Architecture Portfolio | Irene de Miguel

Page 1

Architecture Portfolio

IRENE DE MIGUEL


Hello,

my name is Irene and I’m an Architect from

-about me I am

dedicated, hard working and

committed to seeing things through to the best of my ability. I enjoy being part of a team and I am quick to learn. At school I found maths and drawing to be the subjects that motivated me the most, which led me to focus my college years on Technical Drawing. Following that I studied a 6 years Degree in Architecture, and I never got tired of going deeper and wanted to learn more with each project. My studies have provided me with a competent skill set and they have enhanced my ability to use my myself.

initiative and motivate

The past six years have allowed me to gain experience in multiple areas of architecture. Working with both clients and developers has allowed me to understand the processes and challenges involved with architectural projects. It helped me comprehend that an effective of ideas and knowledge.

design is a progression

I’m particularly interested in residential architecture and the public spaces that surround it. Home is a shelter, a sanctuary, a gallery of the occupier, the place where people are going to spend most of their time and feel safe, make it their own. Being able to contribute in that process and create high quality sustainable living spaces is what I’d love to focus on. My professional experience in both Spain and the UK, along with my Erasmus year, has been an enriching experience, learning the cultural and professional differences has made me open minded and resourceful. This background has provided me with teamwork, communication and management skills, organisational abilities to achieve deadlines, and has given me the opportunity to build a great appreciation and understanding of different work environments and cultures.

Spain. I consider myself to be both creative and realistic in the way I think about places. Architecture has allowed me to develop an understanding of the world and provided me with the tools to research and question how and why we shape the space around us.

Irene de Miguel López


Contact me

Awards | Publications

email: irenedml94@gmail.com

2022:

Finalist | Promo Poster Competition | CNEM XVIII International Edition

2018:

Best Academic Record | Degree in Architecture | University of Alicante, Spain

phone number: +44 07851 352311

2017:

Cerámica Third Prize | ASCER Awards 2017 | University of Alicante, Spain

2017:

Defensive Architecture of the Mediterranean | FORTMED 2017

instagram: @guacamolett linked in: www.linkedin.com/in/irenedemiguel94

FORTMED International Conference Publications 2015:

Best Commercial Showcase | Emporia de Oro National Awards | Veredictas, Spain

Proficiency

Personal Details OS Date of Birth: 11th of April, 1994

Windows

RENDERING

AutoCAD Rhinoceros

MacOS

From: Alicante, Spain Currently living in Bristol, UK Driving Licence: Yes | Category B

2D

V-Ray for Rhino Enscape for Revit

OFFICE

Education

GRAPHIC

Word

3D

Photoshop

AutoCAD

Excel

inDesign

Rhinoceros

Power Point

Illustrator

Revit

2010 - 2012: College | Technical Drawing, Maths, Physics. Colegio Calasancio Alicante | Spain

Languages | Skills

2012 - 2018: Degree in Architecture (MECES 3 / EQF 7) University of Alicante | Spain 2015 - 2016: Erasmus | Architecture and Planning BA(Hons) University of the West of England | UK

Spanish (Mother tongue)

2020: Postgraduate CPD course | Professional Practice and Management in Architecture RIBA Part 3 course | University of the West of England

English (C2 Cambridge)

Catalan (B1 Valenciano)

Team and project management | Collaborative work Mentoring | CPD management and tracking Multitasking effectively | Organized and responsible Able to meet deadlines and produce quality work

Professional Experience

Attention to detail Quick and willing to learn new skills and software

2016 | 2017: Architectural Assistant Part 2 Studio Hive Ltd | Bristol, UK

Hobbies | Interests

2017: Architectural Intern COR Asociados. Arquitectos | Alicante, Spain 2018 - Ongoing: Architect | ARB registered: 094179D Studio Hive Ltd | Bristol, UK Music

Food

Photography

Drawing

Travel

Cycling

Running


Architecture Portfolio

Irene de Miguel López

Concept design

| Proposals and strategies

Detailed design

| Creating high quality spaces

Graphic design

| Hand drawing and illustrations


Concept design

Proposals and strategies

Yarumal Educational and recreational intervention | Antioquia, Colombia

Battleaxes Houses New residential flexible units as part of a wider mixed development | Wraxall, UK RIBA Stages 0 to 2.

