Looking ahead: 2021

Two poloidal field coils have been completed and a third is in fabrication in the European winding facility on site. Achieve first 1,200-tonne vacuum vessel sub-assembly Finalize cryostat top lid First central solenoid modules on site; begin structural assembly Install poloidal field coils #6 and #5 in pit Receive next-in-line vacuum vessel sectors Receive next-in-line toroidal field coils Launch cryoplant commissioning Lower first vacuum vessel sub-assembly in pit Start construction of ITER Control Building