Architecture Portfolio
IRENE DE MIGUEL
Hello,
my name is Irene and I’m an Architect from
-about me I am
dedicated, hard working and
committed to seeing things through to the best of my ability. I enjoy being part of a team and I am quick to learn. At school I found maths and drawing to be the subjects that motivated me the most, which led me to focus my college years on Technical Drawing. Following that I studied a 6 years Degree in Architecture, and I never got tired of going deeper and wanted to learn more with each project. My studies have provided me with a competent skill set and they have enhanced my ability to use my myself.
initiative and motivate
The past six years have allowed me to gain experience in multiple areas of architecture. Working with both clients and developers has allowed me to understand the processes and challenges involved with architectural projects. It helped me comprehend that an effective of ideas and knowledge.
design is a progression
I’m particularly interested in residential architecture and the public spaces that surround it. Home is a shelter, a sanctuary, a gallery of the occupier, the place where people are going to spend most of their time and feel safe, make it their own. Being able to contribute in that process and create high quality sustainable living spaces is what I’d love to focus on. My professional experience in both Spain and the UK, along with my Erasmus year, has been an enriching experience, learning the cultural and professional differences has made me open minded and resourceful. This background has provided me with teamwork, communication and management skills, organisational abilities to achieve deadlines, and has given me the opportunity to build a great appreciation and understanding of different work environments and cultures.
Spain. I consider myself to be both creative and realistic in the way I think about places. Architecture has allowed me to develop an understanding of the world and provided me with the tools to research and question how and why we shape the space around us.
Irene de Miguel López
Contact me
Awards | Publications
email: irenedml94@gmail.com
2022:
Finalist | Promo Poster Competition | CNEM XVIII International Edition
2018:
Best Academic Record | Degree in Architecture | University of Alicante, Spain
phone number: +44 07851 352311
2017:
Cerámica Third Prize | ASCER Awards 2017 | University of Alicante, Spain
2017:
Defensive Architecture of the Mediterranean | FORTMED 2017
instagram: @guacamolett linked in: www.linkedin.com/in/irenedemiguel94
FORTMED International Conference Publications 2015:
Best Commercial Showcase | Emporia de Oro National Awards | Veredictas, Spain
Proficiency
Personal Details OS Date of Birth: 11th of April, 1994
Windows
RENDERING
AutoCAD Rhinoceros
MacOS
From: Alicante, Spain Currently living in Bristol, UK Driving Licence: Yes | Category B
2D
V-Ray for Rhino Enscape for Revit
OFFICE
Education
GRAPHIC
Word
3D
Photoshop
AutoCAD
Excel
inDesign
Rhinoceros
Power Point
Illustrator
Revit
2010 - 2012: College | Technical Drawing, Maths, Physics. Colegio Calasancio Alicante | Spain
Languages | Skills
2012 - 2018: Degree in Architecture (MECES 3 / EQF 7) University of Alicante | Spain 2015 - 2016: Erasmus | Architecture and Planning BA(Hons) University of the West of England | UK
Spanish (Mother tongue)
2020: Postgraduate CPD course | Professional Practice and Management in Architecture RIBA Part 3 course | University of the West of England
English (C2 Cambridge)
Catalan (B1 Valenciano)
Team and project management | Collaborative work Mentoring | CPD management and tracking Multitasking effectively | Organized and responsible Able to meet deadlines and produce quality work
Professional Experience
Attention to detail Quick and willing to learn new skills and software
2016 | 2017: Architectural Assistant Part 2 Studio Hive Ltd | Bristol, UK
Hobbies | Interests
2017: Architectural Intern COR Asociados. Arquitectos | Alicante, Spain 2018 - Ongoing: Architect | ARB registered: 094179D Studio Hive Ltd | Bristol, UK Music
Food
Photography
Drawing
Travel
Cycling
Running
Architecture Portfolio
Irene de Miguel López
Concept design
| Proposals and strategies
Detailed design
| Creating high quality spaces
Graphic design
| Hand drawing and illustrations
Concept design
Proposals and strategies
Yarumal Educational and recreational intervention | Antioquia, Colombia
Battleaxes Houses New residential flexible units as part of a wider mixed development | Wraxall, UK RIBA Stages 0 to 2.
Hatfield Road Domestic refurbishment and extension | Weston-super-Mare, UK RIBA Stages 0 to 2.
