LEUZE
A SHOWROOM FOR LEUZE SENSORS Leuze set a new milestone in its company history: after just 12 months of construction time, the Sensor People put their new international distribution center into operation in Unterlenningen, near the Leuze headquarters.
A
clear commitment to the company’s roots and the location. At the same time a clear statement regarding growth targets and the company’s forward looking approach. Perfectly dimensioned The Leuze distribution center has three different storage areas: the floor pallet warehouse, the high bay warehouse and the distribution center’s key area: the automatic small-parts warehouse. Together with GEBHARDT Intralogistics Group, Leuze implemented a complete in house conveyor and storage system in its new distribution center. Requirements The entire intralogistics process had to be automated and customized to the needs of the company. Most importantly, the complexity of various order picking tasks had to be taken into consideration and a solution found that could cope with workload peaks. Key requirement: It
04 - AUTOMATION Mag - OCTOBER 2021
44
had to be possible to adapt the solution flexibly and scalably to additional growth. Apart from the small-parts warehouse, GEBHARDT also provided the conveyor system with simple, perfectly matched solutions, the multifunctional, ergonomic order picking workstations as well as the warehouse management software GEBHARDT StoreWare®. Automatic small parts warehouse The small parts warehouse is located inside a 16 meter high, 66 meter long and 10 meter wide enclosed structure. The containers are carried by the conveyor system through two locks, fitted with high speed doors, into the storage area – and back out again. The small parts warehouse was designed as a 2 aisle shuttle warehouse, with 38 levels and five GEBHARDT StoreBiter® one level shuttles (OLS) in each aisle. “We deliberately chose the one level shuttles with capacitor technology