Tower 2: Second Poster

Page 1

STUDIO B | JACLYN SUN | TOWER ii | CANYON GROUND LEVEL PLAN 1:500

3D VIEW OF PUBLIC PLAZA 1

LA TROBE ST.

Pesdestrian Passage

Dessert Place Grill & Lounge

Body Message

Band Rooms

Cafe

Neighborhood info center

News Kiosk

Fashion Retail

Karaoke

Hotdog Stand

Restaurant Arcade 2 / Public Plaza

Block C

DVD Rental Winery Pet Shop

Juice Bar Florist

Dry Cleaner

Arcade 1 / Public Plaza

Children’s Playground

Sushi Bar Silent Hub

Community Learning Center

Restaurant

SPENCER ST.

Restaurant

Pesdestrian Passage

Hair Salon

Block B

Billard & Pool

Key Smith

Theatre

Gaming Arcade

Block A

Bookstore Tea House

Gallery

Health Centre

Pharmacy Silent Hub Bicycle Rink Bakery

Entertainment Food

Fashion Asian Fashion Retail Grocery Retail

Services and Supplies Retail

Net Cafe

GROUND LEVEL PLANNING STRETEGY

GROUND FLOOR LAYERS

MASSING CONCEPT: BREAK UP THE BIG

Chapel

Lobby to residential Food/ Art & Craft Kiosk

Community Outdoor space

TERRACE

UPPER GROUND

GROUND LEVEL MATERIALITY

GROUND FLOOR

Unexpected Program

Hierarchical Program

APARTMENT COMBINATION

DESIGN CONCEPT: AN ANALOGY

GROSS FLOOR AREA / APPROX. 6100 sqm

CONCRETE / Pocelain white / Groundfloor facade

GROSS FLOOR AREA / APPROX. 4200 sqm

RAW TEXTURED CONCRETE / Creamy sandstone / Wall and pavements

GROSS FLOOR AREA / APPROX. 3340 sqm

TYPICAL FLOOR PLAN 1:500

GROUND FLOOR FACADE DETAILS

APARTMENT LAYOUT 1:200

Exoskeleton external facade transfer loads from upper structure to the ground.

LA TROBE ST.

Balcony

Dining

L’DRY Single glazed curtain wall

Living Study

GARBBAGE & RECYCLING STORAGE & MECHANICAL

BR1

Initial massing based on the concept of fault lines and short cuts

Adjustment based on the existing shortcut patterns dervied from site analysis

Kitchen

GARBBAGE & RECYCLING

CONCEPT DEVELOPMENT

Outdoor walkway

WR 1

Adjustment for natural lighting while aintaining short cut directions

Adjustment for the widths of laneways while maintaining natural lighting and short cuts

COMMUNITY GYM & PUBLIC TERRACE STORAGE & MECHANICAL

Twist for more sunlight

PUBLIC TERRACE

BR2

WR 2

SPENCER ST.

Revisiting the form

TYPE A / TWO BEDROOM FLOOR AREA / APPROX. 100 sqm

GARBBAGE & RECYCLING

COMMUNITY GYM & PUBLIC TERRACE

Balcony

Re-massing based on sunlight analysis and privacy issues per apartment layout

Balcony

L’DRY

Optimizing form and performance

Living Dining

Kitchen

Study

L’DRY

9 a.m.

WR

STORAGE & MECHANICAL

WR

Living 12 p.m.

BR1

TYPE B / ONE BEDROOM FLOOR AREA / APPROX. 55 sqm

SUN ANGLE ON 22 JUNE

TYPE C / STUDIO FLOOR AREA / APPROX. 32 sqm

2 p.m.

4 p.m.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.