Hatfield Road Domestic refurbishment and extension | Weston-super-Mare, UK RIBA Stages 0 to 2.


Yarumal

UA | Final Project with Marina Paton Ballester Yarumal | Antioquia, Colombia

Educational

and recreational intervention. Through this proposal we want to raise awareness about their relation to Alzheimer’s. Each space we design is focused on

Neuroarchitecture parameter, creating a circular itinerary that a

can work as individually spaces or as a whole. We got involved directly with the community and reflected their culture and needs on our proposal, as well as the need for area.

regeneration

in the



Battleaxes Houses Studio HIVE | New housing development Residential project Role: Architect RIBA Stages 0 to 2. This developmet is part of a larger

mixed project. The design had be consistent, acting as a whole.

to

I worked on the houses from the beginning,

sketching

ideas with my

team and turning them into a Revit model, making sure it was compliant and detailing the plans for Planning. I also managed and contributed to the creation of visuals and presentations for Public consultations with the community.

Existing Photographic Survey. CGIs | Revit model with Enscape


Millimetres @A1 10 0

First Stages CGI | Revit 3D model and Enscape

Cut axonometry | Revit model 3D Core 1

100

20091

SCALE

SAFETY / HEALTH / ENVIRONMENTAL INFORMATION

DO NOT SCALE FROM THIS DRAWING

Millimetres @A1

This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

SAFETY / HEALTH / ENVIRONMENTAL INFORMATION

A

B

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below:

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, B project related issues regardingA safety, health and environment, applicable to this document are set out below:

C

CONSTRUCTION:

C

CLEANING / MAINTENANCE:

10

CONSTRUCTION:

0

DEMOLITION / DECOMMISSIONING:

CLEANING / MAINTENANCE: 6265 1526

400

2107

6265 2132

400

3983

DEMOLITION / DECOMMISSIONING:

400

1200

682 0400

2

DN

1621

650

3333

2132

2300

6579

1683

10446

3

2

DO NOT SCALE FROM THIS DRAWING

Description

NS Chk'd

App'd

Information Status

S0

Architecture by Studio Hive 3 Oakfield Road Clifton Bristol BS8 2AT

Level 0 - Ground Floor GA Plan

Client

Ground Floor plan

Studio HIVE

Project Title

Drawing Title

B

C

A

2105 Battleaxes

B

0

Scale

C

Authored

1 : 50 Original Paper Size

A1

Checked

Authorised

Date

Date

NS

IDM Date

Reviewed

Date

19/04/22

19/04/22

Drawing Number

Revision

2105-ASH-01-ZZ-PL-A-20100

5

3D Axonometrics 400

Exploded cut axonometry | Revit model 3D Exploded axonometry 2

20091

SCALE

Scale

1

A1

150

2132

Authored

Checked

Reviewed

Level Floor GA Plan IDM 1 - FirstGR NS

Date

SCALE

1 : 50

04/05/22

Date

04/05/22

Date

04/05/22

Drawing Number

2105-ASH-01-ZZ-MR-A-20091

Authorised

NS

Date

04/05/22 Revision

01

400

2715 1541 0 400 2417 1618

01

11/04/22

Rev.

