BALCONY GUARDRAIL1 : 30 SKYLIGHT STAINLESS STEEL HANDRAIL
STAINLESS STEEL HANDRAIL 532.2
150MM MINERAL WOOL BATT 150MM 미네랄 울 벳
SARANG GLOBAL MINISTRY CENTER |
47.0
INCOMPLETE DOCUMENTS FOR INTERIM REVIEW ONLY, NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION DATE
CURRENT SUBMISSION:
#
12°
1 : 10 1 SANCTUARY RAILING DETAILS
SEOUL SOUTH KOREA
RESPONSIBILITIES • Designed 6,800 seat underground worship sanctuary and chapel. • Configured skylight openings through complex 16’ deep mega trusses between entry plaza and worship room. • Provided a creative egress solution to meet the most stringent fire exit requirements from the 6,800 seat underground assembly space. • Increased the seat number from 6,000 to 6,800 without impacting the worship room size. • Developed full floor plans and coordinated with structure engineer using Revit to accommodate various program requirements in vertical configuration of high-rise building. • Offered bright underground spaces by designing sunken garden to bring natural light all the way down to B5 levels. • Provided client presentations and led weekly design progress meetings. • Developed drawings and details for the worship sanctuary, chapel, lobby, and sunken garden in SD and DD packages using Revit. • Reviewed construction documents from local architect and provided corrections and directions. • Performed job site visit and resolved unforeseen problems during construction.
SUBWAY
1 : 10
SHEET
2 CHOIR LOFT RAILING DETAILS
PARKING
1 : 10
46.7
219.0 32.0
3 SANCTUARY/RR ISOLATION
65.0
47.0
46.8 46.7
B4 SLAB (BEYOND) 뒤쪽 B4 슬라브
80.0
SUBWAY
WD1
80.0 803.5
WD1
SOLID BARRIER FOR SOUND & AIR AT UNDERFLOOR PLENUM 소음과 공기 차단위한 바닥밑 솔리드 차단벽
TYP.
RESTROOM SLAB (BUILT UP) 올려 시공된 화장실 슬라브
47.0
2 LAYERS 16MM GWB 16MM 석고보드 두장
° .152 81
RAMP 램프
647.8
1180.0
1180.0
RESTROOM 화장실
650.0
SANCTUARY 성역
ALL PLUMBING THIS SIDE MOUNT WITH VIBRATION ISOLATION SUPPORTS SIMILAR TO HOLD-RITE 이쪽 면의 모든 배관은 홀드라이트와 비슷한 방진 지지에 의해 설치
40.0
150MM MINERAL WOOL BATT 150MM 미네랄 울 벳
SUBMISSION
Design Development 스테인레스 스틸 핸드레일
532.2
스테인레스 스틸 핸드레일
2 LAYERS 16MM GWB 16MM 석고보드 두장
150mm 아연도금 스터드
50MM AIRSPACE 50MM 에어 스페이스
1 : 30 STAINLESS STEEL HANDRAIL
555.5
STAINLESS STEEL HANDRAIL
BRIDGE
1 : 104 PLAZA SKYLIGHT DETAILS
1 LAYER GWB TO SEAL OFF PLENUMACOUSTICAL CAULK/RESILIENT CONNECTION AT SEAL 한장 석고보드로 플레넘을 봉함- 어커스틱컬 코킹/탄력성 연결로 봉함
530.0
EARLY SCHEME
150MM GALVANIZED STEEL STUDS
A11.01
1 : 10 1 SANCTUARY RAILING DETAILS
LIGHTING SLOT FOR THEATRICAL LIGHTING WHERE INDICATED ON CONSULTANT'S DRAWINGS 컨설턴트 도면에 표기된대로 무대 조명위한 오픈닝
SHEET
2 CHOIR LOFT RAILING DETAILS
UNDERFLOOR SUPPLY AIR PLENUM 바닥 밑 공기 공급 플레넘
2 LAYERS 16MM GWB 16MM 석고보드 두장
JOB NO.
1 : 10
CEILING AS INDICATED ON REFLECTED CEILING PLANS 천장도에 표기따를것
164839
SANCTUARY/RR ISOLATION
VARIES
12°
32.0
3200.0 BALCONY 발코니
Schematic Design Design Development
STRUCTURAL TRUSS 트러스 구조
725.0
219.0
150mm METAL STUDS WITH TWO LAYERS OF GYPSUM BOARD OVER FABRIC 천 위에 150MM 메탈 스터드와 두겹의 석고 보드
SaRang Global Ministry Center
46.8
INTERIOR DETAILS
65.0
DIFFUSER 디퓨져
A11.01
1180.0 647.8
TYP.
46.7
47.0
80.0
47.0
803.5
80.0
MOTORIZED DIMMER 전동식 차양장치
1 2010.01.22 2 2010.06.05
40.0
TUBULAR DAYLIGHT DEVICE 튜브 자연광 채광장치
WD1
46.7
B4 SLAB (BEYOND) 뒤쪽 B4 슬라브
CONCRETE SLAB 콘크리트 슬래브 SPRAY-APPLIED ACOUSTICAL INSULATION 뿜칠 건축음향 인슐레이션
47.0
2 LAYERS 16MM GWB 16MM 석고보드 두장
WD1
SOLID BARRIER FOR SOUND & AIR AT UNDERFLOOR PLENUM 소음과 공기 차단위한 바닥밑 솔리드 차단벽
UNDERSLAB WATERPROOFING MEMBRANE 슬래브하부 방수막
SHEET WATERPROOFING 방수 쉬트
2° .15 81
RAMP 램프
RESTROOM SLAB (BUILT UP) 올려 시공된 화장실 슬라브
NORTH TOWER
INTERIOR DETAILS
ALL PLUMBING THIS SIDE MOUNT WITH VIBRATION ISOLATION SUPPORTS SIMILAR TO HOLD-RITE 이쪽 면의 모든 배관은 홀드라이트와 비슷한 방진 지지에 의해 설치
1180.0
RESTROOM 화장실
650.0
SANCTUARY 성역
PLAZA
50MM ISOLATION BATTENS 50mm 진동방지 배튼
50 MM THICK CLEAR LAMINATED GLASS PAVERS. 50mm 두께 투명 적층 유리 바닥 포장재
JOB NO.
