coal). The potential for water and geothermal energy sources scattered in districts or cities in
Investors
Aceh is targeted to replace fossil energy sources
Present
by development according to the needs of the Aceh
Submission of Applications
Feasibilty Study
Recommendation
electricity system. This will be done in several stages
to the Governor of Aceh cq.
Report to the
from the
by submitting applications for development as
Head of DPMPTSP Aceh
Government of
Government of Aceh
follows:
Aceh
E N E R G Y
&
I N F R A S T R U C T U R E
1. The potential of Hydropower plant in Aceh NO. HYDROELECTRIC
LOCATION
DISTRICT/CITY
Lae Suraya
Subulussalam
24 MW
Potential
LOCATION
DISTRICT/CITY
CAPACITY
STATUS
Woyla-5
Kr. Woyla
West Aceh
56 MW
Potential
50
Leuteung
Sungai Krueng Leumeuh
Pidie
14,7 MW
Potential
Governor’s Recommendation for IPP Candidate
51
Peusangan IV
Kr. Peusangan
Aceh Tengah
120 MW
Potential
102 MW
Governor’s Recommendation for IPP Candidate
52
Redelong
Redelong
Bener Meriah
18 MW
Potential
Bener Meriah
76,8 MW
Governor’s Recommendation for IPP Candidate
53
Teunom 2
Kr. Teunom
Aceh Jaya
240 MW
Potential
Gp. Pertik
Aceh Tengah
11,3 MW
in Arraging of Governor’s Recommendation
54
Woyla 1
Kr. Woyla
West Aceh
174,9 MW
Potential
Seunagan dan Tripa-3
Seunagan dan Kr. Tripa
Nagan Raya
242 MW
in Arraging of Governor’s Recommendation
55
Meureubo
Kr. Meureubo
West Aceh
38 MW
Potential
32
Geumpang
Village Geumpang Pekan
Gayo Lues
25 MW
in Arraging of Governor’s Recommendation
56
Meureubo 2
Kr. Meureubo
West Aceh
59 MW
Potential
33
Peusangan 4
Kr. Peusangan
Aceh Tengah
31 MW
Potential
34
Jambu Aye-3
Wh. Jambu Air
Aceh Tengah
37,2 MW
Potential
57
Kluet 2
Kr. Kluet
South Aceh
120 MW
Potential
35
Pameu
Kr. Pameu
Aceh Tengah
160,6 MW
Potential
58
Krueng Meriam
Tangse
Pidie
48 MW
Potential
36
Bidin/Jambu Aye
Kr. Jambu Aye
Bener Meriah
246 MW
Potential
59
Ketol A
Ketol
Aceh Tengah
10 MW
Potential
37
Peureulak
Kr. Peureulak
East Aceh
34,8 MW
Potential
60
Lawe Gurah
Lawe Gurah
Southeast Aceh
4,5 MW
Potential
38
Ramasan-1
Kr. Ramasan
East Aceh
171,6 MW
Potential
61
Teunom
Kr. Teunom
Aceh Jaya
10 MW
Potential
39
Jambo Papeun-2
Kr. Jambo Papeun
South Aceh
95,2 MW
Potential
62
Tembolon (Bidin 2)
Syiah Utama
Bener Meriah
3,1 MW
Potential
40
Jambo Papeun-3
Kr. Jambo Papeun
South Aceh
25 MW
Potential
63
Lawe Mamas
Lawe Mamas
Southeast Aceh
9,6 MW
Potential
41
Kluet
Kr. Kluet
South Aceh
141 MW
Potential
64
Kemerleng Uning
Pining
Gayo Lues
6 MW
Potential
42
Sibubung-1
Kr.Sibubung
South Aceh
32 MW
Potential
65
Lhok Pineung
Meureudu
Pidie Jaya
5,1 MW
Potential
43
Sibubung-2
Kr.Sibubung
South Aceh
121,1 MW
Potential
66
Lawe Bulan
Lawe Bulan
Southeast Aceh
6,5 MW
Potential
44
Sibubung-3
Kr.Sibubung
South Aceh
22,6 MW
Potential
67
Kerpap
Linge
Aceh Tengah
2,2 MW
Potential
45
Dolok-1
Kr. Dolok
West Aceh
32,2 MW
Potential
68
Subulussalam
Subulussalam
Subulussalam
7,4 MW
Potential
46
Kla
Kla
Gayo Lues
12 MW
Potential
69
Bener Meriah
Bener Meriah
Bener Meriah
7,5 MW
Potential
47
Geumpang
Kr. Geumpang
Pidie
19 MW
Potential
70
Mangku Sosial
Mesidah
Bener Meriah
7,2 MW
Potential
24
Southeast Aceh
120MW
LOCATION
DISTRICT/CITY
CAPACITY
STATUS
Lae Suraya
Pasir Belo
Subulussalam
240 MW
Governor’s Recommendation for IPP Candidate
49
26
Meureubo-3
Kr. Meureubo
Nagan Raya
100 MW
Governor’s Recommendation for IPP Candidate
27
Kluet-1
Kluet
South Aceh
180 MW
28
Teunom-3
Kr. Teunom
Aceh Jaya
29
Samar Kilang
Samar Kilang
30
Pertik-1
31
STATUS
88MW
Constraction (PLN)
6,99MW
Constraction (IPP)
25
1
Hydropower plant Peusangan
Kr. Peusangan
Aceh Tengah
2
PLTM Lake Sikap
Lawe Sikap
Southeast Aceh
3
PLTM Krueng Isep
Krueng Isep
Nagan Raya
10MW
Constraction (IPP)
4
Hydropower plant Kumbih-3
Kumbih
Subulussalam
45MW
Committed (PLN)
5
Peusangan 5-B
Negeri Antara
Bener meriah
6
Jambo Aye
Lubuk Pusaka & Bl. Seunong
East Aceh/North Aceh
7
Tripa-1
Kr. Tripa
8
Tripa-2
9
12,56MW
Governor’s Recommendation for IPP Candidate
140,01MW
Governor’s Recommendation for IPP Candidate
Gayo Lues
48MW
Governor’s Recommendation for IPP Candidate
Kr. Tripa
Gayo Lues
100MW
Governor’s Recommendation for IPP Candidate
Tripa-3
Kr. Tripa
Nagan Raya
192MW
Governor’s Recommendation for IPP Candidate
10
Peusangan 5-A
Negeri Antara
Aceh Tengah/Bener Meriah
10,92MW
Governor’s Recommendation for IPP Candidate
11
Meureubo-1
Kr. Meureubo
West Aceh
50MW
Governor’s Recommendation for IPP Candidate
12
Krueng Geupo/Teunom I Krueng Geupo
Pidie
100MW
Governor’s Recommendation for IPP Candidate
13
Krueng Sikuleh
Krueng Sikuleh
Pidie
100MW
Governor’s Recommendation for IPP Candidate
14
Batee
Kr. Batee
Southwest Aceh
100MW
Governor’s Recommendation for IPP Candidate
15
Luteng-1 dan Luteng 2
Sungai Krueng Leumeuh
Pidie
18,8MW
Governor’s Recommendation for IPP Candidate
16
Jambu Aye
Kr. Jambu Aye
Bener Meriah
75,4MW
Governor’s Recommendation for IPP Candidate
17
Lumut
Wh. Lumut
Aceh Tengah
15MW
Governor’s Recommendation for IPP Candidate
18
Jagong Jeget
Kr. Meureubo
Aceh Tengah
41MW
Governor’s Recommendation for IPP Candidate
19
Woyla
Kr. Woyla
West Aceh
250MW
Governor’s Recommendation for IPP Candidate
20
Cinendang
Sungai Cinendang
Aceh Singkil
151MW
Governor’s Recommendation for IPP Candidate
21
Teunom-3
Kr. Teunom
Aceh Jaya
83,64MW
Governor’s Recommendation for IPP Candidate
22
Lawe Mamas
Sungai Lawe Mamas
Southeast Aceh
47,5MW
Governor’s Recommendation for IPP Candidate
23
Tampur
W. Tampur
East Aceh
428MW
Governor’s Recommendation for IPP Candidate
Lawe Alas (Alas)
NO. NAMA PEMBANGKIT
Governor’s Recommendation for IPP Candidate
48
Kr. Alas
CAPACITY
Lae Suraya
NO. NAMA PEMBANGKIT
TOTAL
5384 MW
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
99
E N E R G Y
&
I N F R A S T R U C T U R E
2. Geothermal Power Plant (PLTP) in Aceh
Potential (MWe) No
Land
Regency/ City
-
-
-
in the form of thermal energy (heat) which is
2.
Lhok Pria Laot
Kota Sabang
50
-
-
-
-
produced and stored in the earth. Geothermal
3.
Jaboi-Keuneukai
Kota Sabang
-
-
50
energy is believed to be economical, abundant,
4.
Ie Seum - Krueng Raya
Aceh Besar
-
63
-
5.
Seulawah Agam
Aceh Besar
-
-
165
6.
Alur Canang
Pidie
25
-
-
7.
Alue Long - Bangga
Pidie
100
-
-
8.
Tangse
Pidie
25
-
-
9.
Rimba Raya
Bener Meriah
100
-
-
10.
G. Geureudong
Aceh Tengah
-
120
reaches 22.073 MWe with reserves of around
11.
Simpang Balik
Bener Meriah
100
-
-
-
-
17.506 MWe.
12.
Silih Nara
Aceh Tengah
100
-
-
-
-
13.
Meranti
East Aceh
25
-
-
-
-
14.
Brawang Buaya
Aceh Tamiang
25
-
-
-
-
15.
Kafi
Gayo Lues
25
-
-
-
-
17 potential geothermal points with an estimated
16.
G. Kembar
Gayo Lues
-
92
capacity of around 1,115 MWe spread over eight
17.
Dolok Perkirapan
Gayo Lues
25
-
-
625
275
215
developed. Indonesia’s geothermal potential
Geothermal sources are found in more than 300 points throughout Indonesia causing the energy to be distributed to nearly all of Indonesia. Aceh has
regencies and cities in Aceh. Total Potential of Aceh Geothermal
2 0 2 1
Evidence
-
in the world, but its utilization has not been fully
A c e h
Probability
25
Indonesia has the largest geothermal potential
o f
Pressumed
Kota Sabang
around tectonic plates.
O p p o r t u n i t i e s
Hipothetis
Iboih
exploitation technology which can only reach
I n v e s t m e n t
Speculative 1.
However, its utilization is still constrained by
100
Alternative (MWe)
Geothermal energy is a renewable energy source
sustainable, and environmentally friendly.
Electric steam power plant, Nagan Raya.
Source (MWe)
1.115 MWe
Continous exploration stage 2 x 5 MW -
-
IPB based on SK Kepala BKPMN No:1/1/IPB/ PMDN/2018 tanggal 9 April 2018 Initial Survey by Geological Agency in 2018 -
-
Determination of the Assignment Area of SP and Exploration Pabum (Kepmen ESDM No. : 04 K/30/DJE/2018)
Intial Survey Program based on SK. Ka. BKPM (a.n Menteri ESDM ) No.1/1/PSPB/PMA/2015 -
-
E N E R G Y
Aceh Gas Infrastructure Development Plan One pipeline has been developed from Lhokseumawe A I Estate and cities along the pipeline. Existing pipeline has been developed from Lhokseumawe (Aceh) to Sumatera Utara for supplying gast in Belawan Industrial Zone and City Gas through the pipeline. Now,
230Km Kab. Pidie Jaya
Kab. Pidie Kab. Bener Meriah
Gas Pipe Arun – Belawan
land acquisition and accessories.
Arun - Banda Aceh Gas Pipe (230 Kms) Arun - Belawan Gas Pipe (350 Kms) KIM - KEK Sei Mangkei Gas Pipe (120 Kms)
Kab. Aceh Taminag
Kab. Nagan Raya
amounting to USD 586,04 Million.
120Km
Kab. Gayo Lues Kab. Aceh Barat Daya
PT. Pertamina Gas (Pertagas) has gas allocation for 185 Million Standart Cubic Feet Per Day (MMSCFD).
Kab. Aceh Selatan
Gas comes from the Arun LNG Storage and Regasification Terminal, in its initial stage (2015) the fasilities supplied 120 MMSCFD of gas to PT. PLN. In 2018 the fasilities supply 197 MMSCFD to PT. 240 M.
pipeline installations (construction of transmission pipes),
Kab. Aceh Tengah
Kab. Aceh Barat
and 350 Kilometers long with a total investment
city gas system in North Aceh and East Aceh Regencies.
of Aceh. The Gas Infrastructure Development is included
Kab. Aceh Timur
Arun – Belawan pipe has capacity 300 MMSCFD
PLN to operate MVPP (Marine Vessel Power Plant)
Lhokseumawe - Banda Aceh – Meulaboh and west coast
Banda Aceh - Arun Belawan - KIM KEK Sei Mangkei
Kota Lhokseumawe Kab. Aceh Utara
about 10.000 household have been connected to the Future pipeline infrastructure will be developed from
I N F R A S T R U C T U R E
GAS PIPE MAP
350Km
Kab. Bireuen
&
After gas pipe Arun – Belawan has been operated, Pertagas developed 120 kms gas pipe to supply gas for national industry in KIM untill KEK Sei Mangkei. Pipe gas Arun – Belawan tol fee = USD 2,53/MSCF.
Kab. Aceh Tenggara
U
SKALA 1:1.500.000 Km 0
25
50
75
100
125
Kab* : Districts
Subulussalam
Investment Opportunities
Phase II: Banda Aceh – Meulaboh 200 km, requires approximately USD 330,43 million.
Scheme of Developments
Phase III: Meulaboh – Kota Fajar 250 km, requires
Phase I: Lhokseumawe - Banda
approximately USD 413,043 million.
Aceh 230 km, requires approximately
Regasification Facilities in Sabang (Weh Island)
USD 380 million.
and Sinabang (Simeulue Island).
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
101
E N E R G Y
&
I N F R A S T R U C T U R E WEH ISLAND Sabang
BANDA ACEH
Supply and Demand of Gas Projection
Ladong (Aceh Industries Area) Lawueng (Cement Factory)
ACEH BESAR LHOKSEUMAWE PIDIE JAYA
BIREUEN
PIDIE ACEH JAYA
NORTH ACEH
ACEH PROVINCE
BENER MERIAH EAST ACEH
WEST ACEH
LANGSA
ACEH TENGAH
Meulaboh
Regasification (existing)
ACEH TAMIANG
NAGAN RAYA
Regasification (plan) GAYO LUES
Gas pipeline (existing) Lhokseumawe - Belawan (345km)
SOUTHWEST ACEH Belawan
Gas pipeline (plan) Lhokseumawe - Banda Aceh (230 km) Banda Aceh - Meulaboh (200 km)
Supply:
SOUTH ACEH
Meulaboh - Kota Fajar (250 km)
MEDAN
SOUTHEAST ACEH Kota Fajar
NORTH SUMATERA PROVINCE
PHE NSO - NSB (Ex. EMOI) Triangle Pase Inc
Sinabang
SUBULUSSALAM
SIMEULUE ISLAND
Zaratex N.V. Arun Regasification
GAS CONSUMERS PER DAY
Prospectus Consumers:
NO
Cement Factory
District/City
Household (BBTUD) Big Industries (BBTUD)
KIA Ladong (Industrial Zone)
TOTAL (BBTUD)
PT PLN (Electricity)
1
Banda Aceh
0,78
1,57
1,18
3,53
City Gas (Households)
2
Aceh Besar
1,16
2,32
1,74
5,22
3
Pidie
1,32
2,63
1,97
5,92
4
Pidie Jaya
0,49
0,97
0,73
2,18
5
Bireuen
1,28
2,57
1,92
5,77
6
Lhokseumawe
0,55
1,10
8,28
9,94
TOTAL
5,58
11,17
15,83
32,58
Transportation
102
Small and Medium Industries (BBTUD)
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E N E R G Y
&
I N F R A S T R U C T U R E
Arun Lhokseumawe Special Economic Zone (KEK).
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
103
Agroindustry Samudera Kutaraja Fishing Port, Lampulo, Banda Aceh.
104
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Testimony
Testimony
I Experience
We have started investing in
It is necessary to improve policies for the licensing
PPS Lampulo since 2017 as
of special industrial sectors that have the potential
the first exporter of fishery products and bonded zone in Aceh.
for PAD and expanding work force. Infrastructure support and a measurable time
I feel many improvements in service
to complete licensing are the main conditions
and ease of licensing every year, in
for improving the investment climate in Aceh.
commitment and quality of service
Therefore, Aceh will become an attractive
from the Provincial Government and
investment destination location “.
the DPMPTSP team who actively guide us in every licensing obstacle that our company faces.
Almer Hafis Sandy President Director PT. Yakin Pasifik Tuna
Tuna fish for export.
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
105
A G R O I N D U S T R Y
Plantations Palm Oil
Aceh has 240,365 hectares of palm oil plantation which are managed by the community with a production of 410,415 tons in 2019. Palm oil is the largest plantation crop in Aceh by volume, area, and economic value. The palm oil industry has significant growth potential as a major source of supply for food products and biofuels. With the increase in production, Aceh is encouraging the construction of CPO factories and their derivative products.
106
I n v e s t m e n t
O p p o r t u n i t i e s
Oil palm plantation, Nagan Raya.
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Planted Area and Production of Palm Oil Owned by Communities by Regency/City in Aceh Province, 2019 Regency/City
Planted Area (Ha)
Production (Ton)
3.719 32.382 11.388 2.658 26.307
1.527 78.723 25.789 4.595 31.534
-
-
9.958 1.677 100 4.139 18.185 19.212 21.169 52.145 15.664 1.300 772 390 208 18.993 240.365 237.769 234.479
16.655 474 23 4.022 48.813 28.184 43.388 102.348 19.497 240 834 839 266 2.664 410.415 440.087 437.292
Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah West Aceh Aceh Besar Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017 O
A
A
I
A
A
The Government of Aceh has developed certain strategic plans for the palm oil commodities, namely: 1. Creating operational and policy support for sustainable palm oil commodities among the government, the private sector, nongovernmental organizations (NGOs), and the community. 2. Supporting public-private investment corporation of palm oil. 3. Reducing threats to high-value forest ecosystems and peat swamp ecosystems. 4. Creating a program for certification and distribution of provincial palm seeds. 5. Improving the supply chain and pricing transparency for palm oil production and processing.
Palm bunches.
Crude Palm Oil (CPO) is the main product of the palm oil industry. Nagan Raya, Aceh Singkil, West Aceh, Aceh Tamiang and Subulussalam are the regencies that produce the most CPO. Therefore, these areas are suitable for the development of the palm oil
The process of sorting in the CPO of PT SPS II Nagan Raya.
processing industry.
A IO A
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
107
A G R O I N D U S T R Y
List of Palm Oil Industries A
201
Bireuen
North Aceh
East Aceh
Aceh Jaya
West Aceh
Aceh Tamiang
PT. Blang Ketumba
PT. Perkebunan Nusantara I
PT. Padang Palma Permai
PT. Boswa Megalopolis
PT. Karya Tanah Subur
PT. Ensem Sawita
PT. Syaukat Agro
PT. Mopoli Raya
PT. Perkebunan Nusantara I (Tanjung Seumantoh)
PT. Syaukath Sejahtera
Subulussalam
Langsa
PT. Global Sawit Semesta
PT. Perkebunan Tualang Raya
PT. Agra Bumi Niaga
Potential Bumi Sakti
PT. Perkebunan Nusantara I (Island Tiga)
PT. Anugerah Fajar Rezeki
PT. Agro Sinergi Nusantara
PT. Mopoli Raya
Aceh Singkil
PT. Teupin Lada PT. Mutiara Sawit Lestari
PT. Mandiri Sawit Bersama
PT. Perkasa Subur Sakti
PT. Bangun Sempurna Lestari
PT. Bahari Dwikencana Lestari
PT. Perkebunan Lembah Bhakti (Singkohor)
PT. PN 1 PKS Tanjung
PT. Bumi Daya Agro Tirta Mas
PT. Parasawita
PT. Perkebunan Lembah Bhakti (Singkil Utara)
PT. Sisirau PT. P.P. Pati Sari
PT. Delima Makmur
PT. Samudera Sawit Nabati
PT. Socfin Indonesia
PT. Nafasindo
PT. Kurnia Nabati Utama
PT. Bima Village Sawita
PT. Ensem Lestari
PT. Mitra Sejati Sejahtera
PT. Tri Agro Palma
PT. Socfin Indonesia
PT. Budidaya Aneka Flora
PT. Bumi Sama Ganda
PT. Singkil Sejahtera Makmur
PT. Abadi Lestari Subulussalam
PT. PP.D.I Patchouli Wangi PT. Bukit Safa
PT. Sawit Tunggal Perdana PT. Bumi Daya Abadi
O
A
A
I
A
A
A IO A
A
I
A
A
A
PT. Darma Wisata Nusantara PT. Padang Palma Permai
108
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Nagan Raya Cooking O I Nagan Raya Regency is geographically located at 03 ° 40- 04 ° 38’ North Latitude and 96 ° 11- 96 ° 48’ East Longitude with a total area of 3,363.72 km2 (336,372 hectares).
Nagan Raya Regency is flanked by four districts namely West Aceh and Aceh Tengah on the North side, Gayo Lues and Southwest Aceh on the East side, West Aceh on the west and the Indonesian Samudera on the South side.
Cut Nyak Dien Airport
From Sultan Iskandar Muda Airport, Blang Bintang to Nagan Raya, the land route takes time:
5 hr 36 min (285 km) via Jl. Lintas Barat Selatan, Aceh
Cot Mu Area Lahan Investasi:
15 Ha
Land Transportation Based on data from the Bina Marga Agency of Nagan Raya Regency, the road length is 924.42 kilometers. The road that is in good condition is 92.21 kilometers, in moderate condition 59.61 kilometers, and in damaged condition 772.6 kilometers.
26 min 17.6 km Via Jalan Meulaboh Nagan Raya
Water transportation There is no major port in Nagan Raya Regency. Export and import activities take place in Kuala Langsa Port, Langsa City. Recorded activity reaches 2,591,633 tons per year. This shows that the port in Langsa City is ready to aid in distribution of cooking oil, especially in the Sumatra region.
Air Transportation For air transportation, the number of
Energy The availability of electricity in
flights arriving and departing at Cut
Nagan Raya Regency is adequate. It
Nyak Dhien Airport was 725 in 2017.
is recorded that in 2013, electricity
The highest frequency of aircraft arriving
usage in Nagan Raya had reached
and departing from and to Nagan Raya
68,960,058 kwh. This figure
occurred in December 2017, with the
decreased by 3.3 percent in 2014 to
number of passengers arriving being
66,670,101 Kwh. Based on PT.PLN in Nagan
224.64 kilometers are paved roads and 698.33
2,027 and 2,197 departing. This has
Raya Regency, in 2015 the number of electricity sold
kilometers are unpaved roads. Thus, transportation
shown that air transportation in Nagan
was 58,471,798 kwh. Although there is a decline, this did
in this Regency is sufficient with the support of
Raya Regency is feasible and sufficient to
not affect the availability of electricity for investment in
public transportation.
ease investment activities.
cooking oil factories in Nagan Raya Regency.