Yarumal
UA | Final Project with Marina Paton Ballester Yarumal | Antioquia, Colombia
Educational
and recreational intervention. Through this proposal we want to raise awareness about their relation to Alzheimer’s. Each space we design is focused on
Neuroarchitecture parameter, creating a circular itinerary that a
can work as individually spaces or as a whole. We got involved directly with the community and reflected their culture and needs on our proposal, as well as the need for area.
regeneration
in the
Battleaxes Houses Studio HIVE | New housing development Residential project Role: Architect RIBA Stages 0 to 2. This developmet is part of a larger
mixed project. The design had be consistent, acting as a whole.
to
I worked on the houses from the beginning,
sketching
ideas with my
team and turning them into a Revit model, making sure it was compliant and detailing the plans for Planning. I also managed and contributed to the creation of visuals and presentations for Public consultations with the community.
Existing Photographic Survey. CGIs | Revit model with Enscape
Millimetres @A1 10 0
First Stages CGI | Revit 3D model and Enscape
Cut axonometry | Revit model 3D Core 1
100
20091
SCALE
SAFETY / HEALTH / ENVIRONMENTAL INFORMATION
DO NOT SCALE FROM THIS DRAWING
Millimetres @A1
This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
SAFETY / HEALTH / ENVIRONMENTAL INFORMATION
A
B
It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below:
It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, B project related issues regardingA safety, health and environment, applicable to this document are set out below:
C
CONSTRUCTION:
C
CLEANING / MAINTENANCE:
10
CONSTRUCTION:
0
DEMOLITION / DECOMMISSIONING:
CLEANING / MAINTENANCE: 6265 1526
400
2107
6265 2132
400
3983
DEMOLITION / DECOMMISSIONING:
400
1200
682 0400
2
DN
1621
650
3333
2132
2300
6579
1683
10446
3
2
DO NOT SCALE FROM THIS DRAWING
Description
NS Chk'd
App'd
Information Status
S0
Architecture by Studio Hive 3 Oakfield Road Clifton Bristol BS8 2AT
Level 0 - Ground Floor GA Plan
Client
Ground Floor plan
Studio HIVE
Project Title
Drawing Title
B
C
A
2105 Battleaxes
B
0
Scale
C
Authored
1 : 50 Original Paper Size
A1
Checked
Authorised
Date
Date
NS
IDM Date
Reviewed
Date
19/04/22
19/04/22
Drawing Number
Revision
2105-ASH-01-ZZ-PL-A-20100
5
3D Axonometrics 400
Exploded cut axonometry | Revit model 3D Exploded axonometry 2
20091
SCALE
Scale
1
A1
150
2132
Authored
Checked
Reviewed
Level Floor GA Plan IDM 1 - FirstGR NS
Date
SCALE
1 : 50
04/05/22
Date
04/05/22
Date
04/05/22
Drawing Number
2105-ASH-01-ZZ-MR-A-20091
Authorised
NS
Date
04/05/22 Revision
01
400
2715 1541 0 400 2417 1618
01
11/04/22
Rev.
Date
IDM
First Issue Description
By
Drawing Suitability
Work in Progress
400
4
3990
2125
Client
Studio HIVE
Project Title
2
2105 Battleaxes
CGI from the First Stages | Revit 3D model and Enscape
Level 2 - Second Floor GA Plan SCALE
App'd
S0
Tel: +44 (0) 117 2443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)
5
20101
NS Chk'd
Information Status
Architecture by Studio Hive 3 Oakfield Road Clifton Bristol BS8 2AT
400 1896
400
400
First Floor plan. | Revit model 20101
Original Paper Size
3983
3
400
2105 Battleaxes
2
8271
150 1457 4484
800
Drawing Title
4
400
Project Title
Studio HIVE
1
2155
S0
Tel: +44 (0) 117 2443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)
150
10546
3
Client
DEMOLITION / DECOMMISSIONING:
150
Information Status
Architecture by Studio Hive 3 Oakfield Road Clifton Bristol BS8 2AT
2
CLEANING / MAINTENANCE:
NS
App'd
1200
Chk'd
3505
Work in Progress
GR
By
01
150
Drawing Suitability
2763
IDM
CONSTRUCTION:
4845
Description
1
150
3352
First Issue
1896
Date
Work in-Progress 13/06/2022 09:56:06
04/05/22
Studio Hive Project Number: 2105
01 Rev.
SAFETY / HEALTH / ENVIRONMENTAL INFORMATION It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below:
Lower Floors GA Plans
10
A
By
Tel: +44 (0) 117 2443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)
This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This 20100 SCALE : 50 document is issued for the party which commissioned it and for specific1purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
1 : 50
IDM
First Issue
Work in Progress
Millimetres @A1
SCALE
Date
1 : 50
Drawing Title
Scale
0m
1m
5m
10m
Upper Floors GA Plans
Authored
1 : 50 Original Paper Size
Scale 1:100
A1
Drawing Number
Work in-Progress 13/06/2022 09:57:04
Lower GF GA Plan
11/04/22
Checked
19/04/22
Reviewed
Authorised
Date
Date
NS
IDM Date
Date
19/04/22 Revision
Hive Project Number: 2105
1
20100
01 Rev.
Drawing Suitability
Work in-Progress 13/06/2022 09:56:50
5
100
5
900
400
1082
Studio Hive Project Number: 2105
4
1896
4
150
400
4575
5350
3
150
1700
200 1854
2
150
2
20091
400
1
1200
1
3D Exploded SCALE
Hatfield Road Studio HIVE | Refurbishment and extension of a private traditional house Residential project Role: Architect RIBA Stages 0 to 2. For this small extension went to several meetings with the clients and took measurements and photographic
surveys on site to draw the plans. My main involvement with this project consisted in producing a set of
Planning, as well materiality sketches
drawings for
as
working on for the proposal, integrating the new contemporary design with the existing.
Cut perspective from living area
Cut perspective from living area
3D cut through new extension
3D cut through new extension
Detailed design
Creating high quality spaces
10-12 Cave Street | Grade II Listed building Role: Project Architect - Studio HIVE Refurbishment of Georgian Listed building in Bristol, UK. RIBA Stages 0 to 4.
Dean Street Works | Interiors Role: Interior designer - Studio HIVE Managed and specified interior design, landscaping and marketing images for the project. RIBA Stages 4 to 6.
WSM RFC Clubhouse Role: Project Architect - Studio HIVE RIBA Stages 0 to 4.
Light through the stones ASCER Awards | FORTMED Congress Santa Barbara Castle | Alicante, Spain
100
DO NOT SCALE FROM THIS DRAWING This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
Millimetres @A1
10-12 Cave Street
NEW TV AERIAL
EXTRACT VENT COWLS
0
10
Neighboring Property
W-4-02
W-4-03
Studio HIVE | Refurbishment of a Grade II Listed building
W-3-05
W-3-04
NEW TIMBER FRAMED CASEMENT WINDOWS TO EXISTING OPENINGS
W-4-01
W-3-03
W-3-02
W-3-01
Student accommodation project Role: Project Architect RIBA Stages 0 to 4.
ALL WINDOWS TO BE REPLACED WITH SIMILAR DOUBLE GLAZED SASH UNITS TO BE APPROVED OF CONSERVATION OFFICER
EXISTING RWP AND HOPPER TO BE REPLACED AND REROUTED AS SHOWN
10-12 Cave Street was a georgian house used as offices. After the initial stages my team and I got Listed Building Consent and Consent.
W-2-05
W-2-04
W-2-03
W-2-02
W-2-01
CRACKED RENDER TO BE REPAIRED AND REPAINTED
SECURITY CAMERA AND ALARM BOX REMOVED REPLACED BY NEW CCTV CAMERA (PTZ - MINI DOME)
Planning
ACCESS CONTROL CARD READER & AUDIO INTERCOM PANEL
W-1-01
FANLIGHTS REPLACED BY CLEAR GLASS NATURAL STONEWORK TO BE CLEANED AND REPAIRED WHERE NEEDED
Following that, I managed a small team
ED-1-03
putting together the Tender Pack drawings, details, RDS, schedules and specifications for construction and interior design, having to communicate with developers and consultants to
ED-1-02
EXISTING DOOR OVERHAULED AND REDECORATED
W-0-01
ED-0-02
EXISTING SECURITY BARS REMOVED FROM OPENINGS - WINDOWS RENEWED TO MATCH
NEW GLAZED UNITS TO DOOR IN EXISTING OPENING
coordinate the design.