530.0
50MM AIRSPACE 50MM 에어 스페이스
스테인레스 스틸 핸드레일
스테인레스 스틸 핸드레일
2 LAYERS 16MM GWB 16MM 석고보드 두장
150mm 아연도금 스터드
SOUTH TOWER ISOLATED CONCRETE SLAB 아이소레이트 콘크리트 슬래브
75MM THICK GRANITE PAVERS ON PEDESTALS 75mm 밀리 두께 화강석 패널대석
164839
150MM GALVANIZED STEEL STUDS
4 PLAZA SKYLIGHT DETAILS WORSHIP SANCTUARY
925.0
1 LAYER GWB TO SEAL OFF PLENUMACOUSTICAL CAULK/RESILIENT CONNECTION AT SEAL 한장 석고보드로 플레넘을 봉함- 어커스틱컬 코킹/탄력성 연결로 봉함
SaRang Global Minist Center
UNDERFLOOR SUPPLY AIR PLENUM 바닥 밑 공기 공급 플레넘
555.5
2 LAYERS 16MM GWB 16MM 석고보드 두장
BUILDING SECTION
LEVEL B2 - WORSHIP SANCTUARY
WORSHIP SANCTUARY
LEVEL 4 - MULTI-PURPOSE ROOMS
NS HOME SHOPPING MIXED-USE |
PANGYO SOUTH KOREA
RESPONSIBILITIES • Created a scheme with non-conventional metal fabric and convinced the client with a strong presentation about its concept. • Provided open and bright outdoor shopping experience under parking garage. • Developed metal fabric installation details and structure systems to achieve high quality construction. • Produced drawings for SD packages. • Provided client presentations and led weekly design progress meetings. • Reviewed construction documents from local architect and provided corrections and directions. • Performed job site visit and resolved unforeseen problems during construction.
io
TV stud
parking
retail
WRAP & LIFT METAL FABRIC
BAYLOR ARTS DISTRICT |
BAYLOR UNIVERSITY WACO, TEXAS
RESPONSIBILITIES • Participated and generated multiple ideas in brainstorming sessions and selected as a final scheme. • Created the main wave concept and developed it to the final design of exterior and main concourse space. • Developed space diagrams to amplify synergy among different art and music programs in the concourse space. • Prepared design presentation to sell this unique contemporary design to conservative school board members and received board approval.
WAVES
VALLEY CREEK CHURCH | BEFORE
RESPONSIBILITIES • Resolved existing circulation issues by adding strategically new lobby and worship space. • Provided early design decisions to expedite the schedule and set GMP secure with IPD (Integrated Project Delivery ). • Lowered construction cost with cost-effective design by collaborating with contractors and consultants. • Resolved unforeseen problems during construction without impacting GMP.
AFTER
TWO ROOF HEIGHTS AT THE WORSHIP ROOM FOR COST SAVING
TILT-UP PANEL DESIGN
MAIN FACADE
FLOWER MOUND TEXAS
WORSHIP ROOM OPTIONS
WORSHIP SPACE
INTEGRATED INTO NATURAL TERRAIN
MAIN LOBBY
EARLY SKETCH
JOYFUL CHURCH |
POHANG SOUTH KOREA
RESPONSIBILITIES • Provided a solution to integrate the building into the landscape with gently flowing lines which wrapped around a large central plaza. • Applied abstract forms and patterns inspired by traditional Korean symbols in the architecture to achieve church’s vision to use traditional Korean symbols in the new design with modern functionality. • Led design team and directed other designers through whole phases. • Provided a solution to locate two buildings in different zoning districts but maintain a holistic design. • Developed details and documented SD, DD drawings and packages using Revit. • Performed presentations to the church congregation for fundraising campaign. • Led coordination meetings with local architects and consultants. • Reviewed construction documents from local architect and offered directions. • Provided design solutions for unforeseen problems during construction. • Received a Grand Prize from 2015 Church and Culture Award by Kookmin Ilbo, Korea.
WORSHIP CENTER
CHAPEL
HARIM IKSAN OFFICE |
IKSAN SOUTH KOREA
RESPONSIBILITIES • Provided a solution to separate circulation among pharmaceutical lab, office space, veterinary clinic, and public amenities with interconnected green spaces. • Developed curtain wall design with vertical fins and back-painted glass to minimize glare, provide shade, and improved R-value. • Resolved complex structure layout due to interference among sky bridge and parking ramp, and various program requirements.
GREEN SPACE THROUGHOUT THE BUILDING
HARIM VISITOR CENTER |
IKSAN SOUTH KOREA
RESPONSIBILITIES • Created concepts and executed them to the final design. • Led design team and directed younger designers. • Documented SD packages using Revit. • Developed key details. • Provided bi-weekly presentations to the clients. • Led coordination with local architects and consultants. • Reviewed construction documents and provided details.
FIRST BAPTIST DALLAS |
DALLAS TEXAS
RESPONSIBILITIES • Participated in brainstorming and design charrette and provided multiple ideas. • Developed master plan and overall conceptual design from brainstorming session. • Charged on space planning and floor plans. • Provided Schematic design for education building and overall exterior. • Performed presentations to the clients. • Designed a $700k fundraising experience room.
WORSHIP CENTER
SKETCHES |