Work Samples Jae Lee

Page 1

BALCONY GUARDRAIL1 : 30 SKYLIGHT STAINLESS STEEL HANDRAIL

STAINLESS STEEL HANDRAIL 532.2

150MM MINERAL WOOL BATT 150MM 미네랄 울 벳

SARANG GLOBAL MINISTRY CENTER |

47.0

INCOMPLETE DOCUMENTS FOR INTERIM REVIEW ONLY, NOT FOR REGULATORY APPROVAL, PERMIT, OR CONSTRUCTION DATE

CURRENT SUBMISSION:

#

12°

1 : 10 1 SANCTUARY RAILING DETAILS

SEOUL SOUTH KOREA

RESPONSIBILITIES • Designed 6,800 seat underground worship sanctuary and chapel. • Configured skylight openings through complex 16’ deep mega trusses between entry plaza and worship room. • Provided a creative egress solution to meet the most stringent fire exit requirements from the 6,800 seat underground assembly space. • Increased the seat number from 6,000 to 6,800 without impacting the worship room size. • Developed full floor plans and coordinated with structure engineer using Revit to accommodate various program requirements in vertical configuration of high-rise building. • Offered bright underground spaces by designing sunken garden to bring natural light all the way down to B5 levels. • Provided client presentations and led weekly design progress meetings. • Developed drawings and details for the worship sanctuary, chapel, lobby, and sunken garden in SD and DD packages using Revit. • Reviewed construction documents from local architect and provided corrections and directions. • Performed job site visit and resolved unforeseen problems during construction.

SUBWAY

1 : 10

SHEET

2 CHOIR LOFT RAILING DETAILS

PARKING

1 : 10

46.7

219.0 32.0

3 SANCTUARY/RR ISOLATION

65.0

47.0

46.8 46.7

B4 SLAB (BEYOND) 뒤쪽 B4 슬라브

80.0

SUBWAY

WD1

80.0 803.5

WD1

SOLID BARRIER FOR SOUND & AIR AT UNDERFLOOR PLENUM 소음과 공기 차단위한 바닥밑 솔리드 차단벽

TYP.

RESTROOM SLAB (BUILT UP) 올려 시공된 화장실 슬라브

47.0

2 LAYERS 16MM GWB 16MM 석고보드 두장

° .152 81

RAMP 램프

647.8

1180.0

1180.0

RESTROOM 화장실

650.0

SANCTUARY 성역

ALL PLUMBING THIS SIDE MOUNT WITH VIBRATION ISOLATION SUPPORTS SIMILAR TO HOLD-RITE 이쪽 면의 모든 배관은 홀드라이트와 비슷한 방진 지지에 의해 설치

40.0

150MM MINERAL WOOL BATT 150MM 미네랄 울 벳

SUBMISSION

Design Development 스테인레스 스틸 핸드레일

532.2

스테인레스 스틸 핸드레일

2 LAYERS 16MM GWB 16MM 석고보드 두장

150mm 아연도금 스터드

50MM AIRSPACE 50MM 에어 스페이스

1 : 30 STAINLESS STEEL HANDRAIL

555.5

STAINLESS STEEL HANDRAIL

BRIDGE

1 : 104 PLAZA SKYLIGHT DETAILS

1 LAYER GWB TO SEAL OFF PLENUMACOUSTICAL CAULK/RESILIENT CONNECTION AT SEAL 한장 석고보드로 플레넘을 봉함- 어커스틱컬 코킹/탄력성 연결로 봉함

530.0

EARLY SCHEME

150MM GALVANIZED STEEL STUDS

A11.01

1 : 10 1 SANCTUARY RAILING DETAILS

LIGHTING SLOT FOR THEATRICAL LIGHTING WHERE INDICATED ON CONSULTANT'S DRAWINGS 컨설턴트 도면에 표기된대로 무대 조명위한 오픈닝

SHEET

2 CHOIR LOFT RAILING DETAILS

UNDERFLOOR SUPPLY AIR PLENUM 바닥 밑 공기 공급 플레넘

2 LAYERS 16MM GWB 16MM 석고보드 두장

JOB NO.