Palm Oil Mill PT. SPS II Nagan Raya.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
109
AGROINDU S T RY
Human Resources
Marketing opportunity
In terms of education, it is accounted that 37 percent of the workforce
The cooking oil industry has diverse market segments
are graduates from Primary School or below and 22 percent are from
depending on the quality of the oil and its composition,
Junior High School. The majority of the workforce in Nagan Raya,
such as amount and level of vitamins. There are
who graduated from Senior High School, is 26 percent. Meanwhile,
five market segments which can be identified by the
the population who graduated from Vocational High School was 2
marketing strategy of business people in the cooking oil
consists of several investment activities, namely:
percent, and 5 percent graduated with Diploma I / II / III education. The
industry, namely the traditional market segment (class
1. Construction of complete factory buildings,
remaining 8 percent are residents who graduated from the University.
C), class B, class B +, class A, and A +. The Ministry
This composition is sufficient to establish a cooking oil factory in
of Agriculture (2017) noted that the development of
Nagan Raya Regency.
palm cooking oil consumption at the household level in Indonesia in 2002-2016 has generally increased with an average increase of 5.81% per year. The predicted
110
Land Availability
consumption of palm cooking oil at the household level
The investment location for the Cooking Oil Industry is placed in Cot Mu
has decreased compared to 2016, while 2018 and 2019
Village, Tadu Raya Sub-District with an area of 15 Ha. The location of the
show that consumption of palm cooking oil has slightly
factory is away from the densely populated areas so that it will not disrupt
increased. Consumption of palm cooking oil in 2018 and
the surrounding environment with cooking oil processing activities. The
2019 is predicted to be 12.17 liters/capita/year and 12.79
location of the factory itself is at 03 ° 57’03.44 “N and 96 ° 21.16.54” E. This
liters/capita/year.
for 2017 was 11.58 liters/capita/year. This consumption
Investment Opportunity/Activity:
Investment Activities The development of Cooking Oil Processing Industry
Cooking Oil Processing Plants:
employee housing and other supporting buildings.
21,3 Tons/Hour
2. Procurement of machinery and equipment for
(Cooking Oil)
3. Provision of fresh fruit bunches.
cooking oil mills.
5,7 Tons/Hour
Nagan Raya Investment and One-Stop Service Agency
(margarine)
30 Tons/Hour (Produksi CPO)
Working Capital Estimate Income Net Present Value
and is located on flatter land compared to other districts and is very close to
Sub-District
: Tadu Raya
Internal Rate Return
West Sumatra national road. The factory is located 250 km from Banda Aceh
District
: Nagan Raya
Benefits Cost Ratio
City and can be reached within 4 hours and 30 minutes, while the distance to
Province
: Aceh
Payback Period
Belawan Port in Medan is 859 km.
Land Status
: Local Community
Area
: 15 Ha
A c e h
2 0 2 1
O
A
I
O
IA A
O
O
I I
O
: Jl. Paduka Yang Mulia Presiden Soekarno, Suka Makmue, 23671
IDR 115 billion IDR 222 billion IDR 245 billion 201587772.1 50.15% 2.761295268 3 Years and 9.908 Month
Investment
position is in the center of all existing cooking oil factories in Nagan Raya
o f
Address
Investment Estimate
: Cot Mu Village
O p p o r t u n i t i e s
Contact us:
4. Procurement of inventory and other tools.
Location
I n v e s t m e n t
Contact Person:
IO A I
I
A
Nagan Raya – Aceh Province
Mariana Telephone
: +62 655 - 7556357 Fax. +62 655 – 7556371
A 201
: dpmptsp@naganrayakab.go.id
: dpmptsp.pmnr2019@gmail.com
Website
: http://dpm-ptsp.naganrayakab.go.id
AGROINDU S T RY
Coffee Indonesia is the fourth largest coffee producer after Brazil, Vietnam, and Colombia and is known as home of the world’s finest coffee. Total area of coffee plantations in Indonesia is approximately 1.240.000 Ha, which consists of 933.000 Ha of Robusta Coffee and 307.000 Ha of Arabica Coffee. More than 90% of all plantations are cultivated by small scale farmers. Indonesia is the only country that has special coffee based on Geographical Indication (GI). High quality Arabica Coffee is mainly produced in Aceh and North Sumatera, meanwhile Robusta Coffee is primarily produce in Lampung, Bengkulu and South Sulawesi. The high level of coffee consumption in the world has certainly become a big opportunity to develop the coffee processing industry in Indonesia.
Picking Gayo Arabica coffee beans, Aceh Tengah.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
111
A G R O I N D U S T R Y
Gayo coffee is cultivated in the Gayo highlands,
certificate by Geography Indication (GI).
including Bener Meriah Regency, Aceh Tengah
In particular, Gayo Arabica coffee received the
and Gayo Lues. Gayo is an ethnic that inhabits
highest score in the 2010 Indonesian Special Coffee
the Gayo highlands in central Aceh. The majority
Auction in Bali, which guaranteed the quality of Gayo
of people in this area are coffee farmers. Coffee
Arabica as one of the best coffees in the world.
cultivation began in 1908 and is mostly Arabica coffee. Gayo is the largest producer of Arabica
Together with related technical agency, Aceh
Coffee in Asia. Gayo coffee has been exported
Investment and One-Stop Service Agency has
to various countries in the world. Statistics show
made big efforts in promoting the Gayo Arabica
that in 2019, Aceh exported 5,034,838 kg of coffee
coffee commodity both in local and international
beans to 20 countries. (Source: Aceh Industry and
market since 2013. We have attended certain
Trade Office, 2019).
exhibitions, coffee business forums and met the coffee consumers directly at the international
Gayo Coffee has received various recognition and
events. This has had a positive impact, showed by
international certification because of its high quality,
a positive trend of increasing the volume of Aceh
particularly organic coffee which has fair trade
coffee exports.
Currently Gayo coffee is continued to make efforts to meet the demand for coffee in domestic and foreign market by increasing productivity and quality (agricultural extension and intensification).
112
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Farmer of the Gayo Arabica coffee plantation, Aceh Tengah, is checking the ripeness of the coffee beans before the picking process.
A G R O I N D U S T R Y
Arabica Coffee Planted Area and Production of small holder by Regency/City in Aceh, 2019
Rembele
Bener Meriah
Area Planted Production (Ha) (ton)
Aceh Tengah
49.835
Bener Meriah
29.172
Gayo Lues
4.864
1.366
North Aceh
1.888
755
2019
102.860
65.902
2018
101.855
64.121
2017
101.473
61.761
A IA
A
317 km
6 hr 46 min
54.4 km
North Aceh
20.9 km
21.3 km
Rembele
1 hr 34 min
SIM
38 min
40 min
310 km
SIM
North Aceh
6 hr 43 min
34.609
46.273
I A
Malikussaleh
SIM* Blang Bintang
Arabica
Regency/City
SIM
30 min
Bener Meriah
15.5 km
Bener Meriah
7 min
2.9 km
5 hr 59 min 299 km
Takengon,
North Aceh
Aceh Tengah
9 hr 43 min 463 km
Gayo Lues
Aceh Tengah
Gayo Lues
Patiambang Kualanamu
A A
Aceh Tengah
Bener Meriah
North Aceh
Gayo Lues
Area Planted (Ha):
Area Planted (Ha):
Area Planted (Ha):
Area Planted (Ha):
Production (TON):
Production (TON):
Production (TON):
Production (TON):
49.835 Ha 34.609 Ton
46.273 Ha 29.172 Ton
1.888 Ha
755 Ton
4.864 Ha
8 hr 30 min 335 km
1.366 Ton
Clik to see Google Map
Gayo Arabica coffee beans, Aceh Tengah.
*SIM, INTERNASIONAL AIRPORT, BL ANG BINTANG
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
113
A G R O I N D U S T R Y
Robusta Coffee
Robusta Coffee Planted Area and Production of Small Holder by Regency/ City in Aceh, 2019
Robusta Regency/ City
Area Planted (Ha)
Production (ton)
103 1.422 378 522
5 340 144 143
1.051
466
West Aceh
579
85
Aceh Besar
1.754 10.290
586 2.942
13 573 691 719 35 328
4 165 128 200 5 82
Bener Meriah
2.010 1.890
566 966
Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam
101 3 10
11 1 2
22.471
6.841
22.382 22.276
5.501 6.731
Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah
Robusta Coffee has a strong taste and is more bitter than Arabica Coffee. Robusta Coffee is widely used as the main ingredient for instant coffee or mixture of Arabica Coffee to improve the taste of coffee. Robusta coffee is planted in Pidie Jaya Regency, Aceh Jaya, Bener Meriah, Aceh Besar, and South Aceh. Total plantation area is 22.382 Ha with total production of 6.841 ton in 2019. 114
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya
2019 2018 2017 O
2 0 2 1
A
A
I
A
A
A IO A
Robusta coffee beans, Pidie.
A G R O I N D U S T R Y
Coffee Exporter in 2019 No.
Coffee Exporter
1
Aceh Coffee Processing Industry The demand of Gayo coffee in domestic and foreign
Estimated investment to build an instant coffee
Cv. Sara Ate
markets is very high, particularly in the form of green
processing industry with a capacity of 30,000,000
2
Koperasi Permata Gayo
beans. The government encourages the increase of the
sachets is:
3
Koperasi Produsen Arisarina
quality of Aceh coffee; to create a great opportunity
} Selling price at the producer / industry level US
4
KSU. Arinagata
Popular culture of coffee consumption in Aceh is also
} Premium quality US $ 0.04 per sachet.
5
KSU. Sara Ate
a good prospect for building the Gayo instant coffee
The closeness of the supply chain in Aceh region is an
6
PT. Cahaya Komoditas Nusantara
processing industry. Project Purpose: Construction of
advantage to develop this investment as the production
7
PT. Fajar Jeumpa
Instant Coffee Processing Industry Based on market
cost is lower than average (assuming a green coffee
observations. Today, at least 10 instant coffee brands
bean price of US $ 4.58/Kg).
8
PT. Ihtiyeri Keti Ara
are sold in the market which indicates the increase of
This price allows creating market segments, market
9
PT. Ketiara
instant coffee consumption in Aceh. As can be seen, the
share and market space, which can compete with other
10
PT. Sumatera Arabika Gayo
potential for development in this industry is very high.
famous national products.
11
PT. Meukat Komuditi Gayo
12
CV. Aridalta Mandiri
13
Koptan Gayo Megah Berseri
14
KBQ. Baburrayyan
15
Koperasi Kopi Wanita Gayo (Kokowagayo)
US$ 3.333.333
NPV = US$ 1.844.999
16
CV. Donya Drop Daruet
Operational Cost:
• IRR = 23% • BC = 1,6 • Payback Period: 6 YEARS
O
A
I
A
A
in developing a modern coffee processing industry.
I
A
Estimates
Construction of Coffee Processing Industry and working capital:
US$ 2.925.043 *(US$ 1 = IDR 12.000)
$ 0.10 per sachet.
Location: Aceh Tengah Aceh Special Economic Zone, Lhoksemawe
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
115
A G R O I N D U S T R Y
Cacao
Cacao Planted Area and Production of Small Holder by Regency/City in Aceh, 2019
Aceh is one of the major cocoa producer regions in Indonesia with plantations spread across almost all regions in Aceh, from Pidie in the eastern part of Aceh to Simeulue Island on the outer side of Aceh province.
The development of strategy is to create a sustainable cocoa downstream industry. The upstream industry will focus on increasing value added in the downstream sector. Aceh Tenggara, Pidie Jaya, East Aceh, Pidie and North Aceh are suitable areas for cocoa producing and development of the chocolate processing industry.
116
I n v e s t m e n t
O p p o r t u n i t i e s
Regency/City
Planted Area (Ha)
Production (Ton)
Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah West Aceh Aceh Besar Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017
1.884 371 1.354 21.005 13.573 528 972 3.467 10.382 7.009 9.321 1.890 3.483 1.556 3.198 1.118 1.378 15.070 737 111 134 726 99.267 99.342 101.203
145 84 346 10.491 6.038 258 426 623 3.591 2.689 3.704 1.077 1.897 585 548 148 879 6.990 208 81 74 211 41.093 39.296 39.295
O
o f
A c e h
2 0 2 1
A
A
I
A
A
A IO A
Cacao, Pidie Jaya.
A G R O I N D U S T R Y
Rehabilitation, Development of Cocoa Plantation and Processing I SIM* Blang Bintang
3 hr 41 min 166 km
Pidie Jaya cocoa farmers pick ripe cacao.
Pidie Jaya
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
117
A G R O I N D U S T R Y
Transportation Supporting Infrastructure Accessibility
LAND
AIR
by the Malacca Strait, east by Bireuen regency,
Pidie Jaya Regency is a regency that
Construction of toll roads in the Pidie
Sultan Iskandar Muda International Airport distance from
west and south by Pidie regency. Geographically,
expanded from Pidie Regency in 2007. This
Jaya area is estimated to start in 2021.
Pidie Jaya Regency is164.9 km through Sumatra Main
Pidie Jaya Regency is located at 4 ° 30’– 04 ° 60
regency is traversed by the Aceh to North
The toll road construction in the Pidie
Road/ Banda Aceh - Medan Road with travel time of 3
‘N (latitude) and 96 ° 30’– 96 ° 20’ East longitude
Sumatra road, so it is quite strategic at
Jaya area is 35 km long. The construction
hours 29 minutes. Malikus Saleh Airport distance from
(east longitude). The area covers 1,162.85 km²
the economic level. The distance between
distance of this toll road is about 6 to
Pidie Jaya Regency is 103.2 km via Sumatera Main Road /
which consists of lowlands and beaches but
the capital regency (Meureudu) and sub-
7 km south of the Banda Aceh - Medan
Banda Aceh – Medan Road with travel time approximately
mostly highlands. Pidie Jaya Regency consists
districts ranges from 0 - 25 km. Bandar
national road. The construction of the
2 hours 17 minutes.
of 8 districts covering 34 sub-districts and 222
Baru sub-district is the farthest sub-district
toll road in Pidie Jaya is included in the
villages.
from Meureudu city.
Sigli - Lhokseumawe package. This toll
SE A
road route starts from the side of the
Ulee Lheue Port, from Pidie Jaya Regency is a distance of
hilly slopes of Bandar Baru District to
175.4 km via the Trans Sumatra Road / Banda Aceh - Medan
Bandar Dua District with the position of
Road with a travel time of 3 hours 45 minutes. Malahayati
the entrance around Meureudu District.
Container Port, from Pidie Jaya Regency is a distance of
Currently, the closest toll gate is the
141.8 km via Jalan Sumatera / Banda Aceh Highway - Medan
Indrapuri Toll Gate, from Pidie Jaya
with a travel time of 3 hours 14 minutes. Krueng Geukueh
Regency with a distance of 144.4 km via
Port, from Pidie Jaya Regency is a distance of 114.9 km via
Sumatera / Banda Aceh Highway - Medan
the Trans Sumatra Road / Banda Aceh - Medan Road with a
with a 2 hour 58 minute of travel time.
travel time of 2 hours 29 minutes.
Pidie Jaya Regency is located in Nanggroe Aceh Darussalam (NAD) Province, bordered on the north
118
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Rehabilitation, Development of Cocoa Gardens and Processing of Cocoa Products
Cocoa Products Processing
Rehabilitation and Development of Cocoa
The Government of Pidie Jaya Regency has
Cocoa is one of 19 (nineteenth) important plantation
machine and a warehouse for storing cocoa.
commodities in Pidie Jaya. Cocoa takes up the most land area
This facility can be used by companies wishing to
and is cultivated by the most farmers. Cocoa contributes the
invest in the cocoa processing industry.
highest annual income in Pidie Jaya. Cocoa is grown in seven of the eight sub-districts, namely Bandar Baru, Trienggadeng,
facilities in the form of a cocoa processing
Location
: Banda Aceh – Medan Highway, Paru Village, Kec. Bandar Baru, Kab. Pidie Jaya
Facilities
: Warehouse and Cocoa
Meureudu, Ulim, Bandar Dua, Panteraja, and Meurah Dua. These conditions have made this commodity become a potential commodity to be developed and to be one of income
Processing Machinery
sources to the region. Moreover, the conditions of rainfall and land suitability in Pidie Jaya support high production
Ownership : Local Government Pidie Jaya
and prevent the plants from plant pests which are difficult to
Regency
control, namely vascular streak dieback. Location: Kec. Bandar Baru, Kec. Panteraja, Kec. Trienggadeng, Kec. Meureudu, Kec. Meurah Dua, Kec. Ulim, Kec. Bandar Dua.
1.733 Ha
Area
:
Land Ownership
: Community
Ripe cacao.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
119
A G R O I N D U S T R Y
Contact Person:
Market Opportunity Cocoa is one of the leading commodities that
The interesting thing is, the prices of cocoa
has an important role in economic development
bean products that are marketed online are
in Pidie Jaya Regency. Market opportunities that
quite tempting. Of course this market is
are still open and the availability of large areas of
attractive to target and this allows farmers to
land are potentials that should be considered in
sell their products directly to consumers with
cocoa development efforts.
several conditions. Among other things, the cocoa beans come from gardens that already have organic certificates.
The high consumption of chocolate both domestically and abroad, such as in the European Union, especially for processed cocoa which has
The treatment process must be controlled
a higher value than cocoa beans, could become a
and free of contamination. Then packaged in
market opportunity for cocoa in Pidie Jaya Regency.
an attractive manner and marketed through various online shopping sites. This is a
120
Currently, there is a growing trend of
different market from the one in Indonesia,
consuming cocoa beans directly or processing
which is oriented towards the processing
cocoa beans at home to make pasta or hot
industry. In order to penetrate the factory, the
chocolate. This is in line with public awareness
farmer must be able to collect up to 15 tons
in developed countries about the benefits of
of cocoa beans. Meanwhile, the household
chocolate for health. This condition actually
market is different. With just 1 kg of seeds,
creates a market niche for cocoa beans,
farmers can market directly to consumers at
especially packaged nibs.
quite attractive prices.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
I
ESTIMATES
Rehabilitation and Development of Cocoa:
Rp. 14.132.795.760,Processing of Cocoa Products:
PIDIE JAYA INVESTMENT AND ONE-STOP SERVICE AGENCY Address
: District Government Office Complex. Pidie Jaya Cot Trieng, Meureudu Sub-
Rp. 5.550.000.000,COOPERATION SCHEME Mediator-assisted group pattern / Mediated Partnership Model. Partnership patterns between farmers and big entrepreneurs. Partnership patterns between entrepreneurs and local governments. Individual patterns with the help of farmer groups / KUP and mediators.
District, Pidie Jaya Regency Postal Code :
24186
Phone
:
(0653) 3485061
: dpmptsppijay@gmail.com/ dpmptsppijay2@gmail.com CP : Cut Ruhana Husin, SKM., M.Kes. (Head Div. DPMPTSP) Hp. 0853
7046 5325
A G R O I N D U S T R Y
Patchouli
Patchouli Planted Area, Harvested Area and Production of Small Holder by Regency/City in Aceh, 2019
Currently, Indonesia is the world’s largest patchouli oil producer, which meets the needs of more than 80%
According to a study, Aceh patchouli oil contains patchouli alcohol 30-34% with a yield of 3%, which makes it the best patchouli in the world. The main areas for patchouli production are Aceh Selatan, West Aceh, Gayo Lues, Aceh Jaya and
(svet.charita.cz).
-
-
-
Aceh Singkil
24
6
2
South Aceh
326
188
37
Southeast Aceh
210
210
74
East Aceh
-
-
-
Aceh Tengah
-
-
-
West Aceh
202
131
29
Aceh Besar
118
60
15
Pidie
-
-
-
Bireuen
14
8
1,30
North Aceh
6
2
0,40
Southwest Aceh
5
15
1
Gayo Lues
75
75
26
Aceh Tamiang
5
5
0,41
Nagan Raya
56
41
3
Aceh Jaya
158
124
36
Simeulue
Aceh Besar Regencies. These areas are suitable
Bener Meriah
1
-
-
for the development of the patchouli processing
Pidie Jaya
3
-
-
Banda Aceh
-
-
-
Sabang
7
-
-
Langsa
-
-
-
Lhokseumawe
-
-
-
Subulussalam
-
-
-
2019
1.219
864
225
2018
1.210
780
178
2017
2.041
1.474
484
industry. Patchouli is one of Indonesia’s largest and important export commodities. This valuable essential oil is distilled from its dried leaves. This oil is widely used in various industries, especially the perfume, aromatherapy, cosmetics, medicine, toiletries, etc. industry where the demand Patchouli, Aceh Jaya.
of the world market. Patchouli is widely cultivated in Aceh. With its high alcohol content, patchouli is one of the most sought-after tropical plant varieties in Aceh
Regency/City Planted Area (Ha) Harvested Area (Ha) Production (Ton/Ha)
continues to increase.
Aceh patchouli has obtained a Geographical Indication Certificate in 2013 from the Ministry of Law and Human Rights (ditjenbun.pertanian.go.id).
O
A
A
I
A
A
A IO A
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
121
: A G R O I N D U S T R Y
:.
Patchouli Aceh O
Why ACEH y ACEH has the best patchouli oil in the world, cultivated from northern region of Indonesia.
Indonesia is the major supplier of Patchouli Oil to the world market,
y With more than 3500 hectares in Aceh, mostly in the region
accounting for around 90% of
of Aceh Tenggara, Aceh Jaya, Aceh Selatan and Gayo Lues.
international trade. Aceh is the largest region whose produces Patchouli Oil in Indonesia. China and India also produce, but all production is taken up by their
Market Segmentation
y Simply-to-Produce and Low-Technological Needs y The supply chain for patchouli oil is not-so complex, comprising farmers, collectors, and exporters.
domestic markets. Aceh can produce around 1,300,000 tonnes per year, with a
Market Review of Aceh Crude Patchouli Oil Global Patchouli Oil:
y Patchouli oil is mainly obtained by steam distillation of
value of around US$50 million).
shade dried leaves to cultivated patchouli plants.
Segmentation by End-User: y Beauty Cosmetics & Personal Care (Hair, Skin, Facial, etc) y Aromatherapy (In-door, Automotive, Massage, etc) y Food & Beverages
Hotspots
Patchouli, Aceh Jaya.
122
I n v e s t m e n t
O p p o r t u n i t i e s
:
ACEH, Indonesia
Market Value
:
More than US$50 Million.
