Aceh Investment Opportunities (AIO) 2021 - EN

Page 1

Cover Depan

|| !"

Aceh Investment Opportunities


Gua Sarang, Sabang


Cover Depan

1

31

DAFTARISI

4 7 8 9

10 12 14 16 17

Foreword

Vision and Mission

WHY ACEH? Realization & Promotion Aceh Regional Spatial Plan (RTRW)

Aceh in Figures

Aceh Administrative Region

Population Population in Aceh

18 19

20 23 25 26 27

28 30

32 33

Economic Indicator

34

Export & Import

36

Investment Realization

Labor Force

Supporting Infrastructure Airport Total Aircraft and Passenger in Aceh Airports Seaport Aceh Seaport

37

39 41 47 50

52 55

56 57

Passenger Terminal Route of Crossing Ships, Goods, and Passengers at Ports in Aceh Malahayati Port Operations Internasional Seaport Krueng Geukueh - Kuala Langsa Sea Highway Route Network (T1), Pioneer Sea Transportation R1, Pioneer Sea Transportation R2

Station Road Energy/ Electricity Group Tariff, Power Limit, Consumption and kva Fees and Prepaid Electricity Clean Water Water Supply Pipeline Development Banking and Financial Institutions Banking and Financial Institutions in Banda Aceh

59 61

62 64

66 68 69 70 70 70

70 71 71 72

Hotels Hotel In Banda Aceh And Surrounding Areas Hospitals in Aceh Telecommunication 4 Potential Sectors

Energy & Infrastructure

Testimony: Investment Experience Businesspersons in Aceh

Infrastructure Trans Sumatra Toll Road Development Project Progress of the Implementation of the Cross - Sigli Banda Aceh and Langsa Binjai Toll Roads Langsa - Lhokseumawe Toll Road Technical Data Technical Data Lhokseumawe – Sigli Toll Road

73 74

75 76 77 78 80 81 82 83 84 85 86 95

Toll Road Technical Data Financial Data

Urban Railways Development POTENCY Vehicle Ownership Transportation (Travel Transport Mode) The requirement analysis Trip Purpose Spatial Pattern Analysis Potential Railway Line Plans Potential Hinterland Surround Line A Land Along a Street Railway Plan Line Estimation Cost of Monorail Construction Technology Chosen General Structure of Kpbu Banda Aceh Railways Project

96 97 98 99 100

101 102

104 105 106 108

Energy Testimony: Investment Experience

Energy 1. The potential of hydroelectric power in Aceh 2. Geothermal Power Plant (PLTP) in Aceh

Aceh Gas Infrastructure Development Plan Supply and Demand of Gas Projection

Agroindustry

Testimony: Investment Experience Plantations Palm Oil Palm Oil Industries in Aceh

109 110 110

111 113

114 115

116 117 118 120

121 122

Nagan Raya Cooking Oil Processing Industry Investment Opportunity/Activity: Contact Person:

Coffee Arabica Coffee Planted Area and Production

Robusta Coffee Aceh Coffee Processing Industry

Cacao Rehabilitation, Development of Cocoa Plantation and Processing Industry Transportation Supporting Infrastructure Contact Person:

Patchouli Patchouli Aceh (Crude Patchouli Oil)

124

129 134 135 137 137

138 139 140 141 142

144

145

Financial Review Of Aceh Crude Patchouli Oil

Aceh Tengah Pasta Sauces Processing Industry Development Contact Person:

Livestock

Beef Industry Aceh Besar Beef Industry Development Project

Fishery Idi Fishing Port Metro Mina ParkKuala Idi – East Aceh Concept of Development Area Site Plan Metro Mina Zone Contact Us:

146 147 148 149

151 152 152 152

153 153

154

Sawang Ba’U Fishing Port

Tourism Development

Testimony: Investment Experience in Accommodation Sector

Tourism Total Domestic and International Tourist Aceh

156 159 159

160 163 164 166

NAIC & BSB Nurul Arafah Islamic Center & Banda Aceh Business Center Supporting Facilities Project Development for Gemilang Tourism Project Nurul Arafah Islamic Center (NAIC) Investment Estimates: Banda Aceh Business Center (BSB) Contact Person:

Lhoknga Golf Course Development Aceh Besar

168 168

170 171

D A F T A R

Ie Seum Hot Spring Resort Tourism Development Investment Activities Contact Person: Pidie Lingkok Kuwieng Tourism Development Contact Person:

Banyak Islands Tourism Development The following are the potential investment that can be developed in Banyak Islands:

Registration Procedure Iupswa Eco-Tourism Business Development Licenses Contact Person:

Aceh Investment Development Zones

Testimony: Investment Experience

172 173 174 175

176 177 178 180 181 182 182

Aceh Investment Development Zones

184 186 187

Sabang Free Port and Free Trade Zone (FP & FTZ) Sabang Area Sabang Management and Development Agency

Development of Iboih and Gapang Marine Tourist Destination Development of the International Resort and Gua Sarang Golf Course Area Development of Meeting, Incentive, Convention, and Exhibition (MICE) Cluster and Iboih Condominium

Marina and Eco Resort Lhok Weng Development

Klah Island Marine Tourism Development Sabang Management and Development – One Stop Services Agency

189

190 191

Special Economic Zone (SEZ) Arun Lhokseumawe Investment Procedure in SEZ Facilities and Incentives Contact Person:

Aceh Industrial Estate (KIA) Ladong, Aceh Besar Investment Opportunities

193

Samudera Kutaraja Fishing Port, Banda Aceh

195

Frozen Tuna Processing Industry Development

201 202

Electronically Integrated Business Licensing Service

203

204 206

Contact Person:

e

u

n

Contact Person: CONTACT US INVESTMENT AND ONE STOP SERVICE AGENCY BY REGENY/ CITY IN ACEH PROVINCE dpmtsp.acehprov.go.id

I n v e s t

s i

A c e h

2 0 2 1

3

I S I


Foreword We

consider that the development of a region’s economy

The energy and infrastructure sectors can also be options

cannot be separated from the role of investment.

for you to invest in, especially in the new renewable energy

Investment is an important indicator as the main asset in

sector. The Government of Aceh continues to strive to improve

driving our potential in natural resources.

the development of infrastructure by inviting investors and

We understand that we cannot independently work to create welfare and prosperity in Aceh. We need the role of private

entrepreneurs to participate in construction of Aceh toll roads program, Airports and Urban Mass Transit (MRT).

sectors to develop and optimize downstream output of Aceh’s

In an effort to increase the convenience of investing, the

natural recourses, which definitely become the source of

Government of Aceh has developed four special economic

mutual benefit for the investor, increase region’s income and

zones, namely: Free Trade Zone, Free Sea Port Zones and

source of income to the community.

Sabang Free Port. Arun Lhokseumawe Special Economic Zone, Aceh Industrial Area and Kuta Radja Samudera Harbor,

We hope that the existence of investment will build new

with various incentives and facilities that we offer to develop

industrial centers in various leading sectors in Aceh, especially the development of the tourism industry which is the leading sector in Aceh. Aceh has tourist destinations that

business and guarantee the safety and convenience of investing in Aceh.

are scattered in almost all districts and cities with their own

Aceh is open to investment. The Government of Aceh is

uniqueness and beauty according to regions.

committed to providing ease of investing and improving the investment climate to make Aceh one of the investment

Moreover, the agro-industry sector in Aceh offers several excellent commodities including coffee, cocoa, palm oil and patchouli. Other superior sectors are fisheries and livestock

destinations in Indonesia. Thank you for your trust in investing in Aceh.

and it is our main priority to make high selling value products

4

from them through world-class processing standards by

GOVERNOR OF ACEH

involving SMEs as the business partners.

Ir. Nova Iriansyah, MT

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


K A T A

In manifesting Aceh as one of the investment

our determination in serving the investors. Hence,

destinations in Indonesia, the Regional

to overcome the obstacles that investors may

Government has prepared various facilities

encounter during obtaining accurate data and

needed by investors to invest in Aceh.

information regarding the potential investment

It is our commitment, The Aceh Investment and One-Stop Service Agency becomes the leader in welcoming investors to start their business in Aceh with guaranteed security provided by the Governor of Aceh and full support from all ranges of government and a warm welcome from the community. We are committed to serve all investors by providing accurate information pertaining to potential investments, coordinated with related agencies and institutions as well as providing fast,

P E N G A N T A R

in Aceh during this pandemic, we decided to prepare and publish the data and information in the form of soft file which people can easily access on our various digital platform. We expect that this “Aceh Investment Opportunities” book can be the primary reference for the investors to analyze potential resources and explore profitable investment oppor tunities. We welcome you to invest in Aceh. We would like to thank you for continuously taking part in developing potential investment in Aceh.

easy and accurate licensing services.

Dr. Aulia Sofyan

Even though this year the world is facing a

Head of Aceh Investment and One-Stop

COVID-19 pandemic, yet it has not discouraged

Services Agency

I n v e s t m e n t

Oe p up o nr t u I nn i vt ei se st

os fi

A c e h

2 0 2 1

5


Governor of Aceh office.

6

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


V I S I

&

Vision and Mission Vision:

Mission:

Realizing a peaceful and prosperous

Accelerate bureaucratic reform to

Aceh through a clean, fair and

achieve a clean and authoritative

serving government.

government in supporting the quality and equitable public service delivery Build and protect production centers as well as creative service industries that produce competitive products to increase employment and provide easy access to capital

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

7

M I S I


WHY ACEH?

Aceh is located at the most west of Sumatera

Our infrastructure is ready to connect your business

We have major commodities for your industries

We have the workforce for your need

We have a persuasive business climate

Aceh are close to most of ASEAN

The international airport, the top-ranked

Arabica coffee from Gayo Highland,

Supported by 20% of Aceh’s annual

Get to know experience of PT. Hutama

member with 500 million consumers,

seaport, the high-speed road.

cacao from Pidie Jaya and fishery in

budget for education to increase the

Karya and dozens of other national

uncounted investment opportunities for

Banda Aceh are among the best in

capacity of human recourse and to

and multinationals company that are

the investors.

Indonesia.

create a skilled workforce.

thriving in Aceh. We lay a red carpet for potential investors who want to expand their business in Aceh. We roll out the red carpet potential investors who wish to expand their business in Aceh.

8

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


R E A L I S A S I

Realization & Promotion

THE NETHER LANDS ENGLAND FRANCE UNITED STATES

Realizat]ion of Foreign Investment in 2019 to Aceh:

CAYMAN ISLAND

SPAIN

BRITISH VIRGIN ISLAND

GERMANY MOSCOW BELGIUM PEOPLE’S REPUBLIC OF CHINA

3. Singapore 4. Belgium

UNITED ARAB EMIRATES

THAILAND ACEH

Promotion of Aceh Investment to the Listed Country:

5. United States

1. United Arab Emirates

6. People's Republic of China

2. Saudi Arabia

7. North Korea

3. Moscow

8. Bristish Virgin Island

4. America

9. South Korea

5. Australia

10. Cayman Island

6. Germany

11. France

7. People's Republic of China

12. Spain

8. South Korea

13. The Netherlands

9. Malaysia

14. Thailand

10. Thailand

15. Australia

11. Singapore

16. England

12. India

SOUTH KOREA

INDIA

1. Malaysia 2. Afghanistan

P R O M O S I

NORTH KOREA

AFGHANISTAN

SAUDI ARABIA

&

MALAYSIA SINGAPORE

AUSTRALIA

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

9


Aceh Regional Spatial Plan (RTRW)

The Aceh regional spatial plan describes the plan for spatial structure of Aceh region which includes an urban system within its territory and it is connected to villages area within its service area and the Aceh regional infrastructure network system. The Aceh regional spatial plan covers protected areas and cultivation areas, the establishment of Aceh strategic areas and directions for the use of Aceh spatial layout.

Spatial Layout is a policy direction and strategy for spatial use in Aceh which is used as a reference for long-term planning.

One of the goals of spatial planning for the Aceh region is to create strategic area functions that support Aceh’s position as Indonesia’s main gateway.

The following is the spatial pattern for the 2013-2033 RTRW Aceh: Protected area, with an area of

Cultivated area, with an area of

2,938,579.68 Ha

2,949,506.83 Ha

1 Protected Forest Area, Sabang.

10

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

00


R T R W

Fid

Aceh Spatial Pattern RTRW 2013-2033

Status

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Water Resource Assets Aquaculture Natural Reserves Horticulture Protected Forest Education Forest Production Forest Conversion Production Forest Limited Production Forest Public Forest Hankam Area Industrial Area Cultural Protective Area Peat Protected Area Geological Protected Area Sea Protected Area Mangrove Protected Area Water Intake Protection Area Sempadan Lake Protected Area Sempadan Beach Protected Area Integrated River Protected Area Tourism Area Mining Area

Cultivation Cultivation Protect Cultivation Protect Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Protect Protect Protect Protect Protect Protect Protect Protect Protect Cultivation Cultivation

Size According To The Body Stem Of 2013 Qanun RTRWA 43,760.00 300.00 1,790,626.00 555,948.00 15,578.00 141,876.00

Fid

Aceh Spatial Pattern RTRW 2013-2033

Status

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Livestock Area Transmigration Area Great Plantations Community Plantations Rural Surface Urban Surface Agricultural Wetland Dryland Farming Suaka Marga Satwa Pinus Jantho Suaka Family Satwa Rawa Singkil Tahura Mountain Kapor Tahura Pocut Meurah Intan Tahura Teupah Selatan Isaq Living Park Mount Lauser National Park Kuta Malaka Natural Tourism Park Jantho Pine Natural Tourism Park Many Landland Natural Islands Park Many Sea Natural Tourism Park Natural Tourism Park Of Weh Island Land Natural Tourism Park Of The Weh Island Of The Sea Tpa Bodies Of Water

Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Cultivation Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Protect Cultivation Cultivation

Size According To The Body Stem Of 2013 Qanun RTRWA 12,931.00 393,013.00 761,572.00 89,847.00 58,489.00 252,063.00 436,729.00 15,374.00 81,836.00 1,485.00 6,218.00 920.00 86,320.00 624,651.00 1,549.00 2,614.00 24,693.00 205,725.00 1,250.00 5,275.00

5,610,642.00

Total

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

11


Aceh in Figures

Aceh

Jawa

70,65% 8,94%

Gayo

Batak

Alas

7,22%

3,29%

2,13%

1,49%

1,40%

1,11%

Singkil

Minangkabau

Lainnya

1,74%

1,99%

1,99%

Islam

Katholik

Protestan

Buddha

Hindu

98,22%

0,16%

0,80%

0,10%

0,01%

Capital City

Banda Aceh O

12

Simeulue Aneuk Jamee Tamiang

I n v e s t m e n t

O p p o r t u n i t i e s

O

o f

A

A c e h

I I

O

2 0 2 1

IA 201

Language

Indonesia Traditional Language

17


Guel traditional dance.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

13


Aceh Administrative Region The Government System in Aceh Province is implemented by levels of 2

Regency/City

Regency/City

Regency/City

Regency/City

Aceh Singkil

South Aceh

Southeast Aceh

East Aceh

Capital City

Capital City

Capital City

Capital City

Singkil

Tapaktuan

Kutacane

Sub-District

Sub-District

Sub-District

Sub-District

11

18

16

24

Village

Village

Village

Village

120

260

385

515

Regency/City

Regency/City

Regency/City

Regency/City

Regency/City

West Aceh

Aceh Besar

Pidie

Bireuen

Aceh Tengah

Capital City

Capital City

Capital City

Capital City

Meulaboh

Kota Jantho

Sigli

Bireuen

Sub-District

Sub-District

Sub-District

Sub-District

12

23

23

17

Village

Village

Village

Village

322

604

731

609

Regency/City

Simeulue Capital City

Sinabang Sub-District

10

and Village.

Village

138

Capital City

Takengon Sub-District

14 Village

295

14

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

I


A C E H

A D M I N I S T R A T I V E

Regency/City

Regency/City

Regency/City

Southwest Aceh

Gayo Lues

Aceh Tamiang

Capital City

Capital City

Capital City

Capital City

Blangpidie

Blangkejeren

Karang Baru

Suka Makmue

Sub-District

Sub-District

Sub-District

Sub-District

9

11

12

10

Village

Village

Village

Village

152

145

213

222

Regency/City

Regency/City

Regency/City

Regency/City

Regency/City

Regency/City

Bener Meriah

Pidie Jaya

Banda Aceh

Sabang

Langsa

Lhokseumawe

Subulussalam

Capital City

Capital City

Capital City

Capital City

Capital City

Capital City

Capital City

Calang

Simpang Tiga Reudeulong

Meureudu

Banda Aceh

Sabang

Langsa

Lhokseumawe

Singkil

Sub-District

Sub-District

Sub-District

Sub-District

Sub-District

Sub-District

Sub-District

Sub-District

9

10

8

9

2

5

4

5

Village

Village

Village

Village

Village

Village

Village

Village

172

233

222

90

18

66

68

82

Regency/City

A Capital City

Lhokseukon Sub-District

27 Village

852

Regency/City Regency/City

Aceh Jaya Capital City

R E G I O N I

Regency/City

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

15


Population Population is one of the indicators to support investment; the most important part in investment development, both as consumers of produced goods by investment activities or as partners and employees to support the realization of investment in Aceh. 5.371.532 Based on the Aceh Central Bureau of Statistic, total population in Aceh is 5.281.314 5.371.53 people in 2019.

5.189.469 5.096.248

5.001.953

2015 A

16

A A

2016 A

I n v e s t m e n t

A

A A

A

2017 A I

2018

Banda Aceh residents enjoy their afternoon with families at Blang Padang.

I A

O p p o r t u n i t i e s

2019

o f

A c e h

2 0 2 1


P O P U L A S I

Total Population by Regency/City in Aceh, 2019 Regency/City

2015

2016

2017

2018

2019

Simeulue

89.117

90.291

91.375

92.393

93.230

Aceh Singkil

114.518

116.712

119.490

121.681

124.099

South Aceh

224.897

228.603

231.893

235.115

238.080

Southeast Aceh

200.014

204.468

208.481

212.417

216.499

East Aceh

402.976

411.279

419.594

427.567

436.080

Aceh Tengah

196.090

200.412

204.273

208.505

212.489

West Aceh

193.791

197.921

201.682

205.971

210.110

Aceh Besar

392.584

400.913

409.109

417.302

425.220

Pidie

418.882

425.974

432.599

439.131

444.979

Bireuen

435.300

443.627

453.224

461.726

471.640

North Aceh

583.892

593.492

602.554

611.435

619.410

Southwest Aceh

140.689

143.312

145.726

148.111

150.389

87.881

89.500

91.024

92.602

94.100

Aceh Tamiang

278.324

282.921

287.007

291.112

295.010

Nagan Raya

155.070

158.223

161.329

164.483

167.289

86.385

87.622

89.618

91.087

92.889

Bener Meriah

136.821

139.890

142.526

145.086

148.180

Pidie Jaya

148.719

151.472

154.795

158.091

161.220

Banda Aceh

250.303

254.904

259.913

265.111

270.320

Sabang

33.215

33.622

33.978

34.571

34.870

Langsa

165.890

168.820

171.574

174.318

176.809

Lhokseumawe

191.407

195.186

198.980

203.284

207.200

Subulussalam

75.188

77.084

78.725

80.215

81.420

5.001.953

5.096.248

5.189.469

5.281.314

5.371.532

Gayo Lues

Aceh Jaya

TOTAL O

A

O I

I

I

A

A

A O

A I

I

Blang Padang, Banda Aceh.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

17


Economic I Gross Regional Domestic Product (GRDP)

Economic Growth 4,49% 4,28%

Economic Growth without Oil and Gas (%)

A

O I

4,18%

3,95

4,2%

3,29% -0,73% Year I

I

2015 A

2016

A

A O

A I

2017

2018

Year

Value of GRDP by Industrial Origins/ Productions (without Oil and Gas)

Value of GRDP by Industrial Origins/ Productions (with Oil and Gas)

2015

124.080,82

129.092.66

2016

132.614.00

136.843.82

2019

I

2017

141.076.46

145.806.92

2018

150.350.45

155.911.12

2019

158.555.41

164.210.64

O

18

I n v e s t m e n t

4,25

4,15%

4,13%

Economic Growth with Oil and Gas (%) O

4,26%

4,61%

Inflation

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

A

A

O I A

I

I A O

A I

I

1,84 1,69

1,53

I (%, yoy) 2015 O

A

2016 A

O I A

2017 I

I

A O

2018 A I

2019 I


I N D I K A T O R

E K O N O M I

Export Year

Volume (Ton)

USD

2015

1.182.177.854

93.336.621

2016

315.445.662

56.069.045

2017

2.517.468.611

77.679.139

2018

5.089.636.869

138.628.891

7.594.536.779

166.556.777

Year

Volume (Ton)

USD

2015

149.058.410

116.817.672

2016

121.872.735

28.994.572

2017

92.321.035

39.313.804

2018

97.582.007

29.689.996

102.058.410

131.223.716

2019

Import

2019 O

Governor of Aceh, Ir. Nova Iriansyah, MT attended the releasing activity of Gayo Arabica Coffee Exports.

A

A

O I A

I

I

A O

A I

I

The Governor of Aceh released Gayo Arabica coffee exports at the KOPEPI Ketiara Cooperative to foreign countries.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

19


Realization

I

Realization January - September 2020 – According to Sector PMDN : Rp. 6.557,7 M

8.000.000.000.000 7.000.000.000.000

Mineral Industry Nonmetal; Rp271,8 M

6.000.000.000.000

Others; Rp655,2 M

4.000.000.000.000

Mining Sector; Rp582,1 M

3.000.000.000.000

Constructions; Rp3.811,6 M

1.000.000.000.000

Investment

2015

FDI Realization (Rp) Total Investment Realization NOTE:

20

I n v e s t m e n t

5.030.128.791.192

2016

3.796.798.933.644 1.680.960.823.950

669.959.916.000 5.700.088.707.192

2017

1.167.807.218.200 4.964.606.151.844

149.089.023.300 1.830.049.847.250

2015 1 USD = IDR 12,000

2017 1 USD = IDR 13,300

2019 1 USD = IDR 15,000

2016 1 USD = IDR 13,300

2018 1 USD = IDR 13,400

2020 1 USD = IDR 14,400

O p p o r t u n i t i e s

o f

A c e h

Food Sector; Rp450,9 M

Electricity, Gas, and Water; Rp790,4 Jt

2.000.000.000.000

DDI Realization (Rp)

Others; Rp655,2 M Mineral Industry Non-metal; Rp271,8 M

Food Sector; Rp446,7 M

5.000.000.000.000

PMDN + PMA : Rp. 7.060,1 M

2 0 2 1

2018

2019

TW I s.d III 2020

1.232.544.677.586

4.615.149.782.313

6.557.713.101.816

48.016.434.400

1.196.943.330.000

502.425.345.600

1.280.561.111.986

5.812.093.112.313

7.060.138.447.416

PMA : $34,8 (jt)/Rp.502,4 M Food Sector; $296.470

Others; $346.949

Mining Sector; $438.527 Food Crops, Plantation and Animal Husbandry; $1.827.231

Electricity, Gas, and Water;

$31.207.513

Mining Sector; Rp588,4 M Electricity, Gas, and Water;

Rp1.239,8 M

Constructions;

Rp3.811,6 M


I N V E S T M E N T

Realization Quarter III – 2020 : Based on the DALAKS ACEH Sector PMDN No

Business Field

Top 5 Sector PMDN January - September 2020

Top 5 Sector PMA January - September 2020

PMA Investment (Rp Million)

Project

3.811.580

354

1

Electricity, Gas and Water

No

Business Field

Investment (Rp Million)

Project

9.140.280

11

1

Construction

2

Electricity, Gas and Water

790.426

110

2

Mining

157.215

4

3

Mining

582.055

23

3

Chemical and Pharmaceutical Industry

142.361

1

4

Food Industry

446.679

62

4

Trade and Reparation

6.796

4

5

Non Metal and Mineral Industry

271.799

14

5

Food Industry

1.775

5

6

Chemical and Pharmaceutical Industry

246.483

15

6

Other Services

775

3

7

Food Crops, Plantation, And Animal Husbandry

128.753

83

7

-

1

8

Trade and Reparation

79.538

685

Transportation, Warehouse and Telecommunication

9

Housing, Industrial Estates and Offices

73.284

12

8

Food Crops, Plantation, And Animal Husbandry

-

3

10

Other Services

60.034

163

$ 9.449.202

32

11

Rubber and Plastics Industry

48.331

1

12

Hotels and Restaurants

13.638

20

13

Other Industries

2.905

16

14

Wood Industry

965

3

15

Transportation, Warehouse and Telecommunication

786

33

16

Machinery, Electronics, Medical Instruments, Electrical Equipment, Precision, Optical and Watch Industries

319

1

17

Perikanan

63

10

18

Metal, Non-Machinery and Equipment Industry

50

3

19

Paper and Printing Industry

25

6

6.557.713

1.614

Total

R E A L I Z A T I O N

Total

1 Construction Rp. 3.811,6 M [58,12%] 354 Project

4 Food Industry Rp. 446,7 M [6,81%] 6 Project

2 Electricity, Gas and Water Rp. 790,4 M [12,05%] 110 Project

3 Mining Rp. 582,1 M [8,8%] 23 Project

5 Mineral Industry Non-metal Rp. 271,8 M [4,14%] 14 Project

1 Electricity, Gas and Water US$. 31.207.213 [89,44%] 56 Project 4 Mining US$. 438.527 [1,26%] 14 Project

2

3

Food Crops, Plantation, And Animal Husbandry US$. 1.827.231 [5,24%] 8 Project

Forest US$. 773.958 [2,22%] 1 Project

5 Food Industry US$. 296.470 [0,85%] 16 Project

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

21


I N V E S T M E N T

R E A L I Z A T I O N

Realization January - September 2020: Based on Location PMDN : Rp. 6.557,7 M East Aceh ; Rp241,3 M

PMDN + PMA : Rp. 7.060,1 M

Others; Rp615,0 M

Others; Rp810,8 M North Aceh; Rp409,2 M

North Aceh; Rp408,4 M West Aceh; Rp645,7 M

Realization January - September 2020: Based on Location

Aceh Besar; Rp3.912,3 M

Aceh Tengah; Rp735,0 M

Nagan Raya; Rp504,6 M Aceh Besar;

PMA : $34,8 (jt)/Rp.502,4 M Simeulue; $251.856

West Aceh; Rp672,0 M

Others; $857.489

Banda Aceh; $263.256 Aceh Tengah; $1.012.254

Aceh Tengah; Rp749,6 M

West Aceh; $1.827.731 Nagan Raya;

$30.678.062

Rp3.913,9 M

PMDN No

Field Effort

1

Aceh Besar

2

Aceh Tengah

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

PMA

Investment (Rp Million)

Project

No

Field Effort

3.912.263

119

1

Nagan Raya

735.042

10

2

West Aceh

No

Investment (Rp Million)

Project

30.678.062

12

1.827.731

6

1.012.254

8

Country

Investment

Project

31.054.573

23

1.827.231

2

1

Hongkong, RRT

2

Belgium

3

R.R. Tiongkok

809.258

17

4

Singapore

614.367

22

5

South Korea

240.320

18

6

Afghanistan

152.000

2

7

Cayman Island

88.291

2

8

Malaysia

58.816

17

9

Brazil

34.722

2

British Virgin Island

8.212

2

2.083

4

3

West Aceh

645.711

36

4

North Aceh

408.438

210

4

Banda Aceh

263.256

13

5

East Aceh

241.269

32

5

Simeulue

6

Pidie

200.062

3

251.856

11

Banda Aceh

617

East Aceh

7

115.091

6

152.347

7

8

Lhokseumawe

94.387

300

7

Lhokseumawe

142.361

2

Nagan Raya

62.797

21

Aceh Besar

112.975

12

10

9

8

10

Aceh Tamiang

48.800

68

9

Gayo Lues

104.306

7

11

France

11

Aceh Singkil

46.196

12

10

Pidie

88.346

5

12

Spain

775

2

11

Langsa

88.028

1

13

Brazil

0

2

3

Aceh Tengah

12

Bireuen

14.676

27

13

Simeulue

11.557

17

12

Southeast Aceh

58.816

4

14

The Nedherland

0

2

14

Subulussalam

6.332

24

13

North Aceh

54.225

6

15

England

0

3

15

Southwest Aceh

6.153

34

14

South Aceh

21.186

10

16

Australia

0

1

16

Langsa

4.953

16

15

Aceh Tamiang

21.047

2

17

United State

0

4

17

Pidie Jaya

1.519

33

16

Bener Meriah

10.000

3

$34.890.648

125

18

Gayo Lues

1.003

8

17

Sabang

2.858

5

19

Bener Meriah

905

8

18

Aceh Jaya

Aceh Jaya

11

3

20

509

694

19

Southwest Aceh

21

Southeast Aceh

50

6

300

2

Sabang

2

Aceh Singkil

22

0

20

0

6

6.557.713

1.614

$34.890.648

125

Total

22

Realization January - September 2020: Based on Country of Origin

Total

Total

Singapore; $614.367 RR Tiongkok; $614.367

South Korea; $240.320 Others; $344.899

Belgium; $1.827.231

Hongkong, RRT;

$31.054.573


L A B O R

Labor Force

The government of Aceh allocates 20 capital improvement. Through Aceh A the human resource is trained to be expert in specific sectors according of being your business partners.

F O R C E

Total of Labor Force by Sex (thousand) in Aceh, 2004-2019 Year

Male

Female

Total

2004

866,90

2.201,90

3.068,80

2005

1.074,10

544,90

1.619,00

2006

1.081,70

680,50

1.762,20

2007

1.125,60

687,90

1.813,50

2008

1.121,00

621,20

1.742,20

2009

1.153,50

639,90

1.793,40

2010

1.207,30

731,20

1.938,50

2011

1.251,50

749,70

2.001,20

2012

1.166,80

631,80

1.798,60

2013

1.294,20

739,90

2.034,10

2014

1.344,10

779,20

2.123,30

2015

1.378,90

804,00

2.182,90

Year

Inflation (%, yoy)

2016

1.418,00

839,90

2.257,90

2015

1,53

2017

1.419,00

869,70

2.288,70

2016

3,95

2018

1.454,90

898,50

2.353,40

2017

4,25

2018

1,84

2019

1.498,50

867,80

2.366,30

2019

1,69

O

A

A

O I A

I

I A O

A I

I

Construction workers.

Provincial Minimum Wage

O

A

A

O I A

I

I n v e s t m e n t

I A O

A I

I

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

23


L A B O R

F O R C E

Construction workers.

24

I n v e s t m e n t

O p p o r t u n i t i e s

Electrical maintenance workers in Aceh.

o f

A c e h

2 0 2 1


Supporting I

Indonesian Airways Garuda Indonesia at Sultan Iskandar Muda Airport.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

25


S U P P O R T I N G

I N F R A S T R U C T U R E

Airport Aceh’s air connectivity is supported by two international airports and 11 domestic airports. Aceh is connected to the direct flight of Banda Aceh-Pinang Island and Banda Aceh-Kuala Lumpur. As for domestic connectivity, Banda Aceh is connected to Medan, Jakarta and Batam.

26

Aceh’s regional connectivity serves

which are scattered in across 13 regencies/

routes, including the Lhokseumawe-

cities, both international and domestic airports.

Medan, Rembele-Medan, Nagan

The existence of these airports will support

Raya-Medan, Sabang-Medan, and

investment activities, especially in passenger

Sinabang-Medan routes.

services, loading and unloading of goods or cargo

Aceh already has 13 airports

in large quantities that will support your business.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Airline Services:

Sultan Iskandar Muda Airport, Blang Bintang, Aceh Besar.


S U P P O R T I N G

I N F R A S T R U C T U R E

Airport, Status, Coordinate, Runway Length (M) By Regency/City in Aceh Coordinate No Airport

Status

X

Y

Runway Length (M)

International

95,4206

5,51709

3000 x 45

Regency/City

1

Sulatan Iskandar MudaAceh Besar

2

Maimun Saleh

Sabang

Domestic

95,333333

5,866667

1850 x 50

3

Lasikin

Simeulue

Domestic

96,3272

2,411134

1400 x 30

4

Kuala Batee

Southwest Aceh

Domestic

96,791934

3,733585

1200 x 23

5

Malikussaleh

North Aceh

Domestic

96,949212

5,228797

1850 x 30

6

Teuku Cut Ali

South Aceh

Domestic

97,286895

3,171154

1274 x 23

7

Cut Nyak Dhien

Nagan Raya

Domestic

96,251593

4,043574

1800 x 30

8

Alas Leuser

Southeast Aceh

Domestic

97,865688

3,388788

1650 x 29,6

9

Rembele

Bener Meriah

Domestic

96,852238

4,721057

2250 x 30

10 T. Hamzah Fanshuri

Aceh Singkil

Domestic

97,966778

2,270036

1200 x 23

11 Patiambang

Gayo Lues

Domestic

97,35857

3,946613

810 x 23

12 Lhoksukon

North Aceh

Domestic

97,260066

5,067552

1115 x 23

Domestic

98,02454

4,52994

800 x 23

13 Airstrip Kuala Langsa Langsa

Total Aircraft and Passenger in Aceh Airports Year

Lasikin

Hamzah Fansuri

T. Cut Ali

Alas Leuser

SIM

Malikussaleh

Kuala Batu

Blang Kejeren

Cut Nyak Dhien

Rembele

Maimun Saleh

Total

Aircraft

1.008

86

93

186

10.399

915

335

236

1.278

678

342

15.556

Passenger

39.049

92

468

1.714

1.176.977

54.449

2.535

1.099

38.289

31.043

10.734

608

-

-

14

6.032

606

37

76

700

406

-

8.479

23.638

-

-

113

657.603

31.940

223

314

22.715

14.021

-

750.567

Ricinan

2018

Aircraft Jan-Ags 2019 Passenger I A

A A

1.356.449

*SIM: Sultan Iskandar Muda International Airport

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

27


S U P P O R T I N G

I N F R A S T R U C T U R E

Seaport

The important role of ports in supporting the economy, industry, trade, social and defense, and security sectors, requires comprehensive and synergic regulatory instrument support as a guideline in carrying out government programs. It is expected that the existence of ports in Aceh will encourage the success of investment development, tourism development, and regional strategic programs, one of which is regional development and regional connectivity in the archipelago. 28

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Loading and unloading activities at Malahayati Port.


S U P P O R T I N G

I N F R A S T R U C T U R E

Aceh has ports in 11 regencies or cities which are ready to support investment activities, as connections and gateways of sea routes between countries, between regions, and between islands in Aceh.

Malahayati port.

Malahayati port.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

29


S U P P O R T I N G

I N F R A S T R U C T U R E

Aceh Seaport No Seaport

Regency/City

1

Sabang

2

Operator

X

Y

Sabang

95,322732

5,881373

BPKS

Malahayati

Banda Aceh

95,526176

5,598071

Pelindo

3

Susoh

Southwest Aceh

96,657856

3,746372

UPP Susoh

4

Tapaktuan

South Aceh

97,18088

3,253258

UPP Tapaktuan

5

Lhokseumawe

North Aceh

97,039462

5,241067

Pelindo I

6

Idi

East Aceh

97,777403

4,959494

UPP Idi

7

Kuala Langsa

Langsa

98,020772

4,524259

Pelindo I

8

Calang

Aceh Jaya

95,572209

4,631652

UPP Calang

9

Meulaboh

West Aceh

96,13184

4,127333

Pelindo I

10

Singkil

Aceh Singkil

97,81228

2,26884

UPP Singkil

11

Sinabang

Simeulue

96,372628

2,482398

UPP Sinabang

O

30

Coordinate

A

A

O

I n v e s t m e n t

A IO A

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Malahayati port.


