// BUILDING ONTO THE EXISTING
Breakwater PORT D’EIVISSA
Breakwater PORT D’EIVISSA
JACOB MATTHIAS KUMMER Undergraduate Thesis Project
2
Breakwater PORT D’EIVISSA
JACOB MATTHIAS KUMMER
~~~~~
A multi-purpose arrival infrastructure, that reintegrates the back into Ibiza ~~~~~
Undergraduate Thesis Project. Bachelor in Architecture IE School of Architecture (IE University), Segovia, Spain. Tutors: Lina Toro, Fernando Rodriguez, Pablo Oriol Manuel Perez Romero, Rafael Iñiguez de Onzoño (Technical practices) Monica Garcia (Research Workshop)
3
4
Breakwater PORT D’EIVISSA
Manifesto 1. The Search for a Safe-haven a. Migrants: Europe in the Spotlight b. Pleading Asylum: The LGBT Community
2. Destination Ibiza a. Ibiza’s Past as a Safe-haven b. Balearic Asylum Rights & Re-establishing the Safe-haven
3. Site: Port d’Eivissa a. Port d’Eivissa b. Port Wall & Sa Penya
4. Project a. Superimposed Condition b. Objectives vs. Opportunities c. Program: A Transition Process d. Phases: Implementation
5. Phase 1: Port a. Strategy & 5-Year Implementation Plan b. Building Layers onto existing Infrastructure c. A Journey through Breakwater
6. Phase 2: Sa Penya a. Strategy & 5-Year Implementation Plan
7. Phase 3: Eivissa a. Ibiza in the Eyes of the Tourist: Past, Present, Future b. Constructing a New Image of Ibiza
7
11 12 14
19 20 26
29 30 32
37 38 40 45 48
53 56 62 88
117 120
135 138 146
5
6
Breakwater PORT D’EIVISSA
Breakwater is a multipurpose arrival infrastructure that reintegrates the “safe-haven” back into Ibiza. It provides a transitional space that deals with the temporary condition between the arrival by boat of visitors, locals and LGBT Asylum Seekers and their integration into Ibiza. It is located in the Port of Ibiza along the existing protective wall (Muelle Adosado) and the adjacent neighbourhood of Sa Penya. This strategic location sits at the entrance of the port and is the first sight seen by anyone who arrives to Ibiza Town by boat.
~~~~ Throughout its history, Ibiza has always been a refuge for minorities. Its laidback, free-spirited culture, along with its exclusion from Franco’s Regime, encouraged open-minded social groups to flock to the island. Thanks to its radical difference from the mainland, Ibiza’s reputation as a ‘free’ island spread on an international scale, attracting people who sought to be part of the movement from all over Europe. Inevitably, the island fell victim to mass tourism, and soon enough public interest shifted from the local lifestyle once cherished by a lucky few to the shallow party culture that we know Ibiza for today.
Nowadays, despite a steady rise in the acceptance of the LGBT community woldwide, having an ‘unusual’ sexual orientation makes for a very difficult life in many countries. If in the past Ibiza might have been the perfect spot for LGBT individuals looking for a better life, those who struggle today do not see this image of Ibiza. However, the Balearic Government has implemented new legislations for asylum seekers, which will guarantee the right to plead asylum for any immigrant arriving by boat, regardless of their sexual orientation or background.
~~~~ Breakwater aims to create a new image of Ibiza, reminiscent of its past and representative of its future. It re-establishes Ibiza as the safe-haven it once was by:
1. Reintegrating the “safe-space” By providing a safe-sace for LGBT Asylum Seekers to integrate in society. Gay, lesbian, bisexual, and transgender individuals are often not given the equal right to plead asylum, are placed in poor conditions and face risk of violence.There is a desperate need for a place where they can be safe and supported through the transition process. 2. Recovering the Fishermen Communities of Ibiza Town By inserting facitlities in the Port and providing long-term accommodation in Sa Penya for the Fishermen. A part of the the local culture will be restitched back into the area. This will spark cultural interest in Ibiza for arriving visitors to the Island and encourage integration in Sa Penya. 3. Improves the Residential Condition of Sa Penya By rejecting gentrification and embracing Sa Penya as a neighbourhood. Small-scale interventions will provide the neighbourhood with the infrastructure it needs, rather than what outsiders want. They will help to preserve the essence of the neighbourhood but in a regulated way. They will also prepare the neighbourhood for the gradual integration of Fishermen and LGBT Asylum Seekers. 4. Reconnects Sa Penya to the outside By gradually encouraging arrivals through the neighbourhood, Sa Penya will slowely open up to the outside. The neighbourhood can once again be a part of the islands main economy - tourism. 5. Sustainability & Biodiversity Breakwater encourages the cultivation of endangered Posidonia and creates awareness of its presence. Some of the existing posidonia fields on the island are World Heritage Sites. The low-lying seabed by the Port Wall shall be used for growth and experimentation of the posidionia crops.
7
8
9
10
1
SEARCHING FOR A SAFE-HAVEN
a) Migrants: Europe in the Spotlight b) Pleading Asylum: The LGBT Community
11
Breakwater
1. SEARCHING FOR A SAFE-HAVEN //
(a)
MIGRANTS: EUROPE IN THE SPOTLIGHT ~~~~
In the past couple of years, Europe has faced a huge influx of migrating refugees. Wars in Iraq and Syria, as well as unrest in parts of North Africa led to over 1 million refugees arriving in Europe in 2015. Migrants usually spend a long time working in difficult conditions to pay for the journey to the new country. Once they arrive to their country of destination, they get detained in temporary camps in very poor conditions. The sudden influx of refugees puts great strain on the receiving country, which is then responsible for granting them their basic human rights by providing them with temporary accommodation and support.
~~~~
500,000
100,000 10,000
1000
ASYLUM CLAIMS IN EUROPE 2015 First-time applications, 2015, in thousands (bbc)
12
// MIGRANTS: EUROPE IN THE SPOTLIGHT
3.8 million
2.5 million 2.3 million 1.9 million
1.4 million
800,000
1250 May 2011
2012
2013
2014
2015
INCREASING SYRIAN REFUGEE POPULATION Syrians are now the largest refugee population in the World (mercycorps)
MIGRANTS A migrant is someone who moves to live in another country or to another part of their same country for a period greater than 1 year. It is estimated that 232 million people a year become international migrants. A migrant can be a refugee, an asylum seeker, or they could be moving for economic reasons. A person could also be migrating for a number of reasons.
ASYLUM SEEKERS An Asylum Seeker has been forced to flee their country because it is too dangerous to stay. They are at risk of persecution, violence and discrimination. They have left their country and are waiting for their application result, after which if they are accepted, they will be a classified as a refugee. If rejected, they cannot gain status as a refugee and will then be classified as an illegal immigrant.
REFUGEES A refugee someone who is in need of international protection from fleeing armed conflict and persecution. It is dangerous for them to remain in their country or return home. The 1951 Refugee Convention states that refugees should not be expelled or returned to situations where their life and freedom would be under threat. Upon recognition, refugees are supposed to be given housing and welfare benefits, and helped to integrate into society. source: The Guardian
Syria Syria Syria Kosovo Albania Pakistan Eritrea Nigeria Iran Ukraine 0
50
100
150
200
250
300
350
400
TOP 10 ORIGINS FOR EU ASYLUM SEEKERS First-time applications, 2015, in thousands (eurostat)
13
Breakwater
1. SEARCHING FOR A SAFE-HAVEN //
(b)
PLEADING ASYLUM: THE LGBT COMMUNITY ~~~~
Widespread acceptance of the LGBT Community and advancements in human rights have made huge progress in recent years. But this is only in very specific parts of the World. Discrimination against gay, lesbian, bisexual and transgender communities still represents an everyday struggle for thousands of individuals worldwide. There are many parts of the World where it is very dangerous to be LGBT. Not only is there a risk of violence and persecution, but also there are often no protective rights for these people. The LGBT Community should have worldwide access to their basic human rights, but this is not the case in many situations.
~~~~
116 Counties
LEGALITY DOESNT GRANT RIGHTS OF SAFETY
60% OF WORLDS NATIONS WHERE HOMOSEXUALITY IS LEGAL First-time applications, 2015, in thousands (bbc)
14
// PLEADING ASYLUM: THE LGBT COMMUNITY
ESTIMATED
350 MILLION
HOMOSEXUALS IN THE WORLD
40% of Countries 77 COUNTRIES WHERE HOMOSEXUALITY IS ILLEGAL
10 COUNTRIES Death penalty for homosexuality (Nigeria, Sudan, Iraq, Iran, Mauritiana, Qatar, Saudi Arabia, Somalia, UAE)
34% SUFFER VIOLENCE Of LGBT Youth in the USA have suffered violence from their parents due to their sexual orientation.
26% FORCED TO LEAVE HOME Of LGBT Youth in the USA have no choice but to leave their family home due to conflict
25-40% OF HOMELESS YOUTH in the USA are LGBT. ENDABUSEWI.ORG
At risk LGBT Individuals seek asylum in other countries because they are unsafe in their home countries on the basis of their sexual identity or orientation.
15
Breakwater
1. SEARCHING FOR A SAFE-HAVEN //
The application is made at the border upon arrival at either the international port or airport. ARRIVAL AT BORDER
72 HOURS
7-30 DAYS
INADMISSIBLE
DENIED
INITIAL ACCEPTANCE
2 DAYS
URGENT
REEXAMEN
90 DAYS
2 DAYS
INADMISSIBLE
ORDINARY
180 DAYS
DENIED
STATUS AS REFUGEE + SUBSIDARY PROTECTION + HUMAN RIGHTS
THE ASYLUM SEEKING PROCESS (SPAIN) The process of pleading asylum in Spain can take up to 7 months. Denied Asylum seekers can apply again, but after the second trial, they are denied admission and are considered an illegal immigrant.
16
// PLEADING ASYLUM: THE LGBT COMMUNITY
RAMI KTIFAN, 23 Fled from Syria due to harrassment and intolerance of his sexual orientation. He now resides in Dresden.
ADERONKE APATA, 47
YOUSIF AL-DOORI, 25
Went to the UK in 2004 to plead Asylum, only to be told that she is “not homosexual”. She had to go through humiliating tests to prove her status and to not be send back to dangerous Nigeria.
Fled Iraq as its is not safe to be gay there. He now lives in Germany with other LGBT Asylum Seekers
LGBT ASYLUM SEEKERS OF 2014 (washingtonpost)
1. WRONGLY SENT TO DETENTION CENTRES Asylum Seekers are often sent to immigration detention centres before being given the chance to plead asylum.
2. SUBJECTED TO DANGEROUS CONDITIONS Detention centres for LGBT people can very dangerous places. The LGBT are subjected to violence and discrimination.
3. FORCED TO UNDERGO HUMILATING TESTS The “tests” to prove their sexuality are often are unfair and inhumane.
DESPERATE NEED FOR A SAFE-HAVEN TO CARRY OUT THE PROCESS
3 BIG PROBLEMS WITH THE ASYLUM SEEKING PROCESS FOR LGBT LGBT individuals are especially at risk during the asylum seeking process. They can be placed in poor conditions and exposed to the same, if not worse discrimination that they face in their home countries.
17
18
2
DESTINATION: Ibiza
a. Ibiza’s Past as a Safe-haven
b. Balearic Asylum Rights & Oppor-
tunity to Restablish the Safe-haven
19
Breakwater
2. DESTINATION IBIZA //
(a)
IBIZA’S PAST AS A SAFE-HAVEN ~~~~
Ibiza is the 3rd largest of the Balearic Islands, a group of Spanish islands located roughly 200km from the Iberian Peninsula. Ibiza, with the neighbouring island of Formentera, forms the Pitiüses Islands. Its strategic location in the Mediterrenan sea, as well as its many cultural attributes, have attracted many different populations and social groups throughout the past 3000 years. From the historical occupation of different civilizations to the more recent influx of different social groups searching for a free-spirited lifestyle. The different occupations have greatly influenced the social-economic situation of the island and its perception internationally.