Market Competitors
:
China, India, Malaysia, Singapore, Philippines. Amyris in partnership with Firmenich, Isobionics
Product Disruptor
:
Quality Concerns
: Natural patchouli oil has many constituents. Syn-bio companies manufacture only a single molecule.
o f
A c e h
2 0 2 1
y Pharmaceuticals y Others (Soaps & Detergents, Household/Retail, Anti-microbial and Insect Repellents)
Segmentation by Region: y Europe
Segment Analysis y Among the type segments, the light patchouli oil segment is expected to account for significant share in terms of revenue in the near future. y Among the nature segments, the organic segment is expected to account for significant revenue growth in the global patchouli oil market owing to rising use of patchouli oil in various end use industries. y Among the end user segments, the cosmetics &
y North America
personal care segment is anticipated to register
y Middle East & Africa
highest growth in terms of revenue in the
y Asia Pacific
target market due to strong, slightly sweet, and
y Latin America
intoxicating scent.
A G R O I N D U S T R Y
Region Competitiveness Analysis
List of importer Countries for the selected product –
y The Asia Pacific patchouli oil market
Product: 330129 Essential oils, whether or not terpeneless, incl. concretes and absolutes…
is expected to account for major
Sources: ITC calculations based on UN COMTRADE and ITC statistics.
revenue share, and projected to dominate the global market in the next 10 years, owing to presence of prominent players in countries such
Importer Countries
2015
2016
2017
2018
2019
World
1,915,685
2,038,292
2,416,564
2,824,567
2,473,572
United States of America
403,464
449,646
563,709
649,266
508,155
France
269,554
284,984
324,298
362,456
307,486
Germany
122,094
134,508
141,353
164,556
153,697
United Kingdom
134,695
126,295
148,850
150,726
134,019
China
44,837
47,604
60,666
92,419
115,303
Netherlands
42,084
49,241
70,747
103,382
108,496
India
80,051
106,000
97,489
109,343
101,895
Indonesia
78,140
79,394
82,231
144,769
98,836
Switzerland
80,456
80,945
95,060
103,983
94,889
Spain
94,023
80,112
90,497
101,077
89,590
as India, Indonesia, Taiwan, China, and Malaysia. y In addition, growing population, increasing disposable income of individuals, rising usage of patchouli oil in pharmaceutical industry are other factors anticipated to drive
Imported value in…(,000 USD)
growth of the global market in years to come. y The North America market is expected to grow at a faster rate in the next coming years, due to rising popularity of aromatherapy among consumers. y The market in Europe, Latin America, and Middle East & Africa are expected to register moderate growth in terms of revenue, due to increasing popularity of patchouli oil in countries in these regions in the near future.
Patchouli, Aceh Jaya.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
123
A G R O I N D U S T R Y
Financial Review Of Aceh Crude Patchouli Oil O
The investment value was obtained after doing trial-error
The production process of the harvest Patchouli is twice a
and it was decided that the economy scale for the corporate
year requires an income cost. The cost of income component
level could be started with a land area of 10 hectares with the
consists of operational costs, labor costs and depreciation. For
complete equipment for a value of Rp. 2,900,000,000 or two
details, see the table below.
PRODUCTION – COMMERCIAL SCALE
billion rupiah (Table above). The plan for the processing plant to
INVESTMENT Land (clear and clean) = Processing Plant = (Distillation Kettle + Warehouse + Building + Generator) Office = PLN firing cost = Water Supply Cost= Total =
200,000,000.00 2,500,000,000.00
operate to receive dry leaf yield from an area of 10 hectares. To
Unit
Illustration
support the optimization of the processing process, the Water
Rp
10 hektar
built. And to avoid sudden power failure, a generator set is also
3,000 kg
Rp
Rp
50,000,000.00
Rp
50,000,000.00
Rp
2,900,000,000.0 0
Sewa 1 Year
Unit
Supply Company and PLN network installation has also been
Estimated harvest production is 2 times a year. Therefore, the projected gross income in 1 year can be obtained. Meanwhile, historical value of 10 years of patchouli oil price in Aceh. For more detailed results, please see the table below.
Rp
645,250,000
Labor Cost
Kg
972,000,000
Depreciation
Rp
362,500,000
Total Cost of Income
Rp
1,979,750,000
% of Income
Gross Income Projection (IDR) - Year 1
Rp/10 Hectares Total unit Price - Market (pessimistic level) Gross Income in 1 Year
Unit
Total
Kg
4,500
Rp Rp
660,000 2,970,000,000
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
66.7%
It needs IDR 1,979,750,000 or one billion nine hundred seventynine million seven hundred and fifty thousand rupiahs to obtain a 1-year gross income of IDR 2,970,000,000 or two billion nine hundred and seventy million rupiahs. Thus, cost of income accounts for 66.7 percent of total gross income. This is felt to be quite burdensome because the value is higher than 50 percent. The ideal condition is below 50 percent in order to provide room for the company’s operations.
124
Total
Operational Cost
planned.
fixed price of patchouli oil was obtained from the median
100,000,000.00
Cost of Income Projection (in IDR) - Year 1
A G R O I N D U S T R Y
Furthermore, the calculation is continued with
The net income yield is projected to increase in the
the projection of profit or net profit in 1 year.
second and third years along with the harvest period that
The final result for net profit is Rp. 802,102,500
is more frequent than the first year. For the first year only
or eight hundred two million one hundred two
2 harvests. Meanwhile, the harvest period for the second
thousand five hundred rupiahs. The net profit
and third years is 3 times and 4 times. The 3-year income
accounts for 27 percent of gross income. This
projection can be seen in the table below.
is still considered reasonable, considering that operational costs are quite high. The ideal result is
ITEMS (IDR)
Year 1
Year 2
Year 3
REVENUEs
2,970,000,000
4,725,000,000
7,200,000,000
COST OF REVENUEs
1,979,750,000
2,458,262,500
3,105,480,000
66.7%
52.0%
43.1%
990,250,000
2,266,737,500
4,094,520,000
33.3%
48.0%
56.9%
99,025,000
226,673,750
409,452,000
when it is close to 50 percent of gross income. For more detailed results, see the table below.
Net Income Projection (in IDR) - Year 1 Gross Profit Cost Of Revenue
2,970,000,000 1,979,750,000 990,250,000
Interest Expense
99,025,000)
TAX Net Income % of Gross Profit
EARNINGS BEFORE INTEREST & TAXES % of Revenues
Earnings Before Interest And Taxes
Earnings Before Taxes
% of Revenues
891,225,000 89,122,500 802,102,500 27.0%
INTEREST EXPENSE
891,225,000
2,040,063,750
3,685,068,000
TAXES EXPENSE
89,122,500
204,006,375
368,506,800
NET EARNINGS
802,102,500
1,836,057,375
3,316,561,200
EARNINGS BEFORE TAXES
% of Revenues Accumulated Yearly Retained Earnings
27.0% 802,102,500
38.9% 2,638,159,875
46.1% 5,954,721,075
In accordance with the calculation results in the table above, it can be seen that the projected net income in the second year has reached more than two billion rupiahs. Meanwhile in the third year it almost reached six billion rupiahs. So that it can be considered to expand the business expansion in the fourth year. And it is projected that in the fifth year it will be able to conduct an initial public offering on the Indonesia Stock Exchange (or Initial
Patchouli, Aceh Jaya.
Public Offering).
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
125
A G R O I N D U S T R Y
In order to determine the value of the benefits obtained from this project, a cost-benefit
Net Present Value (NPV) is the difference between the present value of cash inflows and
The positive NPV calculation result is IDR 1,671,243,998 or (one billion six hundred seventy-
ratio is calculated. A value above 1 indicates that the project will generate benefits (or
the present value of cash outflows over a period of time. NPV is usually used for capital
one million two hundred forty-three thousand nine hundred ninety-eight), and the amount is
profits) by spending only 1 cost. Detailed results can be seen in the table below.
allocation to analyze the benefits of a project that will be implemented. A positive Net
quite significant, reaching fifty percent of the initial investment value as stated in the table
Present Value indicates that the projected income generated by a project or investment
above. This project is feasible and can be continued.
B/C RATIO
Cash Inflows/ Outflows (PV of Cost of Project)
PV Factor (1/((1+r)^n))
PV of Benefit Expected from Project
Profitability Index (PI) is the ratio of the present value of cash flows to be received in
a project that has a negative NPV will generate losses. This concept is the basis of the law
an investment. PI can be used to provide an overview of the feasibility indicators in an
of Net Present Value, which indicates that only good investments can be made.
investment plan. In other words, the Profitability Index is used to see whether a project is feasible for us to run or not.
2021
Rp (2,900,000,000.00)
2021
Rp 802,102,500.00
0.9804
Rp 786,375,000.00
2022
Rp 1,836,057,375.00
0.9612
Rp 1,764,761,029.41
2023
Rp 3,316,561,200.00
0.9423
Rp 3,125,269,692.65
-
Net Present Value
Rp 5,676,405,722.06
Total
1.9574
Benefit-Cost Ratio
exceeds the projected costs incurred. In general, a positive NPV value will be profitable and
Cash Flow
Year-Beginning Investment
Year-End Cash Flows
Rp (2,900,000,000.00)
Net Cash Flow Rp (2,900,000,000.00)
2021
Rp 802,102,500.00
Rp (2,097,897,500.00)
2022
Rp 1,836,057,375.00
Rp (261,840,125.00)
2023
Rp 3,316,561,200.00
Rp 3,054,721,075.00
Interest Rate
10%
Net Present Value
Rp 1,671,243,998.02
Conclusion
Go Project
PROFITABILITY INDEX
Cash Flow
Year-Beginning Investment
Rp (2,900,000,000.00)
End-Year Cash Flows
The calculation result of the cost to benefit ratio is 1.9574 or nearly 2, or in other words, this project can provide benefits which are almost double the value incurred. This means that the project is feasible to continue.
DCF 10%
Net Cash Flow
2021
Rp 802,102,500.00
Rp 80,210,250.00
Rp 721,892,250.00
2022
Rp 1,836,057,375.00
Rp 183,605,737.50
Rp 1,652,451,637.50
2023
Rp 3,316,561,200.00
Rp 331,656,120.00
Rp 2,984,905,080.00
Profitability Index
1.85
Conclusion
Go Project
Patchouli, Aceh Jaya.
The calculation table above produces a profitability index value of 1.85 which means more than 1 which means the project is feasible and can be continued.
126
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Payback Period is the period or number of years
In general, the Payback Period is the period of
required to return the investment value that has
return on investment value through net cash
been issued. The Payback Period in Indonesian is
receipts in a predetermined period. From the
also known as the Payback Period. Investors or
above understanding, it can be concluded that
entrepreneurs often use the Payback Period (PP)
the Payback Period will show an annual figure as
as a determinant in making investment decisions,
a measure of the return on an investment. The
namely decisions that determine whether to invest
data required in calculating the Payback Period
their capital in a project or not. A project with a
is the total net cash receipts from a business or
very long payback period is certainly less attractive
investment unit. Net cash value is the proceeds
to most investors. The payback period can be
from sales after deducting the cost of goods
calculated by dividing the investment value (cost of
sold and operating expenses. Payback Period is
investment) with the annual net cash flow (annual
important to know before we run a new project or
net cash flow).
Payback Periode
Net Cash Flow
Cashflow Index
Year-Beginning Investment
Rp (2,900,000,000.00)
Year-End Cash Flows 2021
Rp 802,102,500.00
(2,097,897,500)
0
Year-End Cash Flows 2022
Rp 1,836,057,375.00
(261,840,125)
0
Year-End Cash Flows 2023
Rp 3,316,561,200.00
3,054,721,075
0.078949282
Positive Cash Flows in Year
2
Payback Period in Year
2.08
business. The shorter the return on investment,
Time Period
3.00
the faster the cash turnover in the
Conclusion
Go Project
business to be run.
The calculation results in the table above show that the payback period is shorter or shorter (2.08 years) than the stipulated time period (3 years). So that it gives the conclusion that the project is feasible and
Conclusion: After obtaining the calculations result for the overall index above which has showed positive results, the planned project is feasible and can be continued.
can be continued.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
127
A G R O I N D U S T R Y
Harvest of tomatoes as a staple in making sauces in Takengon.
128
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Aceh Tengah Pasta Sauces Processing I
Aceh Tengah is bordered by Bener Meriah,
The closest airport to Aceh Tengah Regency is Rembele Airport in Bener Meriah Regency. The distance from Rembele Airport is 21.3
Lues, West Aceh and Nagan Raya Regencies on
km with travel time of 40 minutes from the Takengon city. Currently,
the south, East Aceh and Gayo Lues Districts on
Rembele Airport opens one route every day from Bener Meriah to Kuala
and Pidie Regencies on the west. The capital city of Aceh Tengah Regency is Takengon, it surrounds by mountainous area and
Harvest of onions as a staple in making sauces in Takengon.
Air Transportation
Bireuen and Pidie Regencies on the north, Gayo
the East, and West Aceh, Nagan Raya, Gayo Lues
Aceh Tengah Regency is a highland area with an altitude of 5002600 meters above sea level, located at 40 22’14.22 “- 40 42 ‘40.8” North latitude and 950 15’ 23.6 “970 22 ‘10.76 East Longitude.
Transportation Support Infrastructure (Land, Air)
has tropical and cool climate with the lowest
Land Transportation
Namu Medan operated Wings Air aircraft.
The length of roads in Aceh Tengah Regency is 1,146.21 Km (various types of surfaces) National Road 222.45 Km or 19.41% (11 roads), Provincial roads 122.45 Km or 10.68% (6 roads), and Roads District 801.30 Km or 69.91% (242 roads)
temperatures is 20-10 degree and 26.6 degree is
Aceh Tengah District also has 7 (seven) trace roads connecting this
the highest. This condition makes Aceh Tengah
district with other districts:
The availability of electricity in Aceh Tengah District is adequate. In
is very potential and suitable for agricultural
Î Takengon - Bireuen road, which is an old road route < 100
areas. Most of the business sector structure
Î Takengon - ise - ise - Blang Kejeren - Kuta Cane is also an old lane road.
has not shifted from the agricultural, forestry
Î Takengon - Celala - Beutong - Ateuh (Nagan Raya) road
and fishery. Those play a big role in driving the
Î Takengon road - Genting Gerbang - Pameu - Gempang (Pidie)
economy of Aceh Tengah Regency.
Î Takengon - Kreung Geukuh (Lhokseumawe) road
km long
Î Takengon road - Samar Kilang - Alue ie Mirah (East Aceh) Total population of Aceh Tengah Regency is
Energy 2018, electricity usage in Aceh Tengah has reached 10,128,750 kwh. The amount of electricity sold was 5,146,462 kwh. The construction of the Hydroelectric Power Plant Project (Hydropower plant Peusangan I –II) which is expected to be completed in the next two years will help to overcome the limitation of electricity in the Aceh Tengah District and can produce a multiplier effect on regional development.
Î Takengon - Delung Sekinel - Penarun - Peureulak (East Aceh) road
212,494 in 2019, with growth rate of 1.91 % each year. 63.85% of the population work in
Dengan adanya pengembangan trace jalan pada berbagai kabupaten
the agricultural sector (agriculture, forestry,
sekitar, diperkirakan Kabupaten Aceh tengah dalam jangka panjang
hunting and fisheries). Meanwhile, 31.11%
merupakan daerah yang mempunyai kedudukan strategis, baik dalam
worked in the public sector and 5.03% in the
bidang perdagangan, pariwisata, pendidikan, pemerintahan, industry
The location of investment for the pasta sauce industry is in Blang
manufacturing sector.
dan lain sebagainya.
Bebangka Village, Pegasing District with an area of 1 (one) Ha.
Land Availability
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
129
A G R O I N D U S T R Y
Market opportunity
Tomat Area tanam (Ha)
luas panen (Ha)
Produksi (Kwintal)
Area tanam (Ha)
luas panen (Ha)
Produksi (Kwintal)
Area tanam (Ha)
luas panen (Ha)
Produksi (Kwintal)
Area tanam (Ha)
luas panen (Ha)
Produksi (Kwintal)
Linge
-
-
-
-
-
-
-
-
-
33,5
29
4.768
25
23
5.519
Atu Lintang
1
1
170
-
-
-
2
2
100
43
41,7
6.541
30,5
26,5
9.760
Jagong Jeged
36
29
5.259
40
18,3
2.332
20
11
318
81
65
18.022
118
95
30.378
Bintang
23
26
7.887
-
-
-
5
2
90
110,3
111
15.911
180,3
198,2
43.416
considered resilient in line with
Lut Tawar
35
86,3
32.295
-
7
486
3,2
3,2
150
33
87
14.558
37,6
102,5
14.096
the availability of sufficient
Kebayakan
-
-
-
-
-
-
1
6
18
11,7
13
2.171
9,8
11,3
962
ingredients in Indonesia.
Pegasing
25
29,5
7.269
-
-
-
59
21
1.523
141
133
18.181
106
93
32.175
Aceh Tengah Regency has
Bies
3
3
940
-
1
70
4,9
3,5
93
12
15,4
2.203
12,4
15,1
1.007
a huge prospect to become
Bebesen
1
2
421
65
46
2.170
1
1
30
29
27.2
4.681
25
25,4
4.677
one of the regions establish a
Kuta Panang
5
4
1.054
1
1
0
1
5
20
168
174,7
39.910
75,5
68,9
26.660
sauce industry in Aceh. This is
Silih Nara
12
12
4.335
9,7
10,7
743
1
-
-
162
154
18.446
190,3
182,2
14.150
supported by the availability of
Ketol
-
-
-
1
1
70
37
12
228
573
529
169.711
331
327,5
96.834
Celala
-
-
-
-
-
-
-
-
-
57
53
9.368
56
52
3.559
Rusip Antara
13
16
3.871
15
15
906
-
-
-
34
88,1
18.614
41
89,3
19.108
Aceh Tengah
173
208,8
63.501
137,7
100
6.777
135,1
56,8
2.570
1.488,5
1.521,1
343.085
1.238,4
1.309,9
302.301
important complement to Indonesian culinary which makes it become a potential investment to be developed. The sauce industry is
tomatoes, red chilies, cayenne pepper, and garlic which are cultivated in across 14 SubDistricts in Aceh Tengah
O p p o r t u n i t i e s
Regency.
o f
A c e h
2 0 2 1
Cabe Rawit
Produksi (Kwintal)
a tasteful. Sauces is an
I n v e s t m e n t
Cabe Merah
luas panen (Ha)
of Indonesian culinary is
130
Bawang Putih
Area tanam (Ha)
One of the characteristics
Chilli in the Gayo Highlands, Aceh Tengah.
Bawang Daun
Sub-District
A G R O I N D U S T R Y
Currently, domestic competitiveness for sauce is tight, offering various specialties of each producer. Aceh with its wide variety of culinary flavors which most of are spicy, savory would like to offer the construction of a sauce industry in Aceh Tengah and guarantee the freshness of the sauce that scattered throughout Aceh Tengah Regency .
Investments Offered: Development of Pasta Sauce Industry:
Capacity : 40 Ton / Year Location
: Blang Bebangka Village
Estimasi Investasi
Sub-District
: Pegasing
District
: Aceh Tengah
Investment
Province
: Aceh
Land Status
: Owned by Local Government
IDR 1.5 billion Equipment
Land Authority : Aceh Tengah Industry and Trade Agency & Gajah Putih University
IDR 700 million Investment Capital
Investment Activities :
IDR 800 million
Factory Construction
Net Present Value
Machinery and Equipment Procurement
Internal Rate Return
Provision of transportation / cargo
Discount Factor (DF)
Procurement of other equipment
Benefit Cost Ratio
IDR 1 billion
IDR 248,319,450
IDR 700 million
20%
IDR 2 billion
14% for 5 years
IDR 200 million
1,78
Illustration
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
131
A G R O I N D U S T R Y
Cash Flow for 5 Years of The Construction of Aceh Tengah Pasta Sauce Industry No. Description cash flow projection I
Year o
Year 2
Year 3
Year 4
Year
Cash Flows In
II
1.Sales of various variant pasta sauce
1.500.000.000
1.500.000.000
1.500.000.000
2.000.000.000
2.000.000.000
The Amount of income
1.500.000.000
1.500.000.000
1.500.000.000
2.000.000.000
2.000.000.000
Financial Factory Development Investment
700.000.000
Working Capital Amound of Funding
800.000000
Amound of Funding III
Cash Flows Out Indirect Labor Salary Direct Labor Wages Other Fixed Costs Purchasing Raw Materials Help Materials Energi Utilities/Wrapping Maintenance Others Total Expenditures
IV
Gross Profit (EBIT)
V
Obligations For Interest Payment
(1.500.000.000)
VI
Net Profit Before Tax (EBT)
I n v e s t m e n t
O p p o r t u n i t i e s
(1.500.000.000)
o f
A c e h
2 0 2 1
Assumption: 3 The projection of income is assumed to be constant until year 3 and in year 4 it is predicted to increase. 3 Expenditure projections are assumed to increase annually by 5%. 3 Calculation of the annuity of a working capital loan for 5 years with an interest rate of 14% per year.
1.500.000.000
Invesment Capital Loans Working Capital Loan Anuity (14%) Total Obligations
132
Year 1
275.000.000 100.000.000 50.000.000 150.000.000 75.000.000 50.000.000 30.000.000 30.000.000 100.000.000 860.000.000
288.750.000 105.000.000 60.000.000 165.000.000 78.750.000 52.500.000 33.000.000 31.500.000 105.000.000 903.000.000
303.187.500 110.250.000 70.000.000 175.000.000 82.687.500 55.125.000 36.300.000 33.075.000 110.250.000 948.150.000
318.346.875 115.762.500 80.000.000 185.000.000 86.821.875 57.881.250 39.930.000 34.728.750 115.762.500 995.557.500
334.264.219 121.550.625 90.000.000 195.000.000 91.162.969 60.775.313 43.923.000 36.465.188 121.550.625 1.045.335.375
640.000.000
597.000.000
551.850.000
1.004.442.500
954.664.625
121.026.837 121.026.837
137.970.594 137.970.594
157.286.478 157.286.478
179.306.584 179.306.584
204.409.506 204.409.506
518.973.163
570.870.479
627.957.527
690.753.280
759.828.608
3 Investment criteria: NVF> 0, or positive value, project feasible.
A G R O I N D U S T R Y
Net Present Value of Aceh Tengah Pasta Sauce Processing Industry Development No. I
Description cash flow projection
Year o
Year 1
Year 2
Year 3
Year 4
Income Sauce Sales (1500)
1.500.000.000
1.500.000.000
1.500.000.000
2.000.000.000
Salvage Value
2.000.000.000 200.000.000
Gross Benefit II
Year
1.500.000.000
1.500.000.000
1.500.000.000
2.000.000.000
2.000.000.000
700.000.000
Working Capital
800.000000
Operating Costs
860.000.000
903.000.000
948.150.000
995.557.500
1.045.335.375
Working Capital Loan Anuity
121.026.837
137.970.594
157.286.478
179.306.584
204.409.506
518.973.163
459.029.408
394.563.522
825.135.916
950.255.119
77.845.974
68.854.411
59.184.528
123.770.387
142.538.268
(1.500.000.000)
441.127.188
390.174.995
335.378.994
701.365.528
807.716.851
1.000
0.877
0.769
0.675
0.592
0.519
(1.500.000.000)
386.953.674
300.226.989
226.371.268
415.264.696
419.502.822
III
Benefit
IV
Tax 15 %
V
Net Benefit
VI
DF 14 %
VII
Present Value
VIII
Net Present Value
1.500.000.000
3 The projection of income is assumed to be fixed until year 3, and in year 4 it is predicted to increase. 3 Expenditure projections are assumed to increase every year by 5% 3 Calculation of the annuity of a working capital loan for 5 years with an interest rate of 14% per annum
Spending Building and Factory Invesment
Assumption:
3 Investment criteria: NVF> 0, or a positive value, the project is feasible
248.319.450
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
133
A G R O I N D U S T R Y
IRR and Nett Development of Aceh Tengah Pasta Sauce Industry Year
Net Benefit
DF 14%
Present Value
DF 20% Present Credit
0
- 1.500.000.000
1.000
- 1.500.000.000
1.000
- 1.500.000.000
1
441.127.188
0,877
386.868.544
0,833
367.605.990
2
390.174.995
0,769
300.044.571
0,694
270.954.857
3
335.378.994
0,675
226.380.821
0,579
194.085.066
4
701.365.528
0,592
415.208.393
0,482
338.325.691
5
807.716.851
0,519
419.205.046
0,402
324.603.287
NVP1
248.319.450
NPV2
-4.515.109
Total
Contact Person: Contact us:
IRR = 0,20 ATAU 20% (greater than 14%)
Aceh Tengah Investment And One-Stop Service Agency
IRR > SOCC Criteria, then the Feasible Project Net B/C = 1,78 Criteria for
Net B/C > 1, the Feasible Project
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
: Jl. Kartini No.03, Takengon, Aceh Tengah
Phone
:
(063)21085
Munawar Khalil (Head of Promotion Div. DPMPTSP Aceh Tengah)
Illustration
134
Address
2 0 2 1
Hp
: +6281260999090
: mr.arigayo@gmail.com
A G R O I N D U S T R Y
Livestock The area is suitable for livestock grazing in Aceh is 18,569 Ha.