S U P P O R T I N G

I N F R A S T R U C T U R E

Passenger Terminal Aceh Passenger Terminal

Ulee Lheue Passenger Terminal, Banda Aceh.

Coordinate

No Seaport

Regency/City

Operator

Linear/Tramper

1

Balohan

Sabang

95,347271

5,826857

UPTD Balohan Port

Balohan - Ulee Lheue

2

Ulee Lheue

Banda Aceh

95,2949

5,565373

UPTD Ulee Lheue Port

Ulee Lheue - balohan & Ulee Lheue - Lamteng

3

Kuala Bubon

West Aceh

96,03847

4,20956

UPTD Meulaboh Port

Kuala Bubon - Sinabang

4

Lamteng

Aceh Besar

95,159203

5,642306

Aceh Besar Lamteng - Ulee Lheue Transportation Agency

5

Labuhan Haji

South Aceh

97,00107

3,547861

UPTD Labuhan Haji Port

Labuhan Haji - Sinabang

6

Singkil

Aceh Singkil

97,812678

2,268774

UPTD Singkil Port

Singkil - Island Banyak & Singkil - Gunung Sitoli

7

Island Banyak

Aceh Singkil

97,230928

2,230607

UPTD Singkil Port

Ferriage Island Banyak - Singkil

8

Sinabang

Simeulue

96,403346

2,455425

UPTD Sinabang Port

Lintas Sinabang - Labuhan Haji & Lintas Sinabang - Singkil

O

A

A

O

X

Y

A IO A

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

31


S U P P O R T I N G

I N F R A S T R U C T U R E

Route of Crossing BALOHAN

Ulee Lheue - Balohan

16 Mil

LAMTENG ULEE LHEUE

Ulee Lheue - Lamteng

BANDA ACEH

12 Mil

ACEH BESAR

Sabang Pulo Aceh

Banda Aceh

Meulaboh

Aceh Jaya Banda Aceh

Southwest Aceh

Meulaboh - Sinabang

120 Mil

Labuhan Haji

South Aceh

Labuhan Haji - Sinabang

80 Mil

Simeulue Aceh Singkil

Sinabang

Singkil

Singkil - Sinabang

113 Mil

PULAU BANYAK

Singkil - Pulau Banyak

Singkil - Gn. Sitoli

33 Mil Gn. Sitoli

32

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

59 Mil

Passenger Terminal Ulee Lheue.


S U P P O R T I N G

I N F R A S T R U C T U R E

Ships, Goods, and Passengers at Ports in Aceh Ship (Unit)

Seaports

Goods (Ton)

Passenger (Person)

Domestic Ulee Lheue, Malahayati, Lhoknga

2.967

2.185.199

811.340

Balohan

2.343

79.977

703.654

Singkil dan Island Banyak

550

86.023

66.443

Sinabang

477

162.873

82.835

Krueng Geukueh

350

318.019

-

Meulaboh

261

1.135.253

20.819

Tapak Tuan

170

39.103

51.339

Calang

69

29.540

2.303

Susoh

33

9.573.747

-

Kuala Idi

20

-

-

Kuala Langsa

10

5.311

-

International

Passenger Terminal Ulee Lheue.

Balohan

98

1.550

26.653

Meulaboh

94

5.092.891

-

Krueng Geukueh

59

21.116

-

Ulee Lheue, Malahayati, Lhoknga

5

10.163

-

Kuala Langsa

4

3.128

-

O

A

A

O

A IO A

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

33


S U P P O R T I N G

I N F R A S T R U C T U R E

MALAHAYATI PORT OPERATIONS

Sabang

24 M il

Malahayati (Feeder) 25

M il

94.422 Ton

Lhokseumawe

7

I

8

i

l

35.340 Ton

27

2

unload

M

50

1.025.751 Ton

M

Belawan (Hub)

il

Export

779.460 Ton

Tapaktuan

Load

PERIOD JAN - AGUST 2019 7 A container ship with a capacity of 100 TEUs of 1800 GT 7 Long voyage 1 round voyage: 9 days SOURCE: ACEH TR ANSPORTATION AGENCY

34

I n v e s t m e n t

O p p o r t u n i t i e s

Malahayati Seaport, Aceh Besar

o f

A c e h

2 0 2 1


S U P P O R T I N G

I N F R A S T R U C T U R E

Malahayati Seaport, Aceh Besar

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

35


S U P P O R T I N G

I N F R A S T R U C T U R E

Internasional Seaport Based on the Regulation of the Minister of Trade Number 24 Year 2019

Krueng Geukueh

Kuala Langsa

Type of Imported Products

Type of Imported Products

Food & Beverage

Food & Beverage

Electronic

Electronic

Children toys

Apparel

Footwear

Textile Goods

SOURCE: ACEH TR ANSPORTATION AGENCY

Krueng Geukueh Seaport, North Aceh.

36

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

Sea Highway Route Network (T1), Pioneer Sea Transportation R1, Pioneer Sea Transportation R2

Sabang

DESCRIPTION:

3

Routes T-1, R-1, & R-2

Sinabang

R-1

Tanjung Priok - 997 - Lhokseumawe - 114 Malahayati - 24 - Sabang - 227 - Tapaktuan 875 - Tanjung Priok

Sinabang - 105 - Meulaboh - 105 - Sinabang 66 - Tapaktuan - 64 - Island Banyak - 33 Singkil - 33 - Island Banyak - 64 - Tapaktuan 66 - Sinabang

1

Tanjung Priok

Calang Meulaboh

1800 GT

KM.Sabuk Nusantara 74/2000 GT

4

2 0 2 1

Route Networks and Miles

Ship Name /Weight

1 6 2

A c e h

T-1

Lhokseumawe

2 13

Tapaktuan

8 4 3

Calang

R-2

Calang - 140 - Sinabang - 105 - Meulaboh 105 - Sinabang - 66 - Tapaktuan - 66 Sinabang - 140 - Calang

KM. Sambuk Nusantara 110/1200 GT

5

3

7

o f

2.

Tanjung Priok

SOURCE: ACEH TR ANSPORTATION AGENCY

4

Sinabang Singkil

SOURCE: ACEH TR ANSPORTATION AGENCY

P.Banyak

6 5

5

Tanjung Priok

O p p o r t u n i t i e s

1.

Base

Line R - 2

I n v e s t m e n t

No.

Route Code

Line T - 1 Line R - 1

2

Malahayati

I N F R A S T R U C T U R E

37


S U P P O R T I N G

I N F R A S T R U C T U R E

R-2 Pioneer Sea Transportation Production Data 100

To n

80 60 40 20 0 Calang - Sinabang

Sinabang - Meulaboh

Meulaboh - Sinabang

Sianbang - Tapaktuan

Tapaktuan - Sinabang

Number of Tracks Voyage-1

Voyage-2

Voyage-3

SOURCE: ACEH TR ANSPORTATION AGENCY

38

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Voyage-4

Voyage-5

Voyage-6

Voyage-7

Voyage-8

Voyage-9

Voyage-10

Sinabang - Calang


S U P P O R T I N G

I N F R A S T R U C T U R E

Station The station is one of the transportation nodes, which is absolutely necessary for an area transportation layout. There are 6 (Six) Freight Terminals in Aceh Province: No.

Station

Regency/City

1

Santan Station

Aceh Besar

2

Kandang Station

Lhokseumawe

3

Meulaboh Station

West Aceh

4

Sigli Station Type B

Pidie

5

Bireuen Station Type B

Bireuen

6

Bener Meriah Station

Bener Meriah

SOURCE: ACEH TR ANSPORTATION AGENCY

Santan Truck Station, Aceh Besar.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

39


S U P P O R T I N G

I N F R A S T R U C T U R E

Loading and unloading activities at the Santan Truck Station.

40

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

I N F R A S T R U C T U R E

Road Road infrastructure 2 and Cities in Aceh has well connected access across cities. The Aceh Government is committed to improving road facilities to support economic activity and investment in Aceh. Blang Bintang - Indrapuri Toll Road.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

41


S U P P O R T I N G

I N F R A S T R U C T U R E

Length of Road by Level of Government Authority, Type of Road Surface and Road Conditions (km) in Aceh Province, 2019 Level of Government Authority (Km) Regency/City

Road Conditions (Km)

State

Province

Regency/ City

Total

Paved

Gravel

Land

Total

Good

Averaged

Damaged

Badly

Simeulue

65

222

80

768

117

4

101

222

111

10

101

-

222

Aceh Singkil

68

92

395

555

56

1

35

92

58

2

33

-

92

South Aceh

168

77

981

1.226

22

27

27

77

39

0,40

37

-

77

Southeast Aceh

72

52

1.130

1.254

23

2

27

52

20

1

18

13

52

East Aceh

107

107

1.549

1.764

92

4

11

107

61

5

41

-

107

Aceh Tengah

197

145

801

1.144

128

5

12

145

138

1

6

-

145

West Aceh

56

146

682 w

885

144

2

-

146

141

3

2

-

146

Aceh Besar

185

171

1.279

1.635

119

20

33

171

120

11

24

16

171

Pidie

144

124

1.015

1.283

124

-

-

124

108

8

7

-

124

Bireuen

105

5

1.208

1.318

5

-

-

5

2

1

3

-

5

North Aceh

77

76

2.033

2.186

76

-

-

76

67

6

2

-

76

Southwest Aceh

64

31

749

844

20

-

-

20

21

1

9

-

31

Gayo Lues

124

152

840

1.115

131

11

-

141

135

8

9

-

152

Aceh Tamiang

42

44

968

1.054

18

21

10

49

26

2

17

-

45

Nagan Raya

180

48

924

1.152

48

16

-

64

45

-

1

-

46

Aceh Jaya

134

25

551

711

14

-

12

25

12

7

13

-

32

Bener Meriah

57

118

1.309

1.484

71

-

-

71

89

2

22

-

114

Pidie Jaya

38

23

521

582

13

27

20

60

20

0,21

1

-

21

Banda Aceh

34

23

707

764

23

-

10

33

22

0

-

-

23

Sabang

52

6

145

202

6

-

-

6

6

-

-

-

6

Langsa

29

21

611

661

3

-

18

21

21

-

-

-

21

Lhokseumawe

40

3

412

456

3

-

-

3

3

-

-

-

3

Subulussalam

63

73

474

610

29

5

39

73

32

3

17

20

73

2.102

1.782

19.766

23.650

1.282

145

355

1.782

1.297

72

363

49

1.781

2019 O

42

Type of Road Surface (Km)

A

O I

I n v e s t m e n t

I

I

A

O p p o r t u n i t i e s

A

A O

o f

A c e h

A I

I

2 0 2 1

Total


S U P P O R T I N G

I N F R A S T R U C T U R E

Central Route Aceh Tengah - Gayo Lues. I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

43


S U P P O R T I N G

I N F R A S T R U C T U R E

(Left) Toll Gate. (Right) Trans Sumatra Toll Road, Blang Bintang - Indrapuri Section.

44

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

I N F R A S T R U C T U R E

(Right) South West National Road. (Left) Provincial Road in Central Aceh.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

45


S U P P O R T I N G

I N F R A S T R U C T U R E

Two PLN electric Company technician installed electric cable.

46

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

Energy/Electricity

SIGLI

BP : 43.3 MW B ACEH

BP : 106.3 MW PLTD L BATA

of 514.74 MW, which will meet the electricity needs to support investment activities in Aceh.

SAMALANGA

BP : - MW

PLTD PP

22 MW

Aceh’s current electricity condition is in surplus with a total power of 641.7 MW and a peak load

I N F R A S T R U C T U R E

JANTHO

PLTMG ARUN (LNG) PLTMG ARUN 2 (LNG)

8 MW

184 MW

BP : 6.3 MW

BIREUN

ARUN

BP : 63.4 MW

PANTON LABU

BP : 18 MW IDIE

LHOKSEUMAWE

BP: 22.5 MW

19.8 BP : 51.2 MW

PLTD CTR

8 MW

ACEH JAYA

55 MW

KKA

LANGSA

20 MW

BP : 23 MW TUALANG CUT

TAKENGON

MEULABOH

BP : 23.1 MW

BP : 18.6 MW NAGAN RAYA BP : 21.9 MW

BP: 22.7 MW

PLTU MEULABOH 1,2

BLANGKEJEREN

2x110 MW

GI P BRANDAN (SUMUT) BLANGPIDIE

BP: 14.6 MW

KUTACANE

BP : 15 MW

GI BRASTAGI (SUMUT)

TAPAKTUAN KOTA FAJAR

GI SIDIKALANG (SUMUT) SUBULUSSALAM

BP : 11.7 MW

Power Kit 641,7 MW

Transfer SBU 184 MW

Total Capable Power 474,56 MW

Peak Load 514,74 MW

Reserved Supply 139,1 MW

SINABANG (ISOLATED)

150 kV transmission Substation SBU Interconnection Kit Isolated System SINGKIL

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

47


S U P P O R T I N G

I N F R A S T R U C T U R E

A

Year 2016

Group Tariff Social

Year 2017

Year 2018

Year 2019

201 % Cust Growth 2017

201 % Cust Growth 2018

% Cust Growth 2019

37.917

41.172

43.571

46.098

8,58

5,83

5,8

1.157.061

1.200.091

1.250.058

1.303.772

3,72

4,16

4,3

Business

89.364

104.186

117.040

126.489

16,59

12,34

8,07

Industry

2.213

2.669

3.012

3.236

20,61

12,85

7,44

Public

9.743

10.815

12.496

13.510

11

15,54

8,11

4

199

246

263

4.875

23,62

6,91

1.296.302 1.359.132

1.426.423

1.493.368

4,85

4,95

4,69

Households

Service Special/ Multifunction TOTAL O

48

201

I n v e s t m e n t

A

I A

O

A

O p p o r t u n i t i e s

Electric steam power plant, Nagan Raya.

IO A

o f

A c e h

2 0 2 1


S U P P O R T I N G

I N F R A S T R U C T U R E

(Above Left) The process of working Peusangan Hydropower plant. (Lower Left) Gas Engine Power Substation in Ladong, Aceh Besar. (right) Peusangan Hydropower plant tunnel, Bireuen.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

49


S U P P O R T I N G

I N F R A S T R U C T U R E

Group Tariff, Power Limit, Consumption and kVA Fees and Prepaid Electricity Reguler Group Tariff

Power Limit

Consumption Fee (IDR/kWh) & Cost kVA)

Prepaid (IDR/kWh)

R-1/TR

1,300 VA

1.467,28

1467,28

R-1/TR

2,200 VA

1.467,28

1467,28

R-2/TR

3,500 VA s.d 5,500 VA

1.467,28

1467,28

R-3/TR

6,500 VA ke atas

1.467,28

1467,28

B-2/TR

6,500 VA s.d 200 KVa

1.467,28

1467,28

Block WBP = K x 1,035.78 Block LWBP = 1,035.78 kVArh = 1,114.74 ****) Block WBP = K x 1,035.78 Block LWBP = 1,035.78 kVArh = 1,114.74 ****) Block WBP dan Block LWBP = 996.74 kVArh = 996.74 ****)

B-3/TM

above 200 KVa

I-3/TM

above 200 Kva

I-4/TT

30,000 Kva ke atas

P-1/TR

6,600 VA s.d 200 Kva

1476,28

P-2/TM

above 200 KVa

Block WBP = K x 1,035.78 Block LWBP = 1,035.78 kVArh = 1,114.74 ****)

P-3/TR

-

1.467,28

L/TR, TM, TT

-

1.644,52

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

-

1467,28

SOURCE : PT. PLN (PERSERO) 29 MARET 2018

50

-

2 0 2 1

1467,28

Peusangan hydropower development progress.

Note : Tariffs can change from time to time in accordance with the stipulations of the Minister of Energy and Mineral Resources WBP : Peak Load Time LWBP : Outside Peak Load Time Excess reactive power consumption (kVArh) charges are imposed in case the monthly ****) : Average power factor is less than 0.85 (eighty lia per liter)


S U P P O R T I N G

I N F R A S T R U C T U R E

Peusangan hydropower development progress.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

51


S U P P O R T I N G

I N F R A S T R U C T U R E

Clean Water Water is one of the main requirements in investment activities. Aceh already has 23 Regional Water Supply Companies (PDAMs) as a source of clean water that can be used to support investment activities. However, we still open opportunities for investment development in this sector.

Utilization of clean water at the A

52

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

I N F R A S T R U C T U R E

Krueng Aceh.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

53


S U P P O R T I N G

I N F R A S T R U C T U R E

Customer

Number of Customers, Tariffs, Production Volume, Distribution Volume, Sold Volume and Non-Revenue Water Regional Water Supply Companies (PDAM) by Regency/ City in Aceh, 2019.

SOURCE: REGIONAL MANAGEMENT OF THE ASSOCIATION OF INDONESIAN WATER SUPPLY COMPANIES (PERPAMSI) ACEH PROVINCE

54

I n v e s t m e n t

Production Distribution Volume Volume (m3) (m3)

Sold Volume (m3)

Regency/City

Regional Water Supply Companies (PDAMs)

Simeulue

PDAM Tirta Fulawan

40

2.957

105

1.788

4.890

6.500

514.053

508.900

344.055

164.845

Aceh Singkil

PDAM Tirta Singkil

44

3.766

159

1.072

5.041

1.800

1.645.488

1.445.904

914.686

531.218

South Aceh

PDAM Tirta Naga Tapaktuan

95

3.687

278

1.047

5.107

5.107

1.763.928

1.269.539

656.783

612.756

Southeast Aceh

PDAM Tirta Agara Kutacane

20

2.020

90

31

2.161

2.300

3.811.079

3.153.600

1.220.752

1.932.848

East Aceh

PDAM Tirta Peusada

241

11.328

1.312

316

13.197

3.000

3.665.175

3.501.383

2.420.138

1.245.037

Aceh Tengah

PDAM Tirta Tawar

51

6.209

1.605

2.432

10.297

2.500

1.796.446

1.796.446

1.458.076

338.370

West Aceh

PDAM Tirta Meulaboh

15

4.361

266

6.102

10.744

3.227

388.800

356.400

104.445

251.955

Aceh Besar

PDAM Tirta Mon Tala

310

29.430

3.885

3.970

37.595

4.206

13.669.034

12.627.208

9.293.139

3.334.069

Pidie

PDAM Tirta Mon Krueng Baro

72

7.273

894

1.195

9.434

3.600

2.343.686

2.146.756

1.310.793

835.963

Bireuen

PDAM Tirta Krueng Peusangan

441

20.544

2.210

1.718

24.913

2.000

7.724.105

7.003.853

4.785.938

2.217.915

North Aceh

PDAM Tirta Mon Pase

612

26.242

2.851

7.290

36.995

5.794

11.434.914

10.220.490

5.376.892

4.843.598

Southwest Aceh

PDAM Gunoeng Kila

5

1.308

1

1.251

2.565

4.000

625.320

625.320

15.279

610.041

Gayo Lues

PDAM Tirta Sejuk

45

5.280

205

753

6.283

1.000

3.689.712

3.374.352

1.025.723

2.663.989

Aceh Tamiang

PDAM Tirta Tamiang

209

15.229

1.699

473

17.610

4.195

6.328.949

5.939.430

3.772.491

2.166.939

Nagan Raya

PDAM Simpang Peut

-

-

-

-

-

-

-

-

-

-

Aceh Jaya

BLUD SPAM Tirta Mon Mata

89

6.376

186

2.549

9.200

1.609

1.509.222

1.026.562

1.026.562

482.660

Bener Meriah

PDAM Tirta Beungi

45

4.563

26

126

4.760

2.643

2.410.560

2.410.560

1.111.910

1.298.650

Pidie Jaya

PDAM Tirta Krueng Meureudu

100

6.502

444

391

7.437

3.055

2.091.888

2.049.840

1.014.169

1.077.719

Banda Aceh

PDAM Tirta Daroy

431

40.360

9.204

12.415

62.410

4.758

23.537.332

22.935.283

14.434.227

8.501.056

Sabang

PDAM Tirta Aneuk Laot

45

5.919

643

233

6.840

3.660

2.990.938

2.770.134

1.978.568

791.566

Langsa

PDAM Tirta Keumeuneng

147

13.069

1.435

2.882

17.533

3.666

5.570.005

5.295.376

3.183.489

2.386.516

Lhokseumawe

PDAM Ie Sare Beurata

18

1.832

11

-

1.861

3.588

271.825

271.825

238.927

32.898

Subulussalam

PDAM Kota Subulussalam

16

1.384

2

25

1.427

500

738.720

320.779

274.958

463.762

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Social

Large Rumah Commerce Tangga / Industry / Port

NonTotal Active Customer

Tariff (Rp)

Non Revenue Water (NRW) (m3)


S U P P O R T I N G

I N F R A S T R U

C T U R E

Water Supply Pipeline Development 1. The water supply pipeline system is developed to meet basic needs of the community, industry and other business activities for drinking water; 2. Increasing the water supply production capacity by: a. addition of existing pipeline; and b. increase the capacity of existing installations. 3. Development of the water supply pipeline system is carried out through: a. installation of new distribution pipelines; and b. construction of a new drinking water treatment plant.

Water reservoir for Tirta Daroy Water Company.

4. Development of a water supply pipeline system can be built by a regional system including:

Banda Aceh - Aceh Besar; Lhokseumawe - North Aceh, Langsa - East Aceh, and between other regencies / cities.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

55


S U P P O R T I N G

I N F R A S T R U C T U R E

Banking and Financial I Banking has an important role in investment activities. Aceh already has both state-owned and private banks, as well as regional governmentowned banks that will facilitate investment activities and are likely to be your partners in developing investment in Aceh.

BRI Branch Banda Aceh.

56

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

Banking and Financial Institutions in Banda Aceh

With the Financial Services Authority O

In Aceh there are 31 banks and financial institutions that can bridge your business transactions, see the attachment for bank names below:

and. Able protect the interests of

Indonesian Bank (IB) Aceh Province Representative Office

Bank Central Asia (BCA) Syariah

Bank BII (Maybank)

Bank Swamitra

Bank Mandiri

Bank Aceh Syariah

Bank Permata

BPR Mustaqim

Bank Mandiri Syariah

Bank Tabungan Negara (BTN)

Bank Permata Syariah

PRS Hikmah Wakilah

Bank Negara Indonesia (BNI)

Bank Tabungan Negara (BTN) Syariah

Bank Mega Syariah

LKMS Mahirah Muamalah

Bank Negra Indonesia (BNI) Syariah

Bank Tabungan Pensiun Negara (BTPN)

Bank Panin

BPR Berlian

Bank Rakyat Indonesia (BRI)

Bank Muamalat

Bank Pundi

Jamkrindo Kanca Aceh

Bank Rakyat Indonesia (BRI) Syariah

Bank Bukopin

Bank CIMB Niaga

Ulamm (Lembaga Keuangan)

Bank Central Asia (BCA)

Bank Danamon

Bank Sinarmas

I N F R A S T R U C T U R E

Indonesian Bank, Banda Aceh.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

57


S U P P O R T I N G

I N F R A S T R U C T U R E

Indonesian Bank, Banda Aceh.

58

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


S U P P O R T I N G

Hotels

I N F R A S T R U C T U R E

Total of Accommodations, Available Rooms and Beds in Classified Hotel by Regency/Municipality in Aceh Province, 2017 – 2019 Stars Hotel

Aceh’s hotel sector is supported by national and international connection level, such as the Bencoolen and Kyriad .

Hotel Hermes Palace.

Aceh already has hotels from 5 stars to non-budget in 23 regencies/cities along with the focus of the Aceh Government in developing the tourism sector, additional hotels are needed. Therefore, Aceh is still highly open to the opportunity of developing hotels, MICE, condominiums, and other accommodations.

Non-budget and other accommodations

Regency/City

Accommodation

Rooms

Beds

Accommodation

Rooms

Beds

Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah West Aceh Aceh Besar Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017

1 1 1 1 2 13 1 2 1 23 25 18

25 75 36 60 125 1.294 64 120 87 1.886 1.965 1.457

35 135 59 114 212 2.323 106 238 125 3.347 3.328 2.444

20 23 10 15 6 26 16 13 12 8 1 11 8 7 2 4 3 4 67 137 12 16 7 428 434 319

321 266 198 233 89 440 324 197 199 347 11 143 169 133 52 70 28 48 1.700 1.113 277 423 115 6.896 7.020 6.644

481 467 392 352 172 723 546 309 366 569 19 260 293 240 92 133 36 86 3.024 1.443 498 748 215 11.464 11.631 11.176

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

59


S U P P O R T I N G

I N F R A S T R U C T U R E

Swimming Pool Hermes Palace Hotel.

60

I n v e s t m e n t

O p p o r t u n i t i e s

Hermes Palace Hotel, Banda Aceh.

o f

A c e h

2 0 2 1

Receptionist at Hermes Palace Hotel.


S U P P O R T I N G

I N F R A S T R U C T U R E

Hotel In Banda Aceh And Surrounding Areas Budget Hotel/Non

Hermes Palace Hotel.

88 Hotel Atjeh

Arabia Hotel

Al Fatih Hotel

Afaris House

Ayani Hotel

Daka Hotel

Kuala Radja Hotel

Grand Arabia Hotel

Diana Hotel

Mars Hotel

Grand Nanggroe Hotel

Grand Lambhuk Hotel

Siwah Hotel

Grand Permata Hati

Hip Hop Hotel

Kriyad Muraya Hotel

Hotel 61

Oasis Atjeh Hotel

Lading Hotel

Kumala Hotel

Sei Hotel

Madinah Hotel

Mekkah Hotel

Sulthan Hotel International

Oyo 1630 Hotel Ring Road

Medan Hotel

The Pade Hotel

Oyo 884 Rumoh PMI Hotel

Hermes Palace Hotel

Oyo 1845 GM Inn Hotel Oyo 854 UB Caisar Hotel Poma Hotel Prapat Hotel Rasamala Hotel Seventeen Hotel Thayyiba Hotel Kyriad Muraya Hotel.

Ayani Hotel.

Wisata Hotel

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

61


S U P P O R T I N G

I N F R A S T R U C T U R E

Hospitals in Aceh

General Hospital

Special Hospital

Simeulue

1

-

Aceh Singkil

1

-

South Aceh

1

-

Southeast Aceh

2

-

East Aceh

3

-

Aceh Tengah

2

-

West Aceh

4

-

Aceh Besar

2

-

Pidie

5

-

Bireuen

6

-

North Aceh

2

-

Southwest Aceh

1

-

Gayo Lues

1

-

Aceh Tamiang

2

-

Nagan Raya

1

-

Aceh Jaya

1

-

Bener Meriah

2

-

Pidie Jaya

1

-

Banda Aceh

11

2

Aceh has hospitals in all

Sabang

2

-

regencies / cities, but the

Langsa

4

-

construction of new hospitals is

Lhokseumawe

10

-

still widely open to be developed,

Subulussalam

1

-

especially international hospitals

2019

66

2

that provide complete and up-to-

2018

55

12

date services.

2017

-

-

Regency/City

Jumlah rumah sakit umum & rumah sakit khusus menurut Regency/City di Aceh, 2019

Hospitals are a complete health service facility for individuals. The availability of hospitals is extremely needed to provide health insurance for all entities, both the general public and workers in various investment sectors.

O

62

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

A

I

I

A

A

A O

A I

I

Meuraxa General Hospital.

Cardiat Hybrid Operating Suite


S U P P O R T I N G

I N F R A S T R U C T U R E

Aceh Government Mental Hospital, Banda Aceh.

Zainal Abidin General Hospital, Banda Aceh.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

63


S U P P O R T I N G

I N F R A S T R U C T U R E

Telecommunication Cellular and Internet Network Provider in Aceh

Telecommunication is a technology network which is needed in the development of investment activities. The presence of telecommunications will accelerate all processes

Download Speed : 4G

data transmission accurately and efficiently. Aceh has several telecommunications providers ready to support investment activities. I

64

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Download Speed: Overall

Download Speed: 4G

Latency


S U P P O R T I N G

Telkom Tower, Sinbun Sibreh, Banda Aceh.

I N F R A S T R U C T U R E

Telkom tower, Takengon, Aceh Tengah.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

65


4 Potential Sectors 66

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Iboih, Sabang.


4

I the keys to enhancing the economic A focusing in four major 1 A 2 I

Energy & Infrastructure

Agro-industry

Tourism Development

P O T E N T I A L

S E C T O R S

Aceh Investment Development Zones These four sectors have a strong foundation to be developed. Coffee, Patchouli, Cacao, Coconut, and Palm Oil are main commodities of Aceh. Furthermore, the fishery is also a potential investment to be explored in Aceh.

A I Development Zones.

In accelerating the realization of investment as well as improving the investment climate, we are striving to facilitates licensing service accordance with the procedure, improving infrastructure and security. Therefore, Aceh will be perfect for your future investment. Visit to the Embassy of the United Arab Emirates.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

67


Energy & Infrastructure Indrapuri Toll Gate

68

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


Testimony

Testimony

I Businesspersons in Aceh

In accordance with Presidential Regulation

The people from North Sumatra Province will easily

No. 117 of 2015, currently PT. Hutama

access tourism located in Banda Aceh, so that it will

Karya (Persero) is in charge to costruct

affect Aceh’s community income. In addition, through

the Trans Sumatra Toll Road (JTTS) along

this freeway, the level of comfort and safety can be felt

± 2,765 Km which is integrated from

by toll road users and reduce the crime rate in national

Lampung Province to Aceh Province.

roads. Hutama Karya is grateful for the support that has been given by the Regional

The existence of Trans Sumatra Toll Road is expected to improve accessibility

Government and the people of Aceh, especially in the

between regions, to facilitate logistics and

process of providing land so that the construction of

to boost the economy of Sumatra Island.

the Sigli - Banda Aceh Toll Road can be carried out

The existence of the Trans Sumatra Toll

smoothly.

Road, especially in Aceh Province (Sigli -

Indrapuri IC, Sigli - Banda Aceh Toll Road

Banda Aceh Toll) will be able to drive the

Budi Harto

tourism sector.

Director of PT Hutama Karya (Persero)

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

69


E N E R G Y

&

I N F R A S T R U C T U R E

Infrastructure Trans Sumatra Toll Road Development Project Progress of the Implementation of the Cross - Sigli Banda Aceh and Langsa Binjai Toll Roads The Trans Sumatra Toll Road (JTTS) for the Sigli

section of Indrapuri - Blang Bintang has been fully

- Banda Aceh Section has a total length of 74 Km,

operational since it was inaugurated by President

with an estimated investment value of Rp. 12,354

Joko Widodo on August 25, 2020.

Trillion. The Sigli - Banda Aceh Toll Section has 6 (six)

Banda Aceh - Sigli Toll Road.

70

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Interchange (IC) or Simpang Susun (SS) sections and

The Trans Sumatra Toll Road (JTTS) Binjai - Langsa

is equipped with 6 (six) toll sections namely section

Section has a total length of 131 Km, with an

1 Sigli - Seulimun (25 Km), section 2 Seulimun -

estimated investment value of Rp. 23,354 Trillion.

Jantho (6 Km)), section 3 Jantho - Indrapuri (16

The Binjai - Langsa section has 5 (five) Interchange

Km), section 4 Indrapuri - Blang Bintang (14 Km),

(IC) or Simpang Susun (SS) sections. Until now, the

section 5 Blang Bintang - Kuto Baro (8 Km) and

development progress is in the Binjai - Pangkalan

section 6 Kuto - Baro - Baitussalam (5 Km). Until

Brandan section (58 km) with construction progress

now, development progress has reached 61%

reaching 16%. Langsa - Lhokseumawe Toll Road

construction and 76% land acquisition. The 14 km

Langsa - Lhokseumawe Toll Road Map.


E N E R G Y

&

I N F R A S T R U C T U R E

Langsa - Lhokseumawe Toll Road Technical Data Location of construction: South Sumatra and Jambi Provinces Main road length Design Speed

: 134,888 Km

: 100 Km/Hour

Number of Lines: Initial Stage Final Stage Median Type Max Slope Max Super elevation

:2

x 2 Lanes : 2 x 3 Lanes : Double Median Concrete Barrier : 3% : 8%

Pavement Type: Main road Access Langsa - Lhokseumawe Toll Road Map

Cross

Rest Area Location

The width of the road: Road width Outer Shoulder Width

Crossings

Rest Area Type A : Sta. 95+900 (1 pair) Next to Access Road Idi Rayeuk (1 piece)

: 3,6 m

: 3,0 m

No Description

Total

1

Underbridge (River Bridge)

16

2

Overpass

17

3

Overpass Simpang Susun

2

4

Box Underpass Simpang Susun

1

Interchange Location

4

Box Underpass

99

IC Idi Rayeuk (Sta.

: ± 3,7 km

5

Underpass (Traffic Bridges, Utilities and Railways)

15

: ± 2,73 km

6

Box Culvert

Inner Shoulder Width

: 1,5 m

Rest Area Type B : Sta. 28+700 (1 pair)

Median Width : 5,5 m (Including Shoulder Inside) Widening Direction

: Outward

* Data is still in the process of calculation and study, there may be changes

48+856) IC Lhoksukon (Sta. 102+225) IC Lhokseumawe (Sta. 134+412)

: ± 1,65 km

405

: Rigid

Pavement : Rigid Pavement : Flexible Pavement

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

71


E N E R G Y

&

I N F R A S T R U C T U R E

Technical Data Lhokseumawe – Sigli Toll Road

Lhokseumawe - Sigli Toll Road Map.

Illustration

72

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E N E R G Y

Toll Road Technical Data

Total Rest Area

Location of construction : Aceh Main road length Speed Design

Province : 157 Km : 100 Km/Hour

Final Stage Median Type Max Slope Max Super elevation

IC Bireuen

:2

x 2 Lanes : 2 x 3 Lanes : Double Median Concrete Barrier : 3% : 8%

Access Cross

Lhokseumawe – Sigli Toll Road Maps

: Rigid

Pairs

Interchange Location IC Meuredue IC Lamlo

: Sta.

46+000 : Sta. 105+300 : Sta. 143+000

Location of Rest Area

Pavement Type: Main road

I N F R A S T R U C T U R E

* Data data masih dalam proses perhitungan dan kajian, dimungkinkan adanya perubahan

Number of Lines: Initial Stage

:4

&

Pavement : Rigid Pavement : Flexible Pavement

Rest Area Type A (6 Ha) : Sta 1+000 (1 pair) Sta. 41+000 (1 pair) Sta. 81+000 (1 pair) Sta. 121+000 (1 pair)

The width of the road: Road width Outer Shoulder Width Inner Shoulder Width Median Width (Including Shoulder Inside)

Widening Direction Total Interchange

: 3,6

m : 3,0 m : 1,5 m : 5,5 m : Outward :3

Pieces

Illustration

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

73


E N E R G Y

&

I N F R A S T R U C T U R E

Financial Data Langsa – Lhokseumawe (134,8 Km)

Lhokseumawe – Sigli (157 Km) : Rp 27.725

Investment

: 0,41%

IRR

: Rp

NPV

M

: Rp 23.681

Investment

: 2,01%

IRR

-22.668 M

M

: Rp -18.216 M

NPV

Concession Period: 40 Years (2022 – 2062) Project Financial Structure: 1. Debt 2. Equity (PMN) * Data is still in the process of calculation and study, there may be changes

Lhokseumawe – Sigli Development Plan (Km) 2021 2022 22

40

Langsa – Lhokseumawa Development Plan (Km) 2023 2024 56

2021 2022

39

34

SOURCE: PT. HUTAMA K ARYA

74

I n v e s t m e n t

SOURCE: PT. HUTAMA K ARYA

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

40

2023 2024 40

21

Illustration


E N E R G Y

&

I N F R A S T R U C T U R E

Urban Railways Development Why Are Urban Railways Necessary?