~~~~
130,000
1.6 MILLION
SUMMER POPULATION 13 TIMES WINTER POPLATION
20
// IBIZA’S PAST AS A SAFE-HAVEN
646 B.C.
THE CARTHAGINIANS “IBOSSIM” Although there is evidence of human occupation beforehand, the Carthaginians are thought to have discovered Ibiza and founded Ibiza Town. They were merchants and traders that made Ibiza into an important centre for trade. The harbour already existed at this time and one of the most important exports was salt, or “ White Gold”. The Carthaginians built the Salinas to extract the salt from sea water, which are still used today.
123 B.C. THE ROMANS “EBUSUS” The Romans conquered the Balearic Islands in 123 B.C. Ibiza was coined “Ebusus”. Parts of Dalt Vila, such as the entrance gates, were constructed by the Romans. They taught the local population how to grow grapes, corn and olives.
V - IX Century VANDALS VS. BYZANTINE EMPIRE The Vandals occupied Ibiza for a short period of time. There is little information about this period, however they were thought to have just used the Port facilities on the island. The Byzantines attacked the Vandals in the hope to regain much of the lush agricultural land in Spain and North Africa. The Byzantines contributed to improvements to the island such as the irrigation system and the “share-cropping” system.
IX Century THE ARABS “YEBISAH” The Arabs occupied the island for nearly 500 years. Their presence influenced the construction of houses, the traditional costumes and the island dialect “Ibicenco”. They constructed a large mosque in Dalt Vila. The trade blossmed during the Arab occupation, with most of their economy coming from the Salinas, agriculture, and fishing.
1235 THE CATALANS The Catalans conquered the island, taking its rule from the Arabs. They had a strong influence on the religion of the island, building churches in most villages and renaming them after Christian Saints.
XIII Century -THE PIRATES The Pirates attacked the island of Ibiza in a period when the island was in neglect from the Catalans. In the event of an attack, the villagers would hide in the fortified churches around the island. There are a series of pirate towers present on the island, all within visible sight of eachother, which would light up if a pirate ship was spotted.
HISTORICAL OCCUPATION OF IBIZA Ibiza and Formentera are thought to have been populated nearly 3000 years ago. This discovery came after finding a grave on Formentera dating back to 1600 B.C. The historical occupants came to the Island to take advantage of specific things it had to offer. ibiza-spotlight. The White Island. Stephen Armstrong
21
Breakwater
2006
2. DESTINATION IBIZA //
2007
2008
2009
2010
DATA
135 mill.
ARGI.
ARGI.
T
W
T
F
S
S
M
DALIAS
PACHA
ES CANAR
SPACE
EIVISSA
AMNESIA
SAN ANT.
PRIVILEDGE
SANTA EUL.
EDEN
MARKET SCHEDULE (2014)
IN-SEASON.
OFF.
T
W
TOP 5 CLUB SCHEDULE (2014)
T
F
S
IN-SEASON.
S
OFF.
ACTIVITY
BALEARIC TOTAL PROD. (EURO)
M
Ibiza had an economy based on agriculture, fishing and salt production. Before the Spanish Civil War, there was little tourism and during the war and World War II, tourism ceased.
OCCUPANTS
During the Franco Regime, Ibiza was excluded because it was thought to be a poor island with no important people living there. The fishing and agriculture are still large parts of the economy, as long with mass-tourism. However there has been little growth in recent years.
Ibiza had a reputation of being a place where freedom of thought and expression were united. Hippies searched for a simpler life, a lifestyle that perfectly intertwined with that of the locals. Non-conformists globally flocked to Ibiza and other places such as San Francisco. Large numbers decided to settle on Ibiza, in which they performed many Trance parties and sold goods in the hippie markets.
LOCALS
HIPPIES
PRE-1960s
1960s
Ibiza was excluded from the Franco Regime, in which openly gay people would be imprisioned. It was impossible to live an open life. There was an established gay community already in Ibiza with bars, clubs, restaurants and beaches. The down to earth mentality of its people and laid back lifestyle welcomed the LGBT community with open arms. Ibiza became world renowned for being a free-minded place, where people can be themselves despite their religion, sex, sexual orientation, status or race.
THE RISE OF THE SAFE-HAVEN The local culture that Ibiza has to offer is relaxed, accepting and free-spirited. This attracted the different minded social groups who were looking for somewhere to be liberated. Every migration of a new social group was followed by another. This make the image of Ibiza from the outside constantly changing towards what people wanted.
22
THE LGBT 1970-80s
// IBIZA’S PAST AS A SAFE-HAVEN
%
40
% 27
REST OF WORLD F
S
N-SEASON.
S
J
F
M
A
% 21
UK M
J
J
ESP A
S
14 DAYS 500
%
12
O
DE N
D
350
OFF.
gime, in which was impossible
already in Ibiza
and laid back ith open arms. a free-minded s despite their ace.
100+ SENEGAL JAN-MAR
10/DAY
500+ IBIZA
CANARIES APR-JUN
JUL-SEP
OCT-DEC
35,000
YEARLY OPEN HOTELS (2001-12)
REGISTERED S. SECURITY IN TOURISM (2012)
Ibiza’s free and easy brand and hippy culture brought with it a new music scene. Just like with the Warehouse in Chicago, Amnesia in Ibiza brought the birth of the “Balearic Beat” which is a by product of House music. UK DJs started flocking to the island, and in the late 80s, the UK went Acid House crazy. Along with the rise of party drugs such as ecstasy, people wanted a taste of the party scene in Ibiza. The party goers still frequent on the island, and now it is a popular family and luxury destination.
Ibiza has a population of illegal immigrants, often called “Looky looky men” or “boatpeople”, who are mainly from Senegal. Like many “lost souls” in the past, these men travel from African countries in search for a better life. They make the dangerous journey on “lothios” usually to the Canary Islands and then onwards to Ibiza, with the hope to make money to send back to their families by selling fake luxury goods to tourists. Often the money they send is the families only source of income.
MASS-TOURISTS
IMMIGRANTS
1980s - now
1990s - now
THE DECLINE OF THE SAFE-HAVEN Ibiza’s reputation spread in the late 80s and 90s, and the island fell victim to mass-tourism. It became a very crowded island in the summer rmonths with people loking to party and be in the beach. As Ibiza received more visitors, the Island began to suffer from overcrowding and Ibiza’s essence of being a saferefuge is dimishing.
23
325 hotels
13000 jobs
are present on the island
on an island of 1300000 inhabitants
01. Cala San Vicente 02. Aguas Blancas 03. Es Figueral 04. Pau Des Llea 05. Cala de Boix 06. Cala Mastella 07. Cala Llenya 08. Cala Nova 09. Es Canar 10. Cala Martina 11. S’Argamassa 12. Cala Pada 13. Playa Niu Blau 14. Santa Eulalia 15. Siesta
(elpais)
16. Cala Llonga 17. Sol d’en Serra 18. Cala Oliviera 19. S’Estanyol 20. Talamanca 21. Figueretas 22. Playa d’en Bossa 23. Es Cavallet 24. Las Salinas 25. Es Codolar 26. Sa Caleta 27. Cala Jondal 28. Es Xarcu 29. Es Torrent 30. Cala d’Hort 31. Cala Carbo 32. Cala Vadella 33. Cala Moli 34. Cala Tarida 35. Cala Codolar 36. Cala Conte 37. Cala Bassa 38. Port d’es Torrent 39. Cala Gracio 40. Cala Gracioneta 41. Punta Galera 42. Cala Salada 43. Cala Saladita 44. San Miguel 45. Benirras 46. Cala Xarraca 47. S’ilot d’es Rencli 48. Cala Xuclar 49. Portinatx 50. Cala d’en Serra 51. Sa Pedrera
(antenna3)
BAR CELO NA
TOP BEACHES IBIZA
KASBAH KANYA
43
COASTLINE CAFE MAMBO
VALENCIA
CAFE DEL MAR SAVANNAH
DENIA.
42
VILLA MERCEDES
BARM
ES PARADIS
41 40
SANT ANTONI 22.000
38 37
39
EDEN
36 35
477 pax. 90 veh.
34
SANT JOSEP 2.498
33
THE ISLAND CONDITION Proximity to neighbouring countries
KMH
32
31
30 29
27 28
96% of arriving tourists
DENIA.
24
26
46
49
48
50 47
PORTINATX 458
44 45
1
PORT DE SAN MIQUEL 109 SANT VINCENT 313
SANT JOAN 956
2
SANT MIQUEL 1544 3 4
SANT MATEU 377
5 SANT LORENC 1341
6 7 8 SANTA GERTRUDIS 2.184
9
12
SANTA EULÀRIA 31.500
11
10
13 14
N
SANT RAFEL 2.047
PRIVELDGE
15 AMNESIA
17 16
EIVISSA 49.000
CA OR L L
18 PACHA
19
EL DIVINO
E AD
MA
M
L PA
MAO ROOMS BASEBAR
20
BORABORA
21
SPACE
22
DC10
Top 50 beach Hippy Activity
TERA
Coastal Tourist Area
23
Tourism Hotspot LGBT Hotspot Illegal Immigrant Hotspot
FORM EN
25
Permanent Population
MIGRANTS, VISITORS & OCCUPATION
24
Ibiza Island Mapping
546 pax. 100 veh.
0km
1
2
3
4
5
25
Breakwater
2. DESTINATION IBIZA //
(c)
BALEARIC ASYLUM RIGHTS : ARRIVAL BY BOAT ~~~~
In 2014, The Balearic Government set to introduce a protocol which gives rights to immigrants arriving by boat to the islands. This means that every arrival will be given the chance to plead asylum, as well as being given financial and legal support before being transported and detained in centres on the mainland.
~~~~
PORT DE SANT ANTONI DE PORTMANY
PORT D’EIVISSA
AEROPORT D’EIVISSA
PRESSURE ON ARRIVAL INFRASTRUCTURE Encouraging arrival by boat puts pressure on the infrastructure of Ibiza which is already in strain from the existing touristic condition
26
// BALEARIC ASYLUM RIGHTS: BY BOAT
LGBT ASYLUM SEEKERS NEED A SAFE-SPACE FOR THEIR TRANSITON
+
DECLINE IN IBIZA’S REPUTATION AS BEING A REFUGE
+
EQUAL OPPORTUNITY FOR ASYLUM SEEKERS IN IBIZA
OPPORTUNITY TO RESTABLISH THE SAFE-HAVEN
3
SITE: Port d’Eivissa a. Port d’Eivissa
b. Port Wall & Sa Penya
29
Breakwater
3. PORT D’EIVISSA //
Ma
Ibiz
a
Ro -R oP on
ien te
rina
Club Nautico de Ibiza cargo, fishermen, recreational
469 re
Muelle Ribera 360m ferries, interior traffic
Darsena Poni
ente
RINA
L A MA
Co n Lev tram ue an lle te
Breakwater
Mu exp elle ect Lev a ed gro nte wth
3m R SY
, IA
DA LT V
Y, KE UR
1m
IA
s ave fw
30
no
5m
NIS TU
tio
ec
Dir
SA PENYA
T T, YP EG
IL A
// SITE: PORT D’EIVISSA
(a)
SITE: PORT D’EIVISSA ~~~~
7th
Port of Ibiza ranked 7th in Spain for Sports activities
1400
Recreational Boat Slips in the entire port
The Port of Ibiza is one of 5 ports in the Balearic Islands, and it is projected to grow the most in 2016. There is a 17.5% growth in Port calls for this year, putting extra strain on the infrastructure available. Although there was a port before, the Carthaginians converted the port into an armed infrastructure for use as a naval base. The adjacent neighbourhoods of La Marina and Sa Penya which were split between the different types of trade - Sa Penya being fishing and La Marina being for artesan crafts.