Date

IDM

First Issue Description

By

Drawing Suitability

Work in Progress

400

4

3990

2125

Client

Studio HIVE

Project Title

2

2105 Battleaxes

CGI from the First Stages | Revit 3D model and Enscape

Level 2 - Second Floor GA Plan SCALE

App'd

S0

Tel: +44 (0) 117 2443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)

5

20101

NS Chk'd

Information Status

Architecture by Studio Hive 3 Oakfield Road Clifton Bristol BS8 2AT

400 1896

400

400

First Floor plan. | Revit model 20101

Original Paper Size

3983

3

400

2105 Battleaxes

2

8271

150 1457 4484

800

Drawing Title

4

400

Project Title

Studio HIVE

1

2155

S0

Tel: +44 (0) 117 2443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)

150

10546

3

Client

DEMOLITION / DECOMMISSIONING:

150

Information Status

Architecture by Studio Hive 3 Oakfield Road Clifton Bristol BS8 2AT

2

CLEANING / MAINTENANCE:

NS

App'd

1200

Chk'd

3505

Work in Progress

GR

By

01

150

Drawing Suitability

2763

IDM

CONSTRUCTION:

4845

Description

1

150

3352

First Issue

1896

Date

Work in-Progress 13/06/2022 09:56:06

04/05/22

Studio Hive Project Number: 2105

01 Rev.

SAFETY / HEALTH / ENVIRONMENTAL INFORMATION It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below:

Lower Floors GA Plans

10

A

By

Tel: +44 (0) 117 2443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)

This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This 20100 SCALE : 50 document is issued for the party which commissioned it and for specific1purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

1 : 50

IDM

First Issue

Work in Progress

Millimetres @A1

SCALE

Date

1 : 50

Drawing Title

Scale

0m

1m

5m

10m

Upper Floors GA Plans

Authored

1 : 50 Original Paper Size

Scale 1:100

A1

Drawing Number

Work in-Progress 13/06/2022 09:57:04

Lower GF GA Plan

11/04/22

Checked

19/04/22

Reviewed

Authorised

Date

Date

NS

IDM Date

Date

19/04/22 Revision

Hive Project Number: 2105

1

20100

01 Rev.

Drawing Suitability

Work in-Progress 13/06/2022 09:56:50

5

100

5

900

400

1082

Studio Hive Project Number: 2105

4

1896

4

150

400

4575

5350

3

150

1700

200 1854

2

150

2

20091

400

1

1200

1

3D Exploded SCALE


Hatfield Road Studio HIVE | Refurbishment and extension of a private traditional house Residential project Role: Architect RIBA Stages 0 to 2. For this small extension went to several meetings with the clients and took measurements and photographic

surveys on site to draw the plans. My main involvement with this project consisted in producing a set of

Planning, as well materiality sketches

drawings for

as

working on for the proposal, integrating the new contemporary design with the existing.

Cut perspective from living area

Cut perspective from living area

3D cut through new extension

3D cut through new extension


Detailed design

Creating high quality spaces

10-12 Cave Street | Grade II Listed building Role: Project Architect - Studio HIVE Refurbishment of Georgian Listed building in Bristol, UK. RIBA Stages 0 to 4.

Dean Street Works | Interiors Role: Interior designer - Studio HIVE Managed and specified interior design, landscaping and marketing images for the project. RIBA Stages 4 to 6.

WSM RFC Clubhouse Role: Project Architect - Studio HIVE RIBA Stages 0 to 4.

Light through the stones ASCER Awards | FORTMED Congress Santa Barbara Castle | Alicante, Spain


100

DO NOT SCALE FROM THIS DRAWING This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

Millimetres @A1

10-12 Cave Street

NEW TV AERIAL

EXTRACT VENT COWLS

0

10

Neighboring Property

W-4-02

W-4-03

Studio HIVE | Refurbishment of a Grade II Listed building

W-3-05

W-3-04

NEW TIMBER FRAMED CASEMENT WINDOWS TO EXISTING OPENINGS

W-4-01

W-3-03

W-3-02

W-3-01

Student accommodation project Role: Project Architect RIBA Stages 0 to 4.

ALL WINDOWS TO BE REPLACED WITH SIMILAR DOUBLE GLAZED SASH UNITS TO BE APPROVED OF CONSERVATION OFFICER

EXISTING RWP AND HOPPER TO BE REPLACED AND REROUTED AS SHOWN

10-12 Cave Street was a georgian house used as offices. After the initial stages my team and I got Listed Building Consent and Consent.