URBANIZATION: The existence of trains and station nodes has become the center of new economic activities for the society around Banda Aceh City.

will result in congestion in urban areas. The V/C ratio in 2021 shows a value of >0.85 on several roads in the City of Banda Aceh and will expand in the following years (Hendra, 2017). THE INCREASING USE OF FUEL: The rapid growth of vehicles has not been controlled.

Decree of the Minister of Transportation of the Republic of Indonesia Number Kp 2128 of 2018 concerning the National Railway Master Plan

City of Banda Aceh as PKN

Qanun No. 19/2013

Banda Aceh City as PKN

The Inter-City Railway Network is Developed to Connect: PKN with centers of activities in neighbor countries; between PKN;

cities of Banda Aceh, Medan, Pekan Baru, Padang, Palembang,

The Urban Railway Network is Developed to:

Governor Regulation Number 58 of 2014 concerning Aceh Railway Master Plan.

hexafluoride in the atmosphere.

PP No. 13/2017

Banda Aceh City as PKW

PKW with PKN or between PKW

temperature of the earth’s surface is the result

hydrofluorocarbons, perfluorocarbons, and sulfur

Presidential Regulation No. 13/2012

The development of urban railway and its services include the Bandar Lampung and Batam.

such as; carbon dioxide, methane, nitrous oxide,

Illustration

Regulation Support:

GLOBAL WARMING: The increase in average of the increase of greenhouse gas emissions,

Presidential Regulation No. 13 Regarding Amendments to PP. NO. 26 of 2008 concerning Spatial Layout (RTRWN)

URBAN CHALLENGES: The inability of road capacity to keep up with the growth of vehicles

Direction of Spatial Policy

In addition to the intercity railways service, an urban railway network will also be built in the city of Banda Aceh along 52

Menghubungkan Kawasan perkotaan dengan bandar udara Mendukung aksesibilitas Kawasan perkotaaan PRESIDENTIAL REGULATION NUMBER 13 Year 2012 Regarding the Spatial Plan for the Sumatra Island

km in order to anticipate the increase of congested traffic

Aceh Qanun No. 19 of 2013 concerning the 2013-2033 Aceh

TRAFFIC ACCIDENTS: Total Accidents in Banda Aceh

movement in the city of Banda Aceh. The railway line connects

Regional Spatial Plan

City and Aceh Besar were 211 in 2018 and 257 in 2019.

the Banda Aceh city with SIM Airport.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

75


E N E R G Y

&

I N F R A S T R U C T U R E

POTENCY

No

Total Population

Sub-District

2015

2016

2017

2018

2020

2025

2030

2035

2040

BANDA ACEH CITY 1

Jaya Baru

24561

25012

25503

26013

27075

29922

35823

36547

40391

2

Banda Raya

23034

23459

23919

24398

25394

28064

33599

34278

37883

Demographics of Greater

3

Baiturrahman

35363

36013

36721

37455

38984

43084

51580

52622

58157

Banda Aceh

4

Lueng Bata

24660

25114

25607

26119

27185

30044

35969

36696

40555

5

Kuta Alam

49706

50618

51614

52645

54793

60556

72499

73963

81742

6

Kuta Raja

12872

13107

13365

13632

14188

15681

18773

19152

21167

7

Syiah Kuala

35817

36477

37193

37938

39486

43639

52245

53301

58907

8

Meuraxa

19040

19388

19770

20166

20989

23196

27771

28332

31312

9

Ulee Kareng

25250

25716

26221

26745

27836

30764

36831

37575

41527

10

Kuta Cot Gile

13783

14075

14363

14651

15249

16853

20176

20584

22749

25767

28477

34094

34782

38440

28007

30953

37057

37806

41782

13350

14755

17664

18021

19917

Population growth from 20152018 reached 25% However, it is predicted that population growth in 2040 is estimated to increase and reach 55.2% of the total population in 2018.

ACEH BESAR REGENCY 11

Mesjid Raya

23290

23785

24271

24757

12

Darussalam

25316

25853

26384

26909

13

12067

31983

12575

12827

15782

16116

16445

16774

17459

19295

23100

23567

26045

15

Blang Bintang Krueng Barona Jaya Peukan Bada

17422

17792

18156

18520

19276

21303

25504

26020

28756

16

Lhoknga

16552

16904

17250

17596

18314

20240

24232

24721

27321

17

Darul Imarah

52073

53177

54264

55350

57609

63668

76224

77764

85942

18

Darul Kamal

7553

7713

7870

8028

8356

9234

11056

11279

12465

19

Ingin Jaya

31318

12232

32637

33290

34649

38293

45845

46771

51690

Total

465459

474534

484128

493813

513966

568021

680042

693781

766748

14

O

76

I n v e s t m e n t

P R O J E C T I O N

O p p o r t u n i t i e s

A

o f

AI

A c e h

A

I

2 0 2 1

A I A

I

O A

O I

A

O

I

Simpang lima, Banda Aceh.


E N E R G Y

&

I N F R A S T R U C T U R E

Vehicle Ownership The number of private vehicle ownership from

This indicates that as the economy develops

2014 to 2018 has increased every year, with

and income levels increase, the level of vehicle

an average increase of 3.86% per year. While

ownership will also increase. The increase

in 2018, the number of private vehicles owned

in vehicle ownership has a drastic impact on

increased by 16.33% from 2014.

increasing traffic volume, causing traffic jams.

Total Private Vehicle Ownership 227193

232455

3%

220019

2% 0%

212108 199829

13% 29%

2014

2015

2016

2017

A

I A

IA

A A

A

Private car Walking / Bicycle

53%

Becak Trans Kutaraja Online Transportation

2018

Private vehicle ownership in 2018 is increased 3% from previous year.

O

Motorcycle

Figure of Transportation used in Aceh- Source: Consultant Survey Results

201

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

77


E N E R G Y

&

I N F R A S T R U C T U R E

Transportation (Travel Transport Mode) Motorcycles and private cars are the most common

The average percentage of domestic and international

transportation which are used for travel. It is

passengers in Sultan Iskandar Mud International Airport and

accounted that approximately 53% of respondents

Ulee Lheue Seaport have increased respectively by 7% for

use motorcycles and 29% use private cars.

domestic passengers and 2% for international passengers,

Meanwhile, only 18% of public transportation such as

and 13% for port passengers. This is strongly influenced by the

Trans Koetaradja, becak, and online transportation are

Government policies and the programs: improving the tourism

used by the society. The existence of urban railways is

sector in Banda Aceh and Sabang City by holding international

expected to increase the use of public transportation

and national events, and maintaining and developing

and decrease traffic jams.

infrastructure and service networks in the transportation sector.

Total Passenger of Sultan Iskandar Muda Airport Total Domestic Passenger (2010-2018)

991330 1012543

Total International Passenger (2010-2018)

805442 547147

565646 609494

661780

210521 256654 163045

577143 612109

79892

91860

88927

96388

105007 129985

Ulee Lheue Passenger Terminal.

2010 2011 2012 2013 2014 2015 2016 2017 2018 The percentage growth of domestic passenger in Sultan Iskandar Muda Airport is 7%.

78

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2010 2011 2012 2013 2014 2015 2016 2017 2018 The percentage growth of international passengers at Sultan Iskandar Muda Airport is 2%.

2 0 2 1


E N E R G Y

&

I N F R A S T R U C T U R E

The average percentage growth of Ulee Lheue 1 11 0 201

Total Passenger of Ulee Lheue Port 468818 418897 377442 312807 140175

129205

103354 61349

2015

2015

Kapal Cepat O

A

A

2015

2015

Kapal Lambat O

A IO A

201

Ulee Lheue Passenger Terminal.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

79


80 O

I n v e s t m e n t O I A AI

O p p o r t u n i t i e s A

o f O I A

A c e h 2 0 2 1 I

.S

Sp

ba ya -

ura

-S

pe

ng

ta

Ba

rab ay a

Su .L ue

p.

ra

-K ot a bo ta

m

Ja

Sp

ta

Ba

p.

-S

pe

es

M

O O I A AI A I A O I A I O O I A AI A

Sp

O I A I

ng

.L ue

Sp

ta

Ba

rab ay a

Su

0

ba ya -

0

p.

0

ura

500

e

500

-S

500

ta p

1000

ta

1000

bo

Ko ta

ra

1500

Ba

am

.J

Sp

e-

es

M

1500

.S

ng

.L ue

Sp

I A

Ko ta -

ta p

p.

Ko ta

ay a

ra b ra -

es -S bo

am

.J

Sp

Ko ta

.M

Sp

Su

2000 8433

p.

2000

7828

Ko ta

2500

7202

-S

2500 11411

ay a-

2500

10478

Ko ta

Traffic Flow at Daily Hours (smp)

17284

ur ab

Traffic Flow at Peak Hour (Afternoon) 19626

.S

Traffic Flow at Peak Hour (Morning) 21363

Sp

ur ab ay aKo Ko ta -S ta p. Su ra ba Sp ya .M es ra -K Ko ot ta a -S Sp p. .J M am es ra bo t a Ko pe ta -K -S ot p. a Sp Ja .L m ue bo ng ta Ba pe ta Sp -S .S p. Su ura rab ba ya ay a -S p. Lu en gB ata

.S

ng

.L ue

Sp

I A

Sp

Ko ta

p.

-S

Ko ta

ay a

Ko ta

ra b

ra -

es

Su

bo ta

am

.J

Sp

Ko ta

.M

Sp

p.

-S

ay a-

&

Ko ta

ur ab

.S

Sp

E N E R G Y I N F R A S T R U C T U R E

The requirement analysis

Characteristics of Traffic

2000

1500

1000


E N E R G Y

Trip Purpose 3000 2110

1914

2000

2113

1555

2586

Ulee Lheue Ferry Port

1092

1000 37

121

73

461

8

Tsunami Museum

et oW or W k or kt oH om Ho e m et oS ch Sc oo ho l ol to Ho m Ho e m et oO th Ot er he rt oH om W e or k to W or W k or k to Ot he Ot t he rt oW or Ot k he rt oO th er

0

Baiturrahman Great Mosque

Ho m

Graph of distribution based on the purpose of trip O

O

I

I

O

A

AA

O

I

A 201

A

O

A IO

15

Polda Aceh

5

3

Baiturrahim Mosque

49

6

2

RSUDZA

Syiah Kuala University

10

9 Abulyatama University

7 4 14

DESCRIPTION: 1 = Leung Bata 2 = Baiturrahman 3 = Kuta Raja 4 = Banda Aceh 5 = Syiah Kuala 6 = Kuta Alam 7 = Jaya Baru 8 = Meuraxa 9 = Ulee Kareng 10 = Darussalam 11 = Blang Bintang 12 = Krueng Barona Jaya 13 = Lambaro 14 = Mata Ie 15 = Lhoeknga 16 = Krueng Raya 17 = Lampenerut

UIN Arraniry

Aceh KODAM Governor's Office Iskandar Muda

Simpang 7 Ulee Kareng

13

Batoh Bus Terminal

17

1

Simpang Lambaro

I N F R A S T R U C T U R E

DESIRE LINE TO BANDA ACEH CITY CENTER

16

Travel Destination Graph

&

Bandara Sultan Iskandar Muda

12

Source: FS urban railways in Aceh Province and its surroundings

NEEDS

ANALYSIS (2)

11

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

81


E N E R G Y

&

I N F R A S T R U C T U R E

Spatial Pattern Analysis Sub-District Type of Allocation of Space Transverse Blang Bintang

Airport Area, Urban Settlements, Agricultural Wetland

Ingin Jaya

Urban Settlements, Agricultural Wetland

Lueng Bata

Trade and Service Area, Office Area, Residential Area

Baiturrahman

Trade and Service Area, Office Area, Cultural Heritage Area, Green Open Space

Meuraxa

Trading Area, Residential Area, River Side, Port Area

Based on the results of the spatial overlay pattern

mostly in the spatial design of trade and service areas and residential areas

82

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E N E R G Y

&

I N F R A S T R U C T U R E

Potential Railway Line Plans

M E S J I D R AYA

BAITUSSALAM

DARUSSALAM SYIAH KUALA

K U TA R A J A K U TA A L A M

A

C MEURAXA ULEE KARENG K R U E N G B A R O N A J AYA BAITURRAHMAN

B

K OTA B A R O

L U E N G B ATA J AYA B A R U

PEUKANBADA

Line Plan

Length (Km)

Route

Line A

16,86

SIM Airport-Modal Bangsa-Bakoi-Pagar air-Lueng Bata-Grand Mosque-Lampaseh-Ulee Lheue Port

Line B

20,70

Krueng Cut-Darussalam-Bakoi-Pasar Lambaro-Wali Nanggroe-Sp. Lampeuneurut-Keutapang-City Centre

Line C

11,93

Lam Ujong-Sp. Mesra- Government Office Center -City Center

B A N D A R AYA

DARUL IMARAH

I N G I N J AYA

B

BLANG B I N TA N G

A

LHOKNGA DARULKAMAL

S I M PA N G T I G A

SUKAMAKMUR

M O N TA S I K

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

83


E N E R G Y

&

I N F R A S T R U C T U R E

Potential Hinterland Surround Line A Line

SYIAH KUALA

STASIUN 7 (ULEE LHEUE) BAITUSSALAM

Sub-District

Station Location

Potential Area

Blang Bintang

SIM Airport Station and Lambaro Station

International Airport Area, Trade and Service, Education, Religious Buildings, Residential Area

Ingin Jaya

Bakoi Station and Pagar Air Station

Tagelan/planted area and irigation area

Lueng Bata Station

Residential area, Trade and Service, Education, Religious Buildings, Offices, PLTD, Sport Field, Transportation

Masjid Raya Station

Residential area, Trade and Service, Education, Religious Buildings, Offices, PLTD, Sport Field, Transportation, Defense / Military, Museums, Health, Markets

Ulee Lheue Station

Residential area, Trade and Service, Education, Religious Buildings, Offices, PLTD, Sport Field, Health, Cultural Heritage, Green Spaces

STASIUN 4 (PAGAR AIR) DARUSSALAM STASIUN 1 (BANDARA SIM) K U TA R A J A K U TA A L A M

A A

STASIUN 3 (LAMBARO) MEURAXA ULEE KARENG BAITURRAHMAN

PEUKANBADA

KRUENG BARONA J AYA

K OTA B A R O

Lueng Bata

L U E N G B ATA

J AYA B A R U

Line A

A

STASIUN 6 (MASJID RAYA) I N G I N J AYA DARULIMARAH

Baiturrahman

B L A N G B I N TA N G

STASIUN 5 (LEUNGBATA)

Meuraxa

STASIUN 2 (MODAL BANGSA)

LHOKNGA

DARULKAMAL

S UKAMAKMUR

M O N TA S I K

K U TA M A L A K A

84

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E N E R G Y

The location of the railway line (line A) is selected by considering the optimization of land use, the potential for area development and the projection of passenger movements in the hinterland around the railway line.

Residential (M2)

Ricefield (M2)

As for the location of stations, apart from

Station 1

-

20.000

Station 2

8.054

11.946

Station 3

6.916

13.084

Station 4

4.730

15.270

Station 5

10.492

9.508

Station 6

7.200

account the need for local and international travel connectivity such as airports, ports, terminals and Trans Koetaradja Buses.

Line A Plan (Length 16,86 Km

International transportation type; SIM and Ulee Lheue Port Through development areas Connecting the activity center in Banda Aceh City and Aceh Besar Regency Catchment area is relatively further than sea area

12.800

Station 7

20.000

Depo

35.000

Railway Track Line Corridor

I N F R A S T R U C T U R E

Land Along a Street Railway Plan Line Utilization

considering the railway line, it also takes into

&

Total Description:

46276

98.625

83.668

236.233

Ulee Lheue Station

SIM Airport Station Modal Bangsa Station Lambaro Station Pagar Air Station Leung Bata Station Grand Mosque Station Ulee Lheue Station

Leung Bata Station

Pagar Air Station I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

85


E N E R G Y

&

I N F R A S T R U C T U R E

Estimation Cost of Monorail Construction

Cost of monorail construction in Line A with railway length is 16,86 Km and estimated to reach 5,78 Trillion (381.000.000 USD). The and reaches Rp. 16,97 Trillion (1.113.304.892 USD).

86

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Total trips in corridor line of railway planned in 2027:

17,170 (Peak Hour) 171,700 (Daily) + 30% SIM Airport Passengers + 30% Ulee Lheue Port

Railway Length

Cost

Travel Time

No

Line Plan

Km

Rp (Million)

Minutes

1

Line A

16,86

5.781.760

25

2025 – 2035 = 5.0%

2

Line B

20,70

7.098.602

31

2030 – 2040 = 4.5%

3

Line C

11,93

4.091.127

17

2040 – 2050 = 4.0%

Total

49,49

16.971.489

73

2050 – 2060 = 3.5%

The calculation cost for line B and C is done by rough count method based on assumption calculation component cost in line A. Illustration

Expected Total Passengers in Line A

Passengers

Passenger Trip Growth:

Percentage of TRAIN used = 10% In 2027 And Increase 0.5% Every Year, 30% By 2067


E N E R G Y

Railway Financial Components

The Cost of Passenger PSGR/DAY

2027

2032

2037

2042

2047

2052

17,170

27,392

41,951

60,992

86,865

118,896 160,727 209,983 258,485

2057

2062

2066

No

7

10

15

22

30

40

52

65

HEADWAY

9

6

4

3

2

1

1

1

Rp.Million/ km

Description

A

The Number 4 Of Trains 14

I N F R A S T R U C T U R E

I 10 00

A

YEARS

&

Rp. Million

CAPEX

5.781.760

1

Land Use

1.313.860

2

Civil Works (Line, Stasion, dan Depo)

195.000

3

Electrical, Rolling stock, Telecommunication & signals

70.000

Per km

265.000

Cost 16,86 km

4.467.900

B

OPEX 1

Illustration

O

112.680

Cost O&P 16,86 km

112.680

Line Length

16,86 Km

Durration of Travel

25 Minutes

Waiting Time

Initial Station : 5 Minutes Other Stations : 1 Minutes

User Cost

Rp. 10.500 per Km

A

AI

A

I A

O I

A

O

I

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

87


E N E R G Y

&

I N F R A S T R U C T U R E

The Economic Analysis DISCOUNT RATE (%) Economic Feasibility

8.00

9.63

10.00

NET PRESENT VALUE - NPV (Milyar IDR)

18,968.29

14,145.32

13,259.51

BENEFIT COST RATIO – BCR

1.34

1.00

0.93

ECONOMIC INTERNAL RATE OF RETURN - FIRR (%)

9.63

NPV > 0, EIRR > The rate of interest set is the project economically that feasibly operated

Illustration

88

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E N E R G Y

&

I N F R A S T R U C T U R E

The Financial Analysis DISCOUNT RATE (%) Economic Feasibility

7.00

8.00

9.00

NET PRESENT VALUE - NPV (Milyar IDR)

18.724,50

14,466.30

11.154.29

BENEFIT COST RATIO – BCR

1.32

1.02

0.79

FINANCIAL INTERNAL RATE OF RETURN - FIRR (%)

8.00

NPV > 0, FIRR

Total cost of travel in line A 1 0 0 202 the percentage of people 10 0 0 20 1

project financially O

A

AI

A

I A

O I

A

O

I

Illustration

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

89


E N E R G Y

&

I N F R A S T R U C T U R E

I

A

000

Railways Financial Components No

Description

A

Rp. Million/ km

CAPEX Areas

2

Civil Works (Line Station, dan Depo)

195.000

3

Electrical, Rolling stock, Signal and Telecommunication

70.000

1.313.860

A

Per km

265.000

Cost 16,86 km

1

90

I n v e s t m e n t

4.467.900

OPEX Cost O&P 16,86 km

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

16,86 Km

Travel Time

25 Minutes

Waiting Time

Initial Station : 5 Minutes Other Stations: 1 Minutes

User Cost

Rp. 5.000 per Km

5.781.760

1

B

Rp. Million

Line Length

112.680 112.680

O

O

A I

AI

A

I A

O I


E N E R G Y

The Economic Analysis

O

DISCOUNT RATE (%)

ECONOMIC FEASIBILTY

8.00

9.63

10.00

FINANCIAL FEASIBILITY

3.00

4.10

5.00

NET PRESENT VALUE - NPV (Milyar IDR)

18,968.29

14,145.32

13,259.51

NET PRESENT VALUE - NPV (Milyar IDR)

20,399.00

14,186.90

10,400.07

BENEFIT COST RATIO – BCR

1.34

1.00

0.93

BENEFIT COST RATIO – BCR

1.44

1.00

0.73

ECONOMIC INTERNAL RATE OF RETURN - FIRR (%)

9.63

FINANCIAL INTERNAL RATE OF RETURN - FIRR (%)

4.10

economically that feasibly operated A

AI

A

I A

O I

A

O

NPV > 0, EIRR < interest rate set is project I

I N F R A S T R U C T U R E

The Financial Analysis

DISCOUNT RATE (%)

NPV > 0, EIRR > The rate of interest set is the project

&

which financially not feasible

I n v e s t m e n t

Total travel cost for Line A is Rp. 00 assumption that in 202 public travels using 10 0 0 20 2

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

91


E N E R G Y

&

I N F R A S T R U C T U R E

Las Vegas Monorail, United States of America

Technology Chosen Tokyo Monorail, Jepang

Illustration

92

I n v e s t m e n t

Railways

6 train/railways

Width

3,038 mm (9 ft 11.6 in)

Height

4,362 mm (14 ft 3.7 in)

Doors

2 pairs per side

Maximum Speed

80 km/J (50 mph)

Traction system

Resistor control

Power output

Illustration

70 kW x 24

Minimum radius

< 60 m (200 ft)

Acceleration

3.5 km/h/s

Electrification

750 V DC third rail

Deceleration

4.0 km/h/s (service), 4.5 km/ h/s (emergency)

Operating speed

50 mph (80 km/j)

Electric system(s)

750 V DC

Capacity

224 Passengers Interior

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E N E R G Y

KL Monorail, Malaysia

Cross Section

&

I N F R A S T R U C T U R E

Interior

Body

Body

Bogie

Bogie

1,3

4,7 Illustration

Wikipedia

750 V DC Third rail

EQUATION FIELD: BF ORIGINAL SOIL ELEVATION DISTANCE

+14.000 +13.000 14.588 14.400 1.6890.056

6.837

7.303

2.223

I n v e s t m e n t

14.255

Electrification

+15.000

14.913

8,6 km (5,3 mil)

14.989

Line Lenghth

+16.000

0.041

60 km/j (37mph)

15.103

Operating Speed

+17.000

14.809

430 Passengers

The pile width is planned to be 2.0 m

+18.000

0.150

Capacity

6,0

1.969 15.080

4 train/railways

0.286 14.754

Railways

Illustration

0.278

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

93


E N E R G Y

&

I N F R A S T R U C T U R E

Train Minimum Standard

3 vehichles

Overall Width

2.35 m (per Vehicle) Type A 3.0 m Type B 5.5 m

Single Vehicle Lengths

Type C 7.3 m Middle cars 3.2 ton

Vehicle Weight

Illustration

End Cars 3.5 ton

Width at Surface

1.2 m Wide Concrete Slab

Width Of Elevated

1.1 m

Minimum Clearance Height Under Beam and Cantilever

4.5 m

Gradient (Slope)

12%

Minimum Horizontal Curve

38 m

Minimum Vertical Curve

300 m

Maximum Speed

100 km/h Type A 6 seated + wheel chair Type B 10 kursi + 25 standees

Vehicle Capacity

Type C 18 seated + 25 standees O

94

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

A A

O O AI A

O IA IO

A 2000


E N E R G Y

General Structure of KPBU Banda Aceh Railways Project Ministry of Transportation

Ministry of Finance

Business Entity

Investor(s)

AMDAL

2022

PROCUREMENT

2024

STAR UP & MAINTENANCE

2023

CONSTRUCTION

2027

PJPK (Aceh Government)

Agreement Regress

KPBU Agreement

Penjaminan

Lenders

I N F R A S T R U C T U R E

STAGE OF IMPLEMENTATION

2019

Application for Feasibility Support

&

Debt

Project Company

Equity Infrastructure Services

Providing Support

Construction and O&M Contracts Payment Rates (Option 1)

FEASIBILITY STUDY

2021

ENGINEERING DESIGN

Contractor

Payment Rates (Option 2)

User

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

95


Hydropower plant Peusangan, Bireuen.

Energy 96

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


Testimony

Testimony

Partner:

I Experience significant increase in growth of electrical

It is designed with a run-off river type with a cascade

The development of Hydropower plant Peusangan 1 and

During the Covid-19 pandemic, the

energy in Aceh Province and North

system using a regulating weir and two power houses.

2 is expected to bring benefits to the PLN and local areas,

Government of Aceh Tengah Regency

Sumatra are followed by gradually increase in

The total fall height from upstream to downstream is

including:

has cooperated and supported us to

population and economic growth. This has been

around 411.3 m. The installed generating capacity is 88

continue the construction processes

demanding huge investment in development

MW and is expected to produce up to 327.2 GWh per

of new power plants to fill the gap between

year. Peusangan 1 and 2 hydropower plant construction

power demand and supply system. Responding

work is divided into 4 job lots, namely:

1. Driving the economy wheels; the existence of Peusangan 1 and 2 hydropower plant will improve the quality and reliability of electricity supply in the Aceh Tengah regency and its surroundings to support the development of regional potential. 2. The operation of the Peusangan 1 and 2 hydropower plant will provide local revenue (PAD) from water use charges which can reach Rp. 1.96 billion / year (annual production = 327.2 GWH)

plant has reached 80.58% in September

3. Bringing up new tourism potentials related to the Peusangan hydropower plant, such as water tubing in the River Channel area, educational tours, etc.

be fully operational in 2022.

to that, the Government of Indonesia gives high priority in utilizing renewable energy and regional primary energy. Aceh Province has great potential for hydro power as an energy source.

1. Lot I – Main Civil Works by Hyundai E&C & PT. PP (Persero) Tbk. J / V 2. Lot II – Metal Works by PT. Wijaya Karya (Persero) Tbk. & PT. Amarta Karya (Persero) J / O 3. Lot III – Electromechanical Works by Andritz Hydro

Hydropower plant Peusangan 1 and 2 is the first largest hydropower project built in Aceh Province, utilizing the Peusangan river that flows from Laut Tawar Lake in Takengon City.

GmbH 4. Lot IV – 150 kV Transmission Line and Substations by PT. BBS & PT. KBI J / V

of the Peusangan 1 and 2 hydropower plant following the Covid-19 prevention protocols. As a result, the progress of the Peusangan 1 and 2 hydropower 2020 with total investment value up to the third quarter of 2020 reaching IDR 3,644,863,588,800, and it is expected to

Nanda Dani Andrianto

4. The operation of Hydropower plant Peusangan 1 and 2 can reduce BPP and increase the renewable energy mix as per the Government program.

Manager of UPP KITSUM 5

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

97


E N E R G Y

&

I N F R A S T R U C T U R E

Energy In an attempt to meet national electricity needs,

Indonesia merupakan salah satu negara dengan

Mr. President Jokowidodo has launched the

Indonesia is a country with abundant renewable

“35.000 MWe for Indonesia” program. This

energy potential. This potential can be used to

program is a form of government commitment to

substitute fossil energy if it is properly managed

create energy independence by optimally utilizing

and utilized,. Renewable energy is produced from

the sources of renewable energy as a substitute

energy resources that will not run out naturally, even

for fossil energy sources. There are diverse

if managed properly. Aceh offers 2 (two) primary

sources of fossil energy found on earth such as

sources of renewable energy, namely water and

petroleum, natural gas and coal which gradually

geothermal energy.

decrease and eventually run out as they are being used continuously.

The sources of fossil energy found on earth

out because they are used continuously.

Peusangan Hydropower plant, Bireuen.

98

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

To meet the demand for electricity, it is necessary

Aceh Governor’s Recommendation Application Process Issuing the Business Identification Number (NIB) that has been approved

Recommendation

Preparing Feasibility

by the Ministry of Law and

form from district

Study Report

Human Rights, NPWP, and

or city government

other permits in accordance with the OSS system

to build generating facilities by utilizing the potential of primary energy sources in Aceh. Most of it currently uses fossil energy sources (petroleum, gas and coal). The potential for water and geothermal energy sources scattered in districts or cities in

Investors

Aceh is targeted to replace fossil energy sources

Present

by development according to the needs of the Aceh

Submission of Applications

Feasibilty Study

Recommendation

electricity system. This will be done in several stages

to the Governor of Aceh cq.

Report to the

from the

by submitting applications for development as

Head of DPMPTSP Aceh

Government of

Government of Aceh

follows:

Aceh


E N E R G Y

&

I N F R A S T R U C T U R E

1. The potential of Hydropower plant in Aceh NO. HYDROELECTRIC

LOCATION

DISTRICT/CITY

Lae Suraya

Subulussalam

24 MW

Potential

LOCATION

DISTRICT/CITY

CAPACITY

STATUS

Woyla-5

Kr. Woyla

West Aceh

56 MW

Potential

50

Leuteung

Sungai Krueng Leumeuh

Pidie

14,7 MW

Potential

Governor’s Recommendation for IPP Candidate

51

Peusangan IV

Kr. Peusangan

Aceh Tengah

120 MW

Potential

102 MW

Governor’s Recommendation for IPP Candidate

52

Redelong

Redelong

Bener Meriah

18 MW

Potential

Bener Meriah

76,8 MW

Governor’s Recommendation for IPP Candidate

53

Teunom 2

Kr. Teunom

Aceh Jaya

240 MW

Potential

Gp. Pertik

Aceh Tengah

11,3 MW

in Arraging of Governor’s Recommendation

54

Woyla 1

Kr. Woyla

West Aceh

174,9 MW

Potential

Seunagan dan Tripa-3

Seunagan dan Kr. Tripa

Nagan Raya

242 MW

in Arraging of Governor’s Recommendation

55

Meureubo

Kr. Meureubo

West Aceh

38 MW

Potential

32

Geumpang

Village Geumpang Pekan

Gayo Lues

25 MW

in Arraging of Governor’s Recommendation

56

Meureubo 2

Kr. Meureubo

West Aceh

59 MW

Potential

33

Peusangan 4

Kr. Peusangan

Aceh Tengah

31 MW

Potential

34

Jambu Aye-3

Wh. Jambu Air

Aceh Tengah

37,2 MW

Potential

57

Kluet 2

Kr. Kluet

South Aceh

120 MW

Potential

35

Pameu

Kr. Pameu

Aceh Tengah

160,6 MW

Potential

58

Krueng Meriam

Tangse

Pidie

48 MW

Potential

36

Bidin/Jambu Aye

Kr. Jambu Aye

Bener Meriah

246 MW

Potential

59

Ketol A

Ketol

Aceh Tengah

10 MW

Potential

37

Peureulak

Kr. Peureulak

East Aceh

34,8 MW

Potential

60

Lawe Gurah

Lawe Gurah

Southeast Aceh

4,5 MW

Potential

38

Ramasan-1

Kr. Ramasan

East Aceh

171,6 MW

Potential

61

Teunom

Kr. Teunom

Aceh Jaya

10 MW

Potential

39

Jambo Papeun-2

Kr. Jambo Papeun

South Aceh

95,2 MW

Potential

62

Tembolon (Bidin 2)

Syiah Utama

Bener Meriah

3,1 MW

Potential

40

Jambo Papeun-3

Kr. Jambo Papeun

South Aceh

25 MW

Potential

63

Lawe Mamas

Lawe Mamas

Southeast Aceh

9,6 MW

Potential

41

Kluet

Kr. Kluet

South Aceh

141 MW

Potential

64

Kemerleng Uning

Pining

Gayo Lues

6 MW

Potential

42

Sibubung-1

Kr.Sibubung

South Aceh

32 MW

Potential

65

Lhok Pineung

Meureudu

Pidie Jaya

5,1 MW

Potential

43

Sibubung-2

Kr.Sibubung

South Aceh

121,1 MW

Potential

66

Lawe Bulan

Lawe Bulan

Southeast Aceh

6,5 MW

Potential

44

Sibubung-3

Kr.Sibubung

South Aceh

22,6 MW

Potential

67

Kerpap

Linge

Aceh Tengah

2,2 MW

Potential

45

Dolok-1

Kr. Dolok

West Aceh

32,2 MW

Potential

68

Subulussalam

Subulussalam

Subulussalam

7,4 MW

Potential

46

Kla

Kla

Gayo Lues

12 MW

Potential

69

Bener Meriah

Bener Meriah

Bener Meriah

7,5 MW

Potential

47

Geumpang

Kr. Geumpang

Pidie

19 MW

Potential

70

Mangku Sosial

Mesidah

Bener Meriah

7,2 MW

Potential

24

Southeast Aceh

120MW

LOCATION

DISTRICT/CITY

CAPACITY

STATUS

Lae Suraya

Pasir Belo

Subulussalam

240 MW

Governor’s Recommendation for IPP Candidate

49

26

Meureubo-3

Kr. Meureubo

Nagan Raya

100 MW

Governor’s Recommendation for IPP Candidate

27

Kluet-1

Kluet

South Aceh

180 MW

28

Teunom-3

Kr. Teunom

Aceh Jaya

29

Samar Kilang

Samar Kilang

30

Pertik-1

31

STATUS

88MW

Constraction (PLN)

6,99MW

Constraction (IPP)

25

1

Hydropower plant Peusangan

Kr. Peusangan

Aceh Tengah

2

PLTM Lake Sikap

Lawe Sikap

Southeast Aceh

3

PLTM Krueng Isep

Krueng Isep

Nagan Raya

10MW

Constraction (IPP)

4

Hydropower plant Kumbih-3

Kumbih

Subulussalam

45MW

Committed (PLN)

5

Peusangan 5-B

Negeri Antara

Bener meriah

6

Jambo Aye

Lubuk Pusaka & Bl. Seunong

East Aceh/North Aceh

7

Tripa-1

Kr. Tripa

8

Tripa-2

9

12,56MW

Governor’s Recommendation for IPP Candidate

140,01MW

Governor’s Recommendation for IPP Candidate

Gayo Lues

48MW

Governor’s Recommendation for IPP Candidate

Kr. Tripa

Gayo Lues

100MW

Governor’s Recommendation for IPP Candidate

Tripa-3

Kr. Tripa

Nagan Raya

192MW

Governor’s Recommendation for IPP Candidate

10

Peusangan 5-A

Negeri Antara

Aceh Tengah/Bener Meriah

10,92MW

Governor’s Recommendation for IPP Candidate

11

Meureubo-1

Kr. Meureubo

West Aceh

50MW

Governor’s Recommendation for IPP Candidate

12

Krueng Geupo/Teunom I Krueng Geupo

Pidie

100MW

Governor’s Recommendation for IPP Candidate

13

Krueng Sikuleh

Krueng Sikuleh

Pidie

100MW

Governor’s Recommendation for IPP Candidate

14

Batee

Kr. Batee

Southwest Aceh

100MW

Governor’s Recommendation for IPP Candidate

15

Luteng-1 dan Luteng 2

Sungai Krueng Leumeuh

Pidie

18,8MW

Governor’s Recommendation for IPP Candidate

16

Jambu Aye

Kr. Jambu Aye

Bener Meriah

75,4MW

Governor’s Recommendation for IPP Candidate

17

Lumut

Wh. Lumut

Aceh Tengah

15MW

Governor’s Recommendation for IPP Candidate

18

Jagong Jeget

Kr. Meureubo

Aceh Tengah

41MW

Governor’s Recommendation for IPP Candidate

19

Woyla

Kr. Woyla

West Aceh

250MW

Governor’s Recommendation for IPP Candidate

20

Cinendang

Sungai Cinendang

Aceh Singkil

151MW

Governor’s Recommendation for IPP Candidate

21

Teunom-3

Kr. Teunom

Aceh Jaya

83,64MW

Governor’s Recommendation for IPP Candidate

22

Lawe Mamas

Sungai Lawe Mamas

Southeast Aceh

47,5MW

Governor’s Recommendation for IPP Candidate

23

Tampur

W. Tampur

East Aceh

428MW

Governor’s Recommendation for IPP Candidate

Lawe Alas (Alas)

NO. NAMA PEMBANGKIT

Governor’s Recommendation for IPP Candidate

48

Kr. Alas

CAPACITY

Lae Suraya

NO. NAMA PEMBANGKIT

TOTAL

5384 MW

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

99


E N E R G Y

&

I N F R A S T R U C T U R E

2. Geothermal Power Plant (PLTP) in Aceh

Potential (MWe) No

Land

Regency/ City

-

-

-

in the form of thermal energy (heat) which is

2.

