Organizational Structure
LOOKING AHEAD: 2020
• • • Handover of the Tokamak and Assembly buildings Official start of machine assembly First-of-a-kind magnet and vacuum vessel components on site • • • • Giant sector sub-assembly tools enter into action Cryostat manufacturing concludes New construction-focused organization at ITER Staff numbers pass 1,000
Advertisement
In the Assembly Hall, contractors must control humidity and maintain air at a uniform temperature during machine assembly. A powerful heating, ventilation and air conditioning system and anti-dust coating on the floors will contribute to maintaining required air quality.