Crossing Uptown

Page 1







ARC48_550

ACTION UPTOWN: CROSSING UPTOWN

It was determined that Duquesne has its own campus identity and should not be altered with in the community continuity project.

on

erati

onsid

om c ed fr

d exclu way Free

existing lamp posts

Approx. 250 existing lampposts spaced within a range of 50-150 apart. There are currently not enought lamp posts in Uptown to accomodate for safe night time circulation throughout the community.

It was determined that Duquesne has its own campus identity and should not be altered with in the community continuity project.

luded

exc way Free

on

erati

onsid

c from

existing bus shelters existing bus signs

25 total bus stops; 4 shelters, 21 signs. The existing bus stop plan throughout Uptown lacks shelters, which provide protection against the elements as well as bus schedules.

PS1.00

PROJECT SCOPE: BROAD DEMOGRAPHIC CHARACTERISTIC DATA
















































ACTION UPTOWN: CROSSING UPTOWN

ARC48_550

First chisel out the mortar using a hammer and a chisel. Pull out any loose bricks as necessary.

Place fresh mortar between bricks using a trowel and/or a hawk tool. Place new bricks to replace removed ones.

Use a brick jointer to smooth the mortar down between the bricks, making sure there are no gaps or cracks. SITE CONTEXT: GENERAL SITE MODIFICATION STRATEGIES

SC1.13







































Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.