Marina Ibiza ecreational boats
Nowdays, the Port boasts a huge array of different areas, for all different types of activities. The area of La Marina is now a site for nightlife and tourism, whereas Sa Penya has stays in a deteriorated condition.
Marina Botafoch 427 recreational boats
1. MOORING
3. LIFTING
5. LIQUID FUEL COLLECTION
FO RM EN TE RA ,
MA LLO RC A
2. PILOTING
4. SOLID WASTE COLLECTION
BALEARIA NIXE Ibiza - Formentera/Denia 546 pax. 56 veh.
BALEARIA RAMON LLUL Ibiza - Formentera 477 pax. 90 veh.
6. WATER WASTE COLLECTION
ISCOMAR NURA NURA Ibiza - Mallorca 950 pax. 150 veh.
7. MOVEMENT OF GOODS
PORT SITE PLAN
,D EN IA
8. PASSENGER SERVICE
BOATS ARRVING
1:3500 0m
20
80
120
160
EXISTING PORT SERVICES
TO PORT WALL
31
Breakwater
3. PORT D’EIVISSA //
(b)
SITE: PORT WALL & SA PENYA ~~~~
The site of Breakwater sits in the entrance of the Port, at the existing protective Port Wall and the adjacent neighbourhood of Sa Penya. This is one of the first sights one has as they are entering Ibiza. The Port Wall was constructed to protect the inner harbour from the natural elements. Nowadays it is not used to its full potential. Recreational ferries arrive here but it doesn’t function as an infrastructure with this use should. The neighbourhood of Sa Penya is the first parts of the city one arrives too as they disembark the ferries. It sits between the Port of Ibiza and the UNESCO Protected City wall of Dalt Vila. Previously a fishermen occupied neighbourhood, it has suffered from a deteriorating condition in the last 30 years after a Gitano population moved in from mainland Spain for work opportunities in the contruction industry. It has been segregated from the outside and the Islands main economy - tourism. The neighbourhood’s condition has left the residents without access to basic infrastructure due to the centralization of public services to other parts of Ibiza Town because of the tourism industry.
~~~~
600 - 700 Estimated population
80%
Belong to the Gitano community
83%
Of children under 14 years of age never completed school
64%
Living in poverty
Highest unemployment rate in Ibiza
source: Where utopia meets dystopia - pablo conejo
SA PENYA
PORT
32
// SITE: PORT WALL & SA PENYA
DEPOPULATION & DIVESTMENT
BARRIO DE SA PENYA
FISHERMEN MOVE OUT TO OTHER AREAS
1. MOVING-OUT OF FISHERMEN POPULATION The tourism boom in the 60s and 70s saw residents of Sa Penya gaining wealth from the Fishermen trade. Many moved out to more modern neighbourhoods. Most of the neighbourhood remained empty and suffered from divestment.
BARRIO DE SA PENYA
MIGRANT WORKERS
2. MOVING-IN OF GITANO POPULATION The tourism boom brought employment opportunities for construction workers. The low house prices in the neighbourhood attracted Gypsy migrants from the Iberian Peninsula. It doubled the population.
AVOID BARRIO DE SA PENYA
BARRIO DE SA PENYA
BALEARIA NIXE
BALEARIA RAMON LLUL
ISCOMAR NURA NURA
3. DETERIORATING CONDITION - TOURISTS AVOID IT When the tourism boom declined, Sa Penya developed an illicit economy based on drug commerce. The neighbourhood developed a negative reputation and therefore it became closed off from the tourism industry.
33
Breakwater
3. PORT D’EIVISSA //
M,L,XL 2.
3.
These are larger, open spaces which are
4.
1.
informally used for need activities such as parking. S, M These are tigher public spaces between buildings such as smaller squares, and alleys. In the past they were occupied by street level commcerce.
EXISTING PUBLIC SPACES The neighbourhoods declining condition has left the residents without access to basic infrastructure and services. The other parts of the city and port area are more directed towards the main economy of the island - tourism. This led to a decentralization of public services to other parts of Ibiza Town.
34
1.
2.
3.
4.
MARE DEU VIEWPOINT
PLACA SA DRASSANETA
CARRER DE LA MARE DE DEU
PLACA SA RIBA
Difficult access and hidden from city. The viewpoint leads into the neighbourhood
Past of being cery active, centre of community with bars, restaurants and markets
Centre of the “gay ghetto” of Ibiza, with the active nightlife
This square of full of life in the summer. It has many bars and restaurants that work mostly seasonally.
// SITE: PORT WALL & SA PENYA
Poor street lighting Lack of Urban Fixtures Lack of Parking, Healthcare Lack of Trash facilities & collection, water supply, drainage phone & internet, health & nutirition, safety
MISSING INFRASTRUCTURE & SERVICES The neighbourhoods declining condition has left the residents without access to basic infrastructure and services. The other parts of the city and port area are more directed towards the main economy of the island - tourism. This led to a decentralization of public services to other parts of Ibiza Town.
32%
Declared living in precarious housing conditions
20%
With no sanitary services
5-10%
Houses in ruin (slum) condition
35
Sa Penya
Carrers envelats per la roba estesa, amb flaires de mar i sardina fresca. Juguen uns al·lots, canta una fadrina, del portal estant, la majora els crida. En un racó, un gat, escura una espina; joves estrangers es besen i riuen. Pel teu petit món --feu de la gavina--, m’hi ha dut a voltar la mà de l’amiga. I encaterinats pel pas de la brisa, ens ha embadalit el teu cos d’ondina. Batuda pel vent, el sol t’enlluerna, s’arrissa la mar i s’inflen les veles. Sota el baluard, vora la Marina, ets un vaixell blanc ancorat fa dies.
~~~~ August Bover
36
4
PROJECT
a. Superimposed Condition
b. Objectives vs. Opportunities c. Program: A Linear Transition d. Phases: Implementation
37
Breakwater
4. PROJECT //
CITY CONDITION
NEIGHBOURHOOD CONDITION
THE TRANSITION BEGINS AT THE PORT WALL ~~~~ The traffic is reorganized, proving an efficient ferry loading/unloading zone for vehicles (a) . The existing public space (b) will be sunken, separating pedestrian flow from traffic, and creating a step up to the Breakwater. The exposed part of the existing wall will be removed (c), however its footprint will be kept.The traffic is reorganized, proving an efficient ferry loading/unloading zone for vehicles (a) . The existing public space (b) will be sunken, separating pedestrian flow from traffic, and creating a step up to the Breakwater.
(a)
SUPERIMPOSITION: LGBT VS. EXISTING ~~~~
Breakwater will also serve as a catalyst for integration between the existing occupants of this site and new visitors and asylum seekers. It is implemented in an area with an existing complex condition. By superimposing the LGBT Asylum Seeker program into the site it will create positive contributions to the area making it a more pleasant, dieverse and open place to be, instead of worsening the problem and adding more strain to the Port
38
// THE SUPERIMPOSED CONDITION
PORT CONDITION
NEW
EXISTING
LGBT ASYLUM SEEKERS
SA PENYA LOCALS
FISHERMEN
TOURISTS
The LGBT Asylum Seeker looks for safety,
The residents of Sa Penya don’t want the
Sa Penya was a fishermen community. they
The tourists come to Ibiza Town mainly for
support and guidance in the Ibiza. They hope
essence of their neighbourhood to change,
need encouragement and the facilities in
the parties, shopping and leisure. Many are
for a problem-free transition process from
but they need the care that is given to the rest
order to go back to living and working there.
unaware of the local culture in the city. They
arrival to integration into society.
of the city.
need encouragement and the opportunity to explore this local culture, safely.
PRIMARY USERS
39
Breakwater
4. PROJECT //
OBJECTIVES VS. OPPORTUNITY ~~~~
Breakwater identifies the opportunities present in the site and integrates them with the objectives of the project. It is important to understand the existing spaces and how they (do not) function. By studying the existing condition, it is possible to see where the new program can be inserted and how it can adapt to benefit the local condition.
~~~~
5 MAIN OBEJCTIVES OF BREAKWATER
1.
RESTABLISHES IBIZA AS A SAFE-HAVEN By Providing a safe-space for LGBT Asylum Seekers to Integrate into Society. 2.
RECOVERS THE FISHERMEN COMMUNITIES OF IBIZA TOWN & the culture behind it by reintegrating them into Sa Penya and providing facilties in the Port. 3.
IMPROVES THE RESIDENTIAL CONDITION OF SA PENYA by rejecting gentrification, enhancing public space and providing basic infrastructure to the residents 4.
RECONNECTS SA PENYA TO THE OUTSIDE by encouraging arrivals through the neighbourhood. ~~~~ 5.
SUSTAINABILITY & BIODIVERSITY by encouraging the cultivation & experimentation of Oceanic Posidonia growth and creating awareness of its presence.
40
// OBJECTIVES VS. OPPORTUNITIES
2. 15% EMPTY HOUSING
Integration possibitlies into the existing neighbourhood
BARRIO DE SA PENYA
4.
1. 250m EXPOSED SIDE OF WALL Potential for secluded parts of the program
1. RESTABLISHING IBIZA AS A SAFE-HAVEN
5. 15% EMPTY HOUSING
Integration possibitlies into the existing neighbourhood
SA PENYA
BARRIO DE SA PENYA
4.
4. SHELTERED MARINA
Ideal arrival zone for smaller boats - eg. Fishermen.
3. 220m PROTECTED SIDE OF WALL
Potential for insertion of Fishermen facilties and arrival program
2. RECOVERING THE FISHERMEN COMMUNITYS OF IBIZA TOWN
41
Breakwater
4. PROJECT //
8. LACK OF INFRASTRUCTURE
Inserting infrastructure in public areas to enhance pubic life
SA PENYA
BARRIO DE SA PENYA
7. DISCONNECTED PUBLIC SPACES
Opportunity to connect these public spaces with eachother and enchancing their existing condition
4.
6. 230m UPPER LEVEL WALL
Potential to enhance the condition of this wall, turning it into a public space and viewing point
3. IMPROVES THE RESIDENTIAL CONDITION OF SA PENYA
12. CROSS-CONNECTIONS
Making the neighbourhood more permeable from the outside
SA PENYA
BARRIO DE SA PENYA
11. ENTRANCE TO SA PENYA
Encouraging the flow of arrivals through the neighbourhood of Sa Penya through existing viewpoint
4.
10. VEHICLE LOADING
Reorganizing the traffic of this area to separate pedestrian and vehicle spaces
9. 160m FERRY BOARDING DECK
Potential to improve its efficiency by adding another layer separating passenger boarding and goods loading
4. RECONNECTS SA PENYA TO THE OUTSIDE
42
// OBJECTIVES VS. OPPORTUNITIES
Protected Marine Environments
Repopulating Oceanic Posidonia in Talamanca and
Protected Rural Environments
Mallorca. The low lying conditions at the Breakwater are perfect for this method.
PROTECTED MARINE ENVIRONMENTS (UNESCO) The Posidonia meadows in Ibiza are endangered. This is because they are very sensitive to disturbances especially those caused by the tourism industry. It grows very densely on the seabed and attracts a lot of biodiversity as well as being partly responsible for the crystal clear blue waters that the Balearic Islands have to offer. The Parque Natural de Ses Salines in Ibiza is one of the largest conservation zones of posidonia in Ibiza. It is an area that spreads 15.396,90 hectars of seabed, 80% of which is covered in posidonia. There have been recent efforts to extend the posidonia meadow fields. One of the main ways to protect it is promote awareness of its presence. There still remain many parts of the island with posidonia which is not protected. Another way of encouraging its growth is to plant seedlings in protected, shallow waters. This has already been carried out woth success in Mallorca, and in the nearby bay of Talamanca in Ibiza
A PENYA
BARRIO DE SA PENYA
4.