Beef cattle in Aceh Besar.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
135
A G R O I N D U S T R Y
To develop this potential, the Aceh Government has prepared a Master Plan for the Development of livestock areas which is divided into three development areas, namely the Industrial Center Area, the Fattening Center Area and the Breeding Center Area. The main activities in this project are infrastructure development, building irrigation and grazing land, construction of feedlots, breeding room and cattle fattening.
Aceh beef development project strategies includes: Development of farms with a nucleus-plasma scheme, building a cattle breeding management system (grazing or feedlot), building a feedlot in each district with halal
I ESTIMATES $33.147.500 USD Breeding:
beef processing and meat
5.500 Cows
distribution. Targets for
Filling:
15.000 Cows
initial development: Aceh Besar, Pidie, Bener Meriah
ROI B/C
District, Aceh Tengah, and Nagan Raya.
: 29,64 % : 1,23
Payback Period:
3 Years 5 Months Land area
6.434 Ha Location:
Krueng Aceh, Kuta Malaka, Blang Ubo-Ubo Land Ownership:
Government Beef cattle in Aceh Besar.
136
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Beef Industry Aceh Besar I Development Project
Pidie Jaya Beef Industry Development Project
Aceh Nagan Raya Beef Industry Development Project
Aceh Tengah Beef Industry Development Project
Bener Meriah Beef Industry Development Project
Suitable for Development:
Suitable for Development:
Nucleus:
Breeding
Breeding Lot as Research Center
780 Ha
Suitable for:
Land Area:
Land Area:
Plasma:
Land Area:
5.000 Ha
1.500 Ha
4.155 Ha
Land Area:
Location Land Status
500 Ha Location Land Status Scheme
: Biheu Village, Muara Tiga District : Private Owned : Plasma System
Location Land Status Scheme
: Blang Baroe Rambong : Koperasi Aneuk Nanggroe : Sistem Nucleus dan Plasma
2.280 Ha Location Land Status
Scheme
Breeding and Main Cages
: Perumpakan Benjadi : Government Owned
: Jagong Jeget & Karang Ampar : Private and Government Owned
• Nucleus: 605 Ha • Plasma: 5.829 Ha
Suitable for Development of: Kuta Malaka
-
Main Feedlot for Nucleus Herd
Krueng Aceh
-
Traditional Fattening
Cot Sirebee, Jantho
-
Bull Cow Depot
Blang Ubo- Ubo
-
Large-scale breeding for nucleus herd
Beef cattle in Aceh Besar.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
137
A G R O I N D U S T R Y
Fishery Samudera Kutaraja Fishing Port, Lampulo, Banda Aceh.
138
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A G R O I N D U S T R Y
Idi Fishing Port
The production of wild caught fish at Idi Fishery Port is approximately 21,473.51 tons / year and aquaculture is 10,485 tons / year, including tilapia, catfish, milkfish, black tiger prawns, white shrimp, fire shrimp, and crabs. The operational area of Idi Fishery Port is 62.5 Ha which is supported by the following facilities and infrastructure:
Facilities & Infrastructure Capacity Î Jetty
: 1.600 M2
Î Water break
: 800 M3
Î Port pool
: 300 Ha
Î West-side discharge and load jetty : 160 M2 Î East-side fish market
: 600 M2
Î West-side fish market
: 800 M2
Î Fish packaging building
: 150 M2
Î Port management office
: 452 M2
Î Generator set housing
: 48 M2
Î Water Tower
: 1 Unit
In an attempt to increase production of
Î Port Office
: 1 Unit
aquaculture and wild caught fish, the following are
Î West side warehouse
: 8 units
potential investments to be developed:
Î Warehouse Forklift
: 1 unit
Î Workshop
: 1 unit
Î Culinary stalls
: 22 units
Î West-side prayer room
: 1 unit
Î Guesthouse
: 9 unit
Î Port car park
: 1 unit
Î Fuel station for fishing boats
: 2 units
To support the development of a fishery city (minapolitan), the Regional Government of East Aceh focuses on increasing the production of aquaculture and wild caught fish. Products are sold in domestic and international markets.
1. Ice block factory 2,000 blocks / day 2. Fish caning factory 3. Promotion & research center for fisheries 4. Docking facilities 5. Fish market and distribution center pendistribusian ikan
Kuala Idi Fishing Port, East Aceh.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
139
A G R O I N D U S T R Y
Metro Mina ParkKuala Idi – East Aceh East Aceh Regency has natural resources, forests, gas, marine resources and fisheries which make East Aceh become the largest fish producer in Aceh Province.
To improve the fishery sector, East Aceh also has ponds with an area of 18,780 hectares in a total of 5,820 Fisherman. The annual production reaches 13,508.69 tons with total production value from aquaculture ponds reaching 466,210,150,000 each year.
Namu International Airport which is located in Deli Serdang District, North Sumatra Province, a distance of 283 km from the Metro Mina Park location.
Fishery Sector Export Destination
In addition, East Aceh has a community’s salt
The export destinations are Malaysia, Singapore
business or known as salt farmer. In 2019, the
and Brunei Darussalam.
number of salt farmers in East Aceh reached 209
1. Fishery Production Data 2. Regional Development Concept
people and was divided into 16 groups of people East Aceh Regency is flanked by the Malacca
with a total land area of 10.61 hectares with total
Strait which makes it rich in marine resources.
production value of 2,781.5000.000, - each year.
The Kuala Idi coastal fishing port is the largest fish producer in Aceh province and the center of
Î Map of Location Plan Î Basic facilities and infrastructure
fishing activity in East Aceh. Based on data from the East Aceh Fisheries Agency, the number of fishermen reached 20,140
AIR TRANSPORTION
people in 2020, while the number of fishing fleets (ships and boats) reached 3,376 units and sea
The nearest airport is Malikul Shaleh Airport
catches reached 28,799.55 tons / year with an average production value of Rp. 680,760,852,000, / year.
140
I n v e s t m e n t
which is located in Muara Batu Sub-district, North Aceh Regency with a distance of 112 km from the Metro Mina Park. Besides, there also is Kuala
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Kuala Idi Fishing Port, East Aceh.
A G R O I N D U S T R Y
Data Of Potential Fishery No Description
Unit
Total 28,779
1
Number of Tuna catches
Ton
2
Value of the catch
Rp
3
Number of fishermen
4
Fishing Vessels
O
Orang
680.760.852.000 20.140
Boat without Motor / Boat
Unit
611
Outboard Motor Boat
Unit
974
Motor Boat
Unit
1.791
1. < 5 GT
Unit
1.114
2. 5-10 GT
Unit
230
3. 11-20 GT
Unit
203
4. 21-30 GT
Unit
139
5. > 30 GT
Unit
105
A
I
A
Concept of Development Area Area : 62 Ha Location : Keutapang Mameh Village Sub-District : Idi Rayeuk
SAMUDERA ACTIVITY Boat flights
Landing
Auction
Cold Storage
Processing
Cleaning Cooling Storage
Unloading Transport Sort Cleaning
Auction Transport Cleaning
Cleaning Sortir Packing
Penyortiran/ Pengepakan
Freezer
Drying Salting Canning Fileting Fish flour Fish crackers Fish oil Etc.
Service Water Supply Fuel supply Food Supply
Maintenance / Repair 20 GT
15 GT
Site Plan
ACTIVITIES ON LAND
Ship Machine Tool
Transport Cleaning Packing Ice sprinkle
Cleaning Packing
Inter-island marketing
Area
Description
Auction Zone
Fish auction area and supporting facilities consisting of: TPI building, TPI warehouse, Ice Factory, Cold Storage, and parking lot.
Office and Social Zone
Office and social areas consist of: offices administration, cooperatives, shops, clinics, firefighters and fishermen meeting halls.
Supply Zone, Industrial Zone Workshop
This area consist of: gas station, ship workshop, Machine house, and other facilities.
Industrial Zona
Industrial areas.
Sea Transport Ice sprinkle
Pemasaran Lokal Land Transport Ice sprinkle
Mooring/Resting Cleaning Maintenance Break
Kapal Motor
201
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
141
A G R O I N D U S T R Y
Site Plan Metro Mina Zone Investment Data METRO MINA ZONE ILLUS T R ATION
No. Type of work
Total price (Rp)
I
General
125,000,000,000.00
II
Preparatory work
100,600,000,000.00
III
Industrial facilities
6,807,130,000,000.00
a. Sea Facilities
1,411,700,000,000.00
DESCRIPTION
b. Land Facilities
4,072,180,000,000.00
A Fuel Station
c. Ship
1,295,000,000,000.00
d. Transportation and Transportation Equipment
28,250,000,000.00
Facilities and infrastructure
396,530,000,000.00
Total
7,429,260,000,000.00
B Container Field C Harbor D Industrial Zone E Area F Warehouse Clinic G River H Gate II I
Service Area
J Mosque K Residential Area L Business Center M Gate I
142
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
IV
A G R O I N D U S T R Y
Estimation No. Type of work
Specifications and Description
Unit
Quantity
I
GENERAL
1
Land acquisition and settlement
M2
2,000,000.00
2
Permit Fee, etc.
Ls
1
II
Preparatory work
1
Mapping and Measuring Survey
2
Land preparation and clearing
Cut and Fill
Ha
200
M2
2,000,000.00
Estimation Unit price (Rp.)
Total price (Rp.)
60,000.00
120,000,000,000.00
5,000,000,000.00
5,000,000,000.00
Total
125,000,000,000.00
No. Type of work
Specifications and Description
Unit
Quantity
Unit price (Rp.)
Total price (Rp.)
B
LAND FACILITIES
1
Office Buildings
Manager & Harbormaster
M2
3,000.00
5,000,000.00
15,000,000,000.00
2
Warehousing
42 X 60 = 20 Unit, 20 X 48 =
M2
96,480.00
3,500,000.00
337,680,000,000.00
20 Unit, 24 x 36 = 20 Unit. 3
Cold Storage
900 ton capacity
Unit
1
1,500,000,000.00
1,500,000,000.00
4
Block Ice Factory
Capacity 600 tons / day
Unit
2
10,000,000,000.00
20,000,000,000.00
3,000,000.00
600,000,000.00
5
Bulk Ice Factory
Unit
1
1,000,000,000.00
1,000,000,000.00
50,000.00
100,000,000,000.00
6
Crystal Ice Factory
Unit
1
1,000,000,000.00
1,000,000,000.00
Total
100,600,000,000.00
7
Dry Ice Factory
Unit
1
1,000,000,000.00
1,000,000,000.00
8
Belt Conveyor
To supply to the ship
Ls
1
6,000,000,000.00
6,000,000,000.00
III
Fasilitas Industri
9
Repair and Docking
Capacity 2500 tons
Unit
1
3,000,000,000,000.00
3,000,000,000,000.00
A
SEA FACILITIES
10
Clean Water Facilities
Water sources
Unit
1
70,000,000,000.00
70,000,000,000.00
1
Container Storage Jetty
11
Fuel Facilities
Including the BBM Bunker
Unit
1
50,000,000,000.00
50,000,000,000.00
2
Fishing Boat Harbor
12
Electricity
Power Source
Unit
1
125,000,000,000.00
125,000,000,000.00
3
Port Protection Buildings:
13
Telecommunication Facilities
Unit
1
50,000,000,000.00
50,000,000,000.00
A
Break Water
14
Port loading and unloading equipment
Ls
1
12,000,000,000.00
12,000,000,000.00
B
15
Bait Fish Pond
Ha
50
1,000,000,000.00
50,000,000,000.00
16
Street and Parking Lot
a. Parking
M2
117,680.00
2,500,000.00
294,200,000,000.00
b. Container Field
M2
12,000.00
1,900,000.00
22,800,000,000.00
For Industrial Estates
Ls
1
15,000,000,000.00
15,000,000,000.00
Total
4,072,180,000,000.00
1800 X 8 m
Rubblemound (Tetrapot)
Ls
1
800,000,000,000.00
800,000,000,000.00
Ls
1
300,000,000,000.00
300,000,000,000.00
Ml
3,000.00
30,000,000.00
90,000,000,000.00
Kanal (Plaster and Road)
M2
9,600.00
22,000,000.00
211,200,000,000.00
4
Beacon Signs on the Sea
Bh
5
1,100,000,000.00
5,500,000,000.00
3
Light House
Bh
1
5,000,000,000.00
5,000,000,000.00
Total
1,411,700,000,000.00
17
Fire Fighting Installation
Including the crane
A c e h
I n v e s t m e n t
O p p o r t u n i t i e s
2 0 2 0
143
A G R O I N D U S T R Y
Estimation Specifications and Description
No. Type of work
144
Unit
Quantity
Estimation Unit price (Rp.)
C
SHIP
1
Long Line Tuna
200 Gt
Unit
40
20,000,000,000.00
2
Nets
1000 Gt
Unit
3
3
Transport Ship (Including processing)
2000 Gt
Unit
4
Tug Boat
5
Training Ship
6
Fire Boat
7
Fishery Supervisory Ship
8
Coast Patrol Boat
Total price (Rp.)
Facilities and infrastructure
800,000,000,000.00
1
Environmental Wall
75,000,000,000.00
225,000,000,000.00
2
Fenced Industrial Zone
1
150,000,000,000.00
150,000,000,000.00
Unit
1
15,000,000,000.00
15,000,000,000.00
3
Main Street and Environment
Unit
1
10,000,000,000.00
10,000,000,000.00
Unit
1
70,000,000,000.00
70,000,000,000.00
100 Gt
Unit
1
15,000,000,000.00
15,000,000,000.00
30 gt
Unit
2
5,000,000,000.00
10,000,000,000.00
Total
1,295,000,000,000.00
60 Gt
TRANSPORTATION AND EQUIPMENT
1
Truck Cold Storage
City Transportation
Unit
5
1,500,000,000.00
7,500,000,000.00
2
Open Body Truck
Transport from ship to warehouse
Unit
5
550,000,000.00
2,750,000,000.00
3
Employee Bus
Unit
5
1,500,000,000.00
7,500,000,000.00
4
Firefighter trucks
Unit
3
1,500,000,000.00
4,500,000,000.00
5
Operational Vehicles
Unit
15
400,000,000.00
6,000,000,000.00
Total
28,250,000,000.00
I n v e s t m e n t
No. Type of work IV
D
A c e h
Specifications and Description
Personal
O p p o r t u n i t i e s
2 0 2 0
Unit
Quantity
Unit price (Rp.)
Total price (Rp.)
Ml
4,000.00
1,750,000.00
7,000,000,000.00
Ml
4,000.00
1,750,000.00
7,000,000,000.00
a. Main Road Access (Major Road to the Regions)
Km
4
37,000,000,000.00
148,000,000,000.00
b. Access road to Kuala Bungak
Km
6
18,500,000,000.00
111,000,000,000.00
c. Neighborhood Path
Km
6
9,250,000,000.00
55,500,000,000.00
25,000,000,000.00
50,000,000,000.00
150,000.00
18,000,000,000.00
30,000,000.00
30,000,000.00
Total
396,530,000,000.00
TOTAL
7,429,260,000,000.00
Precast concrete
Sub grade stabilized, carrying capacity 40 Ton 4
Bridge
5
Parks and Green Spaces
6
Street and Garden Lights
Median and sidewalk
Contact Us: East Aceh Investment And One-Stop Service Agency East Aceh District Government Central Complex
Unit
2
M2
120,000.00
Ls
1
Gusti Sari Ayu Address
: Jl. Medan Medan- Banda Aceh Km. 370 No. 3 Idi Post Code. 24454
Head of Information, Promotion and Investment Cooperation Divission
Phone
:
Hp
: 08116715105
: dpmpptacehtimur@gmail.com
: hockclickgusti@gmail.com
(063)21085
A G R O I N D U S T R Y
Sawang Ba’U Fishing Port
The facilities at the port of Sawang Ba’u are: FACILITIES AND CAPACITY Port area 1,5 Ha
Sawang Ba’u Village is a fishery center in South Aceh, with a total of 1,604 fishermen and 132 fishing vessels. There are 60 boats 10 GT, and 78 non-motorized boats.
Quay Jetty Breakwater 400 m Pool port 1,2 Ha Revetment 150 m Fish Market (TPI) 6 x 6 m
The fishing gear used is purse saine and the main catches are skip jack and tuna.
The fishery business in Sawang Ba’u is highly promising; the local governments are expected to provide the necessary facilities to encourage the private sector to invest in the construction of fish processing plants. The following are potential investments that can be developed at the Sawang Ba’u Fishing Port: 1. 1. Ice block factory with a capacity of 10 tons/day 2. Fuel station for fishing boats 3. Cold Storage Sawang Cot Bak U Fishing Port, South Aceh.
4. Docking facilities
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
145
Bundaran Simpang Lima, Banda Aceh.
Tourism Development 146
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Testimony
Testimony
I Accommodation Sector yriad Muraya Hotel Aceh started its
guests including celebrities and the community.
hospitality business in Aceh at the
The profit achieved in a short period of time are
end of 2017 with high optimism. By
significant enough to give us confidence to expand
continuing to carry out the concept of halal
our hotel business by building 3 new properties in
and Sharia, the Kyriad Muraya Hotel Aceh
Banda Aceh, Takengon and Kuta Cane. Therefore,
has received a positive response from
in 2021 there will be 4 hotel units under Kyriad
the domestic and international markets.
management. Until now, business opportunities in
Starting from the grand opening of the Hotel
Banda Aceh in particular or Aceh in general are still
in 2017 until now the Kyriad Muraya Hotel
very potential with an ideal ROI period.
Aceh has been listed as the 1st ranking hotel in Aceh and has become the choice of staying for regional and foreign guests
Let’s invest in Aceh......
including the President of the Republic of
Bambang Pramusinto
Indonesia, Ministers, Ambassadors, State
General Manager Kyriad Muraya Hotel Aceh
High Officials, Military Attaches and special
www.kyriad.com | www.kyriadmurayaaceh.com
Kyriad Muraya Aceh
KHMAceh
e
u
n
kyriadmurayahotel
I n v e s t
s i
A c e h
+628116713123
2 0 2 1
147
T O U R I S M
D E V E L O P M E N T
Tourism
The Aceh Culture and Tourism Agency has identified 797 tourist destinations as well as 774 cultural sites and heritages scattered in 23 regencies and cities throughout Aceh. Apart from tourism, Aceh also has a variety of unique cultural arts such as dances, customs, literature, arts, painting, and spiritual activities that are tourist attraction. All that beauty is very easy to enjoy, since accessibility to tourist attractions in Aceh is very convenient. All tourist destinations can be reached by land, sea and air. There are international flights to Aceh, such as from Penang, Kuala Lumpur and Jeddah.
The tourism sector is a promising investment opportunity in Aceh. Aceh has great tourist attractions; natural tourism, cultural tourism, artificial tourism, cultural heritage, and so forth.
The Aceh government is currently discussing a plan to open a new flight route from Aceh to India (Port Blair), as well as the Sabang – Phuket– Langkawi route. As a result, the number of tourists visiting Aceh continues to increase every year. Approximately 2.3 million tourists visited Aceh in 2017 and 2.5 million in 2018. This shows a 20% increase from the previous year. In 2019, the number of tourists who visited Aceh reached 2.6 million. Iboih Beach, Sabang.
148
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
T O U R I S M
D E V E L O P M E N T
Total Domestic and International Tourist by Regency/City in Aceh, 2019 Total Tourist Regency/City
International
Domestic
Total
Simeulue Aceh Singkil South Aceh Southeast Aceh AceH Timur Aceh Tengah West Aceh Aceh Besar
1.499 3.242 19 5.625 43 424 324
47.833 95.309 22.473 21.388 15.941 52.946 52.265
49.332 98.551 22.492 27.013 15.984 53.370 52.589
28.400
500.476
30 10
16.493 66.178
3.531
173.469
33 263 17 66 295 -
14.544 17.383 10.250 1.327 23.850 70.928 2.127
31.670 31.450
482.322 589.244
36
32.850
42
140.751
18
79.532
107.037
2.529.879
106.281 75.758
2.391.968 2.288.625
Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017
528.876 16.523 66.188
177.000 14.577 17.646 10.250 1.344 23.916 71.223 2.127
513.992 620.694 32.886
140.793 79.550
2.636.916
The arrival of foreign tourists by cruise ship in Sabang.
2.498.249 2.364.383
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
149
T O U R I S M
D E V E L O P M E N T
Aceh as “World’s Best Halal Cultural Destination” has encouraged the Aceh Government to be more active in improving various tourist facilities and infrastructure. Based on Data from Aceh in Figures, the tourism sector has contributed approximately 5% to Aceh’s GRDP every year on average. Compared to other sectors, tourisms’ contribution is 8th from the top. Seeing this growth, the Aceh Government is confident that the contribution of the tourism sector can rise to the top four. The Aceh government is optimistic that the tourism sector will become one of the pillars of Aceh’s economy in the future. In an attempt to develop the tourism sector, the Government of Aceh invites investors to participate both as stakeholders and managers in several supporting projects for the tourism industry in the following districts/cities:
0 Kilometer Monument Sabang.
150
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
T O U R I S M
NAIC & BSB A I Banda Aceh Business Center Banda Aceh City
Nurul Arafah Islamic Center (NAIC), Ulee Lheue.