W-1-02
W-1-03
W-1-04
W-0-02
NEW DOOR TO BASEMENT LEVEL
BALUSTRADE TO STAIR TO BE REPAIRED - STAIR TO BE REFURBISHED TO BE REMOVED STAIRS TO BE REPAIRED EXISTING DOOR OPENING TO BE REMOVED
EXISTING DOOR REMOVED AND REPLACED WITH NEW WINDOW
SOUTHWEST ELEVATION
n tatio m² Subs 25.6
02
5
110A
SVP
W-1-0
K10
6
STAC
ID-1-0
beam
K10
u/s
110A
7
ID-1-0
u/s
04
110A
120 K10
110A K10
u/sb
g strike
ceilin
SVP
03C 110A K10
WITH
AAAV
STAC
K10
110A SVP
03D
g slopin g ceilin strike ceiling stairs N DOW
arch spring
dh
w over windoarch u/s
ID-1-0
110A
K10
firepla
g strike
ceilin
110A
STUB R.1.2 er Show Room
3
ce
R.1.9 io Stud
1
03A
110B
K 03
STUB
K10
beam
03
g slopin g ceilin
u/s
R.1.3 ion lat Circu
ceilin
R.1.11er Show
g slopin ceiling
strike
Room
2
to first
stairs UP
fl
or
2 R.1.1 ion lat Circu floor
radiat
g slopin g ceilin
4
g strike
ID-1-1
ceilin
beam
arch spring
u/s
g strike
ceilin
beam
cl fl
04
arch spring
u/s
SVP
2 wh dh w over arch windo u/s 01 ED-1-
1
arch spring
ID-1-0 WELL
LIGHT
1
2
ID-1-0
3 R.1.1lation Circu
K10
110B
02
5161
ED-1-
Visuals for the Cave Street proposed Studio Rooms | Revit model with Enscape
arch spring
3
ID-1-1
0 R.1.1 ion lat Circu ID-1-1
open
ceiling
.1 R.1 io Stud
g strike
W-1-0
W-1-0
6
W-1-0
or
radiat
ID-1-1
ID-1-1
fl
ED-1-
ID-1-0
g strike
4
ID-1-0
8
floor
0
120
SVP
3
to first
R.1.8 ion lat Circu
110A
ceilin
K10
K10
open
110B
ID-1-0
W-1-0
0
ED-1-
K10
9
R.1.4 io Stud
K10
beam
K10
stairs UP
4
W-1-0
1100
110A
110B
K10
K10
R.1.6 io Stud
R.1.7 er Show Room
K10
5
ID-1-0
110B
K 01
STUB
120
01B
R.1.5 er Show Room
110A
K10
SVP
beam
buildi
01A
u/s
ng
ing
adjoin
SVP
K10
SVP
04
STACK
04
1
document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
Millimetres @A1
It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below: CONSTRUCTION:
0
10
CLEANING / MAINTENANCE:
NEIGHBOURING PROPERTY (14 CAVE ST)
DEMOLITION / DECOMMISSIONING:
TOBERMORE FUSION PAVING (SILVER, MID GREY, GRAPHITE)
EXTRACT DUCT AND SERVICE RISERS
adjoining building
SHEFFIELD 5 HOOP CYCLE RACK SVP 01A
SVP 01B
SVP 02
770
egdirf
K10 110B
K10 120
810
radiator EXISTING OPENING RETAINED
EXISTING DOOR OPENINGS RETAINED
R.1.9 Studio
All floors to have new membrane layed
WINDOW FILM u/sb
ceiling strike
Lockable bin store may be required
W-1-06
SVP 03D
cod
fridge
stairs UP
ceiling strike
STUB STACK 04
ID-1-12
u/s beam arch spring
cl fl
R.1.10 Circulation
ID-1-14
arch spring
wh dh window over u/s arch ED-1-01 arch arch spring EXISTING DOORSspring TO BE CONVERTED TO OUTWARD SWING FIRE ESCAPE DOORS