W-2-05

W-2-04

W-2-03

W-2-02

W-2-01

CRACKED RENDER TO BE REPAIRED AND REPAINTED

SECURITY CAMERA AND ALARM BOX REMOVED REPLACED BY NEW CCTV CAMERA (PTZ - MINI DOME)

Planning

ACCESS CONTROL CARD READER & AUDIO INTERCOM PANEL

W-1-01

FANLIGHTS REPLACED BY CLEAR GLASS NATURAL STONEWORK TO BE CLEANED AND REPAIRED WHERE NEEDED

Following that, I managed a small team

ED-1-03

putting together the Tender Pack drawings, details, RDS, schedules and specifications for construction and interior design, having to communicate with developers and consultants to

ED-1-02

EXISTING DOOR OVERHAULED AND REDECORATED

W-0-01

ED-0-02

EXISTING SECURITY BARS REMOVED FROM OPENINGS - WINDOWS RENEWED TO MATCH

NEW GLAZED UNITS TO DOOR IN EXISTING OPENING

coordinate the design.

W-1-02

W-1-03

W-1-04

W-0-02

NEW DOOR TO BASEMENT LEVEL

BALUSTRADE TO STAIR TO BE REPAIRED - STAIR TO BE REFURBISHED TO BE REMOVED STAIRS TO BE REPAIRED EXISTING DOOR OPENING TO BE REMOVED

EXISTING DOOR REMOVED AND REPLACED WITH NEW WINDOW

SOUTHWEST ELEVATION

n tatio m² Subs 25.6

02

5

110A

SVP

W-1-0

K10

6

STAC

ID-1-0

beam

K10

u/s

110A

7

ID-1-0

u/s

04

110A

120 K10

110A K10

u/sb

g strike

ceilin

SVP

03C 110A K10

WITH

AAAV

STAC

K10

110A SVP

03D

g slopin g ceilin strike ceiling stairs N DOW

arch spring

dh

w over windoarch u/s

ID-1-0

110A

K10

firepla

g strike

ceilin

110A

STUB R.1.2 er Show Room

3

ce

R.1.9 io Stud

1

03A

110B

K 03

STUB

K10

beam

03

g slopin g ceilin

u/s

R.1.3 ion lat Circu

ceilin

R.1.11er Show

g slopin ceiling

strike

Room

2

to first

stairs UP

fl

or

2 R.1.1 ion lat Circu floor

radiat

g slopin g ceilin

4

g strike

ID-1-1

ceilin

beam

arch spring

u/s

g strike

ceilin

beam

cl fl

04

arch spring

u/s

SVP

2 wh dh w over arch windo u/s 01 ED-1-

1

arch spring

ID-1-0 WELL

LIGHT

1

2

ID-1-0

3 R.1.1lation Circu

K10

110B

02

5161

ED-1-

Visuals for the Cave Street proposed Studio Rooms | Revit model with Enscape

arch spring

3

ID-1-1

0 R.1.1 ion lat Circu ID-1-1

open

ceiling

.1 R.1 io Stud

g strike

W-1-0

W-1-0

6

W-1-0

or

radiat

ID-1-1

ID-1-1

fl

ED-1-

ID-1-0

g strike

4

ID-1-0

8

floor

0

120

SVP

3

to first

R.1.8 ion lat Circu

110A

ceilin

K10

K10

open

110B

ID-1-0

W-1-0

0

ED-1-

K10

9

R.1.4 io Stud

K10

beam

K10

stairs UP

4

W-1-0

1100

110A

110B

K10

K10

R.1.6 io Stud

R.1.7 er Show Room

K10

5

ID-1-0

110B

K 01

STUB

120

01B

R.1.5 er Show Room

110A

K10

SVP

beam

buildi

01A

u/s

ng

ing

adjoin

SVP

K10

SVP

04

STACK

04

1


document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

Millimetres @A1

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below: CONSTRUCTION:

0

10

CLEANING / MAINTENANCE:

NEIGHBOURING PROPERTY (14 CAVE ST)

DEMOLITION / DECOMMISSIONING:

TOBERMORE FUSION PAVING (SILVER, MID GREY, GRAPHITE)

EXTRACT DUCT AND SERVICE RISERS

adjoining building

SHEFFIELD 5 HOOP CYCLE RACK SVP 01A

SVP 01B

SVP 02

770

egdirf

K10 110B

K10 120

810

radiator EXISTING OPENING RETAINED

EXISTING DOOR OPENINGS RETAINED

R.1.9 Studio

All floors to have new membrane layed

WINDOW FILM u/sb

ceiling strike

Lockable bin store may be required

W-1-06

SVP 03D

cod

fridge

stairs UP

ceiling strike

STUB STACK 04

ID-1-12

u/s beam arch spring

cl fl

R.1.10 Circulation

ID-1-14

arch spring

wh dh window over u/s arch ED-1-01 arch arch spring EXISTING DOORSspring TO BE CONVERTED TO OUTWARD SWING FIRE ESCAPE DOORS

1100L bin

1100L bin WASH DOWN POINT

770

SVP 04

SVP 04

K10 110B

R.1.11 Shower Room

ID-1-13

910

u/s beam ID-1-01

TIMBER SHED OVER THE BINS

oven

radiator

KITCHEN

R.1.12 Circulation

sloping ceiling

HIGH LEVEL VENT

25.6 m²

open to first floor

sloping ceiling

ceiling strike

ID-1-02 EXISTING DOOR OPENING TO BE RETAINED

Substation

stairs DOWN

ceiling strike

fl

cod

R.1.13 Circulation

All existing walls to be lined with new damp proof system

ROUND TOP BOLLARD

1100

ID-1-11

STORAGE

ceiling strike

KITCHEN nevo

W-1-01

ED-1-02

EXISTING RUBBLE WALL TO BE RETAINED

shelving unit

1010

sloping ceiling ceiling strike

egdirf

R.1.1 Studio

ROUND TOP BOLLARD

ROUND TOP BOLLARD

BOILER FLUE

K10 110A

LIGHTWELL

Tiled walls Coloured walls

WALL-MOUNTED DOWNLIGHT

ED-1-04

K10 110A

SASH WINDOWS TO BE REPLACED WITH SIMILAR DOUBLE GLAZED UNITS TO APPROVAL OF CONSERVATION OFFICER

BRIDGE

EXISTING DOOR OPENING TO BE WIDENED

SVP 03C K10 110A

STUB STACK 03 WITH AAAV

R.1.2 Shower Room

K10 110B

K10 110A

SVP 03A mirror c. 700

ID-1-03

ID-1-08 sloping ceiling

arch spring

R.1.8 Circulation

ceiling strike

u/s beam

dh

window over u/s arch

fireplace

ALL BATHROOMS TO SIT BELOW CEILING HEIGHT TO RETAIN CORNICE

ACCESS CONTROL CARD READER

NON SLIP FINNISH ON BRIDGE DECK

open to first floor

EXISTING OPENINGS TO BE FILLED

W-1-02

Entrance matting - M50 130

K10 110A

K10 110A

nevo

stairs UP

EXISTING DOOR OPENING WIDENED ID-1-10

ceiling strike

CAVE STREET

STORAGE

ED-1-03

New walls Existing RWP

ID-1-07

ID-1-09 K10 110A

K10 120

BRIDGE

Filled openings

KEEP FENCE IF POSSIBLE. ADD RISER UP TO 1100 MM

LIGHTWELL

K10 110B

R.1.3 Circulation

fl

R.1.6 Studio

KITCHEN

ID-1-04

ACCESS CONTROL CARD READER & AUDIO INTERCOM PANEL

WINDOW FILM W-1-05

nevo

egdirf

KITCHEN

W-1-03

Demolished fabric cod

K10 110A

K10 110B

K10 110A