Banda Aceh City is located between 05°16’15” - 05°36’16” North Latitude and 95°16’15”95°22’35” East Longitude with average altitude of 0.80 meters above the sea level.
Geographically, the position of Banda Aceh City is
the work force participation rate in Banda Aceh is
highly strategic; close to the countries in southern
61.39% with the Human Development Index (HDI)
Asia. Banda Aceh is bordered in the North by
at 85.07 in 2019.
South Malacca Strait and also bordered by West Aceh Regency, East Indian Samudera, Aceh Besar Regency. Banda Aceh as the capital city of Aceh Province
Infrastruktur Pendukung Transportasi (Darat, Udara, Laut):
is also the center of Aceh Provincial Government and various related agencies. Aside from its
Airport/Bandara Sultan
function as the centre of government, economic,
Iskandar Muda International
educational and cultural services, and religious
Airport, dengan jarak tempuh
center, Banda Aceh City is also the gate of the
ke pusat Kota Banda Aceh
Republic of Indonesia to the western part of the
16,7 Km dengan jarak tempuh
country in terms of transport, land, sea and air.
26 Menit.
Banda Aceh City has great tourism potential considering that this city is a cultural and historical centre. The main economic activity is trade and fisheries since Banda Aceh is a coastal city.
Banda Aceh Business Center (BSB), Keudah, Banda Aceh.
D E V E L O P M E N T
Ulee Lheue Ferry Port Pelabuhan Penyeberangan Ulee Lheue, dapat diakses dari Bandara Sultan Iskandar Muda dengan Jarak 20,6 Km dengan waktu Tempuh 35 Menit.
The total population of Banda Aceh was 268,156
Gerbang Tol Blang Bintang,
people in 2019 with population growth rate of
dengan pusat Kota Banda
1.15 % from 2018 to 2019. Good quality and
Aceh dengan jarak 19 Km
competitiveness of human resources is necessary
dengan waktu tempuh 30
for Aceh investment performance. Besides that,
menit.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
151
T O U R I S M
D E V E L O P M E N T
Supporting Facilities Project Development for Gemilang Tourism Project
Available Land:
Economic Feasibilty Analysis
Total Area: (Government owned)
Payback period for Gemilang Project (Nurul
7.245 M2
Arafah Islamic Centre and Banda Aceh
Future Expansion: Land Acquisition Gemilang Project is an initiation from the
19.331 M
Government of Banda Aceh City to build a world
Location: Jl. Iskandar Muda Gp. Ulee Lheu, Sub-
class Islamic Centre as a destination of halal
District Meuraxa, Banda Aceh City
2
tourism and Banda Aceh Business Centre and as
INAIC ( Nurul Arafah Islamic Center) I I Asean
Market Opportunity: Banda Aceh as the capital city and the centre of government of Aceh Province is also the oldest
as a religious convention centre with a capacity of
Islamic City in Southeast Asia and the capital city
3000 congregants from various Islamic countries,
of the Sultanate of Aceh. Banda Aceh city has great
mainly ASEAN.
potential as a religious tourism destination.
O p p o r t u n i t i e s
IRR
Investment Estimates:
places, dzikr plazas, tahfiz schools, boarding schools, guest houses, health clinics, mini
Supporting Facilities
Development plans: Highway, bridges, parking lots, mosques and towers, ablution markets, souvenir shops and food galleries, post offices, parks and landscapes.
IDR 49,365,000,000 (USD 3.6 MILLION) Main Building
Total Investment
NAIC (Nurul Arafah Islamic Center) has a function
I n v e s t m e n t
Net Present Value
: 15 Years. : US$ 45,423,736 (Positive Value) : 11.00%.
Investment Activities:
IDR 281,681,000,000 (USD 20.5 MILLION)
the lifestyle center in Banda Aceh.
152
Business Centre)
Nurul Arafah Islamic Center (NAIC)
o f
A c e h
2 0 2 1
IDR 331,046,000,000 (USD 24.2 MILLION) Cooperation Scheme:
Build, Use, Hand Over Nurul Arafah Islamic Center (NAIC).
T O U R I S M
Banda Aceh Business Center (BSB)
D E V E L O P M E N T
Investment Estimates IDR 461,024,190,000 (USD 33.8 MILLION)
Contact Person:
Cooperation Scheme:
Banda Aceh Investment And One Stop Services Agency (Dpmptsp)
Government cooperation with
Address
business entities (KPBU).
: Mal Pelayanan Publik (MPP) Bulding, Jl. Diponegoro, Pasar Atjeh Lt.III, Gp. Kampung Baru, Baiturrahman
Land Available:
Sub-District, Banda Aceh Nurul Arafah Islamic Center (NAIC).
Total Area:
11,727 M2
Nurul Arafah Islamic Center (NAIC).
Postal Code
: 23242
Telephone
: (0651)32874 / (+62) 813 62 503 333
: bid.pm.dpmptsp.bna@gmail.com @mpp_bandaacehkota
CP
:
Status:
Government Owned LOcation : Strategic Area (Old town centre) Jl. Cut Meutia Gp. Baru Kecamatan, Baiturrahman, Banda Aceh City
Investment Activities:
Cut Maisarah,SE, MM
Banda Aceh Business Centre will be developed as
(Head Division) /
a center of business district with transportation
0811687480
and accommodations, integrated with shopping malls and modern lifestyle and is expected to increase regional income.
Banda Aceh Business Center (BSB)
Website
: dpmptsp.bandaacehkota.go.id
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
153
T O U R I S M
D E V E L O P M E N T
Lhoknga Golf Course Development Aceh Besar Lhoknga Golf Course is located in the Aceh Besar Regency, close to the popular tourist destination of Lhoknga Beach. The property is 20 KM or about 25 minutes by road from Banda Aceh, the capital of Aceh Province. The Golf Course has a total area of 57 hectares, surrounded with white sandy beaches of Lhoknga and Lampuuk on its western side, and hillside view on the eastern side. Lhoknga Golf Course is the only public golf course in Aceh, located on the designated development land for tourism. The government of Aceh has been developing this Golf Course since 1997 and it has become one of the tourist destinations and integrated golf courses in
Lhoknga Golf Course, Aceh Besar.
Indonesia.
154
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
T O U R I S M
Total Land Value:
Rp. 41.663.040.000.Total Building Value:
Land:
Facilities Provided:
520.788 M2
The condition of Lhoknga Golf Course is still
Total Facility Value:
bad and lacking maintenance due to limited
Rp. 26.148.600.000, -
Land Ownership:
Owned by the Government of Aceh Duration of Lease:
30 Years
Land Status: Certified Audited by MAPPI (Indonesian Society of Appraisal Prosfesi)
government funds. The existing golf course only serves 9 holes out of the 18 holes available. Other facilities include: Grass
Rp. 533.900.000.-
Total Assets:
Rp. 68.345.540.000 (Assessed by independent
Investment Cost Investment for integrated tourism, resort and sport facilities development (4-year plan):
Rp. 83.967.584.000 Existing facilities renovation cost:
Rp. 14.918.415.000 Maintenance cost & wages (annual):
Rp. 18.837.057.794 Total investment cost:
auditor in 2018)
Rp. 117.723.056.794
Lockers
Investment Analysis
Estimated Annual Gross Income
Prayer room
Net Present Value (NPV)=
Facilities and Building Rent:
Rp.118.187.770.374, -.(Feasible)
Rp. 10.700.000.000
Benefit Cost Ratio (BCR)=
Green Fee:
1,3260> 1 (Feasible).
Rp. 26.401.000.000
Internal Rate of Return (IRR)=
Total Annual Income:
26,8367%> MARR 15%. (Feasible).
Rp. 37.101.000.000
The club house
Pump House Electricity and water network Temporary storage warehouse Sprinklers, and Guardrail area
Pay Back Period (PBP)=
Lhoknga Golf Course.
Investment Scheme
11.4730 Years.
Management of the property by investors for a certain period of time
Break Even Point (BEP)=
management and the Government of Aceh.
11,3181 Years.
D E V E L O P M E N T
(a maximum of 30 years). Profit sharing: 40% to investor, 60% to the Lhoknga Golf Course, Aceh Besar.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
155
T O U R I S M
D E V E L O P M E N T
Ie Seum Hot Spring Resort Tourism Development Overview Of Aceh Besar Regency Aceh Besar Regency is located at 5.05 ° - 5-75 ° North Latitude and 94.99 ° - 95.93 ° East Longitude. The North is bordered by the Malacca Strait and Banda Aceh City, the South is bordered by Aceh Jaya Regency, the East is bordered by Pidie Regency, and the West is bordered by the Indian Samudera. Aceh Besar has an area of 2,903.50 km² with 68 tourist destinations consisting of 51 natural attractions, 6 cultural attractions and 11 special interest attractions. Most of the areas are land, and also a small part is in the islands. Aceh Besar District has protected and cultivated forests.
Ie Seum hot spring, Aceh Besar.
156
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
T O U R I S M
Investment Supporting Infrastructure
Water Transportation
Human Resources
There are 2 (two) major ports in Aceh, namely:
The total population of Aceh Besar Regency according to the estimated results in 2017 was
} Malahayati Port, with a distance of 7 km and
Land Transportation Toll road become an alternative transportation to Ie Seum Hot Spring Resort with distance of 18 km and travel time of ± 25 minutes. The location
409,109 consisting of 209,593 of males and
travel time of ± 10 minutes, Malahayati Port
199,516 of females. The total workforce in Aceh
is used as a marine highway that supports
Besar is 555.
Aceh’s logistical connectivity.
Tourism destination of Ie Seum currently has
} Ulee Lheu Port, with a distance of 39 km
of the Ie Seum Hot Spring Resort is 38 km from
and travel time of ± 60 minutes is one of the
the provincial capital city with travel time of ± 55
seaports to Sabang City, which is one of the
minutes. The distance from Aceh Besar Regency
marine tourism destinations in Aceh.
D E V E L O P M E N T
approximately
39 workers
Swimming Pool:
3 people
is 62 km with travel time of ± 90 minutes.
Parking:
3 people Cleanliness:
Electricity and Water Air Transportation
3 people Ie Seum hot spring, Aceh Besar.
Canteen Staff:
The State Electricity Company has distributed
Sultan Iskandar Muda International Airport
electricity to 604 villages in Aceh Besar Regency.
30 people
Blang Bintang is a transportation mobility for
There are 604 villages with 73,655 customers that
For managers of Ie Seum Hot Spring Resort,
local and international tourists. With 5 (five)
are connected to Electricity Power for 102,719,869
Meanwhile, the total amount of drinking water
training has been given by the Tourism, Youth and
major airlines traveling to Aceh there are
VA. Currently, infrastructure and electricity are
distributed to customers was 10,560,758 m3 with
Sports Agency of Aceh Besar Regency.
approximately ± 5,000 trips each year and
available in the Ie Seum Hot Spring Resort.
most of the distribution in November reaching
the number of passengers reaches 550,000
The highest number of drinking water customers
966,167 m3. Meanwhile, the clean water pipeline
each year. The distance from SIM to the
in PDAM Tirta Mountala Aceh Besar Regency
(PDAM) is not yet available. So far, clean water
tourist attraction is 23 km with travel time of
was 3,525 for non-commercial and 2,929 for
is drawn from wells in neighboring villages using
± 38 minutes.
commercial customers in 2017.
makeshift tools.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
157
T O U R I S M
D E V E L O P M E N T
masl in Seulawah Agam. The average temperature of water is 40 ° c to 90 ° c. Meanwhile minimum air temperature in this area is approximately 19-21°c and maximum temperature is 25-30°c.
Availability of Land
Approximately 35,000 tourists from both local
Geographically, the Ie Seum hot spring tourism
is one of the water tourism options besides the
destination is located at Gampong Ie Seum,
beach. By providing tourists with a beautiful view
Masjid Raya Sub-District, Aceh Besar Regency,
of hills and small channels emitting smoke, visitors
Aceh Province, which geographically is located at
can enjoy the sensation of soaking in hot water that
5 ° 22’12.3 “NL and 95 ° 37’46.5”.
relaxes the body.
and outside of the city visit Ie Seum. This location
This tourist spot has a total area of ± 8 ha belonging to the local government.
Additional supporting facilities and infrastructure is expected to increase the tourists of Ie Seum.
Location
The development of Ie seum as a prominent
Village
:
tourist destination in Aceh Province is supported
Sub-District
:
Regency
:
by many factors, including:
good and smooth road condition.
Area
:
and Sports Agency. The facilities that exist are as
Apart from hot spring tourism destination,
Status
:
follows:
tourists can also enjoy the fruit along
3. Play Ground with a size of 20 m x 20 m 4. MCK 7 units
to be developed professionally is the Hot Spring
5. Prayer room 5 x 7 m
Tourism Destination (Ie Seum). The water in this
6. 15 units of canteen and 8 units of Souvenir
tourism destination is natural hot water flowing
Shop managed by the local community
from the foot of Gunoeng Meuh (Golden Mountain)
7. Wooden gazebo
which is a Strato Volcano with an altitude of 1749
8. 8 units of sauna bathroom
A c e h
Management
under the Aceh Besar Regency Tourism, Youth
children’s pool area 6 x 6 m)
o f
and Pipeline.
:
One of the tourist destinations that is expected
O p p o r t u n i t i e s
Ie Seuem Bath Tourism Development and
Province
20 x 15 m with a height of 165 m and a
I n v e s t m e n t
Cold Water Bathing Pool, Water Pumping Machine
Transportation that is easily accessed with
2. Bathing pool 3 units (male & female area
158
Investments Offered:
The management of Ie Seum tourism is currently
1. Parking 2 units
Market Opportunity
Facilities to be built in 2020:
2 0 2 1
the Lambaro and Blang Bintang roads to
Land Ownership :
Ie Seum Mesjid Raya Aceh Besar Aceh ± 8 Ha Mountain Forest Local Government
Barbate date palms, mango gardens, cocoa gardens, candlenut and jamblang fruit, only the arrangement is not yet professional.
Ie Seum hot spring tourism destination.
T O U R I S M
Contact Person:
Investment Activities
Aceh Besar Investment And One-Stop Service Agency Investment Opportunities 2020 Aceh Besar
Expansion Plan } Road Expansion } Parking area
Address : Jln. T. Panglima Polem, SH, Jantho City, 23912 Aceh Besar - Aceh
Investment Estimates
} Café or restaurant
0852-6032-6180 / 0823-6101-5781
Phone
:
Rp. 10 billion
: dpmptsp.abes@gmail.com
Working Capital:
Website : pinto.acehbesarkab.go.id
Investment:
} Souvenir shop
The construction of various supporting
} Potential land for agro-industrial tourism
facilities mentioned above are expected
} Safety fences in streams of hot springs
to increase the number and intensity of
} Disability access
tourist visits with an estimation of about
} Expansion of the bathing pool
300% growth: 35,000 to 105,000 tourists
} Changing room / toilet
each year. Repair and development of
} Children’s play area
supporting facilities will also significantly
Rp. 3.15 billion
} Facilities for praying
increase the cost of entrance tickets from
Payback Period:
} Sauna therapy
the previous Rp. 3,000, - to Rp. 30.000, -
} Cottage / Lodging
per person. This estimation is built based
4 Years
Budi Santosa, SSTP
} Green open spaces
on the analysis of secondary data (the
Cooperation Scheme:
(Kepala Bidang Penanaman Modal)
} Promotion through mass media
number and management of tourism
Utilization Cooperation
} Development and maintenance of
destinations that are professionally
(according to agreement
organized in Aceh Besar).
with regional leaders)
facilities and parks
D E V E L O P M E N T
Rp. 2 billion Estimated annual income:
+6289519820228
Hp
:
: budisantosa.bin.ibnusaadan@gmail.com
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
159
T O U R I S M
D E V E L O P M E N T
Pidie Lingkok Kuwieng Tourism Development 0 0
0
0 20 21
2
Pidie Regency has a Tropical Climate (Lowlands
2 bordered by Pidie Jaya Regency on A
/ Coastal Coast) and Cool Climate (Highlands / Valleys / Mountains) with a rainfall rate of 1,482 mm each year and an average temperature of 24 ° - 32 ° C, and also has a river length of 567, 40
A Regency and Aceh Jaya Regency on the South side.
Km and Beach of 122 Km. Pidie has various types of soil consisting of Alluvial (Kembang Tanjong, Pidie, Simpang Tiga), Hydromorf (Pekan Baro, Geulumpang Tiga, Mutiara, Titue, Keumala, Tiro
160
I n v e s t m e n t
O p p o r t u n i t i e s
o f
Lingkok Kuwieng, Pidie.
A c e h
Land Transportation
Truseb, Muara Tiga), Podsolik (Padang Tiji, Sigli
Pidie Regency has 96 km of state roads, 267.58 km of provincial roads,
City, Indra Jaya, Tangse).
1,084,150 km of Sub-district roads and 1,798.03 km of Gampong roads.
Pidie Regency has several top tourist destinations
Transportation in Pidie Regency is quite adequate with the existence of
such as Beungga Hot Springs, Lestari Rafting
public transportation in the form of large buses and small buses for inter-
Pidie Park, Pelangi Beach, Guha Tujoh and Lingkok
regency and inter-provincial transportation. Meanwhile, transportation within
Kuwieng.
the town there are labi-labi, pedicabs, motorcycles, taxis and rental cars.
2 0 2 1
T O U R I S M
D E V E L O P M E N T
Lingkok Kuwieng. I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
161
T O U R I S M
D E V E L O P M E N T
Air Transportation
Energy
There is no air transportation in Pidie Regency.
The availability of electricity in Pidie Regency is adequate
Flights to Pidie Regency are via Sultan Iskandar
with connected power of 102,368,900 VA consisting of
Muda Airport (SIM) in Blang Bintang, Aceh Besar
the Sigli state electricity agency for 59,380,600 VA and the
Regency. Furthermore, from SIM airport, the Sigli
Beureunuen state electricity agency for 42,988,300 VA. The
Regency can be reached in approximately 2 hours
required electricity for investment activities in the tourism
with a travel distance of 112 km via the Banda
industry is adequate.
Aceh - Medan National road or within 1 hour via the toll road. This SIM airport serves domestic flight routes and several international flights.
Human Resources The total workforce in Pidie Regency is 192,190 persons consisting of 111,145 men and 81,045 women. From its educational background perspective, there are 1,046
Sea Transportation
members of the workforce who have not attended school,
There is no sea port in Pidie Regency. The closest
have finished elementary school. Meanwhile, there are 41,463
sea port is through the Ule-lheu port in Banda Aceh
who have attended junior high school, 62,964 high school,
City which is about two hours to the city to Sigli via
7,169 vocational, 11,363 who have diplomas, and 23,252
Banda Aceh - Medan National road or one hour via
are university graduates. The majority of the work force, at
the toll road.
32.76%, have Senior High School education. With this number
17,447 who have not finished elementary school, 27,486 who
of workers, it is sufficient to fill jobs in the tourism industry.
162
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Lingkok Kuwieng.
T O U R I S M
Land availability
Market Opportunities
Lingkok Kuwieng, also known as Uruek Meuh, located in Padang
Lingkok Kuwieng provides a very unique and captivating natural
Tiji Sub-District (in the Hagu Forest) is 12 km from Sigli City, the
phenomenon. Besides being able to enjoy a river with its green water
capital of Pidie Regency. Lingkok Kuwieng is a river with mountain cliffs, in the form of large cliffs resembling an ancient site. This
equipped with rock cliffs on its sides, we can also enjoy the beautiful natural atmosphere, fresh air, trees, and camping places. By setting up
place is often called the Grand Canyon of Aceh. Lingkok Kuwieng is
tents on rocky cliffs, of course visitors can feel the sensation of staying
a natural phenomenon which formed because of mountain erosion
the night in the middle of the wild accompanied by a campfire. This
that make water volumes change. The beauty of Lingkok Kuwieng
tourist destination can be one of the uncommon and unique places
is complemented by a natural atmosphere and maintained by a row
with its endless natural resources.
of green trees that thrive around the river.
Investments Offered:
Investment Estimates
Development of facilities and markets for the
Investment:
Lingkok Kuwieng tourist destination
IDR 10 Billion
Location
Working capital:
Village
: Pulo Hagu
Sub-District
: Padang Tiji
IDR 15 Billion
District
: Pidie
Estimated Income:
Province
: Aceh
IDR 5 Billion/Years
Investment Activities The development of this tourist destination consists of several investment activities,
To get to the Lingkok Kuwieng Tourist Spot in Padang Tiji, the
including:
distance is 99 Km away from the Banda Aceh City. Meanwhile
1. Road Construction
from Sigli City to Padang Tiji is 13 Km and takes an hour through
2. Souvenir Shopping Center
Padang Tiji Military Command. Starting this year, the road to
3. Parking area
Lingkok Kuwieng has already been repaired by the TNI through
4. Agro-tourism land for tourist attractions that
TMMD activities.
Contact Person: Contact us : PIDIE TOURISM, CULTURE, YOUTH AND SPORTS (DISPARBUDPORA) Address
: Jalan Prof. A. Majid Ibrahim-Tijue Kabupaten Pidie-Aceh, Kode Pos 24151
Phone
:
: disparbudporapidie@gmail.com
Website
: disparbudpora.pidiekab.go.id
(0653) 21109 / Fax: 23748
Payback Period:
5 Years
Scheme:
PIDIE INVESTMENT AND ONE-STOP SERVICES AGENCY (DPMPTSP) Address
: Jalan Tgk. Chik di Reubee No. 5 Kota Sigli, Kode Pos 24114
Telp/Fax
:
(0653)23399
Investment activities are facilitated by the Pidie Regency Government based on a cooperation agreement.
involve the community who own the land
The Lingkok Kuwieng area is a forest owned by the community
5. A stopover place / lodge for visitors
with total area of approximately 20 hectares.
6.
Syammi, SP
Restaurant / Restaurant / Café
7. Toilet / Changing Room 9. Worship Facilities 10. Kids Game Facilities 11. Fasilitas Permainan Anak
Contact Person:
(Head of Tourism Div)
8. Lodging
Lingkok Kuwieng.
D E V E L O P M E N T
Cp
: 0822
5224 8860
: syammiabdullah@gmail.com
Lingkok Kuwieng.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
163
T O U R I S M
D E V E L O P M E N T
Pulau Banyak Tourism Development Nature Tourism Park (TWA) is a Natural Tourism Park appointed based on the Decree (SK) of the Minister of Forestry No. 596 / Kpts-II / 1996 on September 16, 1996 concerning the Designation of the Multi-Island Cluster and the surrounding marine waters covering an area of ± 227,500.
164
I n v e s t m e n t
O p p o r t u n i t i e s
Panjang Island, Pulau Banyak.
