LOOKING AHEAD: 2020
• Handover of the Tokamak and Assembly buildings • Official start of machine assembly magnet and vacuum vessel • First-of-a-kind components on site • Giant sector sub-assembly tools enter into action • Cryostat manufacturing concludes • New construction-focused organization at ITER • Staff numbers pass 1,000 In the Assembly Hall, contractors must control humidity and maintain air at a uniform temperature during machine assembly. A powerful heating, ventilation and air conditioning system and anti-dust coating on the floors will contribute to maintaining required air quality.