DURAPLATE DECK shelving unit

ID-1-06

u/s beam

R.1.4 Studio

910

R.1.7 Shower Room

u/s beam

mc. 500

u/s beam

770

mirror c. 700

R.1.5 Shower Room

ID-1-05

K10 120

910

K10 110A cod

EXISITNG STAIRCASE REMOVED

K10 110A

STUB STACK 01

shelving unit

W-1-04

EXISTING BRICK WALL

GHD

mirror c. 700

115

NEW BRICK WALL (2.4m HEIGHT)

DOOR ENTRY SYSTEM DIGI LOCK

EXISTING CORNICES REMAIN INTACT

P2

21/06/22

P04

10/05/22

P03

13/04/22

5161

100 Millimetres @A1

This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

AG

IDM

Tender amendments

IDM

GR

Tender

NS NS NS

IDM

LBC for student living

SK

IDM

NS

27/08/21

First Issue

IDM

IDM

NS

Chk'd

App'd

Rev.

Date

Description

Drawing Suitability

By

Information Status

Tender

S4

Studio HIVE Combe House 33 Oakfield Road Clifton Bristol BS8 2AT

SAFETY / HEALTH / ENVIRONMENTAL INFORMATION

CHAPTER STREET

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, Client applicable to this document are set out below:

Tel: +44 (0) 1172 443 575 www.studio-hive.co.uk © Studio Hive Limited (2020)

Studio HIVE Combe House, 33 Oakfield Road BS8 2AT

CONSTRUCTION:

2

YP

03/09/21

P01

PLANTERS TO CONTAIN MIX OF PACHYSANDRA TERMINALIS, ROSMARINUS OFFICINALIS , AGAPANTHUS AFRICANUS, GERANIUM

DO NOT SCALE FROM THIS DRAWING

Tender amendments

P02

27

Project Title

1704_Cave Street

10

CLEANING / MAINTENANCE:

0

0

5m

1

Light Types

Switch Types Scale

Authored

Checked

AG ONE1:50 WAY SWITCH

V130

Exterior double socket bicycle store

Ground floor Proposed Plan

Original Paper Size

Reviewed

IDM

Date

Date

27/06/22 A1 POLL SWITCH DOUBLE

N10 200

28/06/22

NS Date

01/07/22

V300

910

R.1.7 Shower Room

mc. 500

TWIN SWITCHED SOCKET OUTLET

*

R.1.4 Studio

* * egdirf

egdirf

TWIN SWITCHED SOCKET WITH USB PORT C

CLEANER'S TWIN SWITCHED SOCKET OUTLET FUSED SPURS

STORAGE

*

*

nevo

CD

PIR

CD

SHAVER SOCKET OUTLET C

TV AERIAL POINT

C

R.1.3 Circulation

R.1.8 Circulation

DATA SOCKET

*

PIR

R.1.6 Studio

nevo

PIR CD

Wall emergency light

Socket Types

cod

mirror c. 700

770

E

shelving unit

*

770

R.1.5 Shower Room

cod

910

810

mirror c. 700

1010

shelving unit

STORAGE

R.1.2 Shower Room

R.1.9 Studio

E egdirf

R.1.1 Studio

cod

*

fridge

CD

07/07/22

P03

19/04/22 03/09/21

LBC for student living

27/08/21

First Issue

P01

AG

Tender

Description

By

NS

IDM

YP SK IDM

Date

C

R.1.10 Circulation CD PIR

Drawing Suitability R.1.11 Shower Room

NS

IDM

NS

IDM IDM

NS

Chk'd

App'd

mirror c. 700

Information Status

Tender

910

R.1.12 Circulation

R.1.13 CirculationPIR CD

Tender Pack amendments

P2

P02

Rev.