In 2000, the Minister of Forestry and Plantation
Change of Designation of Forest Areas to Non-
the Banyak Islands Nature Park was designated as a
issued Decree No. 170 / Kpts-II / 2000 concerning the
Forest Areas of ± 42,616 Hectares, Changes in the
nature tourism park based on the Decree of the Minister
Designation of Forest and Water Areas in the Special
Function of Forest Areas of ± 130,542 Hectares and
of Forestry Number: SK. 5347 / Menhut-VII / KUH /
Region of Aceh Province with an area of ± 3,549,813,
Changes of Non-Forest Areas to Forest Areas of ±
2014 concerning the Designation of Forest Areas for
thus it changed the area of Banyak Islands Nature
26,461 Ha in Aceh Province.
Natural Tourism Parks and Marine Nature Tourism Parks
Tourism Park. In 2013, the Minister of Forestry
Based on the results of the boundary demarcation
in the Banyak Islands, covering an area of 205,720.24
Decree No. SK.941 / Menhut-II / 2013 concerning
in 1996 and the SK for the designation of the area,
hectares in Aceh Singkil Regency, Aceh Province. In
o f
A c e h
2 0 2 1
T O U R I S M
D E V E L O P M E N T
(56,863.95 Ha), and Traditional Blocks (90,337 Ha). In 2017, the Aceh Natural Resources Conservation Center has also compiled a Site Design for Management of Natural Tourism Block Utilization in the Banyak Islands Nature Tourism Park. In the management of the Banyak Islands Nature Park which is a Nature Conservation Area (KPA) refers to Government Regulation (PP) Number 28 of 2011 as amended in PP Number 108 of 2015 concerning Amendments to Government Regulation Number 28 of 2011 concerning Management of Nature Reserve Areas and Conservation Areas Natural. In this PP it is stated that the implementation of Natural Tourism Parks Baguk Island, Pulau Banyak.
is carried out by the Government in this case by the Natural Resources Conservation Agency. Therefore, the Banyak Islands Nature Tourism
2018, the Minister of Environment and Forestry
Park has an area of 230,632.18 hectares consist of
Islands Nature Park area through the Director
Park is managed by the Aceh Natural Resources
Decree No. SK.580 / MENLHK / SETJEN / SET.1 /
205,758.87 hectares of water (89.22% of the total
General of KSDAE Decree No. SK.162 / KSDAE / SET
Conservation Agency, the Directorate General of
12/2018 dated 17 December 2018 concerning the
area) and 24,873.31 hectares of land (10.78% of the
/ KSA.0 / 6/2016 dated 9 June 2016 concerning
Natural Resources and Ecosystem Conservation,
Third Amendment to the Decree of the Minister of
total area)..
the Management Block of the Many Archipelago
and the Ministry of Environment and Forestry. As
Nature Park, Aceh Singkil Regency, Aceh Province.
for the development of Banyak Islands Nature
Forestry Number SK.865 / MENHUT-II / 2014 dated 29 September 2014 concerning Forest Area and
In 2016, the Director General of Conservation of
The division of this area block divides TWA into
Park, it is carried out in an effort to develop
Conservation of Waters of Aceh Province. Based
Natural Resources and Ecosystems (KSDAE) has
Protection Blocks (20,920.39 Ha), Maritime
business activities, construct infrastructure to
on this latest decree, the Banyak Islands Nature
approved the block arrangement of the Banyak
Protection Blocks (87,464.05 Ha), Utilization Blocks
support activities and provide services.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
165
T O U R I S M
D E V E L O P M E N T
The following are the potential investment that can be developed in Banyak Islands:
No.
166
I ne v eu s tn m e In nt v eO sp tp o sr i t uA nc ie thi e 2s 0 2o 1f
A c e h
2 0 2 1
Area (Ha)
1.
Bangkaru Island (Ujung Lakita, Ujung Selatan, Teluk Berasi, tip berambang, Sidincak Farm and Teluk Asin)
± 347
2.
Bangkaru Island (Abuse, Offense, Jungle Door, Luan Batu etc.)
± 404
3.
Tuangku Island (Tip Lolok)
± 202
4.
Tuangku Island
± 1995
5.
Tuanku Island, Pulau Banyak.
Location
Palambak Besar Island
± 51
Site Analysis a. Flat topography b. The vegetation that is dominated by sea pandanus, waru, benut and coconut c. Fauna: Monitor Lizards, Parrots, King Prawns, Magpie Stones, Crocodiles, Mouse Deer d. Potential: Beach, White Sand, Surf Spots and Beautiful Beach Views a. Flat topography b. Vegetation: Sea Waru, sea pandanus, Nyamplung, Ficus, bayur etc. c. Fauna: Monitor Lizard, Murai Batu, King Shrimp, Turtle, Mouse Deer, crocodile d. Objects / Potentials: white fine sand, beaches and limited tours of turtle observation e. There is a turtle resort / camp a. Flat topography b. Vegetation: Waru Sea, Pandanus Sea, ketapang c. Fauna: Lizard, king prawns d. Object / Potential White sand, big waves suitable for surfing e. There are 4 units of resort / bungalow and 1 unit of floating resort / bungalow a. Flat topography b. Vegetation: Waru Sea, Pandanus Sea, ketapang c. Fauna: Lizard, king prawns d. Object / Potential White sand, big waves suitable for surfing a. Flat topography b. Vegetation: Ketapang, Coconut Trees, Pandanus Sea c. Fauna: Lizard, king prawns d. Object / Potential: Fine white sand, suitable for snorkeling and diving e. There are 4 units of resort / bungalow
Recommendation Development Potency
Business Area
Development of Accommodation: Bungalow and Restaurant
Public Space
Tourism Package of Turtle Observation
Business Area
Development of Accommodation: Bungalows, Restaurants, Water Resort
Public Space
Development of Docking and Shelter
Business Area
Development of Accommodation: Bungalows and Restaurants
T O U R I S M
No.
Location
Area (Ha)
Site Analysis
6.
Palambak Besar Island
± 213
a. Flat topography b. Vegetation: ketapang coconut trees, Pandanus sea c. Fauna: Lizard, king prawns d. Object / Potential: Fine white sand, suitable for snorkeling and diving e. There are 4 units of resort / bungalow
Public Space
Development of Docking, Shelter, Camping Ground, Toilet, Prayer Room, Security Post
7.
Sikandang Island
± 130
a. Flat Topography b. Vegetation: Coconut Tree, Waru sea c. Fauna: Lizard, King Shrimp d. Object/Potential: White Sand, Suitable for snorkeling and diving
Public Space
Development of Docking, Shelter, Camping Ground, Toilet, Prayer Room, Security Post
8.
Sikandang Island
± 23
a. Flat Topography b. Vegetation: Coconut Trees, Waru Sea
Business Area
Development of docking bridge and water resort
9.
Taliana Island
±4
a. Flat Topography b. Vegetation: Coconut Trees c. Fauna: Lizard, King Shrimp d. Object/ Potential: White Fine Sand which suitable for snorkeling and diving e. Resort and Bungalow
Business Area
Development of Accommodation: Hotels, Restaurants, Water Resort
10.
Taliana Island
±4
a. Flat Topography b. Vegetation: Coconut Trees c. Fauna: Lizard, King Shrimp d. Object/ Potential: White Fine Sand which suitable for snorkeling and diving
Public Space
Development of Docking, Shelter, Camping Ground, Toilet, Prayer Room, Security Post
11.
Exploitation Block (water)
± 53.490,95
Shallow waters: Kayaking, Snorkeling Deep water: Surfing and diving
Public Space
D E V E L O P M E N T
Recommendation Development Potency
Mangrove, Ujung Lolok, Pulau Banyak.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
167
T O U R I S M
D E V E L O P M E N T
3
Facilities (IUPSWA) which submitted by BUMN, BUMD, BUMS, and Cooperative: 2
IUPSWA
COMMITMENT FULFILLMENT STATEMENT
ECO-TOURISM BUSINESS DEVELOPMENT LICENSES Registration
1
Business Indentification Number (NIB) Issued
Applicant
Requirements of Commitment Fulfillment
Commitment Finalization
Supervision
2
3
IUPSWA INPUT REQUIRED DATA/INFORMATION
Technical Requirements
1
1. Input the required data and information, company profile, shareholders, capital distribution, investment value, application to use foreign worker
Businesses (BUMN, BUMD, Koperasi, dan BUMS) register through website
2. Input business field information based on 5 digit Indonesia Standard Industrial Classification (KLBI): TN (91032), TWA (91034), and TAHURA (91033)
www.oss.go.id
to create OSS account/
USER ID
ISSUED
2. Making a
1. Location Permit
map of the area of planned business activities to be carried out with a scale of at least 1: 25,000 (one in twenty-five thousand);
TECHNICAL REQUIREMENTS
Valid documents-
IUPSWA is issued with commitment fulfillment
Invalid documentsApplication is Rejected
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
a. IUPSWA
Cancellation with
3. Business License
3. Preparing UKL/UPL;
(With Commitment)
4. Creating a
natural tourism exploitation plan; and Pay the IUPSWA fee
commitment
to Director General / Head of Provincial
IUPSWA Holder with commitment to finalize the
* Can be extended 1 (one)
Head UPTD in Regency / City request the business to finalize
commitment approximately 1 (one) year after
time with maximum length
the commitment
obtaining requested commitment fulfillment
of 6 months
3 (three) days of working days after issuance by OSS
General Director/ Head of Provincial Agency / Head of UPTD in Regency / City submits the examination and study result over the
Documents are sent through OSS,
and original document are sent
Institution (3 Working Days) or Head of Provincial Agency /
b. Notification of
Definitive IUPSWA
Agency / Head UPTD in Regency / City
fulfillment commitment to OSS Institution
General Director / Head of
IUPSWA holder with commitment to submit a report
Provincial Agency / Head of UPTD
on the completion of commitment fulfillment to the
in Regency / City will examine and
OSS institution in form of electronic and original
study the finalization commitment
documents to the Director General / Head of Provincial Agency / Head of UPTD Regency / city
(3 Working Days)
Sources of further reading related to natural tourism concession licensing:
Contact Person:
1. Government Regulation No. 24 of 2018
Address
: Jalan Cut Nyak Dhien Km. 1,2
concerning the Electronically Integrated
Telp/Fax
: 0651
Business Licensing Services.
: bksdanad@yahoo.co.id
2. Technical . considerations from the Head of the UPTD in the field of tourism; 3. IL (Environmental Permit) with commitment; 4. Business activity plan; and 5. Integrity pact.
/ KUM.1 / 7/2018 concerning Norms,
Definitive IUPSWA
in the Ministry of Environment and Forestry.
the
(3 Working Days)
/ Head of UPTD in Regency / City will
examine the statement of commitment
Head of Provincial Agency / Head of UPTD
of supervision
and technical requirement (7 (seven) Working Days)
Tutia Rahmi, S.Hut
3. Based on the Minister of Environment and
The governor or regent / mayor issues a Decree on Granting IUPSWA
Forestry Regulation No. P.8 / MENLHK
(valid for 55 years)
/ SETJEN / KUM.1 / 3/2019 concerning
(Forest Ecosystem Controller (PEH) BKSDA Aceh)
Exploitation of Nature Tourism in Wildlife
OR General Director / Head of Provincial Agency
OR
to the OSS institution
Electronically Integrated Licensing Services
c. OSS institution grant
supervision to OSS Institution
in Regency / City result
Standards, Procedures, and Criteria for
can run their business
of
42694
and Forestry No. P.22 / MENLHK / SETJEN
(7 (seven) Working Days)
IUPSWA is effective and license holder
General Director report the result
ACEH NATURAL RESOURCES CONSERVATION CENTER
2. Regulation of the Minister of Environment
equipped with the location map requested;
(7 (seven) working days).
168
2. Environmental Permit
UPTD province or regency/city according to their authority, and is
Examine and Study
Business Indentification Number
ISSUED
1. Technical considerations from the Head of UPT or Head of
IUPSWA Issuance
NIB
1. Marking the boundaries of the business area requested;
5.
4
Commitment Fulfillment
COMMITMENT FULFILLMENT
The applicant is stated to:
SUPERVISION RESULT
REGISTRATION PROCEDURE
General Director report the result of supervision to OSS
Reserves, National Parks, Grand Forest
General Director submits a technical review
General Secretary conducts a legal review and
The Ministry issues a Ministry
and the draft Ministry Decree on the Granting of
submits a Ministry Decree on the Granting of
Decree on the Granting of IUPSWA
IUPSWA to the General Secretary
IUPSWA to the Ministry
(valid for 55 years
7 (seven) working days
7 (seven) working days
3 (three) working days
Hp
: 085260250452
: tutiarahmi05@gmail.com
Parks, and Nature Tourism Parks.
O
I I I I
O O A O A
I O I O A O
A A A
O I I A IO O O O A
O
A IO
O
O
A IO
T O U R I S M
D E V E L O P M E N T
Jetty at Balai Island, Pulau Banyak.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
169
Aceh Investment Development Zones Development of NPK fertilizer, PT. Pupuk Iskandar Muda.
170
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Testimony
Testimony
I Experience Pupuk Iskandar Muda has been operating in Aceh for 38 years which currently has been developing the NPK Chemical Plant. We consider that investment climate in Aceh is excellent with the security conditions that increasingly conducive to making Aceh an attractive investment location outside Java Island, especially in the Arun Lhokseumawe Special Economic Zone (SEZ) that gives tax incentives: tax holidays and tax allowances as well as other conveniences we have received. We are also received big from the local government for growth of investment in Aceh, making Aceh a competitive investment destination.
Yanuar Budinorman CEO of PT PIM
Development of NPK fertilizer, PT. Pupuk Iskandar Muda.
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
171
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Aceh Investment Development Zones Aceh currently has an industrial area that will be the right choice for investors to develop their business. Aceh Industrial Zone consists of the Free Port and Free Trade Zone (FP & FTZ), Special Economic Zones (SEZ), Industrial Zone (IZ) and Samudera Fishery Port Development (OFP). These industrial zone have their own special appeal by offering incentives and conveniences to potential investors. The Government of Aceh expect that the existence of this industrial area can become a center for new economic growth in Aceh. Development of NPK fertilizer, PT. Pupuk Iskandar Muda.
172
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Sabang Free Port and Free Trade Zone (FP & FTZ) Why Invest in Sabang Area? Strategic Location Sabang is the western gateway to Indonesia and an entrance for investment, goods and services from within and outside the country. The location of Sabang is right on the international shipping route that connects trade between the east via the Melaka Strait and the west via the Indian Samudera which bordered by the Bay of Bengal. Thus it is suitable to be an international shipping traffic service center. This area is also positioned
Accessibility Access to the Sabang is supported by sea and air transportation facilities. For sea transportation, Balohan Port provides route from Sabang to Malahayati Port in Banda Aceh (Capital of Aceh Province). Yachts and cruises through Phuket and Langkawi are also an alternative for foreign tourists. For air transportation, Sabang has
CT3 Seaport.
Maimun Saleh Airport which tourists can take a connecting flight via Kuala Lumpur, Malaysia or Medan and Jakarta, Indonesia.
Deep Sea Port
Incentive
Natural beauty
Infrastructure
Sabang has a natural port with a depth of
In order to encourage investment activities in the
approximately 20 meters and has great potential
Sabang area, facilities incentives are provided
The Sabang area is an island that a wide sea and
Infrastructure in the Sabang area is quite
to be developed as a center for international port
for business actors or investor: free trade tax of
various natural tourist destinations, especially
adequate, especially roads, electricity, water and
services, both for export-import ports and national
import duties, value added tax, sales tax on luxury
marine tourism.
telecommunications.
trans shipment ports.
goods and excise.
as a frontier in global competition.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
173
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Land Availability Clean and clear land is an absolute necessity for investment activities. Land covers an area of 708 hectares and has been certified as many as 1,000 parcels are available for investors to develop, especially in the tourism sector.
Sabang Area
Iboih, Sabang.
UU no. 37/2000 regarding the Free Port and Free
Area functions for business development:
Trade Zone (FP & FTZ ) into Law: Sabang Free Port Free Trade Zone or called Sabang Zone is an area that is within the jurisdiction of the Unitary State of the Republic which is separate from the
} Trade and services
customs area so that it is free from:
} Industry } Mining and energy
a. Trade system (does not include goods
} Transportation
subject to quarantine regulations and types
} Maritime and fisheries
of goods / services prohibited by law)
} Post and telecommunications
b. Imposition of import duty,
} Banking
c. Value-added tax, d. Sales tax on luxury goods and excise Duration of the Sabang area: 70
174
I n v e s t m e n t
years
O p p o r t u n i t i e s
o f
Balohan Sabang Passenger Terminal.
A c e h
Includes activities:
2. Provision and development of water resources
1. Manufacturing, design, engineering, sorting, initial and
infrastructure, transportation infrastructure, and
} Insurance
final inspection, packing and repacking of goods and
other facilities including seaports and airports,
} Tourism
raw materials from home and abroad, service repair and
buildings and electricity networks and other
} and other fields.
recondition of machinery and quality improvement.
infrastructure.
2 0 2 1
A C E H
Sabang Management and Development Agency The Sabang Management and Devlopment Agency (BPKS), located in Sabang City, is an agency authorized to manage and develop the Sabang Area in accordance with the functions of the Sabang Area.
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Sabang Investment Opportunities The presence of BPKS as the manager of the Sabang Area is expected to be a partner of the regional government in the management and implementation of development, both facilities and infrastructure to support investment and licensing services. Therefore, it will attract investors to invest in the Sabang area. BPKS determines 4 priority sectors to be developed, namely:
Tourism Sector
Port Sector
BPKS is established the provisions and issues related permits for business actors who carry out their business activities in the Sabang Area. Apart from that, BPKS is also authorized to carry out guidance and integration of policies with the provincial and district / city governments.
Industial and Trading Sector
Fishery Sector
Freddies, Pantai Sumurtiga, Sabang.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
175
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Development of Iboih and Gapang Marine Tourist Destination
Market opportunity
Investment Activities
The development of a marine tourism area as
The regional development project includes
the main tourist destination in Sabang, offers
several stages:
a relaxed atmosphere with forest views as a
Development of the main building cluster
coastline for beautiful Iboih, golden sand filled
Development of functional facilities
with giant stones. The clarity of shallow water sea
Development of supporting facilities
shows a bluish-green hue that gives peace and relax. The beach is curved in shape, resembles lips, smiles and welcoming people to come and feel the warmth and see the exotic flora and fauna of the tropical rainforest which is part of the natural wealth of Sabang.
The area of Iboih and Gapang marine tourism is a marine tourist destination. This area offers
To attract tourists, it is definitely needed to
stunning beaches and beautiful underwater
improve the supporting infrastructure to provide
views. Currently, there are several cottages are
comfort for tourists.
available in this area, but it is still necessary to be
Investment Offered
developed some other investments in this area such as hotels, restaurants, villas, cafes and spas.
Development of the Iboih and Gapang Marine
This area can be accessed by road from Balohan
Tourist Destination
Port (29.1 Km) and travel time of 47 minutes,
Location
:
of 33 minutes. Currently, public transportation is
Area
:
available to Iboih and Gapang.
Land Ownership
:
and from CT-3 Port (20.2 Km) with a travel time
Investment Estimates Total Costs:
Rp. Rp. 1.95 Trillion, IRR : 34 % NPV : PI
925,850,000
: 1,91
Iboih dan Gapang 800 Ha BPKS Iboih
176
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Gapang
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Development of the International Resort and Gua Sarang Golf Course Area Market opportunity
Investment offered
Estimasi Investasi
forest of Pulau Weh that jutting into the blue sea. Gua Sarang
Currently the Sarang Cave area is a favorite selfie
International Resort and Golf Course
Total development costs:
offers natural beauty, green leaves of trees flank along the
spot in Sabang and also a tourists attraction for
Development
pedestrians to this tourist sites. Called as the Sarang Cave, since
the one who are interested in the beach activities
Location:
there is a cave door where bird’s nest is placed. There are as
such as swimming, snorkeling and diving. Even,
many as five cave doors, but only two cave doors are inhabited
it is also often to be used as a camping spot,
Kampung Paya, Gua Sarang
by birds which are believed to have many benefits.
because there are no hotel facilities here.
Rp. 2 Trillion, IRR: 33 % NPV: 466,122,000 PI: 1,4
Sarang Cave is located in Iboih Village, Sukakarya Sub-District, Sabang City, at the foot of the cliffs and hills of the protected
Sarang Cave can be accessed by road via Balohan Port (20.7
Area:
200 Ha
Km) with a travel time of 37 minutes, while from CT-3 Harbor
Though it is still lacking of facilities, the
Land Ownership:
(20.3 Km) with a travel time of 34 minutes. Currently, there is no
enthusiasm of tourist interest in Sarang Cave has
public transportation available to the Sarang Cave. In other hand,
encouraged us to improve and develop supporting
50% of the land owned by BPKS
visitors can rent a car or motorbike to get there.
infrastructure such as resorts and international sports facilities for seek of the tourist comfort and satisfy.
Pay Back Periode:
6 years 11 months
Investment Activities The regional development project includes several stages: Land acquisition Construction of basic facilities cluster (reclamation area, resort development and golf courses) Construction of functional facilities Construction of supporting facilities
Gua Sarang, Sabang.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
177
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
I
Investment Activities
(MICE) Cluster and Iboih Condominium
The regional development project includes several stages: Land acquisition Construction of basic facilities cluster (reclamation area, break water construction, and drainage) Construction of functional facilities
Sabang area has dazzle beaches and amazing
for local, national and international events with
underwater nature scenery that opens up
various activities such as exhibitions, seminars,
opportunities for the construction of MICE and
workshops, coordination meetings: Sabang
condominiums that will be place for various
Investment Estimates
Exhibition Festival, Sabang Sea Festival, Khanduri
events both at national and international levels.
Total development costs:
Laot Festival, Sabang Diving Festival, Sabang Freediving Competition International, Sabang Weh
By offering a complete design by combining
Bicycle, Sabang Jazz Festival, Sabang Mountain
occupancy and convention space in one
Bike, Ethnic Cultural Festival and other events.
property, of course it will attract event organizers to carry out activities in Sabang.
Iboih offers a quiet atmosphere that away from
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
22,40 % NPV:
Market opportunity
Convention, and Exhibition (MICE) Cluster and
Pay Back Periode :
Iboih Condominium
Aceh has experienced a remarkable
Location
: Iboih
5 years 3 months
transformation, from rare visited province to one
Area
: 10 Ha
of the most visited provinces in Indonesia, with
Land Ownership
: 70% of the land
number of events that taken place in Aceh. The
I n v e s t m e n t
IRR:
Development of a Meeting, Incentive,
of the giant aquarium.
178
Rp. 326 billion
235,125,875,000 PI: 1,25
the hustle and bustle of the city, with direct views
Iboih, Sabang.
Construction of supporting facilities
The Sabang area is currently one of the venues
Investment offered
belongs to BPKS
A C E H
Sabang Waterfront City Development
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Investment offered Development of Sabang Waterfront City Location:
The Sabang area which is an island that has great potential for the development of waterfront city - based tourist area, with the concept of development of visual city that bordered by the waterfront. This
Kota Bawah Timur Village, Sukakarya Sub-District Area :
20Ha
waterfront city development is located in the port area of CT-1 to CT-3,
Land Ownership:
which is adjacent to the center of Sabang City.
