STUDIO B | JACLYN SUN | TOWER ii | CANYON GROUND LEVEL PLAN 1:500
3D VIEW OF PUBLIC PLAZA 1
LA TROBE ST.
Pesdestrian Passage
Dessert Place Grill & Lounge
Body Message
Band Rooms
Cafe
Neighborhood info center
News Kiosk
Fashion Retail
Karaoke
Hotdog Stand
Restaurant Arcade 2 / Public Plaza
Block C
DVD Rental Winery Pet Shop
Juice Bar Florist
Dry Cleaner
Arcade 1 / Public Plaza
Children’s Playground
Sushi Bar Silent Hub
Community Learning Center
Restaurant
SPENCER ST.
Restaurant
Pesdestrian Passage
Hair Salon
Block B
Billard & Pool
Key Smith
Theatre
Gaming Arcade
Block A
Bookstore Tea House
Gallery
Health Centre
Pharmacy Silent Hub Bicycle Rink Bakery
Entertainment Food
Fashion Asian Fashion Retail Grocery Retail
Services and Supplies Retail
Net Cafe
GROUND LEVEL PLANNING STRETEGY
GROUND FLOOR LAYERS
MASSING CONCEPT: BREAK UP THE BIG
Chapel
Lobby to residential Food/ Art & Craft Kiosk
Community Outdoor space
TERRACE
UPPER GROUND
GROUND LEVEL MATERIALITY
GROUND FLOOR
Unexpected Program
Hierarchical Program
APARTMENT COMBINATION
DESIGN CONCEPT: AN ANALOGY
GROSS FLOOR AREA / APPROX. 6100 sqm
CONCRETE / Pocelain white / Groundfloor facade
GROSS FLOOR AREA / APPROX. 4200 sqm
RAW TEXTURED CONCRETE / Creamy sandstone / Wall and pavements
GROSS FLOOR AREA / APPROX. 3340 sqm
TYPICAL FLOOR PLAN 1:500
GROUND FLOOR FACADE DETAILS
APARTMENT LAYOUT 1:200
Exoskeleton external facade transfer loads from upper structure to the ground.
LA TROBE ST.
Balcony
Dining
L’DRY Single glazed curtain wall
Living Study
GARBBAGE & RECYCLING STORAGE & MECHANICAL
BR1
Initial massing based on the concept of fault lines and short cuts
Adjustment based on the existing shortcut patterns dervied from site analysis
Kitchen
GARBBAGE & RECYCLING
CONCEPT DEVELOPMENT
Outdoor walkway
WR 1
Adjustment for natural lighting while aintaining short cut directions
Adjustment for the widths of laneways while maintaining natural lighting and short cuts
COMMUNITY GYM & PUBLIC TERRACE STORAGE & MECHANICAL
Twist for more sunlight
PUBLIC TERRACE
BR2
WR 2
SPENCER ST.
Revisiting the form
TYPE A / TWO BEDROOM FLOOR AREA / APPROX. 100 sqm
GARBBAGE & RECYCLING
COMMUNITY GYM & PUBLIC TERRACE
Balcony
Re-massing based on sunlight analysis and privacy issues per apartment layout
Balcony
L’DRY
Optimizing form and performance
Living Dining
Kitchen
Study
L’DRY
9 a.m.
WR
STORAGE & MECHANICAL
WR
Living 12 p.m.
BR1
TYPE B / ONE BEDROOM FLOOR AREA / APPROX. 55 sqm
SUN ANGLE ON 22 JUNE
TYPE C / STUDIO FLOOR AREA / APPROX. 32 sqm
2 p.m.
4 p.m.