SEABED +1.00M
POTENTIAL FOR POSIDONIA CULTIVATIONS
High-tide +0.1m Low-tide -0.1m
5. SUSTAINABILITY & BIODIVERSITY (REPOPULATING POSIDONIA)
43
Breakwater
44
4. PROJECT //
// OBJECTIVES VS. OPPORTUNITIES
(b)
PROGRAM: A LINEAR TRANSITION PROCESS ~~~~
An LGBT Asylum Seeker requires a specific program that follows the different stages of the asylum seeking process. It differs from the regular asylum seekers due to the particular vulnerabilities that the LGBT indivuduals can have at the beginning. The program is Breakwater has been synthasized into 4 main stages to create the best and most effective transition possible. The Arrival stage deals with the process of commencing their transition process and what is needed upon arrival. The Temporary stage lasts up to a period of 30 days. It is in this time where their initial application for asylum is being considered. Upon receiving the result of their initial application, the asylum seeker passed to the Transitional stage which lasts up to 6 months. The aim of the last phase is to integrate into society, develop skills and begin to become independent.
~~~~
72 hours
1. ARRIVAL
90 - 180 days
7 - 30 days
2. TEMPORARY
3. TRANSITIONAL
n/a
4. INTEGRATION
BREAKWATER PROGRAMMATIC SEQUENCE From Arrival to Integration
45
LGBT ASYLUM NEEDS
Breakwater
4. PROJECT //
LGBT Asylum seekers arrive with little belongings. They need to be welcomes in a friendly space. First they need to be registered and provided with the basics.
Due their vulnerability at this time, the program will be kept mostly private from the outside. A temporary living environment is needed.
72 hours
7 - 30 days
2. TEMPORARY
TOURISTS NEEDS
FISHERMEN NEEDS
1. ARRIVAL
30 mins -1 hour
1 hour - 1 day
Fishermen need their own personal slip to moor up their boats and know they are safe where they have left them. A spacious dock for unlaoding is also needed.
Balearic fishermen are used to having their own hut where they can work on their boat, store their equipment. A modern version of the traditional “Casa Varadero” would be suitable.
15 mins -1 hour
10 mins - 1 hour
The tourists will need an arrival structure that can ease their boarding and disembarking from the boat, without having to face lots of stairs.
Tourists would enjoy a welcoming arrival to the city. The arrival space should take advantage of the panoramic views and provide a pleasant place to be.
A transitional, integrative environment is needed at this time. Interaction and self-development is strongly encouraged whilst
90 - 180 days
3. TRANSITIONAL
permanent
The Fishermen would need to have quick and easy access from the dock to their new accomodation in Sa Penya.
20 mins - 2 hours
An environment which could give tourists a “real-taste” of Ibiza would help ease their integration into Ibiza. They should be able to experience the “local” ibiza.
THE NEEDS OF ARRIVALS Each arriving group to the Island has very different needs in terms of program. They spend different amounts of times in different parts of the process.
46
The tools and resources are given to the asylum seeker at the end of the process to live independently. Future support will be available to them.
Lifetime
4. INTEGRATION
n/a
n/a
5 - 10 days
Having experienced in their arrival the panoramic views, and the “other side” to Ibiza, the tourist should be ready to get to know the rest of the Island.
// PROGRAM: A LINEAR TRANSITION PROCESS
Private Single Accommodation Private Double Accomodation Communal gardens/space Communal kitchens
Shared Accomodation in Existing
Communal storage space
Basic Infrastructure
Personal storage space
Security
Personal Exterior space
Mental Health Centre
Arr. 1 LGBT Asylum Arrival Deck
Leisure Activities
Physical Health Centre
LGBT Asylum Welcome Centre
Water Access
Integration Workshops
Waiting & Check-in Area
Security 24/7
Access to facilities of Port Wall
Independency Workshops
Consultation Area
Mental Health Centre
Exterior Space
Access to Job Opportunities
Basics collection
Physical Health Centre
Access to Job Opportunities
Mental Health Care
Exterior Relaxation Space
Laundry
Skill Development
Physical Health Care
1. ARRIVAL
2. TEMPORARY
4. INTEGRATION
3. TRANSITIONAL
Arr.2 Fishermen Arrival Deck
Fishermen Huts
Shared/Single Accomodation
Arr. 3. Tourist Arrival Deck
Wide dock for working
Basic Infrastructure
Loading/Off-loading Goods
Upper/Lower Deck Access
Integration Workshops
Heavy Goods Lift
Shading
Access to facilities of Port Wall
Vehicle Boarding Zone
Raised deck for views and leisure
Exterior Space
Guided Access
Public Space/viewpoints
MINIMUM PROGRAMMATIC REQUIREMENTS Considering the initial needs of all arrivals, its possible to generate a list of minimum programmatic requirements for each stage of the transition process.
47
Breakwater
4. PROJECT //
(b)
PHASES: IMPLEMENTATION OVER 5 YEARS ~~~~
Breakwater is implemented in 3 simultaneous phases over the period of 5 years. The purpose of this is to ease the integration of the new demographic without provoking a sudden counter-reaction from the residents of Eivissa, or more specifically, of Sa Penya. The first year will primarily focus on improving the local condition across the 3 phases. Throughout the second year, arriving tourists will be encouraged through Sa Penya, gradually reintegrating the neighbourhood into the island economy & tourism industry. The Breakwater will be open to receive LGBT Asylum seekers from the beginning of Year 3, and will be carefully integrated into society along their 4 stage transition process.
~~~~
PHASE 1: PORT
1. ARRIVAL
PHASE 2: SA PENYA
2. TEMPORARY
3. TRANSITIONAL
PHASES OF IMPLEMENTATION SYNCRONIZED WITH TRANSITION PROGRAM To ensure a gradual acceptance of the new program
48
PHASE 3: EIVISSA
4. INTEGRATION
// PHASES: IMPLEMENTATON OVER 5 YEARS
COMMUNITY INVOLVEMENT WORKSHOPS Consutling with the neighbours to collaboratively decide which parts of the neighbourhood would be best to intervene in.
DIVERSITY INFORMATION SESSIONS The aim of these workshops will be to raise awareness of current diversity issues related to the Island and internationally.
INTEGRATION WORKSHOPS Integration workshops work on the relationships between different social groups. It is a chance to meet the neighbours and discuss any issues in a relaxed environment.
YR. 0 - 5 COMMUNITY PREPARATION A series of workshops will be directed at the residents of Sa Penya to prepare them for the incoming populations over the next 5 years. They will begin about 6 months before the project implementation commences, and continue throughout the 5 years, incorporating the new demographics also.
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 1: PORT
PHASE 2: SA PENYA
PHASE 3: EIVISSA CITY
yr 2.
1.1
2.1
3.1
1.2
yr 3.
yr 4.
yr 5.
1.3
2.2
2.3 3.2
3.3
5-YEAR IMPLEMENTATION SCHEDULE To ensure a gradual acceptance of the new program
49
Breakwater
4. PROJECT //
1.1 Construction of Lower & Upper deck + arrival program for Fishermen
1.2 Addition of tourist arrival structure to the Upper Deck
PHASE 1: PORT
1.3 Gradual Insertion of LGBT Asylum Seeker Temporary Program
PORT PORTSCALE WALL
2.2 Provision of basic infrastructure & 2.2 Provision of basic infrastructure & services to neighbourhood services to neighbourhood
2.1 Allocation of existing urban fabric to 2.1 Allocation of existing urban fabric to Fishermen + benefits Fishermen + benefits
PHASE PHASE 2: 2: SA SA PENYA PENYA
2.3 Gradual Insertion of LGBT Asylum 2.3 Gradual Insertion of LGBT Asylum Seeker Transitional Program Seeker Transitional Program
BARRIO SCALE NEIGHBOURHOOD
3.1 Building and Constructing a new image of Ibiza Town 3.1 Building and Constructing a new image of Ibiza Town
3.2 Attraction of locals and visitors to a previously sparse, industrial area 3.2 Attraction of locals and visitors to a previously sparse, industrial area
PHASE 3: EIVISSA PHASECITY 3: EIVISSA CITY
2.3 Attention and Love given to Sa Penya, embracing it as a neighbourhood 3.3 Attention and Love given to Sa Penya, embracing it as a neighbourhood
CITY
23 50
0.50m
0.50m
3.84m
3.84m 0.16
0.1
0.1 0.1
0.16 0.01
0.01
SHP 160
0.11m
8.00m
3.84 - 8.00m
3.84 - 8.00m
// PHASES: IMPLEMENTATON OVER 5 YEARS
0.05 0.16
0.01
SHP 100
PREFAB CONCRETE
RHP 100
GLASS BRICKS
VERTICAL SUPPORT HORIZONTAL SUPPORT
14.00 - 22.00m
0.1
HEB 100
0.1 0.01
0.07
0.80 - 5.00m
UPE 100
0.16 0.01
0.16
HEB 160
2.85 - 18.00m
0.16 0.01
0.05
CHP 50
3.00 - 6.00m
0.16
3.00 - 6.00m
IPE 300 + L-PROFILE
0.30
1 STRUCTURAL CATALOGUE FOR 3 PHASES The whole of Breakwater can be built with 1 single structural catalogue. This helps the gradual implementation and adaptability of the project
51
52
5
PHASE 1: Port
a. Strategy & 5-Year Implementation Plan
b. Building Layers onto Existing Infrastructure
c. A Journey Through Breakwater
53
Breakwater
54
PHASE 1: PORT //
OCCUPATION: TEMPORARY
1.1 Construction of Lower & Upper deck + arrival program for Fishermen
1.2 Addition of tourist arrival structure to the Upper Deck
PHASE 1: PORT
1.3 Gradual Insertion of LGBT Asylum Seeker Temporary Program
PORT WALL
55
Breakwater
PHASE 1: PORT //
(a)
STRATEGY & 5-YEAR IMPLEMENTATION PLAN ~~~~
Phase 1 inhabits the existing, protective Port Wall of the Port d’Eivissa. Sitting at the entrance to the inner harbour, it boasts a specific arrival condition which makes it a suitable place for the introduction of the arrival program of Breakwater. This phase deals with the Arrival and Temporary of the LGBT Asylum Transition process, supporting them through the first 30 days of their application. Phase 1 also improves and enhances the existing local condition. It provides an arrival program for working local Fishermen, creates new and revitalises existing public spaces, it reorganizes the road traffic, and creates a more efficient and enjoyable arrival experience for tourists. It inhabits the Port Wall over the period of 5 years, gradually introducing different parts of the program to allow the area to grow without creating sudden shock amongst locals.This ensures that the new program has a smooth integration to the existing.
~~~~
1.
2.
THE PORT WALL
THE EXISTING
3.
4.
THE NATURAL
INDEPENDENT
3.84m 3.84m
3.84 - 8.00m 3.84 - 8.00m
8.00m 8.00m
0.50m 0.50m
3.84m
3.84m
0.10m 0.10m
3.84 - 8.00m 3.84 - 8.00m
14.00 - 22.00m 14.00 - 22.00m
0.80 - 5.00m 0.80 - 5.00m
PHASE 1: PORT
PHASE 2: SA PENYA
4 WAYS TO BUILD ONTO THE EXISTING 3.00 - 6.00m
3.00 - 6.00m
Phase 1 inhabits the existing, protective port wall of Ibiza Town.
56
2.85 - 18.00m
2.85 - 18.00m
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 1: PORT
yr 2.
yr 3.
yr 4.
yr 5.
1.1
1.1 LOWER DECK & DIVIDING WALL The Lower Deck and the Dividing Wall prepares the Breakwater for future occuptation. It creates two sides of the Port Wall which can act independently but there are varying degrees of visual connecton between them thoughout.