Community and BPKS
The development of Sabang Waterfront City will integrate the tourist center with trade. The construction and development of this Waterfront City consists of Sabang Marina Bay, Yacht Clubs,
Investment Activities
waterfront Promenade, Street Food, Tugu Merah Putih (shopping
The regional development project includes several stages:
center area), and the construction will also be connected to the old
Land acquisition
town of Sabang on pedestrian street. The development concepts
Construction of basic facility cluster (reclamation area, break water construction, and drainage)
offered include: walking waterfront, recreational waterfront and
Construction of functional facilities
residential waterfront.
Construction of supporting facilities
Market opportunity
Investment Estimates
The development of Sabang Waterfront City will attract tourists, cruise
Total development costs
:
IRR
:
NPV
:
will be a paradise for tourists who get off from cruise and directly
PI
:
looking for unique destinations, hunting a delights culinary and
Pay Back Period
:
and yachts to stop at the CT-3 Sabang Harbor, where currently has visited by more than 30 cruises and 300 yachts in last three years. By carrying out the integrated tourism and trade design, it certainly
Kota Bawah, Sabang.
shopping for souvenirs from Sabang.
Rp. 60 billion 23% 854,650,000 1.5 7 years 2 months
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
179
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Marina and Eco Resort Lhok Weng Development
Investment offered Development of Marina and Eco Resort Lhok Weng Location:
Lhok Weng is located in a strategic location, in the middle of 5 (five) main Sabang tourism destinations; Iboih Beach, Rubiah Island, Gapang
Kota Bawah Timur Village, Sukakarya District
Beach, Balek Gunong and Zero KM Monument, thus the development
Area:
of the Lhok Weng area must be packaged in a unique and different way,
14 Ha
with the designation of marine tourism areas, marine reserves or local protected areas. Lhok Weng has an area with hills with extraordinary view potential, in
Land Ownership:
Community and BPKS
the form of a white sandy beach. Even though it is only 100 m long, it has mangrove conservation area that can be utilized as eco-tourism and potential development of a marina.
Market opportunity as a new destination. Without giving a big promotion effort, tourists will still visit Iboih, Rubiah Island, Gapang, and Zero KM. Therefore, it is needed is to prepare various facilities, infrastructure and destinations in the Lhok Weng area. The development design offered at Lhok Weng is the development of marina tourism that is integrated with an eco-resort which will provide water sports, restaurants, bazaars, mangrove adventures and other facilities.
I n v e s t m e n t
O p p o r t u n i t i e s
Investment Estimates
The regional development
Total development costs :
project includes several stages:
The geographical position of Lhok Weng is the initial capital
180
Investment Activities
o f
A c e h
2 0 2 1
y Construction of the main facility complex y Construction of socio-cultural facilities (places of worship,
IRR
:
NPV
:
BCR
:
Pay Back Period
:
Rp. 108 billion 20.12% 1,499,304.96 1.4649 7 years 5 months
amphiteather) y Construction of sports and recreation facilities y Construction of supporting facilities
Lhok Weng, Sabang.
A C E H
Klah Island Marine Tourism Development
used to enjoy the beauty of the sea and the city of Sabang. By developing a unique tourism concept that is oriented towards marine tourism such as a floating fish market, definitely will make Klah Island to be a special tourist
Klah Island has an area of 17.71 hectares
Land Acquisition:
destination compared to other tourist destinations in
and used as protected forest and one of the
Sabang.
8% of the total investment value
green spaces in Sabang City. The concept of
Construction:
tourist destination development offered is a
15% of the construction that funded by BPKS
environmental conservation, adaptive tropical architecture with the concept of local traditions. Klah Island has a contour with a moderate steep slope, almost the entire rocky area has various
Klah Island Marine Tourism Development Area:
20 Ha
sizes, the beach is limited and separated into two places, however its beautiful and suitable for swimming.
Investment Activities
Z O N E S
Total Investment:
US$ 20.000.000
Investment offered
D E V E L O P M E N T
Investment Estimates
boat, seafood restaurant, and other tourist facilities. This
combination of marine tourism development and
I N V E S T M E N T
Investment period:
36 months Construction period:
18 months
The regional development project includes several
Market opportunity
stages: Construction of utilization facilities for protected forest
The development of the Klah Island marine
Development of coastal tourism facilities
tourism area is complemented by the
Construction of accommodation facilities and other
development of facilities that will support
support facilities
tourism activities such as; utilization of
Construction of public facilities and entertainment
protected forests, walking tracks, coconut
Construction of management facilities and utilities
groves for forest exploration, windmill parks,
Construction of commercial and public facilities
cable cars and forest viewing decks that can be
Construction of water tourism facilities
Klah Island, Sabang
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
181
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Sabang Management and Development – One Stop Services Agency INVESTMENT LISENCE REGISTRATION PROCEDURE
LICENSE FLOW FOR IMPORT / EXPORT GOODS IN THE SABANG AREA
EXPORT
1 INVESTOR
3
2 VISIT THE ONESTOP INTEGRATED SERVICE AGENCY Fill and Complete the requirements to get Certificate of Company registration
4
DOCUMENTS VERIFICATION Investor is required to wait for document verification from PTSP and review of business location for 2 - 3 days
OBTAIN CERTIFICATE OF REGISTRATION COMPANY
1 BUSINESSMAN
2 VISIT THE PTSP OFFICE Fill out forms and complete administration to get TPP
3
IMPORT
4
RECEIVING TPP Businessman get TPP (Company Registration Certificate) after waiting 2-3 days for the administrative process
EXPORT/ IMPORT Businessman can choose one or both trade activities, both import and export
Contact Person: Contact us: BPKS Pusat Sabang
Jalan Panglima Polem, No. 1 Kuta Bawah Barat, Sukakarya Sabang – 23512
Telp +62 652 22144 Faks +62 652 22143 Email: info@bpks.go.id Email: bp.sabang@gmail.com Contact us:
5 TAKING CARE OF OTHER TECHNICAL PERMITS IN ACCORDANCE WITH THE PROVISIONS
6 OBTAIN THE BUSINESS LICENSE Investor is obtained the Business License from PTSP after 80% realization of the business
7 INVESTOR STAR RUNNING THE BUSINESS PERMANENTLY
PERMIT FOR RELEASING GOODS AND / OR PERMIT FOR IMPORTING GOODS
Susanti
6
5 1. Entrepreneurs who wish to import apply for import permit 2. Entrepreneurs who want to export submit a permit to release goods
(Head of Promotion Sub Division)
BUSINESSMAN CAN START TRADING ACTIVITIES
Hp: +62811 688 9975 Email: susantisabang@gmail.com
BPKS, Sabang.
182
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
PT. Pupuk Iskandar Muda, Lhokseumawe.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
183
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Special Economic Zone (SEZ) Arun Lhokseumawe The SEZ Arun Lhokseumawe is located in North Aceh
several sectors, such as energy, petrochemical, agro-
cocoa, rubber, coconut, essential oils and others. The SEZ
Regency, Lhokseumawe City—Aceh province, and was
industry to support food security, logistics and kraft
Arun Lhokseumawe will develop along with the regional
formed based on Government Regulation Number 5 of
paper producing industries. From the energy sector (oil
development of several countries in the South Asia region
2017. SEZ is based on the geographical location of Aceh
and gas), LNG regasification, LNG Hub / Trading, LPG
through revitalizing the marine economy of the Maritime Silk
which is crossed by the Sea Lane of Communication (SLOC),
Hub / Trading, Mini LNG Plant PLTG will be developed
Road. Hence, the SEZ Arun Lhokseumawe is located in the
that is the Malacca Strait and has a comparative advantage
by developing environmentally friendly power plants or
ASEAN and South Asian trade markets. With this potential
to become part of a global production network or global
providing clean energy solutions. Logistics infrastructure
and opportunities, the SEZ Arun Lhokseumawe is projected
value chain. The SEZ was formed from a consortium of
is also being developed to support input and output from
with an attractive investment of US $ 3.8 million and is
several existing companies, such as PT Pertamina, PT
the oil and gas; meanwhile, petrochemical and agro-
launched to recruit as many as 40,000 workers by 2027.
Pupuk Iskandar Muda (PT PIM), PT Pelindo 1, and also the
industrial industries will be developed through improving
Aceh Regional Development Company (PDPA). The PDPA
international standard port and dock infrastructure.
consists of 3 (three) areas: the Arun refinery complex, Dewantara District and Jamuan village, which is the exact location of PT KKA factory.
Development of NPK fertilizer, PT. Pupuk Iskandar Muda.
184
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Besides, the SEZ Arun Lhokseumawe is one of the rich and productive aquatic ecosystems that supports the development of the fisheries industry. With its
The SEZ Arun Lhokseumawe was inaugurated by
potential, the SEZ Arun Lhokseumawe will also become
the President of the Republic of Indonesia, Mr Joko
a base for the agricultural sector with the support of
Widodo on December 14, 2018. The SEZ focuses on
the superior commodities such as palm oil, coffee,
A C E H
S E L A T
Boundary of the KEK Arun Lhokseumawe
M A L A K A
Empty land (Ha)
LMAN
1.689,8
540
PT Pertamin
151,3
81
PT Pelindo-1
38,18
7,82
PT PIM
305,15
126,5
2.622,48 Ha Land Status: (HPL dan HGB)
Eks PT AAF
236,4
91
PT KKA
199,6
50
Empty land:
Total
2.622,48
896,32
y Dewantara area, North Aceh (PT. PIM, ex AAF and PT. Pelindo-1 land) y Jamuan area, North Aceh (PT.KKA land)
Arun Seaport PT Kertas Kraft Aceh
Eks Arun Area PT Asean Aceh Fertilizer
Electric Steam Power Plant
Land Area:
896.3 Ha (34,2%)
Z O N E S
Comparison of Land Areas Land Area (Ha)
(LMAN and Pertamina land) PT Pupuk Iskandar Muda
D E V E L O P M E N T
Land owner
y Former Arun Refinery Area, Lhokseumawe City
Krueng Geukeuh Seaport
I N V E S T M E N T
Why Invest in SEZ Arun Lhokseumawe: Î A decent and pleasant work environment with world-class infrastructure; Î Meet the needs of today's business, family lifestyle & active lifestyle; Î Strategic location and airport connectivity, a gateway to Northwest Indonesia; Î Excellent location with a natural environment for the lifestyle and residential community. Development of NPK fertilizer, PT. Pupuk Iskandar Muda.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
185
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Potential Development Recreation / Housing
Oil, Gas, Energy } LNG Hub / Trade } LPG Trade / Hub
3. Manpower Availability: | Access to a reliable workforce
} Commercial Facilities
| Education and universities
} Hotel, Conference and recreational facilities
| Close to the surrounding housing
} Housing Development
} Gasification & Processing
} Education
} Refining & Processing Facilities
} Health and Sports Facilities
} Power plants
4. Premium Facilities: | Elite housing | Recreational facilities (recreational park and lake, country club)
} Storage facilities
Investment Procedure in SEZ (1) Agree on an Investment Plan 1.
} Clean Energy Solutions
| Community
UNIQUE SALES UNIT
Petrochemical } Petrochemical Industry Cluster
1. Connectivity and Proximity:
5. Smart and sustainable: | Landscape ecology and recreation | Beautiful nuance in an industrial area
} Environmental Friendly Industry
| Strategic location, important delivery channel
} Integrated Petrochemical Project
| Green Blue Network / WSUD
| Good vehicle connectivity
| The latest technology
| Close to the airport
Food and Agro-Processing
| Seaport
} Infrastructure logistics
2. Integrated Infrastructure:
6. Industry Support: | Special Economic Zones | Land management
| Reliable infrastructure
} Modern port
| 24-hour security
| Electricity, water, sewage treatment, high-speed
| Strict security
| Smart and sustainable infrastructure
Rights for the Formation of a Company in a Special Economic Zone 3.
Prospective Investors create a Company Taxpayer Identification Number (NPWP)/ If the businessman does not have an NPWP, Online Single Submission (OSS) will process the NPWP
| Integrated human resource services | Logistic service
(2) Come to the Licensing Service in the Administrator y The SEZ administrators provide the computer facilities for applicants who already understand how to access OSS services 2. Assisted Services y The SEZ administrator assist the applicants who need help in accessing the OSS 3. Priority Service y The SEZ administrators facilitate the applicants, starting from the application stage to the completion stage of the licensing product.
186
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Business people access the website https://www.oss.go.id/oss/
5.
Business people access the OSS by inputting their National Identity Number (NIK) / Passport, E-mail, and some other information on the available registration form
6.
Business people will receive E-Mail containing Direct Link for OSS Account Activation
7.
Business people activate their OSS account and will receive an e-mail containing a User-ID and password for their OSS account
(4) Businessmen will obtain Business Identification Number (NIB) 1. Entrepreneurs log in to the OSS system using a User ID and Password, then click the menu business license application to retrieve company data from General Law
1. Self Service
} Storage of cargo and containers
optical fibre
Prospective Investors create a Certificate of Establishment of a Business Entity and Ratification from the Ministry of Law and Human
| Education
4.
Prospective Investors and BUPP agree on Investment Plans of SEZ (can be stated in the MoU, Head of Agreement, Agreement, or LUDA)
2.
(3) OSS Account Activation
Administration (AHA) Online which is registered with the OSS system. 2. Business people check the required list of Commitment Permits (Business Permits and Commercial Permits) according to their business activities 3. The OSS system issues NIBs for the businessmen. They can obtain other registration documents simultaneously with the publication of the NIB (If needed) y Certificate of Company Registration; y Foreign Labor Use Plan (RPTKA); y Import Identification Number (API); and y Customs Access
A C E H
Facilities and Incentives Licensing Facilities
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Taxation Aspect
Facilities and Convenience
Terms
The implementation of the Online Single Submission (OSS) system in the SEZ aims to facilitate business people to obtain the Business Identification Number (NIB) which in its performance can be assisted by the SEZ Administrator.
Reduction of Income Tax (PPh)
1. Reduction of Corporate Income Tax / Tax Holiday (For Main Activities) y Investment> Rp. 1 Trillion: 20-100% PPh reduction for 10-25 years y Investment of Rp. 500 Billion - 1 Trillion: 20-100% PPh reduction for 5-15 years y Investment <Rp. 500 Billion: 20-100% PPh reduction for 5-15 years y For certain SEZs set by the National Council 2. Tax Allowance (For Outside the Main Activities) y A net reduction of 30% is charged for six years; y Accelerated compilation and amortization; y 10% of income tax imposed on dividends to overseas taxpayers; and y Compensation for losses from 5 years to 10 years. 3. Income Tax Article 22 on Import is free of charge Business Agency: y PPh 22 on imports is not collected on imports of capital goods for a maximum of 3 years Business people: y PPh 22 imports are not collected on imports of capital goods for a maximum of 2 years
I n v e s t m e n t
y New WP y Conducting new investment and expansion of new investment y The business sector is the main activity in SEZ; y Meets Debt to Equity Ratio (DER) requirements y Delivered a letter of commitment to place funds in banks in Indonesia at least 10% of the investment y It has a legal entity status, since or after August 15, 2011.
WP Recipient of Facilities is the WP of domestic bodies in SEZ who make the new investment/expansion on: y Business fields which are the main activities in SEZs that do not receive tax holiday facilities in SEZ; or y Business fields which are other activities in SEZ
Type and number of items not collected PPh 22 specified by the SEZ administrator (master list)
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
187
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Customs and Taxes Aspect
Customs
Traffic of Goods
Facilities and Convenience
Aspect
Facilities and Convenience
Aspect
Facilities and Convenience
BM exemption in the framework of construction/ development
Inland FTA
The release of goods to other places in the area (TLDDP) is subject to an import duty of 0% by having a Domestic Content Level (TKDN) of at least 40%.
Immigration
Traffic of Goods
y The import of goods into SEZ has not yet been subject to provisions in the import sector y Exports from SEZ to TLDPP are subject to import provisions.
y Visit Visa on Arrival is 30 days long and can be extended five times each 30 days y Multiple Entry Visit Visa for foreigners and their families; y Special visa or residence permit for foreigners who own property in the Tourism SEZ; y Special visa or residence permits for elderly foreigners living in the Tourism SEZ.
y Business entities are rewarded with BM for imports of capital goods for three years y People in business encourage BM to import capital goods and production of raw materials for two years y The type and amount of goods specified by the administrator Exempt from tax for raw materials or auxiliary materials in the manufacture of final products that are not taxable goods
Tax
Land Aspect Land
Employment Aspect
Facilities and Convenience
Employment
y In SEZ, it is in the form of a Wage Board and Special Tripartite Worksheets y Only 1 SP / SB Forum in each company y Confirmation and addition of RPTKA in SEZ y Extension of IMTA in SEZ
188
Immigration
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Facilities and Convenience y Land acquisition can use a land acquisition scheme for the public interest using the APBN or APBD y Given HPL to KEK proposed by K / L, Pemprov, Regency / City, BUMN / D y Business entities/businessmen who obtain HGB or Right of Use can be granted for 30 years at the same time extended for 20 years after being declared commercially producing and starting 30 years (total up to 80 years). y In the case of residential / property ownership, HGB or Right of Use can be given 30 years at the same time extended 20 years after the occupancy/property is declared legally owned and can be changed for 30 years (up to 80 years in total)
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Contact Person: Visit Us:
PT Patriot Nusantara Aceh, KEK Arun Lhokseumawe Development and Management Agency Address
: Jl. Medan - Banda Aceh, Muara Satu Sub-District, Lhokseumawe City, Aceh Province - 24352
(62) 645 8050011
Phone
:
: patriot.sezarun@gmail.com Contact Person:
Rustam Effendi (General Manager Operations) Cp
: +628
11 673 250
: rustam.sezarun@gmail.com Development of NPK fertilizer, PT. Pupuk Iskandar Muda.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
189
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Aceh Industrial Estate (KIA) Ladong, Aceh Besar
Zoning Map of KIA Ladong
Zonasi Food Industry Manufacture Logistic Chemical
Strategic Location
Logistic & Mebel
KIA Ladong is an industrial area which was
Currently, KIA Ladong has the following permits:
inaugurated on December 20, 2018, supported
Area Regulations, Industrial Area Business
by a strategic location to the City Center (22.8
Permits (IUKI), Environmental Permits and Location Permits.
Food Industry
Malahayati Port; 10 Km and Ulee Lheue Port; 30 Km
km), to Sultan Iskandar Muda Airport (33 km), to
Manufacture
Sultan Iskandar Muda Airport 28 Km
Malahayati Port (11.6 km) and the Blang Bintang
Chemical
Toll/Highway 13 Km
Fasilitas Umum (± 1.1 Ha)
Toll Gate (11 km).
Perkantoran (+ 1.8 Ha)
Ladong, Aceh Besar
Pabrik Kulit ( 1.4 Ha) Pengolahan Limbah ( 7.4 Ha) Rusunawa ( 3 Ha)
With an area of 66 hectares that has been freed
66Ha up to 250Ha
RTH Batas Kawasan
from the 250ha development plan, it is hoped
Lahan Belum di Bebaskan
Superior Commodity in Aceh
Business Potentials that can be Developed at KIA
Exsport tuna up to 1.726 ton/year
Cold Storage
Grain production up to 2.3 jt tom/year
Warehouse
Coffee production up to 60.000 ton/year
Rice Milling
that KIA Ladong will become an industrial centre
Supporting infrastructure:
and downstream centre for Aceh’s leading
y Water Supply
commodities based on the halal industry such as
y Electricity
food, beverages and other products.
y Wastewater Treatment y Security
KIA Ladong, Aceh Besar.
190
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A C E H
NON CORE DIRECT Clean Water Facilities
Assist with Licensing
Leasing Buildings
Area Maintenance
Business cooperation with tenants
Unit of Small Industry Utilities (SUIK)
Public facilities
Service-based line of business to tenants
Office Units
Security
Multi-function unit
Electrical Energy Facilities
Land Size:
67, 6 Ha Land Status:
Provisions
NON CORE INDIRECT
Industrial Plots Rental
Industrial Waste Management
250 Ha
Second 5 Years
Third 5 Years
Fourth 5 Years
Final 5 Years
Within the Within the Promotion Promotion Period Period
Free
Free
Basic rate
Basic rate
Basic rate
Within the After the Promotion Promotion Period Period
Free
Basic rate
Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Factor Factor Factor
Within the After the Promotion Promotion Period Period
Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Factor Factor Factor Factor Factor
NOTE:
O O IO
Payment
IO
I
2020
Stages of development at KIA LADONG: Letter of Interest
TENANT
Company Profile
Company document Land of KIA Ladong, Aceh Besar.
Z O N E S
Rental price First 5 Years
Contractual
Management Rights Development Plan:
D E V E L O P M E N T
The basic rate of the land rental price for KIA Ladong = Rp. 5000 / m2 / year. Terms of KIA Ladong Land Rental Prices
Investment Opportunities CORE
I N V E S T M E N T
Establishment Certificate NPWP Permits/License Company leader ID card etc
KAI Ladong, Aceh Besar.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
191
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Samudera Kutaraja Fishing Port, Lampulo - Banda Aceh.
192
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
A C E H
Samudera Kutaraja Fishing Port, Banda Aceh The role of the port as a centre of activity and production centre for fish catches that must be fulfilled is
One of the fishing ports that has a
FLEET/SHIP (GT)
reasonably large fish production in
Z O N E S
2016
2017
2018
2019
Aug-2020
355
359
362
371
374
2485
2513
2534
2597
2928
< 5 - >51
Aceh is the Kutaraja Samudera Fishing Port which is included in the fisheries
6 - 10
management area of WPP 572 with
11 - 20
for pelagic fish and fully exploited for
21 - 30
demersal fish. PPS Kutaraja, which is located in Banda Aceh City, has a very
31 - 50
strategic location, which connects
> 51
directly with the Malacca Strait and the Indian Samudera. Besides,
ABK
PPS Kutaraja is in an area close to potential fishing locations (DPI) and
FISH PRODUCTION
is directly related to international channels.
D E V E L O P M E N T
Total data on Fleet Ships Crew (ABK) and Fishery Production at the Samudera Kutaraja Fishing Port: YEARS
a status that has been overexploited
infrastructure and facilities.
I N V E S T M E N T
Kg.
13.949.930
15.492.130
19.584.495
22.247.928
11.624.147
Rp.
201.615.231.056
244.084.649.389
312.620.526.667
266.241.885.667
128.037.863.000
*) DATA OF SHIP UP TO SEPTEMBER, 23 2020
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
193
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
FACILITIES: y Dock y Warehouse y Fish Market y Water Tank + Installation y Fish auction y Integrated Cold Storage (ICS) 200 Ton y BBM Station
Rental fees according to Aceh Qanun Number 2 of 2019:
5.
y Solid land/dense Rp. y
10.000,-/ m2 / year Raw land Rp. 5.000,- / m2 / year
Investment Opportunities: to catch fish in the EEZ, with 70% local workforce and 30% foreign workers. 6.
y Packing Building Phase 2
SUPPORTING FACILITIES
Fisherman stall (secondary level):
2. PT.Yakin Pasifik Tuna (Fresh fish processing and export
Hectares are utilized.