Lhok Pria Laot

Kota Sabang

50

-

-

-

-

produced and stored in the earth. Geothermal

3.

Jaboi-Keuneukai

Kota Sabang

-

-

50

energy is believed to be economical, abundant,

4.

Ie Seum - Krueng Raya

Aceh Besar

-

63

-

5.

Seulawah Agam

Aceh Besar

-

-

165

6.

Alur Canang

Pidie

25

-

-

7.

Alue Long - Bangga

Pidie

100

-

-

8.

Tangse

Pidie

25

-

-

9.

Rimba Raya

Bener Meriah

100

-

-

10.

G. Geureudong

Aceh Tengah

-

120

reaches 22.073 MWe with reserves of around

11.

Simpang Balik

Bener Meriah

100

-

-

-

-

17.506 MWe.

12.

Silih Nara

Aceh Tengah

100

-

-

-

-

13.

Meranti

East Aceh

25

-

-

-

-

14.

Brawang Buaya

Aceh Tamiang

25

-

-

-

-

15.

Kafi

Gayo Lues

25

-

-

-

-

17 potential geothermal points with an estimated

16.

G. Kembar

Gayo Lues

-

92

capacity of around 1,115 MWe spread over eight

17.

Dolok Perkirapan

Gayo Lues

25

-

-

625

275

215

developed. Indonesia’s geothermal potential

Geothermal sources are found in more than 300 points throughout Indonesia causing the energy to be distributed to nearly all of Indonesia. Aceh has

regencies and cities in Aceh. Total Potential of Aceh Geothermal

2 0 2 1

Evidence

-

in the world, but its utilization has not been fully

A c e h

Probability

25

Indonesia has the largest geothermal potential

o f

Pressumed

Kota Sabang

around tectonic plates.

O p p o r t u n i t i e s

Hipothetis

Iboih

exploitation technology which can only reach

I n v e s t m e n t

Speculative 1.

However, its utilization is still constrained by

100

Alternative (MWe)

Geothermal energy is a renewable energy source

sustainable, and environmentally friendly.

Electric steam power plant, Nagan Raya.

Source (MWe)

1.115 MWe

Continous exploration stage 2 x 5 MW -

-

IPB based on SK Kepala BKPMN No:1/1/IPB/ PMDN/2018 tanggal 9 April 2018 Initial Survey by Geological Agency in 2018 -

-

Determination of the Assignment Area of SP and Exploration Pabum (Kepmen ESDM No. : 04 K/30/DJE/2018)

Intial Survey Program based on SK. Ka. BKPM (a.n Menteri ESDM ) No.1/1/PSPB/PMA/2015 -

-


E N E R G Y

Aceh Gas Infrastructure Development Plan One pipeline has been developed from Lhokseumawe A I Estate and cities along the pipeline. Existing pipeline has been developed from Lhokseumawe (Aceh) to Sumatera Utara for supplying gast in Belawan Industrial Zone and City Gas through the pipeline. Now,

230Km Kab. Pidie Jaya

Kab. Pidie Kab. Bener Meriah

Gas Pipe Arun – Belawan

land acquisition and accessories.

Arun - Banda Aceh Gas Pipe (230 Kms) Arun - Belawan Gas Pipe (350 Kms) KIM - KEK Sei Mangkei Gas Pipe (120 Kms)

Kab. Aceh Taminag

Kab. Nagan Raya

amounting to USD 586,04 Million.

120Km

Kab. Gayo Lues Kab. Aceh Barat Daya

PT. Pertamina Gas (Pertagas) has gas allocation for 185 Million Standart Cubic Feet Per Day (MMSCFD).

Kab. Aceh Selatan

Gas comes from the Arun LNG Storage and Regasification Terminal, in its initial stage (2015) the fasilities supplied 120 MMSCFD of gas to PT. PLN. In 2018 the fasilities supply 197 MMSCFD to PT. 240 M.

pipeline installations (construction of transmission pipes),

Kab. Aceh Tengah

Kab. Aceh Barat

and 350 Kilometers long with a total investment

city gas system in North Aceh and East Aceh Regencies.

of Aceh. The Gas Infrastructure Development is included

Kab. Aceh Timur

Arun – Belawan pipe has capacity 300 MMSCFD

PLN to operate MVPP (Marine Vessel Power Plant)

Lhokseumawe - Banda Aceh – Meulaboh and west coast

Banda Aceh - Arun Belawan - KIM KEK Sei Mangkei

Kota Lhokseumawe Kab. Aceh Utara

about 10.000 household have been connected to the Future pipeline infrastructure will be developed from

I N F R A S T R U C T U R E

GAS PIPE MAP

350Km

Kab. Bireuen

&

After gas pipe Arun – Belawan has been operated, Pertagas developed 120 kms gas pipe to supply gas for national industry in KIM untill KEK Sei Mangkei. Pipe gas Arun – Belawan tol fee = USD 2,53/MSCF.

Kab. Aceh Tenggara

U

SKALA 1:1.500.000 Km 0

25

50

75

100

125

Kab* : Districts

Subulussalam

Investment Opportunities

Phase II: Banda Aceh – Meulaboh 200 km, requires approximately USD 330,43 million.

Scheme of Developments

Phase III: Meulaboh – Kota Fajar 250 km, requires

Phase I: Lhokseumawe - Banda

approximately USD 413,043 million.

Aceh 230 km, requires approximately

Regasification Facilities in Sabang (Weh Island)

USD 380 million.

and Sinabang (Simeulue Island).

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

101


E N E R G Y

&

I N F R A S T R U C T U R E WEH ISLAND Sabang

BANDA ACEH

Supply and Demand of Gas Projection

Ladong (Aceh Industries Area) Lawueng (Cement Factory)

ACEH BESAR LHOKSEUMAWE PIDIE JAYA

BIREUEN

PIDIE ACEH JAYA

NORTH ACEH

ACEH PROVINCE

BENER MERIAH EAST ACEH

WEST ACEH

LANGSA

ACEH TENGAH

Meulaboh

Regasification (existing)

ACEH TAMIANG

NAGAN RAYA

Regasification (plan) GAYO LUES

Gas pipeline (existing) Lhokseumawe - Belawan (345km)

SOUTHWEST ACEH Belawan

Gas pipeline (plan) Lhokseumawe - Banda Aceh (230 km) Banda Aceh - Meulaboh (200 km)

Supply:

SOUTH ACEH

Meulaboh - Kota Fajar (250 km)

MEDAN

SOUTHEAST ACEH Kota Fajar

NORTH SUMATERA PROVINCE

PHE NSO - NSB (Ex. EMOI) Triangle Pase Inc

Sinabang

SUBULUSSALAM

SIMEULUE ISLAND

Zaratex N.V. Arun Regasification

GAS CONSUMERS PER DAY

Prospectus Consumers:

NO

Cement Factory

District/City

Household (BBTUD) Big Industries (BBTUD)

KIA Ladong (Industrial Zone)

TOTAL (BBTUD)

PT PLN (Electricity)

1

Banda Aceh

0,78

1,57

1,18

3,53

City Gas (Households)

2

Aceh Besar

1,16

2,32

1,74

5,22

3

Pidie

1,32

2,63

1,97

5,92

4

Pidie Jaya

0,49

0,97

0,73

2,18

5

Bireuen

1,28

2,57

1,92

5,77

6

Lhokseumawe

0,55

1,10

8,28

9,94

TOTAL

5,58

11,17

15,83

32,58

Transportation

102

Small and Medium Industries (BBTUD)

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E N E R G Y

&

I N F R A S T R U C T U R E

Arun Lhokseumawe Special Economic Zone (KEK).

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

103


Agroindustry Samudera Kutaraja Fishing Port, Lampulo, Banda Aceh.

104

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


Testimony

Testimony

I Experience

We have started investing in

It is necessary to improve policies for the licensing

PPS Lampulo since 2017 as

of special industrial sectors that have the potential

the first exporter of fishery products and bonded zone in Aceh.

for PAD and expanding work force. Infrastructure support and a measurable time

I feel many improvements in service

to complete licensing are the main conditions

and ease of licensing every year, in

for improving the investment climate in Aceh.

commitment and quality of service

Therefore, Aceh will become an attractive

from the Provincial Government and

investment destination location “.

the DPMPTSP team who actively guide us in every licensing obstacle that our company faces.

Almer Hafis Sandy President Director PT. Yakin Pasifik Tuna

Tuna fish for export.

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

105


A G R O I N D U S T R Y

Plantations Palm Oil

Aceh has 240,365 hectares of palm oil plantation which are managed by the community with a production of 410,415 tons in 2019. Palm oil is the largest plantation crop in Aceh by volume, area, and economic value. The palm oil industry has significant growth potential as a major source of supply for food products and biofuels. With the increase in production, Aceh is encouraging the construction of CPO factories and their derivative products.

106

I n v e s t m e n t

O p p o r t u n i t i e s

Oil palm plantation, Nagan Raya.

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Planted Area and Production of Palm Oil Owned by Communities by Regency/City in Aceh Province, 2019 Regency/City

Planted Area (Ha)

Production (Ton)

3.719 32.382 11.388 2.658 26.307

1.527 78.723 25.789 4.595 31.534

-

-

9.958 1.677 100 4.139 18.185 19.212 21.169 52.145 15.664 1.300 772 390 208 18.993 240.365 237.769 234.479

16.655 474 23 4.022 48.813 28.184 43.388 102.348 19.497 240 834 839 266 2.664 410.415 440.087 437.292

Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah West Aceh Aceh Besar Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017 O

A

A

I

A

A

The Government of Aceh has developed certain strategic plans for the palm oil commodities, namely: 1. Creating operational and policy support for sustainable palm oil commodities among the government, the private sector, nongovernmental organizations (NGOs), and the community. 2. Supporting public-private investment corporation of palm oil. 3. Reducing threats to high-value forest ecosystems and peat swamp ecosystems. 4. Creating a program for certification and distribution of provincial palm seeds. 5. Improving the supply chain and pricing transparency for palm oil production and processing.

Palm bunches.

Crude Palm Oil (CPO) is the main product of the palm oil industry. Nagan Raya, Aceh Singkil, West Aceh, Aceh Tamiang and Subulussalam are the regencies that produce the most CPO. Therefore, these areas are suitable for the development of the palm oil

The process of sorting in the CPO of PT SPS II Nagan Raya.

processing industry.

A IO A

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

107


A G R O I N D U S T R Y

List of Palm Oil Industries A

201

Bireuen

North Aceh

East Aceh

Aceh Jaya

West Aceh

Aceh Tamiang

PT. Blang Ketumba

PT. Perkebunan Nusantara I

PT. Padang Palma Permai

PT. Boswa Megalopolis

PT. Karya Tanah Subur

PT. Ensem Sawita

PT. Syaukat Agro

PT. Mopoli Raya

PT. Perkebunan Nusantara I (Tanjung Seumantoh)

PT. Syaukath Sejahtera

Subulussalam

Langsa

PT. Global Sawit Semesta

PT. Perkebunan Tualang Raya

PT. Agra Bumi Niaga

Potential Bumi Sakti

PT. Perkebunan Nusantara I (Island Tiga)

PT. Anugerah Fajar Rezeki

PT. Agro Sinergi Nusantara

PT. Mopoli Raya

Aceh Singkil

PT. Teupin Lada PT. Mutiara Sawit Lestari

PT. Mandiri Sawit Bersama

PT. Perkasa Subur Sakti

PT. Bangun Sempurna Lestari

PT. Bahari Dwikencana Lestari

PT. Perkebunan Lembah Bhakti (Singkohor)

PT. PN 1 PKS Tanjung

PT. Bumi Daya Agro Tirta Mas

PT. Parasawita

PT. Perkebunan Lembah Bhakti (Singkil Utara)

PT. Sisirau PT. P.P. Pati Sari

PT. Delima Makmur

PT. Samudera Sawit Nabati

PT. Socfin Indonesia

PT. Nafasindo

PT. Kurnia Nabati Utama

PT. Bima Village Sawita

PT. Ensem Lestari

PT. Mitra Sejati Sejahtera

PT. Tri Agro Palma

PT. Socfin Indonesia

PT. Budidaya Aneka Flora

PT. Bumi Sama Ganda

PT. Singkil Sejahtera Makmur

PT. Abadi Lestari Subulussalam

PT. PP.D.I Patchouli Wangi PT. Bukit Safa

PT. Sawit Tunggal Perdana PT. Bumi Daya Abadi

O

A

A

I

A

A

A IO A

A

I

A

A

A

PT. Darma Wisata Nusantara PT. Padang Palma Permai

108

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Nagan Raya Cooking O I Nagan Raya Regency is geographically located at 03 ° 40- 04 ° 38’ North Latitude and 96 ° 11- 96 ° 48’ East Longitude with a total area of 3,363.72 km2 (336,372 hectares).

Nagan Raya Regency is flanked by four districts namely West Aceh and Aceh Tengah on the North side, Gayo Lues and Southwest Aceh on the East side, West Aceh on the west and the Indonesian Samudera on the South side.

Cut Nyak Dien Airport

From Sultan Iskandar Muda Airport, Blang Bintang to Nagan Raya, the land route takes time:

5 hr 36 min (285 km) via Jl. Lintas Barat Selatan, Aceh

Cot Mu Area Lahan Investasi:

15 Ha

Land Transportation Based on data from the Bina Marga Agency of Nagan Raya Regency, the road length is 924.42 kilometers. The road that is in good condition is 92.21 kilometers, in moderate condition 59.61 kilometers, and in damaged condition 772.6 kilometers.

26 min 17.6 km Via Jalan Meulaboh Nagan Raya

Water transportation There is no major port in Nagan Raya Regency. Export and import activities take place in Kuala Langsa Port, Langsa City. Recorded activity reaches 2,591,633 tons per year. This shows that the port in Langsa City is ready to aid in distribution of cooking oil, especially in the Sumatra region.

Air Transportation For air transportation, the number of

Energy The availability of electricity in

flights arriving and departing at Cut

Nagan Raya Regency is adequate. It

Nyak Dhien Airport was 725 in 2017.

is recorded that in 2013, electricity

The highest frequency of aircraft arriving

usage in Nagan Raya had reached

and departing from and to Nagan Raya

68,960,058 kwh. This figure

occurred in December 2017, with the

decreased by 3.3 percent in 2014 to

number of passengers arriving being

66,670,101 Kwh. Based on PT.PLN in Nagan

224.64 kilometers are paved roads and 698.33

2,027 and 2,197 departing. This has

Raya Regency, in 2015 the number of electricity sold

kilometers are unpaved roads. Thus, transportation

shown that air transportation in Nagan

was 58,471,798 kwh. Although there is a decline, this did

in this Regency is sufficient with the support of

Raya Regency is feasible and sufficient to

not affect the availability of electricity for investment in

public transportation.

ease investment activities.

cooking oil factories in Nagan Raya Regency.

Palm Oil Mill PT. SPS II Nagan Raya.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

109


AGROINDU S T RY

Human Resources

Marketing opportunity

In terms of education, it is accounted that 37 percent of the workforce

The cooking oil industry has diverse market segments

are graduates from Primary School or below and 22 percent are from

depending on the quality of the oil and its composition,

Junior High School. The majority of the workforce in Nagan Raya,

such as amount and level of vitamins. There are

who graduated from Senior High School, is 26 percent. Meanwhile,

five market segments which can be identified by the

the population who graduated from Vocational High School was 2

marketing strategy of business people in the cooking oil

consists of several investment activities, namely:

percent, and 5 percent graduated with Diploma I / II / III education. The

industry, namely the traditional market segment (class

1. Construction of complete factory buildings,

remaining 8 percent are residents who graduated from the University.

C), class B, class B +, class A, and A +. The Ministry

This composition is sufficient to establish a cooking oil factory in

of Agriculture (2017) noted that the development of

Nagan Raya Regency.

palm cooking oil consumption at the household level in Indonesia in 2002-2016 has generally increased with an average increase of 5.81% per year. The predicted

110

Land Availability

consumption of palm cooking oil at the household level

The investment location for the Cooking Oil Industry is placed in Cot Mu

has decreased compared to 2016, while 2018 and 2019

Village, Tadu Raya Sub-District with an area of 15 Ha. The location of the

show that consumption of palm cooking oil has slightly

factory is away from the densely populated areas so that it will not disrupt

increased. Consumption of palm cooking oil in 2018 and

the surrounding environment with cooking oil processing activities. The

2019 is predicted to be 12.17 liters/capita/year and 12.79

location of the factory itself is at 03 ° 57’03.44 “N and 96 ° 21.16.54” E. This

liters/capita/year.

for 2017 was 11.58 liters/capita/year. This consumption

Investment Opportunity/Activity:

Investment Activities The development of Cooking Oil Processing Industry

Cooking Oil Processing Plants:

employee housing and other supporting buildings.

21,3 Tons/Hour

2. Procurement of machinery and equipment for

(Cooking Oil)

3. Provision of fresh fruit bunches.

cooking oil mills.

5,7 Tons/Hour

Nagan Raya Investment and One-Stop Service Agency

(margarine)

30 Tons/Hour (Produksi CPO)

Working Capital Estimate Income Net Present Value

and is located on flatter land compared to other districts and is very close to

Sub-District

: Tadu Raya

Internal Rate Return

West Sumatra national road. The factory is located 250 km from Banda Aceh

District

: Nagan Raya

Benefits Cost Ratio

City and can be reached within 4 hours and 30 minutes, while the distance to

Province

: Aceh

Payback Period

Belawan Port in Medan is 859 km.

Land Status

: Local Community

Area

: 15 Ha

A c e h

2 0 2 1

O

A

I

O

IA A

O

O

I I

O

: Jl. Paduka Yang Mulia Presiden Soekarno, Suka Makmue, 23671

IDR 115 billion IDR 222 billion IDR 245 billion 201587772.1 50.15% 2.761295268 3 Years and 9.908 Month

Investment

position is in the center of all existing cooking oil factories in Nagan Raya

o f

Address

Investment Estimate

: Cot Mu Village

O p p o r t u n i t i e s

Contact us:

4. Procurement of inventory and other tools.

Location

I n v e s t m e n t

Contact Person:

IO A I

I

A

Nagan Raya – Aceh Province

Mariana Telephone

: +62 655 - 7556357 Fax. +62 655 – 7556371

A 201

Email

: dpmptsp@naganrayakab.go.id

Email

: dpmptsp.pmnr2019@gmail.com

Website

: http://dpm-ptsp.naganrayakab.go.id


AGROINDU S T RY

Coffee Indonesia is the fourth largest coffee producer after Brazil, Vietnam, and Colombia and is known as home of the world’s finest coffee. Total area of coffee plantations in Indonesia is approximately 1.240.000 Ha, which consists of 933.000 Ha of Robusta Coffee and 307.000 Ha of Arabica Coffee. More than 90% of all plantations are cultivated by small scale farmers. Indonesia is the only country that has special coffee based on Geographical Indication (GI). High quality Arabica Coffee is mainly produced in Aceh and North Sumatera, meanwhile Robusta Coffee is primarily produce in Lampung, Bengkulu and South Sulawesi. The high level of coffee consumption in the world has certainly become a big opportunity to develop the coffee processing industry in Indonesia.

Picking Gayo Arabica coffee beans, Aceh Tengah.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

111


A G R O I N D U S T R Y

Gayo coffee is cultivated in the Gayo highlands,

certificate by Geography Indication (GI).

including Bener Meriah Regency, Aceh Tengah

In particular, Gayo Arabica coffee received the

and Gayo Lues. Gayo is an ethnic that inhabits

highest score in the 2010 Indonesian Special Coffee

the Gayo highlands in central Aceh. The majority

Auction in Bali, which guaranteed the quality of Gayo

of people in this area are coffee farmers. Coffee

Arabica as one of the best coffees in the world.

cultivation began in 1908 and is mostly Arabica coffee. Gayo is the largest producer of Arabica

Together with related technical agency, Aceh

Coffee in Asia. Gayo coffee has been exported

Investment and One-Stop Service Agency has

to various countries in the world. Statistics show

made big efforts in promoting the Gayo Arabica

that in 2019, Aceh exported 5,034,838 kg of coffee

coffee commodity both in local and international

beans to 20 countries. (Source: Aceh Industry and

market since 2013. We have attended certain

Trade Office, 2019).

exhibitions, coffee business forums and met the coffee consumers directly at the international

Gayo Coffee has received various recognition and

events. This has had a positive impact, showed by

international certification because of its high quality,

a positive trend of increasing the volume of Aceh

particularly organic coffee which has fair trade

coffee exports.

Currently Gayo coffee is continued to make efforts to meet the demand for coffee in domestic and foreign market by increasing productivity and quality (agricultural extension and intensification).

112

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Farmer of the Gayo Arabica coffee plantation, Aceh Tengah, is checking the ripeness of the coffee beans before the picking process.


A G R O I N D U S T R Y

Arabica Coffee Planted Area and Production of small holder by Regency/City in Aceh, 2019

Rembele

Bener Meriah

Area Planted Production (Ha) (ton)

Aceh Tengah

49.835

Bener Meriah

29.172

Gayo Lues

4.864

1.366

North Aceh

1.888

755

2019

102.860

65.902

2018

101.855

64.121

2017

101.473

61.761

A IA

A

317 km

6 hr 46 min

54.4 km

North Aceh

20.9 km

21.3 km

Rembele

1 hr 34 min

SIM

38 min

40 min

310 km

SIM

North Aceh

6 hr 43 min

34.609

46.273

I A

Malikussaleh

SIM* Blang Bintang

Arabica

Regency/City

SIM

30 min

Bener Meriah

15.5 km

Bener Meriah

7 min

2.9 km

5 hr 59 min 299 km

Takengon,

North Aceh

Aceh Tengah

9 hr 43 min 463 km

Gayo Lues

Aceh Tengah

Gayo Lues

Patiambang Kualanamu

A A

Aceh Tengah

Bener Meriah

North Aceh

Gayo Lues

Area Planted (Ha):

Area Planted (Ha):

Area Planted (Ha):

Area Planted (Ha):

Production (TON):

Production (TON):

Production (TON):

Production (TON):

49.835 Ha 34.609 Ton

46.273 Ha 29.172 Ton

1.888 Ha

755 Ton

4.864 Ha

8 hr 30 min 335 km

1.366 Ton

Clik to see Google Map

Gayo Arabica coffee beans, Aceh Tengah.

*SIM, INTERNASIONAL AIRPORT, BL ANG BINTANG

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

113


A G R O I N D U S T R Y

Robusta Coffee

Robusta Coffee Planted Area and Production of Small Holder by Regency/ City in Aceh, 2019

Robusta Regency/ City

Area Planted (Ha)

Production (ton)

103 1.422 378 522

5 340 144 143

1.051

466

West Aceh

579

85

Aceh Besar

1.754 10.290

586 2.942

13 573 691 719 35 328

4 165 128 200 5 82

Bener Meriah

2.010 1.890

566 966

Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam

101 3 10

11 1 2

22.471

6.841

22.382 22.276

5.501 6.731

Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah

Robusta Coffee has a strong taste and is more bitter than Arabica Coffee. Robusta Coffee is widely used as the main ingredient for instant coffee or mixture of Arabica Coffee to improve the taste of coffee. Robusta coffee is planted in Pidie Jaya Regency, Aceh Jaya, Bener Meriah, Aceh Besar, and South Aceh. Total plantation area is 22.382 Ha with total production of 6.841 ton in 2019. 114

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya

2019 2018 2017 O

2 0 2 1

A

A

I

A

A

A IO A

Robusta coffee beans, Pidie.


A G R O I N D U S T R Y

Coffee Exporter in 2019 No.

Coffee Exporter

1

Aceh Coffee Processing Industry The demand of Gayo coffee in domestic and foreign

Estimated investment to build an instant coffee

Cv. Sara Ate

markets is very high, particularly in the form of green

processing industry with a capacity of 30,000,000

2

Koperasi Permata Gayo

beans. The government encourages the increase of the

sachets is:

3

Koperasi Produsen Arisarina

quality of Aceh coffee; to create a great opportunity

} Selling price at the producer / industry level US

4

KSU. Arinagata

Popular culture of coffee consumption in Aceh is also

} Premium quality US $ 0.04 per sachet.

5

KSU. Sara Ate

a good prospect for building the Gayo instant coffee

The closeness of the supply chain in Aceh region is an

6

PT. Cahaya Komoditas Nusantara

processing industry. Project Purpose: Construction of

advantage to develop this investment as the production

7

PT. Fajar Jeumpa

Instant Coffee Processing Industry Based on market

cost is lower than average (assuming a green coffee

observations. Today, at least 10 instant coffee brands

bean price of US $ 4.58/Kg).

8

PT. Ihtiyeri Keti Ara

are sold in the market which indicates the increase of

This price allows creating market segments, market

9

PT. Ketiara

instant coffee consumption in Aceh. As can be seen, the

share and market space, which can compete with other

10

PT. Sumatera Arabika Gayo

potential for development in this industry is very high.

famous national products.

11

PT. Meukat Komuditi Gayo

12

CV. Aridalta Mandiri

13

Koptan Gayo Megah Berseri

14

KBQ. Baburrayyan

15

Koperasi Kopi Wanita Gayo (Kokowagayo)

US$ 3.333.333

NPV = US$ 1.844.999

16

CV. Donya Drop Daruet

Operational Cost:

• IRR = 23% • BC = 1,6 • Payback Period: 6 YEARS

O

A

I

A

A

in developing a modern coffee processing industry.

I

A

Estimates

Construction of Coffee Processing Industry and working capital:

US$ 2.925.043 *(US$ 1 = IDR 12.000)

$ 0.10 per sachet.

Location: Aceh Tengah Aceh Special Economic Zone, Lhoksemawe

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

115


A G R O I N D U S T R Y

Cacao

Cacao Planted Area and Production of Small Holder by Regency/City in Aceh, 2019

Aceh is one of the major cocoa producer regions in Indonesia with plantations spread across almost all regions in Aceh, from Pidie in the eastern part of Aceh to Simeulue Island on the outer side of Aceh province.

The development of strategy is to create a sustainable cocoa downstream industry. The upstream industry will focus on increasing value added in the downstream sector. Aceh Tenggara, Pidie Jaya, East Aceh, Pidie and North Aceh are suitable areas for cocoa producing and development of the chocolate processing industry.

116

I n v e s t m e n t

O p p o r t u n i t i e s

Regency/City

Planted Area (Ha)

Production (Ton)

Simeulue Aceh Singkil South Aceh Southeast Aceh East Aceh Aceh Tengah West Aceh Aceh Besar Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017

1.884 371 1.354 21.005 13.573 528 972 3.467 10.382 7.009 9.321 1.890 3.483 1.556 3.198 1.118 1.378 15.070 737 111 134 726 99.267 99.342 101.203

145 84 346 10.491 6.038 258 426 623 3.591 2.689 3.704 1.077 1.897 585 548 148 879 6.990 208 81 74 211 41.093 39.296 39.295

O

o f

A c e h

2 0 2 1

A

A

I

A

A

A IO A

Cacao, Pidie Jaya.


A G R O I N D U S T R Y

Rehabilitation, Development of Cocoa Plantation and Processing I SIM* Blang Bintang

3 hr 41 min 166 km

Pidie Jaya cocoa farmers pick ripe cacao.

Pidie Jaya

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

117


A G R O I N D U S T R Y

Transportation Supporting Infrastructure Accessibility

LAND

AIR

by the Malacca Strait, east by Bireuen regency,

Pidie Jaya Regency is a regency that

Construction of toll roads in the Pidie

Sultan Iskandar Muda International Airport distance from

west and south by Pidie regency. Geographically,

expanded from Pidie Regency in 2007. This

Jaya area is estimated to start in 2021.

Pidie Jaya Regency is164.9 km through Sumatra Main

Pidie Jaya Regency is located at 4 ° 30’– 04 ° 60

regency is traversed by the Aceh to North

The toll road construction in the Pidie

Road/ Banda Aceh - Medan Road with travel time of 3

‘N (latitude) and 96 ° 30’– 96 ° 20’ East longitude

Sumatra road, so it is quite strategic at

Jaya area is 35 km long. The construction

hours 29 minutes. Malikus Saleh Airport distance from

(east longitude). The area covers 1,162.85 km²

the economic level. The distance between

distance of this toll road is about 6 to

Pidie Jaya Regency is 103.2 km via Sumatera Main Road /

which consists of lowlands and beaches but

the capital regency (Meureudu) and sub-

7 km south of the Banda Aceh - Medan

Banda Aceh – Medan Road with travel time approximately

mostly highlands. Pidie Jaya Regency consists

districts ranges from 0 - 25 km. Bandar

national road. The construction of the

2 hours 17 minutes.

of 8 districts covering 34 sub-districts and 222

Baru sub-district is the farthest sub-district

toll road in Pidie Jaya is included in the

villages.

from Meureudu city.

Sigli - Lhokseumawe package. This toll

SE A

road route starts from the side of the

Ulee Lheue Port, from Pidie Jaya Regency is a distance of

hilly slopes of Bandar Baru District to

175.4 km via the Trans Sumatra Road / Banda Aceh - Medan

Bandar Dua District with the position of

Road with a travel time of 3 hours 45 minutes. Malahayati

the entrance around Meureudu District.

Container Port, from Pidie Jaya Regency is a distance of

Currently, the closest toll gate is the

141.8 km via Jalan Sumatera / Banda Aceh Highway - Medan

Indrapuri Toll Gate, from Pidie Jaya

with a travel time of 3 hours 14 minutes. Krueng Geukueh

Regency with a distance of 144.4 km via

Port, from Pidie Jaya Regency is a distance of 114.9 km via

Sumatera / Banda Aceh Highway - Medan

the Trans Sumatra Road / Banda Aceh - Medan Road with a

with a 2 hour 58 minute of travel time.

travel time of 2 hours 29 minutes.

Pidie Jaya Regency is located in Nanggroe Aceh Darussalam (NAD) Province, bordered on the north

118

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Rehabilitation, Development of Cocoa Gardens and Processing of Cocoa Products

Cocoa Products Processing

Rehabilitation and Development of Cocoa

The Government of Pidie Jaya Regency has

Cocoa is one of 19 (nineteenth) important plantation

machine and a warehouse for storing cocoa.

commodities in Pidie Jaya. Cocoa takes up the most land area

This facility can be used by companies wishing to

and is cultivated by the most farmers. Cocoa contributes the

invest in the cocoa processing industry.

highest annual income in Pidie Jaya. Cocoa is grown in seven of the eight sub-districts, namely Bandar Baru, Trienggadeng,

facilities in the form of a cocoa processing

Location

: Banda Aceh – Medan Highway, Paru Village, Kec. Bandar Baru, Kab. Pidie Jaya

Facilities

: Warehouse and Cocoa

Meureudu, Ulim, Bandar Dua, Panteraja, and Meurah Dua. These conditions have made this commodity become a potential commodity to be developed and to be one of income

Processing Machinery

sources to the region. Moreover, the conditions of rainfall and land suitability in Pidie Jaya support high production

Ownership : Local Government Pidie Jaya

and prevent the plants from plant pests which are difficult to

Regency

control, namely vascular streak dieback. Location: Kec. Bandar Baru, Kec. Panteraja, Kec. Trienggadeng, Kec. Meureudu, Kec. Meurah Dua, Kec. Ulim, Kec. Bandar Dua.

1.733 Ha

Area

:

Land Ownership

: Community

Ripe cacao.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

119


A G R O I N D U S T R Y

Contact Person:

Market Opportunity Cocoa is one of the leading commodities that

The interesting thing is, the prices of cocoa

has an important role in economic development

bean products that are marketed online are

in Pidie Jaya Regency. Market opportunities that

quite tempting. Of course this market is

are still open and the availability of large areas of

attractive to target and this allows farmers to

land are potentials that should be considered in

sell their products directly to consumers with

cocoa development efforts.

several conditions. Among other things, the cocoa beans come from gardens that already have organic certificates.

The high consumption of chocolate both domestically and abroad, such as in the European Union, especially for processed cocoa which has

The treatment process must be controlled

a higher value than cocoa beans, could become a

and free of contamination. Then packaged in

market opportunity for cocoa in Pidie Jaya Regency.

an attractive manner and marketed through various online shopping sites. This is a

120

Currently, there is a growing trend of

different market from the one in Indonesia,

consuming cocoa beans directly or processing

which is oriented towards the processing

cocoa beans at home to make pasta or hot

industry. In order to penetrate the factory, the

chocolate. This is in line with public awareness

farmer must be able to collect up to 15 tons

in developed countries about the benefits of

of cocoa beans. Meanwhile, the household

chocolate for health. This condition actually

market is different. With just 1 kg of seeds,

creates a market niche for cocoa beans,

farmers can market directly to consumers at

especially packaged nibs.

quite attractive prices.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

I

ESTIMATES

Rehabilitation and Development of Cocoa:

Rp. 14.132.795.760,Processing of Cocoa Products:

PIDIE JAYA INVESTMENT AND ONE-STOP SERVICE AGENCY Address

: District Government Office Complex. Pidie Jaya Cot Trieng, Meureudu Sub-

Rp. 5.550.000.000,COOPERATION SCHEME Mediator-assisted group pattern / Mediated Partnership Model. Partnership patterns between farmers and big entrepreneurs. Partnership patterns between entrepreneurs and local governments. Individual patterns with the help of farmer groups / KUP and mediators.