57
Breakwater
PHASE 1: PORT //
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 1: PORT
yr 2.
yr 3.
yr 4.
1.1
“oh look, local fishermen, lets go check it out!” “Lets go see what the catch of the day is down at the Breakwater”
1.1 INSERTION OF FISHERMEN PROGRAM The Breakwater provides the space for a Fishermen community. The locals are attracted to the Breakwater to buy their fresh “catch of the day”. The tourists are attracted because it is a place of local culture, right in the city centre.
58
yr 5.
// BUILDING ONTO THE EXISTING
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 1: PORT
yr 2.
yr 3.
yr 4.
yr 5.
1.1
“Its a beautiful day out, lets go have a picnic at the Breakwater” “Before we leave, let me go to the upper deck to take some photos of the city”
1.1 INSERTION OF UPPER DECK The Breakwater gives space back to the public, as well as providing one of the most successful touristic attractions known, the Viewpoint. It provides a deck, with undisturbed views of both the city and the ocean. Its the perfect welcoming space to Ibiza, and place for locals to spend their free time.
59
Breakwater
PHASE 1: PORT //
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 1: PORT
1.1
yr 2.
yr 3.
yr 4.
1.2
“Wow! I never knew that Ibiza was like this.” “Wait, I’m just going to buy some Sobrassada from this lady”
1.2 REDEVELOPING TOURIST ARRIVAL STRUCTURE Hundreds of tourists already arrive at this point. The extension of the upper deck provides a more efficient unloading/loading of passengers, and encourages them to enter Ibiza through Sa Penya. This can gradually open up the neighbourhood to the outside and help it become part of the islands economy again.
60
yr 5.
// BUILDING ONTO THE EXISTING
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 1: PORT
1.1
yr 2.
1.2
yr 3.
yr 4.
yr 5.
1.3
“Ibiza is a pretty tolerable place. They are so accepting of these vulnerable people”
1.3 INTRODUCTION OF LGBT ASYLUM PROGRAM Now, Ibiza is more ready to welcome the LGBT Asylum Seekers. Their integration will take place over 6 months and over 4 distinct stages. As the process moves on, gradually the LGBT Asylum Seekers will integrate more and more with locals and tourists.
61
Breakwater
PHASE 1: PORT //
(b)
BUILDING LAYERS ONTO EXISTING INFRASTRUCTURE ~~~~
DRY CONSTRUCTION METHOD: USE & CLIMATE Phase 1 of Breakwater is constructed in layers along the Port Wall. It uses dry constructon methods which allow for the constantly growing and adapting nature of the program. The structure has to be flexible, but braced. The natural climatic conditions will expose the Port Wall to wind and big differences in temperatures and therefore the construction has to be able to breathe, expand and contract. The use load of the Upper Deck will be variable at different times. In the Summer months, when boats arrive, the loads from disembarking passengers will be high and therefore it has to be flexible. The Prefabricated units are made from Cross-Laminated Timber (CLT) which allow for the quick manufacturing of the units for quick reactions to incoming asylum seekers.
MARINE-GRADE MATERIALITY The materials used in the project have been selected to be suitable for the environmental conditions of the site. The metallic elements, primarily in the Primary & Secondary structure, will be made from Hot-Dip Galvanized steel. This will protect it from the marine environment. However, the metallic structure does not come in direct contact with the ocean, only with seaspray. It is separated by a concrete foundation layer. The woods used have been chosen to resist in such marine environments.
EPHEMERAL VS. LONG-LIVED The initial layers of construction (Lower deck, structure, upper deck) have a more permanent presence on the Port Wall. Not only do they have a lasting impact on the landscape but also they provide long-term public space and facilities for local trade. The more ephemeral layers of construction (the prefab program) can be inserted, taken out, and moved around as necessary. However, the prefabricated construction method can resist just as long as the other parts of the program.
~~~~
62
+3.65m
6. & 7. PREFAB PROGRAM 1150 sqm Material: CLT Panels, glass “nana” folding walls.
+4.00m
5. UPPER DECK 3850 sqm Material: Galvanized steel structure, with wooden joists and decking.
+8.00m
4. PRIMARY STRUCTURE +3.80m
Material: Galvanized steel profiles, varying thickness, tensegrity cables.
+2.00m
REORGANIZED TRAFFIC & SUNKEN PLAZA
3. WALL Material: Reconstruction of existing wall, part in prefabricated concrete sandwich panels and part glass blocks.
2. LOWER DECK 5400 sqm Material: Post-Stressed concrete slab, Split into 18 sections
5m
1. THE EXISTING
3m 1m
206m length Material: Concrete Box Caisson foundation, with existing wall.
Formentera, Denia, Mallorca
63
Breakwater
PHASE 1: PORT //
1. THE EXISTING
+4.00m +1.00m
STREET LEVEL REORGANIZATION REMOVAL OF EXPOSED WALL (FOOTPRINT REMAINS) ~~~~
The traffic is reorganized, providing an efficient ferry loading/unloading zone for vehicles (a) . The existing public space (b) will be sunken, separating pedestrian flow from traffic and creating a step up to the Breakwater which signifies the entrance. The exposed part of the existing wall will be removed (c) however its footprint will be kept. Material: Detaching exposed existing wall from Box Caisson foundation, local stone paving
(b) (A)
5m 1m
3m
(c)
64
// BUILDING ONTO THE EXISTING
REORGANIZING BOAT LOADING DECK ZONE There is not a dedicated space for car traffic and no separation from pedestrian movement
AMPLIFYING THE PIER CONDITION The potential for the Port Wall to become an attractice public space is huge. Panoramic views all round.
CONNECTING TO PLACA SA RIBA There is a missing connection to the nearby Placa Sa Riba which is a place full of energy in the summertime.
65
Breakwater
// BUILDING ONTO THE EXISTING
PHASE 1: PORT //
2 & 3. THE LOWER DECK / 5400 SQM
+3.80m +1.00m
POST-STRESSED CONCRETE SLAB RECONSTRUCTED, PREFAB WALL ~~~~
The Lower Deck increases the potential area of the Port Wall, in preparation for the Breakwater program. The previously removed exposed part of the existing wall is rebuilt, dividing port wall into two, and providing different degrees of transparency. Material: Post-stressed concrete slab (split into 18 segments). Prefabricated concrete panels, glass bricks.
TE
CRE
ON
C SED
S
TRE T-S POS
ND
SOU
FAB
PRE
66
CON
TE CRE
W/
ES
HOL
S
GLA
OF
PRO
FAB PRE
CON
C
E RET
CK
RI SB
LL WA
// BUILDING ONTO THE EXISTING
110mm
500mm
500mm
Structure for veg.
LED Strip Lighting Flower bed
visibility
visibility
visibility
sound
sound
sound
1. GLASS BRICK WALL
2. PREFAB CONCRETE W/ HOLES
3. PREFAB SANDWICH CONCRETE
This part of the wall consists of tailor designed glass bricks which give a degree of transparency without losing privacy. It diffuses natural light, illuminating the covered corridors softly on the asylum seeker side of the wall
Prefabricated concrete panels create this part of the wall. Spacers are placed in the form-work when the concrete is setting. This creates protrusions through the entire depth of the wall which will be finished with a glass covering either side.
Prefabricated concrete panels create this part of the wall. Also, however they are fully opaque and in the middle is set sound insulation. This is to provide some parts of the program with soundproofing from the busy and loud Fishermen dock.
ASYLUM SIDE ELEVATION
3.80m height
WALL TRANSITION & PRIVACY 1:50 0m
0.5
1
2
3
67
Breakwater
PHASE 1: PORT //
4. THE PRIMARY STRUCTURE /
+8.00m
GALVANIZED STEEL PROFILES STEEL TENSEGRITY CABLES ~~~~
The Primary Structure spans the entire length of the Port Wall. It carries a load bearing function to the Upper deck, allowing it to be an independent element from what happens below it. It also supports the addition of light “add-ons” such as different types of shading, seating and even vegetation. It is light in appearance and substance and has a subtle yet powerful impact on the landscape.
Material: Galvanized steel profiles, varying thickness, with tensegrity cables (see structural catalogue)
ES
ABL
YC
IT EGR
S
TEN
E
R CTU
ZE
RU L ST TEE DS
I VAN GAL
68
// BUILDING ONTO THE EXISTING
4c 4c 2b 2b 2b 2b 2b 2b 2b 2e 2c 2c 2c
2c 2c 2c 2c 2c
2c
2c+3a 2c+3a 1e
1a
1d
2d
1d
1c
1c
1c 1c+3a 1c+3a
1d
1b
1d
1b
1d
2d
1d
1b
1d
1c+3a 1c+3a 1c
1c
1c
1a
1b
1b
1b
1b
1a 1a 1c
2f
2f
2f
HEB 100 L-Profile 65x50X5 CHS
2f
2f
4b
PRIMARY STRUCTURE PLAN 0m
5
15
25
4a
69
Breakwater
PHASE 1: PORT //
The Primary Structure is connected to the ground with a flexible joint. It is embedded inside the profile for a clean finish.
1
3
2
1. Galvanized Steel Square Hollow Profile (100x100mm) 2. New Post-Tensioned Concrete Slab (0.2 - 0.5m depth) 3. Galvanized steel concrete connection
+1.50M
STRUCTURE/CONCRETE CONNECTION 0mm
70
50
200
300
400
// BUILDING ONTO THE EXISTING
2
1
6
4
3
1. Galvanized Steel Square Hollow Profile (100x100mm) 2. Galvanized Steel HEB 100 Profile 3. Stainless Steel Tensegrity Cables (20mm diameter)) 4. Double Angle Cleat 5. Slide-on-wire canopy
+8.00M
UPPER CONNECTION 1:5 0mm
50
150
250
71
Breakwater
PHASE 1: PORT //
6. THE UPPER DECK / 3850 SQM
+4.00m +1.50m
GALVANIZED STEEL SECONDARY STRUCTURE WOODEN JOISTS & DECKING ~~~~
The Upper Deck is composed of three main layers. The Secondary structure provides support for the upper deck. Bracing is added horizontally between beams and vertically with diagonal ground connections and the wall. Its connection to the ground varys depending on the position. Wooden joists are then inserted to support the in-between spans, and then a White Oak decking is placed on top. Material: Galvanized steel structure with wooden joists and White Oak decking.
G
AR
B DED
TIN GRA
EL
LW
E STE IZED
VAN GAL
G
KIN
DEC
AK TE O
I
WH
EN
OD WO
STS
JOI
L
ZED
E-
R CTU
ON
TRU YS DAR
SEC
72
I VAN GAL
E STE
// BUILDING ONTO THE EXISTING
2. LOAD-BEARING - CONNECTION TO
1. LOAD-BEARING + CONNECTION TO
4. INDEPENDENT FROM DECKING &
DECKING
STUCTURE
DECKING 2a
1a
2b
4a
1b
4b
1c
2c
4c
1e
2f
2d
1d
2e
1c + 3a
2c + 3a
4c 4c 2a 2a 2a 2a 2b 2b 2b 2e 2c 2c 2c 2c 2c 2c 2c 2c 2c
1c
1d
4a
4a
4b
2f
2f
2f
2f
2f
2f
1c
1a
1b
1b
1b
1b
1a
1c
1c
1c
1b
1d
2d
1d
1b
1d
1b
1d
1c
1c
1d
2d
1d
1a
1e
2c+3a 2c+3a
1c+3a
1c+3a 1c+3a
STRUCTURAL SPANS 0m
4
8
16
20
73
Breakwater
PHASE 1: PORT //
The Upper Deck connects to the dividing wall in one of two ways. It differs depending on the type of wall it is.
