The Ashen Forest

Page 38

Floor Plan - Iteration Three 1:500 This third iteration focuses heavily on the manufacturing space, and the park towards the front of the site. The decision to completely remove the right most building was so that the scheme can appeal to the public as much as it does to mourners. By removing the entire building, a ruin can remain and a park can form within, which is inviting to the residents of Parker Drive and serves as a public transition space to reach the frame above. The brick ruin symbolises a decomposing facade, a concept which will be enhanced through additional facade treatments on the existing buildings.

Key 1 - Staff Lockers 2 - Factory Staff Entrance 3 - Cafeteria 4 - Loading bay for Receiving Coffins 5 - Staff Offices 6 - Manufacturing Space 7 - Plant Room 8 - Manufacturing Space 9 - Storage 10 - Large Hall for Staff Cross Circulation 11 - Cold Store 12 - Body Preparation 13 - Control Room 14 - Hall to Crematoriums 15 - Public Space/Reception 16 - Large Auditorium 17 - Public Entrance 18 - Public Toilets 19 - Front Plaza with Columbarium Pods

37

Hand-drawn Development


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.