District, Pidie Jaya Regency Postal Code :

24186

Phone

:

(0653) 3485061

Email

: dpmptsppijay@gmail.com/ dpmptsppijay2@gmail.com CP : Cut Ruhana Husin, SKM., M.Kes. (Head Div. DPMPTSP) Hp. 0853

7046 5325


A G R O I N D U S T R Y

Patchouli

Patchouli Planted Area, Harvested Area and Production of Small Holder by Regency/City in Aceh, 2019

Currently, Indonesia is the world’s largest patchouli oil producer, which meets the needs of more than 80%

According to a study, Aceh patchouli oil contains patchouli alcohol 30-34% with a yield of 3%, which makes it the best patchouli in the world. The main areas for patchouli production are Aceh Selatan, West Aceh, Gayo Lues, Aceh Jaya and

(svet.charita.cz).

-

-

-

Aceh Singkil

24

6

2

South Aceh

326

188

37

Southeast Aceh

210

210

74

East Aceh

-

-

-

Aceh Tengah

-

-

-

West Aceh

202

131

29

Aceh Besar

118

60

15

Pidie

-

-

-

Bireuen

14

8

1,30

North Aceh

6

2

0,40

Southwest Aceh

5

15

1

Gayo Lues

75

75

26

Aceh Tamiang

5

5

0,41

Nagan Raya

56

41

3

Aceh Jaya

158

124

36

Simeulue

Aceh Besar Regencies. These areas are suitable

Bener Meriah

1

-

-

for the development of the patchouli processing

Pidie Jaya

3

-

-

Banda Aceh

-

-

-

Sabang

7

-

-

Langsa

-

-

-

Lhokseumawe

-

-

-

Subulussalam

-

-

-

2019

1.219

864

225

2018

1.210

780

178

2017

2.041

1.474

484

industry. Patchouli is one of Indonesia’s largest and important export commodities. This valuable essential oil is distilled from its dried leaves. This oil is widely used in various industries, especially the perfume, aromatherapy, cosmetics, medicine, toiletries, etc. industry where the demand Patchouli, Aceh Jaya.

of the world market. Patchouli is widely cultivated in Aceh. With its high alcohol content, patchouli is one of the most sought-after tropical plant varieties in Aceh

Regency/City Planted Area (Ha) Harvested Area (Ha) Production (Ton/Ha)

continues to increase.

Aceh patchouli has obtained a Geographical Indication Certificate in 2013 from the Ministry of Law and Human Rights (ditjenbun.pertanian.go.id).

O

A

A

I

A

A

A IO A

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

121


: A G R O I N D U S T R Y

:.

Patchouli Aceh O

Why ACEH y ACEH has the best patchouli oil in the world, cultivated from northern region of Indonesia.

Indonesia is the major supplier of Patchouli Oil to the world market,

y With more than 3500 hectares in Aceh, mostly in the region

accounting for around 90% of

of Aceh Tenggara, Aceh Jaya, Aceh Selatan and Gayo Lues.

international trade. Aceh is the largest region whose produces Patchouli Oil in Indonesia. China and India also produce, but all production is taken up by their

Market Segmentation

y Simply-to-Produce and Low-Technological Needs y The supply chain for patchouli oil is not-so complex, comprising farmers, collectors, and exporters.

domestic markets. Aceh can produce around 1,300,000 tonnes per year, with a

Market Review of Aceh Crude Patchouli Oil Global Patchouli Oil:

y Patchouli oil is mainly obtained by steam distillation of

value of around US$50 million).

shade dried leaves to cultivated patchouli plants.

Segmentation by End-User: y Beauty Cosmetics & Personal Care (Hair, Skin, Facial, etc) y Aromatherapy (In-door, Automotive, Massage, etc) y Food & Beverages

Hotspots

Patchouli, Aceh Jaya.

122

I n v e s t m e n t

O p p o r t u n i t i e s

:

ACEH, Indonesia

Market Value

:

More than US$50 Million.

Market Competitors

:

China, India, Malaysia, Singapore, Philippines. Amyris in partnership with Firmenich, Isobionics

Product Disruptor

:

Quality Concerns

: Natural patchouli oil has many constituents. Syn-bio companies manufacture only a single molecule.

o f

A c e h

2 0 2 1

y Pharmaceuticals y Others (Soaps & Detergents, Household/Retail, Anti-microbial and Insect Repellents)

Segmentation by Region: y Europe

Segment Analysis y Among the type segments, the light patchouli oil segment is expected to account for significant share in terms of revenue in the near future. y Among the nature segments, the organic segment is expected to account for significant revenue growth in the global patchouli oil market owing to rising use of patchouli oil in various end use industries. y Among the end user segments, the cosmetics &

y North America

personal care segment is anticipated to register

y Middle East & Africa

highest growth in terms of revenue in the

y Asia Pacific

target market due to strong, slightly sweet, and

y Latin America

intoxicating scent.


A G R O I N D U S T R Y

Region Competitiveness Analysis

List of importer Countries for the selected product –

y The Asia Pacific patchouli oil market

Product: 330129 Essential oils, whether or not terpeneless, incl. concretes and absolutes…

is expected to account for major

Sources: ITC calculations based on UN COMTRADE and ITC statistics.

revenue share, and projected to dominate the global market in the next 10 years, owing to presence of prominent players in countries such

Importer Countries

2015

2016

2017

2018

2019

World

1,915,685

2,038,292

2,416,564

2,824,567

2,473,572

United States of America

403,464

449,646

563,709

649,266

508,155

France

269,554

284,984

324,298

362,456

307,486

Germany

122,094

134,508

141,353

164,556

153,697

United Kingdom

134,695

126,295

148,850

150,726

134,019

China

44,837

47,604

60,666

92,419

115,303

Netherlands

42,084

49,241

70,747

103,382

108,496

India

80,051

106,000

97,489

109,343

101,895

Indonesia

78,140

79,394

82,231

144,769

98,836

Switzerland

80,456

80,945

95,060

103,983

94,889

Spain

94,023

80,112

90,497

101,077

89,590

as India, Indonesia, Taiwan, China, and Malaysia. y In addition, growing population, increasing disposable income of individuals, rising usage of patchouli oil in pharmaceutical industry are other factors anticipated to drive

Imported value in…(,000 USD)

growth of the global market in years to come. y The North America market is expected to grow at a faster rate in the next coming years, due to rising popularity of aromatherapy among consumers. y The market in Europe, Latin America, and Middle East & Africa are expected to register moderate growth in terms of revenue, due to increasing popularity of patchouli oil in countries in these regions in the near future.

Patchouli, Aceh Jaya.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

123


A G R O I N D U S T R Y

Financial Review Of Aceh Crude Patchouli Oil O

The investment value was obtained after doing trial-error

The production process of the harvest Patchouli is twice a

and it was decided that the economy scale for the corporate

year requires an income cost. The cost of income component

level could be started with a land area of 10 hectares with the

consists of operational costs, labor costs and depreciation. For

complete equipment for a value of Rp. 2,900,000,000 or two

details, see the table below.

PRODUCTION – COMMERCIAL SCALE

billion rupiah (Table above). The plan for the processing plant to

INVESTMENT Land (clear and clean) = Processing Plant = (Distillation Kettle + Warehouse + Building + Generator) Office = PLN firing cost = Water Supply Cost= Total =

200,000,000.00 2,500,000,000.00

operate to receive dry leaf yield from an area of 10 hectares. To

Unit

Illustration

support the optimization of the processing process, the Water

Rp

10 hektar

built. And to avoid sudden power failure, a generator set is also

3,000 kg

Rp

Rp

50,000,000.00

Rp

50,000,000.00

Rp

2,900,000,000.0 0

Sewa 1 Year

Unit

Supply Company and PLN network installation has also been

Estimated harvest production is 2 times a year. Therefore, the projected gross income in 1 year can be obtained. Meanwhile, historical value of 10 years of patchouli oil price in Aceh. For more detailed results, please see the table below.

Rp

645,250,000

Labor Cost

Kg

972,000,000

Depreciation

Rp

362,500,000

Total Cost of Income

Rp

1,979,750,000

% of Income

Gross Income Projection (IDR) - Year 1

Rp/10 Hectares Total unit Price - Market (pessimistic level) Gross Income in 1 Year

Unit

Total

Kg

4,500

Rp Rp

660,000 2,970,000,000

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

66.7%

It needs IDR 1,979,750,000 or one billion nine hundred seventynine million seven hundred and fifty thousand rupiahs to obtain a 1-year gross income of IDR 2,970,000,000 or two billion nine hundred and seventy million rupiahs. Thus, cost of income accounts for 66.7 percent of total gross income. This is felt to be quite burdensome because the value is higher than 50 percent. The ideal condition is below 50 percent in order to provide room for the company’s operations.

124

Total

Operational Cost

planned.

fixed price of patchouli oil was obtained from the median

100,000,000.00

Cost of Income Projection (in IDR) - Year 1


A G R O I N D U S T R Y

Furthermore, the calculation is continued with

The net income yield is projected to increase in the

the projection of profit or net profit in 1 year.

second and third years along with the harvest period that

The final result for net profit is Rp. 802,102,500

is more frequent than the first year. For the first year only

or eight hundred two million one hundred two

2 harvests. Meanwhile, the harvest period for the second

thousand five hundred rupiahs. The net profit

and third years is 3 times and 4 times. The 3-year income

accounts for 27 percent of gross income. This

projection can be seen in the table below.

is still considered reasonable, considering that operational costs are quite high. The ideal result is

ITEMS (IDR)

Year 1

Year 2

Year 3

REVENUEs

2,970,000,000

4,725,000,000

7,200,000,000

COST OF REVENUEs

1,979,750,000

2,458,262,500

3,105,480,000

66.7%

52.0%

43.1%

990,250,000

2,266,737,500

4,094,520,000

33.3%

48.0%

56.9%

99,025,000

226,673,750

409,452,000

when it is close to 50 percent of gross income. For more detailed results, see the table below.

Net Income Projection (in IDR) - Year 1 Gross Profit Cost Of Revenue

2,970,000,000 1,979,750,000 990,250,000

Interest Expense

99,025,000)

TAX Net Income % of Gross Profit

EARNINGS BEFORE INTEREST & TAXES % of Revenues

Earnings Before Interest And Taxes

Earnings Before Taxes

% of Revenues

891,225,000 89,122,500 802,102,500 27.0%

INTEREST EXPENSE

891,225,000

2,040,063,750

3,685,068,000

TAXES EXPENSE

89,122,500

204,006,375

368,506,800

NET EARNINGS

802,102,500

1,836,057,375

3,316,561,200

EARNINGS BEFORE TAXES

% of Revenues Accumulated Yearly Retained Earnings

27.0% 802,102,500

38.9% 2,638,159,875

46.1% 5,954,721,075

In accordance with the calculation results in the table above, it can be seen that the projected net income in the second year has reached more than two billion rupiahs. Meanwhile in the third year it almost reached six billion rupiahs. So that it can be considered to expand the business expansion in the fourth year. And it is projected that in the fifth year it will be able to conduct an initial public offering on the Indonesia Stock Exchange (or Initial

Patchouli, Aceh Jaya.

Public Offering).

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

125


A G R O I N D U S T R Y

In order to determine the value of the benefits obtained from this project, a cost-benefit

Net Present Value (NPV) is the difference between the present value of cash inflows and

The positive NPV calculation result is IDR 1,671,243,998 or (one billion six hundred seventy-

ratio is calculated. A value above 1 indicates that the project will generate benefits (or

the present value of cash outflows over a period of time. NPV is usually used for capital

one million two hundred forty-three thousand nine hundred ninety-eight), and the amount is

profits) by spending only 1 cost. Detailed results can be seen in the table below.

allocation to analyze the benefits of a project that will be implemented. A positive Net

quite significant, reaching fifty percent of the initial investment value as stated in the table

Present Value indicates that the projected income generated by a project or investment

above. This project is feasible and can be continued.

B/C RATIO

Cash Inflows/ Outflows (PV of Cost of Project)

PV Factor (1/((1+r)^n))

PV of Benefit Expected from Project

Profitability Index (PI) is the ratio of the present value of cash flows to be received in

a project that has a negative NPV will generate losses. This concept is the basis of the law

an investment. PI can be used to provide an overview of the feasibility indicators in an

of Net Present Value, which indicates that only good investments can be made.

investment plan. In other words, the Profitability Index is used to see whether a project is feasible for us to run or not.

2021

Rp (2,900,000,000.00)

2021

Rp 802,102,500.00

0.9804

Rp 786,375,000.00

2022

Rp 1,836,057,375.00

0.9612

Rp 1,764,761,029.41

2023

Rp 3,316,561,200.00

0.9423

Rp 3,125,269,692.65

-

Net Present Value

Rp 5,676,405,722.06

Total

1.9574

Benefit-Cost Ratio

exceeds the projected costs incurred. In general, a positive NPV value will be profitable and

Cash Flow

Year-Beginning Investment

Year-End Cash Flows

Rp (2,900,000,000.00)

Net Cash Flow Rp (2,900,000,000.00)

2021

Rp 802,102,500.00

Rp (2,097,897,500.00)

2022

Rp 1,836,057,375.00

Rp (261,840,125.00)

2023

Rp 3,316,561,200.00

Rp 3,054,721,075.00

Interest Rate

10%

Net Present Value

Rp 1,671,243,998.02

Conclusion

Go Project

PROFITABILITY INDEX

Cash Flow

Year-Beginning Investment

Rp (2,900,000,000.00)

End-Year Cash Flows

The calculation result of the cost to benefit ratio is 1.9574 or nearly 2, or in other words, this project can provide benefits which are almost double the value incurred. This means that the project is feasible to continue.

DCF 10%

Net Cash Flow

2021

Rp 802,102,500.00

Rp 80,210,250.00

Rp 721,892,250.00

2022

Rp 1,836,057,375.00

Rp 183,605,737.50

Rp 1,652,451,637.50

2023

Rp 3,316,561,200.00

Rp 331,656,120.00

Rp 2,984,905,080.00

Profitability Index

1.85

Conclusion

Go Project

Patchouli, Aceh Jaya.

The calculation table above produces a profitability index value of 1.85 which means more than 1 which means the project is feasible and can be continued.

126

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Payback Period is the period or number of years

In general, the Payback Period is the period of

required to return the investment value that has

return on investment value through net cash

been issued. The Payback Period in Indonesian is

receipts in a predetermined period. From the

also known as the Payback Period. Investors or

above understanding, it can be concluded that

entrepreneurs often use the Payback Period (PP)

the Payback Period will show an annual figure as

as a determinant in making investment decisions,

a measure of the return on an investment. The

namely decisions that determine whether to invest

data required in calculating the Payback Period

their capital in a project or not. A project with a

is the total net cash receipts from a business or

very long payback period is certainly less attractive

investment unit. Net cash value is the proceeds

to most investors. The payback period can be

from sales after deducting the cost of goods

calculated by dividing the investment value (cost of

sold and operating expenses. Payback Period is

investment) with the annual net cash flow (annual

important to know before we run a new project or

net cash flow).

Payback Periode

Net Cash Flow

Cashflow Index

Year-Beginning Investment

Rp (2,900,000,000.00)

Year-End Cash Flows 2021

Rp 802,102,500.00

(2,097,897,500)

0

Year-End Cash Flows 2022

Rp 1,836,057,375.00

(261,840,125)

0

Year-End Cash Flows 2023

Rp 3,316,561,200.00

3,054,721,075

0.078949282

Positive Cash Flows in Year

2

Payback Period in Year

2.08

business. The shorter the return on investment,

Time Period

3.00

the faster the cash turnover in the

Conclusion

Go Project

business to be run.

The calculation results in the table above show that the payback period is shorter or shorter (2.08 years) than the stipulated time period (3 years). So that it gives the conclusion that the project is feasible and

Conclusion: After obtaining the calculations result for the overall index above which has showed positive results, the planned project is feasible and can be continued.

can be continued.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

127


A G R O I N D U S T R Y

Harvest of tomatoes as a staple in making sauces in Takengon.

128

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Aceh Tengah Pasta Sauces Processing I

Aceh Tengah is bordered by Bener Meriah,

The closest airport to Aceh Tengah Regency is Rembele Airport in Bener Meriah Regency. The distance from Rembele Airport is 21.3

Lues, West Aceh and Nagan Raya Regencies on

km with travel time of 40 minutes from the Takengon city. Currently,

the south, East Aceh and Gayo Lues Districts on

Rembele Airport opens one route every day from Bener Meriah to Kuala

and Pidie Regencies on the west. The capital city of Aceh Tengah Regency is Takengon, it surrounds by mountainous area and

Harvest of onions as a staple in making sauces in Takengon.

Air Transportation

Bireuen and Pidie Regencies on the north, Gayo

the East, and West Aceh, Nagan Raya, Gayo Lues

Aceh Tengah Regency is a highland area with an altitude of 5002600 meters above sea level, located at 40 22’14.22 “- 40 42 ‘40.8” North latitude and 950 15’ 23.6 “970 22 ‘10.76 East Longitude.

Transportation Support Infrastructure (Land, Air)

has tropical and cool climate with the lowest

Land Transportation

Namu Medan operated Wings Air aircraft.

The length of roads in Aceh Tengah Regency is 1,146.21 Km (various types of surfaces) National Road 222.45 Km or 19.41% (11 roads), Provincial roads 122.45 Km or 10.68% (6 roads), and Roads District 801.30 Km or 69.91% (242 roads)

temperatures is 20-10 degree and 26.6 degree is

Aceh Tengah District also has 7 (seven) trace roads connecting this

the highest. This condition makes Aceh Tengah

district with other districts:

The availability of electricity in Aceh Tengah District is adequate. In

is very potential and suitable for agricultural

Î Takengon - Bireuen road, which is an old road route < 100

areas. Most of the business sector structure

Î Takengon - ise - ise - Blang Kejeren - Kuta Cane is also an old lane road.

has not shifted from the agricultural, forestry

Î Takengon - Celala - Beutong - Ateuh (Nagan Raya) road

and fishery. Those play a big role in driving the

Î Takengon road - Genting Gerbang - Pameu - Gempang (Pidie)

economy of Aceh Tengah Regency.

Î Takengon - Kreung Geukuh (Lhokseumawe) road

km long

Î Takengon road - Samar Kilang - Alue ie Mirah (East Aceh) Total population of Aceh Tengah Regency is

Energy 2018, electricity usage in Aceh Tengah has reached 10,128,750 kwh. The amount of electricity sold was 5,146,462 kwh. The construction of the Hydroelectric Power Plant Project (Hydropower plant Peusangan I –II) which is expected to be completed in the next two years will help to overcome the limitation of electricity in the Aceh Tengah District and can produce a multiplier effect on regional development.

Î Takengon - Delung Sekinel - Penarun - Peureulak (East Aceh) road

212,494 in 2019, with growth rate of 1.91 % each year. 63.85% of the population work in

Dengan adanya pengembangan trace jalan pada berbagai kabupaten

the agricultural sector (agriculture, forestry,

sekitar, diperkirakan Kabupaten Aceh tengah dalam jangka panjang

hunting and fisheries). Meanwhile, 31.11%

merupakan daerah yang mempunyai kedudukan strategis, baik dalam

worked in the public sector and 5.03% in the

bidang perdagangan, pariwisata, pendidikan, pemerintahan, industry

The location of investment for the pasta sauce industry is in Blang

manufacturing sector.

dan lain sebagainya.

Bebangka Village, Pegasing District with an area of 1 (one) Ha.

Land Availability

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

129


A G R O I N D U S T R Y

Market opportunity

Tomat Area tanam (Ha)

luas panen (Ha)

Produksi (Kwintal)

Area tanam (Ha)

luas panen (Ha)

Produksi (Kwintal)

Area tanam (Ha)

luas panen (Ha)

Produksi (Kwintal)

Area tanam (Ha)

luas panen (Ha)

Produksi (Kwintal)

Linge

-

-

-

-

-

-

-

-

-

33,5

29

4.768

25

23

5.519

Atu Lintang

1

1

170

-

-

-

2

2

100

43

41,7

6.541

30,5

26,5

9.760

Jagong Jeged

36

29

5.259

40

18,3

2.332

20

11

318

81

65

18.022

118

95

30.378

Bintang

23

26

7.887

-

-

-

5

2

90

110,3

111

15.911

180,3

198,2

43.416

considered resilient in line with

Lut Tawar

35

86,3

32.295

-

7

486

3,2

3,2

150

33

87

14.558

37,6

102,5

14.096

the availability of sufficient

Kebayakan

-

-

-

-

-

-

1

6

18

11,7

13

2.171

9,8

11,3

962

ingredients in Indonesia.

Pegasing

25

29,5

7.269

-

-

-

59

21

1.523

141

133

18.181

106

93

32.175

Aceh Tengah Regency has

Bies

3

3

940

-

1

70

4,9

3,5

93

12

15,4

2.203

12,4

15,1

1.007

a huge prospect to become

Bebesen

1

2

421

65

46

2.170

1

1

30

29

27.2

4.681

25

25,4

4.677

one of the regions establish a

Kuta Panang

5

4

1.054

1

1

0

1

5

20

168

174,7

39.910

75,5

68,9

26.660

sauce industry in Aceh. This is

Silih Nara

12

12

4.335

9,7

10,7

743

1

-

-

162

154

18.446

190,3

182,2

14.150

supported by the availability of

Ketol

-

-

-

1

1

70

37

12

228

573

529

169.711

331

327,5

96.834

Celala

-

-

-

-

-

-

-

-

-

57

53

9.368

56

52

3.559

Rusip Antara

13

16

3.871

15

15

906

-

-

-

34

88,1

18.614

41

89,3

19.108

Aceh Tengah

173

208,8

63.501

137,7

100

6.777

135,1

56,8

2.570

1.488,5

1.521,1

343.085

1.238,4

1.309,9

302.301

important complement to Indonesian culinary which makes it become a potential investment to be developed. The sauce industry is

tomatoes, red chilies, cayenne pepper, and garlic which are cultivated in across 14 SubDistricts in Aceh Tengah

O p p o r t u n i t i e s

Regency.

o f

A c e h

2 0 2 1

Cabe Rawit

Produksi (Kwintal)

a tasteful. Sauces is an

I n v e s t m e n t

Cabe Merah

luas panen (Ha)

of Indonesian culinary is

130

Bawang Putih

Area tanam (Ha)

One of the characteristics

Chilli in the Gayo Highlands, Aceh Tengah.

Bawang Daun

Sub-District


A G R O I N D U S T R Y

Currently, domestic competitiveness for sauce is tight, offering various specialties of each producer. Aceh with its wide variety of culinary flavors which most of are spicy, savory would like to offer the construction of a sauce industry in Aceh Tengah and guarantee the freshness of the sauce that scattered throughout Aceh Tengah Regency .

Investments Offered: Development of Pasta Sauce Industry:

Capacity : 40 Ton / Year Location

: Blang Bebangka Village

Estimasi Investasi

Sub-District

: Pegasing

District

: Aceh Tengah

Investment

Province

: Aceh

Land Status

: Owned by Local Government

IDR 1.5 billion Equipment

Land Authority : Aceh Tengah Industry and Trade Agency & Gajah Putih University

IDR 700 million Investment Capital

Investment Activities :

IDR 800 million

Factory Construction

Net Present Value

Machinery and Equipment Procurement

Internal Rate Return

Provision of transportation / cargo

Discount Factor (DF)

Procurement of other equipment

Benefit Cost Ratio

IDR 1 billion

IDR 248,319,450

IDR 700 million

20%

IDR 2 billion

14% for 5 years

IDR 200 million

1,78

Illustration

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

131


A G R O I N D U S T R Y

Cash Flow for 5 Years of The Construction of Aceh Tengah Pasta Sauce Industry No. Description cash flow projection I

Year o

Year 2

Year 3

Year 4

Year

Cash Flows In

II

1.Sales of various variant pasta sauce

1.500.000.000

1.500.000.000

1.500.000.000

2.000.000.000

2.000.000.000

The Amount of income

1.500.000.000

1.500.000.000

1.500.000.000

2.000.000.000

2.000.000.000

Financial Factory Development Investment

700.000.000

Working Capital Amound of Funding

800.000000

Amound of Funding III

Cash Flows Out Indirect Labor Salary Direct Labor Wages Other Fixed Costs Purchasing Raw Materials Help Materials Energi Utilities/Wrapping Maintenance Others Total Expenditures

IV

Gross Profit (EBIT)

V

Obligations For Interest Payment

(1.500.000.000)

VI

Net Profit Before Tax (EBT)

I n v e s t m e n t

O p p o r t u n i t i e s

(1.500.000.000)

o f

A c e h

2 0 2 1

Assumption: 3 The projection of income is assumed to be constant until year 3 and in year 4 it is predicted to increase. 3 Expenditure projections are assumed to increase annually by 5%. 3 Calculation of the annuity of a working capital loan for 5 years with an interest rate of 14% per year.

1.500.000.000

Invesment Capital Loans Working Capital Loan Anuity (14%) Total Obligations

132

Year 1

275.000.000 100.000.000 50.000.000 150.000.000 75.000.000 50.000.000 30.000.000 30.000.000 100.000.000 860.000.000

288.750.000 105.000.000 60.000.000 165.000.000 78.750.000 52.500.000 33.000.000 31.500.000 105.000.000 903.000.000

303.187.500 110.250.000 70.000.000 175.000.000 82.687.500 55.125.000 36.300.000 33.075.000 110.250.000 948.150.000

318.346.875 115.762.500 80.000.000 185.000.000 86.821.875 57.881.250 39.930.000 34.728.750 115.762.500 995.557.500

334.264.219 121.550.625 90.000.000 195.000.000 91.162.969 60.775.313 43.923.000 36.465.188 121.550.625 1.045.335.375

640.000.000

597.000.000

551.850.000

1.004.442.500

954.664.625

121.026.837 121.026.837

137.970.594 137.970.594

157.286.478 157.286.478

179.306.584 179.306.584

204.409.506 204.409.506

518.973.163

570.870.479

627.957.527

690.753.280

759.828.608

3 Investment criteria: NVF> 0, or positive value, project feasible.


A G R O I N D U S T R Y

Net Present Value of Aceh Tengah Pasta Sauce Processing Industry Development No. I

Description cash flow projection

Year o

Year 1

Year 2

Year 3

Year 4

Income Sauce Sales (1500)

1.500.000.000

1.500.000.000

1.500.000.000

2.000.000.000

Salvage Value

2.000.000.000 200.000.000

Gross Benefit II

Year

1.500.000.000

1.500.000.000

1.500.000.000

2.000.000.000

2.000.000.000

700.000.000

Working Capital

800.000000

Operating Costs

860.000.000

903.000.000

948.150.000

995.557.500

1.045.335.375

Working Capital Loan Anuity

121.026.837

137.970.594

157.286.478

179.306.584

204.409.506

518.973.163

459.029.408

394.563.522

825.135.916

950.255.119

77.845.974

68.854.411

59.184.528

123.770.387

142.538.268

(1.500.000.000)

441.127.188

390.174.995

335.378.994

701.365.528

807.716.851

1.000

0.877

0.769

0.675

0.592

0.519

(1.500.000.000)

386.953.674

300.226.989

226.371.268

415.264.696

419.502.822

III

Benefit

IV

Tax 15 %

V

Net Benefit

VI

DF 14 %

VII

Present Value

VIII

Net Present Value

1.500.000.000

3 The projection of income is assumed to be fixed until year 3, and in year 4 it is predicted to increase. 3 Expenditure projections are assumed to increase every year by 5% 3 Calculation of the annuity of a working capital loan for 5 years with an interest rate of 14% per annum

Spending Building and Factory Invesment

Assumption:

3 Investment criteria: NVF> 0, or a positive value, the project is feasible

248.319.450

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

133


A G R O I N D U S T R Y

IRR and Nett Development of Aceh Tengah Pasta Sauce Industry Year

Net Benefit

DF 14%

Present Value

DF 20% Present Credit

0

- 1.500.000.000

1.000

- 1.500.000.000

1.000

- 1.500.000.000

1

441.127.188

0,877

386.868.544

0,833

367.605.990

2

390.174.995

0,769

300.044.571

0,694

270.954.857

3

335.378.994

0,675

226.380.821

0,579

194.085.066

4

701.365.528

0,592

415.208.393

0,482

338.325.691

5

807.716.851

0,519

419.205.046

0,402

324.603.287

NVP1

248.319.450

NPV2

-4.515.109

Total

Contact Person: Contact us:

IRR = 0,20 ATAU 20% (greater than 14%)

Aceh Tengah Investment And One-Stop Service Agency

IRR > SOCC Criteria, then the Feasible Project Net B/C = 1,78 Criteria for

Net B/C > 1, the Feasible Project

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

: Jl. Kartini No.03, Takengon, Aceh Tengah

Phone

:

(063)21085

Munawar Khalil (Head of Promotion Div. DPMPTSP Aceh Tengah)

Illustration

134

Address

2 0 2 1

Hp

: +6281260999090

Email

: mr.arigayo@gmail.com


A G R O I N D U S T R Y

Livestock The area is suitable for livestock grazing in Aceh is 18,569 Ha.

Beef cattle in Aceh Besar.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

135


A G R O I N D U S T R Y

To develop this potential, the Aceh Government has prepared a Master Plan for the Development of livestock areas which is divided into three development areas, namely the Industrial Center Area, the Fattening Center Area and the Breeding Center Area. The main activities in this project are infrastructure development, building irrigation and grazing land, construction of feedlots, breeding room and cattle fattening.

Aceh beef development project strategies includes: Development of farms with a nucleus-plasma scheme, building a cattle breeding management system (grazing or feedlot), building a feedlot in each district with halal

I ESTIMATES $33.147.500 USD Breeding:

beef processing and meat

5.500 Cows

distribution. Targets for

Filling:

15.000 Cows

initial development: Aceh Besar, Pidie, Bener Meriah

ROI B/C

District, Aceh Tengah, and Nagan Raya.

: 29,64 % : 1,23

Payback Period:

3 Years 5 Months Land area

6.434 Ha Location:

Krueng Aceh, Kuta Malaka, Blang Ubo-Ubo Land Ownership:

Government Beef cattle in Aceh Besar.

136

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Beef Industry Aceh Besar I Development Project

Pidie Jaya Beef Industry Development Project

Aceh Nagan Raya Beef Industry Development Project

Aceh Tengah Beef Industry Development Project

Bener Meriah Beef Industry Development Project

Suitable for Development:

Suitable for Development:

Nucleus:

Breeding

Breeding Lot as Research Center

780 Ha

Suitable for:

Land Area:

Land Area:

Plasma:

Land Area:

5.000 Ha

1.500 Ha

4.155 Ha

Land Area:

Location Land Status

500 Ha Location Land Status Scheme

: Biheu Village, Muara Tiga District : Private Owned : Plasma System

Location Land Status Scheme

: Blang Baroe Rambong : Koperasi Aneuk Nanggroe : Sistem Nucleus dan Plasma

2.280 Ha Location Land Status

Scheme

Breeding and Main Cages

: Perumpakan Benjadi : Government Owned

: Jagong Jeget & Karang Ampar : Private and Government Owned

• Nucleus: 605 Ha • Plasma: 5.829 Ha

Suitable for Development of: Kuta Malaka

-

Main Feedlot for Nucleus Herd

Krueng Aceh

-

Traditional Fattening

Cot Sirebee, Jantho

-

Bull Cow Depot

Blang Ubo- Ubo

-

Large-scale breeding for nucleus herd

Beef cattle in Aceh Besar.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

137


A G R O I N D U S T R Y

Fishery Samudera Kutaraja Fishing Port, Lampulo, Banda Aceh.

138

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A G R O I N D U S T R Y

Idi Fishing Port

The production of wild caught fish at Idi Fishery Port is approximately 21,473.51 tons / year and aquaculture is 10,485 tons / year, including tilapia, catfish, milkfish, black tiger prawns, white shrimp, fire shrimp, and crabs. The operational area of Idi Fishery Port is 62.5 Ha which is supported by the following facilities and infrastructure:

Facilities & Infrastructure Capacity Î Jetty

: 1.600 M2

Î Water break

: 800 M3

Î Port pool

: 300 Ha

Î West-side discharge and load jetty : 160 M2 Î East-side fish market

: 600 M2

Î West-side fish market

: 800 M2

Î Fish packaging building

: 150 M2

Î Port management office

: 452 M2

Î Generator set housing

: 48 M2

Î Water Tower

: 1 Unit

In an attempt to increase production of

Î Port Office

: 1 Unit

aquaculture and wild caught fish, the following are

Î West side warehouse

: 8 units

potential investments to be developed:

Î Warehouse Forklift

: 1 unit

Î Workshop

: 1 unit

Î Culinary stalls

: 22 units

Î West-side prayer room

: 1 unit

Î Guesthouse

: 9 unit

Î Port car park

: 1 unit

Î Fuel station for fishing boats

: 2 units

To support the development of a fishery city (minapolitan), the Regional Government of East Aceh focuses on increasing the production of aquaculture and wild caught fish. Products are sold in domestic and international markets.

1. Ice block factory 2,000 blocks / day 2. Fish caning factory 3. Promotion & research center for fisheries 4. Docking facilities 5. Fish market and distribution center pendistribusian ikan

Kuala Idi Fishing Port, East Aceh.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

139


A G R O I N D U S T R Y

Metro Mina ParkKuala Idi – East Aceh East Aceh Regency has natural resources, forests, gas, marine resources and fisheries which make East Aceh become the largest fish producer in Aceh Province.

To improve the fishery sector, East Aceh also has ponds with an area of 18,780 hectares in a total of 5,820 Fisherman. The annual production reaches 13,508.69 tons with total production value from aquaculture ponds reaching 466,210,150,000 each year.

Namu International Airport which is located in Deli Serdang District, North Sumatra Province, a distance of 283 km from the Metro Mina Park location.

Fishery Sector Export Destination

In addition, East Aceh has a community’s salt

The export destinations are Malaysia, Singapore

business or known as salt farmer. In 2019, the

and Brunei Darussalam.

number of salt farmers in East Aceh reached 209

1. Fishery Production Data 2. Regional Development Concept

people and was divided into 16 groups of people East Aceh Regency is flanked by the Malacca

with a total land area of 10.61 hectares with total

Strait which makes it rich in marine resources.

production value of 2,781.5000.000, - each year.

The Kuala Idi coastal fishing port is the largest fish producer in Aceh province and the center of

Î Map of Location Plan Î Basic facilities and infrastructure

fishing activity in East Aceh. Based on data from the East Aceh Fisheries Agency, the number of fishermen reached 20,140

AIR TRANSPORTION

people in 2020, while the number of fishing fleets (ships and boats) reached 3,376 units and sea

The nearest airport is Malikul Shaleh Airport

catches reached 28,799.55 tons / year with an average production value of Rp. 680,760,852,000, / year.

140

I n v e s t m e n t

which is located in Muara Batu Sub-district, North Aceh Regency with a distance of 112 km from the Metro Mina Park. Besides, there also is Kuala

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Kuala Idi Fishing Port, East Aceh.


A G R O I N D U S T R Y

Data Of Potential Fishery No Description

Unit

Total 28,779

1

Number of Tuna catches

Ton

2

Value of the catch

Rp

3

Number of fishermen

4

Fishing Vessels

O

Orang

680.760.852.000 20.140

Boat without Motor / Boat

Unit

611

Outboard Motor Boat

Unit

974

Motor Boat

Unit

1.791

1. < 5 GT

Unit

1.114

2. 5-10 GT

Unit

230

3. 11-20 GT

Unit

203

4. 21-30 GT

Unit

139

5. > 30 GT

Unit

105

A

I

A

Concept of Development Area Area : 62 Ha Location : Keutapang Mameh Village Sub-District : Idi Rayeuk

SAMUDERA ACTIVITY Boat flights

Landing

Auction

Cold Storage

Processing

Cleaning Cooling Storage

Unloading Transport Sort Cleaning

Auction Transport Cleaning

Cleaning Sortir Packing

Penyortiran/ Pengepakan

Freezer

Drying Salting Canning Fileting Fish flour Fish crackers Fish oil Etc.