11 9
16
6 18
12 2
17 15 14
4
10
3
5
7
1
8
1. Prefabricated Concrete Sandwich panel (500mm) 2. LED Embedded Lighting 3. Metallic Frame to Support Vegetation 4. LED Strip Lighting 5. Acoustic Insulation (100mm) 6. Wooden Joist 7. Thermal Acoustic Insulation (70mm) 8. Cross Laminated Timber Panel (60mm) 9. Metallic Hollow Grating (35mm) 10. Waterproof Membrane (5mm) 11. Self-tapping Screw 12. Cross Laminated Timber Angle Bracket 13. Neoprene Barrier (10mm) 14. Oriented Strand Board - OSB (20mm) 15. EDPM Rubber Layer 5mm 16. White Oak Decking (50mm) 17. Air Cavity 18. Galvanized HEB 160 Profile
+3.84M
UPPER DECK/CONCRETE WALL 1:10 0mm
74
100
300
500
// BUILDING ONTO THE EXISTING
6
210mm
4
110mm
5
4
70mm
5
70mm
4
3
2
1
1. Flower Bed Lining (Zinc sheet 5mm, Geotextile Layer 3mm, EDPM Rubber Layer 5mm) 2. Base Connection to Concrete (Metal plate 7mm, Neoprene layer, Steel supporting U Channel 4mm w/ Weather gaskets, expansion foam, Glass block mortar w/ steel rebars) 3. LED Illumination embedded in brick 4. Main Structural Channel (Rectangular Steel Profile 4mm, Structural support, Mastic seal to exterior) 5. Intermediary Structural Channel (Steel rebars, glass brick mortar, Expansion foam, Mastic seal to exterior) 6. Upper Connection to Upper Deck (Glass brick mortar w/ Steel rebars, Steel Supporting U Channel 4mm w/ Weather gaskets, Neoprene layer, Metal plate 7mm, Bolts)
+3.84M
UPPER DECK/GLASS BRICK WALL 1:10 0mm
100
300
500
75
Breakwater
PHASE 1: PORT //
The Upper Deck is connected to the Primary Structure with flexible joints. They allow the structure to move which is important for the climate for which it is exposed too and use loads.
0.10 1
5
7
0.16
8
6
0.07
1. Galvanized Steel HEB 160 Profile 5. Joist Hanger 6. Galvanized Steel UPE 160 Profile 7. Beam Connection Plate (70 x 160mm) 8. Beam Connection Plate (160 x 160mm)
+4.00M
PRIMARY/SECONDARY STRUCTURE 1:5 0mm
76
50
150
250
// BUILDING ONTO THE EXISTING
7
4
0.16
5
1
3
2
1. Galvanized Steel HEB 160 Profile 3. Wooden Joists (60 x 160mm) 4. White Oak Decking (50mm) 5. Joist Hanger
+4.00
SECONDARY STRUCTURE/DECK 1:5 0mm
50
150
250
77
Breakwater
PHASE 1: PORT //
7. LGBT ASYLUM PROGRAM / 2350 SQM
+3.65m +1.50m
PREFABRICATED CROSS-LAMINATED TIMBER UNITS WITH PLYWOOD FURNISHINGS ~~~~
constructively independent elements
The (Temporary) LGBT Asylum Seeker Arrival program is made up of prefabricated units. This is where the asylum seekers will spend their first month. Their constructive base is Cross-laminated Timber panels. Depending on the location of the specific program element, they are transported to the Port Wall and inserted by either sea or land. It occupies the left side of the wall gaining greater privacy which is important due to their vulnerability at this time. Material: Prefabricated cross-laminated timber, insulated wall layers with a oak cladding exterior finish. Interior floor finished with polished concrete & plywood built in furniture.
LTH HEA
N
TIO ODA
URE
RE
K
DEC
ENT
EC
OM ELC
LEIS
W
78
MU
OM
RC
E OTH
NAL
ES
LITI
I FAC
C
A RY
ORA
P TEM
M COM
TRE
CEN
// BUILDING ONTO THE EXISTING
3D PROGRAM UNITS 5 FISHERMAN
6
7
3 1
4
10
2
8
9
12
11
1. Personal Shading (zinc frame, textile shading) 2. Single Bed (Wooden bed frame, metallic bed posts) 3. Personal ceiling storage (20mm plywood) 4. Seating/Table (Double layer 20mm plywood, 10mm steel cable hung) 5. Furniture Pulley System 6. Upper Storage/service cavity 400mm 7. Passive Ventilation (zinc exhaust) 8. Personal Toilet 9. Personal Shower 10. Bathroom storage shelves 11. Entrance/Hallway (Pocket sliding door) 12. Personal Terrace
THE PREFAB UNIT 0m
0.2
0.8
1.2
79
Breakwater
PHASE 1: PORT //
The prefabricated accommodation units provide all of the essentials for an arriving asylum seeker. They are private spaces where they will spend their first 30 days. Privacy is important at this time due to their initial vulnerable state.
Ceiling storage, seating & table
Sink & Storage
Personal shower & toilet
Private sleeping, interior & exterior space
The Prefab unit provides all the basics needed for the arriving asylum seeker
18 SQM
SINGLE PREFAB UNIT 1 PERSON 0m
80
1
2
3
4
// BUILDING ONTO THE EXISTING
Service ceiling with storage, seating & table
Double Sink & Storage shelves
Personal shower & toilet
OPTIONS Extra storage, cupboards, kitchenette
Private sleeping, interior & exterior space.
The Double unit provides all the basics needed for the arriving asylum seeker couple, or for those who prefer the company of others
36 SQM
DOUBLE PREFAB UNIT 2-3 PEOPLE 0m
1
2
3
4
5
81
Breakwater
PHASE 1: PORT //
8. FISHERMEN ARRIVAL DECK / 529 SQM
+3.65m +1.50m
CROSS-LAMINATED TIMBER UNITS WITH PLYWOOD FURNISHINGS ~~~~
The Fishermen arrival program is also made up of prefabricated units. These “huts” are a contemporary take on the traditional Balearic “casetas varadero” which serve as a place for local fishermen to arrive in their boats, store their equipment, and carry out their everyday activities. Also, the fishermen dock is a place that allows them to sell their catchof-the-day to locals and visitors. Concrete ramps are placed to connect this area to the Upper Deck.
Material: Prefabricated cross-laminated timber, insulated wall layers with a oak cladding exterior finish. Interior floor finished with polished concrete & plywood built in furniture.
AN
ERM
H FIS
S HUT
PS
RAM
82
// BUILDING ONTO THE EXISTING
83
Breakwater
PHASE 1: PORT //
THE COMPLETE SYSTEM The different layers all come together to form the complete constructive system of the Port Wall. The existing concrete caisson foundation is the end load bearing element for all parts of the wall. The Post-tensioned slab carries loads from the prefabricated LGBT and Fishermen programs to the foundation. The LGBT Program is held in cantilever over the water and posidonia below. These units are independent from the metallic structure.The Upper Deck can function without the program below it. The loads from the upper deck transfer to the foundation primary structure and dividing wall.
PASSIVE COOLING TECHNIQUES The air cavity between the unit and the upper deck provides a channel for air to ventillate through to the inner corridor. Therefore, the roof is constantly ventillated. Air vents will connect the interior of the units to the air cavity above. The units can be cooled from the breeze coming from the ocean which is very favorable for the hot summer months.
84
// BUILDING ONTO THE EXISTING
1
2
5. UPPER DECK
INDEPENDENCE cross ventillation - passive cooling of units
6 & 7. PROGRAM
4. WALL
+2.00m
3. LOWER DECK
1 & 2. EXISTING +1.00m
INSERTION OF UNITS 1:50 0m
0.5
1
2
3
85
Breakwater
PHASE 1: PORT //
The prefabricated units are not joined to the metallic structure. The air cavity between the units and the upper deck is covered by a metallic grating to protect
29
from birds, and provides ventilation.
3
1
la venti tion
1.
14
21 18 37 7 10
1. Galvanized Steel Rectangular Hollow Profile (100x160mm) 6. New Post-Tensioned Concrete Slab (0.2 - 0.5m depth) 7. Thermal Acoustic Insulation (70mm) 8. Cross Laminated Timber Panel (60mm) 9. White Oak Decking - Weather treated (20mm) 10. Waterproof Membrane (5mm) 11. Plastic Drainage plate (10mm) 14. Galvanized Zinc Gutter (4mm) 15. Self-tapping Screw 16. Cross Laminated Timber Angle Bracket 17. Neoprene Vapour Barrier (10mm) 18. Oriented Strand Board - OSB (20mm) 20. Aluminium Flush base Folding “nana” door 21. EDPM Rubber Layer 5mm 22. Aluminium Folding “nana” door Head 24. Double Glazed panes (4mm, 15mm (air), 4mm) 25. Concrete Compression Screed - Polished Finish (55mm) 27. Exterior Oak Cladding (10mm) 29. White Oak Decking (50mm) 37. Air Cavity
27
16
37 7 8
22
1
24 20
25
15
9
17 7 11
8 10 6
EXTERIOR FACADE 1:10 0mm
86
100
300
500
// BUILDING ONTO THE EXISTING
36
29 1
upper deck
3
la venti tion
37
14
21
18
14
10 16 27
8
7
37
26 27
1
24 19 20 25
9
17 7 8
10 11
11
6
INTERIOR FACADE 1:10 0mm
100
300
500
87
Breakwater
PHASE 1: PORT //
(c)
A JOURNEY THROUGH THE BREAKWARTER ~~~~
The following section of the book will describe the experience of Breakwater through the eyes of an LGBT Asylum Seeker, Arman, who has just completed the transition process. The documents used to describe Phase 1 of the project shows the Port Wall arfter a period of 5 years. (all heights consider 0m at sea-level)
~~~~
origin: IRAN reason for fleeing: War and in discrimination because of sexuality destination: Breakwater, Ibiza
ARMAN, 24, IRAN “I escaped from Iran 9 months ago. My unaccepting family left me with no choice but to flee. In Iran, its not possible to be openly gay. It is strictly criminilized and very dangerous to be so. Word spread in my town that I was a homosexual and I was receiving threats on a daily basis.I was working in a glass factory at the time in por conditions. It took months for me to save up the money to get a plane ticket to Turkey. My boyfriend was working in a town just south of Tehran. The plan was to flee together, to cross the border into Turkey which is easy for Iranians, and then plead asylum in Europe�
88
3. TRANSITIONAL 90 - 180 days
SA PENYA Placa Sa Riba +1.50m
+11.00m
Breakwater Plaza +0.50m
+5.50m
Medical Centre +1.50m
2. TEMPORARY 7 - 30 days
Ferry Loading Dock +1.00m
Fishermen Deck +1.50m
D
D’
Arr. 2 Fishermen Arrival Deck
C’
B
B’ 1. ARRIVAL 72 hrs
C
1m
A
A’
LGBT Temporary Program +1.50m
Arr. 1 LGBT Asylum Arrival Deck
+1.00M
GROUND FLOOR PLAN 1:1000 0m
5
20
40
60
89
Breakwater
PHASE 1: PORT //
1. ARRIVAL The Transition begin at the Port Wall.
“A couple of days after arriving in Turkey, we went down to the nearby Port. We had been told that there was a trip leaving to Spain within the next few days, stopping at a few islands on the way.
“The owner of the small boat told us that he was heading to the Breakwater in ibiza. He told us that we would be safe there, and that the people there could help us through our transition process and provide us with the security and support that we needed. We told him that we were in, and two days later we departed Turkey and our journey began.”
“Upon approaching Ibiza, we noticed the presence of a light structure, sitting at the front of capital. The sun was reflecting its turqouise colour in a way that it looked like a continuation of the ocean. As we got closer, we could see people standing on what looked like a wall.it was as if they were waiting for us to arrive.”