* * *

PIR

oven

*

nevo

cod

770

GHD

S4

Studio HIVE Combe House 33 Oakfield Road Clifton Bristol BS8 2AT

115

Tel: +44 (0) 1172 443 575 www.studio-hive.co.uk © Studio Hive Limited (2020) Client

Studio HIVE Combe House, 33 Oakfield Road BS8 2AT

Project Title

1704_Cave Street

Reflected Ceiling Drawing - Ground Floor Plan

5m

1

Scale

Authored

1:50 Original Paper Size

100

A1

Checked

AG

IDM

Date

Date

14/06/22

Reviewed

Authorised

GR

NS

Date

Date

01/07/22

Drawing Number

1704-ASH-XX-01-PL-A-20111

04/07/22

07/07/22 Revision

P2

DO NOT SCALE FROM THIS DRAWING

Millimetres @A3

This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

First floor

1

10

2

100

0

3 SAFETY / HEALTH / ENVIRONMENTAL INFORMATION

DO NOT SCALE FROM THIS DRAWING

Millimetres @A1

This document is subject to the terms of the contract between Client and Architecture by Studio Hive. This document is issued for the party which commissioned it and for specific purposes connected with the project detailed, only. It should not be relied upon by any other party, unless the intention is expressly stated in the contract, or used for any other purposes. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from either Architecture by Studio Hive or from the party which commissioned it.

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement. Refer to all pre-construction health and safety information, located on the project Central Document Environment (CDE). Additonal specific, significant, project related issues regarding safety, health and environment, applicable to this document are set out below:

Suspended ceiling. Void may vary depending on floor level. Please check surveyed sections (K10 220A)

70

Ceiling light (V 210) Shower enclosure (N10 132)

3

200

600

All measurements to be taken from the top of the skirting due to unleveled floors.

700

205

214

2040

30

220

2233

800

100

188

Toilet roll holder (N10 144) 543

Push button for cistern (N10 110)

220

215

234

790

328

620

1030

Skirting (P20 110)

Back to wall toilet (N10 110)

Refer to 'Tiling specification for setting out'. Measure walls and avoid cutting tiles in less than half a tile (M40 120)

Shower base (N10 131)

8 10 11 12 17

13

Where the double door cabinet fits on the wall but it can't be centered with the handwash basin, center one of the doors with the handwash basin. Refer to floor plans. Spec ref. N10 143

Stop half/full height tiled walls making sure no tile is cut in less than half a tile (M40 120)

14 15 16

Type 2 (Bathroom single door small mirror cabinet 500x700)

Towel Rail options

70

Standard Room detailed elevations and Constructive detail of the Ground floor Suspended Ceiling System | 2D CAD model 9 200

600

500

3

6 7

Check 'Tiling specifications for setting out' and apply on every tiled wall. Check floor plan to see tiled walls. As a general rule, -SVP boxings and shower will have full height tiled walls. -Toilets and handwash basins, provided they're not in front of SVPs, can be half height. -If there is space, add a low height gap between shower and other fittings. Spec ref: M40 120

Composite top (M50 150)

29

Handwash basin and tap (N10 120, N10 121)

5

Tiled wall (M40 110)

Mirror cabinet (N10 143) Shaver socket inside mirror cabinet (V 110)

CLEANING / MAINTENANCE:

DEMOLITION / DECOMMISSIONING:

Shower kit (N10 130)

700

220

10 0

Wall width may vary on each case. Refer to proposed floor plans and confirm on site.

4

CONSTRUCTION:

Type 1 (Bathroom double door mirror cabinet 700x700)

P2 Rev.