Service Water Supply Fuel supply Food Supply

Maintenance / Repair 20 GT

15 GT

Site Plan

ACTIVITIES ON LAND

Ship Machine Tool

Transport Cleaning Packing Ice sprinkle

Cleaning Packing

Inter-island marketing

Area

Description

Auction Zone

Fish auction area and supporting facilities consisting of: TPI building, TPI warehouse, Ice Factory, Cold Storage, and parking lot.

Office and Social Zone

Office and social areas consist of: offices administration, cooperatives, shops, clinics, firefighters and fishermen meeting halls.

Supply Zone, Industrial Zone Workshop

This area consist of: gas station, ship workshop, Machine house, and other facilities.

Industrial Zona

Industrial areas.

Sea Transport Ice sprinkle

Pemasaran Lokal Land Transport Ice sprinkle

Mooring/Resting Cleaning Maintenance Break

Kapal Motor

201

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

141


A G R O I N D U S T R Y

Site Plan Metro Mina Zone Investment Data METRO MINA ZONE ILLUS T R ATION

No. Type of work

Total price (Rp)

I

General

125,000,000,000.00

II

Preparatory work

100,600,000,000.00

III

Industrial facilities

6,807,130,000,000.00

a. Sea Facilities

1,411,700,000,000.00

DESCRIPTION

b. Land Facilities

4,072,180,000,000.00

A Fuel Station

c. Ship

1,295,000,000,000.00

d. Transportation and Transportation Equipment

28,250,000,000.00

Facilities and infrastructure

396,530,000,000.00

Total

7,429,260,000,000.00

B Container Field C Harbor D Industrial Zone E Area F Warehouse Clinic G River H Gate II I

Service Area

J Mosque K Residential Area L Business Center M Gate I

142

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

IV


A G R O I N D U S T R Y

Estimation No. Type of work

Specifications and Description

Unit

Quantity

I

GENERAL

1

Land acquisition and settlement

M2

2,000,000.00

2

Permit Fee, etc.

Ls

1

II

Preparatory work

1

Mapping and Measuring Survey

2

Land preparation and clearing

Cut and Fill

Ha

200

M2

2,000,000.00

Estimation Unit price (Rp.)

Total price (Rp.)

60,000.00

120,000,000,000.00

5,000,000,000.00

5,000,000,000.00

Total

125,000,000,000.00

No. Type of work

Specifications and Description

Unit

Quantity

Unit price (Rp.)

Total price (Rp.)

B

LAND FACILITIES

1

Office Buildings

Manager & Harbormaster

M2

3,000.00

5,000,000.00

15,000,000,000.00

2

Warehousing

42 X 60 = 20 Unit, 20 X 48 =

M2

96,480.00

3,500,000.00

337,680,000,000.00

20 Unit, 24 x 36 = 20 Unit. 3

Cold Storage

900 ton capacity

Unit

1

1,500,000,000.00

1,500,000,000.00

4

Block Ice Factory

Capacity 600 tons / day

Unit

2

10,000,000,000.00

20,000,000,000.00

3,000,000.00

600,000,000.00

5

Bulk Ice Factory

Unit

1

1,000,000,000.00

1,000,000,000.00

50,000.00

100,000,000,000.00

6

Crystal Ice Factory

Unit

1

1,000,000,000.00

1,000,000,000.00

Total

100,600,000,000.00

7

Dry Ice Factory

Unit

1

1,000,000,000.00

1,000,000,000.00

8

Belt Conveyor

To supply to the ship

Ls

1

6,000,000,000.00

6,000,000,000.00

III

Fasilitas Industri

9

Repair and Docking

Capacity 2500 tons

Unit

1

3,000,000,000,000.00

3,000,000,000,000.00

A

SEA FACILITIES

10

Clean Water Facilities

Water sources

Unit

1

70,000,000,000.00

70,000,000,000.00

1

Container Storage Jetty

11

Fuel Facilities

Including the BBM Bunker

Unit

1

50,000,000,000.00

50,000,000,000.00

2

Fishing Boat Harbor

12

Electricity

Power Source

Unit

1

125,000,000,000.00

125,000,000,000.00

3

Port Protection Buildings:

13

Telecommunication Facilities

Unit

1

50,000,000,000.00

50,000,000,000.00

A

Break Water

14

Port loading and unloading equipment

Ls

1

12,000,000,000.00

12,000,000,000.00

B

15

Bait Fish Pond

Ha

50

1,000,000,000.00

50,000,000,000.00

16

Street and Parking Lot

a. Parking

M2

117,680.00

2,500,000.00

294,200,000,000.00

b. Container Field

M2

12,000.00

1,900,000.00

22,800,000,000.00

For Industrial Estates

Ls

1

15,000,000,000.00

15,000,000,000.00

Total

4,072,180,000,000.00

1800 X 8 m

Rubblemound (Tetrapot)

Ls

1

800,000,000,000.00

800,000,000,000.00

Ls

1

300,000,000,000.00

300,000,000,000.00

Ml

3,000.00

30,000,000.00

90,000,000,000.00

Kanal (Plaster and Road)

M2

9,600.00

22,000,000.00

211,200,000,000.00

4

Beacon Signs on the Sea

Bh

5

1,100,000,000.00

5,500,000,000.00

3

Light House

Bh

1

5,000,000,000.00

5,000,000,000.00

Total

1,411,700,000,000.00

17

Fire Fighting Installation

Including the crane

A c e h

I n v e s t m e n t

O p p o r t u n i t i e s

2 0 2 0

143


A G R O I N D U S T R Y

Estimation Specifications and Description

No. Type of work

144

Unit

Quantity

Estimation Unit price (Rp.)

C

SHIP

1

Long Line Tuna

200 Gt

Unit

40

20,000,000,000.00

2

Nets

1000 Gt

Unit

3

3

Transport Ship (Including processing)

2000 Gt

Unit

4

Tug Boat

5

Training Ship

6

Fire Boat

7

Fishery Supervisory Ship

8

Coast Patrol Boat

Total price (Rp.)

Facilities and infrastructure

800,000,000,000.00

1

Environmental Wall

75,000,000,000.00

225,000,000,000.00

2

Fenced Industrial Zone

1

150,000,000,000.00

150,000,000,000.00

Unit

1

15,000,000,000.00

15,000,000,000.00

3

Main Street and Environment

Unit

1

10,000,000,000.00

10,000,000,000.00

Unit

1

70,000,000,000.00

70,000,000,000.00

100 Gt

Unit

1

15,000,000,000.00

15,000,000,000.00

30 gt

Unit

2

5,000,000,000.00

10,000,000,000.00

Total

1,295,000,000,000.00

60 Gt

TRANSPORTATION AND EQUIPMENT

1

Truck Cold Storage

City Transportation

Unit

5

1,500,000,000.00

7,500,000,000.00

2

Open Body Truck

Transport from ship to warehouse

Unit

5

550,000,000.00

2,750,000,000.00

3

Employee Bus

Unit

5

1,500,000,000.00

7,500,000,000.00

4

Firefighter trucks

Unit

3

1,500,000,000.00

4,500,000,000.00

5

Operational Vehicles

Unit

15

400,000,000.00

6,000,000,000.00

Total

28,250,000,000.00

I n v e s t m e n t

No. Type of work IV

D

A c e h

Specifications and Description

Personal

O p p o r t u n i t i e s

2 0 2 0

Unit

Quantity

Unit price (Rp.)

Total price (Rp.)

Ml

4,000.00

1,750,000.00

7,000,000,000.00

Ml

4,000.00

1,750,000.00

7,000,000,000.00

a. Main Road Access (Major Road to the Regions)

Km

4

37,000,000,000.00

148,000,000,000.00

b. Access road to Kuala Bungak

Km

6

18,500,000,000.00

111,000,000,000.00

c. Neighborhood Path

Km

6

9,250,000,000.00

55,500,000,000.00

25,000,000,000.00

50,000,000,000.00

150,000.00

18,000,000,000.00

30,000,000.00

30,000,000.00

Total

396,530,000,000.00

TOTAL

7,429,260,000,000.00

Precast concrete

Sub grade stabilized, carrying capacity 40 Ton 4

Bridge

5

Parks and Green Spaces

6

Street and Garden Lights

Median and sidewalk

Contact Us: East Aceh Investment And One-Stop Service Agency East Aceh District Government Central Complex

Unit

2

M2

120,000.00

Ls

1

Gusti Sari Ayu Address

: Jl. Medan Medan- Banda Aceh Km. 370 No. 3 Idi Post Code. 24454

Head of Information, Promotion and Investment Cooperation Divission

Phone

:

Hp

: 08116715105

Email

: dpmpptacehtimur@gmail.com

Email

: hockclickgusti@gmail.com

(063)21085


A G R O I N D U S T R Y

Sawang Ba’U Fishing Port

The facilities at the port of Sawang Ba’u are: FACILITIES AND CAPACITY Port area 1,5 Ha

Sawang Ba’u Village is a fishery center in South Aceh, with a total of 1,604 fishermen and 132 fishing vessels. There are 60 boats 10 GT, and 78 non-motorized boats.

Quay Jetty Breakwater 400 m Pool port 1,2 Ha Revetment 150 m Fish Market (TPI) 6 x 6 m

The fishing gear used is purse saine and the main catches are skip jack and tuna.

The fishery business in Sawang Ba’u is highly promising; the local governments are expected to provide the necessary facilities to encourage the private sector to invest in the construction of fish processing plants. The following are potential investments that can be developed at the Sawang Ba’u Fishing Port: 1. 1. Ice block factory with a capacity of 10 tons/day 2. Fuel station for fishing boats 3. Cold Storage Sawang Cot Bak U Fishing Port, South Aceh.

4. Docking facilities

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

145


Bundaran Simpang Lima, Banda Aceh.

Tourism Development 146

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


Testimony

Testimony

I Accommodation Sector yriad Muraya Hotel Aceh started its

guests including celebrities and the community.

hospitality business in Aceh at the

The profit achieved in a short period of time are

end of 2017 with high optimism. By

significant enough to give us confidence to expand

continuing to carry out the concept of halal

our hotel business by building 3 new properties in

and Sharia, the Kyriad Muraya Hotel Aceh

Banda Aceh, Takengon and Kuta Cane. Therefore,

has received a positive response from

in 2021 there will be 4 hotel units under Kyriad

the domestic and international markets.

management. Until now, business opportunities in

Starting from the grand opening of the Hotel

Banda Aceh in particular or Aceh in general are still

in 2017 until now the Kyriad Muraya Hotel

very potential with an ideal ROI period.

Aceh has been listed as the 1st ranking hotel in Aceh and has become the choice of staying for regional and foreign guests

Let’s invest in Aceh......

including the President of the Republic of

Bambang Pramusinto

Indonesia, Ministers, Ambassadors, State

General Manager Kyriad Muraya Hotel Aceh

High Officials, Military Attaches and special

www.kyriad.com | www.kyriadmurayaaceh.com

Kyriad Muraya Aceh

KHMAceh

e

u

n

kyriadmurayahotel

I n v e s t

s i

A c e h

+628116713123

2 0 2 1

147


T O U R I S M

D E V E L O P M E N T

Tourism

The Aceh Culture and Tourism Agency has identified 797 tourist destinations as well as 774 cultural sites and heritages scattered in 23 regencies and cities throughout Aceh. Apart from tourism, Aceh also has a variety of unique cultural arts such as dances, customs, literature, arts, painting, and spiritual activities that are tourist attraction. All that beauty is very easy to enjoy, since accessibility to tourist attractions in Aceh is very convenient. All tourist destinations can be reached by land, sea and air. There are international flights to Aceh, such as from Penang, Kuala Lumpur and Jeddah.

The tourism sector is a promising investment opportunity in Aceh. Aceh has great tourist attractions; natural tourism, cultural tourism, artificial tourism, cultural heritage, and so forth.

The Aceh government is currently discussing a plan to open a new flight route from Aceh to India (Port Blair), as well as the Sabang – Phuket– Langkawi route. As a result, the number of tourists visiting Aceh continues to increase every year. Approximately 2.3 million tourists visited Aceh in 2017 and 2.5 million in 2018. This shows a 20% increase from the previous year. In 2019, the number of tourists who visited Aceh reached 2.6 million. Iboih Beach, Sabang.

148

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


T O U R I S M

D E V E L O P M E N T

Total Domestic and International Tourist by Regency/City in Aceh, 2019 Total Tourist Regency/City

International

Domestic

Total

Simeulue Aceh Singkil South Aceh Southeast Aceh AceH Timur Aceh Tengah West Aceh Aceh Besar

1.499 3.242 19 5.625 43 424 324

47.833 95.309 22.473 21.388 15.941 52.946 52.265

49.332 98.551 22.492 27.013 15.984 53.370 52.589

28.400

500.476

30 10

16.493 66.178

3.531

173.469

33 263 17 66 295 -

14.544 17.383 10.250 1.327 23.850 70.928 2.127

31.670 31.450

482.322 589.244

36

32.850

42

140.751

18

79.532

107.037

2.529.879

106.281 75.758

2.391.968 2.288.625

Pidie Bireuen North Aceh Southwest Aceh Gayo Lues Aceh Tamiang Nagan Raya Aceh Jaya Bener Meriah Pidie Jaya Banda Aceh Sabang Langsa Lhokseumawe Subulussalam 2019 2018 2017

528.876 16.523 66.188

177.000 14.577 17.646 10.250 1.344 23.916 71.223 2.127

513.992 620.694 32.886

140.793 79.550

2.636.916

The arrival of foreign tourists by cruise ship in Sabang.

2.498.249 2.364.383

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

149


T O U R I S M

D E V E L O P M E N T

Aceh as “World’s Best Halal Cultural Destination” has encouraged the Aceh Government to be more active in improving various tourist facilities and infrastructure. Based on Data from Aceh in Figures, the tourism sector has contributed approximately 5% to Aceh’s GRDP every year on average. Compared to other sectors, tourisms’ contribution is 8th from the top. Seeing this growth, the Aceh Government is confident that the contribution of the tourism sector can rise to the top four. The Aceh government is optimistic that the tourism sector will become one of the pillars of Aceh’s economy in the future. In an attempt to develop the tourism sector, the Government of Aceh invites investors to participate both as stakeholders and managers in several supporting projects for the tourism industry in the following districts/cities:

0 Kilometer Monument Sabang.

150

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


T O U R I S M

NAIC & BSB A I Banda Aceh Business Center Banda Aceh City

Nurul Arafah Islamic Center (NAIC), Ulee Lheue.

Banda Aceh City is located between 05°16’15” - 05°36’16” North Latitude and 95°16’15”95°22’35” East Longitude with average altitude of 0.80 meters above the sea level.

Geographically, the position of Banda Aceh City is

the work force participation rate in Banda Aceh is

highly strategic; close to the countries in southern

61.39% with the Human Development Index (HDI)

Asia. Banda Aceh is bordered in the North by

at 85.07 in 2019.

South Malacca Strait and also bordered by West Aceh Regency, East Indian Samudera, Aceh Besar Regency. Banda Aceh as the capital city of Aceh Province

Infrastruktur Pendukung Transportasi (Darat, Udara, Laut):

is also the center of Aceh Provincial Government and various related agencies. Aside from its

Airport/Bandara Sultan

function as the centre of government, economic,

Iskandar Muda International

educational and cultural services, and religious

Airport, dengan jarak tempuh

center, Banda Aceh City is also the gate of the

ke pusat Kota Banda Aceh

Republic of Indonesia to the western part of the

16,7 Km dengan jarak tempuh

country in terms of transport, land, sea and air.

26 Menit.

Banda Aceh City has great tourism potential considering that this city is a cultural and historical centre. The main economic activity is trade and fisheries since Banda Aceh is a coastal city.

Banda Aceh Business Center (BSB), Keudah, Banda Aceh.

D E V E L O P M E N T

Ulee Lheue Ferry Port Pelabuhan Penyeberangan Ulee Lheue, dapat diakses dari Bandara Sultan Iskandar Muda dengan Jarak 20,6 Km dengan waktu Tempuh 35 Menit.

The total population of Banda Aceh was 268,156

Gerbang Tol Blang Bintang,

people in 2019 with population growth rate of

dengan pusat Kota Banda

1.15 % from 2018 to 2019. Good quality and

Aceh dengan jarak 19 Km

competitiveness of human resources is necessary

dengan waktu tempuh 30

for Aceh investment performance. Besides that,

menit.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

151


T O U R I S M

D E V E L O P M E N T

Supporting Facilities Project Development for Gemilang Tourism Project

Available Land:

Economic Feasibilty Analysis

Total Area: (Government owned)

Payback period for Gemilang Project (Nurul

7.245 M2

Arafah Islamic Centre and Banda Aceh

Future Expansion: Land Acquisition Gemilang Project is an initiation from the

19.331 M

Government of Banda Aceh City to build a world

Location: Jl. Iskandar Muda Gp. Ulee Lheu, Sub-

class Islamic Centre as a destination of halal

District Meuraxa, Banda Aceh City

2

tourism and Banda Aceh Business Centre and as

INAIC ( Nurul Arafah Islamic Center) I I Asean

Market Opportunity: Banda Aceh as the capital city and the centre of government of Aceh Province is also the oldest

as a religious convention centre with a capacity of

Islamic City in Southeast Asia and the capital city

3000 congregants from various Islamic countries,

of the Sultanate of Aceh. Banda Aceh city has great

mainly ASEAN.

potential as a religious tourism destination.

O p p o r t u n i t i e s

IRR

Investment Estimates:

places, dzikr plazas, tahfiz schools, boarding schools, guest houses, health clinics, mini

Supporting Facilities

Development plans: Highway, bridges, parking lots, mosques and towers, ablution markets, souvenir shops and food galleries, post offices, parks and landscapes.

IDR 49,365,000,000 (USD 3.6 MILLION) Main Building

Total Investment

NAIC (Nurul Arafah Islamic Center) has a function

I n v e s t m e n t

Net Present Value

: 15 Years. : US$ 45,423,736 (Positive Value) : 11.00%.

Investment Activities:

IDR 281,681,000,000 (USD 20.5 MILLION)

the lifestyle center in Banda Aceh.

152

Business Centre)

Nurul Arafah Islamic Center (NAIC)

o f

A c e h

2 0 2 1

IDR 331,046,000,000 (USD 24.2 MILLION) Cooperation Scheme:

Build, Use, Hand Over Nurul Arafah Islamic Center (NAIC).


T O U R I S M

Banda Aceh Business Center (BSB)

D E V E L O P M E N T

Investment Estimates IDR 461,024,190,000 (USD 33.8 MILLION)

Contact Person:

Cooperation Scheme:

Banda Aceh Investment And One Stop Services Agency (Dpmptsp)

Government cooperation with

Address

business entities (KPBU).

: Mal Pelayanan Publik (MPP) Bulding, Jl. Diponegoro, Pasar Atjeh Lt.III, Gp. Kampung Baru, Baiturrahman

Land Available:

Sub-District, Banda Aceh Nurul Arafah Islamic Center (NAIC).

Total Area:

11,727 M2

Nurul Arafah Islamic Center (NAIC).

Postal Code

: 23242

Telephone

: (0651)32874 / (+62) 813 62 503 333

Email

: bid.pm.dpmptsp.bna@gmail.com @mpp_bandaacehkota

CP

:

Status:

Government Owned LOcation : Strategic Area (Old town centre) Jl. Cut Meutia Gp. Baru Kecamatan, Baiturrahman, Banda Aceh City

Investment Activities:

Cut Maisarah,SE, MM

Banda Aceh Business Centre will be developed as

(Head Division) /

a center of business district with transportation

0811687480

and accommodations, integrated with shopping malls and modern lifestyle and is expected to increase regional income.

Banda Aceh Business Center (BSB)

Website

: dpmptsp.bandaacehkota.go.id

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

153


T O U R I S M

D E V E L O P M E N T

Lhoknga Golf Course Development Aceh Besar Lhoknga Golf Course is located in the Aceh Besar Regency, close to the popular tourist destination of Lhoknga Beach. The property is 20 KM or about 25 minutes by road from Banda Aceh, the capital of Aceh Province. The Golf Course has a total area of 57 hectares, surrounded with white sandy beaches of Lhoknga and Lampuuk on its western side, and hillside view on the eastern side. Lhoknga Golf Course is the only public golf course in Aceh, located on the designated development land for tourism. The government of Aceh has been developing this Golf Course since 1997 and it has become one of the tourist destinations and integrated golf courses in

Lhoknga Golf Course, Aceh Besar.

Indonesia.

154

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


T O U R I S M

Total Land Value:

Rp. 41.663.040.000.Total Building Value:

Land:

Facilities Provided:

520.788 M2

The condition of Lhoknga Golf Course is still

Total Facility Value:

bad and lacking maintenance due to limited

Rp. 26.148.600.000, -

Land Ownership:

Owned by the Government of Aceh Duration of Lease:

30 Years

Land Status: Certified Audited by MAPPI (Indonesian Society of Appraisal Prosfesi)

government funds. The existing golf course only serves 9 holes out of the 18 holes available. Other facilities include: Grass

Rp. 533.900.000.-

Total Assets:

Rp. 68.345.540.000 (Assessed by independent

Investment Cost Investment for integrated tourism, resort and sport facilities development (4-year plan):

Rp. 83.967.584.000 Existing facilities renovation cost:

Rp. 14.918.415.000 Maintenance cost & wages (annual):

Rp. 18.837.057.794 Total investment cost:

auditor in 2018)

Rp. 117.723.056.794

Lockers

Investment Analysis

Estimated Annual Gross Income

Prayer room

Net Present Value (NPV)=

Facilities and Building Rent:

Rp.118.187.770.374, -.(Feasible)

Rp. 10.700.000.000

Benefit Cost Ratio (BCR)=

Green Fee:

1,3260> 1 (Feasible).

Rp. 26.401.000.000

Internal Rate of Return (IRR)=

Total Annual Income:

26,8367%> MARR 15%. (Feasible).

Rp. 37.101.000.000

The club house

Pump House Electricity and water network Temporary storage warehouse Sprinklers, and Guardrail area

Pay Back Period (PBP)=

Lhoknga Golf Course.

Investment Scheme

11.4730 Years.

Management of the property by investors for a certain period of time

Break Even Point (BEP)=

management and the Government of Aceh.

11,3181 Years.

D E V E L O P M E N T

(a maximum of 30 years). Profit sharing: 40% to investor, 60% to the Lhoknga Golf Course, Aceh Besar.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

155


T O U R I S M

D E V E L O P M E N T

Ie Seum Hot Spring Resort Tourism Development Overview Of Aceh Besar Regency Aceh Besar Regency is located at 5.05 ° - 5-75 ° North Latitude and 94.99 ° - 95.93 ° East Longitude. The North is bordered by the Malacca Strait and Banda Aceh City, the South is bordered by Aceh Jaya Regency, the East is bordered by Pidie Regency, and the West is bordered by the Indian Samudera. Aceh Besar has an area of 2,903.50 km² with 68 tourist destinations consisting of 51 natural attractions, 6 cultural attractions and 11 special interest attractions. Most of the areas are land, and also a small part is in the islands. Aceh Besar District has protected and cultivated forests.

Ie Seum hot spring, Aceh Besar.

156

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


T O U R I S M

Investment Supporting Infrastructure

Water Transportation

Human Resources

There are 2 (two) major ports in Aceh, namely:

The total population of Aceh Besar Regency according to the estimated results in 2017 was

} Malahayati Port, with a distance of 7 km and

Land Transportation Toll road become an alternative transportation to Ie Seum Hot Spring Resort with distance of 18 km and travel time of ± 25 minutes. The location

409,109 consisting of 209,593 of males and

travel time of ± 10 minutes, Malahayati Port

199,516 of females. The total workforce in Aceh

is used as a marine highway that supports

Besar is 555.

Aceh’s logistical connectivity.

Tourism destination of Ie Seum currently has

} Ulee Lheu Port, with a distance of 39 km

of the Ie Seum Hot Spring Resort is 38 km from

and travel time of ± 60 minutes is one of the

the provincial capital city with travel time of ± 55

seaports to Sabang City, which is one of the

minutes. The distance from Aceh Besar Regency

marine tourism destinations in Aceh.

D E V E L O P M E N T

approximately

39 workers

Swimming Pool:

3 people

is 62 km with travel time of ± 90 minutes.

Parking:

3 people Cleanliness:

Electricity and Water Air Transportation

3 people Ie Seum hot spring, Aceh Besar.

Canteen Staff:

The State Electricity Company has distributed

Sultan Iskandar Muda International Airport

electricity to 604 villages in Aceh Besar Regency.

30 people

Blang Bintang is a transportation mobility for

There are 604 villages with 73,655 customers that

For managers of Ie Seum Hot Spring Resort,

local and international tourists. With 5 (five)

are connected to Electricity Power for 102,719,869

Meanwhile, the total amount of drinking water

training has been given by the Tourism, Youth and

major airlines traveling to Aceh there are

VA. Currently, infrastructure and electricity are

distributed to customers was 10,560,758 m3 with

Sports Agency of Aceh Besar Regency.

approximately ± 5,000 trips each year and

available in the Ie Seum Hot Spring Resort.

most of the distribution in November reaching

the number of passengers reaches 550,000

The highest number of drinking water customers

966,167 m3. Meanwhile, the clean water pipeline

each year. The distance from SIM to the

in PDAM Tirta Mountala Aceh Besar Regency

(PDAM) is not yet available. So far, clean water

tourist attraction is 23 km with travel time of

was 3,525 for non-commercial and 2,929 for

is drawn from wells in neighboring villages using

± 38 minutes.

commercial customers in 2017.

makeshift tools.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

157


T O U R I S M

D E V E L O P M E N T

masl in Seulawah Agam. The average temperature of water is 40 ° c to 90 ° c. Meanwhile minimum air temperature in this area is approximately 19-21°c and maximum temperature is 25-30°c.

Availability of Land

Approximately 35,000 tourists from both local

Geographically, the Ie Seum hot spring tourism

is one of the water tourism options besides the

destination is located at Gampong Ie Seum,

beach. By providing tourists with a beautiful view

Masjid Raya Sub-District, Aceh Besar Regency,

of hills and small channels emitting smoke, visitors

Aceh Province, which geographically is located at

can enjoy the sensation of soaking in hot water that

5 ° 22’12.3 “NL and 95 ° 37’46.5”.

relaxes the body.

and outside of the city visit Ie Seum. This location

This tourist spot has a total area of ± 8 ha belonging to the local government.

Additional supporting facilities and infrastructure is expected to increase the tourists of Ie Seum.

Location

The development of Ie seum as a prominent

Village

:

tourist destination in Aceh Province is supported

Sub-District

:

Regency

:

by many factors, including:

good and smooth road condition.

Area

:

and Sports Agency. The facilities that exist are as

Apart from hot spring tourism destination,

Status

:

follows:

tourists can also enjoy the fruit along

3. Play Ground with a size of 20 m x 20 m 4. MCK 7 units

to be developed professionally is the Hot Spring

5. Prayer room 5 x 7 m

Tourism Destination (Ie Seum). The water in this

6. 15 units of canteen and 8 units of Souvenir

tourism destination is natural hot water flowing

Shop managed by the local community

from the foot of Gunoeng Meuh (Golden Mountain)

7. Wooden gazebo

which is a Strato Volcano with an altitude of 1749

8. 8 units of sauna bathroom

A c e h

Management

under the Aceh Besar Regency Tourism, Youth

children’s pool area 6 x 6 m)

o f

and Pipeline.

:

One of the tourist destinations that is expected

O p p o r t u n i t i e s

Ie Seuem Bath Tourism Development and

Province

20 x 15 m with a height of 165 m and a

I n v e s t m e n t

Cold Water Bathing Pool, Water Pumping Machine

Transportation that is easily accessed with

2. Bathing pool 3 units (male & female area

158

Investments Offered:

The management of Ie Seum tourism is currently

1. Parking 2 units

Market Opportunity

Facilities to be built in 2020:

2 0 2 1

the Lambaro and Blang Bintang roads to

Land Ownership :

Ie Seum Mesjid Raya Aceh Besar Aceh ± 8 Ha Mountain Forest Local Government

Barbate date palms, mango gardens, cocoa gardens, candlenut and jamblang fruit, only the arrangement is not yet professional.

Ie Seum hot spring tourism destination.


T O U R I S M

Contact Person:

Investment Activities

Aceh Besar Investment And One-Stop Service Agency Investment Opportunities 2020 Aceh Besar

Expansion Plan } Road Expansion } Parking area

Address : Jln. T. Panglima Polem, SH, Jantho City, 23912 Aceh Besar - Aceh

Investment Estimates

} Café or restaurant

0852-6032-6180 / 0823-6101-5781

Phone

:

Rp. 10 billion

Email

: dpmptsp.abes@gmail.com

Working Capital:

Website : pinto.acehbesarkab.go.id

Investment:

} Souvenir shop

The construction of various supporting

} Potential land for agro-industrial tourism

facilities mentioned above are expected

} Safety fences in streams of hot springs

to increase the number and intensity of

} Disability access

tourist visits with an estimation of about

} Expansion of the bathing pool

300% growth: 35,000 to 105,000 tourists

} Changing room / toilet

each year. Repair and development of

} Children’s play area

supporting facilities will also significantly

Rp. 3.15 billion

} Facilities for praying

increase the cost of entrance tickets from

Payback Period:

} Sauna therapy

the previous Rp. 3,000, - to Rp. 30.000, -

} Cottage / Lodging

per person. This estimation is built based

4 Years

Budi Santosa, SSTP

} Green open spaces

on the analysis of secondary data (the

Cooperation Scheme:

(Kepala Bidang Penanaman Modal)

} Promotion through mass media

number and management of tourism

Utilization Cooperation

} Development and maintenance of

destinations that are professionally

(according to agreement

organized in Aceh Besar).

with regional leaders)

facilities and parks

D E V E L O P M E N T

Rp. 2 billion Estimated annual income:

+6289519820228

Hp

:

Email

: budisantosa.bin.ibnusaadan@gmail.com

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

159


T O U R I S M

D E V E L O P M E N T

Pidie Lingkok Kuwieng Tourism Development 0 0

0

0 20 21

2

Pidie Regency has a Tropical Climate (Lowlands

2 bordered by Pidie Jaya Regency on A

/ Coastal Coast) and Cool Climate (Highlands / Valleys / Mountains) with a rainfall rate of 1,482 mm each year and an average temperature of 24 ° - 32 ° C, and also has a river length of 567, 40

A Regency and Aceh Jaya Regency on the South side.

Km and Beach of 122 Km. Pidie has various types of soil consisting of Alluvial (Kembang Tanjong, Pidie, Simpang Tiga), Hydromorf (Pekan Baro, Geulumpang Tiga, Mutiara, Titue, Keumala, Tiro

160

I n v e s t m e n t

O p p o r t u n i t i e s

o f

Lingkok Kuwieng, Pidie.

A c e h

Land Transportation

Truseb, Muara Tiga), Podsolik (Padang Tiji, Sigli

Pidie Regency has 96 km of state roads, 267.58 km of provincial roads,

City, Indra Jaya, Tangse).

1,084,150 km of Sub-district roads and 1,798.03 km of Gampong roads.

Pidie Regency has several top tourist destinations

Transportation in Pidie Regency is quite adequate with the existence of

such as Beungga Hot Springs, Lestari Rafting

public transportation in the form of large buses and small buses for inter-

Pidie Park, Pelangi Beach, Guha Tujoh and Lingkok

regency and inter-provincial transportation. Meanwhile, transportation within

Kuwieng.

the town there are labi-labi, pedicabs, motorcycles, taxis and rental cars.

2 0 2 1


T O U R I S M

D E V E L O P M E N T

Lingkok Kuwieng. I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

161


T O U R I S M

D E V E L O P M E N T

Air Transportation

Energy

There is no air transportation in Pidie Regency.

The availability of electricity in Pidie Regency is adequate

Flights to Pidie Regency are via Sultan Iskandar

with connected power of 102,368,900 VA consisting of

Muda Airport (SIM) in Blang Bintang, Aceh Besar

the Sigli state electricity agency for 59,380,600 VA and the

Regency. Furthermore, from SIM airport, the Sigli

Beureunuen state electricity agency for 42,988,300 VA. The

Regency can be reached in approximately 2 hours

required electricity for investment activities in the tourism

with a travel distance of 112 km via the Banda

industry is adequate.

Aceh - Medan National road or within 1 hour via the toll road. This SIM airport serves domestic flight routes and several international flights.

Human Resources The total workforce in Pidie Regency is 192,190 persons consisting of 111,145 men and 81,045 women. From its educational background perspective, there are 1,046

Sea Transportation

members of the workforce who have not attended school,

There is no sea port in Pidie Regency. The closest

have finished elementary school. Meanwhile, there are 41,463

sea port is through the Ule-lheu port in Banda Aceh

who have attended junior high school, 62,964 high school,

City which is about two hours to the city to Sigli via

7,169 vocational, 11,363 who have diplomas, and 23,252

Banda Aceh - Medan National road or one hour via

are university graduates. The majority of the work force, at

the toll road.

32.76%, have Senior High School education. With this number

17,447 who have not finished elementary school, 27,486 who

of workers, it is sufficient to fill jobs in the tourism industry.

162

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Lingkok Kuwieng.


T O U R I S M

Land availability

Market Opportunities

Lingkok Kuwieng, also known as Uruek Meuh, located in Padang

Lingkok Kuwieng provides a very unique and captivating natural

Tiji Sub-District (in the Hagu Forest) is 12 km from Sigli City, the

phenomenon. Besides being able to enjoy a river with its green water

capital of Pidie Regency. Lingkok Kuwieng is a river with mountain cliffs, in the form of large cliffs resembling an ancient site. This

equipped with rock cliffs on its sides, we can also enjoy the beautiful natural atmosphere, fresh air, trees, and camping places. By setting up

place is often called the Grand Canyon of Aceh. Lingkok Kuwieng is

tents on rocky cliffs, of course visitors can feel the sensation of staying

a natural phenomenon which formed because of mountain erosion

the night in the middle of the wild accompanied by a campfire. This

that make water volumes change. The beauty of Lingkok Kuwieng

tourist destination can be one of the uncommon and unique places

is complemented by a natural atmosphere and maintained by a row

with its endless natural resources.

of green trees that thrive around the river.

Investments Offered:

Investment Estimates

Development of facilities and markets for the

Investment:

Lingkok Kuwieng tourist destination

IDR 10 Billion

Location

Working capital:

Village

: Pulo Hagu

Sub-District

: Padang Tiji

IDR 15 Billion

District

: Pidie

Estimated Income:

Province

: Aceh

IDR 5 Billion/Years

Investment Activities The development of this tourist destination consists of several investment activities,

To get to the Lingkok Kuwieng Tourist Spot in Padang Tiji, the

including:

distance is 99 Km away from the Banda Aceh City. Meanwhile

1. Road Construction

from Sigli City to Padang Tiji is 13 Km and takes an hour through

2. Souvenir Shopping Center

Padang Tiji Military Command. Starting this year, the road to

3. Parking area

Lingkok Kuwieng has already been repaired by the TNI through

4. Agro-tourism land for tourist attractions that

TMMD activities.