~~~~
90
IMAGE OF ARRIVAL
Mid-term model 1:500
91
Breakwater
PHASE 1: PORT //
1. ARRIVAL
2. TEMPORARY
“We arrived at the end of the Port Wall (1). It was a beauitful place. We didn’t feel observed, instead our arrival felt normal. Looking around, the turqouise blue porticos of the structure framed perfectly the silhouette of the Ibiza skyline. We noticed a lot of activity coming from the far end of the pier. It appeared to be a community of fishermen preparing for their morning trip.”
“As we entered the welcome centre we were directed towards the waiting area (2). We were surrounded by lush vegetation and had such a pituresque view over the ocean. The doors to the deck were open, and the cool breeze from the incoming waves felt so liberating.”
“After a short wait we were called to check-in (3). The process was relatively straight forward. A border control officer processed our initial paper work within an hour, and then we were told we would be in the “Arrival” stage for aprocimately 72 hours until the initial processing of the application was complete.
“We were led to our accommodation via the collection zone (5) where we had access to basic essentials that we couldn’t bring from Iran. As we walked down the corridor we noticed there was the Leisure Deck. We saw people like us for the first time enjoying the ocean and using the sauna (4). There was a communal laundry zone (6) and luscious gardens between the accomodation units. We stayed in one of the Double rooms (9a) at the end of the Port Wall.”
~~~~
92
Ferry Loading Dock +1.00m
D
D’
C
C’
9
Ramp Access to Upper deck +1.50m
8 3.00m
3.00m
3.00m
B
B’
7
6
9a. 6.00m Public Garden area +1.50m
5 4
3
1
A
A’
Arr. 1
08.30-22.00 2
1m
5m
3m
+1.50m
Egypt Syria Turkey Algeria Libya ....
+3.00M
GROUND FLOOR PLAN 1:300 0m
2
4
8
12
93
Breakwater
PHASE 1: PORT //
The welcome centre cuts through the prefabricated wall leading the arriving asylum seekers from the arrival deck, through to the welcome centre, and out to the exterior deck that looks over the ocean and posidonia cultivations.
+8.00m
+1.50m
-1.00m -3.40m
-9.00m
94
Posidonia Cultivations -1.00m
// A JOURNEY THROUGH BREAKWATER
Breakwater
Leisure Deck +1.00m
LGBT Asylum Seeker Arrival Deck +1.50m
SECTION AA’ 1:300 0m
2
4
8
12
95
Breakwater
PHASE 1: PORT //
The dividing wall separates the two different spaces. One side is more public and the other is more private. This is important as during their first month the asylum seekers can be very vulnerable and initial privacy if favoured.
+9.50m
Upper Deck +5.50m
+5.50m
Communal Space +1.50m
+1.50m
Water Access
-1.00m
-1.60m
96
Protected Posidonia Cultivations -1.00m
// A JOURNEY THROUGH BREAKWATER
Central Corridor +1.50m
Laundry Room +1.50m
Public Space +1.50m
SECTION BB’ 1:50 0m
0.5
1
2
3
97
Breakwater
PHASE 1: PORT //
2. TEMPORARY
“We were in the Temporary stage for 26 days before receiving our initial application result. Some of our fellow asylum seekers were very sociable. We would meet people in the central corridor or in the communcal kitchens (10) where we would eat our meals in the sheltered exterior spaces.”
“We had access to bikes (11) which was a nice way to get to know the surroundings. There was also communal spaces to store our belongings (8)”.
“We felt connected to the outside but we also appreciated the privacy we had at this time. We were still in shock, and we knew we would enter the Transition phase soon where we would have countless opportunities to integrate with the locals. The tourists would arrive on the Upper Deck. In parts of the corridor they could see down to us, and we could see up to them.
~~~~
98
12
8
Ramp Access to Upper Deck +1.50m
11.
Fishermen Deck +1.50m
10.
D
D’
C
C’
Arr. 2
Arr. 3
Formentera (Nixe) 546 pp, 100 veh.
+3.00M
GROUND FLOOR PLAN 1:300 0m
2
4
8
12
Formentera,Denia (Ramon Llul) 477 pp. 90 veh.
99
Breakwater
PHASE 1: PORT //
The cental corridor encourages interaction between asylum seekers. It is naturally lit by the open ceiling during the day and at nighttime the embedded LED lights in the concrete wall illuminate the space. It is an entirely exterior space. When its rains, the water drains through the wooden floor into the drainage pipes.
100
101
Breakwater
PHASE 1: PORT //
In some parts of the program the prefabricated
concrete
wall
has
embedded acoustic insulation. This is to prevent noise coming from the Port to the accommodation areas. The Upper Deck is an independent element with urban fixtures forming an extended viewpoint and public space.
Upper Deck +5.50m
+5.50m
6. PROGRAM
Single Unit +1.50m
3. WALL
Central Corridor +1.50m
+1.50m
2. LOWER DECK
-1.00m
102
5. UPPER DECK
4. PRIMARY STRUCTURE
Fishermen Dock +1.50m
1. FOUNDATION
SECTION DD’ 1:50 0m
0.5
1
2
3
103
Breakwater
PHASE 1: PORT //
The Fishermen Dock is composed of many different uses. There are huts for the fishermen to perform their daily activities. Each fisherman has his own private boating slip which is supported in cantilever from the concrete slab. The whole dock is protected by movable, slideon-wire canopies. On the far side is the Ferry dock. The tourists disembark on the Upper Deck level.
104
// A JOURNEY THROUGH BREAKWATER
105
106
Breakwater
PHASE 1: PORT //
The two sides of the dividing wall boast very different natural situations. On the left the seabed lies low at only 1m below sea-level. This makes it easy to enjoy time in the water and grow the posidonia. On the right side of the wall there is a different condition with the seabed level much deeper for the port activity. The Port Wall preserves this natural condition.
+8.00m
+1.50m -1.00m Posidonia Cultivations -1.00m
-7.90m
108
// A JOURNEY THROUGH BREAKWATER
Tourist Arrival Deck +5.50m
Public Space/Gardens +1.50m
-
SECTION CC’ 1:300 0m
2
4
8
12
109
Breakwater
PHASE 1: PORT //
The Port Wall has a subtle but impacting presence when seen from the inner Port of Ibiza. The built program doesn’t rise above the height of the existing, exposed part of the Port Wall. The structure changes the way the landscape of perceived. It is painted in a turqouise blue which blends into the sea of Ibiza.
+9.50m
+1.50m 0.00m Asylum Seeker Welcome +1.50m
-6.60m
-12.00m
110
Ramp to Upper Deck +1.50m
Ferry Goods Loading deck +1.00m
// A JOURNEY THROUGH BREAKWATER
Vehicle Loading deck +1.00m
Breakwater
PORT WALL ELEVATION EE’ 1:500 0m
4
10
14
111
Breakwater
PHASE 1: PORT //
2. TEMPORARY
“During our stay, we had access to top medical professionals in the Medical Centre (13), and we still have access to it today even though our transition is complete. The Port Wall has 24/7 security and at nighttime the gates are completely closed (12).”
“The access to the Asylum Seeker side of the Port Wall is discrete (15). A plant lined corridor is sandwiched between two walls made from glass bricks leads you in to the central corridor. The translucency provides a semi-private situation in which you can only see the silhouettes of the people passing by. There is a double ramp which connects the Lower Deck with the Upper Deck. You can see ramp even from the end of the pier as it is a continuation of the corridor. The perspective is beautiful, especially at night when the glass is illuminated.”
The Placa Sa Riba is always full of life (16). It is sunken from the traffic level and Lower Deck. At the weekends, there is a local hippie market which attracted many tourists at a time. On these days we noticed an increased curiosity about our presence.”
“There is a public square at the connection with the existing viewpoint of Sa Penya (14). As you are approaching the Port Wall from the redesigned Placa sa Riba (16), you are led up the steps into this space and on the other side the steps lead you down to the ocean. We noticed that this space was often filled with tourists.”
~~~~
112
+11.00m
PE
NY A/
EIV IS S
A
+1.00m
SA
16.
+0.50m
+5.50m
14.
UP RD PE
K EC
15.
10.00-23.00
Access road for Loading/ Unloading goods +1.00m
13.
12.
+3.00M
GROUND FLOOR PLAN 1:300 0m
2
4
8
12
113
Breakwater
PHASE 1: PORT //
2. TEMPORARY
3. TRANSITIONAL
“After a period of 1 month we received the initial application result. This meant that we could be moved to the Transitional phase which would last up to 6 months until the final verdict of our status in Spain was determined.”
114
// BUILDING ONTO THE EXISTING
115
116
6 PHASE 2: Sa Penya
a. Strategy & 5-Year Implementation Plan
117
Breakwater
118
PHASE 2: SA PENYA //
OCCUPATION: TRANSITIONAL / PERMANENT
2.1 Allocation of existing urban fabric to Fishermen + benefits
2.2 Provision of basic infrastructure & services to neighbourhood
PHASE 2: SA PENYA
2.3 Gradual Insertion of LGBT Asylum Seeker Transitional Program
NEIGHBOUHOOD
119
Breakwater
PHASE 2: SA PENYA //
(a)
STRATEGY & 5-YEAR IMPLEMENTATION ~~~~
Phase 2 inhabits the existing residential and natural condition of Sa Penya. It deals with the temporary phase that arrivals go through between arrival and integration. Its condition as a neighbourhood allows for the introduction of new demographics. It does this by taking advantage of empty buildings and reforming them. Phase 2 also improves the local residential and public condition of Sa Penya which is necessary in order to cope the new incoming populations.Basic infrastructure needs to be provided. These will be in the form of small-scale interventions. The Fishermen will move into the neighbourhood in housing spread all over Sa Penya. Then during their Transition Stage of the program, the LGBT Asylum Seekers will be inserted. Throughout the 5-Year implementation the amount of tourists entering the neighbourhood will gradually rise but at a steady pace not to provoke sudden counter-reactions by the residents. By inserting new populations of people it will open the neighbourhood up over time, and reconnect it to the islands economy.
~~~~
1.
2.
THE PORT WALL
THE EXISTING
3.
4.
INDEPENDENT
THE NATURAL
3.84m 3.84m
3.84 - 8.00m 3.84 - 8.00m
8.00m 8.00m
0.50m 0.50m
3.84m
3.84m
0.10m 0.10m
3.84 - 8.00m 3.84 - 8.00m
14.00 - 22.00m 14.00 - 22.00m
0.80 - 5.00m 0.80 - 5.00m
PHASE 1: PORT
PHASE 2: SA PENYA
2.85 - 18.00m
2.85 - 18.00m
BUILDING ONTO THE EXISTING URBAN FABRIC 3.00 - 6.00m
3.00 - 6.00m
A series of small-scale interventions that build onto existing situations in order to improve the residential condition.
120
// STRATEGY & IMPLEMENTATION
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
yr 2.
yr 3.
yr 4.
yr 5.
2.1
Total existing footprint: 15,000m2 Total to remove:
20% 2.5% decalred “ruin” 7% min. abandoned 10% max. addiontal removal Total remaining footprint: 12,493m2
2.1 POTENTIAL BUILDINGS TO REMOVE The condition of the existing urban fabric in Sa Penya varies from being reasonably maintained and occupied to being abandoned or in ruin. The dense distribution of buildings makes it difficult to penetrate the neighbourhood. Its laborinthial characteristic helps build the essence of Sa Penya. Therefore by carefully selecting a minimal proportion of buildings in bad condition and removing them, the neighbourhood becomes more accessible from the outside, but still keeping its narrow street “charm”.
121
Breakwater
PHASE 2: SA PENYA //
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
yr 2.
yr 3.
yr 4.
yr 5.