1 : 10

CEILING AS INDICATED ON REFLECTED CEILING PLANS 천장도에 표기따를것

164839

SANCTUARY/RR ISOLATION

VARIES

12°

32.0

3200.0 BALCONY 발코니

Schematic Design Design Development

STRUCTURAL TRUSS 트러스 구조

725.0

219.0

150mm METAL STUDS WITH TWO LAYERS OF GYPSUM BOARD OVER FABRIC 천 위에 150MM 메탈 스터드와 두겹의 석고 보드

SaRang Global Ministry Center

46.8

INTERIOR DETAILS

65.0

DIFFUSER 디퓨져

A11.01

1180.0 647.8

TYP.

46.7

47.0

80.0

47.0

803.5

80.0

MOTORIZED DIMMER 전동식 차양장치

1 2010.01.22 2 2010.06.05

40.0

TUBULAR DAYLIGHT DEVICE 튜브 자연광 채광장치

WD1

46.7

B4 SLAB (BEYOND) 뒤쪽 B4 슬라브

CONCRETE SLAB 콘크리트 슬래브 SPRAY-APPLIED ACOUSTICAL INSULATION 뿜칠 건축음향 인슐레이션

47.0

2 LAYERS 16MM GWB 16MM 석고보드 두장

WD1

SOLID BARRIER FOR SOUND & AIR AT UNDERFLOOR PLENUM 소음과 공기 차단위한 바닥밑 솔리드 차단벽

UNDERSLAB WATERPROOFING MEMBRANE 슬래브하부 방수막

SHEET WATERPROOFING 방수 쉬트

2° .15 81

RAMP 램프

RESTROOM SLAB (BUILT UP) 올려 시공된 화장실 슬라브

NORTH TOWER

INTERIOR DETAILS

ALL PLUMBING THIS SIDE MOUNT WITH VIBRATION ISOLATION SUPPORTS SIMILAR TO HOLD-RITE 이쪽 면의 모든 배관은 홀드라이트와 비슷한 방진 지지에 의해 설치

1180.0

RESTROOM 화장실

650.0

SANCTUARY 성역

PLAZA

50MM ISOLATION BATTENS 50mm 진동방지 배튼

50 MM THICK CLEAR LAMINATED GLASS PAVERS. 50mm 두께 투명 적층 유리 바닥 포장재

JOB NO.

530.0

50MM AIRSPACE 50MM 에어 스페이스

스테인레스 스틸 핸드레일

스테인레스 스틸 핸드레일

2 LAYERS 16MM GWB 16MM 석고보드 두장

150mm 아연도금 스터드

SOUTH TOWER ISOLATED CONCRETE SLAB 아이소레이트 콘크리트 슬래브

75MM THICK GRANITE PAVERS ON PEDESTALS 75mm 밀리 두께 화강석 패널대석

164839

150MM GALVANIZED STEEL STUDS

4 PLAZA SKYLIGHT DETAILS WORSHIP SANCTUARY

925.0

1 LAYER GWB TO SEAL OFF PLENUMACOUSTICAL CAULK/RESILIENT CONNECTION AT SEAL 한장 석고보드로 플레넘을 봉함- 어커스틱컬 코킹/탄력성 연결로 봉함

SaRang Global Minist Center

UNDERFLOOR SUPPLY AIR PLENUM 바닥 밑 공기 공급 플레넘

555.5

2 LAYERS 16MM GWB 16MM 석고보드 두장

BUILDING SECTION

LEVEL B2 - WORSHIP SANCTUARY

WORSHIP SANCTUARY

LEVEL 4 - MULTI-PURPOSE ROOMS


NS HOME SHOPPING MIXED-USE |

PANGYO SOUTH KOREA

RESPONSIBILITIES • Created a scheme with non-conventional metal fabric and convinced the client with a strong presentation about its concept. • Provided open and bright outdoor shopping experience under parking garage. • Developed metal fabric installation details and structure systems to achieve high quality construction. • Produced drawings for SD packages. • Provided client presentations and led weekly design progress meetings. • Reviewed construction documents from local architect and provided corrections and directions. • Performed job site visit and resolved unforeseen problems during construction.