Contact Person: Contact us : PIDIE TOURISM, CULTURE, YOUTH AND SPORTS (DISPARBUDPORA) Address

: Jalan Prof. A. Majid Ibrahim-Tijue Kabupaten Pidie-Aceh, Kode Pos 24151

Phone

:

Email

: disparbudporapidie@gmail.com

Website

: disparbudpora.pidiekab.go.id

(0653) 21109 / Fax: 23748

Payback Period:

5 Years

Scheme:

PIDIE INVESTMENT AND ONE-STOP SERVICES AGENCY (DPMPTSP) Address

: Jalan Tgk. Chik di Reubee No. 5 Kota Sigli, Kode Pos 24114

Telp/Fax

:

(0653)23399

Investment activities are facilitated by the Pidie Regency Government based on a cooperation agreement.

involve the community who own the land

The Lingkok Kuwieng area is a forest owned by the community

5. A stopover place / lodge for visitors

with total area of approximately 20 hectares.

6.

Syammi, SP

Restaurant / Restaurant / Café

7. Toilet / Changing Room 9. Worship Facilities 10. Kids Game Facilities 11. Fasilitas Permainan Anak

Contact Person:

(Head of Tourism Div)

8. Lodging

Lingkok Kuwieng.

D E V E L O P M E N T

Cp

: 0822

5224 8860

Email

: syammiabdullah@gmail.com

Lingkok Kuwieng.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

163


T O U R I S M

D E V E L O P M E N T

Pulau Banyak Tourism Development Nature Tourism Park (TWA) is a Natural Tourism Park appointed based on the Decree (SK) of the Minister of Forestry No. 596 / Kpts-II / 1996 on September 16, 1996 concerning the Designation of the Multi-Island Cluster and the surrounding marine waters covering an area of ± 227,500.

164

I n v e s t m e n t

O p p o r t u n i t i e s

Panjang Island, Pulau Banyak.

In 2000, the Minister of Forestry and Plantation

Change of Designation of Forest Areas to Non-

the Banyak Islands Nature Park was designated as a

issued Decree No. 170 / Kpts-II / 2000 concerning the

Forest Areas of ± 42,616 Hectares, Changes in the

nature tourism park based on the Decree of the Minister

Designation of Forest and Water Areas in the Special

Function of Forest Areas of ± 130,542 Hectares and

of Forestry Number: SK. 5347 / Menhut-VII / KUH /

Region of Aceh Province with an area of ± 3,549,813,

Changes of Non-Forest Areas to Forest Areas of ±

2014 concerning the Designation of Forest Areas for

thus it changed the area of Banyak Islands Nature

26,461 Ha in Aceh Province.

Natural Tourism Parks and Marine Nature Tourism Parks

Tourism Park. In 2013, the Minister of Forestry

Based on the results of the boundary demarcation

in the Banyak Islands, covering an area of 205,720.24

Decree No. SK.941 / Menhut-II / 2013 concerning

in 1996 and the SK for the designation of the area,

hectares in Aceh Singkil Regency, Aceh Province. In

o f

A c e h

2 0 2 1


T O U R I S M

D E V E L O P M E N T

(56,863.95 Ha), and Traditional Blocks (90,337 Ha). In 2017, the Aceh Natural Resources Conservation Center has also compiled a Site Design for Management of Natural Tourism Block Utilization in the Banyak Islands Nature Tourism Park. In the management of the Banyak Islands Nature Park which is a Nature Conservation Area (KPA) refers to Government Regulation (PP) Number 28 of 2011 as amended in PP Number 108 of 2015 concerning Amendments to Government Regulation Number 28 of 2011 concerning Management of Nature Reserve Areas and Conservation Areas Natural. In this PP it is stated that the implementation of Natural Tourism Parks Baguk Island, Pulau Banyak.

is carried out by the Government in this case by the Natural Resources Conservation Agency. Therefore, the Banyak Islands Nature Tourism

2018, the Minister of Environment and Forestry

Park has an area of 230,632.18 hectares consist of

Islands Nature Park area through the Director

Park is managed by the Aceh Natural Resources

Decree No. SK.580 / MENLHK / SETJEN / SET.1 /

205,758.87 hectares of water (89.22% of the total

General of KSDAE Decree No. SK.162 / KSDAE / SET

Conservation Agency, the Directorate General of

12/2018 dated 17 December 2018 concerning the

area) and 24,873.31 hectares of land (10.78% of the

/ KSA.0 / 6/2016 dated 9 June 2016 concerning

Natural Resources and Ecosystem Conservation,

Third Amendment to the Decree of the Minister of

total area)..

the Management Block of the Many Archipelago

and the Ministry of Environment and Forestry. As

Nature Park, Aceh Singkil Regency, Aceh Province.

for the development of Banyak Islands Nature

Forestry Number SK.865 / MENHUT-II / 2014 dated 29 September 2014 concerning Forest Area and

In 2016, the Director General of Conservation of

The division of this area block divides TWA into

Park, it is carried out in an effort to develop

Conservation of Waters of Aceh Province. Based

Natural Resources and Ecosystems (KSDAE) has

Protection Blocks (20,920.39 Ha), Maritime

business activities, construct infrastructure to

on this latest decree, the Banyak Islands Nature

approved the block arrangement of the Banyak

Protection Blocks (87,464.05 Ha), Utilization Blocks

support activities and provide services.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

165


T O U R I S M

D E V E L O P M E N T

The following are the potential investment that can be developed in Banyak Islands:

No.

166

I ne v eu s tn m e In nt v eO sp tp o sr i t uA nc ie thi e 2s 0 2o 1f

A c e h

2 0 2 1

Area (Ha)

1.

Bangkaru Island (Ujung Lakita, Ujung Selatan, Teluk Berasi, tip berambang, Sidincak Farm and Teluk Asin)

± 347

2.

Bangkaru Island (Abuse, Offense, Jungle Door, Luan Batu etc.)

± 404

3.

Tuangku Island (Tip Lolok)

± 202

4.

Tuangku Island

± 1995

5.

Tuanku Island, Pulau Banyak.

Location

Palambak Besar Island

± 51

Site Analysis a. Flat topography b. The vegetation that is dominated by sea pandanus, waru, benut and coconut c. Fauna: Monitor Lizards, Parrots, King Prawns, Magpie Stones, Crocodiles, Mouse Deer d. Potential: Beach, White Sand, Surf Spots and Beautiful Beach Views a. Flat topography b. Vegetation: Sea Waru, sea pandanus, Nyamplung, Ficus, bayur etc. c. Fauna: Monitor Lizard, Murai Batu, King Shrimp, Turtle, Mouse Deer, crocodile d. Objects / Potentials: white fine sand, beaches and limited tours of turtle observation e. There is a turtle resort / camp a. Flat topography b. Vegetation: Waru Sea, Pandanus Sea, ketapang c. Fauna: Lizard, king prawns d. Object / Potential White sand, big waves suitable for surfing e. There are 4 units of resort / bungalow and 1 unit of floating resort / bungalow a. Flat topography b. Vegetation: Waru Sea, Pandanus Sea, ketapang c. Fauna: Lizard, king prawns d. Object / Potential White sand, big waves suitable for surfing a. Flat topography b. Vegetation: Ketapang, Coconut Trees, Pandanus Sea c. Fauna: Lizard, king prawns d. Object / Potential: Fine white sand, suitable for snorkeling and diving e. There are 4 units of resort / bungalow

Recommendation Development Potency

Business Area

Development of Accommodation: Bungalow and Restaurant

Public Space

Tourism Package of Turtle Observation

Business Area

Development of Accommodation: Bungalows, Restaurants, Water Resort

Public Space

Development of Docking and Shelter

Business Area

Development of Accommodation: Bungalows and Restaurants


T O U R I S M

No.

Location

Area (Ha)

Site Analysis

6.

Palambak Besar Island

± 213

a. Flat topography b. Vegetation: ketapang coconut trees, Pandanus sea c. Fauna: Lizard, king prawns d. Object / Potential: Fine white sand, suitable for snorkeling and diving e. There are 4 units of resort / bungalow

Public Space

Development of Docking, Shelter, Camping Ground, Toilet, Prayer Room, Security Post

7.

Sikandang Island

± 130

a. Flat Topography b. Vegetation: Coconut Tree, Waru sea c. Fauna: Lizard, King Shrimp d. Object/Potential: White Sand, Suitable for snorkeling and diving

Public Space

Development of Docking, Shelter, Camping Ground, Toilet, Prayer Room, Security Post

8.

Sikandang Island

± 23

a. Flat Topography b. Vegetation: Coconut Trees, Waru Sea

Business Area

Development of docking bridge and water resort

9.

Taliana Island

±4

a. Flat Topography b. Vegetation: Coconut Trees c. Fauna: Lizard, King Shrimp d. Object/ Potential: White Fine Sand which suitable for snorkeling and diving e. Resort and Bungalow

Business Area

Development of Accommodation: Hotels, Restaurants, Water Resort

10.

Taliana Island

±4

a. Flat Topography b. Vegetation: Coconut Trees c. Fauna: Lizard, King Shrimp d. Object/ Potential: White Fine Sand which suitable for snorkeling and diving

Public Space

Development of Docking, Shelter, Camping Ground, Toilet, Prayer Room, Security Post

11.

Exploitation Block (water)

± 53.490,95

Shallow waters: Kayaking, Snorkeling Deep water: Surfing and diving

Public Space

D E V E L O P M E N T

Recommendation Development Potency

Mangrove, Ujung Lolok, Pulau Banyak.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

167


T O U R I S M

D E V E L O P M E N T

3

Facilities (IUPSWA) which submitted by BUMN, BUMD, BUMS, and Cooperative: 2

IUPSWA

COMMITMENT FULFILLMENT STATEMENT

ECO-TOURISM BUSINESS DEVELOPMENT LICENSES Registration

1

Business Indentification Number (NIB) Issued

Applicant

Requirements of Commitment Fulfillment

Commitment Finalization

Supervision

2

3

IUPSWA INPUT REQUIRED DATA/INFORMATION

Technical Requirements

1

1. Input the required data and information, company profile, shareholders, capital distribution, investment value, application to use foreign worker

Businesses (BUMN, BUMD, Koperasi, dan BUMS) register through website

2. Input business field information based on 5 digit Indonesia Standard Industrial Classification (KLBI): TN (91032), TWA (91034), and TAHURA (91033)

www.oss.go.id

to create OSS account/

USER ID

ISSUED

2. Making a

1. Location Permit

map of the area of planned business activities to be carried out with a scale of at least 1: 25,000 (one in twenty-five thousand);

TECHNICAL REQUIREMENTS

Valid documents-

IUPSWA is issued with commitment fulfillment

Invalid documentsApplication is Rejected

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

a. IUPSWA

Cancellation with

3. Business License

3. Preparing UKL/UPL;

(With Commitment)

4. Creating a

natural tourism exploitation plan; and Pay the IUPSWA fee

commitment

to Director General / Head of Provincial

IUPSWA Holder with commitment to finalize the

* Can be extended 1 (one)

Head UPTD in Regency / City request the business to finalize

commitment approximately 1 (one) year after

time with maximum length

the commitment

obtaining requested commitment fulfillment

of 6 months

3 (three) days of working days after issuance by OSS

General Director/ Head of Provincial Agency / Head of UPTD in Regency / City submits the examination and study result over the

Documents are sent through OSS,

and original document are sent

Institution (3 Working Days) or Head of Provincial Agency /

b. Notification of

Definitive IUPSWA

Agency / Head UPTD in Regency / City

fulfillment commitment to OSS Institution

General Director / Head of

IUPSWA holder with commitment to submit a report

Provincial Agency / Head of UPTD

on the completion of commitment fulfillment to the

in Regency / City will examine and

OSS institution in form of electronic and original

study the finalization commitment

documents to the Director General / Head of Provincial Agency / Head of UPTD Regency / city

(3 Working Days)

Sources of further reading related to natural tourism concession licensing:

Contact Person:

1. Government Regulation No. 24 of 2018

Address

: Jalan Cut Nyak Dhien Km. 1,2

concerning the Electronically Integrated

Telp/Fax

: 0651

Business Licensing Services.

Email

: bksdanad@yahoo.co.id

2. Technical . considerations from the Head of the UPTD in the field of tourism; 3. IL (Environmental Permit) with commitment; 4. Business activity plan; and 5. Integrity pact.

/ KUM.1 / 7/2018 concerning Norms,

Definitive IUPSWA

in the Ministry of Environment and Forestry.

the

(3 Working Days)

/ Head of UPTD in Regency / City will

examine the statement of commitment

Head of Provincial Agency / Head of UPTD

of supervision

and technical requirement (7 (seven) Working Days)

Tutia Rahmi, S.Hut

3. Based on the Minister of Environment and

The governor or regent / mayor issues a Decree on Granting IUPSWA

Forestry Regulation No. P.8 / MENLHK

(valid for 55 years)

/ SETJEN / KUM.1 / 3/2019 concerning

(Forest Ecosystem Controller (PEH) BKSDA Aceh)

Exploitation of Nature Tourism in Wildlife

OR General Director / Head of Provincial Agency

OR

to the OSS institution

Electronically Integrated Licensing Services

c. OSS institution grant

supervision to OSS Institution

in Regency / City result

Standards, Procedures, and Criteria for

can run their business

of

42694

and Forestry No. P.22 / MENLHK / SETJEN

(7 (seven) Working Days)

IUPSWA is effective and license holder

General Director report the result

ACEH NATURAL RESOURCES CONSERVATION CENTER

2. Regulation of the Minister of Environment

equipped with the location map requested;

(7 (seven) working days).

168

2. Environmental Permit

UPTD province or regency/city according to their authority, and is

Examine and Study

Business Indentification Number

ISSUED

1. Technical considerations from the Head of UPT or Head of

IUPSWA Issuance

NIB

1. Marking the boundaries of the business area requested;

5.

4

Commitment Fulfillment

COMMITMENT FULFILLMENT

The applicant is stated to:

SUPERVISION RESULT

REGISTRATION PROCEDURE

General Director report the result of supervision to OSS

Reserves, National Parks, Grand Forest

General Director submits a technical review

General Secretary conducts a legal review and

The Ministry issues a Ministry

and the draft Ministry Decree on the Granting of

submits a Ministry Decree on the Granting of

Decree on the Granting of IUPSWA

IUPSWA to the General Secretary

IUPSWA to the Ministry

(valid for 55 years

7 (seven) working days

7 (seven) working days

3 (three) working days

Hp

: 085260250452

Email

: tutiarahmi05@gmail.com

Parks, and Nature Tourism Parks.

O

I I I I

O O A O A

I O I O A O

A A A

O I I A IO O O O A

O

A IO

O

O

A IO


T O U R I S M

D E V E L O P M E N T

Jetty at Balai Island, Pulau Banyak.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

169


Aceh Investment Development Zones Development of NPK fertilizer, PT. Pupuk Iskandar Muda.

170

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


Testimony

Testimony

I Experience Pupuk Iskandar Muda has been operating in Aceh for 38 years which currently has been developing the NPK Chemical Plant. We consider that investment climate in Aceh is excellent with the security conditions that increasingly conducive to making Aceh an attractive investment location outside Java Island, especially in the Arun Lhokseumawe Special Economic Zone (SEZ) that gives tax incentives: tax holidays and tax allowances as well as other conveniences we have received. We are also received big from the local government for growth of investment in Aceh, making Aceh a competitive investment destination.

Yanuar Budinorman CEO of PT PIM

Development of NPK fertilizer, PT. Pupuk Iskandar Muda.

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

171


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Aceh Investment Development Zones Aceh currently has an industrial area that will be the right choice for investors to develop their business. Aceh Industrial Zone consists of the Free Port and Free Trade Zone (FP & FTZ), Special Economic Zones (SEZ), Industrial Zone (IZ) and Samudera Fishery Port Development (OFP). These industrial zone have their own special appeal by offering incentives and conveniences to potential investors. The Government of Aceh expect that the existence of this industrial area can become a center for new economic growth in Aceh. Development of NPK fertilizer, PT. Pupuk Iskandar Muda.

172

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Sabang Free Port and Free Trade Zone (FP & FTZ) Why Invest in Sabang Area? Strategic Location Sabang is the western gateway to Indonesia and an entrance for investment, goods and services from within and outside the country. The location of Sabang is right on the international shipping route that connects trade between the east via the Melaka Strait and the west via the Indian Samudera which bordered by the Bay of Bengal. Thus it is suitable to be an international shipping traffic service center. This area is also positioned

Accessibility Access to the Sabang is supported by sea and air transportation facilities. For sea transportation, Balohan Port provides route from Sabang to Malahayati Port in Banda Aceh (Capital of Aceh Province). Yachts and cruises through Phuket and Langkawi are also an alternative for foreign tourists. For air transportation, Sabang has

CT3 Seaport.

Maimun Saleh Airport which tourists can take a connecting flight via Kuala Lumpur, Malaysia or Medan and Jakarta, Indonesia.

Deep Sea Port

Incentive

Natural beauty

Infrastructure

Sabang has a natural port with a depth of

In order to encourage investment activities in the

approximately 20 meters and has great potential

Sabang area, facilities incentives are provided

The Sabang area is an island that a wide sea and

Infrastructure in the Sabang area is quite

to be developed as a center for international port

for business actors or investor: free trade tax of

various natural tourist destinations, especially

adequate, especially roads, electricity, water and

services, both for export-import ports and national

import duties, value added tax, sales tax on luxury

marine tourism.

telecommunications.

trans shipment ports.

goods and excise.

as a frontier in global competition.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

173


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Land Availability Clean and clear land is an absolute necessity for investment activities. Land covers an area of 708 hectares and has been certified as many as 1,000 parcels are available for investors to develop, especially in the tourism sector.

Sabang Area

Iboih, Sabang.

UU no. 37/2000 regarding the Free Port and Free

Area functions for business development:

Trade Zone (FP & FTZ ) into Law: Sabang Free Port Free Trade Zone or called Sabang Zone is an area that is within the jurisdiction of the Unitary State of the Republic which is separate from the

} Trade and services

customs area so that it is free from:

} Industry } Mining and energy

a. Trade system (does not include goods

} Transportation

subject to quarantine regulations and types

} Maritime and fisheries

of goods / services prohibited by law)

} Post and telecommunications

b. Imposition of import duty,

} Banking

c. Value-added tax, d. Sales tax on luxury goods and excise Duration of the Sabang area: 70

174

I n v e s t m e n t

years

O p p o r t u n i t i e s

o f

Balohan Sabang Passenger Terminal.

A c e h

Includes activities:

2. Provision and development of water resources

1. Manufacturing, design, engineering, sorting, initial and

infrastructure, transportation infrastructure, and

} Insurance

final inspection, packing and repacking of goods and

other facilities including seaports and airports,

} Tourism

raw materials from home and abroad, service repair and

buildings and electricity networks and other

} and other fields.

recondition of machinery and quality improvement.

infrastructure.

2 0 2 1


A C E H

Sabang Management and Development Agency The Sabang Management and Devlopment Agency (BPKS), located in Sabang City, is an agency authorized to manage and develop the Sabang Area in accordance with the functions of the Sabang Area.

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Sabang Investment Opportunities The presence of BPKS as the manager of the Sabang Area is expected to be a partner of the regional government in the management and implementation of development, both facilities and infrastructure to support investment and licensing services. Therefore, it will attract investors to invest in the Sabang area. BPKS determines 4 priority sectors to be developed, namely:

Tourism Sector

Port Sector

BPKS is established the provisions and issues related permits for business actors who carry out their business activities in the Sabang Area. Apart from that, BPKS is also authorized to carry out guidance and integration of policies with the provincial and district / city governments.

Industial and Trading Sector

Fishery Sector

Freddies, Pantai Sumurtiga, Sabang.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

175


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Development of Iboih and Gapang Marine Tourist Destination

Market opportunity

Investment Activities

The development of a marine tourism area as

The regional development project includes

the main tourist destination in Sabang, offers

several stages:

a relaxed atmosphere with forest views as a

Development of the main building cluster

coastline for beautiful Iboih, golden sand filled

Development of functional facilities

with giant stones. The clarity of shallow water sea

Development of supporting facilities

shows a bluish-green hue that gives peace and relax. The beach is curved in shape, resembles lips, smiles and welcoming people to come and feel the warmth and see the exotic flora and fauna of the tropical rainforest which is part of the natural wealth of Sabang.

The area of Iboih and Gapang marine tourism is a marine tourist destination. This area offers

To attract tourists, it is definitely needed to

stunning beaches and beautiful underwater

improve the supporting infrastructure to provide

views. Currently, there are several cottages are

comfort for tourists.

available in this area, but it is still necessary to be

Investment Offered

developed some other investments in this area such as hotels, restaurants, villas, cafes and spas.

Development of the Iboih and Gapang Marine

This area can be accessed by road from Balohan

Tourist Destination

Port (29.1 Km) and travel time of 47 minutes,

Location

:

of 33 minutes. Currently, public transportation is

Area

:

available to Iboih and Gapang.

Land Ownership

:

and from CT-3 Port (20.2 Km) with a travel time

Investment Estimates Total Costs:

Rp. Rp. 1.95 Trillion, IRR : 34 % NPV : PI

925,850,000

: 1,91

Iboih dan Gapang 800 Ha BPKS Iboih

176

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Gapang


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Development of the International Resort and Gua Sarang Golf Course Area Market opportunity

Investment offered

Estimasi Investasi

forest of Pulau Weh that jutting into the blue sea. Gua Sarang

Currently the Sarang Cave area is a favorite selfie

International Resort and Golf Course

Total development costs:

offers natural beauty, green leaves of trees flank along the

spot in Sabang and also a tourists attraction for

Development

pedestrians to this tourist sites. Called as the Sarang Cave, since

the one who are interested in the beach activities

Location:

there is a cave door where bird’s nest is placed. There are as

such as swimming, snorkeling and diving. Even,

many as five cave doors, but only two cave doors are inhabited

it is also often to be used as a camping spot,

Kampung Paya, Gua Sarang

by birds which are believed to have many benefits.

because there are no hotel facilities here.

Rp. 2 Trillion, IRR: 33 % NPV: 466,122,000 PI: 1,4

Sarang Cave is located in Iboih Village, Sukakarya Sub-District, Sabang City, at the foot of the cliffs and hills of the protected

Sarang Cave can be accessed by road via Balohan Port (20.7

Area:

200 Ha

Km) with a travel time of 37 minutes, while from CT-3 Harbor

Though it is still lacking of facilities, the

Land Ownership:

(20.3 Km) with a travel time of 34 minutes. Currently, there is no

enthusiasm of tourist interest in Sarang Cave has

public transportation available to the Sarang Cave. In other hand,

encouraged us to improve and develop supporting

50% of the land owned by BPKS

visitors can rent a car or motorbike to get there.

infrastructure such as resorts and international sports facilities for seek of the tourist comfort and satisfy.

Pay Back Periode:

6 years 11 months

Investment Activities The regional development project includes several stages: Land acquisition Construction of basic facilities cluster (reclamation area, resort development and golf courses) Construction of functional facilities Construction of supporting facilities

Gua Sarang, Sabang.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

177


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

I

Investment Activities

(MICE) Cluster and Iboih Condominium

The regional development project includes several stages: Land acquisition Construction of basic facilities cluster (reclamation area, break water construction, and drainage) Construction of functional facilities

Sabang area has dazzle beaches and amazing

for local, national and international events with

underwater nature scenery that opens up

various activities such as exhibitions, seminars,

opportunities for the construction of MICE and

workshops, coordination meetings: Sabang

condominiums that will be place for various

Investment Estimates

Exhibition Festival, Sabang Sea Festival, Khanduri

events both at national and international levels.

Total development costs:

Laot Festival, Sabang Diving Festival, Sabang Freediving Competition International, Sabang Weh

By offering a complete design by combining

Bicycle, Sabang Jazz Festival, Sabang Mountain

occupancy and convention space in one

Bike, Ethnic Cultural Festival and other events.

property, of course it will attract event organizers to carry out activities in Sabang.

Iboih offers a quiet atmosphere that away from

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

22,40 % NPV:

Market opportunity

Convention, and Exhibition (MICE) Cluster and

Pay Back Periode :

Iboih Condominium

Aceh has experienced a remarkable

Location

: Iboih

5 years 3 months

transformation, from rare visited province to one

Area

: 10 Ha

of the most visited provinces in Indonesia, with

Land Ownership

: 70% of the land

number of events that taken place in Aceh. The

I n v e s t m e n t

IRR:

Development of a Meeting, Incentive,

of the giant aquarium.

178

Rp. 326 billion

235,125,875,000 PI: 1,25

the hustle and bustle of the city, with direct views

Iboih, Sabang.

Construction of supporting facilities

The Sabang area is currently one of the venues

Investment offered

belongs to BPKS


A C E H

Sabang Waterfront City Development

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Investment offered Development of Sabang Waterfront City Location:

The Sabang area which is an island that has great potential for the development of waterfront city - based tourist area, with the concept of development of visual city that bordered by the waterfront. This

Kota Bawah Timur Village, Sukakarya Sub-District Area :

20Ha

waterfront city development is located in the port area of CT-1 to CT-3,

Land Ownership:

which is adjacent to the center of Sabang City.

Community and BPKS

The development of Sabang Waterfront City will integrate the tourist center with trade. The construction and development of this Waterfront City consists of Sabang Marina Bay, Yacht Clubs,

Investment Activities

waterfront Promenade, Street Food, Tugu Merah Putih (shopping

The regional development project includes several stages:

center area), and the construction will also be connected to the old

Land acquisition

town of Sabang on pedestrian street. The development concepts

Construction of basic facility cluster (reclamation area, break water construction, and drainage)

offered include: walking waterfront, recreational waterfront and

Construction of functional facilities

residential waterfront.

Construction of supporting facilities

Market opportunity

Investment Estimates

The development of Sabang Waterfront City will attract tourists, cruise

Total development costs

:

IRR

:

NPV

:

will be a paradise for tourists who get off from cruise and directly

PI

:

looking for unique destinations, hunting a delights culinary and

Pay Back Period

:

and yachts to stop at the CT-3 Sabang Harbor, where currently has visited by more than 30 cruises and 300 yachts in last three years. By carrying out the integrated tourism and trade design, it certainly

Kota Bawah, Sabang.

shopping for souvenirs from Sabang.

Rp. 60 billion 23% 854,650,000 1.5 7 years 2 months

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

179


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Marina and Eco Resort Lhok Weng Development

Investment offered Development of Marina and Eco Resort Lhok Weng Location:

Lhok Weng is located in a strategic location, in the middle of 5 (five) main Sabang tourism destinations; Iboih Beach, Rubiah Island, Gapang

Kota Bawah Timur Village, Sukakarya District

Beach, Balek Gunong and Zero KM Monument, thus the development

Area:

of the Lhok Weng area must be packaged in a unique and different way,

14 Ha

with the designation of marine tourism areas, marine reserves or local protected areas. Lhok Weng has an area with hills with extraordinary view potential, in

Land Ownership:

Community and BPKS

the form of a white sandy beach. Even though it is only 100 m long, it has mangrove conservation area that can be utilized as eco-tourism and potential development of a marina.

Market opportunity as a new destination. Without giving a big promotion effort, tourists will still visit Iboih, Rubiah Island, Gapang, and Zero KM. Therefore, it is needed is to prepare various facilities, infrastructure and destinations in the Lhok Weng area. The development design offered at Lhok Weng is the development of marina tourism that is integrated with an eco-resort which will provide water sports, restaurants, bazaars, mangrove adventures and other facilities.

I n v e s t m e n t

O p p o r t u n i t i e s

Investment Estimates

The regional development

Total development costs :

project includes several stages:

The geographical position of Lhok Weng is the initial capital

180

Investment Activities

o f

A c e h

2 0 2 1

y Construction of the main facility complex y Construction of socio-cultural facilities (places of worship,

IRR

:

NPV

:

BCR

:

Pay Back Period

:

Rp. 108 billion 20.12% 1,499,304.96 1.4649 7 years 5 months

amphiteather) y Construction of sports and recreation facilities y Construction of supporting facilities

Lhok Weng, Sabang.


A C E H

Klah Island Marine Tourism Development

used to enjoy the beauty of the sea and the city of Sabang. By developing a unique tourism concept that is oriented towards marine tourism such as a floating fish market, definitely will make Klah Island to be a special tourist

Klah Island has an area of 17.71 hectares

Land Acquisition:

destination compared to other tourist destinations in

and used as protected forest and one of the

Sabang.

8% of the total investment value

green spaces in Sabang City. The concept of

Construction:

tourist destination development offered is a

15% of the construction that funded by BPKS

environmental conservation, adaptive tropical architecture with the concept of local traditions. Klah Island has a contour with a moderate steep slope, almost the entire rocky area has various

Klah Island Marine Tourism Development Area:

20 Ha

sizes, the beach is limited and separated into two places, however its beautiful and suitable for swimming.

Investment Activities

Z O N E S

Total Investment:

US$ 20.000.000

Investment offered

D E V E L O P M E N T

Investment Estimates

boat, seafood restaurant, and other tourist facilities. This

combination of marine tourism development and

I N V E S T M E N T

Investment period:

36 months Construction period:

18 months

The regional development project includes several

Market opportunity

stages: Construction of utilization facilities for protected forest

The development of the Klah Island marine

Development of coastal tourism facilities

tourism area is complemented by the

Construction of accommodation facilities and other

development of facilities that will support

support facilities

tourism activities such as; utilization of

Construction of public facilities and entertainment

protected forests, walking tracks, coconut

Construction of management facilities and utilities

groves for forest exploration, windmill parks,

Construction of commercial and public facilities

cable cars and forest viewing decks that can be

Construction of water tourism facilities

Klah Island, Sabang

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

181


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Sabang Management and Development – One Stop Services Agency INVESTMENT LISENCE REGISTRATION PROCEDURE

LICENSE FLOW FOR IMPORT / EXPORT GOODS IN THE SABANG AREA

EXPORT

1 INVESTOR

3

2 VISIT THE ONESTOP INTEGRATED SERVICE AGENCY Fill and Complete the requirements to get Certificate of Company registration

4

DOCUMENTS VERIFICATION Investor is required to wait for document verification from PTSP and review of business location for 2 - 3 days

OBTAIN CERTIFICATE OF REGISTRATION COMPANY

1 BUSINESSMAN

2 VISIT THE PTSP OFFICE Fill out forms and complete administration to get TPP

3

IMPORT

4

RECEIVING TPP Businessman get TPP (Company Registration Certificate) after waiting 2-3 days for the administrative process

EXPORT/ IMPORT Businessman can choose one or both trade activities, both import and export

Contact Person: Contact us: BPKS Pusat Sabang

Jalan Panglima Polem, No. 1 Kuta Bawah Barat, Sukakarya Sabang – 23512

Telp +62 652 22144 Faks +62 652 22143 Email: info@bpks.go.id Email: bp.sabang@gmail.com Contact us:

5 TAKING CARE OF OTHER TECHNICAL PERMITS IN ACCORDANCE WITH THE PROVISIONS

6 OBTAIN THE BUSINESS LICENSE Investor is obtained the Business License from PTSP after 80% realization of the business

7 INVESTOR STAR RUNNING THE BUSINESS PERMANENTLY

PERMIT FOR RELEASING GOODS AND / OR PERMIT FOR IMPORTING GOODS

Susanti

6

5 1. Entrepreneurs who wish to import apply for import permit 2. Entrepreneurs who want to export submit a permit to release goods

(Head of Promotion Sub Division)

BUSINESSMAN CAN START TRADING ACTIVITIES

Hp: +62811 688 9975 Email: susantisabang@gmail.com

BPKS, Sabang.

182

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

PT. Pupuk Iskandar Muda, Lhokseumawe.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

183


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Special Economic Zone (SEZ) Arun Lhokseumawe The SEZ Arun Lhokseumawe is located in North Aceh

several sectors, such as energy, petrochemical, agro-

cocoa, rubber, coconut, essential oils and others. The SEZ

Regency, Lhokseumawe City—Aceh province, and was

industry to support food security, logistics and kraft

Arun Lhokseumawe will develop along with the regional

formed based on Government Regulation Number 5 of

paper producing industries. From the energy sector (oil

development of several countries in the South Asia region

2017. SEZ is based on the geographical location of Aceh

and gas), LNG regasification, LNG Hub / Trading, LPG

through revitalizing the marine economy of the Maritime Silk

which is crossed by the Sea Lane of Communication (SLOC),

Hub / Trading, Mini LNG Plant PLTG will be developed

Road. Hence, the SEZ Arun Lhokseumawe is located in the

that is the Malacca Strait and has a comparative advantage

by developing environmentally friendly power plants or

ASEAN and South Asian trade markets. With this potential

to become part of a global production network or global

providing clean energy solutions. Logistics infrastructure

and opportunities, the SEZ Arun Lhokseumawe is projected

value chain. The SEZ was formed from a consortium of

is also being developed to support input and output from

with an attractive investment of US $ 3.8 million and is

several existing companies, such as PT Pertamina, PT

the oil and gas; meanwhile, petrochemical and agro-

launched to recruit as many as 40,000 workers by 2027.

Pupuk Iskandar Muda (PT PIM), PT Pelindo 1, and also the

industrial industries will be developed through improving

Aceh Regional Development Company (PDPA). The PDPA

international standard port and dock infrastructure.

consists of 3 (three) areas: the Arun refinery complex, Dewantara District and Jamuan village, which is the exact location of PT KKA factory.

Development of NPK fertilizer, PT. Pupuk Iskandar Muda.

184

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Besides, the SEZ Arun Lhokseumawe is one of the rich and productive aquatic ecosystems that supports the development of the fisheries industry. With its

The SEZ Arun Lhokseumawe was inaugurated by

potential, the SEZ Arun Lhokseumawe will also become

the President of the Republic of Indonesia, Mr Joko

a base for the agricultural sector with the support of

Widodo on December 14, 2018. The SEZ focuses on

the superior commodities such as palm oil, coffee,


A C E H

S E L A T

Boundary of the KEK Arun Lhokseumawe

M A L A K A

Empty land (Ha)

LMAN

1.689,8

540

PT Pertamin

151,3

81

PT Pelindo-1

38,18

7,82

PT PIM

305,15

126,5

2.622,48 Ha Land Status: (HPL dan HGB)

Eks PT AAF

236,4

91

PT KKA

199,6

50

Empty land:

Total

2.622,48

896,32

y Dewantara area, North Aceh (PT. PIM, ex AAF and PT. Pelindo-1 land) y Jamuan area, North Aceh (PT.KKA land)

Arun Seaport PT Kertas Kraft Aceh

Eks Arun Area PT Asean Aceh Fertilizer

Electric Steam Power Plant

Land Area:

896.3 Ha (34,2%)

Z O N E S

Comparison of Land Areas Land Area (Ha)

(LMAN and Pertamina land) PT Pupuk Iskandar Muda

D E V E L O P M E N T

Land owner

y Former Arun Refinery Area, Lhokseumawe City

Krueng Geukeuh Seaport

I N V E S T M E N T

Why Invest in SEZ Arun Lhokseumawe: Î A decent and pleasant work environment with world-class infrastructure; Î Meet the needs of today's business, family lifestyle & active lifestyle; Î Strategic location and airport connectivity, a gateway to Northwest Indonesia; Î Excellent location with a natural environment for the lifestyle and residential community. Development of NPK fertilizer, PT. Pupuk Iskandar Muda.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

185


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Potential Development Recreation / Housing

Oil, Gas, Energy } LNG Hub / Trade } LPG Trade / Hub

3. Manpower Availability: | Access to a reliable workforce

} Commercial Facilities

| Education and universities

} Hotel, Conference and recreational facilities

| Close to the surrounding housing

} Housing Development

} Gasification & Processing

} Education

} Refining & Processing Facilities

} Health and Sports Facilities

} Power plants

4. Premium Facilities: | Elite housing | Recreational facilities (recreational park and lake, country club)

} Storage facilities

Investment Procedure in SEZ (1) Agree on an Investment Plan 1.