1100L bin
1100L bin WASH DOWN POINT
770
SVP 04
SVP 04
K10 110B
R.1.11 Shower Room
ID-1-13
910
u/s beam ID-1-01
TIMBER SHED OVER THE BINS
oven
radiator
KITCHEN
R.1.12 Circulation
sloping ceiling
HIGH LEVEL VENT
25.6 m²
open to first floor
sloping ceiling
ceiling strike
ID-1-02 EXISTING DOOR OPENING TO BE RETAINED
Substation
stairs DOWN
ceiling strike
fl
cod
R.1.13 Circulation
All existing walls to be lined with new damp proof system
ROUND TOP BOLLARD
1100
ID-1-11
STORAGE
ceiling strike
KITCHEN nevo
W-1-01
ED-1-02
EXISTING RUBBLE WALL TO BE RETAINED
shelving unit
1010
sloping ceiling ceiling strike
egdirf
R.1.1 Studio
ROUND TOP BOLLARD
ROUND TOP BOLLARD
BOILER FLUE
K10 110A
LIGHTWELL
Tiled walls Coloured walls
WALL-MOUNTED DOWNLIGHT
ED-1-04
K10 110A
SASH WINDOWS TO BE REPLACED WITH SIMILAR DOUBLE GLAZED UNITS TO APPROVAL OF CONSERVATION OFFICER
BRIDGE
EXISTING DOOR OPENING TO BE WIDENED
SVP 03C K10 110A
STUB STACK 03 WITH AAAV
R.1.2 Shower Room
K10 110B
K10 110A
SVP 03A mirror c. 700
ID-1-03
ID-1-08 sloping ceiling
arch spring
R.1.8 Circulation
ceiling strike
u/s beam
dh
window over u/s arch
fireplace
ALL BATHROOMS TO SIT BELOW CEILING HEIGHT TO RETAIN CORNICE
ACCESS CONTROL CARD READER
NON SLIP FINNISH ON BRIDGE DECK
open to first floor
EXISTING OPENINGS TO BE FILLED
W-1-02
Entrance matting - M50 130
K10 110A
K10 110A
nevo
stairs UP
EXISTING DOOR OPENING WIDENED ID-1-10
ceiling strike
CAVE STREET
STORAGE
ED-1-03
New walls Existing RWP
ID-1-07
ID-1-09 K10 110A
K10 120
BRIDGE
Filled openings
KEEP FENCE IF POSSIBLE. ADD RISER UP TO 1100 MM
LIGHTWELL
K10 110B
R.1.3 Circulation
fl
R.1.6 Studio
KITCHEN
ID-1-04
ACCESS CONTROL CARD READER & AUDIO INTERCOM PANEL
WINDOW FILM W-1-05
nevo
egdirf
KITCHEN
W-1-03
Demolished fabric cod
K10 110A
K10 110B
K10 110A
DURAPLATE DECK shelving unit
ID-1-06
u/s beam
R.1.4 Studio
910
R.1.7 Shower Room
u/s beam
mc. 500
u/s beam
770
mirror c. 700
R.1.5 Shower Room
ID-1-05
K10 120
910
K10 110A cod
EXISITNG STAIRCASE REMOVED
K10 110A
STUB STACK 01
shelving unit
W-1-04
EXISTING BRICK WALL
GHD
mirror c. 700
115
NEW BRICK WALL (2.4m HEIGHT)
DOOR ENTRY SYSTEM DIGI LOCK
EXISTING CORNICES REMAIN INTACT
P2
21/06/22
P04
10/05/22
P03
13/04/22
5161
100 Millimetres @A1
This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
AG
IDM
Tender amendments
IDM
GR
Tender
NS NS NS
IDM
LBC for student living
SK
IDM
NS
27/08/21
First Issue
IDM
IDM
NS
Chk'd
App'd
Rev.