Land status:
Land Management Rights (HPL)
Samudera Kutaraja Fishing Port, Lampulo - Banda Aceh.
194
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
7.
Fish Freezing Factory.
8.
Fish canning factory.
9.
Fish processing plant (nuggets, sausages etc.)
4 Unit of Toilet and Bathroom facilities : Place of Worship: 10x10 m² Postage: 2 Unit Fisherman stall (first level): 10 Unit (4x10 m²)
The total of the land area is 52 Hektar, only 10
Block ice factory with a capacity of> 80 tons/day.
y Packing Building Phase 1
9 Unit 4x10 m²)
A fishing vessel with a capacity of 60 GT
List of Companies using the PPS Kuta Raja port land facilities:
10.
Seaweed processing plant.
11.
Modern iodine salt factories.
12.
Docking / Shipyard
1. PT. Aceh Lampulo Jaya Bahari (Fresh fish processing and
13.
Fibre Industry (Ships, holdings etc.)
14.
Hygienic fish market
15.
Fish/shrimp feed factories.
16.
Floating SPBN.
export scale storage) scale storage) 3. PT. Nusantara Oilindo Pratama (SPDN) 4. PT. Daya Mitra (Community facility)
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Frozen Tuna Processing Industry Development Market opportunity
Fishery products which are commonly found in Aceh marine and PPS Kutaraja, namely: Skipjack tuna, Frigate mackerel, Layang (Roughear scad, Tuna (Yellow fin), Lemuru (Northen pilchard), Selar (Oxeye scad), Tongkol Komo (Eastern little tuna), Goats (Trigger fish), Lisong (Bullet tuna), and Sunglir / Salam Fish (Rainbow planner) with a production value of 22,247,978 kg in 2019 and 11,624,147 kg in August 2020 with the fleet used varies from 5 to 51 GT.
Export Market Potential From the macro perspective, the export market trend
January to September 2020 Aceh has exported 325,319
for fishery products throughout the country has
kg of tuna with a value of USD 395,359.4 to Thailand and
increased quite significantly in the last 5 years. Even
Japan by PT. Aceh Lampulo Jaya Bahari and PT Yakin
National Market Potential
during the Covid-19 pandemic, export activities of fresh
Pasifik Tuna from Sultan Iskandar Muda Airport and
fish products from Indonesia to foreign countries are
Belawan Port.
Today’s national market opportunities are getting
continued, although there was still a decline. However,
better, and this is in line with the increasing
this decline is not too extreme compared to other
trend of fish consumption by Indonesians. The
business sectors, such as automotive and tourism.
Indonesian population of more than 200 million people which become the most prominent factor for the sale of captured fishery products. By a significant increase in trend of the consumption fishery products in Indonesia in the last 5 years.
The export market for Aceh’s fishery products according to BKIMP-KP 2017 to Malaysia, Singapore, Thailand, Vietnam, Korea, and Japan which can be increased in value and
From January to April 2019, Indonesia recorded that it
destination to other countries, with various efforts including
has exported 56.30 thousand tons of tuna with a value
increasing the production of quality tuna catching products
of USD 244.45 million or 14.46 percent of Indonesia’s
using fishing gear and a more modern factory to increase
total fishery exports of 1.68 billion US dollars.
fish production at PPS Kutaraja requires Technological Support Vessel Monitoring System (VMS) is a fishing
For 2019-2020, the national fisheries consumption
The Aceh Industry and Trade Agency noted that in 2019
vessel monitoring and supervision system commonly
is targeted to reach 54.49 kg per capita per year.
Aceh exported 149,343.52 Kg tuna with a value of USD
used in several developed countries, namely using the
So that the Aceh province has the opportunity
367,160.50, export activities were carried out through
Vessel Monitoring System (VMS) instrument as one of
to supply the fishery product market throughout
the Belawan Port in Medan by PT. Aceh Lampulo Jaya
the strategies in the concept. Monitoring, Control and
Indonesia.
Bahari as the exporter to America. Meanwhile, from
Surveillance (MCS) fisheries management.
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
195
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Business Feasibility Analysis
The existence of VMS for ship owners provides considerable benefits, namely the
Initial assumptions:
monitoring system, facilitate management
Central Bank Interest Rate 8%, Discount Rate 24%,
Profit & Loss Statement, 5-years Annual Cash
in the operational arrangements of their
Inflation Rate 6%, Annual Business Growth Rate
Flow, Net Present Value, Payback Period, Internal
fishing vessels, provide information on the
10%, Return on Capital after 3 years, export market
Rate of Return, Profitability Index and Benefit /
ship’s position in case of an accident, detect
destinations and adjusted prices, Skipjack tuna
Cost Ratio.
position in case of piracy, monitor all fishing
(Cakalang) 25,000 kg per day, Amount of work 240
activities fish that are carried out by the crew
days in 1 year, the local price is Rp. 11,000 / kg
in anticipation of fraud and which is no less that the fish caught does not come from accepted in the exported country.
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
Item
Unit
Value (Rp.)
Total (Rp.)
Buying the Iron Ship + Frozen Cold Storage 100 GT
1
10.000.000.000,00
10.000.000.000,00
Build Cold Storage 400 tons + ABF 5 tons
1
10.000.000.000,00
10.000.000.000,00
and the export price is Rp. 20,000 / kg
Build a Block Ice Factory 50 tons / day
1
2.000.000.000,00
2.000.000.000,00
Data obtained from the implementation of on-site
Buy a ThermoKing Truck 20 ‘Container
5
1.000.000.000,00
5.000.000.000,00
calculate the financial feasibility of development
Company Establishment
1
15.000.000,00
15.000.000,00
1. Cold storage 400 tons + Air Blast Freezer 5 tons
Office supplies
1
119.000.000,00
119.000.000,00
2. 100 GT frozen-box on-board ship 3. 5 Thermoking Trucks
Build Office + Buy 3 Hectares of Land
1
3.100.000.000,00
3.100.000.000,00
4. Office building + warehouse 1 package
Total
research and primary data gathering are used to
illegal activities, so that the catch can be
Initial Investment Projections The initial capital requirements for investment are as follows:
ship owners do not need to create a separate
important, namely as evidence of traceability
196
Parameters Used
20.234.000.000,00
A C E H
I N V E S T M E N T
Projected Gross Income Gross
Projected Operating Costs
Income in 1 operating year is as follows:
Costs incurred within 1 operational year are as follows:
Total Skipjack Tuna
3.225.600,00
Kg
Price in Market Export
20.000,00
Rupiah/Kg
25.200,00
Kg
2.016.000.000,00
Rupiah
8.064.000.000,00 64.512.000.000,00
1
Container
4
Container
Rupiah
16
Rupiah
128
Z O N E S
Operational Cost (Variabel)
Year
Type 1
D E V E L O P M E N T
1
Day
1
Week
Container
1
Month
Container
1
Year
Value 173.000.000,00
5 Thermoking Truck @ 20’ container
12.800.000.000,00
1 (On-Board) Storage 100 GT Cold Storage 400 ton
204.000.000,00
Loading-unloading
480.000.000,00 13.657.000.000,00
Total
Operational Cost (Fixed) Type Employee Salary
1.264.800.000,00
Total
1.264.800.000,00
Total Operational Cost=
PEXELS.COM
Value
14.921.800.000,00
Tuna Cakalang (skipjack tuna)
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
197
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Projected Profit and Loss
5 Year Cash Flow Projection
The results of profit and loss in 1 operating year are as follows:
Component
Unit
Cash Flow (Rp.) Total
Income 3.225.600
Export Price
rupiah
15.000,00
Gross Income
rupiah
48.384.000.000,00
Expenditure
2023
2024
2025
Plus: Depreciation & Amortization Less: Changes in Working Capital
14,000,436,000
15,400,479,600
16,940,527,560
18,634,580,316 20,498,038,348
(16,187,200,000) (12,140,400,000) (8,093,600,000) (4,046,800,000)
-
-
783,394,500
822,564,225
863,692,436
906,877,058
Cash from Operations
30,187,636,000
26,757,485,100
24,211,563,335
21,817,687,880
19,591,161,290
Operational Cost
rupiah
14.921.800.000,00
Investing Cash Flow
-
-
-
-
Cost of goods sold
rupiah
17.906.160.000,00
20,234,000,000
Cash from Investing
-
-
-
-
Profit before Tax
Rupiah
15.555.040.000,00
20,234,000,000
Gross Profit
1 year
14.000.436.000,00
9,953,636,000
26,757,485,100
24,211,563,335
21,817,687,880
19,591,161,290
Opening Cash Balance
-
9,953,636,000
36,711,121,100
60,922,684,435
82,740,372,315
Closing Cash Balance
9,953,636,000
Information : Operational Costs = 15.75 of Gross Income Gross Profit = 65.35 of Gross Income
198
2022
Operating Cash Flow Net Earnings
kilogram
Fish Sold
2021
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Net Increase (decrease) in Cash
36,711,121,100 60,922,684,435
82,740,372,315 102,331,533,604
A C E H
I N V E S T M E N T
Net Present Value Projection
Projected Payback Period
The amount of the net present value of cash flows is as follows:
The length of years to return the total investment capital is as follows::
Net Present Value
Cash Flow
Net Cash Flow
Early Year Investment
Rp (20,234,000,000.00)
Rp (20,234,000,000.00)
2021
Rp 14,000,436,000.00
2022 2023
End of year cash flows
D E V E L O P M E N T
Payback Periode
Net Cash Flow
Year Into
Early Year Investment
Rp 20,234,000,000.00
(20,234,000,000)
0
(6,233,564,000.00)
End of cash flow in 2021
Rp 14,000,436,000.00
(6,233,564,000)
1
Rp 15,400,479,600.00
9,166,915,600.00
End of cash flow in 2022
Rp 15,400,479,600.00
9,166,915,600
2
Rp 16,940,527,560.00
26,107,443,160.00
End of cash flow in 2023
Rp 16,940,527,560.00
26,107,443,160
3
Current Interest Rates
10%
Duration Required
Net Present Value
1,172,723,092.68
Payback Periode
Conclusion
Go Project
Z O N E S
3 0.70 Go Project
Conclusion
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
199
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
Internal Rate of Return
Profitability Index Projection
Projected Benefit / Cost Ratio
The length of years to return the total investment capital is as follows:
The profitability index values of the project cash flows are as follows:
The profitability index values of the project cash flows are as follows:
Internal Rate of Return
Cash Flow
First-Year Investment
Rp (20,234,000,000.00)
Year-End Cash Flow
14,000,436,000.00
(6,233,564,000.00)
2022
15,400,479,600.00
9,166,915,600.00
2023
16,940,527,560.00
26,107,443,160.00
Conclusion
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
Rp (20,234,000,000.00)
2021
Internal Rate of Return
I n v e s t m e n t
Profitability Index First-Year Investment
Interest Rate
200
Net Cash Flow
10.00% 12% Go Project
Year-End Cash Flow
Cash Flow
Net Cash Flow
B/C RATIO
Cash Inflows/Outflows (PV of Cost of Project)
PV Factor (1/((1+r)^n))
2021
(20,234,000,000.00)
-
2021
14,000,436,000.00
0.9804
13,725,917,647.06
2022
15,400,479,600.00
0.9612
14,802,460,207.61
2023
16,940,527,560.00
0.9423
15,963,437,478.80
TOTAL
-
-
44,491,815,333.47
BenefitCost Ratio
2.1989
Rp (20,234,000,000.00) Rp (20,234,000,000.00)
2021
Rp 14,000,436,000.00
(6,233,564,000.00)
2022
Rp 15,400,479,600.00
9,166,915,600.00
2023
Rp 16,940,527,560.00
26,107,443,160.00
Interest Rate Net Present Value Profitability Index CONCLUSION
10% Rp1,172,723,092.68 1.0580 Go Project
O
A
A
O
A
2020
PV of Benefit Expected from Project
E L E C T R O N I C A L L Y
I N T E G R A T E D
B U S I N E S S
L I C E N S I N G
S E R V I C E
Electronically Integrated Business Licensing Service TYPE OF BUSINESS AND SECTOR LICENSING APPLICATION INDIVIDUAL
NON INDIVIDUAL
AGENCY/DELEGATION
e.g.,
SCOPE OF ONLINE SINGLE SUBMISSION (OSS) OTHER BUSINESS
TRANDING BUSINESS (“UD”)
PMDN LEGAL ENTITY
NON LEGAL ENTITY
e.g., PT
e.g., CV
AGENCY/DELEGATION REPRESENTATIVE OFFICE
INDIVIDUAL
e.g., KP3A, BUJKA
FOREIGN STPW (Franchise Registration Certificate)
Company Types All types of company, including individual and non individual
Transformation Changes in compony legality data and business data
Company Registration Business registration and obtaining the NIB
Business Development Addition in business activities
BUSINESS LICENSE Type Of Licenses Business licenses, commercial/ operational licenses, and issuing all of the above
Closing Business Closing the company and all its business activities
Online Single Submission (OSS) System V 1.1 (1/6) Business Identification Number “NIB”
Business License
3 Data Legality Check
3 Project Data
3 Management and Shareholder data
3 Data Business Classification in Indonesia (“KBLI”)
3 Infrastructure and facilities permit
3 Data objectives and purposes
3 Data Completion
3 Data Validation
3 Data Validation
Output:
Output:
3 Business License
Legality 3 Company Data 3 List of certificates
3 Validation of legality data
3 NIB
3 Location Data
Commercial Licenses
Othe than the “PT”
Limited Liability Company (“PT”)
Online Single Submission (OSS) System V 1.1 (2/6)
Online Single Submission (Oss) System V1.1 (3/6)
Collecting list of certificates data
Obtaining Data General Law Administration (“AHA”) Online LEGALITY STAGE
1. Company Data
2. Legality Data
3 Company profile data
3 Company legality data
3 Capital/ Asset Data
3. Management & Shareholder data
3 Management & Shareholder data
4. Data Objectives & Purposes 3 Data Objectives & Purposes
5. Validation Data 3 Validation of all collrcted data from step 1-4 3 Example: The conformity of Investment (“PMA”) status
1.
Data Legality Check
3 Management and Shareholder data 3 Objectives and Pupose 3 Data Validation
PMA
PMDN
PMDN
Badan Usaha Asing
Continue to the NIB stage >>
2. Input Data KBLI
3. Input Your Data 3 Customs activity
3 Company Data
Online Single Submission (Oss) System V1.1 (5/6)
BUSINESS LICENSE STAGE (1/2)
NIB STAGE
LEGALITY STAGE
Output: 3 Commercial Licenses
Online Single Submission (Oss) System V1.1 (4/6)
3 Provide 5 digit of KBLI Data
3 Regestration Data of Insurance & Social Security (“BPJS”) 3 Data Information on Mandatory Manpower Report (“WLKP”)
4. Draft NIB Check
5. Print out Your NIB
1. Project Data 3 KBLI List
3 Validation of all collected data from step 1 to 3 3 Draft NIB
3 NIB
3 Product List
3 Number of WLKP (after notified by Ministry of Manpower)
3 Company Business Data 3 Investment plan data
STEPS ON GETTING BUSINESS LICENSE (1/2)
2. Location Data
3. Location Permit
3 Filling out the related to business location
3 Filling out the form related to business location (to be discussed)
3 Location choise includes land, water, forest area, KEK, KI and FTZ
Online Single Submission (Oss) System V1.1 (6/6)
4. Environment Permit
3 Filling out the form related to environment permit (to be discussed)
Next >>
5. Building Permit (“IMB”) + Certificate of Occupancy (“SLF”) 3 Filling out form related to IMB + SLF
6. Business License 3 Filling out the form related to business license
STAGES IN COMMERCIAL/OPERATIONAL LICENSE 7. Project Draft and Business License
8. Project Output and Business License
3 Draft checking of all collected data from step 1-6
3 Location permit
3 Preview the obtained permits
3 IMB + SLF
3 Environment permit 3 Business License
2. Draft Commercial License
1. Commercial License 3 Fill out the commitment form to complete operational/ commercial license
3. Output Commercial License
3 Choses draft of commercila/ operational license
3 Commercial License (being discussed as the final output)
Continue to the Commercial/Operational License >>
Continue to the business license stage >>
20 SECTORS, EXCEPT: FINANCE, MINING, OIL AND GAS
e
u
n
I n v e s t
s i
A c e h
2 0 2 1
201
E L E C T R O N I C A L L Y
I N T E G R A T E D
B U S I N E S S
L I C E N S I N G
S E R V I C E
Contact Person:
CONTACT PERSON FOR SYSTEMIC PROBLEMS PROBLEM IN VALIDATING TAXPAYER IDENTIFICATIONS NUMBER (“NPWP”)
PROBLEM IN NUMBER IDENTITY (“NIK”)
Portal Ex-1
: Dispalying and Updating Data
Layanan Call Center Ditjen Dukcapil Kemendagri
Phone
:
021 - 5262912
Web Service: Electronic Data Interchange Email
: p d e@ p a j a k . g o . id
Phone
:
021 - 52904817
Ditjen Dukcapil @ccdukcapil 08118005373 08118005373 callcenter.dukcapil@gmail.com
202
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
E L E C T R O N I C A L L Y
INDONESIAN INVESTMENT COORDINATING BOARD (“BKPM”) :
B U S I N E S S
L I C E N S I N G
S E R V I C E
London
CONTACT US Address
I N T E G R A T E D
Jl. Jend. Gatot Subroto No. 44, Jakarta 12190
New York
Seoul Abu Dhabi
Taipe
P.O. Box 3186, Indonesia
Singapore
One Stop Service Contact Center 0807 100 2576
Phone
:
: i n fo @ b kp m.g o .i d
OR
Tokyo
1500765
Sydney
bkpm.go.id | incestindonesia.go.id
Indonesia Investment Promotion Centre (IIPC)
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
203
A C E H
I N V E S T M E N T
D E V E L O P M E N T
Z O N E S
I N V E S T M E N T
A N D
O N E
S T O P
S E R V I C E
A G E N C Y
B Y
R E G E N Y / C I T Y
INVESTMENT AND ONE STOP SERVICE AGENCY BY REGENY/CITY IN ACEH PROVINCE No
Regency/City
DPMPTSP
Address
Phone
No
Regency/City
DPMPTSP
Address
Phone
No
Regency/City
DPMPTSP
Address
Phone
No
Regency/City
DPMPTSP
Address
Phone
1
Kota Banda Aceh
Investment and One-Stop Service Agency
Mal Pelayanan Publik-Gedung Pasar Atjeh Baru Lt.3 Jl. Diponegoro-Banda Aceh
(0651) 32874
Dpmptsp.bna@gmail.com
8
Southwest Aceh
Investment and One-Stop Service, Labor and Transmigration Agency
Jl. Pasar ikan lama No .17
(0659)9496049
Kp2t_abdya@yahoo.co.id
15
Kota Lhokseumawe
Investment and One-Stop Service and Labor Agency
Jl. Merdeka Barat Gampong Kuala Blang Lhokseumawe
(0645)48468
Dpmptsp.tenagakerja.lsm@ gmail.com
22
Southeast Aceh
Investment and One-Stop Service Agency
-
-
-
23
Bener Meriah
Investment and One-Stop Service Agency
Jl. Serule-kayu (Komplek Perkantoran Pemda) Redelong
-
-
2
Kota Sabang
Investment and One-Stop Service and Labor Agency
Jl. Diponegoro No.23 Kota Sabang
+62652-22633
Dpmptsp_naker@yahoo.co.id
9
South Aceh
Investment and One-Stop Service Agency
Jl. Merdeka Nomor 7-9
(0656)323077
3
Aceh Besar
Investment and One-Stop Service Agency
Jl. T. Bactiar Panglima Polem, SH Kota Jantho
082361015781-085260326180
Dpmptsp.acehbesar@yahoo. com
10
Singkil
One Stop Service Agency
Jl. Jendral Ahmad Yani, Singkil
+62658-21181
11 4
Aceh Jaya
Investment and One-Stop Service Agency
Jl. Mahkota Kuala Meurisi
5
Nagan Raya
Investment and One-Stop Service Agency
Jl. Poros Utama No.17, Suka Makmue
6
West Aceh
7
204
Investment and One-Stop Service Agency
Kota Subulussalam
e
u
n
I n v e s t
s i
Investment and One-Stop Service Agency
A c e h
2 0 2 1
Jl. Imam Bonjol No. 30 Meulaboh Jl. Pertemuan No.16
(0654)2210275
Kppt_calangaj@yahoo.com 12
0655-7007980 (0627) 31005
Simeulue
13 Pmp2t@subulussalamkota. go.id/kp2t.subulussalam@ gmail.com
14
Pidie Pidie Jaya
Bireuen
Investment and One-Stop Service, Labor and Transmigration Agency
Jl. Teuku Umar
Investment and One-Stop Service Agency
Jl. Tgk Chiek Direubee No.5 Sigli
Investment and One-Stop Service Agency
Investment and One-Stop Service Agency
Jl. Komplek Perkantoran Pemkab Pidie Jaya Cot Trieng Kantor Pusat Pemerintahan Kab. Bireuen, Cot GapuBireuen
(0650)21404
(0653) 23399 (0653)3485061
-
16
North Aceh
Investment and One-Stop Service, Labor and Transmigration Agency
Jl. Iskandar Muda No.53
(0645) 41969
-
17
East Aceh
Investment and One-Stop Service Agency
Jl. Medan – B.Aceh KM. 370 No. 3 Idi
-
dpmpptacehtimur@gmail.com
18
Kota Langsa
Investment and One-Stop Service Agency
Jl. P.Polem No.41 Gp. Jawa Kota Langsa
0811671245
Dpmptsplangsa1@gmail.com, dpmptsp@langsakota.go.id
19
Aceh Tamiang
Investment and One-Stop Service Agency
Jl. Ir. H. Juanda No. 69 Karang Baru
(0641) 7430494
dpmptsp@acehtamiangkab. go.id
20
Aceh Tengah
Investment and One-Stop Service Agency
Jl. Kartini No.03
(063)21085
21
Gayo Lues
Investment and One-Stop Service Agency
Jl. Tgk. M. Husin Bustanussalam Blangkejeren
-
dpmtkptsp@simeuluekab
dpmptsppijay@gmail.com
(0644)21212 Ptsp.bireuen@gmail.com
-
I N
A C E H
P R O V I N C E
A D D R E S S
D P M P T S P
R E G E N C Y / C I T Y
The MPP Lobby room (Public Service Mall) One-Stop Integrated Service, Banda Aceh City.
I n v e s t m e n t
O p p o r t u n i t i e s
o f
A c e h
2 0 2 1
205
dpmtsp.acehprov.go.id
Jl. Ahmad Yani No. 39, Banda Aceh, Indonesia
investinaceh@acehprov.go.id / investinaceh@gmail.com
A
O AIO 2021
+62 651 23170 / Fax: +62 651 23171