io

TV stud

parking

retail

WRAP & LIFT METAL FABRIC


BAYLOR ARTS DISTRICT |

BAYLOR UNIVERSITY WACO, TEXAS

RESPONSIBILITIES • Participated and generated multiple ideas in brainstorming sessions and selected as a final scheme. • Created the main wave concept and developed it to the final design of exterior and main concourse space. • Developed space diagrams to amplify synergy among different art and music programs in the concourse space. • Prepared design presentation to sell this unique contemporary design to conservative school board members and received board approval.

WAVES

VALLEY CREEK CHURCH | BEFORE

RESPONSIBILITIES • Resolved existing circulation issues by adding strategically new lobby and worship space. • Provided early design decisions to expedite the schedule and set GMP secure with IPD (Integrated Project Delivery ). • Lowered construction cost with cost-effective design by collaborating with contractors and consultants. • Resolved unforeseen problems during construction without impacting GMP.

AFTER

TWO ROOF HEIGHTS AT THE WORSHIP ROOM FOR COST SAVING

TILT-UP PANEL DESIGN

MAIN FACADE

FLOWER MOUND TEXAS

WORSHIP ROOM OPTIONS

WORSHIP SPACE


INTEGRATED INTO NATURAL TERRAIN

MAIN LOBBY

EARLY SKETCH

JOYFUL CHURCH |

POHANG SOUTH KOREA

RESPONSIBILITIES • Provided a solution to integrate the building into the landscape with gently flowing lines which wrapped around a large central plaza. • Applied abstract forms and patterns inspired by traditional Korean symbols in the architecture to achieve church’s vision to use traditional Korean symbols in the new design with modern functionality. • Led design team and directed other designers through whole phases. • Provided a solution to locate two buildings in different zoning districts but maintain a holistic design. • Developed details and documented SD, DD drawings and packages using Revit. • Performed presentations to the church congregation for fundraising campaign. • Led coordination meetings with local architects and consultants. • Reviewed construction documents from local architect and offered directions. • Provided design solutions for unforeseen problems during construction. • Received a Grand Prize from 2015 Church and Culture Award by Kookmin Ilbo, Korea.

WORSHIP CENTER

CHAPEL


HARIM IKSAN OFFICE |

IKSAN SOUTH KOREA

RESPONSIBILITIES • Provided a solution to separate circulation among pharmaceutical lab, office space, veterinary clinic, and public amenities with interconnected green spaces. • Developed curtain wall design with vertical fins and back-painted glass to minimize glare, provide shade, and improved R-value. • Resolved complex structure layout due to interference among sky bridge and parking ramp, and various program requirements.

GREEN SPACE THROUGHOUT THE BUILDING

HARIM VISITOR CENTER |

IKSAN SOUTH KOREA

RESPONSIBILITIES • Created concepts and executed them to the final design. • Led design team and directed younger designers. • Documented SD packages using Revit. • Developed key details. • Provided bi-weekly presentations to the clients. • Led coordination with local architects and consultants. • Reviewed construction documents and provided details.


FIRST BAPTIST DALLAS |

DALLAS TEXAS

RESPONSIBILITIES • Participated in brainstorming and design charrette and provided multiple ideas. • Developed master plan and overall conceptual design from brainstorming session. • Charged on space planning and floor plans. • Provided Schematic design for education building and overall exterior. • Performed presentations to the clients. • Designed a $700k fundraising experience room.

WORSHIP CENTER

SKETCHES |