} Clean Energy Solutions

| Community

UNIQUE SALES UNIT

Petrochemical } Petrochemical Industry Cluster

1. Connectivity and Proximity:

5. Smart and sustainable: | Landscape ecology and recreation | Beautiful nuance in an industrial area

} Environmental Friendly Industry

| Strategic location, important delivery channel

} Integrated Petrochemical Project

| Green Blue Network / WSUD

| Good vehicle connectivity

| The latest technology

| Close to the airport

Food and Agro-Processing

| Seaport

} Infrastructure logistics

2. Integrated Infrastructure:

6. Industry Support: | Special Economic Zones | Land management

| Reliable infrastructure

} Modern port

| 24-hour security

| Electricity, water, sewage treatment, high-speed

| Strict security

| Smart and sustainable infrastructure

Rights for the Formation of a Company in a Special Economic Zone 3.

Prospective Investors create a Company Taxpayer Identification Number (NPWP)/ If the businessman does not have an NPWP, Online Single Submission (OSS) will process the NPWP

| Integrated human resource services | Logistic service

(2) Come to the Licensing Service in the Administrator y The SEZ administrators provide the computer facilities for applicants who already understand how to access OSS services 2. Assisted Services y The SEZ administrator assist the applicants who need help in accessing the OSS 3. Priority Service y The SEZ administrators facilitate the applicants, starting from the application stage to the completion stage of the licensing product.

186

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Business people access the website https://www.oss.go.id/oss/

5.

Business people access the OSS by inputting their National Identity Number (NIK) / Passport, E-mail, and some other information on the available registration form

6.

Business people will receive E-Mail containing Direct Link for OSS Account Activation

7.

Business people activate their OSS account and will receive an e-mail containing a User-ID and password for their OSS account

(4) Businessmen will obtain Business Identification Number (NIB) 1. Entrepreneurs log in to the OSS system using a User ID and Password, then click the menu business license application to retrieve company data from General Law

1. Self Service

} Storage of cargo and containers

optical fibre

Prospective Investors create a Certificate of Establishment of a Business Entity and Ratification from the Ministry of Law and Human

| Education

4.

Prospective Investors and BUPP agree on Investment Plans of SEZ (can be stated in the MoU, Head of Agreement, Agreement, or LUDA)

2.

(3) OSS Account Activation

Administration (AHA) Online which is registered with the OSS system. 2. Business people check the required list of Commitment Permits (Business Permits and Commercial Permits) according to their business activities 3. The OSS system issues NIBs for the businessmen. They can obtain other registration documents simultaneously with the publication of the NIB (If needed) y Certificate of Company Registration; y Foreign Labor Use Plan (RPTKA); y Import Identification Number (API); and y Customs Access


A C E H

Facilities and Incentives Licensing Facilities

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Taxation Aspect

Facilities and Convenience

Terms

The implementation of the Online Single Submission (OSS) system in the SEZ aims to facilitate business people to obtain the Business Identification Number (NIB) which in its performance can be assisted by the SEZ Administrator.

Reduction of Income Tax (PPh)

1. Reduction of Corporate Income Tax / Tax Holiday (For Main Activities) y Investment> Rp. 1 Trillion: 20-100% PPh reduction for 10-25 years y Investment of Rp. 500 Billion - 1 Trillion: 20-100% PPh reduction for 5-15 years y Investment <Rp. 500 Billion: 20-100% PPh reduction for 5-15 years y For certain SEZs set by the National Council 2. Tax Allowance (For Outside the Main Activities) y A net reduction of 30% is charged for six years; y Accelerated compilation and amortization; y 10% of income tax imposed on dividends to overseas taxpayers; and y Compensation for losses from 5 years to 10 years. 3. Income Tax Article 22 on Import is free of charge Business Agency: y PPh 22 on imports is not collected on imports of capital goods for a maximum of 3 years Business people: y PPh 22 imports are not collected on imports of capital goods for a maximum of 2 years

I n v e s t m e n t

y New WP y Conducting new investment and expansion of new investment y The business sector is the main activity in SEZ; y Meets Debt to Equity Ratio (DER) requirements y Delivered a letter of commitment to place funds in banks in Indonesia at least 10% of the investment y It has a legal entity status, since or after August 15, 2011.

WP Recipient of Facilities is the WP of domestic bodies in SEZ who make the new investment/expansion on: y Business fields which are the main activities in SEZs that do not receive tax holiday facilities in SEZ; or y Business fields which are other activities in SEZ

Type and number of items not collected PPh 22 specified by the SEZ administrator (master list)

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

187


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Customs and Taxes Aspect

Customs

Traffic of Goods

Facilities and Convenience

Aspect

Facilities and Convenience

Aspect

Facilities and Convenience

BM exemption in the framework of construction/ development

Inland FTA

The release of goods to other places in the area (TLDDP) is subject to an import duty of 0% by having a Domestic Content Level (TKDN) of at least 40%.

Immigration

Traffic of Goods

y The import of goods into SEZ has not yet been subject to provisions in the import sector y Exports from SEZ to TLDPP are subject to import provisions.

y Visit Visa on Arrival is 30 days long and can be extended five times each 30 days y Multiple Entry Visit Visa for foreigners and their families; y Special visa or residence permit for foreigners who own property in the Tourism SEZ; y Special visa or residence permits for elderly foreigners living in the Tourism SEZ.

y Business entities are rewarded with BM for imports of capital goods for three years y People in business encourage BM to import capital goods and production of raw materials for two years y The type and amount of goods specified by the administrator Exempt from tax for raw materials or auxiliary materials in the manufacture of final products that are not taxable goods

Tax

Land Aspect Land

Employment Aspect

Facilities and Convenience

Employment

y In SEZ, it is in the form of a Wage Board and Special Tripartite Worksheets y Only 1 SP / SB Forum in each company y Confirmation and addition of RPTKA in SEZ y Extension of IMTA in SEZ

188

Immigration

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Facilities and Convenience y Land acquisition can use a land acquisition scheme for the public interest using the APBN or APBD y Given HPL to KEK proposed by K / L, Pemprov, Regency / City, BUMN / D y Business entities/businessmen who obtain HGB or Right of Use can be granted for 30 years at the same time extended for 20 years after being declared commercially producing and starting 30 years (total up to 80 years). y In the case of residential / property ownership, HGB or Right of Use can be given 30 years at the same time extended 20 years after the occupancy/property is declared legally owned and can be changed for 30 years (up to 80 years in total)


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Contact Person: Visit Us:

PT Patriot Nusantara Aceh, KEK Arun Lhokseumawe Development and Management Agency Address

: Jl. Medan - Banda Aceh, Muara Satu Sub-District, Lhokseumawe City, Aceh Province - 24352

(62) 645 8050011

Phone

:

Email

: patriot.sezarun@gmail.com Contact Person:

Rustam Effendi (General Manager Operations) Cp

: +628

11 673 250

Email

: rustam.sezarun@gmail.com Development of NPK fertilizer, PT. Pupuk Iskandar Muda.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

189


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Aceh Industrial Estate (KIA) Ladong, Aceh Besar

Zoning Map of KIA Ladong

Zonasi Food Industry Manufacture Logistic Chemical

Strategic Location

Logistic & Mebel

KIA Ladong is an industrial area which was

Currently, KIA Ladong has the following permits:

inaugurated on December 20, 2018, supported

Area Regulations, Industrial Area Business

by a strategic location to the City Center (22.8

Permits (IUKI), Environmental Permits and Location Permits.

Food Industry

Malahayati Port; 10 Km and Ulee Lheue Port; 30 Km

km), to Sultan Iskandar Muda Airport (33 km), to

Manufacture

Sultan Iskandar Muda Airport 28 Km

Malahayati Port (11.6 km) and the Blang Bintang

Chemical

Toll/Highway 13 Km

Fasilitas Umum (± 1.1 Ha)

Toll Gate (11 km).

Perkantoran (+ 1.8 Ha)

Ladong, Aceh Besar

Pabrik Kulit ( 1.4 Ha) Pengolahan Limbah ( 7.4 Ha) Rusunawa ( 3 Ha)

With an area of 66 hectares that has been freed

66Ha up to 250Ha

RTH Batas Kawasan

from the 250ha development plan, it is hoped

Lahan Belum di Bebaskan

Superior Commodity in Aceh

Business Potentials that can be Developed at KIA

Exsport tuna up to 1.726 ton/year

Cold Storage

Grain production up to 2.3 jt tom/year

Warehouse

Coffee production up to 60.000 ton/year

Rice Milling

that KIA Ladong will become an industrial centre

Supporting infrastructure:

and downstream centre for Aceh’s leading

y Water Supply

commodities based on the halal industry such as

y Electricity

food, beverages and other products.

y Wastewater Treatment y Security

KIA Ladong, Aceh Besar.

190

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A C E H

NON CORE DIRECT Clean Water Facilities

Assist with Licensing

Leasing Buildings

Area Maintenance

Business cooperation with tenants

Unit of Small Industry Utilities (SUIK)

Public facilities

Service-based line of business to tenants

Office Units

Security

Multi-function unit

Electrical Energy Facilities

Land Size:

67, 6 Ha Land Status:

Provisions

NON CORE INDIRECT

Industrial Plots Rental

Industrial Waste Management

250 Ha

Second 5 Years

Third 5 Years

Fourth 5 Years

Final 5 Years

Within the Within the Promotion Promotion Period Period

Free

Free

Basic rate

Basic rate

Basic rate

Within the After the Promotion Promotion Period Period

Free

Basic rate

Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Factor Factor Factor

Within the After the Promotion Promotion Period Period

Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Basic rate + Inflation Factor Factor Factor Factor Factor

NOTE:

O O IO

Payment

IO

I

2020

Stages of development at KIA LADONG: Letter of Interest

TENANT

Company Profile

Company document Land of KIA Ladong, Aceh Besar.

Z O N E S

Rental price First 5 Years

Contractual

Management Rights Development Plan:

D E V E L O P M E N T

The basic rate of the land rental price for KIA Ladong = Rp. 5000 / m2 / year. Terms of KIA Ladong Land Rental Prices

Investment Opportunities CORE

I N V E S T M E N T

Establishment Certificate NPWP Permits/License Company leader ID card etc

KAI Ladong, Aceh Besar.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

191


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Samudera Kutaraja Fishing Port, Lampulo - Banda Aceh.

192

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


A C E H

Samudera Kutaraja Fishing Port, Banda Aceh The role of the port as a centre of activity and production centre for fish catches that must be fulfilled is

One of the fishing ports that has a

FLEET/SHIP (GT)

reasonably large fish production in

Z O N E S

2016

2017

2018

2019

Aug-2020

355

359

362

371

374

2485

2513

2534

2597

2928

< 5 - >51

Aceh is the Kutaraja Samudera Fishing Port which is included in the fisheries

6 - 10

management area of WPP 572 with

11 - 20

for pelagic fish and fully exploited for

21 - 30

demersal fish. PPS Kutaraja, which is located in Banda Aceh City, has a very

31 - 50

strategic location, which connects

> 51

directly with the Malacca Strait and the Indian Samudera. Besides,

ABK

PPS Kutaraja is in an area close to potential fishing locations (DPI) and

FISH PRODUCTION

is directly related to international channels.

D E V E L O P M E N T

Total data on Fleet Ships Crew (ABK) and Fishery Production at the Samudera Kutaraja Fishing Port: YEARS

a status that has been overexploited

infrastructure and facilities.

I N V E S T M E N T

Kg.

13.949.930

15.492.130

19.584.495

22.247.928

11.624.147

Rp.

201.615.231.056

244.084.649.389

312.620.526.667

266.241.885.667

128.037.863.000

*) DATA OF SHIP UP TO SEPTEMBER, 23 2020

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

193


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

FACILITIES: y Dock y Warehouse y Fish Market y Water Tank + Installation y Fish auction y Integrated Cold Storage (ICS) 200 Ton y BBM Station

Rental fees according to Aceh Qanun Number 2 of 2019:

5.

y Solid land/dense Rp. y

10.000,-/ m2 / year Raw land Rp. 5.000,- / m2 / year

Investment Opportunities: to catch fish in the EEZ, with 70% local workforce and 30% foreign workers. 6.

y Packing Building Phase 2

SUPPORTING FACILITIES

Fisherman stall (secondary level):

2. PT.Yakin Pasifik Tuna (Fresh fish processing and export

Hectares are utilized.

Land status:

Land Management Rights (HPL)

Samudera Kutaraja Fishing Port, Lampulo - Banda Aceh.

194

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

7.

Fish Freezing Factory.

8.

Fish canning factory.

9.

Fish processing plant (nuggets, sausages etc.)

4 Unit of Toilet and Bathroom facilities : Place of Worship: 10x10 m² Postage: 2 Unit Fisherman stall (first level): 10 Unit (4x10 m²)

The total of the land area is 52 Hektar, only 10

Block ice factory with a capacity of> 80 tons/day.

y Packing Building Phase 1

9 Unit 4x10 m²)

A fishing vessel with a capacity of 60 GT

List of Companies using the PPS Kuta Raja port land facilities:

10.

Seaweed processing plant.

11.

Modern iodine salt factories.

12.

Docking / Shipyard

1. PT. Aceh Lampulo Jaya Bahari (Fresh fish processing and

13.

Fibre Industry (Ships, holdings etc.)

14.

Hygienic fish market

15.

Fish/shrimp feed factories.

16.

Floating SPBN.

export scale storage) scale storage) 3. PT. Nusantara Oilindo Pratama (SPDN) 4. PT. Daya Mitra (Community facility)


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Frozen Tuna Processing Industry Development Market opportunity

Fishery products which are commonly found in Aceh marine and PPS Kutaraja, namely: Skipjack tuna, Frigate mackerel, Layang (Roughear scad, Tuna (Yellow fin), Lemuru (Northen pilchard), Selar (Oxeye scad), Tongkol Komo (Eastern little tuna), Goats (Trigger fish), Lisong (Bullet tuna), and Sunglir / Salam Fish (Rainbow planner) with a production value of 22,247,978 kg in 2019 and 11,624,147 kg in August 2020 with the fleet used varies from 5 to 51 GT.

Export Market Potential From the macro perspective, the export market trend

January to September 2020 Aceh has exported 325,319

for fishery products throughout the country has

kg of tuna with a value of USD 395,359.4 to Thailand and

increased quite significantly in the last 5 years. Even

Japan by PT. Aceh Lampulo Jaya Bahari and PT Yakin

National Market Potential

during the Covid-19 pandemic, export activities of fresh

Pasifik Tuna from Sultan Iskandar Muda Airport and

fish products from Indonesia to foreign countries are

Belawan Port.

Today’s national market opportunities are getting

continued, although there was still a decline. However,

better, and this is in line with the increasing

this decline is not too extreme compared to other

trend of fish consumption by Indonesians. The

business sectors, such as automotive and tourism.

Indonesian population of more than 200 million people which become the most prominent factor for the sale of captured fishery products. By a significant increase in trend of the consumption fishery products in Indonesia in the last 5 years.

The export market for Aceh’s fishery products according to BKIMP-KP 2017 to Malaysia, Singapore, Thailand, Vietnam, Korea, and Japan which can be increased in value and

From January to April 2019, Indonesia recorded that it

destination to other countries, with various efforts including

has exported 56.30 thousand tons of tuna with a value

increasing the production of quality tuna catching products

of USD 244.45 million or 14.46 percent of Indonesia’s

using fishing gear and a more modern factory to increase

total fishery exports of 1.68 billion US dollars.

fish production at PPS Kutaraja requires Technological Support Vessel Monitoring System (VMS) is a fishing

For 2019-2020, the national fisheries consumption

The Aceh Industry and Trade Agency noted that in 2019

vessel monitoring and supervision system commonly

is targeted to reach 54.49 kg per capita per year.

Aceh exported 149,343.52 Kg tuna with a value of USD

used in several developed countries, namely using the

So that the Aceh province has the opportunity

367,160.50, export activities were carried out through

Vessel Monitoring System (VMS) instrument as one of

to supply the fishery product market throughout

the Belawan Port in Medan by PT. Aceh Lampulo Jaya

the strategies in the concept. Monitoring, Control and

Indonesia.

Bahari as the exporter to America. Meanwhile, from

Surveillance (MCS) fisheries management.

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

195


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Business Feasibility Analysis

The existence of VMS for ship owners provides considerable benefits, namely the

Initial assumptions:

monitoring system, facilitate management

Central Bank Interest Rate 8%, Discount Rate 24%,

Profit & Loss Statement, 5-years Annual Cash

in the operational arrangements of their

Inflation Rate 6%, Annual Business Growth Rate

Flow, Net Present Value, Payback Period, Internal

fishing vessels, provide information on the

10%, Return on Capital after 3 years, export market

Rate of Return, Profitability Index and Benefit /

ship’s position in case of an accident, detect

destinations and adjusted prices, Skipjack tuna

Cost Ratio.

position in case of piracy, monitor all fishing

(Cakalang) 25,000 kg per day, Amount of work 240

activities fish that are carried out by the crew

days in 1 year, the local price is Rp. 11,000 / kg

in anticipation of fraud and which is no less that the fish caught does not come from accepted in the exported country.

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

Item

Unit

Value (Rp.)

Total (Rp.)

Buying the Iron Ship + Frozen Cold Storage 100 GT

1

10.000.000.000,00

10.000.000.000,00

Build Cold Storage 400 tons + ABF 5 tons

1

10.000.000.000,00

10.000.000.000,00

and the export price is Rp. 20,000 / kg

Build a Block Ice Factory 50 tons / day

1

2.000.000.000,00

2.000.000.000,00

Data obtained from the implementation of on-site

Buy a ThermoKing Truck 20 ‘Container

5

1.000.000.000,00

5.000.000.000,00

calculate the financial feasibility of development

Company Establishment

1

15.000.000,00

15.000.000,00

1. Cold storage 400 tons + Air Blast Freezer 5 tons

Office supplies

1

119.000.000,00

119.000.000,00

2. 100 GT frozen-box on-board ship 3. 5 Thermoking Trucks

Build Office + Buy 3 Hectares of Land

1

3.100.000.000,00

3.100.000.000,00

4. Office building + warehouse 1 package

Total

research and primary data gathering are used to

illegal activities, so that the catch can be

Initial Investment Projections The initial capital requirements for investment are as follows:

ship owners do not need to create a separate

important, namely as evidence of traceability

196

Parameters Used

20.234.000.000,00


A C E H

I N V E S T M E N T

Projected Gross Income Gross

Projected Operating Costs

Income in 1 operating year is as follows:

Costs incurred within 1 operational year are as follows:

Total Skipjack Tuna

3.225.600,00

Kg

Price in Market Export

20.000,00

Rupiah/Kg

25.200,00

Kg

2.016.000.000,00

Rupiah

8.064.000.000,00 64.512.000.000,00

1

Container

4

Container

Rupiah

16

Rupiah

128

Z O N E S

Operational Cost (Variabel)

Year

Type 1

D E V E L O P M E N T

1

Day

1

Week

Container

1

Month

Container

1

Year

Value 173.000.000,00

5 Thermoking Truck @ 20’ container

12.800.000.000,00

1 (On-Board) Storage 100 GT Cold Storage 400 ton

204.000.000,00

Loading-unloading

480.000.000,00 13.657.000.000,00

Total

Operational Cost (Fixed) Type Employee Salary

1.264.800.000,00

Total

1.264.800.000,00

Total Operational Cost=

PEXELS.COM

Value

14.921.800.000,00

Tuna Cakalang (skipjack tuna)

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

197


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Projected Profit and Loss

5 Year Cash Flow Projection

The results of profit and loss in 1 operating year are as follows:

Component

Unit

Cash Flow (Rp.) Total

Income 3.225.600

Export Price

rupiah

15.000,00

Gross Income

rupiah

48.384.000.000,00

Expenditure

2023

2024

2025

Plus: Depreciation & Amortization Less: Changes in Working Capital

14,000,436,000

15,400,479,600

16,940,527,560

18,634,580,316 20,498,038,348

(16,187,200,000) (12,140,400,000) (8,093,600,000) (4,046,800,000)

-

-

783,394,500

822,564,225

863,692,436

906,877,058

Cash from Operations

30,187,636,000

26,757,485,100

24,211,563,335

21,817,687,880

19,591,161,290

Operational Cost

rupiah

14.921.800.000,00

Investing Cash Flow

-

-

-

-

Cost of goods sold

rupiah

17.906.160.000,00

20,234,000,000

Cash from Investing

-

-

-

-

Profit before Tax

Rupiah

15.555.040.000,00

20,234,000,000

Gross Profit

1 year

14.000.436.000,00

9,953,636,000

26,757,485,100

24,211,563,335

21,817,687,880

19,591,161,290

Opening Cash Balance

-

9,953,636,000

36,711,121,100

60,922,684,435

82,740,372,315

Closing Cash Balance

9,953,636,000

Information : Operational Costs = 15.75 of Gross Income Gross Profit = 65.35 of Gross Income

198

2022

Operating Cash Flow Net Earnings

kilogram

Fish Sold

2021

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Net Increase (decrease) in Cash

36,711,121,100 60,922,684,435

82,740,372,315 102,331,533,604


A C E H

I N V E S T M E N T

Net Present Value Projection

Projected Payback Period

The amount of the net present value of cash flows is as follows:

The length of years to return the total investment capital is as follows::

Net Present Value

Cash Flow

Net Cash Flow

Early Year Investment

Rp (20,234,000,000.00)

Rp (20,234,000,000.00)

2021

Rp 14,000,436,000.00

2022 2023

End of year cash flows

D E V E L O P M E N T

Payback Periode

Net Cash Flow

Year Into

Early Year Investment

Rp 20,234,000,000.00

(20,234,000,000)

0

(6,233,564,000.00)

End of cash flow in 2021

Rp 14,000,436,000.00

(6,233,564,000)

1

Rp 15,400,479,600.00

9,166,915,600.00

End of cash flow in 2022

Rp 15,400,479,600.00

9,166,915,600

2

Rp 16,940,527,560.00

26,107,443,160.00

End of cash flow in 2023

Rp 16,940,527,560.00

26,107,443,160

3

Current Interest Rates

10%

Duration Required

Net Present Value

1,172,723,092.68

Payback Periode

Conclusion

Go Project

Z O N E S

3 0.70 Go Project

Conclusion

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

199


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

Internal Rate of Return

Profitability Index Projection

Projected Benefit / Cost Ratio

The length of years to return the total investment capital is as follows:

The profitability index values of the project cash flows are as follows:

The profitability index values of the project cash flows are as follows:

Internal Rate of Return

Cash Flow

First-Year Investment

Rp (20,234,000,000.00)

Year-End Cash Flow

14,000,436,000.00

(6,233,564,000.00)

2022

15,400,479,600.00

9,166,915,600.00

2023

16,940,527,560.00

26,107,443,160.00

Conclusion

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

Rp (20,234,000,000.00)

2021

Internal Rate of Return

I n v e s t m e n t

Profitability Index First-Year Investment

Interest Rate

200

Net Cash Flow

10.00% 12% Go Project

Year-End Cash Flow

Cash Flow

Net Cash Flow

B/C RATIO

Cash Inflows/Outflows (PV of Cost of Project)

PV Factor (1/((1+r)^n))

2021

(20,234,000,000.00)

-

2021

14,000,436,000.00

0.9804

13,725,917,647.06

2022

15,400,479,600.00

0.9612

14,802,460,207.61

2023

16,940,527,560.00

0.9423

15,963,437,478.80

TOTAL

-

-

44,491,815,333.47

BenefitCost Ratio

2.1989

Rp (20,234,000,000.00) Rp (20,234,000,000.00)

2021

Rp 14,000,436,000.00

(6,233,564,000.00)

2022

Rp 15,400,479,600.00

9,166,915,600.00

2023

Rp 16,940,527,560.00

26,107,443,160.00

Interest Rate Net Present Value Profitability Index CONCLUSION

10% Rp1,172,723,092.68 1.0580 Go Project

O

A

A

O

A

2020

PV of Benefit Expected from Project


E L E C T R O N I C A L L Y

I N T E G R A T E D

B U S I N E S S

L I C E N S I N G

S E R V I C E

Electronically Integrated Business Licensing Service TYPE OF BUSINESS AND SECTOR LICENSING APPLICATION INDIVIDUAL

NON INDIVIDUAL

AGENCY/DELEGATION

e.g.,

SCOPE OF ONLINE SINGLE SUBMISSION (OSS) OTHER BUSINESS

TRANDING BUSINESS (“UD”)

PMDN LEGAL ENTITY

NON LEGAL ENTITY

e.g., PT

e.g., CV

AGENCY/DELEGATION REPRESENTATIVE OFFICE

INDIVIDUAL

e.g., KP3A, BUJKA

FOREIGN STPW (Franchise Registration Certificate)

Company Types All types of company, including individual and non individual

Transformation Changes in compony legality data and business data

Company Registration Business registration and obtaining the NIB

Business Development Addition in business activities

BUSINESS LICENSE Type Of Licenses Business licenses, commercial/ operational licenses, and issuing all of the above

Closing Business Closing the company and all its business activities

Online Single Submission (OSS) System V 1.1 (1/6) Business Identification Number “NIB”

Business License

3 Data Legality Check

3 Project Data

3 Management and Shareholder data

3 Data Business Classification in Indonesia (“KBLI”)

3 Infrastructure and facilities permit

3 Data objectives and purposes

3 Data Completion

3 Data Validation

3 Data Validation

Output:

Output:

3 Business License

Legality 3 Company Data 3 List of certificates

3 Validation of legality data

3 NIB

3 Location Data

Commercial Licenses

Othe than the “PT”

Limited Liability Company (“PT”)

Online Single Submission (OSS) System V 1.1 (2/6)

Online Single Submission (Oss) System V1.1 (3/6)

Collecting list of certificates data

Obtaining Data General Law Administration (“AHA”) Online LEGALITY STAGE

1. Company Data

2. Legality Data

3 Company profile data

3 Company legality data

3 Capital/ Asset Data

3. Management & Shareholder data

3 Management & Shareholder data

4. Data Objectives & Purposes 3 Data Objectives & Purposes

5. Validation Data 3 Validation of all collrcted data from step 1-4 3 Example: The conformity of Investment (“PMA”) status

1.

Data Legality Check

3 Management and Shareholder data 3 Objectives and Pupose 3 Data Validation

PMA

PMDN

PMDN

Badan Usaha Asing

Continue to the NIB stage >>

2. Input Data KBLI

3. Input Your Data 3 Customs activity

3 Company Data

Online Single Submission (Oss) System V1.1 (5/6)

BUSINESS LICENSE STAGE (1/2)

NIB STAGE

LEGALITY STAGE

Output: 3 Commercial Licenses

Online Single Submission (Oss) System V1.1 (4/6)

3 Provide 5 digit of KBLI Data

3 Regestration Data of Insurance & Social Security (“BPJS”) 3 Data Information on Mandatory Manpower Report (“WLKP”)

4. Draft NIB Check

5. Print out Your NIB

1. Project Data 3 KBLI List

3 Validation of all collected data from step 1 to 3 3 Draft NIB

3 NIB

3 Product List

3 Number of WLKP (after notified by Ministry of Manpower)

3 Company Business Data 3 Investment plan data

STEPS ON GETTING BUSINESS LICENSE (1/2)

2. Location Data

3. Location Permit

3 Filling out the related to business location

3 Filling out the form related to business location (to be discussed)

3 Location choise includes land, water, forest area, KEK, KI and FTZ

Online Single Submission (Oss) System V1.1 (6/6)

4. Environment Permit

3 Filling out the form related to environment permit (to be discussed)

Next >>

5. Building Permit (“IMB”) + Certificate of Occupancy (“SLF”) 3 Filling out form related to IMB + SLF

6. Business License 3 Filling out the form related to business license

STAGES IN COMMERCIAL/OPERATIONAL LICENSE 7. Project Draft and Business License

8. Project Output and Business License

3 Draft checking of all collected data from step 1-6

3 Location permit

3 Preview the obtained permits

3 IMB + SLF

3 Environment permit 3 Business License

2. Draft Commercial License

1. Commercial License 3 Fill out the commitment form to complete operational/ commercial license

3. Output Commercial License

3 Choses draft of commercila/ operational license

3 Commercial License (being discussed as the final output)

Continue to the Commercial/Operational License >>

Continue to the business license stage >>

20 SECTORS, EXCEPT: FINANCE, MINING, OIL AND GAS

e

u

n

I n v e s t

s i

A c e h

2 0 2 1

201


E L E C T R O N I C A L L Y

I N T E G R A T E D

B U S I N E S S

L I C E N S I N G

S E R V I C E

Contact Person:

CONTACT PERSON FOR SYSTEMIC PROBLEMS PROBLEM IN VALIDATING TAXPAYER IDENTIFICATIONS NUMBER (“NPWP”)

PROBLEM IN NUMBER IDENTITY (“NIK”)

Portal Ex-1

: Dispalying and Updating Data

Layanan Call Center Ditjen Dukcapil Kemendagri

Phone

:

021 - 5262912

Web Service: Electronic Data Interchange Email

: p d e@ p a j a k . g o . id

Phone

:

021 - 52904817

Ditjen Dukcapil @ccdukcapil 08118005373 08118005373 callcenter.dukcapil@gmail.com

202

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1


E L E C T R O N I C A L L Y

INDONESIAN INVESTMENT COORDINATING BOARD (“BKPM”) :

B U S I N E S S

L I C E N S I N G

S E R V I C E

London

CONTACT US Address

I N T E G R A T E D

Jl. Jend. Gatot Subroto No. 44, Jakarta 12190

New York

Seoul Abu Dhabi

Taipe

P.O. Box 3186, Indonesia

Singapore

One Stop Service Contact Center 0807 100 2576

Phone

:

Email

: i n fo @ b kp m.g o .i d

OR

Tokyo

1500765

Sydney

bkpm.go.id | incestindonesia.go.id

Indonesia Investment Promotion Centre (IIPC)

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

203


A C E H

I N V E S T M E N T

D E V E L O P M E N T

Z O N E S

I N V E S T M E N T

A N D

O N E

S T O P

S E R V I C E

A G E N C Y

B Y

R E G E N Y / C I T Y

INVESTMENT AND ONE STOP SERVICE AGENCY BY REGENY/CITY IN ACEH PROVINCE No

Regency/City

DPMPTSP

Address

Phone

Email

No

Regency/City

DPMPTSP

Address

Phone

Email

No

Regency/City

DPMPTSP

Address

Phone

Email

No

Regency/City

DPMPTSP

Address

Phone

Email

1

Kota Banda Aceh

Investment and One-Stop Service Agency

Mal Pelayanan Publik-Gedung Pasar Atjeh Baru Lt.3 Jl. Diponegoro-Banda Aceh

(0651) 32874

Dpmptsp.bna@gmail.com

8

Southwest Aceh

Investment and One-Stop Service, Labor and Transmigration Agency

Jl. Pasar ikan lama No .17

(0659)9496049

Kp2t_abdya@yahoo.co.id

15

Kota Lhokseumawe

Investment and One-Stop Service and Labor Agency

Jl. Merdeka Barat Gampong Kuala Blang Lhokseumawe

(0645)48468

Dpmptsp.tenagakerja.lsm@ gmail.com

22

Southeast Aceh

Investment and One-Stop Service Agency

-

-

-

23

Bener Meriah

Investment and One-Stop Service Agency

Jl. Serule-kayu (Komplek Perkantoran Pemda) Redelong

-

-

2

Kota Sabang

Investment and One-Stop Service and Labor Agency

Jl. Diponegoro No.23 Kota Sabang

+62652-22633

Dpmptsp_naker@yahoo.co.id

9

South Aceh

Investment and One-Stop Service Agency

Jl. Merdeka Nomor 7-9

(0656)323077

3

Aceh Besar

Investment and One-Stop Service Agency

Jl. T. Bactiar Panglima Polem, SH Kota Jantho

082361015781-085260326180

Dpmptsp.acehbesar@yahoo. com

10

Singkil

One Stop Service Agency

Jl. Jendral Ahmad Yani, Singkil

+62658-21181

11 4

Aceh Jaya

Investment and One-Stop Service Agency

Jl. Mahkota Kuala Meurisi

5

Nagan Raya

Investment and One-Stop Service Agency

Jl. Poros Utama No.17, Suka Makmue

6

West Aceh

7

204

Investment and One-Stop Service Agency

Kota Subulussalam

e

u

n

I n v e s t

s i

Investment and One-Stop Service Agency

A c e h

2 0 2 1

Jl. Imam Bonjol No. 30 Meulaboh Jl. Pertemuan No.16

(0654)2210275

Kppt_calangaj@yahoo.com 12

0655-7007980 (0627) 31005

Simeulue

13 Pmp2t@subulussalamkota. go.id/kp2t.subulussalam@ gmail.com

14

Pidie Pidie Jaya

Bireuen

Investment and One-Stop Service, Labor and Transmigration Agency

Jl. Teuku Umar

Investment and One-Stop Service Agency

Jl. Tgk Chiek Direubee No.5 Sigli

Investment and One-Stop Service Agency

Investment and One-Stop Service Agency

Jl. Komplek Perkantoran Pemkab Pidie Jaya Cot Trieng Kantor Pusat Pemerintahan Kab. Bireuen, Cot GapuBireuen

(0650)21404

(0653) 23399 (0653)3485061

-

16

North Aceh

Investment and One-Stop Service, Labor and Transmigration Agency

Jl. Iskandar Muda No.53

(0645) 41969

-

17

East Aceh

Investment and One-Stop Service Agency

Jl. Medan – B.Aceh KM. 370 No. 3 Idi

-

dpmpptacehtimur@gmail.com

18

Kota Langsa

Investment and One-Stop Service Agency

Jl. P.Polem No.41 Gp. Jawa Kota Langsa

0811671245

Dpmptsplangsa1@gmail.com, dpmptsp@langsakota.go.id

19

Aceh Tamiang

Investment and One-Stop Service Agency

Jl. Ir. H. Juanda No. 69 Karang Baru

(0641) 7430494

dpmptsp@acehtamiangkab. go.id

20

Aceh Tengah

Investment and One-Stop Service Agency

Jl. Kartini No.03

(063)21085

21

Gayo Lues

Investment and One-Stop Service Agency

Jl. Tgk. M. Husin Bustanussalam Blangkejeren

-

dpmtkptsp@simeuluekab

dpmptsppijay@gmail.com

(0644)21212 Ptsp.bireuen@gmail.com

-

I N

A C E H

P R O V I N C E


A D D R E S S

D P M P T S P

R E G E N C Y / C I T Y

The MPP Lobby room (Public Service Mall) One-Stop Integrated Service, Banda Aceh City.

I n v e s t m e n t

O p p o r t u n i t i e s

o f

A c e h

2 0 2 1

205


dpmtsp.acehprov.go.id

Jl. Ahmad Yani No. 39, Banda Aceh, Indonesia

investinaceh@acehprov.go.id / investinaceh@gmail.com

A

O AIO 2021

+62 651 23170 / Fax: +62 651 23171


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.