2.1
95.5% Locals 4.5% Fishermen
2.2 ACUPUNCTUAL INSERTION OF FISHERMEN The Fishermen are offered reformed accommodation in Sa Penya. Their allocated housing will be within the existing buildings and they will be living amongst the residents of Sa Penya. They will be inserted acupunctually to create a gradual and widespread immserion of this returning demographic. By moving back into the neighbourhood, Fishermen will have access to some benefits. Firstly, rent prices will be very low compared to the rest of the city and also their new home will come with their own unit and slip on the Fishermen Deck on the Port Wall.
122
// STRATEGY & IMPLEMENTATION
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
2.1
2.2
yr 2.
yr 3.
yr 4.
yr 5.
2.3
92% Locals 4.5% Fishermen 3.5% Asylum Seekers
2.3 ACCUPUNCTURE INSERTION OF LGBT ASYLUM In the 3rd year of the Breakwater intervention cycle, the LGBT Asylum Seekers will be inserted acupunctually for the Transitional stage. The neighbourhood and its residents would have already had 3 years of experience of coexisting with fishermen and also a gradual increasing presence of tourists. They would have also taken part in many community workshops and therefore it is supposed that the integration of asylum seekers will not so challenging for the residents of Sa Penya. Like the Fishermen, their housing units will be located in existing buildings and spread out the whole neighbourhood to encourage a gradual integration.
123
Breakwater
PHASE 2: SA PENYA //
BEFORE
INFORMAL LAND-USE 2008
AFTER
ABANDONED CENTRE POLIVALENT 2011
REJECTING GENTRIFICATION BY EMBRACING THE NEIGHBOURHOOD There have been many attempts to improve the neighbourhood of Sa Penya by providing new uses for the land. These come as part of the PEPRI (PLAN ESPECIAL DE PROTECCIÓ I REFORMA INTERIOR DE SA PENYA LA MARINA) however many of these interventions have been rejected by the neighbours. The residents need basic infrastructure and when it is not provided they have grown comfortable with informally using the land to what they need.
124
// STRATEGY & IMPLEMENTATION
BEFORE
STREET ACTIVITY 1960’s
AFTER
STREET ACTIVITY 2011
ENCOURAGING STREET LEVEL COMMERCE (NOT DRUGS) Before the 1960s in Sa Penya, the fishing and trade culture led to street level commerce in the neighbourhood. In recent times, this activity has diminished and turned into an illicit economy of drug commerce at street level.
125
Breakwater
PHASE 2: SA PENYA //
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
2.1
yr 2.
yr 3.
yr 4.
2.2
1. THE ADD-ON
SA PENYA
~~~~
1. THE SHOWER TOWER The Shower Tower provides the neighbourhood of Sa Penya with much needed infrastructure. It stores water for the whole neighbourhood and distrubutes it in pipes on top of the existing buildings. They are located at the centre of existing squares becoming new nodes of activity where locals can come, socialize with others and even take showers instead of breaking water hydrants to wash.
0m
126
1
4
6
yr 5.
// STRATEGY & IMPLEMENTATION
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
2.1
yr 2.
yr 3.
yr 4.
yr 5.
2.2
THE ADD-ON
2. THE ADD-ON The Add-On is reminiscent of the process of self-construction that currently occurs in the neighbourhood. It clings onto the existing building providing the residents of Sa Penya with much needed exterior space. Its implementation is flexible but regulated, eliminating the controversies of constructing illegally in the neighbourhood but preserving its essence.
0m
2
4
6
127
Breakwater
PHASE 2: SA PENYA //
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
2.1
yr 2.
yr 3.
yr 4.
2.2
~~~~
3. THE CLIFF-STEP The Cliff-Step provides access from the neighbourhood to sea level. It is built into the cliff, and supported in cantilever. This aims to provide new recreational possibilities for the residents of Sa Penya. It has extended platforms that span over the ocean below, becoming attraction points for locals from others areas of Ibiza and tourists.
0m
128
5
10
15
yr 5.
// STRATEGY & IMPLEMENTATION
LOCAL CONDITION TOURISTIC CONDITION LGBT ASYLUM CONDITION
yr 1.
PHASE 2: SA PENYA
2.1
yr 2.
yr 3.
yr 4.
yr 5.
2.2
4. THE SIDE-STEP The Side-Step is built on the exposed facades of the existing buildings. They can occur in the newly created gaps in the neighbourhood where buildings existed before. They provide access for residents of upper floors to street level as well as providing a structure for vegetation to grow. They create channels of green throughout the neighbourhood.
0m
1
2
4
129
Breakwater
PHASE 2: SA PENYA //
Each intervention will be implemented at different times over a period of many years depending on the needs of the neighbourhood and its residents.
3. THE CLIFF-STEP
+11.50m
+0.50m
+0.50m +5.50m
130
+36.40m
E’ 1. SHOWER TOWER
+12.40m
2. ADD-ON
+10.40m
+4.40m
4. SIDE -STEP
EXAMPLE CITY PLAN 1:600 0m
5
10
20
E 131
Breakwater
PHASE 2: SA PENYA //
The interventions will have power to change
the
way
the
residents
live
neighbourhood. The main activity at street level will be mixed, depending on how the individual wishes to occupy it. Locals from other parts of the city and visitors to the island will be able to walk through the neighbourhood as it will be more open.
GREEN-CUTS Installing urban gardens between remaining buildings
+1.00m
132
4. THE SIDE-STEP Wall-mounted access to upper floors
// STRATEGY & IMPLEMENTATION
1. THE SHOWER TOWER Providing much needed infrastructure and communal spaces
+36.40m 2. THE ADD-ON Providing exterior space to existing residents
CAR-PARK Converting the Centre Polivant back to its original use informal use.
+29.00m
+12.40m +10.40m +7.40m
CITY SECTION EE’ 1:400 0m
5
10
20
133
134
7
PHASE 3: Eivissa
a. Ibiza through the Eyes of the Tourist
b. Constructing a New Image of Ibiza
135
Breakwater
136
PHASE 3: EIVISSA //
EFFECT: LONG-TERM
3.1 Building and Constructing a new image of Ibiza Town
3.2 Attraction of locals and visitors to a previously sparse, industrial area
PHASE 3: EIVISSA CITY
3.3 Attention and Love given to Sa Penya, embracing it as a neighbourhood
CITY +2.00M
UPPER DECK PLAN 1:1000
137
Breakwater
PHASE 3: EIVISSA //
(b)
IBIZA THROUGH THE EYES OF THE TOURIST ~~~~
The current image of Ibiza is an accumulation of many different symbols that have represented the island in the past. Its identity has been forever changing due to the different migrating populations and visitors to the island. Ibiza has attempted to rebrand itself many times in the past and the strategy taken has always been the critical position between what the tourists are looking for and what is good for the island. WHAT TOURISTS DESIRE
THE GOOD OF THE ISLAND
The image of Ibiza from the outside has also faced a gradual transition in the past 90 years from being focused on the culture and activity of the locals to the leisure and party culture that the island can offer tourists. This is visible in various postcards and images from different periods. It is possible to identity when the changes happened and how the island seen from the external viewpoint. Local Culture
Tourist Culture
1930s
NOW
~~~~
138
// IBIZA THROUGH THE EYES OF THE TOURIST
“Pareja Tipica”. Postcard from Ibiza, 1930s
“Cap Quadrat”. Postcard from Ibiza, 1991
139
Breakwater
PHASE 3: EIVISSA //
PRE-1960s “L’illa Blanca” The White Island was one of the first touristic imaginieries of Ibiza. The “whiteness” identifies the the island as being the “Mediterranean Dream”.1 The term was coined by Santiago Rusinol, a Spanish painter and poet who first visited the island in 1912. He was inspired by the landscape of Ibiza and used the term “The White Island” in a few poems and narratives. It created such a powerful image of the island from the outside that the Ibiza Mayor ordered that new construction on the island need to be painted white, as well as the facades of old buildings.2
140
// IBIZA THROUGH THE EYES OF THE TOURIST
“Un rincon tipico de “Sa Penya””. Postcard from Ibiza, 1955
“From Ibiza where I’m spending my holidays. I send you my thoughts. The weather is marvellous, and we are having a great time of it by swimming and sailing with really nice people. Yours sincerely”
PRE-1960s INTEREST LOCAL CULTURE & ACTIVITES Ibiza became popular amongst intellectuals and artists. People were visiting the island to get a sense of the local culture and to capture its essence in photography, art and literature. The visitors would interact with locals, and learn about the local agriculture and fishing culture.
141
Breakwater
PHASE 3: EIVISSA //
Crowds arriving in Port d’Eivissa, 1950s.
142
// IBIZA THROUGH THE EYES OF THE TOURIST
Hippies with locals in Sa Penya, 1960s.
Hippies at cafe in Ibiza Town. 1960s.
1960s-70s FREE LIFESTYLE, LIVING AMONGST LOCALS The image of Ibiza painted by the artists and intellectuals attracted crowds to the island. Free spirited people saw the laid-back and pure lifestyle the island had to offer and many migrated to the island. The artists left slowly due to the over crowding. The new hippy culture on the island constructed a new image of the Island from the outside. People saw that the island was free from rules and sexually liberal. The images of Ibiza seen from this time represent this lifestyle and shows them living among the locals in peace and respect.
143
Breakwater
PHASE 3: EIVISSA //
Amnesia Postcard, 1990s.
Party from the 1980s. Sa Penya.
1980s-90s FOCUS ON THE SOCIAL, PARTY SCENE The free-minded, open lifestyle that the hippies carved out for the island saw a huge influx of visitors to the island. Everybody wanted a piece of what Ibiza had to offer. The electronic music scene and mega-clubs started to open and it became the party island. The image from the outside of the island drastically changed. Tourists were generally no longer seeking the local culture, or even integrating with locals. They were focusing and seeing what the island has to offer in terms of party and the social scene.
144
// IBIZA THROUGH THE EYES OF THE TOURIST
Postcards from souvenir shop, Ibiza town.
1990s - PRESENT SUPERFICIAL VIEW OF IBIZA If you walk around Ibiza nowadays searching for a postcard of the true essence of the island, you will have a hard time finding one. The majority of mainstream postcards sent out from Ibiza convey false or superficial realities of Ibiza, and of what it has become as a mass-tourist destination. You may find one postcard showcasing the local culture, amongst 8 others showing the touristic culture.
145
Breakwater
PHASE 3: EIVISSA //
(b)
CONSTRUCTING A NEW IMAGE FOR IBIZA ~~~~
Breakwater will create a new, integrative brand for Ibiza. It will focus on preserving the interest in local culture from the tourism before the 1960s and also embrace the free-lifestyle of Ibiza and the locals acceptance of the incoming. The postcards will always showcase a typical panorama of Ibiza Town with something representative of what will be happening after the intervention of Breakwater. Some will also showcase the transitional nature of Breakwater’s program, others will show the integration of visitors into the neighbourhood of Sa Penya. The general conception of these postcards is that Ibiza is a safe and welcoming place for all.
~~~~
EMBRACING THE LOCALS, PROTECTING THE INCOMING
146
// BUILDING ONTO THE EXISTING // CONSTRUCTING A NEW IMAGE OF IBIZA
Your safe-haven awaits you
Breakwater PORT D’EIVISSA
157 147
Breakwater
PHASE 3: EIVISSA //
Relax, enjoy, and embrace the newcomers
Breakwater PORT D’EIVISSA
148
// CONSTRUCTING A NEW IMAGE OF IBIZA
Discover the otherside of Ibiza
Breakwater PORT D’EIVISSA
149
Breakwater
PHASE 3: EIVISSA //
“Ibiza will be Earth’s final refuge”
Breakwater PORT D’EIVISSA
150
// CONSTRUCTING A NEW IMAGE OF IBIZA
151
152
I would like to thank my friends and and family for supporting me always and getting me through this process.
and to the Faculty and my colleagues at IE University for making the past 5 years such an enjoyable experience.