Date
Description
Drawing Suitability
By
Information Status
Tender
S4
Studio HIVE Combe House 33 Oakfield Road Clifton Bristol BS8 2AT
SAFETY / HEALTH / ENVIRONMENTAL INFORMATION
CHAPTER STREET
It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, Client applicable to this document are set out below:
Tel: +44 (0) 1172 443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)
Studio HIVE Combe House, 33 Oakfield Road BS8 2AT
CONSTRUCTION:
2
YP
03/09/21
P01
PLANTERS TO CONTAIN MIX OF PACHYSANDRA TERMINALIS, ROSMARINUS OFFICINALIS , AGAPANTHUS AFRICANUS, GERANIUM
DO NOT SCALE FROM THIS DRAWING
Tender amendments
P02
27
Project Title
1704_Cave Street
10
CLEANING / MAINTENANCE:
0
0
5m
1
Light Types
Switch Types Scale
Authored
Checked
AG ONE1:50 WAY SWITCH
V130
Exterior double socket bicycle store
Ground floor Proposed Plan
Original Paper Size
Reviewed
IDM
Date
Date
27/06/22 A1 POLL SWITCH DOUBLE
N10 200
28/06/22
NS Date
01/07/22
V300
910
R.1.7 Shower Room
mc. 500
TWIN SWITCHED SOCKET OUTLET
*
R.1.4 Studio
* * egdirf
egdirf
TWIN SWITCHED SOCKET WITH USB PORT C
CLEANER'S TWIN SWITCHED SOCKET OUTLET FUSED SPURS
STORAGE
*
*
nevo
CD
PIR
CD
SHAVER SOCKET OUTLET C
TV AERIAL POINT
C
R.1.3 Circulation
R.1.8 Circulation
DATA SOCKET
*
PIR
R.1.6 Studio
nevo
PIR CD
Wall emergency light
Socket Types
cod
mirror c. 700
770
E
shelving unit
*
770
R.1.5 Shower Room
cod
910
810
mirror c. 700
1010
shelving unit
STORAGE
R.1.2 Shower Room
R.1.9 Studio
E egdirf
R.1.1 Studio
cod
*
fridge
CD
07/07/22
P03
19/04/22 03/09/21
LBC for student living
27/08/21
First Issue
P01
AG
Tender
Description
By
NS
IDM
YP SK IDM
Date
C
R.1.10 Circulation CD PIR
Drawing Suitability R.1.11 Shower Room
NS
IDM
NS
IDM IDM
NS
Chk'd
App'd
mirror c. 700
Information Status
Tender
910
R.1.12 Circulation
R.1.13 CirculationPIR CD
Tender Pack amendments
P2
P02
Rev.
* * *
PIR
oven
*
nevo
cod
770
GHD
S4
Studio HIVE Combe House 33 Oakfield Road Clifton Bristol BS8 2AT
115
Tel: +44 (0) 1172 443 575 www.studio-hive.co.uk © Studio Hive Limited (2020) Client
Studio HIVE Combe House, 33 Oakfield Road BS8 2AT
Project Title
1704_Cave Street
Reflected Ceiling Drawing - Ground Floor Plan
5m
1
Scale
Authored
1:50 Original Paper Size
100
A1
Checked
AG
IDM
Date
Date
14/06/22
Reviewed
Authorised
GR
NS
Date
Date
01/07/22
Drawing Number
1704-ASH-XX-01-PL-A-20111
04/07/22
07/07/22 Revision
P2
DO NOT SCALE FROM THIS DRAWING
Millimetres @A3
This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
First floor
1
10
2
100
0
3 SAFETY / HEALTH / ENVIRONMENTAL INFORMATION
DO NOT SCALE FROM THIS DRAWING
Millimetres @A1
This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.
It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below:
Suspended ceiling. Void may vary depending on floor level. Please check surveyed sections (K10 220A)
70
Ceiling light (V 210) Shower enclosure (N10 132)
3
200
600
All measurements to be taken from the top of the skirting due to unleveled floors.
700
205
214
2040
30
220
2233
800
100
188
Toilet roll holder (N10 144) 543
Push button for cistern (N10 110)
220
215
234
790
328
620
1030
Skirting (P20 110)
Back to wall toilet (N10 110)
Refer to 'Tiling specification for setting out'. Measure walls and avoid cutting tiles in less than half a tile (M40 120)
Shower base (N10 131)
8 10 11 12 17
13
Where the double door cabinet fits on the wall but it can't be centered with the handwash basin, center one of the doors with the handwash basin. Refer to floor plans. Spec ref. N10 143
Stop half/full height tiled walls making sure no tile is cut in less than half a tile (M40 120)
14 15 16
Type 2 (Bathroom single door small mirror cabinet 500x700)
Towel Rail options
70
Standard Room detailed elevations and Constructive detail of the Ground floor Suspended Ceiling System | 2D CAD model 9 200
600
500
3
6 7
Check 'Tiling specifications for setting out' and apply on every tiled wall. Check floor plan to see tiled walls. As a general rule, -SVP boxings and shower will have full height tiled walls. -Toilets and handwash basins, provided they're not in front of SVPs, can be half height. -If there is space, add a low height gap between shower and other fittings. Spec ref: M40 120
Composite top (M50 150)
29
Handwash basin and tap (N10 120, N10 121)
5
Tiled wall (M40 110)
Mirror cabinet (N10 143) Shaver socket inside mirror cabinet (V 110)
CLEANING / MAINTENANCE:
DEMOLITION / DECOMMISSIONING:
Shower kit (N10 130)
700
220
10 0
Wall width may vary on each case. Refer to proposed floor plans and confirm on site.