28/06/22 Date

Drawing Suitability

First Issue

AG Description

By

IDM

NS

Chk'd

App'd

3

Information Status

Studio HIVE Project Number: 1704

Drawing Title

0

19/07/22 Revision

1704-ASH-XX-01-PL-A-20110

V230

shelving unit

Authorised

GR Date

Drawing Number

V210

P2

Studio HIVE Project Number: 1704

Drawing Title

DEMOLITION / DECOMMISSIONING:


Dean Street Works Studio HIVE | Interior Design for a new residential building Student accommodation project Role: Interior designer RIBA Stages 4 to 6. I worked on the interior design and

landscaping for the project, specifying finishes and fittings and regularly going to site courtyard

during and after construction. I also worked on the marketing strategy for the project delivery, making a

brochure

and

managing

the

production of visuals with consultants, as well as doing most of the

photography work for the common areas post completion.

Courtyard CGI | Dean Street, Bristol

Front exterior CGI. Photography of DSW after completion. Entrance corridor and the HIVE | Dean Street, Bristol


Selected spreads from the DSW marketing brochure | Dean Street, Bristol

Signage detail of DSW after completion. CGI of Premium Studio | Dean Street, Bristol

Photography of DSW after completion. Cluster corridor and the HIVE | Dean Street, Bristol


WSM RFC Clubhouse Studio HIVE | From masterplan to detailed design Rugby Clubhouse plus commercial Role: Project Architect RIBA Stages 0 to 4. The new Rugby Clubhouse for Westonsuper-Mare is part of a

wider

development

including residential buildings and a Health Centre. This presented challenges for both building and masterplan

design.

I have worked on this project since its very first stages, taking it through

Planning and working on the Tender drawings and specifications, working with developers and consultants to achieve a coordinated design, as well as managing the production of CGIs.

Materiality sketches, Stage 2 | Revit model and Procreate


CGI of WSM RFC Clubhouse proposal for Planning included in the Design and Access Statement | Revit model and Enscape

CGI of WSM RFC Clubhouse proposal for Planning included in the Design and Access Statement | Revit model and Enscape


Light through the stones ASCER Awards 2017 Cerámica Third Prize FORTMED ‘17 Congress | Spain with Judit Lastres Aguilera Intervention to revitalise Santa Barbara Castle, highlighting the contrast between historic and contemporary while keeping in mind the heritage. We did research on the current condition of the facilities, as well as the constructive details and the SFS

structure needed for the intervention. The ceramic panels resemble the existing castle stone walls, however the light passes through and gives them a slightly different look.

Constructive method | Ceramic panels composition Santa Barbara Castle | Alicante, Spain


Graphic design

Hand drawing and illustrations

Hand drawing Initial sketches to develop architectural proposals and live drawing of buildings.

guacamolett commissions Commissioned illustrations and hand drawings. During the last few years I’ve used my skills to develop a profile where I share and sell my artwork, turning one of my hobbies into a small business.

Sea shelter International competition for young architects. Visuals and collages showing the initial concept of the design.


Hand drawing I rely on hand drawing especially for the initial sketches on a project. It helps me think about the space I’m designing during the first stages and understand a building in a way that no other method can. In the same way, live drawing of an existing building has developed my attention to detail. “You don’t see a building until you draw it.” Paradogically, it has also enhanced my

imagination and creativity. It has improved my capacity to quickly think outside the box when it comes to problem solving. Artist Studio Concept Design | University of the West of England

Live hand drawings | Bristol and Cardiff, UK

Live hand drawing | University of Alicante


commissions

Freehand sketch | Suspension Bridge, Bristol

Places collection - commissioned illustrations

My interpretation of Despina, Italo Calvino’s Invisible City


Sea shelter

ArkxSite Competition Site Monastery - International architecture ideas competition Cape Espichel | Portugal with Clara Cabot Cabot Intervention to regenerate the Sao Domingos

Fortress,

a

historical

landmark

located within a powerful natural scenery and steep cliffs. Our proposal merges the contemporary and historic elements. It establishes a multilateral dialogue between façade and landscape, creating a series of meditation spaces. The connection with nature is essential, blurring limits between indoor and outdoor atmospheres.



Thank you for taking the time to review my portfolio



Irene de Miguel | Architecture Portfolio


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.