Foreword from the Director-General

Year in review

PHYSICAL WORK ACHIEVED Project shareProject share Project share TO FIRST PLASMA

Advertisement

(design, component manufacturing, building construction, shipment and delivery, assembly and installation)

67.3%

IPIP IP PROGRESS TOWARD THE REALIZATION OF FIRST PLASMA SYSTEMS AND COMPONENTS

Physical work Physical work Physical work Physical work Manufacturing completed Manufacturing completed Manufacturing completed

96.4% of design completed 77.6% of manufacturing completed

PANumber PANumberPANumber BUILDING CONSTRUCTION COMPLETED ON SITE

73% First Plasma scope

PAValue PAValuePAValue

All figures and graphics as of 31 December 2019

Design completedDesign completed Building construction on siteDesign completed Building construction on siteDesign completed Building construction on site 2019 Year in review