4
CONSTRUCTION:
Type 1 (Bathroom double door mirror cabinet 700x700)
P2 Rev.
28/06/22 Date
Drawing Suitability
First Issue
AG Description
By
IDM
NS
Chk'd
App'd
3
Information Status
Studio HIVE Project Number: 1704
Drawing Title
0
19/07/22 Revision
1704-ASH-XX-01-PL-A-20110
V230
shelving unit
Authorised
GR Date
Drawing Number
V210
P2
Studio HIVE Project Number: 1704
Drawing Title
DEMOLITION / DECOMMISSIONING:
Dean Street Works Studio HIVE | Interior Design for a new residential building Student accommodation project Role: Interior designer RIBA Stages 4 to 6. I worked on the interior design and
landscaping for the project, specifying finishes and fittings and regularly going to site courtyard
during and after construction. I also worked on the marketing strategy for the project delivery, making a
brochure
and
managing
the
production of visuals with consultants, as well as doing most of the
photography work for the common areas post completion.
Courtyard CGI | Dean Street, Bristol
Front exterior CGI. Photography of DSW after completion. Entrance corridor and the HIVE | Dean Street, Bristol
Selected spreads from the DSW marketing brochure | Dean Street, Bristol
Signage detail of DSW after completion. CGI of Premium Studio | Dean Street, Bristol
Photography of DSW after completion. Cluster corridor and the HIVE | Dean Street, Bristol
WSM RFC Clubhouse Studio HIVE | From masterplan to detailed design Rugby Clubhouse plus commercial Role: Project Architect RIBA Stages 0 to 4. The new Rugby Clubhouse for Westonsuper-Mare is part of a
wider
development
including residential buildings and a Health Centre. This presented challenges for both building and masterplan
design.
I have worked on this project since its very first stages, taking it through
Planning and working on the Tender drawings and specifications, working with developers and consultants to achieve a coordinated design, as well as managing the production of CGIs.
Materiality sketches, Stage 2 | Revit model and Procreate
CGI of WSM RFC Clubhouse proposal for Planning included in the Design and Access Statement | Revit model and Enscape
CGI of WSM RFC Clubhouse proposal for Planning included in the Design and Access Statement | Revit model and Enscape
Light through the stones ASCER Awards 2017 Cerámica Third Prize FORTMED ‘17 Congress | Spain with Judit Lastres Aguilera Intervention to revitalise Santa Barbara Castle, highlighting the contrast between historic and contemporary while keeping in mind the heritage. We did research on the current condition of the facilities, as well as the constructive details and the SFS
structure needed for the intervention. The ceramic panels resemble the existing castle stone walls, however the light passes through and gives them a slightly different look.
Constructive method | Ceramic panels composition Santa Barbara Castle | Alicante, Spain
Graphic design
Hand drawing and illustrations
Hand drawing Initial sketches to develop architectural proposals and live drawing of buildings.
guacamolett commissions Commissioned illustrations and hand drawings. During the last few years I’ve used my skills to develop a profile where I share and sell my artwork, turning one of my hobbies into a small business.
Sea shelter International competition for young architects. Visuals and collages showing the initial concept of the design.
Hand drawing I rely on hand drawing especially for the initial sketches on a project. It helps me think about the space I’m designing during the first stages and understand a building in a way that no other method can. In the same way, live drawing of an existing building has developed my attention to detail. “You don’t see a building until you draw it.” Paradogically, it has also enhanced my
imagination and creativity. It has improved my capacity to quickly think outside the box when it comes to problem solving. Artist Studio Concept Design | University of the West of England
Live hand drawings | Bristol and Cardiff, UK
Live hand drawing | University of Alicante
commissions
Freehand sketch | Suspension Bridge, Bristol
Places collection - commissioned illustrations
My interpretation of Despina, Italo Calvino’s Invisible City
Sea shelter
ArkxSite Competition Site Monastery - International architecture ideas competition Cape Espichel | Portugal with Clara Cabot Cabot Intervention to regenerate the Sao Domingos
Fortress,
a
historical
landmark
located within a powerful natural scenery and steep cliffs. Our proposal merges the contemporary and historic elements. It establishes a multilateral dialogue between façade and landscape, creating a series of meditation spaces. The connection with nature is essential, blurring limits between indoor and outdoor atmospheres.
Thank you for taking the time to review my portfolio
Irene de Miguel | Architecture Portfolio